Maint: 313 KB
Tidal Lagoon (Swansea Bay) Plc
Draft DCO, V3, 5 August 2014. Submitted for Deadline III of 5 August 2014.
Other
Maint: 325 KB
Tidal Lagoon (Swansea Bay) Plc
Draft DCO, comparison document between V2 and V3. Submitted for Deadline III of 5 August 2014.
Other
Maint: 304 KB
Tidal Lagoon (Swansea Bay) Plc
Draft DCO, V2, 8 July 2014. Submitted for Deadline II of 9 July 2014.
Other
Maint: 332 KB
Tidal Lagoon (Swansea Bay) Plc
Draft DCO, comparison document between V1 and V2. Submitted for Deadline II of 9 July 2014.
Other
Maint: 673 KB
Tidal Lagoon (Swansea Bay) Plc
Covering letter and submission. Submitted in response to s51 advice - dated 4 June 2014
Other
Maint: 175 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.19 Anchored vessels (14 days August 2013). Submitted in response to s51 advice.
Other
Maint: 117 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.6 Welsh noise map - industrial noise. Submitted in response to s51 advice.
Other
Maint: 160 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.12 Fishing vessel sightings data (2005-2009). Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.8 Comparison of Swansea WwTW impact optimism/mitigation options. Submitted in response to s51 advice.
Other
Maint: 175 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.4 10 year MAIB incident locations by type (within 5 miles of the Project). Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.2 Bus stop locations. Submitted in response to s51 advice.
Other
Maint: 650 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.11 Operational phase traffic on Fabian Way (eastbound). Submitted in response to s51 advice.
Other
Maint: 437 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 18.3 Area B - Queens dock oil terminal former tank storage areas and eastern lagoon seawall landfall. Submitted in response to s51 advice.
Other
Maint: 231 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.5 Section of the Lagoon seawall at more sheltered locations. Submitted in response to s51 advice.
Other
Maint: 140 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 6 - Revised Book of Reference (3A paragraph 20). Submitted in response to s51 advice.
Other
Maint: 461 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.56 Potential locations for construction support sites. Submitted in response to s51 advice.
Other
Maint: 593 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.8 Construction traffic on Fabian Way (eastbound). Submitted in response to s51 advice.
Other
Maint: 210 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.65 Turbine semi-goliath gantry crane. Submitted in response to s51 advice.
Other
Maint: 163 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 18.8 Distribution of Total Petroleum Hydrocarbons TPH in groundwater based on URS investigation of the former transit site tank farm area. Submitted in response to s51 advice.
Other
Maint: 874 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.4 Schematic representation of model and data interfaces. Submitted in response to s51 advice.
Other
Maint: 550 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.7 AIS data within 5nm buffer (28 days October 2012). Submitted in response to s51 advice.
Other
Maint: 208 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.61 Illustration of water flow between the sea and the Lagoon. Submitted in response to s51 advice.
Other
Maint: 651 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.12 Operational phase traffic on Fabian Way (two way flows). Submitted in response to s51 advice.
Other
Maint: 186 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.18 AIS data on busiest day (20th August 2013). Submitted in response to s51 advice.
Other
Maint: 171 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.25 Comparison of baseline and lagoon construction impacts on microbiological water quality. Submitted in response to s51 advice.
Other
Maint: 114 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.35 Proposed access road with Port security entrance relocated. Submitted in response to s51 advice.
Other
Maint: 641 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.9 Comparison of baseline and lagoon operation impacts on microbiological water quality. Submitted in response to s51 advice.
Other
Maint: 771 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.1 Swansea Bay study area water quality designations and key locations. Submitted in response to s51 advice.
Other
Maint: 282 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.32 Halfway point pearl. Submitted in response to s51 advice.
Other
Maint: 617 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.14 Sheet pile wall. Submitted in response to s51 advice.
Other
Maint: 174 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.9 Anchored vessels (56 days July and October 2012). Submitted in response to s51 advice.
Other
Maint: 461 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.3 Discharge sources model discharge locations and Smart Coast sample sites. Submitted in response to s51 advice.
Other
Maint: 916 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.10 Illustrative cross section of a bi-directional bulb fixed speed turbine. Submitted in response to s51 advice.
Other
Maint: 764 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.27 Sailing are within the Lagoon. Submitted in response to s51 advice.
Other
Maint: 214 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.57 Schematic layout of offices stores car parking site access control and plant yard. Submitted in response to s51 advice.
Other
Maint: 324 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.16 RYA overview of recreational cruising routes and facilities. Submitted in response to s51 advice.
Other
Maint: 629 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.3 Baseline traffic flows (westbound). Submitted in response to s51 advice.
Other
Maint: 573 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.9 Construction traffic on Fabian Way (two way flows). Submitted in response to s51 advice.
Other
Maint: 498 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 18.1 Proposed location of Project. Submitted in response to s51 advice.
Other
Maint: 454 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.28 Illustration of western landfall building. Submitted in response to s51 advice.
Other
Maint: 668 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.45 Cutter Suction Dredger. Submitted in response to s51 advice.
Other
Maint: 89 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 10 - Submission in respect of construction of temporary cofferdam (4B paragraph 26). Submitted in response to s51 advice.
Other
Maint: 398 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.5 Schematic representation of model application process. Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 17.3a Groundwater flooding susceptibility (west). Submitted in response to s51 advice.
Other
Maint: 537 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.2 Swansea Bay Coastal Model - model grid and bathymetry. Submitted in response to s51 advice.
Other
Maint: 160 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.13 Fishing vessel satellite data (2009). Submitted in response to s51 advice.
Other
Maint: 522 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.64 Maximum flood tide current flow patterns in front of turbine house. Submitted in response to s51 advice.
Other
Maint: 629 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.2 Masterplan. Submitted in response to s51 advice.
Other
Maint: 3 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 3.2 Key difference between lagoon layout options J(3) and J(2). Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.22 Comparison of baseline and lagoon on nitrogen concentrations. Submitted in response to s51 advice.
Other
Maint: 176 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.10 Fishing vessels AIS tracks (28 days July 2012). Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Ltd
Annexe 5 - Updated Figure 7.18 Difference in baseline and lagoon operation temperatures. Submitted in response to s51 advice.
Other
Maint: 62 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.53 Sediment fill levels in sections during installation. Submitted in response to s51 advice.
Other
Maint: 473 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.26 Western landfall layout. Submitted in response to s51 advice.
Other
Maint: 309 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.3 RNLI bases in proximity to project. Submitted in response to s51 advice.
