Wrexham Energy Centre

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (90)

Developer's Application (156)

Acceptance (10)

Pre Examination (12)

Examination (213)

Decision (24)

Decided (3)

Date

SourceDescription
Other
Wrexham Power Limited (PDF, 71 KB)
Other
BEIS (PDF, 30 KB)
Correction Notice
Other
BEIS (PDF, 28 KB)
Correction Order
Other
Development Consent Order made by the Secretary of State (PDF, 878 KB)
Other
Notice of the Decision by the SoS (Reg 23) (PDF, 85 KB)
Other
Recommendation Report and Appendices (PDF, 2 MB)
Other
Secretary of State's decision letter (PDF, 457 KB)
Other
Submissions Received After the Close of Examination (PDF, 466 KB)
Other
Wales and West Utilities (PDF, 142 KB)
Response to The Department for Business, Energy and Industrial Strategy letter dated 8 June 2017
Other
Wrexham Power Limited (PDF, 549 KB)
Response to The Department for Business, Energy and Industrial Strategy letter dated 8 June 2017
Other
BEIS Second Consultation Letter dated 8 June 2017 (PDF, 40 KB)
Request for comments from the Applicant and other addressees
Other
Earthworm Energy (Document 2 MB)
Photograph showing CSS Pickhill
Other
Earthworm Energy (PDF, 663 KB)
Pickhill Table Plan
Other
Earthworm Energy (Document 35 KB)
Photograph showing edge of inverter protection
Other
Earthworm Energy (Document 2 MB)
Photograph showing Transformer Station & Combiner Pickhill
Other
Earthworm Energy (Document 163 KB)
Photograph showing Pickhill Meter Export 30.3.17 17.04
Other
Earthworm Energy (PDF, 29 KB)
Pixhill report
Other
Earthworm Energy (Document 162 KB)
Photograph showing Pickhill Meter Date 30.3.17
Other
Earthworm Energy (PDF, 6 MB)
Response to The Department for Business, Energy and Industrial Strategy letter dated 8 May
Other
Forge Property Consultants on behalf of Gerard Michael Ormrod Owen (PDF, 70 KB)
Response to The Department for Business, Energy and Industrial Strategy letter dated 8 May
Other
Wales and West Utilities (PDF, 90 KB)
Response to The Department for Business, Energy and Industrial Strategy letter dated 8 May
Other
Wales and West Utilities (PDF, 39 KB)
Response to The Department for Business, Energy and Industrial Strategy letter dated 8 May
Other
Wrexham Power Limited (PDF, 330 KB)
Response to The Department for Business, Energy and Industrial Strategy letter dated 8 May
Other
Wrexham Power Limited (PDF, 709 KB)
Response to The Department for Business, Energy and Industrial Strategy letter dated 8 May
Other
Wrexham Power Limited (PDF, 974 KB)
Draft Development Consent Order
Other
Wrexham Power Limited (PDF, 661 KB)
Draft Development Consent Order (Tracked change version between Revision 7 and Revision 8)
Other
BEIS Consultation Letter dated 8 May 2017 (PDF, 160 KB)
Request for comments from the Applicant and other addressees
Other
Wrexham County Borough Council (PDF, 83 KB)
This communication was received before the Preliminary Meeting. As pre-examination correspondence, it was at that time considered on an administrative basis only. It clarified that this was a representation from the Economic Development Team. It was used to adjust the published title of RR-040 to reflect that rather than representing the views of the council as a whole, it was a representation from the Economic Development Team. It is published now to confirm that position
Other
Notification of Completion of ExA Examination (PDF, 79 KB)
Other
Unaccompanied Site Inspection Note (PDF, 171 KB)
The ExA's note of their unaccompanied site inspection undertaken on 18 January 2017.
Other
Welsh Government (PDF, 210 KB)
Response to the Examining Authority's request for further information
Other
Wrexham County Borough Council (PDF, 37 KB)
Response to the Examining Authority's request for further information
Other
Wrexham Power Limited (PDF, 37 KB)
Covering letter for Deadline 9 representations
Other
Wrexham Power Limited (PDF, 2 MB)
Explanatory Memorandum to Draft Development Consent Order (Revision 2)
Other
Wrexham Power Limited (PDF, 1 MB)
Comparison version of Revision 1 and Revision 2 of the Explanatory Memorandum
Other
Wrexham Power Limited (PDF, 1 MB)
Draft Development Consent Order (Revision 7)
Other
Wrexham Power Limited (PDF, 4 MB)
2.2 Land Plans including Crown Land (Revision 5)
Other
Wrexham Power Limited (PDF, 873 KB)
Response to representations made at Deadline 8
Other
Wrexham Power Limited (PDF, 1,003 KB)
Response to Chris Briggs Deadline 7 submission
Other
National Grid Gas Plc (PDF, 34 KB)
Withdrawing representations in respect of the Application.
