You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (5)
Developer's Application (325)
- All Documents
- Additional Information (2)
- Application Form (5)
- Compulsory Acquisition Information (3)
- Draft Development Consent Orders (3)
- Environmental Statement (257)
- Other Documents (28)
- Plans (12)
- Reports (15)
Acceptance (13)
Pre Examination (69)
- All Documents
- Additional Submissions (38)
- Appointment of Examining Authority (1)
- Certificates and Notices (3)
- Hearing Agenda (2)
- Hearing Notice (1)
- Other Documents (12)
- Preliminary Meeting (2)
- Procedural Deadline A (2)
- Procedural Decisions (1)
- s56 notification (s56) (1)
- Unaccompanied Site Inspection (6)
Examination (688)
- All Documents
- Additional Submission (1)
- Additional Submissions (18)
- Compulsory Acquisition Hearing (2)
- Compulsory Acquisition Hearing (CAH) (6)
- Deadline 1 (D1) (106)
- Deadline 2 (D2) (58)
- Deadline 3 (D3) (33)
- Deadline 3a (D3a) (49)
- Deadline 4 (D4) (48)
- Deadline 5 (D5) (47)
- Deadline 6 (D6) (51)
- Deadline 7 (D7) (62)
- Deadline 8 (D8) (126)
- Examination Library (1)
- Hearing Agenda (8)
- Hearing Notice (4)
- Issue Specific Hearing 1 (ISH1) (4)
- Issue Specific Hearing 2 (ISH2) (10)
- Issue Specific Hearing 3 (ISH3) (10)
- Issue Specific Hearing 4 (ISH4) (6)
- Open Floor Hearing 1 (OFH1) (2)
- Other Documents (6)
- Preliminary Meeting Note (2)
- Procedural Decisions (21)
- Report on the Implications for European Sites (RIES) (1)
- Unaccompanied Site Inspection (6)
Decision (31)
Decided (2)
Transboundary Documents
Date
Source | Description |
---|---|
Other |
Department for Energy Security & Net Zero (PDF, 101 KB)
Correction Order
|
Other |
Department for Energy Security & Net Zero (PDF, 169 KB)
Correction Notice
|
Other |
Natural Resources Wales (PDF, 2 MB)
Decision Document (ORML2233) Generation Assets (ORML2233G) Transmission Assets (ORML2233T) Gwynt y Môr interlink (ORML2233L) River Clwyd Crossing (ORML2233C)
|
Other |
Recommendation Report (Welsh) (PDF, 14 MB)
|
Other |
Secretary of State Decision Letter (Welsh) (PDF, 500 KB)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 724 KB)
Post-examination Submission - 21 June 2023
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 691 KB)
Post-examination Submission - 18 July 2023
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 196 KB)
Post-examination Submission - 8 September 2023
|
Other | |
Other |
Habitats Regulation Assessment (PDF, 538 KB)
|
Other |
Post-examination Submissions (PDF, 13 MB)
|
Other |
Recommendation Report (PDF, 9 MB)
|
Other |
Regulation 31 Notice (PDF, 65 KB)
|
Other | |
Other | |
Other |
Secretary of State Decision Letter (English) (PDF, 458 KB)
|
Other |
The Crown Estate (PDF, 187 KB)
Post-examination Submission - Section 135
|
Other |
Welsh Government (PDF, 197 KB)
Post-examination Submission - Section 135
|
Other |
Department of Agriculture, Environment and Rural Affairs (DAERA) (PDF, 305 KB)
Late response to the Secretary of State’s consultation of 14 August 2023
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 32 MB)
Response to the Secretary of State's Consultation of 14 August 2023
|
Other |
Cefn Meiriadog Community Council (PDF, 124 KB)
Response to the Secretary of State's Consultation of 14 August 2023
|
Other |
Charlotte Bowers (PDF, 119 KB)
Response to the Secretary of State's Consultation of 14 August 2023
|
Other |
Davis Meade Property Consultants on behalf of Mr JB & Mrs E Evans (PDF, 336 KB)
Response to the Secretary of State's Consultation of 14 August 2023
|
Other |
Joint Nature Conservation Committee (JNCC) (PDF, 34 KB)
Late response to the Secretary of State’s consultation of 14 August 2023
|
Other |
Linda Griffiths (PDF, 180 KB)
Response to the Secretary of State's Consultation of 14 August 2023
|
Other |
Lois Oldfield Williams (PDF, 58 KB)
Response to the Secretary of State's Consultation of 14 August 2023
|
Other |
Martin Barlow (PDF, 104 KB)
Response to the Secretary of State's Consultation of 14 August 2023
|
Other |
Martyn Hussey (PDF, 120 KB)
Response to the Secretary of State's Consultation of 14 August 2023
|
Other |
Natural Resources Wales (PDF, 146 KB)
Response to the Secretary of State's Consultation of 14 August 2023
|
Other |
Rhyl Flats Wind Farm Limited (PDF, 124 KB)
Response to the Secretary of State's Consultation of 14 August 2023
|
Other |
Robin Barlow (PDF, 103 KB)
Response to the Secretary of State's Consultation of 14 August 2023
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 12 MB)
Post-examination Submission - Updated review of cumulative and in-combination effects and NPS tracker
|
Other |
Department for Energy Security & Net Zero (PDF, 143 KB)
Secretary of State Consultation Letter dated 14 August 2023
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 154 KB)
Notice for December hearings – 15 November 2022
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 154 KB)
Notice for February/March hearings – 06 February 2023
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Additional Submission - CS.4 Draft Development Consent Order (Tracked – Showing Changes from Section 51) (Final Closing Submission) - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Additional Submission - CS.4 Draft Development Consent Order (Clean) (Final Closing Submission) - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 649 KB)
Additional Submission - CS.4.1 Schedule of Changes to the Draft DCO (Final Closing Submission) - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Additional Submission - CS.4 Draft Development Consent Order (Tracked – Showing Changes from 17 March 2023) (Final Closing Submission) - Accepted at the discretion of the Examining Authority
|
Other |
Addleshaw Goddard LLP on behalf of National Grid Electricity Transmission Plc (PDF, 128 KB)
Additional Submission - Letter of Withdrawal - Accepted at the discretion of the Examining Authority
|
Other | |
Other | |
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 390 KB)
Deadline 8 Submission - Late Submission - CS.4.1 Schedule of Changes to the Draft DCO (Closing Submission) - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 395 KB)
Deadline 8 Submission - Late Submission - CS.8 Applicant's Statement of Commonality for SoCG (Closing Submission) - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 8 Submission - Late Submission - CS.4Draft Development Consent Order (Clean) (Closing Submission) - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Deadline 8 Submission - Late Submission - CS.4 Draft Development Consent Order (Tracked – Showing Changes from D8) (Closing Submission) - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 311 KB)
Deadline 8 Submission - Late Submission - CS.5 Joint Position Statement with Isle of Anglesey County Council, Eryri National Park, Conwy County Borough Council and Denbighshire County Council (Closing Submission) - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 600 KB)
Deadline 8 Submission - Late Submission - CS.2 Document Tracker (Closing Submission) - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 368 KB)
Deadline 8 Submission - Late Submission - CS.7 Statement of Common Ground 1 - North Wales Local Planning Authorities (Seascape, Landscape and Visual Impacts Assessment) (Closing Submission) - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Deadline 8 Submission - Late Submission - CS.4 Draft Development Consent Order (Tracked - Showing Changes from Application) (Closing Submission) - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
Deadline 8 Submission - Late Submission - CS.3 Applicant's Closing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 278 KB)
Deadline 8 Submission - Late Submission - CS.1 Guide to the Applicant’s Closing Submission - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 250 KB)
Deadline 8 Submission - Late Submission - CS.6 Landscape Enhancement Package and Tourism Fund Update (Closing Submission) - Accepted at the discretion of the Examining Authority
|
Other |
Davis Meade Property Consultants on behalf of Mr JB & Mrs E Evans (PDF, 866 KB)
Deadline 8 Submission - Late Submission - Written Summary of Oral Submission at CAH - Accepted at the discretion of the Examining Authority
|
Other |
Eversheds Sutherland (International) LLP on behalf of Network Rail (PDF, 540 KB)
Deadline 8 Submission - Letter of Withdrawal
|
Other |
Welsh Government (Transport) (PDF, 137 KB)
Additional Submission - Updated Cover Letter - Accepted at the discretion of the Examining Authority
|
Other |
Welsh Government (Transport) (PDF, 89 KB)
Additional Submission - Protective Provisions - Accepted at the discretion of the Examining Authority
|
Other |
Amy Evans and Martin Griffiths (PDF, 110 KB)
Deadline 8 Submission
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 337 KB)
Deadline 8 Submission - 8.27 Outline Code of Construction Practice - Appendix 11 - Outline Invasive Non-Native Species Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 356 KB)
Deadline 8 Submission - 8.33 Statement of Common Ground 5 - Natural Resources Wales (Seascape, Landscape and Visual Impact Assessment)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 9 MB)
Deadline 8 Submission - 8.60 Category 6: Environmental Statement - Volume 6 - Annex 2.3: LVIA Visualisations - Figure 2.21 (Viewpoint 4: A55)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 10 MB)
Deadline 8 Submission - 8.45 Category 6: Environmental Statement - Volume 3 - Chapter 1: Onshore Project Description
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 6 MB)
Deadline 8 Submission - 8.47 Category 6: Environmental Statement - Volume 3 - Chapter 6: Ground Conditions and Land Use
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 681 KB)
Deadline 8 Submission - 8.15 Update on Negotiations with Landowners, Occupiers, Statutory Undertakers and other Utilities (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 474 KB)
Deadline 8 Submission - 8.17.1 Book of Reference Schedule of Changes
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 398 KB)
Deadline 8 Submission - 8.21 Applicant's Response to Marine Licence Re-Consultation Comments
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 5 MB)
Deadline 8 Submission - 8.71 Category 6: Environmental Statement - Volume 2 - Chapter 8: Commercial Fisheries
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 287 KB)
Deadline 8 Submission - 8.76 Schedule of Changes to Plans
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 427 KB)
Deadline 8 Submission - 8.7 Written Summary of Oral Submissions to ISH4 (Offshore Environmental Effects and the draft Development Consent Order)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 4 MB)
Deadline 8 Submission - 8.52 Category 6: Environmental Statement - Volume 4 - Annex 3.1: Water Framework Directive Compliance Assessment
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 4 MB)
Deadline 8 Submission - 8.62 Category 6: Environmental Statement - Volume 6 - Annex 2.3: LVIA Visualisations - Figure 2.23 (Viewpoint 6: Bodelwyddan Castle)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 336 KB)
Deadline 8 Submission - 8.31 Statement of Common Ground 3 - Conwy County Borough Council
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 3 MB)
Deadline 8 Submission - 8.73 Category 6: Environmental Statement - Volume 3 - Chapter 3: Socioeconomics
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 380 KB)
Deadline 8 Submission - 8.74 Joint Position Statements with Isle of Anglesey County Council, Eryri National Park and Conwy County Borough Council
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 543 KB)
Deadline 8 Submission - 8.10 Explanatory Memorandum (Clean)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 293 KB)
Deadline 8 Submission - 8.32 Statement of Common Ground 4 - Isle of Anglesey County Council
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 2 MB)
Deadline 8 Submission - 8.56 Category 6: Environmental Statement - Volume 5 - Annex 5.7: Dormouse Survey Report
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 6 MB)
Deadline 8 Submission - 8.67 Category 6: Environmental Statement - Volume 2 - Chapter 10: Seascape, Landscape and Visual Impact Assessment
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 3 MB)
Deadline 8 Submission - 8.61 Category 6: Environmental Statement - Volume 6 - Annex 2.3: LVIA Visualisations - Figure 2.22 (Viewpoint 5: Minor Rd, Groesffordd)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 8 MB)
Deadline 8 Submission - 8.49 Category 6: Environmental Statement - Volume 3 - Chapter 8: Onshore Archaeology and Cultural Heritage
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 2 MB)
Deadline 8 Submission - 8.9 Draft Development Consent Order (Clean)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 853 KB)
Deadline 8 Submission - 8.16 Table of Compulsory Acquisition and Temporary Possession Objections (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 7 MB)
Deadline 8 Submission - 8.17 Book of Reference (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 7 MB)
Deadline 8 Submission - 8.42 Category 6: Environmental Statement - Volume 2 - Chapter 6: Fish and Shellfish Ecology
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 465 KB)
Deadline 8 Submission - 8.11 Marine Licence Principles (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 1 MB)
Deadline 8 Submission - 8.14 Statement of Reasons (Clean)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 246 KB)
Deadline 8 Submission - 8.29 Update on Negotiations with Rhyl Flats Wind Farm Limited and North Hoyle Wind Farm Limited at Deadline 8
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 350 KB)
Deadline 8 Submission - 8.30 Statement of Common Ground 1 - North Wales Local Planning Authorities (Seascape, Landscape and Visual Impacts Assessment)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 307 KB)
Deadline 8 Submission - 8.38 Statement of Common Ground 14 - The RSPB
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 338 KB)
Deadline 8 Submission - 8.27 Outline Code of Construction Practice - Appendix 11 - Outline Invasive Non-Native Species Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 511 KB)
Deadline 8 Submission - 8.34 Statement of Common Ground 6 - Natural Resources Wales (Offshore)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 51 MB)
Deadline 8 Submission - 8.55 Category 6: Environmental Statement - Volume 5 - Annex 5.1: Preliminary Ecological Appraisal Report
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 577 KB)
Deadline 8 Submission - 8.4 Applicant’s Comments on Responses to the Examining Authority’s Third Written Questions
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 305 KB)
Deadline 8 Submission - 8.25 Note on the Weight to be Given to Enhancement
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 21 MB)
Deadline 8 Submission - 8.46 Category 6: Environmental Statement - Volume 3 - Chapter 5: Onshore Biodiversity and Nature Conservation
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 1 MB)
Deadline 8 Submission - 8.12 Schedule of Mitigation and Monitoring (Clean)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 1 MB)
Deadline 8 Submission - 8.54 Category 6: Environmental Statement - Volume 4 - Annex 7.2: Draft Outline Marine Mammal Mitigation Protocol
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 31 MB)
Deadline 8 Submission - 8.50 Category 6: Environmental Statement - Volume 3 - Chapter 10: Noise and Vibration
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 10 MB)
