Internal Power Generation Enhancement for Port Talbot Steelworks

Gallwch hidlo’r canlyniadau i ddangos yr eitemau sy’n cyfateb i’ch buddiant yn unig.

Dogfennau a Gyhoeddwyd Fesul Cam

Cyn cais (5)

Cais y datblygwr (213)

Derbyn (6)

Cyn archwiliad (3)

Archwiliad (82)

Penderfyniad (15)

Penderfywyd (0)

Dogfennau ar draws ffiniau
Dyddiad

SourceDescription
Other
Secretary of State Decision Letter and Statement of Reasons (PDF, 4 MB)
Decision made by the Secretary of State for Energy and Climate Change, dated 8 December 2015
Other
Development Consent Order as made by the Secretary of State (PDF, 553 KB)
Development Consent Order as made by the Secretary of State 8 December 2015
Other
Habitats Regulations Assessment (PDF, 755 KB)
Habitats Regulations Assessment
Other
Notice of the Decision by the Secretary of State (Reg 23) (PDF, 108 KB)
Letter giving notice of the decision by the Secretary of State for Energy and Climate Change
Other
Examining Authority Recommendation Report and Recommended Development Consent Order (PDF, 2 MB)
Examining Authority's Recommendation Report and Recommended Development Consent Order
Other
Associated British Ports (PDF, 733 KB)
Response from Associated British Ports to the request for comments by the Department of Energy and Climate Change in their letter dated 29 October 2015
Other
Duncan O'Connor (Pinsent Masons LLP) ar ran Tata Steel UK Limited (PDF, 505 KB)
Response from Tata Steel UK Limited to the request for comments by the Department of Energy and Climate Change in their letter dated 29 October 2015
Other
Louise Edwards ar ran Natural Resources Wales (PDF, 191 KB)
Response from Natural Resources Wales to the request for comments by the Department of Energy and Climate Change in their letter dated 29 October 2015
Other
Department for Energy and Climate Change (PDF, 110 KB)
Letter to the Applicant, Associated British Ports and Natural Resources Wales requesting comments on the application
Other
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Ltd (PDF, 754 KB)
Draft Development Consent Order (Revision 6) comparison showing changes made between revision 0 and revision 6
Other
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Ltd (PDF, 524 KB)
Revision 2 of Comments on Associated British Port?s response to the ExA?s rule 17 request of 20 May, originally submitted 5 June 2015
Other
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Ltd (PDF, 318 KB)
Explanatory Memorandum (Revision 2)
Other
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Ltd (PDF, 692 KB)
Draft Development Consent Order (Revision 6)
Other
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Ltd (PDF, 457 KB)
Draft Development Consent Order (Revision 6) comparison showing changes made between revisions 5 and 6. NB this document acts as a substitute appendix 1 to that embedded within the Applicant?s Final Submission (displayed under Additional Submissions). This is due to a technical error which is not displaying the original appendix 1 in full.
Other
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Ltd (PDF, 1 MB)
Final Submission from the Applicant including the following appendices: Appendix 1 - comparison between Rev 5 and Rev 6 of the draft DCO. Please be aware that this Appendix has been substituted and published separately (under Developer?s Application ? Draft Development Consent Orders) as due to a technical error is not displaying in full within this document. Appendix 2 - comparison between 5 June and 9 June versions of Applicants comments on ABP's response to Rule 17 request for information by the EXA on 20 May 2015. Appendix 3 - joint statement with Network Rail. Appendix 4 - final text of SoCG with NPTCBC.
Other
Sheelagh MacGregor (Pinsent Masons LLP) ar ran Tata Steel UK Limited (PDF, 263 KB)
Statement of Common Ground between Tata Steel UK Limited and Neath Port Talbot County Borough Council
Other
Martyn Jarvis (Addleshaw Goddard LLP) ar ran Network Rail (PDF, 217 KB)
Joint statement by Tata Steel UK Limited and Network Rail
Other
Ben Lewis (Bilfinger GVA) ar ran Tata Steel UK Limited (PDF, 811 KB)
Statement of Common Ground between Tata Steel UK Limited and the City & County of Swansea
Other
Section 99 Letter (PDF, 66 KB)
Notification of completion of the examination
Other
Tata Steel UK Ltd (PDF, 533 KB)
The applicant?s comments on Associated British Port?s response to the ExA?s rule 17 request of 20 May.