Other
Natural England (PDF, 197 KB)
Response to Deadlines 7 and 8
Other
Susan Harber (PDF, 89 KB)
Copy of BBC News article dated 9 January 2017
Other
Wales and West Utilities (PDF, 249 KB)
Response to the Deadline 8 Questions and associated plan
Other
Wrexham Power Limited (PDF, 540 KB)
Responses to the Examining Authority request for further information (including responses to questions issued on 9 January 2017 and responses to representations from Interested Parties at Deadline 7)
Other
Wrexham Power Limited (PDF, 60 KB)
Covering letter for Deadline 8 representations
Other
Wrexham Power Limited (PDF, 38 KB)
Updated Book of Reference (Revision 3)
Other
Wrexham Power Limited (PDF, 437 KB)
Response to Chris Briggs late response to Rule 17 letter dated 12 December 2016
Other
Wrexham Power Limited (PDF, 38 KB)
Schedule of Changes relating to the updated Book of Reference (Revision 3)
Other
Wrexham Power Limited (PDF, 38 KB)
Book of Reference - comparison version of Revision 2 and Revision 3
Other
Chris Briggs (PDF, 456 KB)
Response to Rule 17 letter dated 12 December 2016- Late Submission accepted at the discretion of the ExA
Other
Rule 17 and Rule 8(3) Request for Further Information (PDF, 57 KB)
Other
Rule 17 Questions of 9 January 2017 (PDF, 73 KB)
ExA's Rule 17 Questions of 9 January 2017
Other
Earthworm Energy Plc Ltd (PDF, 65 KB)
Response to Rule 17 letter dated 12 December 2016
Other
Kellogg Company of Great Britain Limited (PDF, 1 MB)
Response to Rule 17 letter dated 12 December 2016
Other
National Grid Gas Plc (PDF, 32 KB)
Update on the protective provisions submitted by the Applicant in the draft Development Consent Order at deadline 6
Other
Natural Resources Wales (PDF, 345 KB)
Response to Rule 17 letter dated 12 December 2016
Other
Rostons Limited on behalf of Frederick Ronald Done, T G Ellis, PB, J and SC Edwards (PDF, 138 KB)
Response to Rule 17 letter dated 12 December 2016
Other
Wales and West Utilities (PDF, 46 KB)
Response to Rule 17 letter dated 12 December 2016
Other
Wrexham County Borough Council (PDF, 65 KB)
Response to Rule 17 letter dated 12 December 2016
Other
Wrexham Power Limited (PDF, 71 KB)
Covering letter for Deadline 7 representations
Other
Wrexham Power Limited (PDF, 1 MB)
Draft Development Consent Order (Revision 6)
Other
Wrexham Power Limited (PDF, 336 KB)
Schedule of changes to the Land Plans
Other
Wrexham Power Limited (PDF, 783 KB)
Responses to ExA’s comments on the Draft Development Consent Order
Other
Wrexham Power Limited (PDF, 4 MB)
Land Plans including Crown Land (Revision 4)
Other
Wrexham Power Limited (PDF, 2 MB)
Explanatory Memorandum to Draft Development Consent Order
Other
Wrexham Power Limited (PDF, 2 MB)
Response to Rule 17 letter dated 12 December 2016
Other
Wrexham Power Limited (PDF, 38 KB)
Schedule of changes relating to the updated Book of Reference
Other
Wrexham Power Limited (PDF, 1 MB)
Comparison version of Revision 0 and Revision 1 of the Draft Development Consent Order Explanatory Memorandum
Other
Wrexham Power Limited (PDF, 890 KB)
Comparison version of Revision 5 and Revision 6 of the Draft Development Consent Order
Other
Wrexham Power Limited (PDF, 4 MB)
Statement of Common Ground between Wrexham Power Limited and Wrexham County Borough Council
Other
Report on the Implications for European Sites (PDF, 231 KB)
Report on the Implications for European Sites (RIES) issued by the Examining Authority on 12 December 2016.
Other
Examining Authority's Commentary on the draft Development Consent Order (PDF, 248 KB)
Other
Examining Authority's Request for Futher Information (PDF, 63 KB)
Other
Rule 17 Letter (PDF, 52 KB)
Other
Chris Briggs (PDF, 85 KB)
Emissions data for Deeside Power Station sourced from NRW. Accepted at the discretion of the Examining Authority
Other
Wrexham Power Limited (PDF, 38 KB)
Letter in respect of the Compulsory Acquisition of rights over land owned by Mr Owen. This was accepted at the discretion of the Examining Authority
Other
Chris Briggs (PDF, 23 KB)
Freedom of Information request sent to Natural Resources Wales
Other
Chris Briggs (PDF, 295 KB)
Combined Cycle Gas Turbine Emission Plumes
Other
Joanna Roberts (PDF, 324 KB)
Written representation following the Issue Specific hearing on the Environment and Other Issues held on 23 November 2016- Late Submission accepted at the discretion of the ExA
Other
Natural Resources Wales (PDF, 128 KB)
Response to Deadline 6 - Covering Letter
Other
Natural Resources Wales (PDF, 202 KB)
Annex A - Summary of Oral Representations made at the Issue Specific hearing on Environmental and Other Issues of 23 November 2016
Other
Natural Resources Wales (PDF, 181 KB)
Annex B - Answers to questions asked by the ExA at the Issue Specific hearing on Environmental and Other Issues held on 23 November 2016
Other
Natural Resources Wales (PDF, 207 KB)
Freedom of information request from Mr Briggs and Natural Resources Wales' response
Other
Wrexham Power Limited (PDF, 854 KB)
Joint statement between solicitors for the Applicant and solicitors for Mr Owen.
