Internal Power Generation Enhancement for Port Talbot Steelworks

Gallwch hidlo’r canlyniadau i ddangos yr eitemau sy’n cyfateb i’ch buddiant yn unig.

Dogfennau a Gyhoeddwyd Fesul Cam

Cyn cais (5)

Cais y datblygwr (213)

Derbyn (6)

Cyn archwiliad (3)

Archwiliad (82)

Penderfyniad (15)

Penderfywyd (0)

Dogfennau ar draws ffiniau
Dyddiad

SourceDescription
Other
Maint: 4 MB
Secretary of State Decision Letter and Statement of Reasons
Decision made by the Secretary of State for Energy and Climate Change, dated 8 December 2015
Other
Maint: 553 KB
Development Consent Order as made by the Secretary of State
Development Consent Order as made by the Secretary of State 8 December 2015
Other
Maint: 755 KB
Habitats Regulations Assessment
Habitats Regulations Assessment
Other
Maint: 108 KB
Notice of the Decision by the Secretary of State (Reg 23)
Letter giving notice of the decision by the Secretary of State for Energy and Climate Change
Other
Maint: 2 MB
Examining Authority Recommendation Report and Recommended Development Consent Order
Examining Authority's Recommendation Report and Recommended Development Consent Order
Other
Maint: 733 KB
Associated British Ports
Response from Associated British Ports to the request for comments by the Department of Energy and Climate Change in their letter dated 29 October 2015
Other
Maint: 505 KB
Duncan O'Connor (Pinsent Masons LLP) ar ran Tata Steel UK Limited
Response from Tata Steel UK Limited to the request for comments by the Department of Energy and Climate Change in their letter dated 29 October 2015
Other
Maint: 191 KB
Louise Edwards ar ran Natural Resources Wales
Response from Natural Resources Wales to the request for comments by the Department of Energy and Climate Change in their letter dated 29 October 2015
Other
Maint: 110 KB
Department for Energy and Climate Change
Letter to the Applicant, Associated British Ports and Natural Resources Wales requesting comments on the application
Other
Maint: 754 KB
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Ltd
Draft Development Consent Order (Revision 6) comparison showing changes made between revision 0 and revision 6
Other
Maint: 524 KB
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Ltd
Revision 2 of Comments on Associated British Port?s response to the ExA?s rule 17 request of 20 May, originally submitted 5 June 2015
Other
Maint: 318 KB
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Ltd
Explanatory Memorandum (Revision 2)
Other
Maint: 692 KB
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Ltd
Draft Development Consent Order (Revision 6)
Other
Maint: 457 KB
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Ltd
Draft Development Consent Order (Revision 6) comparison showing changes made between revisions 5 and 6. NB this document acts as a substitute appendix 1 to that embedded within the Applicant?s Final Submission (displayed under Additional Submissions). This is due to a technical error which is not displaying the original appendix 1 in full.
Other
Maint: 1 MB
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Ltd
Final Submission from the Applicant including the following appendices: Appendix 1 - comparison between Rev 5 and Rev 6 of the draft DCO. Please be aware that this Appendix has been substituted and published separately (under Developer?s Application ? Draft Development Consent Orders) as due to a technical error is not displaying in full within this document. Appendix 2 - comparison between 5 June and 9 June versions of Applicants comments on ABP's response to Rule 17 request for information by the EXA on 20 May 2015. Appendix 3 - joint statement with Network Rail. Appendix 4 - final text of SoCG with NPTCBC.
Other
Maint: 263 KB
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Limited
Statement of Common Ground between Tata Steel UK Limited and Neath Port Talbot County Borough Council
Other
Maint: 217 KB
Martyn Jarvis (Addleshaw Goddard LLP) ar ran Network Rail
Joint statement by Tata Steel UK Limited and Network Rail
Other
Maint: 811 KB
Ben Lewis (Bilfinger GVA) ar ran Tata Steel UK Limited
Statement of Common Ground between Tata Steel UK Limited and the City & County of Swansea
Other
Maint: 66 KB
Section 99 Letter
Notification of completion of the examination
Other
Maint: 533 KB
Tata Steel UK Ltd
The applicant?s comments on Associated British Port?s response to the ExA?s rule 17 request of 20 May.