Other
Brian Greenwood on behalf of Associated British Ports (PDF, 397 KB)
Responses to the ExA's questions dated 20 May 2015, and Associated British Port's proposed protective provision
Other
Duncan O'Connor (Pinsent Masons LLP) ar ran Tata Steel UK Limited (PDF, 492 KB)
Draft Development Consent Order (Revision 5) comparison showing changes made between revisions 4 and 5
Other
Duncan O'Connor (Pinsent Masons LLP) ar ran Tata Steel UK Limited (PDF, 639 KB)
Draft Development Consent Order (Revision 5)
Other
Louise Edwards ar ran Natural Resources Wales (PDF, 211 KB)
Response to Rule 8(3) and Rule 17 letter of 20 May 2015 requesting further information
Other
Duncan O'Connor (Pinsent Masons LLP) ar ran Tata Steel UK Limited (PDF, 3 MB)
Response to Rule 8(3) and Rule 17 letter of 20 May 2015 requesting further information
Other
Brian Greenwood (Winckworth Sherwood LLP) ar ran Associated British Ports (PDF, 14 MB)
Response to Rule 8(3) and Rule 17 letter of 20 May 2015 requesting further information
Other
Margaret Ketteridge ar ran GTC (PDF, 40 KB)
Response to Rule 8(3) and Rule 17 letter of 20 May 2015 requesting further information
Other
Duncan O'Connor (Pinsent Masons LLP) ar ran Tata Steel UK Limited (PDF, 441 KB)
Response to Rule 8(3) and Rule 17 letter of 15 May 2015 requesting further information
Other
Welsh Government (PDF, 132 KB)
Response to Rule 8(3) and Rule 17 letter of 15 May 2015 requesting further information
Other
Rule 8(3) and Rule 17 Letter (PDF, 104 KB)
Other
150515 Rule 17 and 8(3) request for information from the applicant (PDF, 73 KB)
Other
Brian Greenwood (Winckworth Sherwood LLP) ar ran Associated British Ports (PDF, 175 KB)
Comments on responses to ExA?s second written questions
Other
Ben Lewis (Bilfinger GVA) ar ran Tata Steel UK Limited (PDF, 392 KB)
Draft Statement of Common Ground between Tata Steel UK Limited and Neath Port Talbot County Borough Council
Other
Ben Lewis (Bilfinger GVA) ar ran Tata Steel UK Limited (PDF, 828 KB)
Draft Development Consent Order (Revision 4)
Other
Ben Lewis (Bilfinger GVA) ar ran Tata Steel UK Limited (PDF, 1 MB)
Explanatory note on the draft Development Consent Order (Revision 4) including comparison of Revision 3 and Revision 4, and comparison of Explanatory Memorandum
Other
Ben Lewis (Bilfinger GVA) ar ran Tata Steel UK Limited (PDF, 247 KB)
Explanatory Memorandum (Revision 1)
Other
Ben Lewis (Bilfinger GVA) ar ran Tata Steel UK Limited (PDF, 741 KB)
Comments on responses to ExA?s second written questions
Other
Sarah Wood (Eversheds LLP) ar ran National Grid Electricity Transmission plc (PDF, 166 KB)
National Grid Electricity Transmission Plc's response to the Examining Authority's 2nd written questions
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 6 MB)
High Level Assessment of Major Accident Hazards
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 1 MB)
Design Principles Document
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 957 KB)
Draft Development Consent Order (Revision 3)
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 4 MB)
Tata Steel UK Limited's response to the Examining Authority's 2nd written questions
Other
Louise Edwards ar ran Natural Resources Wales (PDF, 67 KB)
Natural Resources Wales response to the Examining Authority's 2nd written questions
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 45 KB)
Book of Reference (Revision 1)
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 1 MB)
Explanatory notes on the draft Development Consent Order (Revision 3) including Comparison of Revision 2 and Revision 3
Other
Brian Greenwood (Winckworth Sherwood LLP) ar ran Associated British Ports (PDF, 2 MB)
Written summary of oral representation put at the Issue Specific Hearing held on 15 April 2015 and Response to the ExA?s Second Round Questions submitted for Deadline 6
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 45 KB)
Explanatory comments on revised Book of Reference and comparison with submission version
Other
Issue Specific Hearing (SAIN, 29 MB)
Issue Specific Hearing to address outstanding issues
Other
Open Floor Hearing (SAIN, 2 MB)
Other
Open Floor Hearing Agenda 15 April 2015 (PDF, 52 KB)
Agenda for the Open Floor Hearing
Other
Issue Specific Hearing Agenda 15 April 2015 (PDF, 60 KB)
Agenda for the Issue Specific Hearing on Outstanding Issues
Other
Examining Authority�s Second Round of Questions (PDF, 34 KB)
ExA's second round of questions
Other
Report on the Implications for European Sites (RIES) (PDF, 353 KB)
Other
Notification of Second Round Questions and Issue of the RIES (PDF, 82 KB)
The Examining Authority's notice of Second Round of Written Questions and Report on the Implications for European Sites (RIES)
Other
Copy of Rule 13(6) notice as published in the South Wales Evening Post (PDF, 43 KB)
Other
Neath Port Talbot County Borough Council (PDF, 271 KB)
Comments on applicant?s final preferred draft DCO
Other
Addleshaw Goddard ar ran Network Rail Infrastructure Limited (PDF, 98 KB)
Comments on applicant?s final preferred draft DCO
Other
Notification of additional Hearings (PDF, 78 KB)
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 262 KB)
Statement of Common Ground between Natural Resources Wales and Tata Steel UK Ltd.