Deadline 8 Submission - 8.57 Category 6: Environmental Statement - Volume 6 - Annex 2.3: LVIA Visualisations - Figure 2.18 (Viewpoint 1: Bridlepath nr Faenol-broper)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 1 MB)
Deadline 8 Submission - 8.26 Applicant's Further Response to ExQ3.0.7
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 338 KB)
Deadline 8 Submission - 8.18 Consents and Licences Required Under Other Legislation (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 2 MB)
Deadline 8 Submission - 8.20 National Policy Statement Tracker (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 1 MB)
Deadline 8 Submission - 8.12 Schedule of Mitigation and Monitoring (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 6 MB)
Deadline 8 Submission - 8.69 Category 6: Environmental Statement - Volume 2 - Chapter 2: Marine Geology, Oceanography and Physical Processes
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 2 MB)
Deadline 8 Submission - 8.20 National Policy Statement Tracker (Clean)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 2 MB)
Deadline 8 Submission - 8.19 Draft National Policy Statement Tracker (Clean)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 7 MB)
Deadline 8 Submission - 8.24 Note on Opportunities for Ecological Enhancement and Connectivity at the OnSS Site
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 292 KB)
Deadline 8 Submission - 8.8 The Applicant’s Comments on the RIES
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 16 MB)
Deadline 8 Submission - 8.43 Category 6: Environmental Statement - Volume 2 - Chapter 11: Offshore Archaeology and Cultural Heritage
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 2 MB)
Deadline 8 Submission - 8.9 Draft Development Consent Order (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 665 KB)
Deadline 8 Submission - 8.15 Update on Negotiations with Landowners, Occupiers, Statutory Undertakers and other Utilities (Clean)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 283 KB)
Deadline 8 Submission - 8.78 Landscape Enhancement Scheme Principles
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 4 MB)
Deadline 8 Submission - 8.63 Category 6: Environmental Statement - Volume 6 - Annex 2.3: LVIA Visualisations - Figure 2.24 (Viewpoint 7: St Asaph)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 8 MB)
Deadline 8 Submission - 8.68 Planning Statement
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 7 MB)
Deadline 8 Submission - 8.48 Category 6: Environmental Statement - Volume 3 - Chapter 7: Hydrology, Hydrogeology and Flood Risk
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 3 MB)
Deadline 8 Submission - 8.64 Category 6: Environmental Statement - Volume 6 - Annex 2.3: LVIA Visualisations - Figure 2.25 (Viewpoint 8: Rhuddlan)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 832 KB)
Deadline 8 Submission - 8.16 Table of Compulsory Acquisition and Temporary Possession Objections (Clean)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 807 KB)
Deadline 8 Submission - 8.51 Category 6: Environmental Statement - Volume 3 - Chapter 13: Onshore Conclusions
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 364 KB)
Deadline 8 Submission - 8.35 Statement of Common Ground 7 - Natural Resources Wales (Onshore)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 395 KB)
Deadline 8 Submission - 8.28 Applicant's Statement of Commonality for SoCG
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 505 KB)
Deadline 8 Submission - 8.37 Statement of Common Ground 10 - Isle of Man Government
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 461 KB)
Deadline 8 Submission - 8.44 Category 6: Environmental Statement - Volume 2 - Chapter 14: Interrelationships
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 7 MB)
Deadline 8 Submission - 8.70 Category 6: Environmental Statement - Volume 2 - Chapter 4: Offshore Ornithology
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 268 KB)
Deadline 8 Submission - 8.3 Applicant’s Comments on Submissions Received at Deadline 7
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 6 MB)
Deadline 8 Submission - 8.53 Category 6: Environmental Statement - Volume 4 - Annex 7.1: Marine Mammal Baseline Characterisation
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 3 MB)
Deadline 8 Submission - 8.65 Category 6: Environmental Statement - Volume 6 - Annex 2.3: LVIA Visualisations - Figure 2.26 (Viewpoint 9: Y Foel)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 1 MB)
Deadline 8 Submission - 8.14 Statement of Reasons (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 591 KB)
Deadline 8 Submission - 8.2 Application Document Tracker
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 464 KB)
Deadline 8 Submission - 8.11 Marine Licence Principles (Clean)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 241 KB)
Deadline 8 Submission - 8.13 Applicant's Update on the Marine Licence Submission and Progress
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 801 KB)
Deadline 8 Submission - 8.41 Category 6: Environmental Statement - Volume 1 - Chapter 3: Environmental Impact Assessment Methodology
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 7 MB)
Deadline 8 Submission - 8.59 Category 6: Environmental Statement - Volume 6 - Annex 2.3: LVIA Visualisations - Figure 2.20 (Viewpoint 3: Glascoed Rd)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 258 KB)
Deadline 8 Submission - 8.5 Applicant’s Response to the Rule 17 Letter Dated 09 March 2023
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 2 MB)
Deadline 8 Submission - 8.19 Draft National Policy Statement Tracker (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 8 MB)
Deadline 8 Submission - 8.58 Category 6: Environmental Statement - Volume 6 - Annex 2.3: LVIA Visualisations - Figure 2.19 (Viewpoint 2: St Asaph, Business Park)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 507 KB)
Deadline 8 Submission - 8.6 Written Summary of Oral Submissions to the CAH (Compulsory Acquisition Hearing)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 684 KB)
Deadline 8 Submission - 8.23 Applicant's Comments on NSIP Action Plan and Opportunities for Offshore Environmental Net Gain
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 5 MB)
Deadline 8 Submission - 8.39 Application Errata List (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 34 MB)
Deadline 8 Submission - 8.40 Category 5: Reports - Report 5.2: Report to Inform Appropriate Assessment
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 53 MB)
Deadline 8 Submission - 8.66 Category 6: Environmental Statement - Volume 2 - Chapter 7: Marine Mammals
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 249 KB)
Deadline 8 Submission - 8.22 Landscape Enhancement Package and Tourism Fund Update
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 304 KB)
Deadline 8 Submission - 8.36 Statement of Common Ground 9 - National Trust
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 27 MB)
Deadline 8 Submission - 8.75 Location Plan
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 342 KB)
Deadline 8 Submission - 8.1 Guide to the Applicant's Deadline 8 Submission
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 1 MB)
Deadline 8 Submission - 8.72 Category 6: Environmental Statement - Volume 3 - Chapter 2: Landscape and Visual Impact Assessment
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 430 KB)
Deadline 8 Submission - 8.77 Joint Statement with Dwr Cymru / Welsh Water
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 7 MB)
Deadline 8 Submission - 8.17 Book of Reference (Clean)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 624 KB)
Deadline 8 Submission - 8.9.1 Schedule of Changes to the Draft DCO
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 897 KB)
Deadline 8 Submission - 8.10 Explanatory Memorandum (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 348 KB)
Deadline 8 Submission - 8.18 Consents and Licences Required Under Other Legislation (Clean)
|
Other |
Awel y Môr Offshore Wind Farm (PDF, 5 MB)
Deadline 8 Submission - 8.39 Application Errata List (Clean)
|
Other |
Wilson Fearnall Ltd on behalf of GBL and IB Kerfoot Discretionary Trust (PDF, 1 MB)
Deadline 8 Submission - Comments on Applicants response to ExQ3
|
Other |
Joint Nature Conservation Committee (PDF, 679 KB)
Deadline 8 Submission - Comments on the RIES
|
Other |
Addleshaw Goddard LLP on behalf of National Grid Electricity Transmission Plc (PDF, 2 MB)
Deadline 8 Submission - Cover Letter
|
Other |
Addleshaw Goddard LLP on behalf of National Grid Electricity Transmission Plc (PDF, 146 KB)
Deadline 8 Submission - Protective Provisions in relation to Awel Y Môr DCO
|
Other |
Addleshaw Goddard LLP on behalf of National Grid Electricity Transmission Plc (PDF, 1 MB)
Deadline 8 Submission - Keadby 3 DCO
|
Other |
NATS Safeguarding (PDF, 76 KB)
Deadline 8 Submission - Letter of Withdrawal
|
Other |
Natural England (PDF, 102 KB)
Deadline 8 Submission - Comments on the RIES
|
Other |
Natural Resources Wales (PDF, 183 KB)
Deadline 8 Submission
|
Other |
North Hoyle Wind Farm Ltd (PDF, 108 KB)
Deadline 8 Submission - Closing Submission
|
Other |
North Hoyle Wind Farm Ltd (PDF, 170 KB)
Deadline 8 Submission - Protective Provisions
|
Other |
North Hoyle Wind Farm Ltd (PDF, 105 KB)
Deadline 8 Submission - Written Summary of Oral Submission at CAH
|
Other |
North Hoyle Wind Farm Ltd (PDF, 98 KB)
Deadline 8 Submission - Response to Deadline 6 Submissions
|
Other |
North Hoyle Wind Farm Ltd (PDF, 134 KB)
Deadline 8 Submission - Comments on Deadline 7 Submissions
|
Other |
Rhyl Flats Windfarm Ltd (PDF, 136 KB)
Deadline 8 Submission - Closing Submission
|
Other |
Rhyl Flats Windfarm Ltd (PDF, 186 KB)
Deadline 8 Submission - Comments on Deadline 7 Submissions
|
Other |
Rhyl Flats Windfarm Ltd (PDF, 165 KB)
Deadline 8 Submission - Response to Deadline 6 Submissions
|
Other |
Rhyl Flats Windfarm Ltd (PDF, 110 KB)
Deadline 8 Submission - Written Summary of Oral Submission at CAH
|
Other |
Welsh Government (PDF, 144 KB)
Deadline 8 Submission - Response to Rule 17
|
Other |
Welsh Government (Transport) (PDF, 222 KB)
Deadline 8 Submission
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 7 Submission - 7.8 Book of Reference (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 456 KB)
Deadline 7 Submission - 7.6.1 Schedule of Changes to the Draft DCO
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 619 KB)
Deadline 7 Submission - 7.9 Update on Negotiation with Landowners, Occupiers and Statutory Undertakers and Other Utilities (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 395 KB)
Deadline 7 Submission - 7.11 Outline Code of Construction Practice (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 287 KB)
Deadline 7 Submission - 7.31 Statement of Common Ground 11 - Maritime and Coastguard Agency
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 7 Submission - 7.2 Document Tracker
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 460 KB)
Deadline 7 Submission - 7.32 Statement of Common Ground 2 - Denbighshire County Council
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 375 KB)
Deadline 7 Submission - 7.11 Outline Code of Construction Practice (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 15 MB)
Deadline 7 Submission - 7.26 The Eryri (Snowdonia) National Park Partnership Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 9 MB)
Deadline 7 Submission - 7.4 Applicant’s Response to the Examining Authority’s Third Written Questions
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 7 Submission - 7.19 Schedule of Mitigation and Monitoring (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 8 MB)
Deadline 7 Submission - 7.23 The Anglesey AONB Management Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 429 KB)
Deadline 7 Submission - 7.5 Applicant's Response to CAH and ISH4 Actions
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 755 KB)
Deadline 7 Submission - 7.10 Table of Compulsory Acquisition and Temporary Possession Objections (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 478 KB)
Deadline 7 Submission - 7.14 Outline Code of Construction Practice - Appendix 8 - Public Access Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 7 Submission - 7.18 Statement of Reasons (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 374 KB)
Deadline 7 Submission - 7.30 Statement of Common Ground 16 - North Wales Wildlife Trust
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 17 MB)
Deadline 7 Submission - 7.25 The Clwydian Range and Dee Valley AONB Management Plan 2020 - 2025
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 461 KB)
Deadline 7 Submission - 7.7 Marine Licence Principles (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 486 KB)
Deadline 7 Submission - 7.13 Outline Code of Construction Practice - Appendix 4 - Soil Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 7 Submission - 7.16 Design Principles Document (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 7 Submission - 7.19 Schedule of Mitigation and Monitoring (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
Deadline 7 Submission - 7.21 Visual Effects from Faenol-Bropor (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 15 MB)
Deadline 7 Submission - 7.24 The Clwydian Range and Dee Valley AONB Management Plan 2014 - 2019
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 21 MB)
Deadline 7 Submission - 7.15 Outline Landscape and Ecology Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 13 MB)
Deadline 7 Submission - 7.22 Category 6 - Environmental Statement - Volume 6 - Annex 2.2 - LVIA Figures – Figure 2.6 (Aerial Mapping with Proposed Development)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 501 KB)
Deadline 7 Submission - 7.14 Outline Code of Construction Practice - Appendix 8 - Public Access Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 72 MB)
Deadline 7 Submission - 7.17 Funding Statement (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 225 KB)
Deadline 7 Submission - 7.28 Joint Statement with SP Manweb
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 313 KB)
Deadline 7 Submission - 7.3 Comments on Submissions Received at Deadline 6
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 384 KB)
Deadline 7 Submission - 7.27 Applicant's Statement of Commonality for SoCG
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 470 KB)
Deadline 7 Submission - 7.8.1 Book of Reference - Schedule of Changes
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 7 Submission - 7.18 Statement of Reasons (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 7 Submission - 7.6 Draft Development Consent Order (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 7 Submission - 7.6 Draft Development Consent Order (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 620 KB)
Deadline 7 Submission - 7.9 Update on Negotiation with Landowners, Occupiers and Statutory Undertakers and Other Utilities (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
Deadline 7 Submission - 7.20 Agricultural Land Classification Report at the Onshore Substation Site
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 7 Submission - 7.16 Design Principles Document (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
Deadline 7 Submission - 7.21 Visual Effects from Faenol-Bropor (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 315 KB)
Deadline 7 Submission - 7.1 Guide to the Applicant's Deadline 7 Submission
