What happens next
Dates for the Examination can be viewed on the Examination Timetable page.
Notice of the Procedural Decision has been issued by the Examining Authority to Interested Parties in the Rule 8 letter; this includes information about how the Examination will be conducted and the Examination Timetable as currently set out.
08/05/2024 - Deadline for close of examination. See the Examination Timetable for further information.If you have a legal interest in land affected by a Nationally Significant Infrastructure Project and:
- have not been identified by the Applicant; and
- did not register to become an Interested Party;
then you can make a request to the Examining Authority to become an Interested Party under s102A of the Planning Act 2008.
Timeline (52 items)
The Deadline 4A submissions have been published.
The Planning Inspectorate’s webpage for the West Burton Solar Project will be moved over to the new National Infrastructure Planning website on Wednesday 20 March 2024. This means that the information currently on the ‘Overview tab‘ will be presented in a different way and the way you access documents will be different.
Please contact the Case Team if you have any queries about the change: [email protected]
The recordings and transcripts of Issue Specific Hearing 5 on Wednesday 13 March 2024 have been published.
Following the ExA’s decision to accept the Applicant Proposed Provision for examination (PDF, 249 KB), comments are now invited on the Applicant’s proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 15 March 2024.
Any comments must be made on the Registration and Relevant Representation Form and must relate only to the Applicant proposed provision for the compulsory acquisition of additional land as set out in the Applicant Change Request documents. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
The Planning Inspectorate’s webpage for the West Burton Solar Project will be moved over to the new National Infrastructure Planning website on Wednesday 20 March 2024. This means that the information currently on the ‘Overview tab‘ will be presented in a different way and the way you access documents will be different.
Please contact the Case Team if you have any queries about the change: [email protected]
Instructions for those wishing to participate in the Issue Specific Hearing 5 on Wednesday 13 March 2024 have been sent. For those wishing to observe the ISH5 in real time please use the following livestream link: https://cvslivestream.co.uk/westburtonsolar/
The Agenda can be accessed here: ISH5 Agenda (PDF, 125 KB)
Following the ExA’s decision to accept the Applicant Proposed Provision for examination (PDF, 249 KB), comments are now invited on the Applicant’s proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 15 March 2024.
Any comments must be made on the Registration and Relevant Representation Form and must relate only to the Applicant proposed provision for the compulsory acquisition of additional land as set out in the Applicant Change Request documents. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
The Planning Inspectorate’s webpage for the West Burton Solar Project will be moved over to the new National Infrastructure Planning website during week commencing 18 March 2024. This means that the information currently on the ‘Overview’ tab’ will be presented in a different way and the way you access documents will be different.
Please contact the Case Team if you have any queries about the change: [email protected]
The Agenda for Issue Specific Hearing 5 (PDF, 128KB) has been amended and re-published due to a change made by the Examining Authority (ExA) to the running order of two of Agenda Items. Please use this version going forward.
The Deadline 4 Submissions have been published. The ExA has accepted the following as late submissions for Deadline 4 from the Applicant:
Following the ExA’s decision to accept the Applicant Proposed Provision for examination (PDF, 249 KB), comments are now invited on the Applicant’s proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 15 March 2024.
Any comments must be made on the Registration and Relevant Representation Form and must relate only to the Applicant proposed provision for the compulsory acquisition of additional land as set out in the Applicant Change Request documents. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
The Planning Inspectorate’s webpage for the West Burton Solar Project will be moved over to the new National Infrastructure Planning website during week commencing 18 March 2024. This means that the information currently on the ‘Overview’ tab’ will be presented in a different way and the way you access documents will be different.
Please contact the Case Team if you have any queries about the change: [email protected]’
The Agenda for Issue Specific Hearing 5 (PDF, 128KB) has been amended and re-published due to a change made by the ExA (Examining Authority) to the running order of two of Agenda Items. Please use this version going forward.