Other
Brian Greenwood ar ran Associated British Ports (PDF, 88 KB)
Written summary of oral representation put at the Issue Specific Hearing held on 25 February 2015 and written representation submitted for Deadline 4
Other
Natural Resources Wales (PDF, 9 MB)
Written summary of the oral representation put at the Issue Specific Hearing on the Environmental Matters held on 25 February 2015
Other
Network Rail Infrastructure Limited (PDF, 119 KB)
Additional submission from Network Rail providing an update on the current negotiations with the Applicant
Other
Welsh Government (PDF, 20 KB)
Additional submission from Welsh Government confirming no outstanding issues regarding the application or examination process.
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 1 MB)
Explanatory notes on the draft Development Consent Order (Revision 2) including Comparison of Revision 1 and Revision 2.
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 705 KB)
Draft Development Consent Order (Revision 2).
Other
Neath Port Talbot County Borough Council (PDF, 51 KB)
Notes of Issue Specific Hearing held on 25 February 2015
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 2 MB)
Written summary of oral representation put at the Issue Specific Hearing on Compulsory Acquisition and Environmental matters held on 25 February 2015.
Other
Examining Authority's Note of Accompanied Site Visit (PDF, 83 KB)
Other
Audio Recording - Compulsory Acquisition Hearing (SAIN, 24 MB)
Audio recording of the Compulsory Acquisition Hearing 25 February 2015.
Other
Audio Recording - Issue Specific Hearing (SAIN, 79 MB)
Audio recording of the Issue Specific Hearing on Environmental Matters 25 February 2015.
Other
Audio Recording - Open Floor Hearing (SAIN, 7 MB)
Audio recording of the Open Floor Hearing 24 February 2015.
Other
Accompanied Site Visit Itinerary 24 February 2015 (PDF, 77 KB)
Accompanied Site Visit Itinerary 24 February 2015
Other
Natural Resources Wales (PDF, 62 KB)
Written summary of the oral representation put at the Issue Specific Hearing on the DCO held on 12 February 2015
Other
Compulsory Acquisition Hearing and Issue Specific Hearing on environmental matters - Agenda (PDF, 98 KB)
Compulsory Acquisition Hearing and Issue specific hearing on environmental matters (including Environmental Impact Assessment (EIA) and Habitats Regulations Assessment (HRA) - Hearing Agenda 25 and (if required) 26 February 2015
Other
Neath Port Talbot County Borough Council (PDF, 917 KB)
Written summary of the oral representation put at the Issue Specific Hearing on the DCO held on 12 February 2015
Other
City & County of Swansea (PDF, 379 KB)
Comments on Applicant's response to the City & County of Swansea's LIR and agenda item 6 of the Issue Specific Hearing on the draft Development Consent Order on 12th February 2015
Other
Open Floor Hearing Agenda 24 February 2015 (PDF, 82 KB)
Open Floor Hearing Agenda 24 February 2015
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 720 KB)
Written summary of the oral representation put at the Issue Specific Hearing on the DCO held on 12 February 2015
Other
Audio Recording Part 2 (Document 44 MB)
Issue Specific Hearing on the draft Development Consent Order 12 February 2015. Part 2 of 2
Other
Audio Recording Part 1 (Document 71 MB)
Issue Specific Hearing on the draft Development Consent Order 12 February 2015. Part 1 of 2
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 753 KB)
Comments on Written Representations
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 685 KB)
Responses to Rule 17 letter of 30 January 2015 requesting further information
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 1 MB)
Explanatory notes on the draft Development Consent Order (Revision 1) & Comparison of Revision 0 and Revision 1
Other
Civil Aviation Authority (PDF, 23 KB)
Responses to Rule 17 letter of 30 January 2015 requesting further information
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 657 KB)