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 7 Submission - 7.12 Outline Code of Construction Practice - Appendix 1 - Outline Onshore Construction Method Statement (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 452 KB)
Deadline 7 Submission - 7.13 Outline Code of Construction Practice - Appendix 4 - Soil Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 68 MB)
Deadline 7 Submission - 7.17 Funding Statement (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 476 KB)
Deadline 7 Submission - 7.7 Marine Licence Principles (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 7 Submission - 7.8 Book of Reference (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 904 KB)
Deadline 7 Submission - 7.10 Table of Compulsory Acquisition and Temporary Possession Objections (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 7 Submission - 7.12 Outline Code of Construction Practice - Appendix 1 - Outline Onshore Construction Method Statement (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 21 MB)
Deadline 7 Submission - 7.15 Outline Landscape and Ecology Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 259 KB)
Deadline 7 Submission - 7.29 Update on Negotiations with Rhyl Flats Wind Farm Limited and North Hoyle Wind Farm Limited at Deadline 7
|
Other |
Conwy County Borough Council (PDF, 442 KB)
Deadline 7 Submission - Response to ExQ3
|
Other |
Denbighshire County Council (PDF, 133 KB)
Deadline 7 Submission - Response to ISH4 Action List
|
Other |
Denbighshire County Council (PDF, 105 KB)
Deadline 7 Submission - Response to ExQ3
|
Other |
Wilson Fearnall Ltd on behalf of GBL and IB Kerfoot Discretionary Trust (PDF, 263 KB)
Deadline 7 Submission - Response to ExQ3
|
Other |
Joint Nature Conservation Committee (JNCC) (PDF, 76 KB)
Deadline 7 Submission - Response to ExQ3
|
Other |
Davis Meade Property Consultants on behalf of Mr JB & Mrs E Evans (PDF, 1 MB)
Deadline 7 Submission - Response to ExQ3
|
Other |
National Grid Electricity Transmission PLC (NGET) (PDF, 131 KB)
Deadline 7 Submission - Response to ExQ3
|
Other |
Natural Resources Wales (PDF, 6 MB)
Deadline 7 Submission - Response to ExQ3
|
Other |
North Hoyle Wind Farm Limited (PDF, 91 KB)
Deadline 7 Submission
|
Other |
Rhyl Flats Wind Farm Ltd (PDF, 201 KB)
Deadline 7 Submission
|
Other |
Royal Society for the Protection of Birds (PDF, 211 KB)
Deadline 7 Submission - Response to ExQ3
|
Other | |
Other | |
Other |
The Crown Estate (PDF, 142 KB)
Deadline 7 Submission - Response to ExQ3
|
Other |
Welsh Government (PDF, 217 KB)
Deadline 7 Submission - Response to ExQ3
|
Other |
Charlotte Bowers (PDF, 102 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other | |
Other | |
Other |
Action List - CAH 28 February 2023 (English) (PDF, 120 KB)
|
Other |
Action List - CAH 28 February 2023 (Welsh) (PDF, 121 KB)
|
Other |
Action List - ISH4 1 March 2023 (English) (PDF, 109 KB)
|
Other |
Action List - ISH4 1 March 2023 (Welsh) (PDF, 112 KB)
|
Other |
Issue Specific Hearing 4 (ISH4) - Transcript - Part 1 - 01 March 2023 (PDF, 250 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other |
Issue Specific Hearing 4 (ISH4) - Transcript - Part 2 - 01 March 2023 (PDF, 236 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other |
Issue Specific Hearing 4 (ISH4) - Transcript - Part 3 - 01 March 2023 (PDF, 250 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other | |
Other | |
Other | |
Other |
Compulsory Acquisition Hearing (CAH) - Transcript - Part 1 - 28 February 2023 (PDF, 265 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other |
Compulsory Acquisition Hearing (CAH) - Transcript - Part 2 - 28 February 2023 (PDF, 205 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other |
Compulsory Acquisition Hearing (CAH) - Transcript - Part 3 - 28 February 2023 (PDF, 260 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other |
Compulsory Acquisition Hearing (CAH) - Transcript - Part 4 - 28 February 2023 (PDF, 184 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
National Grid Electricity Transmission Plc (PDF, 61 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Amy Evans and Martin Griffiths (PDF, 388 KB)
Deadline 6 Submission
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 435 KB)
Deadline 6 Submission - 6.5.1 Schedule of Changes to the Draft DCO
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 570 KB)
Deadline 6 Submission - 6.10 Update on Negotiation with Landowners, Occupiers and Statutory Undertakers and Other Utilities (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 246 KB)
Deadline 6 Submission - 6. 9 Applicant's Update on the Marine Licence Submission and Progress
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 6 Submission - 6.4 Draft National Policy Statement Tracker
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 30 MB)
Deadline 6 Submission - 6.25 Water Bodies in a River Basin Management Plan Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
Deadline 6 Submission - 6.17 Special Category Land Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 6 Submission - 6.24 Crown Land Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
Deadline 6 Submission - 6.12 Funding Statement (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 6 Submission - 6.7 Book of Reference (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 560 KB)
Deadline 6 Submission - 6.10 Update on Negotiation with Landowners, Occupiers and Statutory Undertakers and Other Utilities (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 31 MB)
Deadline 6 Submission - 6.22 Statutory / Non-statutory Nature Conservation Sites Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 551 KB)
Deadline 6 Submission - 6.2 Documents Tracker
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 279 KB)
Deadline 6 Submission - 6.32 Outline Code of Construction Practice Appendix 12 Outline Construction Communications Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 535 KB)
Deadline 6 Submission - 6.14 Community Linguistic Statement (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 26 MB)
Deadline 6 Submission - 6.20 Street Works and Access Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 462 KB)
Deadline 6 Submission - 6.8 Marine Licence Principles (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 6 Submission - 6.6 Statement of Reasons (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 456 KB)
Deadline 6 Submission - 6.8 Marine Licence Principles (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 327 KB)
Deadline 6 Submission - 6.1 Guide to the Applicant’s Deadline 6 Submission
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 27 MB)
Deadline 6 Submission - 6.16 Location Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 427 KB)
Deadline 6 Submission - 6.31 Outline Offshore Piling Noise Monitoring Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 25 MB)
Deadline 6 Submission - 6.26 Hedgerow and Protected Tree Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 348 KB)
Deadline 6 Submission - 6.30 Statement of Common Ground 5 – Natural Resources Wales (Seascape, Landscape and Visual Impact Assessment)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 6 Submission - 6.6 Statement of Reasons (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 28 MB)
Deadline 6 Submission - 6.23 Statutory / Non-statutory Sites or Features of the Historic Environment Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
Deadline 6 Submission - 6.12 Funding Statement (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 453 KB)
Deadline 6 Submission - 6.7.1 Book of Reference – Schedule of Changes
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 278 KB)
Deadline 6 Submission - 6.32 Outline Code of Construction Practice Appendix 12 Outline Construction Communications Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 268 KB)
Deadline 6 Submission - 6.13 Landscape Enhancement Package and Tourism Fund Update
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 531 KB)
Deadline 6 Submission - 6.14 Community Linguistic Statement (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Deadline 6 Submission - 6.5 Draft Development Consent Order (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 6 Submission - 6.34 Outline Code of Construction Practice Appendix 1 Outline Onshore Construction Method Statement (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 509 KB)
Deadline 6 Submission - 6.11 Table of Compulsory Acquisition and Temporary Possession Objections (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 475 KB)
Deadline 6 Submission - 6.33 Statement of Common Ground 2 – Denbighshire County Council
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 6 Submission - 6.7 Book of Reference (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 6 Submission - 6.34 Outline Code of Construction Practice Appendix 1 Outline Onshore Construction Method Statement (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 301 KB)
Deadline 6 Submission - 6.27 Schedule of Changes to Plans
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 864 KB)
Deadline 6 Submission - 6.5 Draft Development Consent Order (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 26 MB)
Deadline 6 Submission - 6.21 Temporary Stopping Up of Public Rights of Way Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 710 KB)
Deadline 6 Submission - 6.3 Applicant’s Comments on Responses to the Examining Authority’s Second Written Questions
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 12 MB)
Deadline 6 Submission - 6.18 Land Plan (Onshore)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 388 KB)
Deadline 6 Submission - 6.28 Applicant's Statement of Commonality for SoCG
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 31 MB)
Deadline 6 Submission - 6.19 Works Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 502 KB)
Deadline 6 Submission - 6.29 Statement of Common Ground 6 – Natural Resources Wales (Offshore)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 522 KB)
Deadline 6 Submission - 6.11 Table of Compulsory Acquisition and Temporary Possession Objections (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 384 KB)
Deadline 6 Submission - 6.15 Note on Substation Building Heights
|
Other |
National Grid Electricity Transmission PLC (NGET) (PDF, 844 KB)
Deadline 6 Submission
|
Other |
Natural Resources Wales (PDF, 122 KB)
Deadline 6 Submission
|
Other |
North Hoyle Wind Farm Limited (PDF, 85 KB)
Deadline 6 Submission
|
Other |
Report on the Implications for European Sites (RIES) (PDF, 833 KB)
Issued by the Examining Authority - 22 February 2023
|
Other |
Rhyl Flats Wind Farm Limited (PDF, 148 KB)
Deadline 6 Submission
|
Other |
Compulsory Acquisition Hearing Agenda (English) (PDF, 246 KB)
|
Other |
Compulsory Acquisition Hearing Agenda (Welsh) (PDF, 248 KB)
|
Other |
Issue Specific Hearing 4 Agenda (English) (PDF, 246 KB)
|
Other |
Issue Specific Hearing 4 Agenda (Welsh) (PDF, 247 KB)
|
Other |
Natural Resources Wales (PDF, 239 KB)
Deadline 5 Submission - Addendum to [REP5-039] Conservation Objectives for Liverpool Bay Special Protection Area - Late Submission accepted at the discretion of the Examining Authority
|
Other |
Denbighshire County Council (PDF, 369 KB)
Deadline 5 Submission - Response to ExQ2 - Late Submission accepted at the discretion of the Examining Authority
|
Other |
Conwy County Borough Council (PDF, 4 MB)
Deadline 5 Submission - Response to ExQ2
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 5 Submission - 5.11 Outline Code of Construction Practice - Appendix 1 - Outline Onshore Construction Method Statement (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 531 KB)
Deadline 5 Submission - 5.16 Update on Negotiations with Landowners, Occupiers, Statutory Undertakers and Other Utilities (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 447 KB)
Deadline 5 Submission - 5.3 Comments on Submissions Received at Deadline 4
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 772 KB)
Deadline 5 Submission - 5.6 Life Cycle Assessment for the Awel y Môr Offshore Windfarm
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 373 KB)
Deadline 5 Submission - 5.12 Outline Code of Construction Practice (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 522 KB)
Deadline 5 Submission - 5.16 Update on Negotiations with Landowners, Occupiers, Statutory Undertakers and Other Utilities (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 446 KB)
Deadline 5 Submission - 5.13 Outline Code of Construction Practice - Appendix 4 - Soil Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 5 Submission - 5.14 Design Principles Document (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 311 KB)
Deadline 5 Submission - 5.1 Guide to the Applicant's Deadline 5 Submission
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 453 KB)
Deadline 5 Submission - 5.17 Table of Compulsory Acquisition and Temporary Possession Objections (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 302 KB)
Deadline 5 Submission - 5.18 Statement of Common Ground 9 - National Trust
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 5 Submission - 5.10 Statement of Reasons (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 5 Submission - 5.14 Design Principles Document (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 416 KB)
Deadline 5 Submission - 5.7 Designated Landscapes and Relevant Tests
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 442 KB)
Deadline 5 Submission - 5.15.1 Book of Reference – Schedule of Changes
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 5 Submission - 5.15 Book of Reference (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 5 Submission - 5.11 Outline Code of Construction Practice - Appendix 1 - Outline Onshore Construction Method Statement (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 545 KB)
Deadline 5 Submission - 5.2 Document Tracker
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 5 Submission - 5.10 Statement of Reasons (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 447 KB)
Deadline 5 Submission - 5.13 Outline Code of Construction Practice - Appendix 4 - Soil Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 5 Submission - 5.9 Draft Development Consent Order (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 487 KB)
Deadline 5 Submission - 5.8 Applicant's Statement of Commonality for SoCG
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Deadline 5 Submission - 5.9 Draft Development Consent Order (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 367 KB)
Deadline 5 Submission - 5.19 Statement of Common Ground 7 - Natural Resources Wales (Onshore)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 267 KB)
Deadline 5 Submission - 5.21 Schedule of Changes to Plans
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
Deadline 5 Submission - 5.5 Gwynt y Môr Abnormal Indivisible Load Investigation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 420 KB)
Deadline 5 Submission - 5.9.1 Schedule of Changes to the Draft DCO
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 465 KB)
Deadline 5 Submission - 5.17 Table of Compulsory Acquisition and Temporary Possession Objections (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 15 MB)
Deadline 5 Submission - 5.4 Applicant's Response to the Examining Authority's Second Written Questions
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 390 KB)
Deadline 5 Submission - 5.12 Outline Code of Construction Practice (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 21 MB)
Deadline 5 Submission - 5.20 Land Plan (Onshore)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 5 Submission - 5.15 Book of Reference (Clean)