Other
Maint: 397 KB
Brian Greenwood on behalf of Associated British Ports
Responses to the ExA's questions dated 20 May 2015, and Associated British Port's proposed protective provision
Other
Maint: 492 KB
Duncan O'Connor (Pinsent Masons LLP) ar ran Tata Steel UK Limited
Draft Development Consent Order (Revision 5) comparison showing changes made between revisions 4 and 5
Other
Maint: 639 KB
Duncan O'Connor (Pinsent Masons LLP) ar ran Tata Steel UK Limited
Draft Development Consent Order (Revision 5)
Other
Maint: 211 KB
Louise Edwards ar ran Natural Resources Wales
Response to Rule 8(3) and Rule 17 letter of 20 May 2015 requesting further information
Other
Maint: 3 MB
Duncan O'Connor (Pinsent Masons LLP) ar ran Tata Steel UK Limited
Response to Rule 8(3) and Rule 17 letter of 20 May 2015 requesting further information
Other
Maint: 14 MB
Brian Greenwood (Winckworth Sherwood LLP) ar ran Associated British Ports
Response to Rule 8(3) and Rule 17 letter of 20 May 2015 requesting further information
Other
Maint: 40 KB
Margaret Ketteridge ar ran GTC
Response to Rule 8(3) and Rule 17 letter of 20 May 2015 requesting further information
Other
Maint: 441 KB
Duncan O'Connor (Pinsent Masons LLP) ar ran Tata Steel UK Limited
Response to Rule 8(3) and Rule 17 letter of 15 May 2015 requesting further information
Other
Maint: 132 KB
Welsh Government
Response to Rule 8(3) and Rule 17 letter of 15 May 2015 requesting further information
Other
Maint: 104 KB
Rule 8(3) and Rule 17 Letter
Other
Maint: 73 KB
150515 Rule 17 and 8(3) request for information from the applicant
Other
Maint: 175 KB
Brian Greenwood (Winckworth Sherwood LLP) ar ran Associated British Ports
Comments on responses to ExA?s second written questions
Other
Maint: 392 KB
Ben Lewis (Bilfinger GVA) ar ran Tata Steel UK Limited
Draft Statement of Common Ground between Tata Steel UK Limited and Neath Port Talbot County Borough Council
Other
Maint: 828 KB
Ben Lewis (Bilfinger GVA) ar ran Tata Steel UK Limited
Draft Development Consent Order (Revision 4)
Other
Maint: 1 MB
Ben Lewis (Bilfinger GVA) ar ran Tata Steel UK Limited
Explanatory note on the draft Development Consent Order (Revision 4) including comparison of Revision 3 and Revision 4, and comparison of Explanatory Memorandum
Other
Maint: 247 KB
Ben Lewis (Bilfinger GVA) ar ran Tata Steel UK Limited
Explanatory Memorandum (Revision 1)
Other
Maint: 741 KB
Ben Lewis (Bilfinger GVA) ar ran Tata Steel UK Limited
Comments on responses to ExA?s second written questions
Other
Maint: 166 KB
Sarah Wood (Eversheds LLP) ar ran National Grid Electricity Transmission plc
National Grid Electricity Transmission Plc's response to the Examining Authority's 2nd written questions
Other
Maint: 6 MB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
High Level Assessment of Major Accident Hazards
Other
Maint: 1 MB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Design Principles Document
Other
Maint: 957 KB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Draft Development Consent Order (Revision 3)
Other
Maint: 4 MB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Tata Steel UK Limited's response to the Examining Authority's 2nd written questions
Other
Maint: 67 KB
Louise Edwards ar ran Natural Resources Wales
Natural Resources Wales response to the Examining Authority's 2nd written questions
Other
Maint: 45 KB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Book of Reference (Revision 1)
Other
Maint: 1 MB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Explanatory notes on the draft Development Consent Order (Revision 3) including Comparison of Revision 2 and Revision 3
Other
Maint: 2 MB
Brian Greenwood (Winckworth Sherwood LLP) ar ran Associated British Ports
Written summary of oral representation put at the Issue Specific Hearing held on 15 April 2015 and Response to the ExA?s Second Round Questions submitted for Deadline 6
Other
Maint: 45 KB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Explanatory comments on revised Book of Reference and comparison with submission version
Other
audio recording
Maint: 29 MB
Issue Specific Hearing
Issue Specific Hearing to address outstanding issues
Other
audio recording
Maint: 2 MB
Open Floor Hearing
Other
Maint: 52 KB
Open Floor Hearing Agenda 15 April 2015
Agenda for the Open Floor Hearing
Other
Maint: 60 KB
Issue Specific Hearing Agenda 15 April 2015
Agenda for the Issue Specific Hearing on Outstanding Issues
Other
Maint: 34 KB
Examining Authority�s Second Round of Questions
ExA's second round of questions
Other
Maint: 353 KB
Report on the Implications for European Sites (RIES)
Other
Maint: 82 KB
Notification of Second Round Questions and Issue of the RIES
The Examining Authority's notice of Second Round of Written Questions and Report on the Implications for European Sites (RIES)
Other
Maint: 43 KB
Copy of Rule 13(6) notice as published in the South Wales Evening Post
Other
Maint: 271 KB
Neath Port Talbot County Borough Council
Comments on applicant?s final preferred draft DCO
Other
Maint: 98 KB
Addleshaw Goddard ar ran Network Rail Infrastructure Limited
Comments on applicant?s final preferred draft DCO
Other
Maint: 78 KB
Notification of additional Hearings
Other
Maint: 262 KB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Statement of Common Ground between Natural Resources Wales and Tata Steel UK Ltd.