Comments on responses to ExA?s first written questions
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 711 KB)
Comments on Local Impact Reports
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 676 KB)
Draft Development Consent Order - Revision 1
Other
150205 EN010062 PTPower ISH DCO hearing Agenda (PDF, 141 KB)
Agenda for the Issue Specific Hearing on the draft Development Consent Order
Other
Rule 17 Welsh Government Letter (PDF, 80 KB)
Other
Rule 17 Letter (PDF, 81 KB)
Other
National Grid Electricity Transmission Plc (PDF, 76 KB)
Written Representation by National Grid Electricity Transmission Plc. The Examining Authority has exercised its authority and agreed to accept this as a late submission for Deadline 1
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 654 KB)
Statement of Progress relating to Statements of Common Ground
Other
Powys County Council (PDF, 42 KB)
Additional submission from Powys County Council, clarifying their involvement in the examination
Other
Neath Port Talbot County Borough Council (PDF, 219 KB)
Written Representation
Other
Neath Port Talbot County Borough Council (PDF, 61 KB)
Neath Port Talbot County Borough Council's response to the Examining Authority's 1st written questions
Other
Western Power Distribution (PDF, 87 KB)
Western Power Distribution response to the Examining Authority's 1st written questions
Other
Neath Port Talbot County Borough Council (PDF, 8 MB)
Local Impact Report
Other
Network Rail Infrastructure Limited (PDF, 592 KB)
Written Representation
Other
Brian Greenwood ar ran Associated British Ports (PDF, 7 KB)
Associated British Ports's response to the Examining Authority's 1st written questions
Other
Natural Resources Wales (PDF, 475 KB)
Written Representation by Natural Resources Wales, including responses to the Examining Authority's 1st written questions, Flood Risk Guidance and letter sent from the Welsh Government to Local Authorities in Wales regarding Flood Risk and Climate Change
Other
Ben Lewis (GVA) ar ran Tata Steel UK Limited (PDF, 5 MB)
Tata Steel UK Limited's response to the Examining Authority's 1st written questions
Other
Health and Safety Executive (PDF, 168 KB)
Written Representation
Other
City & County of Swansea (PDF, 580 KB)
Local Impact Report
Other
Brian Greenwood ar ran Associated British Ports (PDF, 158 KB)
Written Representation from Brian Greenwood on behalf of Associated British Ports
Other
Margaret Ketteridge ar ran GTC (PDF, 42 KB)
Written Representation from Margaret Ketteridge on behalf of GTC Pipelines Limited, Independent Pipelines Limited, Independent Power Networks Limited, The Electricity Network Company Limited and Quadrant Pipelines Limited
Other
Notification of Hearings and Accompanied Site Visit (PDF, 82 KB)
Other
Rule 8(3) letter, variation to the timetable (PDF, 97 KB)
Other
Duncan O Connor (Pinsent Masons) on behalf of Tata Steel UK Ltd (PDF, 1 MB)
Correspondence from the Applicant, Revisions 0 and 1 of the No Significant Effects Report, and a Comparite version (Rev 0 and 1)
Other
Duncan O Connor (Pinsent Masons) on behalf of Tata Steel UK Limited (PDF, 389 KB)
Errata document supplied by the Applicant relating to their Consultation Report (Doc 5.03)
Other
Tata Steel UK Ltd (PDF, 11 MB)
Correspondence from the Applicant, Habitats Screening Report Rev 2, Report to Inform an Appropriate Assessment and Comparite version of the Habitats Screening Report (Rev 0 and 2)
Other
Ben Lewis (GVA) on behalf of Tata Steel UK Limited (PDF, 8 MB)
Correspondence from the Applicant on the revised parameters for the project, including emails dated 8 December and 15 December 2014, a Cover Letter, a Statement on Revised Parameters and Revised Works Plan (Drawing Ref 2.04)
Other
Examining Authority's First Round of Written Questions (PDF, 88 KB)
The Examining Authority's First Round of Written Questions accompanying the Rule 8 Letter issued on 18 December 2014.
