Piblinell Carbon Deuocsid HyNet North West

Nid safbwyntiau’r Arolygiaeth Gynllunio yw’r rhai a fynegir ar y dudalen hon. Yr hyn a ddangosir yma yw cynnwys a gyflwynwyd i’r Arolygiaeth Gynllunio gan y cyhoedd a phartïon eraill â buddiant, sy’n rhoi eu barn ynglŷn â’r cynnig hwn.

Piblinell Carbon Deuocsid HyNet

Derbyniwyd 13/01/2023
Gan Environment Agency

Sylw

We are having ongoing discussions with the Applicant’s agents and are working with them to resolve the issues we have raised on the current EIA submission. We have reviewed the submitted documents and have provided below a summary of matters where we consider that further clarification is required to ensure that the proposal has no detrimental impact on the environment. These matters include land ownership, flood risk, contaminated land, biodiversity, and environmental permitting. Land Ownership As per Schedule of Negotiations with Land Interests, Document Reference Number APP-028, the Applicant is consulting with our North Estates Ops team to set up a site meeting to address queries relating to affected land ownership. At this stage, we are unable to confirm that there are no objections to the acquisition of any of our land interests. Flood Risk Parts of the Pipeline lie within Flood Zone 2 & 3 on the Environment Agency’s Flood Risk Map for planning. As such, we advise that the location of the Above Ground Installation (AGI) is examined and considered in detail within the development’s Flood Risk Assessment (FRA), including full compliance and justification under the Overarching National Policy Statement for Energy (EN-1) and National Policy Statement for Gas Supply Infrastructure and Gas and Oil Pipelines (EN-4) and include all necessary protection and mitigation measures – including compensatory flood storage where necessary. Any temporary or permanent works within 8m of any main river will be subject to the need for a Flood Risk Activity Permit (FRAP) under the Environmental Permitting Regulations from the Environment Agency. Our standard position is that we recommend that the applicant twin track with the DCO and a permit application. At this stage we cannot give any assurances that the current proposals will be granted a FRAP. Contaminated Land Soil and/or groundwater contamination may exist along the length of the proposed pipeline. Associated risks to controlled waters should be addressed as part of the development proposals, and we would wish to be a consultee on the approval of these plans. We support the production of a Dewatering Management Plan and a Groundwater Management and Monitoring Plan, and we would wish to be a consultee on the approval of these plans. If it is proposed to abstract 20m3/day or more to facilitate dewatering of excavations, then this will require an abstraction licence to be issued before any dewatering commences (unless an exemption applies). These applications will need to be supported by a suitable Water Features Survey and Hydrogeological Risk Assessment detailing the risks that the abstraction poses to dependent water features and how these will be mitigated. If any pumping tests are to be carried out at rates of 20m3/day or more to determine aquifer properties to inform the HRA, then the applicant will need to apply for a Groundwater Investigation Consent under the Water Resources Act 1991 prior to carrying out the pumping tests. Discharges of water from pumping tests and dewatering activities will require an environmental permit under the Environmental Permitting (England & Wales) Regulations 2016, from the Environment Agency, unless an exemption applies. Discharges of surface water from the development should be managed in accordance with the guidance provided in the CIRIA SUDS Manual and the Environment Agency’s Groundwater protection position statements - GOV.UK (www.gov.uk). Discharges from areas subject to contamination should not be discharged to ground (infiltration) without appropriate levels of treatment. Infiltration of surface water should not take place on contaminated land. Our standard position is that we recommend that the Applicant twin track with the DCO and permit applications, at present this has not been undertaken, therefore at this stage we cannot give any assurances that the current proposals will be granted for these permits. Ecology Protection/Enhancement We have reviewed the document reference APP-061 - Environmental Statement (Volume II) Chapter 9 – Biodiversity, and have the following comments to make: 9.4.3. ELEMENTS SCOPED OUT OF THE ASSESSMENT We agree that the elements shown in Table 9.2 are not considered to give rise to likely significant effects as a result of the DCO Proposed Development. 9.8. DESIGN DEVELOPMENT, IMPACT AVOIDANCE, AND EMBEDDED MITIGATION Table 9.10 Embedded Mitigation Designed for the DCO Proposed Development Although the mitigation proposed in ‘Waterbodies D-BD-011’ is generally acceptable, we are concerned that a waterbody ‘near Stanlow Refinery’ will be permanently lost. We expect to see full details of adequate compensatory habitat as a result of this loss. 9.9. ASSESSMENT OF LIKELY IMPACTS AND EFFECTS We agree with the assessment of likely impacts/effects and expect these to be mitigated and adequately compensated, as proposed in Table 9.12. 9.10.11. ECOLOGICAL ENHANCEMENT In addition to the creation of wood habitat piles and the installation of bat and bird boxes, the completion of nearby Water Framework Directive mitigation measures, that enhance riverine habitats for biodiversity, must also be included. This would contribute to biodiversity net gain and the legal objective of ‘good ecological potential’ for these waterbodies.
Atodiad 1
Atodiad 1