Other
Maint: 88 KB
Brian Greenwood ar ran Associated British Ports
Written summary of oral representation put at the Issue Specific Hearing held on 25 February 2015 and written representation submitted for Deadline 4
Other
Maint: 9 MB
Natural Resources Wales
Written summary of the oral representation put at the Issue Specific Hearing on the Environmental Matters held on 25 February 2015
Other
Maint: 119 KB
Network Rail Infrastructure Limited
Additional submission from Network Rail providing an update on the current negotiations with the Applicant
Other
Maint: 20 KB
Welsh Government
Additional submission from Welsh Government confirming no outstanding issues regarding the application or examination process.
Other
Maint: 1 MB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Explanatory notes on the draft Development Consent Order (Revision 2) including Comparison of Revision 1 and Revision 2.
Other
Maint: 705 KB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Draft Development Consent Order (Revision 2).
Other
Maint: 51 KB
Neath Port Talbot County Borough Council
Notes of Issue Specific Hearing held on 25 February 2015
Other
Maint: 2 MB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Written summary of oral representation put at the Issue Specific Hearing on Compulsory Acquisition and Environmental matters held on 25 February 2015.
Other
Maint: 83 KB
Examining Authority's Note of Accompanied Site Visit
Other
audio recording
Maint: 24 MB
Audio Recording - Compulsory Acquisition Hearing
Audio recording of the Compulsory Acquisition Hearing 25 February 2015.
Other
audio recording
Maint: 79 MB
Audio Recording - Issue Specific Hearing
Audio recording of the Issue Specific Hearing on Environmental Matters 25 February 2015.
Other
audio recording
Maint: 7 MB
Audio Recording - Open Floor Hearing
Audio recording of the Open Floor Hearing 24 February 2015.
Other
Maint: 77 KB
Accompanied Site Visit Itinerary 24 February 2015
Accompanied Site Visit Itinerary 24 February 2015
Other
Maint: 62 KB
Natural Resources Wales
Written summary of the oral representation put at the Issue Specific Hearing on the DCO held on 12 February 2015
Other
Maint: 98 KB
Compulsory Acquisition Hearing and Issue Specific Hearing on environmental matters - Agenda
Compulsory Acquisition Hearing and Issue specific hearing on environmental matters (including Environmental Impact Assessment (EIA) and Habitats Regulations Assessment (HRA) - Hearing Agenda 25 and (if required) 26 February 2015
Other
Maint: 917 KB
Neath Port Talbot County Borough Council
Written summary of the oral representation put at the Issue Specific Hearing on the DCO held on 12 February 2015
Other
Maint: 379 KB
City & County of Swansea
Comments on Applicant's response to the City & County of Swansea's LIR and agenda item 6 of the Issue Specific Hearing on the draft Development Consent Order on 12th February 2015
Other
Maint: 82 KB
Open Floor Hearing Agenda 24 February 2015
Open Floor Hearing Agenda 24 February 2015
Other
Maint: 720 KB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Written summary of the oral representation put at the Issue Specific Hearing on the DCO held on 12 February 2015
Other
Maint: 44 MB
Audio Recording Part 2
Issue Specific Hearing on the draft Development Consent Order 12 February 2015. Part 2 of 2
Other
Maint: 71 MB
Audio Recording Part 1
Issue Specific Hearing on the draft Development Consent Order 12 February 2015. Part 1 of 2
Other
Maint: 753 KB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Comments on Written Representations
Other
Maint: 685 KB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Responses to Rule 17 letter of 30 January 2015 requesting further information
Other
Maint: 1 MB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Explanatory notes on the draft Development Consent Order (Revision 1) & Comparison of Revision 0 and Revision 1
Other
Maint: 23 KB
Civil Aviation Authority
Responses to Rule 17 letter of 30 January 2015 requesting further information