Other
Preliminary Meeting Note (PDF, 178 KB)
Note of the Preliminary Meeting held 9 December 2014
Other
Tata Steel UK Limited (PDF, 22 MB)
Photomontages of the revised parameters
Other
Rule 8 Letter (PDF, 165 KB)
Other
Preliminary Meeting Audio (Document 43 MB)
Audio Recording of the Preliminary Meeting held on 9th December 2014
Other
Rhondda Cynon Taf County Borough Council (PDF, 42 KB)
Late representation/correspondence submitted during the pre-examination stage and accepted by the Examining Authority
Other
Rule 6 letter (PDF, 144 KB)
Other
Tata Steel UK limited (PDF, 708 KB)
Certificates of Compliance with Regulation 13 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009, and s.56 and s.59 of the Planning Act 2008
Other
Bridgend County Borough Council (PDF, 39 KB)
Adequacy of Consultation
Other
Camarthenshire County Council (PDF, 36 KB)
Adequacy of Consultation
Other
6.03.1 Vol 3a ES APP 1.3 PEIR Figures High Resolution (ZIP, 219 MB)
Other
6.03.1 Vol 3a ES APP 1.3 PEIR Appendices (Document 256 MB)
Other
6.03.1 Vol 3a ES APP 1.3 PEIR Figures Low Resolution (ZIP, 121 MB)
Other
Neath Port Talbot County Borough Council (PDF, 76 KB)
Adequacy of Consultation
Other
Brecon Beacons National Park Authority (PDF, 53 KB)
Adequacy of Consultation
Other
EN010062 Section 55 Checklist (PDF, 469 KB)
Other
5.04 Details of Other Consents and Licences (SUBMISSION) (PDF, 58 KB)
Other
10.01 Planning Statement (SUBMISSION) (PDF, 9 MB)
Other
6.04.5 Vol 4e Figure 7.43 (PDF, 3 MB)
Other
6.03.2 Vol 3b ES APP 14.3 Site Photographs (PDF, 827 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS context (PDF, 2 MB)
Other
6.03.2 Vol 3b ES APP 14.4 Technical Note Option 1 (PDF, 274 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS datasheet (PDF, 539 KB)
Other
6.04.6 Vol 4f Figure 7.50 (PDF, 5 MB)
Other
6.04.4 Vol 4d Figure 7.29 (PDF, 2 MB)
Other
6.04.2 Vol 4b Figure 7.8 (PDF, 7 MB)
Other
6.03.1 Vol 3a ES APP 9.1 F Coal Authority reports (3) (PDF, 221 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable site 2500 (PDF, 2 MB)
Other
6.03.1 Vol 3a ES APP 1.5 Planning Inspectorate Correspondence (PDF, 162 KB)
Other
6.04.7 Vol 4g Figure 16.2 Cumulative (PDF, 7 MB)
Other
6.04.4 Vol 4d Figure 7.33 (PDF, 2 MB)
Other
6.03.2 Vol 3b ES APP 11.1 Heritage Assets (PDF, 218 KB)
Other
6.03.1 Vol 3a ES APP 5.4 Potential Effects Supporting Tables (PDF, 530 KB)
Other
6.04.4 Vol 4d Figure 7.25 (PDF, 3 MB)
Other
6.04.1 Vol 4a Figure 7.5 (PDF, 6 MB)
Other
6.03.1 Vol 3a ES APP 9.1 F Coal Authority reports (2) (PDF, 218 KB)
Other
6.03.1 Vol 3a ES APP 9.1 A Envirocheck Photolog (PDF, 5 MB)
Other
6.03.1 Vol 3a ES APP 1.1 Scoping Report (PDF, 51 MB)
Other
6.03.1 Vol 3a ES APP 1.3 PEIR Main Text (ZIP, 5 MB)
Other
6.02.5 ES Vol 2e Figures (PDF, 7 MB)
Other
6.04.7 Vol 4g Figure 16.9 Cumulative (PDF, 2 MB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS site 2500 (PDF, 262 KB)
Other
6.03.1 Vol 3a ES APP 6.7 Habitat Management Plan (PDF, 167 KB)
Other
6.04.7 Vol 4g Cover (PDF, 43 KB)
Other
6.04.4 Vol 4d Figure 7.28 (PDF, 2 MB)
Other
6.04.2 Vol 4b Figure 7.10 (PDF, 7 MB)
Other
6.03.1 Vol 3a ES APP 1.7 NPTCBC Correspondence (PDF, 210 KB)
Other
DCO Order Limits (ZIP, 18 KB)
Other
6.04.6 Vol 4f Figure 7.53 (PDF, 3 MB)
Other
6.04.4 Vol 4d Figure 7.32 (PDF, 5 MB)
Other
6.04.2 Vol 4b Figure 7.11 (PDF, 6 MB)
Other