Other
Maint: 700 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 18.2 Western onshore Area (area a) including proposed western seawall landfall, Queens Dock and Grid Cable Route. Submitted in response to s51 advice.
Other
Maint: 773 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.25a Illustration of offshore Building. Submitted in response to s51 advice.
Other
Maint: 505 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 18.4 Area C showing the Crymlyn Burrows SSSI and grid connection route to the Baglan Bay substation. Submitted in response to s51 advice.
Other
Maint: 347 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.4 Section of the Lagoon seawall at exposed Locations. Submitted in response to s51 advice.
Other
Maint: 332 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.22 Location of three focal areas. Submitted in response to s51 advice.
Other
Maint: 105 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 8 - Submission in respect of location of turbine and sluice gate housing structure (4B paragraph 27). Submitted in response to s51 advice.
Other
Maint: 182 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.14 Recreational vessels (28 days July 2012). Submitted in response to s51 advice.
Other
Maint: 293 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 3 - Notices under s42(1)(d) of proposed application served in respect of properties on Bevans Row (1E paragraph 15). Submitted in response to s51 advice.
Other
Maint: 622 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.43 Key elements phase 3 construction. Submitted in response to s51 advice.
Other
Maint: 189 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.29 Comparison of operational Lagoon with turbines relocated and additional discharge on microbiological water quality. Submitted in response to s51 advice.
Other
Maint: 633 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.46 Geotube filling - illustration of purpose modified installation vessel. Submitted in response to s51 advice.
Other
Maint: 672 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.55 Installing sheet piles harbour side. Submitted in response to s51 advice.
Other
Maint: 253 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.37 Cross-section of new access road. Submitted in response to s51 advice.
Other
Maint: 62 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 12.1 Terrestrial ecology study area. Submitted in response to s51 advice.
Other
Maint: 481 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.2 Location of noise sensitive receivers. Submitted in response to s51 advice.
Other
Maint: 126 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.4 Welsh noise map - road noise. Submitted in response to s51 advice.
Other
Maint: 102 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 22.2 Coastal recreational facilities Swansea bay. Submitted in response to s51 advice.
Other
Maint: 21 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 4 - Copy of representation by the Coal Authority on 30 July 2013 (1E paragraph 16). Submitted in response to s51 advice.
Other
Maint: 150 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.1 Principle navigational features in proximity to the Project. Submitted in response to s51 advice.
Other
Maint: 232 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 17.5 Illustration of extreme tide levels inside and outside of the Lagoon wall for 1 in 200 year current (2013) and climate change water levels. Submitted in response to s51 advice.
Other
Maint: 346 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 17.6 Schematic cross section indicating swale feature. Submitted in response to s51 advice.
Other
Maint: 87 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.60 Construction access routes. Submitted in response to s51 advice.
Other
Maint: 780 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.10 Comparision of effects of enhancement options on microbiological water quality dry weather - E Coli 100ml. Submitted in response to s51 advice.
Other
Maint: 69 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.58 Indicative batching plant layout. Submitted in response to s51 advice.
Other
Maint: 417 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.52 Plan of proposed operation of installing lower level tie rods. Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.14 Predicted Lagoon impoundment 90 percentile and 95 percentile E Coli concentrations. Submitted in response to s51 advice.
Other
Maint: 504 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.13 Two main alternative turbine and sluice gate housing locations. Submitted in response to s51 advice.
Other
Maint: 332 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.13 Predicted changes in 90 percentile and 95 percentile FIO concentrations and Aberfan Sands DSP. Submitted in response to s51 advice.
Other
Maint: 179 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.19 Overview of grid connection route from Swansea Port. Submitted in response to s51 advice.
Other
Maint: 542 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.21 Plan of access road between Queen's Dock and the Lagoon. Submitted in response to s51 advice.
Other
Maint: 193 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.29 Eastern landfall viewing platform. Submitted in response to s51 advice.
Other
Maint: 470 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.24 Location of offshore Building. Submitted in response to s51 advice.
Other
Maint: 53 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 1 - Table of heights and dimensions in the draft DCO and the Statement of Reasons (1a paragraph 1). Submitted in response to s51 advice.
Other
Maint: 227 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.38 Cross section of new access road. Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.19 Comparison of baseline and lagoon operation on maximum summer temperature. Submitted in response to s51 advice.
Other
Maint: 558 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.33 Key ecological proposals. Submitted in response to s51 advice.
Other
Maint: 632 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.10 Operational phase traffic on Fabian Way (westbound). Submitted in response to s51 advice.
Other
Maint: 187 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.28 Comparison of operational Lagoon and decommissioned lagoon impacts on microbiological water quality. Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.6 Vehicle access. Submitted in response to s51 advice.
Other
Maint: 591 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.6 AIS data within 15nm buffer (28 days July 2012). Submitted in response to s51 advice.
Other
Maint: 191 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.17 AIS data within 5nm buffer (14 days August 2013). Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.23 Difference in baseline and lagoon concentrations of nitrogen. Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.21 Comparison of baseline and lagoon operation on winter salinity. Submitted in response to s51 advice.
Other
Maint: 465 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 1.3 Location of project and masterplan. Submitted in response to s51 advice.
Other
Maint: 153 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.2 SAR helicopter bases relative to Project. Submitted in response to s51 advice.
Other
Maint: 733 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.16 Comparison of effects of optimisation options on predicted annual 97 percentile microbiological water quality. Submitted in response to s51 advice.
Other
Maint: 448 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.1 Location of key noise sensitive receptors. Submitted in response to s51 advice.
Other
Maint: 158 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 17.2 Location of key water features in study area. Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.11 Comparison of effects of enhancement options on microbiological water quality wet weather. Submitted in response to s51 advice.
Other
Maint: 83 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 9 - Submission in respect of location of ultra violet water treatment facility (4B paragraph 25). Submitted in response to s51 advice.
Other
Maint: 249 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.48 Second stage of the seawall construction. Submitted in response to s51 advice.
Other
Maint: 980 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 17.4 WFD Carboniferous coal measures groundwater waterbody. Submitted in response to s51 advice.
Other
Maint: 184 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 22.1 Port of Swansea context map. Submitted in response to s51 advice.
Other
Maint: 638 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.50 Cross section of twin wall sheet pile cofferdam. Submitted in response to s51 advice.
Other
Maint: 445 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.8 AIS vessels track busiest day (3rd July 2012). Submitted in response to s51 advice.
Other
Maint: 186 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.21 Recreational vessels (14 days August 2013). Submitted in response to s51 advice.
Other
Maint: 173 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.15 Indicative layout of dolphin piles. Submitted in response to s51 advice.