|
Other |
Wilson Fearnall Ltd on behalf of GBL and IB Kerfoot Discretionary Trust (PDF, 6 MB)
Deadline 5 Submission - Response to ExQ2
|
Other |
Gwynedd Archaeological Planning Service (PDF, 784 KB)
Deadline 5 Submission - Response to ExQ2
|
Other |
Isle of Anglesey County Council (PDF, 469 KB)
Deadline 5 Submission - Response to ExQ2
|
Other |
Davis Meade Property Consultants on behalf of Mr G & Mrs ME Hughes (PDF, 30 MB)
Deadline 5 Submission - Response to ExQ2
|
Other |
Davis Meade Property Consultants on behalf of Mr JB & Mrs E Evans (PDF, 202 KB)
Deadline 5 Submission - Response to ExQ2
|
Other |
National Grid Electricity Transmission PLC (NGET) (PDF, 198 KB)
Deadline 5 Submission - Response to ExQ2
|
Other |
Natural Resources Wales (PDF, 259 KB)
Deadline 5 Submission - Response to ExQ2
|
Other |
North Hoyle Wind farm Limited (PDF, 239 KB)
Deadline 5 Submission
|
Other |
Rhyl Flats Windfarm Ltd (PDF, 150 KB)
Deadline 5 Submission - Response to ExQ2
|
Other |
Royal Society for the Protection of Birds (PDF, 5 MB)
Deadline 5 Submission - Response to ExQ2
|
Other |
The Crown Estate (PDF, 141 KB)
Deadline 5 Submission - Response to ExQ2
|
Other |
Welsh Government (PDF, 241 KB)
Deadline 5 Submission - Response to ExQ2
|
Other |
Rule 13 - Notification of Hearings (English) (PDF, 194 KB)
|
Other |
Rule 13 - Notification of Hearings (Welsh) (PDF, 194 KB)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 156 KB)
Notice for February/March hearings
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 459 KB)
Deadline 4 Submission - 4.13 Outline Soil Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 4 Submission - 4.8 Applicant's Response to R17Q1.1
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 245 KB)
Deadline 4 Submission - 4.18 Applicant's Update on the Marine Licence Submission and Progress
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 4 Submission - 4.16 Schedule of Mitigation and Monitoring (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 368 KB)
Deadline 4 Submission - 4.25 Statement of Common Ground 16 - North Wales Wildlife Trust
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 311 KB)
Deadline 4 Submission - 4.24 Statement of Common Ground 13 - UK Chamber of Shipping
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 381 KB)
Deadline 4 Submission - 4.6 Applicant's Statement of Commonality for SoCG
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 436 KB)
Deadline 4 Submission - 4.2 Document Tracker
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
Deadline 4 Submission - 4.14 Outline Onshore Construction Method Statement (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 4 Submission - 4.16 Schedule of Mitigation and Monitoring (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
Deadline 4 Submission - 4.20 Visual Effects from Faenol-Bropor
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 304 KB)
Deadline 4 Submission - 4.21 Statement of Common Ground 8 - Cadw
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 374 KB)
Deadline 4 Submission - 4.15 Outline Code of Construction Practice (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 434 KB)
Deadline 4 Submission - 4.29 Table of Compulsory Acquisition and Temporary Possession Objections (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 342 KB)
Deadline 4 Submission - 4.12 Statement of Common Ground 10 - Isle of Man Government
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 298 KB)
Deadline 4 Submission - 4.22 Statement of Common Ground 15 - JNCC
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 485 KB)
Deadline 4 Submission - 4.28 Update on Negotiations with Landowners, Occupiers, Statutory Undertakers and Other Utilities (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 446 KB)
Deadline 4 Submission - 4.13 Outline Soil Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 437 KB)
Deadline 4 Submission - 4.26 Outline Public Access Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 480 KB)
Deadline 4 Submission - 4.30.1 Book of Reference - Schedule of Changes
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Deadline 4 Submission - 4.5 Applicant's Response to Rule 17 Letter dated 19 December 2022
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 437 KB)
Deadline 4 Submission - 4.26 Outline Public Access Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 369 KB)
Deadline 4 Submission - 4.31 Statement of Common Ground 1 - North Wales Local Planning Authorities (Seascape, Landscape and Visual Impacts Assessment)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 21 MB)
Deadline 4 Submission - 4.10 Outline Landscape and Ecology Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 863 KB)
Deadline 4 Submission - 4.7 Outline Skills and Employment Strategy
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 4 Submission - 4.9 Design Principles Document (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 539 KB)
Deadline 4 Submission - 4.27 Outline Construction Traffic Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 479 KB)
Deadline 4 Submission - 4.29 Table of Compulsory Acquisition and Temporary Possession Objections (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 358 KB)
Deadline 4 Submission - 4.11 Statement of Common Ground 3 - Conwy County Borough Council
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 265 KB)
Deadline 4 Submission - 4.19 Review of Table 8 of the Landscape and Visual Impact Assessment (LVIA)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 531 KB)
Deadline 4 Submission - 4.27 Outline Construction Traffic Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 4 Submission - 4.30 Book of Reference (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 298 KB)
Deadline 4 Submission - 4.1 Guide to the Applicant's Deadline 4 Submission
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 455 KB)
Deadline 4 Submission - 4.17 Marine Licence Principles (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
Deadline 4 Submission - 4.14 Outline Onshore Construction Method Statement (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 4 Submission - 4.9 Design Principles Document (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 465 KB)
Deadline 4 Submission - 4.17 Marine Licence Principles (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 4 Submission - 4.30 Book of Reference (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 389 KB)
Deadline 4 Submission - 4.15 Outline Code of Construction Practice (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 495 KB)
Deadline 4 Submission - 4.28 Update on Negotiations with Landowners, Occupiers, Statutory Undertakers and Other Utilities (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 287 KB)
Deadline 4 Submission - 4.23 Statement of Common Ground 12 - Trinity House
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 350 KB)
Deadline 4 Submission - 4.4 Comments on Submissions Received at Deadline 3a
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 21 MB)
Deadline 4 Submission - 4.10 Outline Landscape and Ecology Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 733 KB)
Deadline 4 Submission - 4.3 Applicant's Response to ISH2 and ISH3 Action Points
|
Other |
Natural Resources Wales (PDF, 193 KB)
Deadline 4 Submission
|
Other |
North Hoyle Wind Farm Ltd (PDF, 125 KB)
Deadline 4 Submission
|
Other |
Rhyl Flats Windfarm Ltd (PDF, 256 KB)
Deadline 4 Submission - Appendix 1
|
Other |
Rhyl Flats Windfarm Ltd (PDF, 146 KB)
Deadline 4 Submission - Comments on Table 5 of the Applicant’s Deadline 3 Representations
|
Other |
Trustees of the Bodrhyddan Estate Maintenance Fund and Bodrhyddan Farming Company Ltd (PDF, 348 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 686 KB)
Deadline 3a Submission - 3a.6 Marine Ornithology Great Orme Assessment (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 381 KB)
Deadline 3a Submission - 3a.13 Applicant's Response to Natural Resources Wales Marine License Team Request for Further Information
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 555 KB)
Deadline 3a Submission - 3a.19 Marine Ornithology Great Orme Assessment (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 265 KB)
Deadline 3a Submission - 3a.12 Schedule of Changes to Plans
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 50 MB)
Deadline 3a Submission - 3a.8 Street Works and Access Plans
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 3a Submission - 3a.7 Statutory/Non-Statutory Sites or Features of the Historic Environment Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
Deadline 3a Submission - 3a.11 Land Plan Offshore
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 831 KB)
Deadline 3a Submission - 3a.17 Draft Development Consent Order (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 489 KB)
Deadline 3a Submission - 3a.3 Comments on Submissions Received at Deadline 3
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 337 KB)
Deadline 3a Submission - 3a.5 Written Summary of Oral Submission at ISH3 (Proposed Substation Site and Related Matters)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 285 KB)
Response to Rule 17 Letter dated 15 November 2022 - Awel y Môr Offshore Wind Farm Limited - 3a.2 Applicant's Response to Rule 17 Letter
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Deadline 3a Submission - 3a.16 Draft Development Consent Order (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 378 KB)
Deadline 3a Submission - 3a.15 Applicant's Statement of Commonality for SoCG
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 5 MB)
Deadline 3a Submission - 3a.14 Applicant's Response to Marine Licence Application Comments
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 269 KB)
Deadline 3a Submission - 3a.1 Guide to the Applicant's Deadline 3a Submission
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 356 KB)
Deadline 3a Submission - 3a.4 Written Summary of Oral Submissions at ISH2 (Seascape and Related Matters)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 53 MB)
Deadline 3a Submission - 3a.9 Water Bodies in a River Basin Management Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 51 MB)
Deadline 3a Submission - 3a.10 Hedgerow and Protected Tree Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 547 KB)
Deadline 3a Submission - 3a.18 Schedule of Changes to the Draft DCO
|
Other |
Denbighshire County Council (PDF, 184 KB)
Deadline 3a Submission - Post-hearing submission requested by the ExA
|
Other |
Llanddulas and Rhyd Y Foel Community Council (PDF, 122 KB)
Deadline 3a Submission - Post-hearing submission requested by the ExA
|
Other |
Natural Resources Wales (PDF, 153 KB)
Deadline 3a Submission - Written summaries of oral submissions at hearings
|
Other |
Natural Resources Wales (PDF, 2 MB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - ES 6.2.1
|
Other |
Natural Resources Wales (PDF, 307 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Works Application Form
|
Other |
Natural Resources Wales (PDF, 324 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (NRW Advisory)
|
Other |
Natural Resources Wales (PDF, 636 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Guide to the Marine License Application
|
Other |
Natural Resources Wales (PDF, 89 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Listed Buildings
|
Other |
Natural Resources Wales (PDF, 72 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (Public Representation)
|
Other |
Natural Resources Wales (PDF, 353 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - ML-1.10
|
Other |
Natural Resources Wales (PDF, 223 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (MCA)
|
Other |
Natural Resources Wales (PDF, 890 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (Isle of Man)
|
Other |
Natural Resources Wales (PDF, 138 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation Letter
|
Other |
Natural Resources Wales (PDF, 142 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales
|
Other |
Natural Resources Wales (PDF, 3 MB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Plan Areas Map
|
Other |
Natural Resources Wales (PDF, 607 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - 6.7.1 Non-technical summary
|
Other |
Natural Resources Wales (PDF, 216 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (IACC)
|
Other |
Natural Resources Wales (PDF, 154 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (RCAHMW)
|
Other |
Natural Resources Wales (PDF, 136 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (JNCC)
|
Other |
Natural Resources Wales (PDF, 314 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (CEFAS)
|
Other |
Natural Resources Wales (PDF, 276 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (Janet Finch-Saunders MS)
|
Other |
Natural Resources Wales (PDF, 252 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (RSPB)
|
Other |
Natural Resources Wales (PDF, 13 MB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (Defence Infrastructure Organisation)
|
Other |
Natural Resources Wales (PDF, 366 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (Cadw)
|
Other |
Natural Resources Wales (PDF, 347 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (NATS Safeguarding)
|
Other |
Natural Resources Wales (PDF, 123 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Cover Letter
|
Other |
Natural Resources Wales (PDF, 293 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Further Information Document List
|
Other |
Natural Resources Wales (PDF, 261 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (The Crown Estate)
|
Other |
Natural Resources Wales (PDF, 251 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (Clwyd-Powys Archaeological Trust)
|
Other |
Natural Resources Wales (PDF, 214 KB)
Response to Rule 17 Letter dated 15 November 2022 - Natural Resources Wales - Marine Licence Application Consultation (NFFO)
|
Other | |
Other | |
Other | |
Other | |
Other |
Issue Specific Hearing (ISH2) on seascape and related issues part 1 - Transcript - 07 December 2022 (PDF, 262 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other |
Issue Specific Hearing (ISH2) on seascape and related issues part 2 - Transcript - 07 December 2022 (PDF, 240 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other |
Issue Specific Hearing (ISH2) on seascape and related issues part 3 - Transcript - 07 December 2022 (PDF, 267 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other |
Issue Specific Hearing (ISH2) on seascape and related issues part 4 - Transcript - 07 December 2022 (PDF, 136 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other |
Issue Specific Hearing (ISH3) on proposed substation site part 1 - Transcript - 08 December 2022 (PDF, 270 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other |
Issue Specific Hearing (ISH3) on proposed substation site part 2 - Transcript - 08 December 2022 (PDF, 212 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other |
Issue Specific Hearing (ISH3) on proposed substation site part 3 - Transcript - 08 December 2022 (PDF, 253 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other |
Issue Specific Hearing (ISH3) on proposed substation site part 4 - Transcript - 08 December 2022 (PDF, 234 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. Due to the functionality of Microsoft Teams, the transcript is particularly inaccurate with the Welsh language. Please do not interpret the translations as accurate. The video recording remains as the primary record of the event.