Other
Wrexham Power Limited (PDF, 963 KB)
Comparison version of Revision 4 and Revision 5 of the Draft Development Consent Order
Other
Wrexham Power Limited (PDF, 1 MB)
Draft Development Consent Order (Revision 5)
Other
Wrexham Power Limited (PDF, 529 KB)
Written summary of oral submissions put at the Issue Specific hearing on the Draft Development Consent Order held on 24 Nov 2016
Other
Wrexham Power Limited (PDF, 787 KB)
Signed Statement of Common Ground between the Applicant and Natural Resources Wales
Other
Wrexham Power Limited (PDF, 1 MB)
Written summary of oral submissions put at the Issue Specific hearing on the Environment and Other Issues held on 23 November 2016
Other
Wrexham Power Limited (PDF, 407 KB)
Written summary of oral submissions put at the Compulsory Acquisition Hearing held on 24 Nov 2016
Other
Audio of the Compulsory Acquisition Hearing (PDF, 35 KB)
Audio of the Compulsory Acquisition Hearing of 24 November 2016
Other
Audio of the DCO Issue Specific Hearing (Part 1) (PDF, 34 KB)
Audio of the DCO Issue Specific Hearing on the Draft DCO of 24 November 2016
Other
Audio of the DCO Issue Specific Hearing (Part 2) (PDF, 34 KB)
Audio of the DCO Issue Specific Hearing on the Draft DCO of 24 November 2016
Other
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 1) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 23 November 2016
Other
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 2) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 23 November 2016
Other
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 3) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 23 November 2016
Other
Natural Resources Wales (PDF, 61 KB)
Further Response to the ExA’s Second Written Questions
Other
Wrexham Power Limited (PDF, 987 KB)
Comments on submissions made at Deadline 4
Other
Unaccompanied Site Inspection Note (PDF, 45 KB)
The ExA's note of their unaccompanied site inspection undertaken 23 and 24 November 2016
Other
Unaccompanied site inspection note (PDF, 155 KB)
The ExA's note of their unaccompanied site inspection undertaken 22 November 2016
Other
Clwyd Powys Archaeological Trust (PDF, 66 KB)
Update on negotiations with the Applicant in advance of the November hearings. This was accepted at the discretion of the Examining Authority
Other
Wales and West Utilities (PDF, 201 KB)
Update on negotiations with the Applicant in advance of the November hearings. This was accepted at the discretion of the Examining Authority
Other
Accompanied Site Inspection Itinerary and Hearing Agendas (PDF, 3 MB)
Other
Wrexham Power Limited (PDF, 4 MB)
Land Plans - Late Submission accepted at the discretion of the ExA
Other
Chris Briggs (PDF, 744 KB)
Representation about stack and noise emissions
Other
Dwr Cymru Welsh Water (PDF, 536 KB)
Response to ExA's Second Written Questions
Other
Kellogg Company of Great Britain Limited (PDF, 2 MB)
Response to the ExA’s Second Written Questions
Other
Natural England (PDF, 209 KB)
Response to the ExA’s Second Written Questions
Other
Natural Resources Wales (PDF, 126 KB)
Response to the ExA’s Second Written Questions
Other
Wrexham County Borough Council (PDF, 103 KB)
Response to ExA's Second Written Questions.