Other
Maint: 116 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.5 Welsh noise map - rail noise. Submitted in response to s51 advice.
Other
Maint: 535 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 16.2 Wind Rose, Pembury sands (2012). Submitted in response to s51 advice.
Other
Maint: 131 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.24 Comparison of baseline and Lagoon impacts on dissolved oxygen concentrations. Submitted in response to s51 advice.
Other
Maint: 294 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 16.3 Comparison of measured and modelled nitrogen dioxide concentrations.. Submitted in response to s51 advice.
Other
Maint: 123 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 2 - Table of dimensions of all elements of Project
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 17.3b Groundwater flooding susceptibility - east. Submitted in response to s51 advice.
Other
Maint: 566 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.16 Example of safety boom proposed. Submitted in response to s51 advice.
Other
Maint: 177 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.11 Fishing vessels AIS tracks (28 days October 2012). Submitted in response to s51 advice.
Other
Maint: 608 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.41 Key elements phase 1 construction. Submitted in response to s51 advice.
Other
Maint: 204 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.36 Access track to eastern landfall. Submitted in response to s51 advice.
Other
Maint: 340 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.12 predicted changes in 90 percentile and 95 percentile FIO concentrations at Swansea bay DSP. Submitted in response to s51 advice.
Other
Maint: 234 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.47 First stage of the seawall construction. Submitted in response to s51 advice.
Other
Maint: 608 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.4 Baseline traffic flows (eastbound). Submitted in response to s51 advice.
Other
Maint: 641 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.30 Landward Ecological Park. Submitted in response to s51 advice.
Other
Maint: 306 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.9 Dredging Option B less extensive deeper option for dredging. Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.15 Predicted Lagoon impoundment 90 percentile and 95 percentile Enterococci concentrations. Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.26 Comparison of Baseline and increased decay rates on microbiological water quality. Submitted in response to s51 advice.
Other
Maint: 279 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.54 Illustrative cross section of seawall without Geotubes. Submitted in response to s51 advice.
Other
Maint: 7 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 7 - Revised Land Plan 7A (3A paragraph 20). Submitted in response to s51 advice.
Other
Maint: 843 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.40 Plan of water shuttle service. Submitted in response to s51 advice.
Other
Maint: 470 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.63 Maximum ebb tide current flow patterns in front and oblique to turbine house. Submitted in response to s51 advice.
Other
Maint: 480 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.3 Location of underwater noise monitoring locations. Submitted in response to s51 advice.
Other
Maint: 350 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.31 Location of sculptural elements. Submitted in response to s51 advice.
Other
Maint: 356 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.8 Dredging Option A extensive shallow option for dredging. Submitted in response to s51 advice.
Other
Maint: 131 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 18.9 Distribution of benzene in groundwater based on URS investigation of the former. Submitted in response to s51 advice.
Other
Maint: 44 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 3.1 Areas of high tidal range around England and Wales. Submitted in response to s51 advice.
Other
Maint: 205 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.27 Average dilution as log10 of contaminants from de-watering. Submitted in response to s51 advice.
Other
Maint: 655 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.42 Key elements phase 2 construction. Submitted in response to s51 advice.
Other
Maint: 384 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.34 Access to Lagoon off Fabian Way. Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.1 Study Area. Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.20 Fishing vessels (14 days August 2013). Submitted in response to s51 advice.
Other
Maint: 416 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.5 10 year RLNI incidents by casualty type (within 5nm of the site). Submitted in response to s51 advice.
Other
Maint: 57 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.49 Temporary cofferdam - option 1 using rock armour. Submitted in response to s51 advice.
Other
Maint: 311 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 2.1 Outline project programme. Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.20 Difference in mean salinity between baseline and operational lagoon. Submitted in response to s51 advice.
Other
Maint: 540 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.7 Construction traffic on Fabian Way (westbound). Submitted in response to s51 advice.
Other
Maint: 617 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.5 Baseline traffic flows (two way). Submitted in response to s51 advice.
Other
Maint: 349 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.59 Indicative steel fabrication yard layout Area C. Submitted in response to s51 advice.
Other
Maint: 263 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.7 Visitor facilities locations. Submitted in response to s51 advice.
Other
Maint: 61 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.62 Lagoon operating cycle. Submitted in response to s51 advice.
Other
Maint: 95 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.1 Location of the Project. Submitted in response to s51 advice.
Other
Maint: 387 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.6 Section of Lagoon seawall using conventional construction. Submitted in response to s51 advice.
Other
Maint: 839 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.3 Lagoon layout option J(3) on Admiralty Chart background. Submitted in response to s51 advice.
Other
Maint: 503 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.11 Illustration elevation of sluice gate. Submitted in response to s51 advice.
Other
Maint: 777 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.44 Target construction programme. Submitted in response to s51 advice.
Other
Maint: 175 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.15 Recreational vessels (28 days October 2012). Submitted in response to s51 advice.
Other
Maint: 393 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.51 Illustration of installation of sheet piles. Submitted in response to s51 advice.