Other
Maint: 657 KB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Comments on responses to ExA?s first written questions
Other
Maint: 711 KB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Comments on Local Impact Reports
Other
Maint: 676 KB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Draft Development Consent Order - Revision 1
Other
Maint: 141 KB
150205 EN010062 PTPower ISH DCO hearing Agenda
Agenda for the Issue Specific Hearing on the draft Development Consent Order
Other
Maint: 80 KB
Rule 17 Welsh Government Letter
Other
Maint: 81 KB
Rule 17 Letter
Other
Maint: 76 KB
National Grid Electricity Transmission Plc
Written Representation by National Grid Electricity Transmission Plc. The Examining Authority has exercised its authority and agreed to accept this as a late submission for Deadline 1
Other
Maint: 654 KB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Statement of Progress relating to Statements of Common Ground
Other
Maint: 42 KB
Powys County Council
Additional submission from Powys County Council, clarifying their involvement in the examination
Other
Maint: 219 KB
Neath Port Talbot County Borough Council
Written Representation
Other
Maint: 61 KB
Neath Port Talbot County Borough Council
Neath Port Talbot County Borough Council's response to the Examining Authority's 1st written questions
Other
Maint: 87 KB
Western Power Distribution
Western Power Distribution response to the Examining Authority's 1st written questions
Other
Maint: 8 MB
Neath Port Talbot County Borough Council
Local Impact Report
Other
Maint: 592 KB
Network Rail Infrastructure Limited
Written Representation
Other
Maint: 7 KB
Brian Greenwood ar ran Associated British Ports
Associated British Ports's response to the Examining Authority's 1st written questions
Other
Maint: 475 KB
Natural Resources Wales
Written Representation by Natural Resources Wales, including responses to the Examining Authority's 1st written questions, Flood Risk Guidance and letter sent from the Welsh Government to Local Authorities in Wales regarding Flood Risk and Climate Change
Other
Maint: 5 MB
Ben Lewis (GVA) ar ran Tata Steel UK Limited
Tata Steel UK Limited's response to the Examining Authority's 1st written questions
Other
Maint: 168 KB
Health and Safety Executive
Written Representation
Other
Maint: 580 KB
City & County of Swansea
Local Impact Report
Other
Maint: 158 KB
Brian Greenwood ar ran Associated British Ports
Written Representation from Brian Greenwood on behalf of Associated British Ports
Other
Maint: 42 KB
Margaret Ketteridge ar ran GTC
Written Representation from Margaret Ketteridge on behalf of GTC Pipelines Limited, Independent Pipelines Limited, Independent Power Networks Limited, The Electricity Network Company Limited and Quadrant Pipelines Limited
Other
Maint: 82 KB
Notification of Hearings and Accompanied Site Visit
Other
Maint: 97 KB
Rule 8(3) letter, variation to the timetable
Other
Maint: 1 MB
Duncan O Connor (Pinsent Masons) on behalf of Tata Steel UK Ltd
Correspondence from the Applicant, Revisions 0 and 1 of the No Significant Effects Report, and a Comparite version (Rev 0 and 1)
Other
Maint: 389 KB
Duncan O Connor (Pinsent Masons) on behalf of Tata Steel UK Limited
Errata document supplied by the Applicant relating to their Consultation Report (Doc 5.03)
Other
Maint: 11 MB
Tata Steel UK Ltd
Correspondence from the Applicant, Habitats Screening Report Rev 2, Report to Inform an Appropriate Assessment and Comparite version of the Habitats Screening Report (Rev 0 and 2)
Other
Maint: 8 MB
Ben Lewis (GVA) on behalf of Tata Steel UK Limited
Correspondence from the Applicant on the revised parameters for the project, including emails dated 8 December and 15 December 2014, a Cover Letter, a Statement on Revised Parameters and Revised Works Plan (Drawing Ref 2.04)
Other
Maint: 88 KB
Examining Authority's First Round of Written Questions
The Examining Authority's First Round of Written Questions accompanying the Rule 8 Letter issued on 18 December 2014.