Other
Wrexham Power Limited (PDF, 1 MB)
Objection Schedule (Revision 2)
Other
Wrexham Power Limited (PDF, 1 MB)
Comments on submissions made at Examination Deadline 3
Other
Wrexham Power Limited (PDF, 2 MB)
Covering letter for Deadline 4 submissions
Other
Wrexham Power Limited (PDF, 1 MB)
Response to the ExA's Second Written Questions
Other
Wrexham Power Limited (PDF, 1 MB)
Draft Development Consent Order (Revision 4)
Other
Wrexham Power Limited (PDF, 38 KB)
Updated Book of Reference (Revision 2)
Other
Wrexham Power Limited (PDF, 38 KB)
Book of Reference - comparison version of Revision 1 and Revision 2
Other
Wrexham Power Limited (PDF, 838 KB)
Comparison version of Revision 3 and Revision 4 of the Draft Development Consent Order
Other
Wrexham Power Limited (PDF, 1 MB)
Comparison version of Revision 1 and Revision 2 of Environmental Statement Appendix: Construction Environmental Management Plan
Other
Wrexham Power Limited (PDF, 4 MB)
Landscape and Visual Impact Assessment Photomontage Report
Other
Wrexham Power Limited (PDF, 9 MB)
Environmental Statement Appendix: Foul and Surface Water Drainage Strategy - Revision 1
Other
Wrexham Power Limited (PDF, 136 KB)
Update regarding the Draft Development Consent Order following the Compulsory Acquisition Hearing held on 29 September 2016
Other
Wrexham Power Limited (PDF, 1 MB)
Environmental Statement Appendix: Construction Environmental Management Plan (Revision 2)
Other
Wrexham Power Limited (PDF, 9 MB)
Comparison version of Revision 0 and Revision 1 of the Environmental Statement Appendix: Foul and Surface Water Drainage Strategy
Other
Wrexham Power Limited (PDF, 5 MB)
Water Framework Directive Report
Other
Notification of Hearings and Accompanied Site Inspection for November 2016 (PDF, 101 KB)
Other
ExA Second Written Questions (PDF, 204 KB)
ExA Second Written Questions
Other
Notification of Second Written Questions (PDF, 109 KB)
Notification of Second Written Questions
Other
Joanna Roberts (PDF, 2 MB)
Update to Deadline 3 submission (REP3-022) - accepted at the discretion of the ExA on 20 October 2016
Other
Joanna Roberts (PDF, 630 KB)
Written summary of oral submissions put at the Issue Specific hearing on Environmental and Other Issues held on 28 and 29 September 2016
Other
Rostons Limited on behalf of Frederick Ronald Done, T G Ellis, PB, J and SC Edwards (PDF, 121 KB)
Update regarding clients land agreements with the Applicant - accepted at the discretion of the ExA
Other
Chris Briggs (PDF, 24 KB)
Written summary of oral submissions put at hearings held between 27 and 29 September 2016
Other
Dennis and Angela Edwards (PDF, 374 KB)
Written summaries of oral submissions put at hearings held between 27 and 29 September 2016
Other
Kath Briggs (PDF, 20 KB)
Written summary of oral submission made on 28 September 2016
Other
Kellogg Company of Great Britain Limited (PDF, 137 KB)
Comments on the Applicant's response to Kellogg's Written Representation.
Other
Michael Morris (PDF, 4 MB)
Written summaries of oral submissions put at hearings held between 27 and 29 September 2016
Other
Ms Elizabeth Cross (PDF, 41 KB)
Representation following the hearings held between 27 and 29 September 2016
Other
Ms Fay Green on behalf of St. Paul's School (PDF, 38 KB)
Representation following the hearings held between 27 and 29 September 2016
Other
Natural Resources Wales (PDF, 477 KB)
Written summaries of oral submissions put at hearings held between 27 and 29 September 2016
Other
Robert Eccleston (PDF, 16 KB)
Written summaries of oral submissions put at hearings held between 27 and 29 September 2016
Other
Susan Harber (PDF, 38 KB)
Written summary of oral submission made on 28 September 2016
Other
Wrexham Power Limited (PDF, 2 MB)
Composite Kingmoor Park and Power Station Complex Plan
Other
Wrexham Power Limited (PDF, 621 KB)
Draft Development Consent Order (Revision 3)
Other
Wrexham Power Limited (PDF, 75 KB)
Covering letter for Deadline 3 representations
Other
Wrexham Power Limited (PDF, 3 MB)
Written summary of oral case put at the Issue Specific hearing on Environmental and Other Issues on 28 September 2016
Other
Wrexham Power Limited (PDF, 2 MB)
Distances from Power Station Complex Plan
Other
Wrexham Power Limited (PDF, 2 MB)
Written summary of oral case put at the Issue Specific hearing on Environmental and Other Issues on 29 September 2016
Other
Wrexham Power Limited (PDF, 386 KB)
Written summary of oral submissions put at the Issue Specific hearing on the Draft Development Consent Order
Other
Wrexham Power Limited (PDF, 2 MB)
Written summary of oral submission put at the Compulsory Acquisition Hearing
Other
Wrexham Power Limited (PDF, 660 KB)
Photographs of Owens Corning Structures