Other
Maint: 1 MB
4.2 Funding statement
Other
Maint: 140 KB
4.3 Book of reference
Other
Maint: 15 MB
4.1 Statement of Reasons
Other
Maint: 254 MB
8.1 Design and Access Statement
Other
Maint: 471 KB
5.1 A6.5 LPA sign off of SoCC
Other
Maint: 474 KB
5.1 A5.10 List of consultees at Phase 1C
Other
Maint: 1 MB
5.1 A7.1 PEIR s46 notice
Other
Maint: 8 MB
2.2.25 PROW Plan Part 8 1
Other
Maint: 20 MB
6.3.13.9 - 6.3.13.19 ES Landscapes Aspect Layer
Other
Maint: 438 KB
5.1 A5.11 Website updates
Other
Maint: 4 MB
5.5b Habitats Regulations Assessment Appendices
Other
Maint: 5 MB
2.4.16 Saltmarsh Plan 1
Other
Maint: 2 MB
6.3.21.2 ES Terrestrial Archaeological assets within a detailed study area
Other
Maint: 345 KB
5.1 A11.2 EIA Event attendees
Other
Maint: 1 MB
6.4.15.12 ES Draft Construction Phase Travel Plan
Other
Maint: 3 MB
6.4.12.1 - 6.4.12.8 and 6.4.12.10 ES Terrestrial Ecology Technical Appendices
Other
Maint: 5 MB
6.4.7.1 ES Hydrodynamic model update and validation report
Other
Maint: 1 MB
6.2.20 ES Cultural Heritage Marine Archaeology
Other
Maint: 25 MB
5.1 A6.13 s47 and s48 notices
Other
Maint: 172 KB
6.4.6.3 ES Summary of results from contamination and PSA analyses
Other
Maint: 555 KB
6.3.10.10 ES Long-term Mean Sighting Rates of Minke Whale
Other
Maint: 941 KB
6.3.6.51 ES Predicted changes to mud deposition during calm periods (Spring tide only)
Other
Maint: 306 KB
6.3.6.38 ES Timeseries plots of flow speed changes Site O5
Other
Maint: 1 MB
5.7 Statement in respect of Statutory Nuisance
Other
Maint: 13 MB
2.4.42-2.4.44 Demolition Plan 1
Other
Maint: 2 MB
6.4.9.3 ES Fish Turbine Encounter modelling
Other
Maint: 2 MB
6.3.11.15 ES Bird Survey - 28 March 2013
Other
Maint: 113 KB
6.2b ES Glossary
Other
Maint: 2 MB
5.1 A5.1 Presentations to stakeholders Design D
Other
Maint: 894 KB
5.1 A3.5 Early project definition - presentation to stakeholders
Other
Maint: 6 MB
6.3.13.8 ES Landscape Designations
Other
Maint: 244 KB
6.2a ES Abbreviations
Other
Maint: 4 MB
2.4.21 Halfway Point
Other
Maint: 265 KB
6.4.2.2 ES Transboundary correspondence
Other
Maint: 2 MB
2.4.29 Cable Route 2
Other
Maint: 2 MB
5.1 A2.3 Access strategy
Other
Maint: 1 MB
2.4.48 Proposed Plan - Basement - 2 1
Other
Maint: 9 MB
6.3.13.1 ES Landscape Character
Other
Maint: 232 KB
6.3.6.50 ES Predicted changes to mud deposition during a 10 in 1yr storm event
Other
Maint: 305 KB
6.3.6.37 ES Timeseries plots of flow speed changes Site L7
Other
Maint: 589 KB
6.3.6.9 ES PSA results from benthic survey
Other
Maint: 2 MB
2.4.32 Cable Route 5
Other
Maint: 338 KB
3.1 Draft DCO
Other
Maint: 1 MB
5.1 CR12 Conclusions
Other
Maint: 1 MB
2.4.51 Proposed Plan - First Floor 1
Other
Maint: 223 KB
6.3.6.24 ES Maximum predicted sedimentation East bund construction
Other
Maint: 6 MB
2.4.22 Typical fencing gate details
Other
Maint: 508 KB
5.1 A10.4 Schedule of notices served to PIL
Other
Maint: 5 MB
5.1 A7.6 PEIR NTS
Other
Maint: 9 MB
2.2.27 PROW Plan Part 10 1
Other
Maint: 37 MB
2.2.2-2.2.10 Works Plan 1
Other
Maint: 5 MB
2.4.12 Eastern Landfall Plan 1
Other
Maint: 5 MB
8.2 Planning Statement
Other
Maint: 248 KB
6.3.10.13 ES GPS track of Seal Pups
Other
Maint: 388 KB
6.3.6.10 ES Measured variation in key coastal process parameters at metocean site 1
Other
Maint: 9 MB
5.1 A6.11 Zone of Theoretical Visibility 24.09.13
Other
Maint: 3 MB
6.4.7.2 ES Supporting Technical Information Report
Other
Maint: 9 MB
2.4.1 Masterplan Key Plan
Other
Maint: 567 KB
5.1 A6.8 Map of community consultation zones
Other
Maint: 5 MB
6.3.13.4 ES Local Seascape Unit Plan
Other
Maint: 1,021 KB
6.3.6.52 ES Predicted changes to mud deposition during a 1 in 20yr storm event
Other
Maint: 892 KB
2.4.25 Turbine House Section
Other
Maint: 13 MB
5.4 Natural Features Report
Other
Maint: 1 MB
5.1 A11.1 Invitation and Schedule EIA Presentation Event 221013
Other
Maint: 90 KB
8.6 DCO Heads of Terms
Other
Maint: 54 KB
6.4.15.14 ES Major Event Travel Plan Framework
Other
Maint: 221 KB
6.3.6.42 ES Predicted changes to MHWS
Other
Maint: 348 KB
6.3.6.16 ES Locations of samples analysed for sediment contamination
Other
Maint: 9 MB
2.4.9 Western landfall vegetation
Other
Maint: 21 KB
5.6 Other consents and licences
Other
Maint: 760 KB
5.1 A10.6 PILS responses 280114
Other
Maint: 7 MB
2.2.23 PROW Plan Part 6 1
Other
Maint: 2 MB
6.3.11.14 ES Bird Survey - 15 February 2013
Other
Maint: 2 MB
6.4.15.1 ES Baseline Traffic Data
Other
Maint: 226 KB
6.3.6.17 ES Maximum predicted SSC increases West bund construction
Other
Maint: 34 MB
2.4.2-2.4.7 Masterplan detail scale
Other
Maint: 651 KB
5.1 A7.5 Preferred option and the PEIR presentation
Other
Maint: 5 MB
5.1 A6.10 Zone of Theoretical Visibility 19.06.13
Other
Maint: 6 MB