The Deadline 4 Submissions have been published
Following the ExA’s decision to accept the Applicant Proposed Provision for examination (PDF, 249 KB), comments are now invited on the Applicant’s proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 15 March 2024.
Any comments must be made on the Registration and Relevant Representation Form and must relate only to the Applicant proposed provision for the compulsory acquisition of additional land as set out in the Applicant Change Request documents. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
The Planning Inspectorate’s webpage for the West Burton Solar Project will be moved over to the new National Infrastructure Planning website during week commencing 18 March 2024. This means that the information currently on the ‘Overview’ tab’ will be presented in a different way and the way you access documents will be different.
Please contact the Case Team if you have any queries about the change: [email protected]
The Agenda for Issue Specific Hearing 5 (PDF, 128KB) has been amended and re-published due to a change made by the ExA (Examining Authority) to the running order of two of Agenda Items. Please use this version going forward.
The Deadline 4 Submissions have been published.
Following the ExAs decision to accept the Applicant Proposed Provision for examination (PDF, 249 KB), comments are now invited on the Applicants proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 15 March 2024.
Any comments must be made on the Registration and Relevant Representation Form and must relate only to the Applicant proposed provision for the compulsory acquisition of additional land as set out in the Applicant Change Request documents. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
The Planning Inspectorates webpage for the West Burton Solar Projects move to the new BETA service has been postponed. Further information will be published on this in due course.
The Agenda for Issue Specific Hearing 5 Wednesday 13 March 2024 has been published.
The Deadline 4 Submissions have been published.
Following the Examining Authoritys (ExA) decision to accept the Applicant Proposed Provision for examination (PDF, 249 KB), comments are now invited on the Applicants proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 15 March 2024.
Any comments must be made on the Registration and Relevant Representation Form and must relate only to the Applicant proposed provision for the compulsory acquisition of additional land as set out in the Applicant Change Request documents. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
The Planning Inspectorates webpage for the West Burton Solar Projects move to the new BETA service has been postponed. Further information will be published on this in due course.
The Deadline 4 Submissions have been published.
Following the Examining Authority’s (ExA) decision to accept the Applicant Proposed Provision for examination (PDF, 249 KB), comments are now invited on the Applicants proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 15 March 2024.
Any comments must be made on the Registration and Relevant Representation Form and must relate only to the Applicant proposed provision for the compulsory acquisition of additional land as set out in the Applicant Change Request documents. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
The Planning Inspectorate’s webpage for the West Burton Solar Project’s move to the new BETA service has been postponed. Further information will be published on this in due course.
Following the Examining Authority’s (ExA) decision to accept the Applicant Proposed Provision for examination (PDF, 249 KB), comments are now invited on the Applicants proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 15 March 2024.
Any comments must be made on the Registration and Relevant Representation Form and must relate only to the Applicant proposed provision for the compulsory acquisition of additional land as set out in the Applicant Change Request documents. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
The Planning Inspectorate’s webpage for the West Burton Solar Project’s move to the new BETA service has been postponed. Further information will be published on this in due course.
The Action Points from the following hearings have been published:
- ISH2 Tuesday 22 January 2024 (PDF, 32 KB)
- CAH1 Tuesday 6 February 2024 (PDF, 30 KB)
- ISH3 Wednesday 7 January 2024 (PDF, 78 KB)
- ISH4 Thursday 8 February 2024 (PDF, 30 KB)
The Examining Authority has issued a notice of a Hearing and changes to the Examination Timetable (PDF, 272 KB)
The ExA has, at their discretion, accepted a submission from Neil Elliott as an Additional Submission (PDF, 563 KB)
Following the Examining Authoritys (ExA) decision to accept the Applicant Proposed Provision for examination (PDF, 249 KB), comments are now invited on the Applicants proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 15 March 2024.