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 435 KB)
Additional Submission - Statement of Common Ground 2 – Denbighshire County Council - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 303 KB)
Additional Submission - Statement of Common Ground 8 - Cadw - Accepted at the discretion of the Examining Authority
|
Other |
Agenda for ISH2 Seascape and related matters - English (PDF, 158 KB)
Agenda for Issue Specific Hearing 2 (ISH2) dealing with seascape, landscape and visual effects of the proposed offshore works and related matters, including cultural heritage, socio-economics and tourism effects.
|
Other |
Agenda for ISH2 Seascape and related matters - Welsh (PDF, 177 KB)
Agenda for Issue Specific Hearing 2 (ISH2) dealing with seascape, landscape and visual effects of the proposed offshore works and related matters, including cultural heritage, socio-economics and tourism effects.
|
Other |
Agenda for ISH3 Proposed Substation Site - English (PDF, 186 KB)
Agenda for Issue Specific Hearing 3 (ISH3) dealing with the proposed onshore substation site and related matters.
|
Other |
Agenda for ISH3 Proposed Substation Site - Welsh (PDF, 200 KB)
Agenda for Issue Specific Hearing 3 (ISH3) dealing with the proposed onshore substation site and related matters.
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 346 KB)
Deadline 3 Submission - 3.16 Applicant's Response to Natural Resources Wales (NRW) REP1-080 3.1.24 to 3.1.25
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 330 KB)
Deadline 3 Submission - 3.23 Statement of Common Ground 12 - Trinity House
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 267 KB)
Deadline 3 Submission - 3.1 Application Documents Tracker
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 537 KB)
Deadline 3 Submission - 3.17 Staging of Onshore Works
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Deadline 3 Submission - 3.15 Level B Harassment Threshold Comparison Note
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 315 KB)
Deadline 3 Submission - 3.18 Statement of Common Ground 4 - Isle of Anglesey County Council
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 347 KB)
Deadline 3 Submission - 3.22 Statement of Common Ground 9 - National Trust
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 343 KB)
Deadline 3 Submission - 3.19 Statement of Common Ground 5 - Natural Resources Wales (Seascape, Landscape and Visual Impact Assessment)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 298 KB)
Deadline 3 Submission - 3.24 Statement of Common Ground 15 - The Joint Nature Conservation Committee (JNCC)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Deadline 3 Submission - 3.3 National Policy Statement Tracker
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 523 KB)
Deadline 3 Submission - 3.2 Comments on Submissions Received at Deadline 2
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 529 KB)
Deadline 3 Submission - 3.10 Equalities Impact Report
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 3 Submission - 3.13 Design Principles Document (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Deadline 3 Submission - 3.6 Draft Development Consent Order (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 26 MB)
Deadline 3 Submission - 3.12 Temporary Stopping Up of Public Rights of Way Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 492 KB)
Deadline 3 Submission - 3.20 Statement of Common Ground 6 - Natural Resources Wales (Offshore)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 377 KB)
Deadline 3 Submission - 3.21 Statement of Common Ground 7 - Natural Resources Wales (Onshore)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 451 KB)
Deadline 3 Submission - 3.5 Update on Negotiations with Landowners, Occupiers, Statutory Undertakers and Other Utilities (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 3 Submission - 3.14 Design Principles Document (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 3 Submission - 3.7 Draft Development Consent Order (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 457 KB)
Deadline 3 Submission - 3.4 Update on Negotiations with Landowners, Occupiers, Statutory Undertakers and Other Utilities (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 452 KB)
Deadline 3 Submission - 3.9 Clarification Note on Predicted Impacts Apportioned to Isle of Man Designated Sites
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 387 KB)
Deadline 3 Submission - 3.11 Statement of Commonality for Statement of Common Ground
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 215 KB)
Deadline 3 Submission - 3.8 Schedule of Changes to the Draft DCO
|
Other |
Martin Griffiths (PDF, 123 MB)
Deadline 3 Submission - Written Submission
|
Other |
Martyn Hussey (PDF, 95 KB)
Deadline 3 Submission - Written Submission
|
Other |
NATS (PDF, 198 KB)
Deadline 3 Submission - Confirmation of non-attendance at hearings
|
Other |
Natural Resources Wales (PDF, 233 KB)
Deadline 3 Submission - Written Submission
|
Other |
Network Rail Infrastructure Limited (PDF, 111 KB)
Deadline 3 Submission - Confirmation of non-attendance at hearings
|
Other |
North Hoyle Wind Farm Ltd (PDF, 108 KB)
Deadline 3 Submission - Written Submission
|
Other |
Rhyl Flats Windfarm Ltd (PDF, 107 KB)
Deadline 3 Submission - Written Submission
|
Other |
SP Energy Networks (PDF, 74 KB)
Deadline 3 Submission - Written Submission
|
Other |
Trinity House (PDF, 179 KB)
Deadline 3 Submission - Comments on any other submissions received at D2
|
Other |
Ethan Homer (PDF, 88 KB)
Additional Submission – Request to attend ASI on 6 December 2022 - Late Submission accepted at the discretion of the Examining Authority
|
Other |
Rostons on behalf of Mrs H Proffitt, Mrs J Johnson, Mrs S Archdale and Mrs R Hughes (PDF, 7 MB)
Additional Submission - Response to ExQ1 - Accepted at the discretion of the Examining Authority
|
Other |
Davis Meade Property Consultants on behalf of Mr JB, Mrs E and Mr E Evans (PDF, 195 KB)
Additional Submission – Request to attend ASI on 6 December 2022 - Late Submission accepted at the discretion of the Examining Authority
|
Other | |
Other | |
Other |
Welsh Government (PDF, 157 KB)
Additional Submission – Request to attend ASI on 6 December 2022 - Late Submission accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 156 KB)
Notice for December hearings
|
Other | |
Other | |
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 531 KB)
Deadline 2 Submission - 2.32 Outline Soil Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 465 KB)
Deadline 2 Submission - 2.7 Table of Compulsory Acquisition and Temporary Possession Objections (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Deadline 2 Submission - 2.24 Schedule of Mitigation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 698 KB)
Deadline 2 Submission - 2.28 Cumulative Effects Assessment Clarification Note
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 505 KB)
Deadline 2 Submission - 2.33 Outline Soil Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 497 KB)
Deadline 2 Submission - 2.25 Update on Negotiation with Landowners, Occupiers and Statutory Undertakers and Other Utilities (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 276 KB)
Deadline 2 Submission - 2.1 Application Document Tracker
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 345 KB)
Deadline 2 Submission - 2.19 Outline Noise and Vibration Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 479 KB)
Deadline 2 Submission - 2.42 Outline Code of Construction Practice (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 646 KB)
Deadline 2 Submission - 2.39 Outline Construction Traffic Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 490 KB)
Deadline 2 Submission - 2.41 Outline Public Access Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 411 KB)
Deadline 2 Submission - 2.5 Comments on Other Submissions Received at Deadline 1
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 403 KB)
Deadline 2 Submission - 2.47 Outline Invasive Non-Native Species Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 344 KB)
Deadline 2 Submission - 2.48 Outline Construction Communications Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 307 KB)
Deadline 2 Submission - 2.29 Assessment of the Visual Effects from the Glascoed Nature Reserve
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 417 KB)
Deadline 2 Submission - 2.34 Outline Site Waste Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 376 KB)
Deadline 2 Submission - 2.49 Outline Construction Communications Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 444 KB)
Deadline 2 Submission - 2.31 Outline Air Quality Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 713 KB)
Deadline 2 Submission - 2.6 Comments on Land Use Consultants’ Review of LVIA and SLVIA
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 518 KB)
Deadline 2 Submission - 2.40 Outline Public Access Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 2 Submission - 2.18 Outline Construction Method Statement (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Deadline 2 Submission - 2.2 Applicant’s Response to Written Representations
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 768 KB)
Deadline 2 Submission - 2.4 Comments on Denbighshire County Council’s Local Impact Report (LIR)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
Deadline 2 Submission - 2.11 Book of Reference (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 27 MB)
Deadline 2 Submission - 2.9 Outline Landscape and Ecology Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
Deadline 2 Submission - 2.15 Draft Development Consent Order (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 290 KB)
Deadline 2 Submission - 2.21 Applicant's Update on the Marine Licence Submission and Progress
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 2 Submission - 2.17 Outline Construction Method Statement (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 642 KB)
Deadline 2 Submission - 2.38 Outline Construction Traffic Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 308 KB)
Deadline 2 Submission - 2.44 Outline Artificial Light and Emissions Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 359 KB)
Deadline 2 Submission - 2.37 Outline Pollution Prevention and Emergency Incident Response Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 412 KB)
Deadline 2 Submission - 2.20 Outline Noise and Vibration Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 396 KB)
Deadline 2 Submission - 2.36 Outline Pollution Prevention and Emergency Incident Response Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 480 KB)
Deadline 2 Submission - 2.8 Table of Compulsory Acquisition and Temporary Possession Objections (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 625 KB)
Deadline 2 Submission - 2.13 Book of Reference - Schedule of Changes
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 361 KB)
Deadline 2 Submission - 2.46 Outline Invasive Non-Native Species Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
Deadline 2 Submission - 2.12 Book of Reference (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 438 KB)
Deadline 2 Submission - 2.43 Outline Code of Construction Practice (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 463 KB)
Deadline 2 Submission - 2.26 Update on Negotiation with Landowners, Occupiers and Statutory Undertakers and Other Utilities (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
Deadline 2 Submission - 2.14 Draft Development Consent Order (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 446 KB)
Deadline 2 Submission - 2.27 Applicant's Statement of Commonality for SoCG
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 2 Submission - 2.3 Applicant’s Comments on Responses to the Examining Authority’s First Written Questions
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 27 MB)
Deadline 2 Submission - 2.10 Outline Landscape and Ecology Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 523 KB)
Deadline 2 Submission - 2.23 Marine Licence Principles (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 305 KB)
Deadline 2 Submission - 2.16 Schedule of Changes to the Draft DCO
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 294 KB)
Deadline 2 Submission - 2.50 Statement of Common Ground 11 - Maritime and Coastguard Agency
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 475 KB)
Deadline 2 Submission - 2.22 Marine Licence Principles (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 325 KB)
Deadline 2 Submission - 2.45 Outline Artificial Light and Emissions Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 439 KB)
Deadline 2 Submission - 2.35 Outline Site Waste Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 442 KB)
Deadline 2 Submission - 2.30 Outline Air Quality Management Plan (Tracked)
|
Other |
DEFA Isle of Man Government (PDF, 416 KB)
Deadline 2 Submission - Comments on responses to ExA’s ExQ1
|
Other |
Flint County Council (PDF, 238 KB)
Deadline 2 Submission - Withdrawal from Examination Process
|
Other |
Gwynedd Archaeological Planning Service (PDF, 765 KB)
Deadline 2 Submission - Comments from any other submissions received at Deadline 1
|
Other |
Irish Whale and Dolphin Group (PDF, 994 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Meath County Council (PDF, 282 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
North Hoyle Wind Farm Limited (PDF, 92 KB)
Deadline 2 Submission - Responses to Relevant Representations at Deadline 1
|
Other |
North Hoyle Wind Farm Ltd (PDF, 153 KB)
Deadline 2 Submission - Comments on responses to ExA’s ExQ1
|
Other |
Office of the Planning Regulator (PDF, 151 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Rhyl Flats Wind Farm Limited (PDF, 158 KB)
Deadline 2 Submission - Comments on responses to ExA’s ExQ1
|
Other |
Rhyl Flats Wind Farm Limited (PDF, 90 KB)
Deadline 2 Submission - Responses to Relevant Representations at Deadline 1
|
Other |
Royal Society for the Protection of Birds (PDF, 19 MB)
Deadline 2 Submission - Written Representation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1,002 KB)
Deadline 1 Submission - 1.9 Draft Development Consent Order (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 659 KB)
Deadline 1 Submission - 1.44 Statement of Reasons (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 324 KB)
Deadline 1 Submission - 1.3 Fish and Shellfish Clarification Note
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 31 MB)
Deadline 1 Submission - 1.23 Plan of Watercourse Crossings: Part 2 (Figures 6-10)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 8 MB)