6.3.13.5 ES Zone of Theoretical Visibility
Other
Maint: 2 MB
5.1 A2.2 Cable route iterations
Other
Maint: 933 KB
5.1 A10.7 Inland fishing table
Other
Maint: 2 MB
2.4.30 Cable Route 3
Other
Maint: 2 MB
6.3.11.21 ES High Tide Roost Locations
Other
Maint: 9 MB
2.2.28 PROW Plan Part 11 1
Other
Maint: 44 KB
6.4.19.1 ES World Health Organisation Guidelines
Other
Maint: 2 MB
5.1 CR1 Introduction
Other
Maint: 1 MB
2.4.54 Proposed Section - AA
Other
Maint: 5 MB
6.4.18.1 ES Groundwater-intertidal zone discharge conceptual model
Other
Maint: 319 KB
6.3.6.20 ES Sedimentation timeseries for West bund construction
Other
Maint: 262 KB
5.1 A3.3 List of NSB s47 consultees
Other
Maint: 531 KB
2.2.16 Works Sections 6 1
Other
Maint: 5 MB
5.1 A3.7 Lagoon proposal summary brochure
Other
Maint: 740 KB
5.1 A2.6 Masterplan designs
Other
Maint: 105 KB
6.4.15.8 ES Langdon road roundabout Arcady Results
Other
Maint: 124 KB
6.4.4.2 ES OEMP
Other
Maint: 3 MB
5.1 A11.3 Draft ES response table
Other
Maint: 1 MB
2.4.53 Proposed Plan Roof 1
Other
Maint: 124 KB
6.4.15.4 ES Traffic Flow Diagrams
Other
Maint: 3 MB
5.1 CR2 Project design evolution
Other
Maint: 285 KB
8.4 Table of mitigation and where secured
Other
Maint: 433 KB
6.3.6.23 ES SSC timeseries plots for East bund construction
Other
Maint: 3 MB
6.3.18.10 ES BGS Groundwater Flooding Susceptibility
Other
Maint: 2 MB
6.3.11.5 ES Bird Survey - 15 December 2011
Other
Maint: 242 KB
6.3.8.7 ES Biotope Map A
Other
Maint: 374 KB
5.1 A3.2 List of s42d PILS
Other
Maint: 537 KB
5.1 A7.4 Notice issued to s42
Other
Maint: 237 KB
6.3.6.34 ES Predicted difference in mean Spring tidal flow relative change
Other
Maint: 2 MB
6.2.8 ES Intertidal and Subtidal Benthic Ecology
Other
Maint: 6 MB
5.3 Historic Environment Report
Other
Maint: 119 KB
6.4.20.1 ES Gazetteer of Known Maritime Sites
Other
Maint: 6 MB
6.4.8.3 ES Artificial structures in coastal habitats
Other
Maint: 1 MB
5.1 A5.8 Non stat cons - report on feedback
Other
Maint: 2 MB
6.4.6.1 ES Model setup calibration and validation
Other
Maint: 6 MB
6.2.9 ES Fish Including Recreational and Commercial Fisheries
Other
Maint: 298 KB
6.3.6.36 ES Timeseries plots of flow speed changes Site L4
Other
Maint: 2 MB
6.2.10 ES Marine Mammals and Turtles
Other
Maint: 3 MB
2.4.37 FW Junction 3
Other
Maint: 503 KB
5.1 A7.3 Notice to LPA s43
Other
Maint: 8 MB
2.2.19 PROW Plan Part 2 1
Other
Maint: 9 MB
2.2.1 Works Key Plan 1
Other
Maint: 177 KB
6.4.19.2 ES Noise Data
Other
Maint: 2 MB
6.3.11.1 ES Western Bird Survey Area
Other
Maint: 303 KB
6.3.6.39 ES Timeseries plots of flow speed changes Site O3
Other
Maint: 384 KB
6.3.6.11 ES Measured variation in key coastal process parameters at metocean site 2
Other
Maint: 2 MB
6.2.1 ES Introduction
Other
Maint: 1 MB
5.1 CR4 Non-stat EIA scoping
Other
Maint: 8 MB
6.3.8.3 ES Designated Sites
Other
Maint: 297 KB
5.1 A6.4 Final Socc
Other
Maint: 6 MB
6.3.8.15 ES Seabed Classification
Other
Maint: 2 MB
6.3.6.1ES Numerical Model Extents
Other
Maint: 21 MB
6.1 ES Non Technical Summary - Welsh
Other
Maint: 4 MB
5.5a Habitats Regulations Assessment Report
Other
Maint: 370 KB
5.1 A11.5 Meetings with stat bodies - continuous engagement
Other
Maint: 29 MB
6.4.21.1 ES Cultural Heritage Terrestrial Archaeology Baseline
Other
Maint: 10 MB
6.3.8.1 ES Study Area
ES Vol. 2. Chapter 8 Figure 8.1 Study Area
Other
Maint: 397 KB
5.1 A5.7 Non stat cons - feedback form
Other
Maint: 1 MB
2.2.11 Works Sections 1 1
Other
Maint: 3 MB
8.3 Water Framework directive
Other
Maint: 249 KB
6.3.6.33 ES Predicted difference in mean Spring tidal flow Absolute change
Other
Maint: 5 MB
6.3.6.8 ES Titan Seabed Sediment Distribution
Other
Maint: 751 KB
5.1 A6.3 LPA comments on the draft socc - response tracker
Other
Maint: 43 KB
6.4.10.1 ES Grey Seal Sightings
Other
Maint: 640 KB
6.3.10.1 ES Study Areas for Marine Mammal Baseline
Other
Maint: 2 MB
2.4.34 Cable Route 7
Other
Maint: 8 MB
6.3.20.1 - 6.3.20.3 ES Figures
Other
Maint: 7 MB
2.2.20 PROW Plan Part 3 1
Other
Maint: 12 MB
1.3 Copies of newspaper notices
Other
Maint: 393 KB
5.1 A7.7 PEIR and NTS Deposit Locations and Event 161013
Other
Maint: 1 MB
6.4.15.2 ES Traffic Count Data
Other
Maint: 781 KB
5.1 A5.3 Sample letters to key stakeholders and E-newsletter
Other
Maint: 566 KB
5.1 A9.3 Community consultation questionnaire report
Other
Maint: 150 KB
6.4.14.2 ES Hazard Log
Other
Maint: 6 MB
2.4.8 Western landfall
Other
Maint: 3 MB
6.2.17 ES Hydrology and Flood Risk
Other
Maint: 11 MB
2.2.18 PROW Plan Part 1 1
Other
Maint: 10 MB
2.2.21 PROW Plan Part 4 1
Other
Maint: 2 MB
6.3.21.1 ES Terrestrial Archaeological assets within a detailed study area
Other
Maint: 1 MB
6.3.1.1 ES Location of Swansea Bay Tidal Lagoon
Other
Maint: 169 KB