Any comments must be made on the Registration and Relevant Representation Form and must relate only to the Applicant proposed provision for the compulsory acquisition of additional land as set out in the Applicant Change Request documents. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
The Planning Inspectorate webpage for the West Burton Solar project will be moved entirely over to the new BETA service on 19 February 2024. This means that the appearance of the “Overview” tab will be more consistent with the tabs on the BETA project webpage, and that information on the current “Overview” tab may be presented in a different way. Please contact the Case Team if you have any concerns or queries: [email protected]
The Examining Authority has issued a notice of a Hearing and changes to the Examination Timetable (PDF, 272 KB)
The ExA has published the Note of the Unaccompanied Site Inspection Wednesday 24 and Thursday 25 January 2024 (PDF, 404 KB)
Following the Examining Authority’s (ExA) decision to accept the Applicant’s Proposed Provision for examination (PDF, 249 KB), comments are now invited on the Applicant’s proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 15 March 2024.
Any comments must be made on the Registration and Relevant Representation Form and must relate only to the Applicant’s proposed provision for the compulsory acquisition of additional land as set out in the Applicant’s Change Request documents. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
Following the Examining Authority’s (ExA) decision to accept the Applicant’s Proposed Provision for examination (PDF, 249 KB), comments are now invited on the Applicant’s proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 15 March 2024.
Any comments must be made on the Registration and Relevant Representation Form and must relate only to the Applicant’s proposed provision for the compulsory acquisition of additional land as set out in the Applicant’s Change Request documents. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
The recordings and transcripts of Issue Specific Hearing 3 on Wednesday 7 February 2024 and Issue Specific Hearing 4 on Thursday 8 February 2024 have been published.
Following the Examining Authority’s (ExA) decision to accept the Applicant’s Proposed Provision for examination (PDF, 249 KB), comments are now invited on the Applicant’s proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 15 March 2024.
Any comments must be made on the Registration and Relevant Representation Form and must relate only to the Applicant’s proposed provision for the compulsory acquisition of additional land as set out in the Applicant’s Change Request documents. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
Instructions for those wishing to participate in the hearings scheduled Tuesday 6 – Thursday 8 February 2024 have been sent. For those wishing to observe any of the Hearings in real time please use the following livestream link: https://cvslivestream.co.uk/westburtonsolar/
Please note that the Hearings will start broadcasting LIVE once they open. If the livestream does not initially work, it may be resolved by refreshing the webpage. If you have any issues with accessing the livestream, please contact the Case Team: [email protected] or 0303 444 5000
Please note that the agendas for ISH3 Wednesday 7 February 2024 and ISH4 Thursday 8 February 2024 have been updated:
- Updated Issue Specific Hearing 3 Agenda Wednesday 7 February 2024 (PDF, 170KB )
- Updated Issue Specific Hearing 4 Thursday 8 February 2024 (PDF, 156KB )
The recordings and transcripts of the Compulsory Acquisition Hearing 1 on Tuesday 6 February 2024 have been published.
Instructions for those wishing to participate in the hearings scheduled Tuesday 6 – Thursday 8 February 2024 have been sent. For those wishing to observe any of the Hearings in real time please use the following livestream link: https://cvslivestream.co.uk/westburtonsolar/
Please note that the Hearings will start broadcasting LIVE once they open. If the livestream does not initially work, it may be resolved by refreshing the webpage. If you have any issues with accessing the livestream, please contact the Case Team: [email protected] or 0303 444 5000
Please note that the agendas for ISH3 Wednesday 7 February 2024 and Thursday 8 February 2024 have been updated:
- Updated Issue Specific Hearing 3 Agenda Wednesday 7 February 2024 (PDF, 170KB )
- Updated Issue Specific Hearing 4 Thursday 8 February 2024 (PDF, 156KB )
The recordings and transcripts of the Compulsory Acquisition Hearing 1 on Tuesday 6 February 2024 have been published.