Other
Wrexham Power Limited (PDF, 2 MB)
Distances from Stacks Plan
Other
Wrexham Power Limited (PDF, 753 KB)
Comparison version of Revision 2 and Revision 3 of the Draft Development Consent Order
Other
Audio of the Compulsory Acquisition Hearing (Part 1) (PDF, 35 KB)
Audio of the Compulsory Acquisition Hearing of 29 September 2016
Other
Audio of the Compulsory Acquisition Hearing (Part 2) (PDF, 35 KB)
Audio of the Compulsory Acquisition Hearing of 29 September 2016
Other
Audio of the DCO Issue Specific Hearing (Part 1) (PDF, 34 KB)
Audio of the DCO Issue Specific Hearing on the Draft DCO of 28 September 2016
Other
Audio of the DCO Issue Specific Hearing (Part 2) (PDF, 34 KB)
Audio of the DCO Issue Specific Hearing on the Draft DCO of 28 September 2016
Other
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 1) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 28 September 2016
Other
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 2) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 28 September 2016
Other
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 3) (PDF, 35 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 29 September 2016
Other
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 4) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 29 September 2016
Other
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 5) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 29 September 2016
Other
Audio of the Open Floor Hearing (PDF, 34 KB)
Audio of the Open Floor Hearing on 28 September 2016
Other
Unaccompanied Site Inspection Note 2 (PDF, 171 KB)
Note of the second Unaccompanied Site Inspection on 28 September 2016
Other
Chris Briggs (PDF, 45 KB)
Comments on the Accompanied Site Inspection
Other
Jonathan Young (PDF, 37 KB)
Written submission in advance of the September Hearings
Other
Natural England (PDF, 289 KB)
Response to the ExA's First Written Questions: Section 1.2 - Biodiversity
Other
Natural Resources Wales (PDF, 409 KB)
Response to the ExA's First Written Questions
Other
Wrexham County Borough Council (PDF, 56 KB)
Update on the Local Impact Report
Other
Wrexham Power Limited (PDF, 3 MB)
Response to the Local Impact Report prepared by Wrexham County Borough Council
Other
Wrexham Power Limited (PDF, 9 MB)
Statement of Common Ground on the historic environment between the Welsh Government/ Cadw and Wrexham Power Limited
Other
Wrexham Power Limited (PDF, 1 MB)
Flood Consequence Assessment
Other
Wrexham Power Limited (PDF, 4 MB)
Addendum to the Environmental Statement: Cumulative Effects Assessment – Electrical Connection
Other
Wrexham Power Limited (PDF, 1 MB)
Draft Development Consent Order (Revision 2)
Other
Wrexham Power Limited (PDF, 68 KB)
Covering Letter for Deadline 2 submissions
Other
Wrexham Power Limited (PDF, 1 MB)
Updated Construction Environmental Management Plan (Revision 1)
Other
Wrexham Power Limited (PDF, 750 KB)
Draft Development Consent Order - Comparison version of Revision 1 and Revision 2
Other
Wrexham Power Limited (PDF, 609 KB)
Objections Schedule - Response to the ExA's First Written Questions- 1.4.4 and 1.4.6
Other
Wrexham Power Limited (PDF, 4 MB)
Access Right of Way Plan (Revision 2)
Other
Wrexham Power Limited (PDF, 974 KB)
Comments on responses to the ExA’s First Written Questions
Other
Wrexham Power Limited (PDF, 4 MB)
Response to Written Representations
Other
Wrexham Power Limited (PDF, 4 MB)
Land Plans (Revision 2)
Other
Wrexham Power Limited (PDF, 662 KB)
Position paper on common ground between Natural Resources Wales and Wrexham Power Limited
Other
Accompanied Site Inspection Itinerary and Hearing Agendas (PDF, 6 MB)
Other
Notification of Hearings and Accompanied Site Inspection for September 2016 (PDF, 175 KB)
Other
Chris Briggs (PDF, 611 KB)
Response to the ExA's First Written Question 1.13.4 - Late Submission accepted at the discretion of the ExA
Other
Chris Briggs (PDF, 419 KB)
Response to the ExA's First Written Question 1.1.13 - Late Submission accepted at the discretion of the ExA
Other
Chris Briggs (PDF, 104 KB)
Written Representation
Other
Clive Roberts (PDF, 181 KB)
Written Representation
Other
Dennis and Angela Edwards (PDF, 108 KB)
Written Representation
Other
Earthworm Energy Plc Ltd (PDF, 1 MB)
Written Representation
Other
Joanna Roberts (PDF, 181 KB)
Written Representation
Other
John Smith and Susan Davies (PDF, 16 KB)
Written Representation
Other
Jonathan and Tamsin Young (PDF, 40 KB)
Written Representation
Other
Kath Briggs (PDF, 82 KB)
Written Representation
Other
Kellogg Company of Great Britain Limited (PDF, 314 KB)
Written Representation
Other
Marian Hughes (PDF, 72 KB)
Written Representation