6.4.15.7 ES Fabian Way Park Ride Access LinSig results
Other
Maint: 632 KB
6.3.6.45 ES Predicted changes to wave parameters 1 in 1yr southwesterly wave
Other
Maint: 4 MB
6.3.18.6 ES Superficial Geology
Other
Maint: 2 MB
6.2.19 ES Noise and Vibration
Other
Maint: 831 KB
5.1 A9.5 Public responses to PEIR (s47)
Other
Maint: 3 MB
5.1 A2.1 Lagoon Designs A-N
Other
Maint: 467 KB
6.3.8.9 ES Biotope Map C
Other
Maint: 3 MB
5.1 A5.5 TLSB project introduction flyer
Other
Maint: 808 KB
5.1 A11.6 TLSB cultural sport and education programmes
Other
Maint: 15 MB
2.4.57 Proposed Elevations
Other
Maint: 4 MB
2.4.13 Eastern Landfall Sections
Other
Maint: 6 MB
5.1 A6.9 Zone of Theoretical Visibility 06.06.12
Other
Maint: 2 MB
6.4.9.4 ES Fish Turbine Passage Modelling
Other
Maint: 9 MB
6.3.8.17 ES Titan Survey Sample Points
Other
Maint: 2 MB
7.1 Cable and Grid Connection Statement
Other
Maint: 7 MB
6.3.13.2 - 6.3.13.3 ES Regional Seascape Unit Plans
Other
Maint: 8 MB
6.3.8.2 ES 2013 Survey Areas
Other
Maint: 1 MB
6.3.6.41 ES Scheme tidal residual
Other
Maint: 926 KB
6.3.10.3b ES Inter-Agency Marine Mammal Working Group Management Units
Other
Maint: 2 MB
5.1 A4.1 Scoping responses table
Other
Maint: 13 MB
5.1 A9.1 Exhibition boards
Other
Maint: 51 KB
6.4.13.1 ES Visually Verified Montages by iCreate Methodology Report
Other
Maint: 2 MB
6.3.11.7 ES Bird Survey - 20 February 2012
Other
Maint: 1 MB
6.3.6.40 ES Baseline tidal residual
Other
Maint: 500 KB
6.4.15.13 ES Draft Operational Phase Travel Plan
Other
Maint: 2 MB
6.2.22 ES Economy Tourism and Recreation
Other
Maint: 6 MB
2.4.41 Demolition Key Plan 1
Other
Maint: 6 MB
6.4.9.1 ES Fish Including recreational and commercial fisheries baseline
Other
Maint: 4 MB
5.2 Flood Consequence Assessment
Other
Maint: 144 KB
3.2 Explanatory Memorandum
Other
Maint: 1 MB
2.4.56 Proposed Section - CC
Other
Maint: 3 MB
6.3.8.5 ES Biotope Map East
Other
Maint: 2 MB
6.3.1.2 ES Application Site
Other
Maint: 251 KB
6.3.6.32 ES Mean Spring baseline flow speeds
Other
Maint: 541 KB
2.4.24 Turbine House GA
Other
Maint: 4 MB
5.1 A6.2 Draft consultation strategy and socc
Other
Maint: 193 KB
6.3.10.12 ES At-Sea Usage Map for Grey Seal
Other
Maint: 625 KB
6.3.10.4 ES Long-term mean sighting rates of Harbour Porpoise
Other
Maint: 3 MB
2.4.38 TLP Access Road
Other
Maint: 2 MB
6.3.11.2 ES Eastern Bird Survey Area
Other
Maint: 3 MB
6.3.8.4 ES Biotope Map West
Other
Maint: 286 KB
6.3.6.14 ES Historical beach profiles for location around Swansea Bay
Other
Maint: 5 MB
2.3.2 Natural Features Ph1
Other
Maint: 675 KB
5.1 A5.6 Project film script and stills
Other
Maint: 359 KB
5.1 A6.12 s48 planning notices
Other
Maint: 101 KB
6.4.6.4 ES Summary of model run scenarios for Coastal Processes EIA
Other
Maint: 343 KB
6.3.10.11 ES Long-term Mean Vessel Sighting Rates of Seals
Other
Maint: 1,010 KB
5.1 A3.4 All non stat cons and community cons
Other
Maint: 258 KB
6.4.15.5 ES Fabian Way Quay Parade Kings Road LinSig results
Other
Maint: 8 MB
6.3.8.16 ES Seabed Sediment Distribution Titan Survey
Other
Maint: 742 KB
6.3.4.7b ES Metal Sampling
Other
Maint: 361 KB
1.5 Guide to the application
Other
Maint: 1 MB
5.1 CR6 SoCC defining and publicising
Other
Maint: 2 MB
8.5 Marine Licence Application
Other
Maint: 1 MB
6.4.12.9 ES CFD Simulation Results
Other
Maint: 6 MB
6.3.13.6 ES Cumulative Development Locations
Other
Maint: 2 MB
6.3.11.3 ES Bird Survey - 21 October 2011
Other
Maint: 303 KB
6.3.6.35 ES Timeseries plots of flow speed changes Site
Other
Maint: 623 KB
6.3.6.7 ES Wave roses for metocean sites and Scarweather buoy
Other
Maint: 30 MB
2.4.45 GA Elevations
Other
Maint: 932 KB
2.2.15 Works Sections 5 1
Other
Maint: 379 KB
6.3.6.30 ES Sedimentation timeseries plots for Sediment disposal
Other
Maint: 4 MB
2.3.1 Natural Features
Other
Maint: 2 MB
5.1 A11.7 Bauman institute report
Other
Maint: 2 MB
6.3.11.16 ES Bird Survey - 26 April 2013
Other
Maint: 171 KB
6.3.10.2 ES Location of Boat Based Surveys and Fixed Monitoring Sites
Other
Maint: 974 KB
6.3.5.1 ES Local Authority Boundaries
Other
Maint: 968 KB
5.1 A5.9 April Events publicity
Other
Maint: 2 MB
5.1 CR7 Stat cons with stat consultees
Other
Maint: 2 MB
6.4.8.1 ES Benthic Survey Proposal
Other
Maint: 425 KB
6.3.6.28 ES SSC timeseries plots for Sediment disposal
Other
Maint: 1 MB
6.2.2 ES EIA Process and Assessment of Significance
Other
Maint: 6 MB
6.3.20.4 - 6.3.20.11 ES Figures
Other
Maint: 3 MB
6.3.8.10 ES Biotope Map West of River Tawe A
Other
Maint: 543 KB
6.3.6.44 ES Predicted changes to wave parameters 10 in 1yr southwesterly wave
Other
Maint: 3 MB
6.2.18 ES Land Quality and Hydrogeology
Other
Maint: 4 MB
1.2 Application form
Other
Maint: 3 MB
5.1 CR9 Stat cons with local community
Other
Maint: 1 MB