Instructions for those wishing to participate in the hearings scheduled Tuesday 6 – Thursday 8 February 2024 have been sent. For those wishing to observe any of the Hearings in real time please use the following livestream link: https://cvslivestream.co.uk/westburtonsolar/
Please note that the Hearings will start broadcasting LIVE once they open. If the livestream does not initially work, it may be resolved by refreshing the webpage. If you have any issues with accessing the livestream, please contact the Case Team: [email protected] or 0303 444 5000
The Agendas for the hearings Tuesday 6 – Thursday 8 February 2024 have been published:
- Compulsory Acquisition Hearing 1 Agenda Tuesday 6 February 2024 (PDF, 155KB)
- Issue Specific Hearing 3 Agenda Wednesday 7 February 2024 (PDF, 169KB)
- Issue Specific Hearing 4 Thursday 8 February 2024 (PDF, 155KB)’
The following have been accepted into the Examination as Additional Submissions:
Additional Submission from Mark Wardle accepted at the discretion of the Examining Authority (PDF, 73KB)
Additional Submission from Victoria White, a non-Interested Party, accepted at the discretion of the Examining Authority (PDF, 129KB)’
The Examining Authority (ExA) has made a Procedural Decision to accept the Applicant’s request to make changes to the application received on 19 January 2024, which includes an update to the Examination Timetable: Rule 8(3) and 9 Procedural Decision (PDF, 249KB)
The Proposed Provisions Checklist (PDF, 168KB) has also been published.
The Applicant’s Change Request application documents have been published
The following agendas have been published:
The following agendas have been published:
- Compulsory Acquisition Hearing 1 Agenda Tuesday 6 February 2024 (PDF, 155KB)
- Issue Specific Hearing 3 Agenda Wednesday 7 February 2024 (PDF, 169KB)
- Issue Specific Hearing 4 Thursday 8 February 2024 (PDF, 155KB)
The Applicant’s Change Request application documents have been published.
The following have been accepted into the Examination as Additional Submissions:
- Additional Submission accepted at the discretion of the Examining Authority – Position Statement from the Environment Agency in lieu of attendance at the Issue Specific Hearing 3 (PDF, 368KB)
- Additional Submission from Sue Bingham accepted at the discretion of the Examining Authority (PDF, 144KB)
- Additional Submission from Richard Gill accepted at the discretion of the ExA (PDF, 158KB)
The recordings and transcripts of Issue Specific Hearing 2 Tuesday 23 January 2024 and Open Floor Hearing 2 Wednesday 24 January 2024 have been published.
The Examination Library (PDF, 784KB) has been updated.
The following agendas have been published:
- Compulsory Acquisition Hearing 1 Agenda Tuesday 6 February 2024 (PDF, 155KB)
- Issue Specific Hearing 3 Agenda Wednesday 7 February 2024 (PDF, 169KB)
- Issue Specific Hearing 4 Thursday 8 February 2024 (PDF, 155KB)
The Applicant’s Change Request application documents have been published.
The following has been accepted into the Examination as an Additional Submission from a non-Interested Party:
The recordings and transcripts of Issue Specific Hearing 2 Tuesday 23 January 2024 and Open Floor Hearing 2 Wednesday 24 January 2024 have been published.
The Examination Library (PDF, 784KB) has been updated.
The following Agendas have been published:
- Open Floor Hearing 2 Agenda Wednesday 24 January 2024 (PDF, 122KB)
- Issue Specific Hearing 3 Agenda Wednesday 7 February 2024 (PDF, 169KB)
- Issue Specific Hearing 4 Thursday 8 February 2024 (PDF, 155KB)
The Agenda for the Compulsory Acquisition Hearing Tuesday 6 February will be published as soon as possible.