Other
Mark Harber (PDF, 98 KB)
Written Representation - Accepted at the discretion of the Examining Authority
Other
Michael Morris (PDF, 7 MB)
Response to the ExA's First Written Question 1.1.1
Other
Michael Morris (PDF, 100 KB)
Written Representation
Other
National Grid Gas (PDF, 51 KB)
Written Representation
Other
Natural England (PDF, 73 KB)
Response to the ExA's First Written Questions and Written Representation
Other
Natural Resources Wales (PDF, 623 KB)
Response to the ExA's First Written Questions and Written Representation
Other
North Wales Wildlife Trust (PDF, 271 KB)
Written Representation- Accepted at the discretion of the Examining Authority
Other
Public Health Wales (PDF, 157 KB)
Response to the ExA's First Written Question 1.13.1
Other
Robert Eccleston (PDF, 18 KB)
Written Representation
Other
Rostons Limited on behalf of Frederick Ronald Done, T G Ellis and Mr Edwards (PDF, 1 MB)
Written Representation
Other
SP Energy Networks (PDF, 54 KB)
Written Representations
Other
Stephen Whitby (PDF, 237 KB)
Written Representation
Other
Susan Harber (PDF, 95 KB)
Request for an Open Floor Hearing and Written Representation
Other
Susan Harber (PDF, 15 KB)
Request for a Site Inspection
Other
Wales and West Utilities (PDF, 227 KB)
Response to the ExA's First Written Questions
Other
Wales and West Utilities (PDF, 207 KB)
Written Representation
Other
Welsh Government (PDF, 273 KB)
Response to the ExA’s First Written Questions
Other
Welsh Water (PDF, 78 KB)
Written Representation
Other
Wrexham County Borough Council (PDF, 43 KB)
Written Representation
Other
Wrexham Power Limited (PDF, 4 MB)
Site visit location plans
Other
Wrexham Power Limited (PDF, 3 MB)
Appendices to the Response to the ExA's First Written Questions
Other
Wrexham Power Limited (PDF, 2 MB)
Response to Relevant Representations
Other
Wrexham Power Limited (PDF, 330 KB)
Update on Statements of Common Ground
Other
Wrexham Power Limited (PDF, 2 MB)
Response to the ExA's First Written Questions
Other
Wrexham Power Limited (PDF, 344 KB)
Site Visit Itinerary
Other
Wrexham Power Limited (PDF, 624 KB)
Covering Letter
Other
Wrexham Power Limited (PDF, 37 KB)
Updated position on Statements of Common Ground - Late Submission accepted at the discretion of the ExA
Other
Examining Authority’s First Written Questions (PDF, 567 KB)
Other
Note of Preliminary Meeting (PDF, 128 KB)
Other
Rule 8 Letter (PDF, 379 KB)
Other
Preliminary Meeting Audio (Part 2) (PDF, 34 KB)
Audio of the Preliminary Meeting 19 July 2016.
Other
DCO Issue-Specific hearing - Audio (Part 2) (PDF, 34 KB)
Audio of the Issue-Specific hearing on the draft DCO of 19 July 2016.
Other
DCO Issue-Specific hearing - Audio (Part 1) (PDF, 34 KB)
Audio of the Issue-Specific hearing on the draft DCO of 19 July 2016.
Other
Preliminary Meeting Audio (Part 1) (PDF, 34 KB)
Audio of the Preliminary Meeting 19 July 2016.
Other
Clive Roberts (PDF, 15 KB)
Written summary of oral case put at the Issue-Specific hearing on the draft DCO of 19 July 2016.
Other
Natural Resources Wales (PDF, 189 KB)
Response to the Rule 6 Letter of 24 June 2016. This was accepted at the discretion of the Examining Authority.
Other
Wrexham Power Limited (PDF, 572 KB)
Draft Development Consent Order (Comparison of Revision 0 and Revision 1). Submitted following the Preliminary Meeting and the Issue-Specific hearing on the draft DCO
Other
Wrexham Power Limited (PDF, 627 KB)
Written summary of oral case put at the Issue-Specific hearing on the draft DCO of 19 July 2016.
Other
Wrexham Power Limited (PDF, 38 KB)
Note explaining the changes made to the Book of Reference and which are detailed in the document titled "Schedule of Changes relating to the updated Book of Reference (Revision 1). Submitted following the Preliminary Meeting and the Issue-Specific hearing on the draft DCO.
Other
Wrexham Power Limited (PDF, 1 MB)
Cover Letter for submissions following the Preliminary Meeting and the Issue-Specific hearing on the draft DCO
Other
Wrexham Power Limited (PDF, 420 KB)
Draft Development Consent Order (Revision 1). Submitted following the Preliminary Meeting and the Issue-Specific hearing on the draft DCO.
Other
Wrexham Power Limited (PDF, 3 MB)
Land Plans including Crown Land (Revision 1). Submitted following the Preliminary Meeting and the Issue-Specific hearing on the draft DCO
Other
Wrexham Power Limited (PDF, 3 MB)
Access Rights of Way Plan (Revision 1). Key Plan and Sheet 1 to 3. Submitted following the Preliminary Meeting and the Issue-Specific hearing on the draft DCO.
Other
Historic England (PDF, 156 KB)
Response to the Rule 6 Letter of 24 June 2016. This was accepted at the discretion of the Examining Authority.