2.2.13 Works Sections 3 1
Other
Maint: 1 MB
6.3.18.5 ES Made Ground
Other
Maint: 2 MB
6.3.11.9 ES Bird Survey - 21 September 2012
Other
Maint: 221 KB
6.3.6.21 ES Predicted sedimentation at end of Spring Neap cycle West bund construction
Other
Maint: 1 MB
6.2.23 ES Mitigation and Monitoring
Other
Maint: 3 MB
6.2.12 ES Terrestrial Ecology
Other
Maint: 298 KB
5.1 A9.2 Community consultation questionnaire
Other
Maint: 61 KB
6.4.16.1 ES Traffic Flows
Other
Maint: 12 MB
6.4.14.1 ES Navigation Risk Assessment
Other
Maint: 2 MB
6.3.8.12 ES Biotope Map North of Mumbles Head A
Other
Maint: 11 MB
5.1 A5.4 Education Program Boards
Other
Maint: 288 KB
5.1 A7.2 s42 48 Notice DECC sos
Other
Maint: 4 MB
2.4.14 Offshore building public realm plan 1
Other
Maint: 575 KB
6.3.6.48 ES Predicted changes to wave parameters 10 in 1yr southeasterly wave
Other
Maint: 1 MB
6.2.16 ES 16 Air Quality
Other
Maint: 4 MB
2.4.17 Saltmarsh Sections
Other
Maint: 602 KB
5.1 A5.2 Presentation to stakeholders E-M
Other
Maint: 378 KB
5.1 A3.6 List of consultees at Phase 1A
Other
Maint: 2 MB
5.1 CR11 Non-stat ongoing engagement
Other
Maint: 245 KB
6.4.15.6 ES Fabian Way Port Tennant Junction LinSig results
Other
Maint: 429 KB
6.4.11.1 ES Summary of WeBS High Tide Core Count Data Graphs
Other
Maint: 2 MB
6.3.11.13 ES Bird Survey - 22 January 2013
Other
Maint: 314 KB
6.3.6.25 ES Sedimentation timeseries for East bund construction
Other
Maint: 757 KB
2.4.58 - Proposed Drawings - Burrows Information Centre
Other
Maint: 1 MB
2.4.49 Proposed Plan - Basement - 1 1
Other
Maint: 1 MB
6.4.4.1 ES CEMP
Other
Maint: 2 MB
6.3.11.11 ES Bird Survey - 26 November 2012
Other
Maint: 228 KB
6.3.6.22 ES Maximum predicted SSC increases East bund construction
Other
Maint: 1 MB
6.2.24 ES Interrelationships
Other
Maint: 4 MB
2.4.20 Spectator Terrace
Other
Maint: 1 MB
5.1 A6.1 notice to LPA - consultation on SoCC
Other
Maint: 3 MB
2.2.14 Works Sections 4 1
Other
Maint: 1 MB
2.4.52 Proposed Plan - Second Floor 1
Other
Maint: 1 MB
6.4.23.1 ES Adaptive Environmental Monitoring Plan
Other
Maint: 2 MB
6.3.11.10 ES Bird Survey - 25 October 2012
Other
Maint: 2 MB
6.2.5 ES Planning and Policy Context
Other
Maint: 384 KB
2.4.26 Sluice House Section
Other
Maint: 1 MB
5.1 A5.12 TLSB leisure facs feasibility study 120413
Other
Maint: 4 MB
5.5c Habitats Regulations Assessment Figure 1
Other
Maint: 2 MB
5.1 CR10 Stat cons with PILs
Other
Maint: 253 KB
6.4.14.3 ES MCA Checklist
Other
Maint: 6 MB
6.3.13.7 ES Viewpoint Locations
Other
Maint: 5 MB
6.3.8.6 ES Overview of Biotopes
Other
Maint: 222 KB
6.3.6.19 ES Maximum predicted sedimentation West bund construction
Other
Maint: 1 MB
2.4.55 Proposed Section - BB
Other
Maint: 2 MB
2.4.31 Cable Route 4
Other
Maint: 6 MB
2.3.3 Natural Features WFD
Other
Maint: 5 MB
2.4.18 Typical Queen's Dock access road
Other
Maint: 4 MB
2.4.10 Western Landfall Sections
Other
Maint: 5 MB
2.2.24 PROW Plan Part 7 1
Other
Maint: 159 KB
6.4.9.5 ES Accuracy and limitations
Other
Maint: 2 MB
6.3.11.20 ES Bird Survey - 23 August 2013
Other
Maint: 861 KB
6.3.10.3a ES Inter-Agency Marine Mammal Working Group Management Units
Other
Maint: 225 KB
6.3.6.29 ES Maximum predicted sedimentation Sediment disposal
Other
Maint: 2 MB
6.2.3 ES Site Selection and Option Appraisal
Other
Maint: 2 MB
6.3.11.6 ES Bird Survey - 06 January 2012
Other
Maint: 627 KB
6.3.6.49 ES Predicted changes to wave parameters 1 in 10yr southeasterly wave
Other
Maint: 2 MB
6.3.6.15 ES Postulated Sand Transport Directions in Swansea Bay
Other
Maint: 2 MB
6.2.15 ES Onshore Transport Assessment
Other
Maint: 11 MB
5.1 A9.4 Publicity materials
Other
Maint: 2 MB
5.1 CR5 Non-stat issues and options
Other
Maint: 694 KB
2.2.12 Works Sections 2 1
Other
Maint: 498 KB
8.7 Scoping Opinion
Other
Maint: 414 KB
6.3.6.13 ES MODIS Satellite Surface SSC Winter
Other
Maint: 2 MB
6.3.11.17 ES Bird Survey - 24 May 2013
Other
Maint: 9 MB
6.3.8.18 ES Faunal Assemblage Groups
Other
Maint: 984 KB
2.4.28 Cable Route 1
Other
Maint: 4 MB
5.1 A6.6 Consultation strategy
Other
Maint: 118 KB
6.4.11.2 ES Gower Ornithological Society Data
Other
Maint: 7 MB
2.2.26 PROW Plan Part 9 1
Other
Maint: 118 KB
6.4.15.9 ES Fabian Way Elba Crescent LinSig results
Other
Maint: 2 MB
6.3.11.19 ES Bird Survey - 11 July 2013
Other
Maint: 549 KB
6.3.10.9 ES Long-term Mean Sighting Rates of Rissos Dolphin
Other
Maint: 2 MB
2.4.47 GA Plans
Other
Maint: 2 MB
2.2.40 Marine Works Dredging
Other
Maint: 2 MB
6.3.11.12 ES Bird Survey - 18 December 2012
Other
Maint: 4 MB
6.3.8.13 ES Biotope Map North of Mumbles Head B
Other
Maint: 2 MB
5.1 CR3 Non-stat project def and EIA
Other
Maint: 197 KB
6.4.15.10 ES Fabian Way Ffordd Amazon Transyt output
Other
Maint: 944 KB
