Cysylltiad Gogledd Cymru

Nid safbwyntiau’r Arolygiaeth Gynllunio yw’r rhai a fynegir ar y dudalen hon. Yr hyn a ddangosir yma yw cynnwys a gyflwynwyd i’r Arolygiaeth Gynllunio gan y cyhoedd a phartïon eraill â buddiant, sy’n rhoi eu barn ynglŷn â’r cynnig hwn.

Cysylltiad Gogledd Cymru

Derbyniwyd 24/11/2018
Gan Stephen Parry-Williams

Sylw

The route currently being considered includes a parcel of land which we own.
I believe the route in Section E should be reconsidered, especially in light of the preferred route of the 3rd crossing for a road bridge across the Menai Straits. The current route should be followed for a greater length before reaching the new road crossing.
I believe the existing pylons should be utilized along with a 'heat sink' run out to the sea near the power station for dissipation of emergency loads, which would negate the requirement for a second run of pylons across Anglesey and save the Government/the Country a great deal of money, given that the output of the Power Station is now less than was originally envisaged.
Failing that, the underground option should still be considered as the long-term preferred option.
We expect to be recompensed for any value lost on our property should the 'National Grids' prefered option eventually be adopted.