5.03 No Significant Effects Report (SUBMISSION) (PDF, 416 KB)
Other
6.03.1 Vol 3a ES APP 6.3 HSI Assessment (PDF, 67 KB)
Other
10.02 Planning Statement Summary (SUBMISSION) (PDF, 501 KB)
Other
6.04.5 Vol 4e Figure 7.41 (PDF, 4 MB)
Other
6.04.3 Vol 4c Figure 7.17 (PDF, 7 MB)
Other
6.03.2 Vol 3b ES APP 14.7 Abstraction Summary for Option 2 (PDF, 79 KB)
Other
6.04.7 Vol 4g Figure 16.1 Cumulative (PDF, 5 MB)
Other
6.04.5 Vol 4e Cover (PDF, 43 KB)
Other
6.04.2 Vol 4b Figure 7.14 (PDF, 7 MB)
Other
6.03.2 Vol 3b Cover (PDF, 102 KB)
Other
2.02 Existing Site Layout Plan (PDF, 4 MB)
Other
10.03 Design and Access Statement (SUBMISSION) (PDF, 18 MB)
Other
6.04.3 Vol 4c Figure 7.18 (PDF, 7 MB)
Other
6.03.2 Vol 3b ES APP 14.8 Historic Abstraction Rates (PDF, 220 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS historic 10000 (PDF, 11 MB)
Other
6.04.6 Vol 4f Figure 7.48 (PDF, 6 MB)
Other
6.03.1 Vol 3a ES APP 1.6 Phased Approach Briefing Note (PDF, 612 KB)
Other
6.03.2 Vol 3b ES APP 15.1 Code of Construction Practice (PDF, 550 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS historic 2500 (PDF, 4 MB)
Other
6.04.4 Vol 4d Figure 7.23 (PDF, 4 MB)
Other
6.04.1 Vol 4a Cover (PDF, 43 KB)
Other
6.04.5 Vol 4e Figure 7.35 (PDF, 3 MB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS 10000 (PDF, 11 MB)
Other
4.03 Book of Reference (SUBMISSION) (PDF, 45 KB)
Other
2.06 Indicative elevations-sections-floorplans (SUBMISSION) (PDF, 741 KB)
Other
6.04.4 Vol 4d Figure 7.21 (PDF, 5 MB)
Other
6.04.7 Vol 4g Figure 16.7 Cumulative (PDF, 4 MB)
Other
6.03.1 Vol 3a Cover (PDF, 103 KB)
Other
6.02 ES Vol 2a (PDF, 3 MB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS Context (PDF, 2 MB)
Other
6.03.1 Vol 3a ES APP 5.2 Methodology Supporting Tables (PDF, 213 KB)
Other
2.07.1 Nature Conservation Sites (SUBMISSION) (PDF, 8 MB)
Other
6.04.5 Vol 4e Figure 7.47 (PDF, 2 MB)
Other
6.04.3 Vol 4c Figure 7.20 (PDF, 8 MB)
Other
6.04 Photomontage Cover (PDF, 182 KB)
Other
6.04.6 Vol 4f Figure 7.52 (PDF, 3 MB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable historic 2500 A11 (PDF, 3 MB)
Other
6.04.5 Vol 4e Figure 7.36 (PDF, 1 MB)
Other
6.03.2 Vol 3b ES APP 14.2 Water Balance Modelling Report (PDF, 887 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS site 2500 (PDF, 309 KB)
Other
6.04.6 Vol 4f Figure 7.51 (PDF, 2 MB)
Other
6.04.2 Vol 4b Figure 7.9 (PDF, 6 MB)
Other
6.03.1 Vol 3a ES APP 9.1 G Legilsation (PDF, 301 KB)
Other
2.03 Land Plans (SUBMISSION) (PDF, 3 MB)
Other
6.03.2 Vol 3b ES APP 16.1 CLVIA (PDF, 72 KB)
Other
6.04.4 Vol 4d Figure 7.24 (PDF, 3 MB)
Other
6.03.2 Vol 3b ES APP 14 Water Environment Appendices (PDF, 2 MB)
Other
6.04.1 Vol 4a Figure 7.3 (PDF, 6 MB)
Other
6.03.1 Vol 3a ES APP 9.1 E Tan15 Map (Document 700 KB)
Other
2.08 Historic Environment Features (SUBMISSION) (PDF, 5 MB)
Other
6.04.6 Vol 4f Figure 7.49 (PDF, 5 MB)
Other
6.03.1 Vol 3a ES APP 1.4 Consultation Matrix (PDF, 132 KB)
Other
6.04.2 Vol 4b Figure 7.12 (PDF, 7 MB)
Other
6.04.6 Vol 4f Figure 7.54 (PDF, 1 MB)
Other
6.04.4 Vol 4d Figure 7.30 (PDF, 6 MB)
Other
6.03.1 Vol 3a ES APP 6.4 Breeding Bird Letter (PDF, 559 KB)
Other
5.02 Statment of Statutory Nuisance (SUBMISSION) (PDF, 87 KB)
Other
6.04.7 Vol 4g Figure 16.8 Cumulative (PDF, 3 MB)
Other
6.04.5 Vol 4e Figure 7.38 (PDF, 8 MB)
Other
6.03.1 Vol 3a ES APP 6.5 Kidney Vetch Report (PDF, 64 KB)