Deadline 1 Submission - 1.41 Onshore ECC Flood Consequence Assessment (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 12 MB)
Deadline 1 Submission - 1.21 Special Category Land Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 377 KB)
Deadline 1 Submission - 1.13 Application Document Tracker
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 434 KB)
Deadline 1 Submission - 1.36 Outline Public Access Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 868 KB)
Deadline 1 Submission - 1.47 Table of Environmental Statement Conclusions
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 471 KB)
Deadline 1 Submission - 1.24 Marine Licence Principles (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 15 MB)
Deadline 1 Submission - 1.48 Crown Land Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 21 MB)
Deadline 1 Submission - 1.33 Outline Landscape and Ecology Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 8 MB)
Deadline 1 Submission - 1.42 Onshore ECC Flood Consequence Assessment (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 364 KB)
Deadline 1 Submission - 1.11 Applicant's Statement of Commonality for SoCG
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 444 KB)
Deadline 1 Submission - 1.6 Written Summaries of Oral Submissions to ISH1 (dDCO) and the OFH
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 240 KB)
Deadline 1 Submission - 1.14 Applicant's Update on the Marine Licence Submission and Progress
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 357 KB)
Deadline 1 Submission - 1.10 Schedule of Changes to the Draft DCO
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 1 Submission - 1.32 Fisheries Liaison and Co-Existence Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
Deadline 1 Submission - 1.50 Outline Code of Construction Practice: Appendix 1 - Construction Method Statement
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 335 KB)
Deadline 1 Submission - 1.15 Marine Water and Sediment Quality Clarification Note
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 374 KB)
Deadline 1 Submission - 1.2 Marine Mammal Clarification Note
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 1 Submission - 1.26 Book of Reference (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 22 MB)
Deadline 1 Submission - 1.22 Land Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 1 Submission - 1.43 Proposed Substation Flood Consequences Assessment: Appendix A - Proposed Substation Preliminary Outline Drainage Strategy
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 310 KB)
Deadline 1 Submission - 1.19 Applicant's Response to ISH1 dDCO Actions
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 27 MB)
Deadline 1 Submission - 1.30 Location Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Deadline 1 Submission - 1.27 Book of Reference (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 397 KB)
Deadline 1 Submission - 1.49 Outline Code of Construction Practice
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 1 Submission - 1.1 Applicant’s Response to Relevant Representations
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 480 KB)
Deadline 1 Submission - 1.38 Outline Soil Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 488 KB)
Deadline 1 Submission - 1.35 Outline Public Access Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Deadline 1 Submission - 1.8 Draft Development Consent Order (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 1 Submission - 1.18 Schedule of Mitigation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 31 MB)
Deadline 1 Submission - 1.23 Plan of Watercourse Crossings: Part 1 (Figures 1-5)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 535 KB)
Deadline 1 Submission - 1.25 Marine Licence Principles (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 532 KB)
Deadline 1 Submission - 1.17 Explanatory Memorandum (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 374 KB)
Deadline 1 Submission - 1.12 Table of Compulsory Acquisition and Temporary Possession Objections
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 331 KB)
Deadline 1 Submission - 1.39 Outline Invasive Non-Native Species Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 360 KB)
Deadline 1 Submission - 1.40 Outline Invasive Non-Native Species Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 462 KB)
Deadline 1 Submission - 1.37 Outline Soil Management Plan (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 488 KB)
Deadline 1 Submission - 1.51 Explanatory Memorandum (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
Deadline 1 Submission - 1.46 Rhyl Flats Restriction Zone in Proximity to Awel y Môr Cable Corridor
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 22 MB)
Deadline 1 Submission - 1.31 Works Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 1 Submission - 1.20 Vessel Emissions Clarification Note
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 419 KB)
Deadline 1 Submission - 1.16 Marine Ornithology Great Orme Assessment
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 24 MB)
Deadline 1 Submission - 1.7 Applicant’s Response to the Examining Authority’s First Written Questions
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Deadline 1 Submission - 1.43 Proposed Substation Flood Consequences Assessment
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 21 MB)
Deadline 1 Submission - 1.34 Outline Landscape and Ecology Management Plan (Tracked)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Deadline 1 Submission - 1.45 Statement of Reasons (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 901 KB)
Deadline 1 Submission - 1.5 National Policy Statement Tracker
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 439 KB)
Deadline 1 Submission - 1.28 Book of Reference – Schedule of Changes
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 21 MB)
Deadline 1 Submission - 1.29 Statutory / Non-statutory Nature Conservation Sites Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
Deadline 1 Submission - 1.4 Application Errata List
|
Other |
Carl Davies (PDF, 119 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Conwy County Borough Council (PDF, 511 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Conwy County Borough Council (PDF, 733 KB)
Deadline 1 Submission - Written Representation
|
Other |
Denbighshire County Council (PDF, 28 MB)
Deadline 1 Submission - Local Impact Report with Appendices
|
Other |
Department of Agriculture, Environment and Rural Affairs (DAERA) (PDF, 104 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Dŵr Cymru Welsh Water (PDF, 154 KB)
Deadline 1 Submission - Cover Letter
|
Other |
Dŵr Cymru Welsh Water (PDF, 836 KB)
Deadline 1 Submission - Sewer Plans 1-5
|
Other |
Dŵr Cymru Welsh Water (PDF, 149 KB)
Deadline 1 Submission - Conditions for Development
|
Other |
Dŵr Cymru Welsh Water (PDF, 481 KB)
Deadline 1 Submission - Water Plans 1-4
|
Other |
Wilson Fearnall Ltd on behalf of GBL and IB Kerfoot Discretionary Trust (PDF, 99 KB)
Deadline 1 Submission - Comments on Applicant's proposed Accompanied Site Inspection
|
Other |
Gwynedd Archaeological Planning Service (PDF, 112 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Gwynedd Archaeological Planning Service (PDF, 1 MB)
Deadline 1 Submission - Written Representation and Summary
|
Other |
Gwynedd Council (PDF, 4 MB)
Deadline 1 Submission - Supplementary Planning Guidance
|
Other |
Gwynedd Council (PDF, 4 MB)
Deadline 1 Submission - Anglesey and Gwynedd Joint LDP (Welsh)
|
Other |
Gwynedd Council (PDF, 8 MB)
Deadline 1 Submission - Cover Email
|
Other |
Gwynedd Council (PDF, 1 MB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Isle of Anglesey County Council (PDF, 449 KB)
Deadline 1 Submission - Written Representation
|
Other |
Joint Nature Conservation Committee (JNCC) (PDF, 252 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Maritime and Coastguard Agency (PDF, 494 KB)
Deadline 1 Submission - Written Representation and Response to the Examining Authority's First Written Questions
|
Other |
Davis Meade Property Consultants on behalf of Mr AEM Owen (PDF, 2 MB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Davis Meade Property Consultants on behalf of Mr G and Mrs ME Hughes (PDF, 5 MB)
Deadline 1 Submission - Written Representation
|
Other |
Davis Meade Property Consultants on behalf of Mr G and Mrs ME Hughes (PDF, 242 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Davis Meade Property Consultants on behalf of Mr JB and Mrs E Evans (PDF, 4 MB)
Deadline 1 Submission - Written Representation
|
Other |
Davis Meade Property Consultants on behalf of Mr JB and Mrs E Evans (PDF, 12 MB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Rostons on behalf of Mr R and Mrs H Proffitt (PDF, 692 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions with Appendices
|
Other |
National Grid Electricity Transmission PLC (NGET) (PDF, 126 KB)
Deadline 1 Submission - Protective Provisions
|
Other |
Addleshaw Goddard LLP on behalf of National Grid Electricity Transmission PLC (NGET) (PDF, 390 KB)
Deadline 1 Submission - Notification of wish to speak at any Open Floor Hearing and Compulsory Acquisition Hearing
|
Other |
National Grid Electricity Transmission PLC (NGET) (PDF, 53 KB)
Deadline 1 Submission - Written Representation
|
Other |
Addleshaw Goddard LLP on behalf of National Grid Electricity Transmission PLC (NGET) (PDF, 44 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
National Trust (PDF, 110 KB)
Deadline 1 Submission - Written Representation
|
Other |
National Trust (PDF, 40 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
NATS Safeguarding (PDF, 274 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Natural Resources Wales (PDF, 133 KB)
Deadline 1 Submission - Request to attend Accompanied Site Inspection
|
Other |
Natural Resources Wales (PDF, 172 KB)
Deadline 1 Submission - Confirmation of non-attendance at the Compulsory Acquisition Hearing and Open Floor Hearing
|
Other |
Natural Resources Wales (PDF, 2 MB)
Deadline 1 Submission - Written Representation and Response to the Examining Authority's First Written Questions with further information letter referenced in section 4 of the Written Representation
|
Other |
Eversheds Sutherland (International) LLP on behalf of Network Rail Infrastructure Limited (PDF, 268 KB)
Deadline 1 Submission - Written Representation and Response to the Examining Authority's First Written Questions
|
Other |
Eversheds Sutherland (International) LLP on behalf of Network Rail Infrastructure Limited (PDF, 156 KB)
Deadline 1 Submission - Request to be considered as an Interested Party
|
Other |
North Hoyle Wind Farm Limited (PDF, 123 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
North Hoyle Wind Farm Limited (PDF, 87 KB)
Deadline 1 Submission - Written summary of oral submissions to Issue Specific Hearing 1
|
Other |
North Hoyle Wind Farm Limited (PDF, 117 KB)
Deadline 1 Submission - Written Representation
|
Other |
Rhyl Flats Wind Farm Limited (PDF, 122 KB)
Deadline 1 Submission - Written summary of oral submissions to Issue Specific Hearing 1
|
Other |
Rhyl Flats Wind Farm Limited (PDF, 269 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions with Appendices
|
Other |
Rhyl Flats Wind Farm Limited (PDF, 242 KB)
Deadline 1 Submission - Written Representation and Summary
|
Other |
Royal Society for the Protection of Birds (PDF, 256 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Royal Society for the Protection of Birds (PDF, 34 MB)
Deadline 1 Submission - Written Representation and Summary with References
|
Other |
Snowdonia National Park Authority (PDF, 934 KB)
Deadline 1 Submission - Joint LPA Review of LVIA and SLVIA
|
Other |
Snowdonia National Park Authority (PDF, 106 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Snowdonia National Park Authority (PDF, 307 KB)
Deadline 1 Submission - Joint LPA Response to LVIA and SLVIA
|
Other |
SP Energy Networks (PDF, 8 MB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Davis Meade Property Consultants on behalf of The Estate of the Late Mr Wynford Davies (PDF, 2 MB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Trinity House (PDF, 155 KB)
Deadline 1 Submission - Written Representation
|
Other |
Trinity House (PDF, 219 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Welsh Government (PDF, 265 KB)
Deadline 1 Submission - Response to the Examining Authority's First Written Questions
|
Other |
Section 102A to Hon Thomas Rowley-Conwy - English (PDF, 100 KB)
|
Other |
Section 102A to Hon Thomas Rowley-Conwy - Welsh (PDF, 101 KB)
|
Other |
Preliminary Meeting Note - English (PDF, 156 KB)
|
Other |
Preliminary Meeting Note - Welsh (PDF, 179 KB)
|
Other |
Action points arising from Issue Specific Hearing 1 (ISH1) - English (PDF, 79 KB)
Action points arising from Issue Specific Hearing 1 (ISH1) dealing with matters relating to the draft Development Consent Order (dDCO) – Wednesday 21 September 2022
|
Other |
Action points arising from Issue Specific Hearing 1 (ISH1) - Welsh (PDF, 100 KB)
Action points arising from Issue Specific Hearing 1 (ISH1) dealing with matters relating to the draft Development Consent Order (dDCO) – Wednesday 21 September 2022
|
Other | |
Other | |
Other | |
Other |
Issue Specific Hearing 1 (ISH1) dealing with matters relating to the draft Development Consent Order part 1 - Transcript - 21 September 2022 (PDF, 231 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
|
Other |
Issue Specific Hearing 1 (ISH1) dealing with matters relating to the draft Development Consent Order part 2 - Transcript - 21 September 2022 (PDF, 240 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
|
Other |
Open Floor Hearing 1 (OFH1) Transcript - 22 September 2022 (PDF, 153 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
|
Other | |
Other | |
Other |
Recording of Open Floor Hearing 1 (OFH1) - 22 September 2022 (Document 4 KB)
|
Other |
Preliminary Meeting - Transcript - 20 September 2022 (PDF, 272 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
|
Other |
Recording of Preliminary Meeting - 20 September 2022 (Document 4 KB)
|
Other |
Network Rail (PDF, 117 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other | |
Other | |
Other | |
Other | |
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 29 MB)
Procedural Deadline A Submission
|
Other |
Towyn & Kinmel Bay Town Council (PDF, 232 KB)
Procedural Deadline A Submission
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 178 KB)
Hearing Notice
|
Other | |
Other |
Natural England (PDF, 69 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other | |
Other | |
Other |