Other
Rule 6 (PDF, 654 KB)
Other
Wrexham Power Limited (PDF, 633 KB)
Grid Connection Statement- Revision 1 (Tracked change version)
Other
Wrexham Power Limited (PDF, 506 KB)
Grid Connection Statement- Revision 1
Other
Unaccompanied Site Inspection Note (PDF, 202 KB)
Other
Wrexham Power Limited (PDF, 38 KB)
Covering letter enclosing certificates of compliance and Schedule of changes relating to the Updated Book of Reference
Other
Wrexham Power Limited (PDF, 38 KB)
Updated Book of Reference (Tracked Change version)- Submitted with the certificates.
Other
Wrexham Power Limited (PDF, 38 KB)
Schedule of changes relating to the Updated Book of Reference- Submitted with the certificates.
Other
Wrexham Power Limited (PDF, 38 KB)
Certificates of compliance with s56 and s59 of the Planning Act 2008 and Regulation 13 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Other
Wrexham Power Limited (PDF, 38 KB)
Updated Book of Reference (Clean version)- Submitted with the certificates.
Other
Wrexham County Borough Council (PDF, 63 KB)
Draft Local Impact Report- Accepted at the discretion of the Examining Authority
Other
Examination Library (PDF, 281 KB)
Other
Notice of the appointment of an Examining Authority (PDF, 211 KB)
Other
2.9.7 Illustrative Landscape within WEC Site Sheet 6 of 7 (PDF, 1 MB)
Other
6.4.5 WEC ES CH10 Appendix 10.2 Night time assessment methodology (PDF, 189 KB)
Other
6.3.8 WEC ES CH10 Figure 10.3b Landscape Character Areas east (PDF, 3 MB)
Other
9.1 WEC Glossary (PDF, 288 KB)
Other
6.4.5 WEC ES CH10 Appendix 10.5 Visual baseline (PDF, 447 KB)
Other
6.4.5 WEC ES CH10 Appendix 10.3 Landscape consultation (PDF, 1 MB)
Other
6.3.6 WEC ES CH08 Fig 8.4 Max annual mean N02 (PDF, 2 MB)
Other
6.2.11 WEC ES Ch11 - Ecology (PDF, 1 MB)
Other
6.4.3 WEC ES CH08 Appendix 8.1 Construction dust assessment methodology (PDF, 753 KB)
Other
6.4.8 WEC ES CH13 Appendix 13.1 Assessment Tables (PDF, 887 KB)
Other
6.2.14 WEC ES Ch14 - The water environment (PDF, 1 MB)
Other
6.3.8 WEC ES CH10 Figure 10.6 Photomontages (PDF, 32 MB)
Other
6.3.11 WEC ES CH13 Figure 13.1 Location of fromer fibreglass factory (PDF, 3 MB)
Other
2.9.7 Illustrative Landscape within WEC Site Sheet 3 of 7 (PDF, 1 MB)
Other
2.8.3 WEC Existing Site and Illustrative Vegetation Loss Sheet 3 of 7 (PDF, 1 MB)
Other
6.2.15 WEC ES Ch15 - Waste (PDF, 891 KB)
Other
6.3.6 WEC ES CH08 Fig 8.7 Max annual Nox (PDF, 2 MB)
Other
6.3.8 WEC ES CH10 Figure 10.2b Topography East (PDF, 5 MB)
Other
5.7 WEC No Significant Effects Report (PDF, 20 MB)
Other
6.3.3 WEC ES CH05 Fig 5.1 Cumulative Effects (PDF, 1 MB)
Other
Flintshire County Council (PDF, 36 KB)
Adequacy of Consultation representation from Flintshire County Council
Other
6.2.5 WEC ES Ch5 - The scope of the EIA and overall methodology (PDF, 1 MB)
Other
2.9.7 Illustrative Landscape within WEC Site Sheet 2 of 7 (PDF, 2 MB)
Other
5.3 WEC Design and Access Statement (PDF, 6 MB)
Other
2.2 WEC Land Plans Including Crown Land (PDF, 4 MB)
Other
2.5.4 WEC Illustrative Power Station Complex Eastern and Southern Elevations (PDF, 559 KB)
Other
6.4.2 WEC ES CH07 Appendix 7.1 WCBC Correspondence (PDF, 460 KB)
Other
6.2.13 WEC ES Ch13 - Ground conditions (PDF, 1 MB)
Other
6.3.6 WEC ES CH08 Fig 8.6 Max 8 hourly CO (PDF, 2 MB)
Other
6.3.5 WEC ES CH07 Fig 7.6 PSC PIA Accident Plot (PDF, 1 MB)
Other
6.2.8 WEC ES Ch8 - Air quality (PDF, 2 MB)