Other
6.04.3 Vol 4c Cover (PDF, 43 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS 10000 soils (PDF, 3 MB)
Other
4.02 Funding Statement (SUBMISSION) (PDF, 265 KB)
Other
6.04.5 Vol 4e Figure 7.42 (PDF, 3 MB)
Other
6.03.2 Vol 3b ES APP 14.6 Abstraction Summary for Option 1 (PDF, 79 KB)
Other
9.02 Gas Connection Statement (SUBMISSION) (PDF, 272 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable historic 2500 A3 (PDF, 3 MB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable historic 2500 A14 (PDF, 4 MB)
Other
6.03.1 Vol 3a ES APP 1.11 ABP Correspondence (PDF, 2 MB)
Other
6.04.7 Vol 4g Figure 16.6 Cumulative (PDF, 7 MB)
Other
6.04.5 Vol 4e Figure 7.39 (PDF, 5 MB)
Other
6.03.2 Vol 3b ES APP 14.5 Technical Note Option 2 (PDF, 310 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS index (PDF, 101 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS site 10000 (PDF, 2 MB)
Other
6.03.1 Vol 3a ES APP 8.1 Noise Vibration (PDF, 2 MB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS datasheet (PDF, 626 KB)
Other
6.03.1 Vol 3a ES APP 5.3 Existing Conditions Supporting Tables (PDF, 263 KB)
Other
6.04.5 Vol 4e Figure 7.45 (PDF, 2 MB)
Other
6.03.1 Vol 3a ES APP 6.6 No Significant Effects (HRA Screening) Report (PDF, 440 KB)
Other
9.01 Grid Connection Statement (SUBMISSION) (PDF, 252 KB)
Other
2.07.3 Water Bodies in a River Basin Management Plan (SUBMISSION) (PDF, 5 MB)
Other
6.04.4 Vol 4d Figure 7.27 (PDF, 2 MB)
Other
6.04.1 Vol 4a Figure 7.7 (PDF, 6 MB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable site 10000 (PDF, 2 MB)
Other
2.05 Indicative Site Layout Plans (SUBMISSION) (PDF, 16 MB)
Other
6.04.4 Vol 4d Cover (PDF, 43 KB)
Other
6.03.1 Vol 3a ES APP 9.1 Geo-environmental Desk Study (PDF, 332 KB)
Other
1.02 Application Form (SUBMISSION) (PDF, 99 KB)
Other
6.03.1 Vol 3a ES APP 9.1 D Borehole Logs SS78NE102 (PDF, 259 KB)
Other
6.01 Non Technical Summary (PDF, 19 MB)
Other
6.04.7 Vol 4g Figure 16.5 Cumulative (PDF, 7 MB)
Other
6.03.2 Vol 3b ES APP 14.1 Legislation (PDF, 187 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS Historic 2500 (PDF, 4 MB)
Other
6.03.1 Vol 3a ES APP 6.2 Reptile Survey Report (PDF, 82 KB)
Other
2.07.2 Sites of Landscape Importance (SUBMISSION) (PDF, 7 MB)
Other
6.04.1 Vol 4a Figure 7.6 (PDF, 7 MB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck Cable Context (PDF, 2 MB)
Other
6.03.1 Vol 3a ES APP 1.2 Scoping Response (PDF, 4 MB)
Other
6.02.1 ES Vols 2b - 2e INDEX (PDF, 85 KB)
Other
6.04.1 Vol 4a Figure 7.1 (PDF, 6 MB)
Other
6.03.1 Vol 3a ES APP 9.1 F Coal Authority reports (1) (PDF, 82 KB)
Other
6.03.1 Vol 3a ES APP 1.3 PEIR NTS (ZIP, 43 MB)
Other
6.02.4 ES Vol 2d Figures (PDF, 30 MB)
Other
6.04.4 Vol 4d Figure 7.22 (PDF, 5 MB)
Other
6.04.1 Vol 4a Figure 7.2 (PDF, 7 MB)
Other
6.03.1 Vol 3a ES APP 9.1 D Borehole Logs SS78NE209 (PDF, 455 KB)
Other
1.01 Introduction to the Applicant (SUBMISSION) (PDF, 525 KB)
Other
5.01.1 Consultation Report - Summary (SUBMISSION) (PDF, 261 KB)
Other
6.04.5 Vol 4e Figure 7.40 (PDF, 5 MB)
Other
6.03.2 Vol 3b ES APP 14.9 Quality of Blow Down Water (PDF, 114 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS index (PDF, 102 KB)
Other
4.01 Statement of Reasons (SUBMISSION) (PDF, 272 KB)
Other
6.04.4 Vol 4d Figure 7.34 (PDF, 3 MB)
Other
6.04.3 Vol 4c Figure 7.15 (PDF, 9 MB)
Other