Instructions for those wishing to participate in the Issue Specific Hearing 2 on Tuesday 23 January and Open Floor Hearing 2 Wednesday 24 January 2024 have been sent. For those wishing to observe any of the Hearings in real time please use the following livestream link: https://cvslivestream.co.uk/westburtonsolar/
Please note that the Hearings will start broadcasting LIVE once they open. If the livestream does not initially work, it may be resolved by refreshing the webpage. If you have any issues with accessing the livestream, please contact the Case Team: [email protected] or 0303 444 5000
The following Agendas have been published:
Open Floor Hearing 2 Agenda Wednesday 24 January 2024 (PDF, 122KB)
Issue Specific Hearing 3 Agenda Wednesday 7 February 2024 (PDF, 169KB)
Issue Specific Hearing 4 Thursday 8 February 2024 (PDF, 155KB)
The Agenda for the Compulsory Acquisition Hearing Tuesday 6 February will be published as soon as possible.
Instructions for those wishing to participate in the Issue Specific Hearing 2 on Tuesday 23 January and Open Floor Hearing 2 Wednesday 24 January 2024 have been sent. For those wishing to observe any of the Hearings in real time please use the following livestream link: https://cvslivestream.co.uk/westburtonsolar/
Please note that the Hearings will start broadcasting LIVE once they open. If the livestream does not initially work, it may be resolved by refreshing the webpage. If you have any issues with accessing the livestream, please contact the Case Team: [email protected] or 0303 444 5000
The following Hearing Agendas have been published:
Issue Specific Hearing 2 on the draft Development Consent Order Hearing Agenda (ISH2) Tuesday 23 January 2024 (PDF, 138KB)
Open Floor Hearing 2 (OFH2) Hearing Agenda Wednesday 24 January 2024 (PDF, 122KB)
The Examination Library (PDF, 741KB) is up to date
The Deadline 3 submissions have been published.
The Examining Authority has accepted the following submissions from non-Interested Parties into the Examination as Additional Submissions:
- Additional Submission from Alison Dudley accepted at the discretion of the ExA (PDF, 4KB)
- Additional Submission from Derek Moffatt accepted at the discretion of the ExA (PDF, 132KB)
- Additional Submission from Mary Cavill accepted at the discretion of the ExA (PDF, 7KB)
- Additional Submission from Victoria White accepted at the discretion of the ExA (PDF, 153KB)
- Additional Submission from Katherine McIlroy accepted at the discretion of the ExA (PDF, 455KB)
The Examining Authority’s response to the Applicants Change Notification letter (PDF, 154KB) has been published.
The Examination Library will be updated shortly
The Examining Authority’s response to the Applicants Change Notification letter (PDF, 154KB) has been published.
The Examining Authority has accepted the following into the Examination as Additional Submissions:
The Deadline 2 submissions have been published.
The Applicant has submitted a notification of their intention to submit a Change Request (PDF, 2MB). Please note that the publication of the Applicant’s Change Notification does not indicate that the proposed changes to the application have been accepted for examination by the Examining Authority (ExA). The ExA will issue a Procedural Decision in response to the Change Notification in due course. In the meantime, any comments/responses about the merits of the application should be made in respect of the application as originally submitted.
The Examination Library (PDF 696KB) has been updated.
The Examining Authority’s Notice of Hearings and Request for Information (PDF, 173KB) has been published.
The Examining Authority’s First Written Questions (PDF, 1MB) have been published.
The Deadline 1A Submissions have been published. The Examination Library (PDF 699KB) has been updated.
The Deadline 1 submissions have been published.
The Rule 8 Notification of Examination Timetable (PDF, 297KB) has been published.
The Action Points from Issue Specific Hearing 1 Thursday 9 November 2023 (PDF, 108KB) have been published.
The Examination Timetable (Rule 8 letter) has been sent to Interested Parties
Procedural decision following Preliminary Meeting
The recordings and transcripts of the resumed Preliminary Meeting Wednesday 8 November 2023, Open Floor Hearing 1 Wednesday 8 November 2023 and Issue Specific Hearing 1 Thursday 9 November 2023 have been published.