Other
Maint: 178 KB
Preliminary Meeting Note
Note of the Preliminary Meeting held 9 December 2014
Other
Maint: 22 MB
Tata Steel UK Limited
Photomontages of the revised parameters
Other
Maint: 165 KB
Rule 8 Letter
Other
Maint: 43 MB
Preliminary Meeting Audio
Audio Recording of the Preliminary Meeting held on 9th December 2014
Other
Maint: 42 KB
Rhondda Cynon Taf County Borough Council
Late representation/correspondence submitted during the pre-examination stage and accepted by the Examining Authority
Other
Maint: 144 KB
Rule 6 letter
Other
Maint: 708 KB
Tata Steel UK limited
Certificates of Compliance with Regulation 13 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009, and s.56 and s.59 of the Planning Act 2008
Other
Maint: 39 KB
Bridgend County Borough Council
Adequacy of Consultation
Other
Maint: 36 KB
Camarthenshire County Council
Adequacy of Consultation
Other
Maint: 219 MB
6.03.1 Vol 3a ES APP 1.3 PEIR Figures High Resolution
Other
Maint: 256 MB
6.03.1 Vol 3a ES APP 1.3 PEIR Appendices
Other
Maint: 121 MB
6.03.1 Vol 3a ES APP 1.3 PEIR Figures Low Resolution
Other
Maint: 76 KB
Neath Port Talbot County Borough Council
Adequacy of Consultation
Other
Maint: 53 KB
Brecon Beacons National Park Authority
Adequacy of Consultation
Other
Maint: 469 KB
EN010062 Section 55 Checklist
Other
Maint: 58 KB
5.04 Details of Other Consents and Licences (SUBMISSION)
Other
Maint: 9 MB
10.01 Planning Statement (SUBMISSION)
Other
Maint: 3 MB
6.04.5 Vol 4e Figure 7.43
Other
Maint: 827 KB
6.03.2 Vol 3b ES APP 14.3 Site Photographs
Other
Maint: 2 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS context
Other
Maint: 274 KB
6.03.2 Vol 3b ES APP 14.4 Technical Note Option 1
Other
Maint: 539 KB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS datasheet
Other
Maint: 5 MB
6.04.6 Vol 4f Figure 7.50
Other
Maint: 2 MB
6.04.4 Vol 4d Figure 7.29
Other
Maint: 7 MB
6.04.2 Vol 4b Figure 7.8
Other
Maint: 221 KB
6.03.1 Vol 3a ES APP 9.1 F Coal Authority reports (3)
Other
Maint: 2 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable site 2500
Other
Maint: 162 KB
6.03.1 Vol 3a ES APP 1.5 Planning Inspectorate Correspondence
Other
Maint: 7 MB
6.04.7 Vol 4g Figure 16.2 Cumulative
Other
Maint: 2 MB
6.04.4 Vol 4d Figure 7.33
Other
Maint: 218 KB
6.03.2 Vol 3b ES APP 11.1 Heritage Assets
Other
Maint: 530 KB
6.03.1 Vol 3a ES APP 5.4 Potential Effects Supporting Tables
Other
Maint: 3 MB
6.04.4 Vol 4d Figure 7.25
Other
Maint: 6 MB
6.04.1 Vol 4a Figure 7.5
Other
Maint: 218 KB
6.03.1 Vol 3a ES APP 9.1 F Coal Authority reports (2)
Other
Maint: 5 MB
6.03.1 Vol 3a ES APP 9.1 A Envirocheck Photolog
Other
Maint: 51 MB
6.03.1 Vol 3a ES APP 1.1 Scoping Report
Other
Maint: 5 MB
6.03.1 Vol 3a ES APP 1.3 PEIR Main Text
Other
Maint: 7 MB
6.02.5 ES Vol 2e Figures
Other
Maint: 2 MB
6.04.7 Vol 4g Figure 16.9 Cumulative
Other
Maint: 262 KB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS site 2500
Other
Maint: 167 KB
6.03.1 Vol 3a ES APP 6.7 Habitat Management Plan
Other
Maint: 43 KB
6.04.7 Vol 4g Cover
Other
Maint: 2 MB
6.04.4 Vol 4d Figure 7.28
Other
Maint: 7 MB
6.04.2 Vol 4b Figure 7.10
Other
Maint: 210 KB
6.03.1 Vol 3a ES APP 1.7 NPTCBC Correspondence
Other
Maint: 18 KB
DCO Order Limits
Other
Maint: 3 MB
6.04.6 Vol 4f Figure 7.53
Other
Maint: 5 MB
6.04.4 Vol 4d Figure 7.32
Other
Maint: 6 MB
6.04.2 Vol 4b Figure 7.11
Other
Maint: 416 KB