6.3.10.5 ES Marine Mammal Sightings recorded in the Atlantic Array Baseline Monitoring
Other
Maint: 1 MB
2.4.27 Turbine House Elevation
Other
Maint: 352 KB
5.1 A11.8 Response to NRW
Other
Maint: 559 KB
6.3.10.8 ES Long-term Mean Sighting Rates of Bottlenose Dolphin
Other
Maint: 2 MB
5.1 A3.1 List of statutory consultees and stage consulted
Other
Maint: 165 KB
6.3.10.6 ES Harbour Porpoise Sightings GMMP
Other
Maint: 2 MB
6.2.21 ES Cultural Heritage Terrestrial Archaeology and Historic Landscape
Other
Maint: 270 KB
6.3.8.8 ES Biotope Map B
Other
Maint: 3 MB
6.2.13 ES Seascape and Landscape Visual Impact Assessment
Other
Maint: 8 MB
6.2.4 ES Project Description
Other
Maint: 3 MB
6.3.6.2 ES Local detail of numerical model
Other
Maint: 5 MB
1.1 Cover letter
Other
Maint: 224 KB
6.3.6.26 ES Predicted sedimentation at end of Spring Neap cycle East bund construction
Other
Maint: 426 KB
5.1 A7.8 Updates to website and OD
Other
Maint: 1 MB
1.4 Guide to the application
Other
Maint: 1 MB
6.3.6.4 ES Modelled current speed and direction
Other
Maint: 572 KB
6.3.10.7 ES Long-term Mean Sighting Rates of Common Dolphin
Other
Maint: 557 KB
5.1 A2.4 Building locations
Other
Maint: 2 MB
2.4.33 Cable Route 6
Other
Maint: 2 MB
6.3.11.4 ES Bird Survey - 15 November 2011
Other
Maint: 3 MB
6.4.6.2 ES Model Bathymetry Review
Other
Maint: 97 KB
6.4.20.2 ES Sea Level Change
Other
Maint: 238 KB
5.1 A11.4 Meetings with non-stat - continuous engagement
Other
Maint: 1 MB
6.3.6.6 ES Wind and wave roses
Other
Maint: 219 KB
6.3.6.31 ES Predicted sedimentation at end of Spring Neap cycle Sediment disposal
Other
Maint: 2 MB
6.3.18.7 ES Bedrock
Other
Maint: 4 MB
2.4.15 Offshore building public realm section
Other
Maint: 9 MB
6.3.8.14 ES Predicted Subtidal Habitats
Other
Maint: 3 MB
6.3.8.11 ES Biotope Map West of River Tawe B
Other
Maint: 2 MB
5.1 A6.7 Schedule and copies of SoCC newspaper publications
Other
Maint: 653 KB
6.3.6.46 ES Predicted changes to wave parameters 1 in 10yr southwesterly wave
Other
Maint: 2 MB
6.3.11.8 ES Bird Survey - 09 March 2012
Other
Maint: 2 MB
6.3.16.1 ES Air Quality Study Area
Other
Maint: 32 MB
6.4.8.2 ES Intertidal Biotope Survey Notes
Other
Maint: 2 MB
5.1 CR8 Stat cons with NSBs
Other
Maint: 538 KB
2.4.36 Cable Route Details
Other
Maint: 664 KB
6.3.6.47 ES Predicted changes to wave parameters 1 in 20yr southwesterly wave
Other
Maint: 4 MB
2.4.11 Western Landfall Sections
Other
Maint: 6 MB
2.4.19 Typical lagoon wall treatment
Other
Maint: 451 KB
6.3.6.18 ES SSC timeseries plots for West bund construction
Other
Maint: 173 KB
6.4.22.1 ES Turning Tide the economic significance of the TLSB
Other
Maint: 7 MB
2.2.22 PROW Plan Part 5 1
Other
Maint: 377 KB
6.3.6.3 ES Regional Map of Swansea Bay
Other
Maint: 1 MB
7.3 Statement of Recreational Amenity
Other
Maint: 7 MB
6.4.9.2 ES Fish Fauna Characterisation Surveys
Other
Maint: 2 MB
7.2 Safety Zone Statement
Other
Maint: 3 MB
6.4.5.1 ES Sustainability Carbon Balance
Other
Maint: 224 KB
6.3.6.43 ES Predicted changes to MLWS
Other
Maint: 5 MB
6.2.14 ES Navigation and Marine Transport Assessment
Other
Maint: 9 MB
2.1.1 - 2.1.20 Combined Land and Crown plans
Other
Maint: 12 MB
5.1 A10.1 10.2 and 10.3 Redline plans
Other
Maint: 2 MB
6.2.11 ES Coastal Birds
Other
Maint: 2 MB
2.4.35 Cable Route 8
Other
Maint: 2 MB
5.1 A10.5 Sample notice letters and redline plans
Other
Maint: 2 MB
2.4.50 Proposed Plan - Ground Floor 1
Other
Maint: 376 KB
6.4.15.11 ES A483 A48 LinSig results
Other
Maint: 191 KB
6.4.11.3 ES Field Survey Data
Other
Maint: 8 MB
6.2.7 ES Water Quality Assessment
Other
Maint: 2 MB
2.4.39 ABP Junction
Other
Maint: 117 KB
6.4.2.1 ES List of Statutory Consultees
Other
Maint: 2 MB
6.3.11.18 ES Bird Survey - 10 June 2013
Other
Maint: 235 KB
6.3.6.27 ES Maximum predicted SSC increase Sediment disposal
Other
Maint: 397 KB
6.3.6.12 ES MODIS Satellite Surface SSC Summer
Other
Maint: 3 MB
5.1 A7.9 Formal Consultation Response to PEIR Report MASTER v0.4
Other
Maint: 2 MB
6.2.6 ES Coastal Processes Sediment Transport and Contamination
Other
Maint: 678 KB
5.1 A2.5 Public realm
Other
Maint: 10 MB
2.2.17 PROW Key Plan 1
Other
Maint: 251 KB
6.3.6.5 ES Current roses from metocean sites for spring and neap tides
Other
Maint: 24 MB
2.4.46 GA Sections
Other
Maint: 469 KB
5.1 A1.1 Index of Consultation Report Appendices
Other
Maint: 147 KB
6.4.15.3 ES TRICS data
Other
Maint: 17 MB
6.1 ES Non Technical Summary - English
Other
Maint: 692 KB
2.4.23 Water Shuttle
Other
Maint: 2 MB
5.1 A4.2 Welsh Govt MCU Scoping Opinion
Gellir hidlo dogfennau yn ôl eu dyddiad cyhoeddi neu yn ôl y dyddiad cau sy’n berthnasol iddynt. Cyhoeddir dyddiadau cau yn yr amserlen ar ddechrau’r archwiliad a gellir eu gweld ar dab amserlen yr archwiliad.