Instructions for those wishing to participate in the resumed Preliminary Meeting, Open Floor Hearing 1 on 8 November 2023 and Issue Specific Hearing 1 on Thursday 9 November 2023 have been sent. For those wishing to observe any of the Hearings in real time please use the following livestream link: https://cvslivestream.co.uk/westburtonsolar/
Please note that the Hearings will start broadcasting LIVE once they open. If the livestream does not initially work, it may be resolved by refreshing the webpage. If you have any issues with accessing the livestream, please contact the Case Team: [email protected] or 0303 444 5000.
The Agendas for the Open Floor Hearing 1 Wednesday 8 November 2023 (PDF, 160 KB) and Issue Specific Hearing 1 Thursday 9 November 2023 (PDF, 132 KB) have been published.
The notification of the resumed Preliminary Meeting (Rule 6 Letter) (PDF 368KB) has been issued. This letter also contains notification of hearings and the updated draft Examination Timetable.
The submissions for Procedural Deadline B have been published.
The Agendas for the Open Floor Hearing 1 Wednesday 8 November 2023 (PDF, 160 KB) and Issue Specific Hearing 1 Thursday 9 November 2023 (PDF, 132 KB) have been published.
The notification of the resumed Preliminary Meeting (Rule 6 Letter) (PDF 368KB) has been issued. This letter also contains notification of hearings and the updated draft Examination Timetable.
The Agendas for the Open Floor Hearing 1 Wednesday 8 November 2023 (PDF, 160 KB) and Issue Specific Hearing 1 Thursday 9 November 2023 (PDF, 132 KB) have been published.
The deadline to request attendance at the Preliminary Meeting (Wednesday 8 November 2023), Open Floor Hearing 1 or Issue Specific Hearing 1, or to make a submission on the draft Examination Timetable, is 23:59 Tuesday 31 October 2023 (Procedural Deadline B) via the ‘Make A Submission’ tab.
The notification of the resumed Preliminary Meeting (Rule 6 Letter) (PDF 368KB) has been issued. This letter also contains notification of hearings and the updated draft Examination Timetable.
The notification of the resumed Preliminary Meeting (Rule 6 Letter) (PDF 368KB) has been issued. This letter also contains notification of hearings and the updated draft Examination Timetable.
A Procedural Decision (Rule 9) (PDF, 146KB) has been published.
The Examination Library will be updated shortly.
The Examining Authority (ExA) has today (07 September 2023) announced their procedural decision to adjourn the Preliminary Meeting and delay the start of the Examination.
The Open Floor Hearing scheduled for the afternoon of 7 September 2023 has therefore been postponed.
Instructions for those wishing to participate in the Preliminary Meeting and Open Floor Hearing on 7 September 2023 have been sent. For those wishing to observe any of the Hearings in real time please use the following livestream link: https://cvslivestream.co.uk/westburtonsolar/
Please note that the Hearings will start broadcasting LIVE once they open. If the livestream does not initially work, it may be resolved by refreshing the webpage. If you have any issues with accessing the livestream, please contact the Case Team: [email protected] or 0303 444 5000.
The Agendas for the Preliminary Meeting (PDF, 85KB) and Open Floor Hearing (PDF, 147KB) on 7 September 2023 have been published.
The Procedural Deadline A submissions have been published.
The notification of Preliminary Meeting (Rule 6 letter) (PDF, 403KB) has been sent.
The letter also includes the draft Examination Timetable and Initial Assessment of Principal Issues.
The Procedural Deadline A submissions have been published.
The notification of Preliminary Meeting (Rule 6 letter) (PDF, 403kb) has been sent.
The letter also includes the draft Examination Timetable and Initial Assessment of Principal Issues.
The notification of Preliminary Meeting (Rule 6 letter) has been sent Read the letter
The letter also includes the draft Examination Timetable and Initial Assessment of Principal Issues.
View Relevant Representation for this project
Relevant Representations have been published
The Applicant’s response to the s51 Advice issued by the Planning Inspectorate on 18 April 2023 has been published.
This application was received by the Planning Inspectorate on 21 March 2023.