5.03 No Significant Effects Report (SUBMISSION)
Other
Maint: 67 KB
6.03.1 Vol 3a ES APP 6.3 HSI Assessment
Other
Maint: 501 KB
10.02 Planning Statement Summary (SUBMISSION)
Other
Maint: 4 MB
6.04.5 Vol 4e Figure 7.41
Other
Maint: 7 MB
6.04.3 Vol 4c Figure 7.17
Other
Maint: 79 KB
6.03.2 Vol 3b ES APP 14.7 Abstraction Summary for Option 2
Other
Maint: 5 MB
6.04.7 Vol 4g Figure 16.1 Cumulative
Other
Maint: 43 KB
6.04.5 Vol 4e Cover
Other
Maint: 7 MB
6.04.2 Vol 4b Figure 7.14
Other
Maint: 102 KB
6.03.2 Vol 3b Cover
Other
Maint: 4 MB
2.02 Existing Site Layout Plan
Other
Maint: 18 MB
10.03 Design and Access Statement (SUBMISSION)
Other
Maint: 7 MB
6.04.3 Vol 4c Figure 7.18
Other
Maint: 220 KB
6.03.2 Vol 3b ES APP 14.8 Historic Abstraction Rates
Other
Maint: 11 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS historic 10000
Other
Maint: 6 MB
6.04.6 Vol 4f Figure 7.48
Other
Maint: 612 KB
6.03.1 Vol 3a ES APP 1.6 Phased Approach Briefing Note
Other
Maint: 550 KB
6.03.2 Vol 3b ES APP 15.1 Code of Construction Practice
Other
Maint: 4 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS historic 2500
Other
Maint: 4 MB
6.04.4 Vol 4d Figure 7.23
Other
Maint: 43 KB
6.04.1 Vol 4a Cover
Other
Maint: 3 MB
6.04.5 Vol 4e Figure 7.35
Other
Maint: 11 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS 10000
Other
Maint: 45 KB
4.03 Book of Reference (SUBMISSION)
Other
Maint: 741 KB
2.06 Indicative elevations-sections-floorplans (SUBMISSION)
Other
Maint: 5 MB
6.04.4 Vol 4d Figure 7.21
Other
Maint: 4 MB
6.04.7 Vol 4g Figure 16.7 Cumulative
Other
Maint: 103 KB
6.03.1 Vol 3a Cover
Other
Maint: 3 MB
6.02 ES Vol 2a
Other
Maint: 2 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS Context
Other
Maint: 213 KB
6.03.1 Vol 3a ES APP 5.2 Methodology Supporting Tables
Other
Maint: 8 MB
2.07.1 Nature Conservation Sites (SUBMISSION)
Other
Maint: 2 MB
6.04.5 Vol 4e Figure 7.47
Other
Maint: 8 MB
6.04.3 Vol 4c Figure 7.20
Other
Maint: 182 KB
6.04 Photomontage Cover
Other
Maint: 3 MB
6.04.6 Vol 4f Figure 7.52
Other
Maint: 3 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable historic 2500 A11
Other
Maint: 1 MB
6.04.5 Vol 4e Figure 7.36
Other
Maint: 887 KB
6.03.2 Vol 3b ES APP 14.2 Water Balance Modelling Report
Other
Maint: 309 KB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS site 2500
Other
Maint: 2 MB
6.04.6 Vol 4f Figure 7.51
Other
Maint: 6 MB
6.04.2 Vol 4b Figure 7.9
Other
Maint: 301 KB
6.03.1 Vol 3a ES APP 9.1 G Legilsation
Other
Maint: 3 MB
2.03 Land Plans (SUBMISSION)
Other
Maint: 72 KB
6.03.2 Vol 3b ES APP 16.1 CLVIA
Other
Maint: 3 MB
6.04.4 Vol 4d Figure 7.24
Other
Maint: 2 MB
6.03.2 Vol 3b ES APP 14 Water Environment Appendices
Other
Maint: 6 MB
6.04.1 Vol 4a Figure 7.3
Other
Maint: 700 KB
6.03.1 Vol 3a ES APP 9.1 E Tan15 Map
Other
Maint: 5 MB
2.08 Historic Environment Features (SUBMISSION)
Other
Maint: 5 MB
6.04.6 Vol 4f Figure 7.49
Other
Maint: 132 KB
6.03.1 Vol 3a ES APP 1.4 Consultation Matrix
Other
Maint: 7 MB
6.04.2 Vol 4b Figure 7.12
Other
Maint: 1 MB
6.04.6 Vol 4f Figure 7.54
Other
Maint: 6 MB
6.04.4 Vol 4d Figure 7.30
Other
Maint: 559 KB
6.03.1 Vol 3a ES APP 6.4 Breeding Bird Letter
Other
Maint: 87 KB
5.02 Statment of Statutory Nuisance (SUBMISSION)
Other
Maint: 3 MB
6.04.7 Vol 4g Figure 16.8 Cumulative
Other
Maint: 8 MB
6.04.5 Vol 4e Figure 7.38
Other
Maint: 64 KB
6.03.1 Vol 3a ES APP 6.5 Kidney Vetch Report
Other
Maint: 43 KB