Notification of Other Person status (PDF, 109 KB)
NatureScot
|
Other |
Notification of Other Person status (PDF, 109 KB)
Department of Agriculture, Environment and Rural Affairs (DAERA)
|
Other |
Notification of Other Person status (PDF, 109 KB)
Janet Finch-Saunders MS
|
Other |
Notification of Other Person status (PDF, 121 KB)
Minestère de l’écologie du development durable et de l’énergie (France)
|
Other |
Notification of Other Person status (PDF, 121 KB)
Department of Housing, Local Government and Heritage (Ireland)
|
Other |
Notification of Other Person status (PDF, 109 KB)
Natural England
|
Other |
Notification of Other Person status (Welsh) (PDF, 120 KB)
Janet Finch-Saunders MS
|
Other |
Notification of Other Person status (Welsh) (PDF, 122 KB)
Department of Housing, Local Government and Heritage (Ireland)
|
Other |
Notification of Other Person status (Welsh) (PDF, 133 KB)
Natural England
|
Other |
Notification of Other Person status (Welsh) (PDF, 120 KB)
NatureScot
|
Other |
Notification of Other Person status (Welsh) (PDF, 117 KB)
Minestère de l’écologie du development durable et de l’énergie (France)
|
Other |
Notification of Other Person status (Welsh) (PDF, 120 KB)
Department of Agriculture, Environment and Rural Affairs (DAERA)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 4.3 Book of Reference (Clean)
|
Other |
Janet Finch-Saunders (PDF, 446 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 44 KB)
Section 59 Certificate
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 79 KB)
Section 56 Certificate
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 84 KB)
Regulation 16 Notice
|
Other |
UK Health Security Agency (UKHSA) (PDF, 26 KB)
Additional Submission, accepted at the discretion of the Examining Authority
|
Other | |
Other | |
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 6.3.3 Environmental Statement - Volume 3 - Chapter 3 - Socio-Economics
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 17 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 2.6 Street Works and Access Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 9 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 6.5.5.8 Volume 5, Annex 5.8: Breeding Bird Survey Report
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 394 KB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 3.3 Schedule of Changes
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 878 KB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: ML-6.2.1.1 Offshore Project Description Audit
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 19 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 2.1 Location Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 19 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 2.10 Crown Land Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 6.3.2 Volume 3, Chapter 2: Landscape and Visual Impact Assessment
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 5.2.3 Report to Inform Appropriate Assessment (RIAA) Annex 3: European Site Information
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 18 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 2.12 Hedgerow and Protected Tree Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 705 KB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 1.4 Guide to the Application
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 4.3 Book of Reference (Tracked Changes)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 541 KB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 6.1.1 Volume 1, Chapter 1: Introduction
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 22 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 2.8 Statutory / Non-statutory Nature Conservation Sites Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 405 KB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 5.4.1 Marine Licence Principles
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 14 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 2.4 Special Category Land Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 12 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 6.6.2.2.7.1 Volume 6, Annex 2.2: Landscape and Visual Impact Assessment (LVIA) Figures - Figure 2.6 (Aerial Mapping with Proposed Development)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 74 KB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 6.5.5.8.1 Volume 5, Annex 5.8: Appendix 4 CONFIDENTIAL Barn Owl Survey Results
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 19 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 2.11 Water Bodies in a River Basin Management Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 17 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 2.7 Temporary Stopping Up of Public Rights of Way Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 896 KB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 3.3 Draft Development Consent Order validation report. Revision: B
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 49 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 6.2.7 ES Volume 2, Chapter 7: Marine Mammals
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 3.1.2 Draft Development Consent Order Revision: E (Tracked Changes)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 6.3.11 Volume 3, Chapter 3.11: Air Quality
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 239 KB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 4.3.2 Schedule of Changes
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 765 KB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 6.2.15 Volume 2, Chapter 15: Offshore Conclusions
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 4.2 Funding Statement
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 162 KB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: Cover Letter
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 6.2.10 Volume 2, Chapter 10: Seascape, Landscape and Visual Impact Assessment
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 22 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 2.5 Works Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 3.1 Draft Development Consent Order Revision: E (Clean)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 20 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 2.1 Statutory / Non-statutory Sites or Features or the Historic Environment Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 26 MB)
Additional Submission, accepted at the discretion of the Examining Authority. Response to post-Acceptance s51 advice: 2.3 Land Plan (Onshore)
|
Other |
Examination Library (PDF, 953 KB)
|
Other |
Applicant’s S56 notice of accepted application (PDF, 297 KB)
|
Other |
Appointment of Examining Authority (PDF, 96 KB)
Notice of appointment of the Examining Authority
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 68 KB)
6.5.5.8 Environmental Statement - Volume 5 - Annex 5.8 - Breeding Bird Survey Report
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 447 KB)
5.4 Consents and Licences Required Under Other Legislation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
4.1 Statement of Reasons
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
6.4.4.4 Environmental Statement - Volume 4 - Annex 4.4 - Migratory Collision Risk Modelling
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 693 KB)
6.2.15 Environmental Statement - Volume 2 - Chapter 15 - Offshore Conclusions
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
6.1.4.1 Environmental Statement - Volume 1 - Annex 4.1 - Site Selection and Alternatives (SSA) Identification of Area Search Report
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 17 MB)
6.4.5.1 Environmental Statement - Volume 4 - Annex 5.1 - Benthic Ecology Subtidal Characterisation (Array)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 312 KB)
8.13.5 Outline Code of Construction Practice - Appendix 5 - Outline Site Waste Management Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 22 MB)
2.7 Temporary Stopping Up of Public Rights of Way Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 669 KB)
6.1.3 Environmental Statement - Volume 1 - Chapter 3 - Environmental Impact Assessment Methodology
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 22 MB)
2.12 Hedgerow and Protected Tree Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 14 MB)
2.3 Land Plan (Onshore)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 8 MB)
8.1 Planning Statement
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 32 MB)
6.4.2.4.8 Environmental Statement - Volume 4 - Annex 2.4 - Seafloor and Shallow Geological Results (Array) (Part 8)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 40 MB)
6.4.2.5.1 Environmental Statement - Volume 4 - Annex 2.5 - Seafloor and Shallow Geological Results (Offshore Export Cable Corridor (ECC)) (Part 1)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 9 MB)
6.4.4.1 Environmental Statement - Volume 4 - Annex 4.1 - Offshore Ornithology Baseline Characterisation Report
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 359 KB)
5.4.1 Marine Licence Principles
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 445 KB)
7.2 Safety Zone Statement
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
6.1.2 Environmental Statement - Volume 1 - Chapter 2 - Policy and Legislation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
8.13.1 Outline Code of Construction Practice - Appendix 1 - Outline Construction Method Statement
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
6.2.13 Environmental Statement - Volume 2 - Chapter 13 - Military and Civil Aviation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 30 MB)
6.4.2.4.3 Environmental Statement - Volume 4 - Annex 2.4 - Seafloor and Shallow Geological Results (Array) (Part 3)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
5.2.6 Report 5.2 - Annex 6 - Screening Matrices
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 926 KB)
3.3 Validation Report
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 213 KB)
1.3 Application Form
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 687 KB)
3.1 Draft Development Consent Order
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 413 KB)
6.4.4.6 Environmental Statement - Volume 4 - Annex 4.6 - Offshore Ornithology Population Viability Analysis
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
6.2.3 Environmental Statement - Volume 2 - Chapter 3 - Marine Water and Sediment Quality
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
6.4.4.2 Environmental Statement - Volume 4 - Annex 4.2 - Offshore Ornithology Displacement
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 26 MB)
2.9 Statutory / Non-statutory Sites or Features or the Historic Environment Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 429 KB)
1.2 Section 55 Checklist
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 45 MB)
6.4.2.5.3 Environmental Statement - Volume 4 - Annex 2.5 - Seafloor and Shallow Geological Results (Offshore Export Cable Corridor (ECC)) (Part 3)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 284 KB)
8.12 Schedule of Monitoring
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 12 MB)
6.4.5.2 Environmental Statement - Volume 4 - Annex 5.2 - Benthic Ecology Subtidal Characterisation (Offshore Export Cable Corridor (ECC))
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 10 MB)
5.1.2 Consultation Report - Annex 1 - Consultation Report Appendices - Part 2 (E to H)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 24 MB)
2.11 Water Bodies in a River Basin Management Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
6.4.3.1 Environmental Statement - Volume 4 - Annex 3.1 - Water Framework Directive Compliance Assessment
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 9 MB)
5.1 Consultation Report
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 650 KB)
1.4 Guide to the Application
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 161 KB)
4.2 Funding Statement
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
7.1 Grid Connection and Cable Details Statement
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 28 MB)
2.5 Works Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
3.2 Explanatory Memorandum
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
5.2.8 Report to Inform Appropriate Assessment - Annex 8 - Abundance and Distribution of Red Throated Diver in Gwynt y Môr Offshore Wind Farm and Wider Area
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 34 MB)
5.2 Report to Inform Appropriate Assessment
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 43 MB)
6.4.2.4.7 Environmental Statement - Volume 4 - Annex 2.4 - Seafloor and Shallow Geological Results (Array) (Part 7)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 461 KB)
5.2.2 Report to Inform Appropriate Assessment - Annex 2 - Habitats Regulations Assessment (HRA) Screening Update (Ornithology)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 25 MB)
2.1 Location Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 443 KB)
8.13.4 Outline Code of Construction Practice - Appendix 4 - Outline Soil Management Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 384 KB)
5.3 Statutory Nuisance Statement
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 298 KB)
5.2.5 Report to Inform Appropriate Assessment - Annex 5 - Ornithology Apportioning Note
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
6.2.2 Environmental Statement - Volume 2 - Chapter 2 - Marine Geology, Oceanography and Physical Processes
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 545 KB)
6.4.4.3 Environmental Statement - Volume 4 - Annex 4.3 - Offshore Ornithology Collision Risk Modelling
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 377 KB)
6.4.4.5 Environmental Statement - Volume 4 - Annex 4.5 - Offshore Ornithology Scoping and Consultation Responses
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 317 KB)
6.2.14 Environmental Statement - Volume 2 - Chapter 14 - Inter-relationships
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
5.2.4 Report to Inform Appropriate Assessment - Annex 4 - Bottlenose Dolphin and Grey Seal Additional Information
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 743 KB)
1.1 Application Letter
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
6.1.3.1 Environmental Statement - Volume 1 - Annex 3.1 - Cumulative Effects Assessment Methodology
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 413 KB)
8.13.2 Outline Code of Construction Practice - Appendix 2 - Outline Noise and Vibration Management Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
