Cynllunio Seilwaith Cenedlaethol

  • English
  • Cwestiynau cyffredin
  • Cysylltu â ni
  • Map o’r safle
Ymholiadau: 0303 444 5000
Skip to main content
 

Main menu

    • Hafan
    • Prosiectau
      • Fferm Wynt Alltraeth Awel y Môr
      • Piblinell Carbon Deuocsid HyNet North West
      • Green Gen Vyrnwy Frankton
      • Fferm Solar Maen Hir
      • Future Energy Llanwern Solar Project
      • Fferm Wynt Alltraeth Mona
      • Prosiect Pŵer Carbon Isel Cei Connah
      • Abergelli Power
      • Brechfa Forest Connection
      • Brechfa Forest West Wind Farm
      • Cysylltiad Ffermydd Gwynt Gogledd Cymru
      • Cysylltiad Gogledd Cymru
      • Fferm Wynt Coedwig Clocaenog
      • Hirwaun Power Station
      • Internal Power Generation Enhancement for Port Talbot Steelworks
      • Mid Wales Electricity Connection (N Grid)
      • Mynydd y Gwynt Wind Farm
      • South Hook Combined Heat & Power Station
      • SP Mid Wales (Electricity) Connections Project (SP Manweb)
      • Storfa Bwmpio Glyn Rhonwy
      • Tidal Lagoon Cardiff
      • Tidal Lagoon Newport
      • Tidal Lagoon Swansea Bay
      • Wrexham Energy Centre
    • Y broses o wneud cais
      • Rôl yr Arolygiaeth Gynllunio
      • Y broses
      • Cymryd rhan yn y broses
      • Gwasanaeth cyn ymgeisio ar gyfer ymgeiswyr
      • Cyflwyno cais am ganiatâd datblygu
      • Ffioedd gwneud cais
      • Archif Ffioedd gwneud cais
      • Costau
      • Cwestiynau cyffredin
    • Deddfwriaeth a chyngor
      • Deddfwriaeth
      • Canllawiau
      • Nodiadau cyngor
      • Dogfennau enghreifftiol
      • Datganiadau Polisi Cenedlaethol
      • Cofrestr cyngor
    • Cymorth
      • Am y wefan Cynllunio Seilwaith Cenedlaethol
      • Datganiad hygyrchedd
      • Telerau ac Amodau
      • Chwcis
      • Preifatrwydd
      • Rhestr termau
      • Yr iaith Gymraeg
      • Map o’r safle
      • Dolenni defnyddiol
      • Cysylltu â ni
  1. Penderfyniad
  2. Penderfynwyd
  3. Tynnwyd yn ôl
Darganfod rhagor am y broses- >
Gorsafoedd Cynhyrchu:

Wrexham Energy Centre

gan Wrexham Power Limited
View this project in English
information icon

Mae’r dogfennau archwiliad sy’n ymwneud â’r prosiect hwn wedi’u harchifo ac nid ydynt ar gael ar y wefan hon mwyach. Gellir gweld penderfyniad yr Ysgrifennydd Gwladol a Gorchymyn Caniatâd Datblygu  ar y tab Dogfennau.

I ddarganfod ble i weld y Dogfennau Ardystiedig, cyfeiriwch at y manylion cyswllt a nodir yn Nodyn Esboniadol y Gorchymyn Caniatâd Datblygu.

05/06/2023
  1. Trosolwg
  2. Cyngor a51
  3. Dogfennau
  4. Sylwadau perthnasol

Wrexham Energy Centre

BlaenorolGweld popethNesaf
Enquiry received via email

Wrexham Energy Centre

12/09/2013
Mark Isherwood AM

Ymholiad

“

Enquiry from Welsh Conservative Member for North Wales, Mark Isherwood regarding section 53 authorisation.
Letter and response available from links below.

”

Atodiad 4
Atodiad 4
Atodiad 1
Atodiad 1
Atodiad 3
Atodiad 3
Atodiad 2
Atodiad 2

Am y prosiect hwn

Penderfynwyd ar y cais hwn cyn i’’r gweithdrefnau presennol gael eu rhoi ar waith. O ganlyniad, nid yw’’r holl gynnwys a luniwyd gan yr Arolygiaeth Gynllunio wedi’’i gyfieithu i’’r Gymraeg. A combined cycle gas turbine (CCGT) power station with a generating capacity of up to 299 MWe. The project will include an integral gas connection.

Ewch i wefan datblygwr

Lleoliad y prosiect

Wrexham

Gwybodaeth Gyswllt

tim achos yr Arolygiaeth Gynllunio:
WrexhamEnergy@planninginspectorate.gov.uk
0303 444 5000

Datblygwr:
Wrexham Power Limited - ffôn08003196185

Map o’r safle – Telerau ac Amodau – Hygyrchedd – Preifatrwydd ymlaen GOV.UK – Chwcis
Cynnwys y wefan: Hawlfraint 2017 Yr Arolygiaeth Gynllunio

Dywedwch wrthym a ydych yn derbyn cwcis

 

Rydym yn defnyddio’r Rydym yn defnyddio cwcis i gasglu gwybodaeth am sut rydych chi’n defnyddio’r wefan Cynllunio Seilwaith Cenedlaethol. Rydym yn defnyddio’r wybodaeth hon i sicrhau bod y wefan yn gweithio cystal ag y bo modd, ac i wella gwasanaethau’r llywodraeth.

 

Gallwch ddod o hyd i fwy o wybodaeth ar ein tudalen preifatrwydd.

 

Cwcis ar y wefan Seilwaith Cenedlaethol
Cynllunio Seilwaith Cenedlaethol

Ffeiliau sy’n cael eu cadw ar eich ffôn, llechen neu gyfrifiadur pan fyddwch yn ymweld â gwefan yw cwcis.

Rydym yn defnyddio cwcis i gadw gwybodaeth am sut rydych yn defnyddio’r wefan Seilwaith Cenedlaethol, fel y tudalennau rydych yn ymweld â nhw.

Cwcis Angenrheidiol

Mae’r cwcis hanfodol hyn yn gwneud pethau fel gwarchod y wefan rhag cael ei defnyddio’n faleisus. Mae angen eu galluogi bob tro.

Dysgwch fwy am y cwcis ar y wefan Seilwaith Cenedlaethol

Cwcis sy’n mesur eich defnydd o’r wefan

Cwcis sy’n mesur eich defnydd o’r wefan

Rydym yn defnyddio Google Analytics i fesur sut rydych chi’n defnyddio’r wefan er mwyn i ni allu ei gwella ar sail anghenion defnyddwyr. Nid ydym yn caniatáu i Google ddefnyddio na rhannu’r data ar sut rydych chi’n defnyddio’r wefan hon.

Mae Google Analytics yn gosod cwcis sy’n cadw gwybodaeth ddienw am:

  • sut gwnaethoch chi gyrraedd y wefan
  • ytudalennau rydych yn ymweld â nhw ar y wefan hon a faint o amser rydych yn ei dreulio ar bob tudalen
  • beth rydych yn clicio arno tra’r ydych yn ymweld â’r wefan

Please enable Strictly Necessary Cookies first so that we can save your preferences!