6.04.3 Vol 4c Cover
Other
Maint: 3 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS 10000 soils
Other
Maint: 265 KB
4.02 Funding Statement (SUBMISSION)
Other
Maint: 3 MB
6.04.5 Vol 4e Figure 7.42
Other
Maint: 79 KB
6.03.2 Vol 3b ES APP 14.6 Abstraction Summary for Option 1
Other
Maint: 272 KB
9.02 Gas Connection Statement (SUBMISSION)
Other
Maint: 3 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable historic 2500 A3
Other
Maint: 4 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable historic 2500 A14
Other
Maint: 2 MB
6.03.1 Vol 3a ES APP 1.11 ABP Correspondence
Other
Maint: 7 MB
6.04.7 Vol 4g Figure 16.6 Cumulative
Other
Maint: 5 MB
6.04.5 Vol 4e Figure 7.39
Other
Maint: 310 KB
6.03.2 Vol 3b ES APP 14.5 Technical Note Option 2
Other
Maint: 101 KB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS index
Other
Maint: 2 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS site 10000
Other
Maint: 2 MB
6.03.1 Vol 3a ES APP 8.1 Noise Vibration
Other
Maint: 626 KB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS datasheet
Other
Maint: 263 KB
6.03.1 Vol 3a ES APP 5.3 Existing Conditions Supporting Tables
Other
Maint: 2 MB
6.04.5 Vol 4e Figure 7.45
Other
Maint: 440 KB
6.03.1 Vol 3a ES APP 6.6 No Significant Effects (HRA Screening) Report
Other
Maint: 252 KB
9.01 Grid Connection Statement (SUBMISSION)
Other
Maint: 5 MB
2.07.3 Water Bodies in a River Basin Management Plan (SUBMISSION)
Other
Maint: 2 MB
6.04.4 Vol 4d Figure 7.27
Other
Maint: 6 MB
6.04.1 Vol 4a Figure 7.7
Other
Maint: 2 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable site 10000
Other
Maint: 16 MB
2.05 Indicative Site Layout Plans (SUBMISSION)
Other
Maint: 43 KB
6.04.4 Vol 4d Cover
Other
Maint: 332 KB
6.03.1 Vol 3a ES APP 9.1 Geo-environmental Desk Study
Other
Maint: 99 KB
1.02 Application Form (SUBMISSION)
Other
Maint: 259 KB
6.03.1 Vol 3a ES APP 9.1 D Borehole Logs SS78NE102
Other
Maint: 19 MB
6.01 Non Technical Summary
Other
Maint: 7 MB
6.04.7 Vol 4g Figure 16.5 Cumulative
Other
Maint: 187 KB
6.03.2 Vol 3b ES APP 14.1 Legislation
Other
Maint: 4 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS Historic 2500
Other
Maint: 82 KB
6.03.1 Vol 3a ES APP 6.2 Reptile Survey Report
Other
Maint: 7 MB
2.07.2 Sites of Landscape Importance (SUBMISSION)
Other
Maint: 7 MB
6.04.1 Vol 4a Figure 7.6
Other
Maint: 2 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck Cable Context
Other
Maint: 4 MB
6.03.1 Vol 3a ES APP 1.2 Scoping Response
Other
Maint: 85 KB
6.02.1 ES Vols 2b - 2e INDEX
Other
Maint: 6 MB
6.04.1 Vol 4a Figure 7.1
Other
Maint: 82 KB
6.03.1 Vol 3a ES APP 9.1 F Coal Authority reports (1)
Other
Maint: 43 MB
6.03.1 Vol 3a ES APP 1.3 PEIR NTS
Other
Maint: 30 MB
6.02.4 ES Vol 2d Figures
Other
Maint: 5 MB
6.04.4 Vol 4d Figure 7.22
Other
Maint: 7 MB
6.04.1 Vol 4a Figure 7.2
Other
Maint: 455 KB
6.03.1 Vol 3a ES APP 9.1 D Borehole Logs SS78NE209
Other
Maint: 525 KB
1.01 Introduction to the Applicant (SUBMISSION)
Other
Maint: 261 KB
5.01.1 Consultation Report - Summary (SUBMISSION)
Other
Maint: 5 MB
6.04.5 Vol 4e Figure 7.40
Other
Maint: 114 KB
6.03.2 Vol 3b ES APP 14.9 Quality of Blow Down Water
Other
Maint: 102 KB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS index
Other
Maint: 272 KB
4.01 Statement of Reasons (SUBMISSION)
Other
Maint: 3 MB
6.04.4 Vol 4d Figure 7.34
Other
Maint: 9 MB
6.04.3 Vol 4c Figure 7.15
Other
Maint: 23 MB