6.03.2 Vol 3b ES APP 13.1 Flood Consequences Assessment (PDF, 23 MB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable historic 2500 A7 (PDF, 3 MB)
Other
6.03.1 Vol 3a ES APP 1.8 NRW Correspondence (PDF, 1 MB)
Other
2.04 Works Plans (SUBMISSION) (PDF, 15 MB)
Other
10.05 Health and Safety Statement (SUBMISSION) (PDF, 137 KB)
Other
6.04.5 Vol 4e Figure 7.44 (PDF, 3 MB)
Other
6.03.2 Vol 3b ES APP 14.10 Historic Water Quality Discharge (PDF, 273 KB)
Other
6.03.1 Vol 3a ES APP 9.1 C Local Authority Search (PDF, 28 KB)
Other
6.02.2 ES Vol 2b Figures (PDF, 25 MB)
Other
6.04.4 Vol 4d Figure 7.31 (PDF, 6 MB)
Other
6.04.2 Vol 4b Figure 7.13 (PDF, 6 MB)
Other
6.03.1 Vol 3a ES APP 9.1 H Linkages (PDF, 116 KB)
Other
6.03.1 Vol 3a ES APP 1.10 Gwent and Glamorgan Archaeological Trust Correspondence (PDF, 250 KB)
Other
5.01 Consultation Report (PDF, 26 MB)
Other
6.04.7 Vol 4g Figure 16.3 Cumulative (PDF, 7 MB)
Other
6.03.1 Vol 3a ES APP 5.5 Model Sensitivity Runs (PDF, 213 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck LHS site 10000 soils (PDF, 3 MB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable historic 2500 A10 (PDF, 3 MB)
Other
6.03.1 Vol 3a ES APP 1.9 Responses to Brigend County Borough Council (PDF, 147 KB)
Other
10.04 Glossary (SUBMISSION) (PDF, 98 KB)
Other
6.04.5 Vol 4e Figure 7.46 (PDF, 2 MB)
Other
6.04.3 Vol 4c Figure 7.19 (PDF, 5 MB)
Other
6.03.1 Vol 3a ES APP 9.1 D Borehole Logs SS78NE108 (PDF, 421 KB)
Other
6.04.1 Vol 4a Figure 7.4 (PDF, 7 MB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable DataSheet (PDF, 446 KB)
Other
6.03.1 Vol 3a ES APP PEIR (PDF, 105 KB)
Other
3.02 DCO Explanatory Memorandum (SUBMISSION) (PDF, 226 KB)
Other
6.04.7 Vol 4g Figure 16.4 Cumulative (PDF, 7 MB)
Other
6.04.5 Vol 4e Figure 7.37 (PDF, 5 MB)
Other
6.04.3 Vol 4c Figure 7.16 (PDF, 9 MB)
Other
EN010062 Notification of Decision to Accept Application (PDF, 115 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck RHS site 10000 (PDF, 2 MB)
Other
6.03.1 Vol 3a ES APP 6.1 Ecological Constraints Report (PDF, 7 MB)
Other
6.04.6 Vol 4f Cover (PDF, 43 KB)
Other
6.04.4 Vol 4d Figure 7.26 (PDF, 3 MB)
Other
6.02.3 ES Vol 2c Figures (PDF, 14 MB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable historic 10000 (PDF, 11 MB)
Other
6.04.2 Vol 4b Cover (PDF, 43 KB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable Site soils 10000 (PDF, 3 MB)
Other
6.03.1 Vol 3a ES APP 9.1 B Envirocheck cable Index (PDF, 91 KB)
Other
6.03.1 Vol 3a ES APP 5.1 Policy Tables (PDF, 225 KB)
Other
2.01 Location Plan (SUBMISSION) (PDF, 7 MB)
Other
3.01 PORT TALBOT STEELWORKS (POWER GENERATION ENHANCEMENT) ORDER (SUBMISSION) (PDF, 357 KB)
Other
131212 EN010062 Tata Steel Transboundary Screening (PDF, 53 KB)
Tata Steel completed transboundary screening matrix
Other
131114 EN010062 Late Response OFWAT REDACTED (PDF, 1 MB)
Other
131105 EN010062 Scoping Opinion (PDF, 5 MB)
Secretary of State's Scoping Opinion
Other
131105 EN010062 Late responses (PDF, 68 KB)
Late responses to Secretary of State's scoping consultation
Other
130926 EN010062 TATA Steel Scoping Report (PDF, 28 MB)
The applicant's Scoping Report.
Gellir hidlo dogfennau yn ôl eu dyddiad cyhoeddi neu yn ôl y dyddiad cau sy’n berthnasol iddynt. Cyhoeddir dyddiadau cau yn yr amserlen ar ddechrau’r archwiliad a gellir eu gweld ar dab amserlen yr archwiliad.