5.2.3 Report to Inform Appropriate Assessment - Annex 3 - European Site Information
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 8 MB)
4.3 Book of Reference
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 656 KB)
8.11 Schedule of Mitigation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 407 KB)
8.1.1 Wind Turbine Generator (WTG) Size Technical Note
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 24 MB)
6.4.2.4.4 Environmental Statement - Volume 4 - Annex 2.4 - Seafloor and Shallow Geological Results (Array) (Part 4)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 25 MB)
6.4.2.4.6 Environmental Statement - Volume 4 - Annex 2.4 - Seafloor and Shallow Geological Results (Array) (Part 6)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 310 KB)
8.13.12 Outline Code of Construction Practice - Appendix 12 - Outline Construction Communications Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 40 MB)
5.1.1 Consultation Report - Annex 1 - Consultation Report Appendices - Part 1 (A to D)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
6.2.4 Environmental Statement - Volume 2 - Chapter 4 - Offshore Ornithology
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
6.2.10 Environmental Statement - Volume 2 - Chapter 10 - Seascape, Landscape and Visual Impact
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 41 MB)
6.4.2.4 Environmental Statement - Volume 4 - Annex 2.4 - Seafloor and Shallow Geological Results (Array) (Part 2)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 208 KB)
8.13.11 Outline Code of Construction Practice - Appendix 11 - Outline Invasive Non-Native Species Management Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
6.2.12 Environmental Statement - Volume 2 - Chapter 12 - Other Marine Users and Activities
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 44 MB)
6.4.2.5.2 Environmental Statement - Volume 4 - Annex 2.5 - Seafloor and Shallow Geological Results (Offshore Export Cable Corridor (ECC)) (Part 2)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 275 KB)
8.13.10 Outline Code of Construction Practice - Appendix 10 - Outline Artificial Light and Emissions Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 21 MB)
2.6 Street Works Access Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
6.1.4.2 Environmental Statement - Volume 1 - Annex 4.2 - Site Selection and Alternatives (SSA) Shortlisting Outcomes Report
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
1.5 Copies of Section 48 Newspaper Notices
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 27 MB)
6.4.2.4.9 Environmental Statement - Volume 4 - Annex 2.4 - Seafloor and Shallow Geological Results (Array) (Part 9)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 8 MB)
2.10 Crown Land Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
2.2 Land Plan (Offshore)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 16 MB)
6.2.11 Environmental Statement - Volume 2 - Chapter 11 - Offshore Archaeology and Cultural Heritage
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 536 KB)
5.2.1 Report to Inform Appropriate Assessment - Annex 1 - Habitats Regulations Assessment (HRA) Screening Update (Non-Ornithology)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 14 MB)
6.1.4 Environmental Statement - Volume 1 - Chapter 4 - Site Selection Alternatives
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 489 KB)
6.1.1 Environmental Statement - Volume 1 - Chapter 1 - Introduction
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 26 MB)
6.4.2.5.4 Environmental Statement - Volume 4 - Annex 2.5 - Seafloor and Shallow Geological Results (Offshore Export Cable Corridor (ECC)) (Part 4)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 10 MB)
6.1.3.2 Environmental Statement - Volume 1 - Annex 3.2 - Transboundary Screening
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
6.2.1 Environmental Statement - Volume 2 - Chapter 1 - Offshore Project Description
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
5.2.7 Report 5.2 - Annex 7 - Integrity Matrices
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 5 MB)
2.4 Special Category Land Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 24 MB)
6.4.2.4.5 Environmental Statement - Volume 4 - Annex 2.4 - Seafloor and Shallow Geological Results (Array) (Part 5)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 28 MB)
2.8 Statutory / Non-statutory Nature Conservation Sites Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 317 KB)
8.13.3 Outline Code of Construction Practice - Appendix 3 - Outline Air Quality Management Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 288 KB)
8.1.2 Planning Statement - Appendix 2 - Welsh National Marine Plan Policy Checklist
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 5 MB)
6.4.6.1 Environmental Statement - Volume 4 - Annex 6.1 - Fish and Shellfish Ecology Technical Baseline
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 5 MB)
6.2.8 Environmental Statement - Volume 2 - Chapter 8 - Commercial Fisheries
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
6.3.11 Environmental Statement - Volume 3 - Chapter 11 - Air Quality
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 5 MB)
6.6.10.4.2 Environmental Statement - Volume 6 - Annex 10.4 - SILVA Figures - Figure 2a (Maximum Design Scenario A (332m Blade Tip))
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
6.2.6 Environmental Statement - Volume 2 - Chapter 6 - Fish and Shellfish Ecology
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 954 KB)
6.4.7.2 Environmental Statement - Volume 4 - Annex 7.2 - Draft Outline Marine Mammal Mitigation Protocol
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 45 MB)
6.2.9 Environmental Statement - Volume 2 - Chapter 9 - Shipping and Navigation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 42 MB)
8.2.2 Evidence Plan Report - Annex - Appendices Part 2 (D to F)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
6.4.7.1 Environmental Statement - Volume 4 - Annex 7.1 - Marine Mammal Baseline Characterisation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
6.6.10.4.12 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLVIA) Figures - Figure 9 (LANDMAP - Visual and Sensory Evaluation)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
6.6.10.4.18 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLVIA) Figures - Figure 12c (Comparative Blade Tip Zone of Theoretical Visibility (ZTV) Maximum Design Scenario (MDS) A (Preliminary Environmental Information Report (PEIIER)) and MDS A (Environmental Statement (ES))
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 215 KB)
8.7 Offshore Operations and Maintenance Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 461 KB)
8.13.7 Outline Code of Construction Practice - Appendix 7 - Outline Construction Traffic Management Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 8 MB)
8.3 Outline Offshore Archaeological Written Scheme of Investigation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 255 KB)
8.13.6 Outline Code of Construction Practice - Appendix 6 - Outline Pollution Prevention and Emergency Incident Response Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
6.6.10.4.16 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLVIA) Figures - Figure 12a (Blade Tip Zone of Theoretical Visibility (ZTV) for Maximum Design Scenario A)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
6.4.6.2 Environmental Statement - Volume 4 - Annex 6.2 - Underwater Noise Technical Report
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
6.6.10.4.14 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLVIA) Figures - Figure 10b (Tranquillity)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
6.6.10.4.15 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLVIA) Figures - Figure 11 (Visual Receptors and Viewpoint Locations)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 16 MB)
6.5.7.4 Environmental Statement - Volume 5 - Annex 7.4 - A525 Trenchless Crossing Works Horizontal Directional Drilling (HDD)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
6.6.10.4.17 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLVIA) Figures - Figure 12b (Hub Height Zone of Theoretical Visibility (ZTV) for Maximum Design Scenario A)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 331 KB)
8.13.9 Outline Code of Construction Practice - Appendix 9 - Outline Travel Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 5 MB)
6.2.5 Environmental Statement - Volume 2 - Chapter 5 - Benthic Subtidal and Intertidal Ecology
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 38 MB)
8.4 Outline Landscape and Ecology Management Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
6.6.10.4.1 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLVIA) Figures - Figure 1 (Array Area and SLVIA Study Area with Cumulative Developments)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
8.8 Design Principles Document
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 520 KB)
8.5 Fishing Liaison and Co-existence Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 451 KB)
8.13.8 Outline Code of Construction Practice - Appendix 8 - Outline Public Access Management Plan
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 21 MB)
6.4.5.3 Environmental Statement - Volume 4 - Annex 5.3 - Benthic Ecology Intertidal Characterisation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 31 MB)
6.3.10 Environmental Statement - Volume 3 - Chapter 10 - Noise and Vibration
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 414 KB)
8.13 Outline Code of Construction Practice
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 597 KB)
6.5.5.9 Environmental Statement - Volume 5 - Annex 5.9 - Badger Survey Report (Public)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
6.6.10.4.19 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLVIA) Figures - Figure 13a (Blade Tip Zone of Theoretical Visibility (ZTV) for Maximum Design Scenario B)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 577 KB)
8.2 Evidence Plan Report
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 10 MB)
6.3.1 Environmental Statement - Volume 3 - Chapter 1 - Onshore Project Description
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 649 KB)
6.6.10.4.10 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLVIA) Figures - Figure 7b (Landscape Character (Wales, Regional) - Legend)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 561 KB)
8.16 Community Linguistic Statement
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 12 MB)
6.2.7 Environmental Statement - Volume 2 - Chapter 7 - Marine Mammals
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 8 MB)
6.5.7.1 Environmental Statement - Volume 5 - Annex 7.1 - Onshore Export Cable Corridor (ECC) Flood Consequence Assessment
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
6.6.10.4.11 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLVIA) Figures - Figure 8 (Landscape Planning Designations)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
6.6.10.4.13 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLVIA) Figures - Figure 10a (Snowdonia National Park Baseline Light Pollution)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 9 MB)
8.2.1 Evidence Plan Report - Annex - Appendices Part 1 (A to C)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 3 MB)
6.3.3 Environmental Statement - Volume 3 - Chapter 3 - Socio-Economics
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 6 MB)
6.3.4 Environmental Statement - Volume 3 - Chapter 4 - Tourism and Recreation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 19 MB)
6.4.9.1 Environmental Statement - Volume 4 - Annex 9.1 - Navigation Risk Assessment
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
6.6.10.4.22 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLILVIA) Figures - Figure 14 (Horizontal Angle Zone of Theoretical Visibility (ZTV) for Maximum Design Scenario A)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 25 MB)
6.6.10.4.25 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SILVIA) Figures - Figure 16c (Blade Tip Zone of Theoretical Visibility (ZTV) (Maximum Design Scenario (MDS) A) With Landscape Character and Viewpoint Locations) - Part 2
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
8.9 Disposal Site Characterisation
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
6.6.10.4.21 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLVIA) Figures - Figure 13c (Comparative Blade Tip Zone of Theoretical Visibility (ZTV) Maximum Design Scenario (MDS) B ( Preliminary Environmental Information Report (PEIR) and MDS B (Environmental Statement (ES))
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 16 MB)
6.6.10.4.23 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SILVIA) Figures - Figure 15 (Seascape Character (Wales, Regional) With Blade Tip Zone of Theoretical Visibility (ZTV))
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 5 MB)
6.4.8.1 Environmental Statement - Volume 4 - Annex 8.1 - Commercial Fisheries Baseline Report
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 2 MB)
6.5.7.2 Environmental Statement - Volume 5 - Annex 7.2 - Onshore Substation Flood Consequence Assessment
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 7 MB)
6.5.7.3 Environmental Statement - Volume 5 - Annex 7.3 - Landfall Trenchless Crossing Works Horizontal Directional Drilling (HDD)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 679 KB)
6.3.13 Environmental Statement - Volume 3 - Chapter 13 - Onshore Conclusions
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 1 MB)
6.3.2 Environmental Statement - Volume 3 - Chapter 2 - Landscape and Visual Impact Assessment
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 941 KB)
6.4.7.3 Environmental Statement - Volume 4 - Annex 7.3 - Marine Mammal Quantitative Assessment Assumptions
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 316 KB)
6.4.8.2 Environmental Statement - Volume 4 - Annex 8.2 - Commercial Fisheries Consultation Record
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 4 MB)
6.6.10.4.20 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SLILVIA) Figures - Figure 13b (Hub Height Zone of Theoretical Visibility (ZTV) for Maximum Design Scenario B)
|
Other |
Awel y Môr Offshore Wind Farm Limited (PDF, 44 MB)
6.6.10.4.24 Environmental Statement - Volume 6 - Annex 10.4 - Seascape, Landscape and Visual Impact Assessment (SILVIA) Figures - Figure 16a-b (Blade Tip Zone of Theoretical Visibility (ZTV) (Maximum Design Scenario (MDS) A) With Landscape Character and Viewpoint Locations) - Part 1
|
Other |