6.03.2 Vol 3b ES APP 13.1 Flood Consequences Assessment
Other
Maint: 3 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable historic 2500 A7
Other
Maint: 1 MB
6.03.1 Vol 3a ES APP 1.8 NRW Correspondence
Other
Maint: 15 MB
2.04 Works Plans (SUBMISSION)
Other
Maint: 137 KB
10.05 Health and Safety Statement (SUBMISSION)
Other
Maint: 3 MB
6.04.5 Vol 4e Figure 7.44
Other
Maint: 273 KB
6.03.2 Vol 3b ES APP 14.10 Historic Water Quality Discharge
Other
Maint: 28 KB
6.03.1 Vol 3a ES APP 9.1 C Local Authority Search
Other
Maint: 25 MB
6.02.2 ES Vol 2b Figures
Other
Maint: 6 MB
6.04.4 Vol 4d Figure 7.31
Other
Maint: 6 MB
6.04.2 Vol 4b Figure 7.13
Other
Maint: 116 KB
6.03.1 Vol 3a ES APP 9.1 H Linkages
Other
Maint: 250 KB
6.03.1 Vol 3a ES APP 1.10 Gwent and Glamorgan Archaeological Trust Correspondence
Other
Maint: 26 MB
5.01 Consultation Report
Other
Maint: 7 MB
6.04.7 Vol 4g Figure 16.3 Cumulative
Other
Maint: 213 KB
6.03.1 Vol 3a ES APP 5.5 Model Sensitivity Runs
Other
Maint: 3 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS site 10000 soils
Other
Maint: 3 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable historic 2500 A10
Other
Maint: 147 KB
6.03.1 Vol 3a ES APP 1.9 Responses to Brigend County Borough Council
Other
Maint: 98 KB
10.04 Glossary (SUBMISSION)
Other
Maint: 2 MB
6.04.5 Vol 4e Figure 7.46
Other
Maint: 5 MB
6.04.3 Vol 4c Figure 7.19
Other
Maint: 421 KB
6.03.1 Vol 3a ES APP 9.1 D Borehole Logs SS78NE108
Other
Maint: 7 MB
6.04.1 Vol 4a Figure 7.4
Other
Maint: 446 KB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable DataSheet
Other
Maint: 105 KB
6.03.1 Vol 3a ES APP PEIR
Other
Maint: 226 KB
3.02 DCO Explanatory Memorandum (SUBMISSION)
Other
Maint: 7 MB
6.04.7 Vol 4g Figure 16.4 Cumulative
Other
Maint: 5 MB
6.04.5 Vol 4e Figure 7.37
Other
Maint: 9 MB
6.04.3 Vol 4c Figure 7.16
Other
Maint: 115 KB
EN010062 Notification of Decision to Accept Application
Other
Maint: 2 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS site 10000
Other
Maint: 7 MB
6.03.1 Vol 3a ES APP 6.1 Ecological Constraints Report
Other
Maint: 43 KB
6.04.6 Vol 4f Cover
Other
Maint: 3 MB
6.04.4 Vol 4d Figure 7.26
Other
Maint: 14 MB
6.02.3 ES Vol 2c Figures
Other
Maint: 11 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable historic 10000
Other
Maint: 43 KB
6.04.2 Vol 4b Cover
Other
Maint: 3 MB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable Site soils 10000
Other
Maint: 91 KB
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable Index
Other
Maint: 225 KB
6.03.1 Vol 3a ES APP 5.1 Policy Tables
Other
Maint: 7 MB
2.01 Location Plan (SUBMISSION)
Other
Maint: 357 KB
3.01 PORT TALBOT STEELWORKS (POWER GENERATION ENHANCEMENT) ORDER (SUBMISSION)
Other
Maint: 53 KB
131212 EN010062 Tata Steel Transboundary Screening
Tata Steel completed transboundary screening matrix
Other
Maint: 1 MB
131114 EN010062 Late Response OFWAT REDACTED
Other
Maint: 5 MB
131105 EN010062 Scoping Opinion
Secretary of State's Scoping Opinion
Other
Maint: 68 KB
131105 EN010062 Late responses
Late responses to Secretary of State's scoping consultation
Other
Maint: 28 MB
130926 EN010062 TATA Steel Scoping Report
The applicant's Scoping Report.
Gellir hidlo dogfennau yn ôl eu dyddiad cyhoeddi neu yn ôl y dyddiad cau sy’n berthnasol iddynt. Cyhoeddir dyddiadau cau yn yr amserlen ar ddechrau’r archwiliad a gellir eu gweld ar dab amserlen yr archwiliad.