Other
2.8.6 WEC Existing Site and Illustrative Vegetation Loss Sheet 6 of 7 (PDF, 1 MB)
Other
6.4.10 WEC ES CH15 Appendix 15.2 SWMP (PDF, 243 KB)
Other
6.4.11 WEC ES CH19 Appendix 19.1 CEMP (PDF, 1 MB)
Other
6.3.4 WEC ES CH06 Fig 6.1 Wards (PDF, 4 MB)
Other
6.3.6 WEC ES CH08 Fig 8.5 MAx hourly mean N02 (PDF, 2 MB)
Other
4.1 WEC Statement of Reasons (PDF, 796 KB)
Other
6.3.6 WEC ES CH08 Fig 8.1 Air Quality Receptor Locations (PDF, 3 MB)
Other
6.3.8 WEC ES CH10 Figure 10.3a Landscape Character Areas west (PDF, 4 MB)
Other
2.5.2 WEC Illustrative Power Station Complex General Arrangement (PDF, 906 KB)
Other
6.4.8 WEC ES CH13 Appendix 13.5 SKM Enviros WPL Phase 1 Desk Study 2011 (PDF, 5 MB)
Other
4.2 WEC Funding Statement (PDF, 9 MB)
Other
6.1 WEC ES Volume 1 Non-Technical Summary (English) (PDF, 2 MB)
Other
6.4.9 WEC ES CH14 Appendix 14.2 Water environment consultation (PDF, 2 MB)
Other
6.3.11 WEC ES CH14 Figure 14.1 Study Area (PDF, 3 MB)
Other
6.3.8 WEC ES CH10 Figure 10.4a Photomontage VP locations west (PDF, 4 MB)
Other
6.3.9 WEC ES CH11 Figure 11.6 Bat Activity Survey (PDF, 561 KB)
Other
8.2 WEC Gas Connection Statement (PDF, 419 KB)
Other
6.4.1 WEC ES CH05 Appendix 5.2 Cumulative Assessment Tables (PDF, 331 KB)
Other
2.1.2 WEC Existing Site Layout Sheet 3 of 3 (PDF, 1 MB)
Other
6.4.6 WEC ES CH11 Appendix 11.2 Survey Data - Ban and GCN (PDF, 613 KB)
Other
6.3.9 WEC ES CH11 Figure 11.2 Non-statutory sites (PDF, 3 MB)
Other
6.4.6 WEC ES CH11 Appendix 11.7 Biosecurity (PDF, 1 MB)
Other
6.3.10 WEC ES CH12 Figure 12.1 Designated Cultural Heritage Constraints (PDF, 3 MB)
Other
2.8.2 WEC Existing Site and Illustrative Vegetation Loss Sheet 2 of 7 (PDF, 1 MB)
Other
Hysbysiad o benderfyniad i dderbyn cais am archwiliad (PDF, 125 KB)
Other
Section 55 Acceptance of Applications Checklist (PDF, 384 KB)
Other
6.4.10 WEC ES CH15 Appendix 15.3 Consultation (PDF, 243 KB)
Other
6.3.9 WEC ES CH11 Figure 11.3 Phase 1 Habitat Survey Plan (PDF, 15 MB)
Other
6.2.1 WEC ES Ch1 - Introduction (PDF, 762 KB)
Other
6.4.2 WEC ES CH07 Appendix 7.6 Transport Statement (PDF, 3 MB)
Other
Notification of Decision to Accept Application (PDF, 115 KB)
English language version.
Other
6.4.5 WEC ES CH10 Appendix 10.8 Arboricultural impact assessment (PDF, 3 MB)
Other
2.5.3 WEC Illustrative Power Station Complex Northern and Western Elevations (PDF, 546 KB)
Other
6.4.6 WEC ES CH11 Appendix 11.3 Lesser Silver Water Beetle Survey (PDF, 2 MB)
Other
6.4.2 WEC ES CH07 Appendix 7.4 Swept Path Analysis (PDF, 494 KB)
Other
6.3.5 WEC ES CH07 Fig 7.2 PSC Construction Traffic Route (PDF, 1 MB)
Other
6.4.7 WEC ES CH12 Appendix 12.3 Consultation (PDF, 461 KB)
Other
6.3.7 WEC ES Ch09 Fig 9.2 Noise survey locations (PDF, 1 MB)
Other
6.3.9 WEC ES CH11 Figure 11.5 Bat Roost Potential Trees (PDF, 14 MB)
Other
6.3.5 WEC ES CH07 Fig 7.8 GC PIA Accident Plot (PDF, 1 MB)
Other
6.3.9 WEC ES CH11 Figure 11.1 statutory designations and study area (PDF, 4 MB)
Other
Post acceptance s51 advice (PDF, 140 KB)
Other
5.5 WEC Statement of Statutory Nuisance (PDF, 928 KB)
Other
6.4.5 WEC ES CH10 Appendix 10.1 Photomontage methodology (PDF, 223 KB)
Other
Powys County Council (PDF, 269 KB)
Adequacy of Consultation representation from Powys County Council
Other
6.4.8 WEC ES CH13 Appendix 13.3 Shepherd Gilmore Env Ltd Geo-Env Desk Study 2008 AM (PDF, 39 MB)
Other
6.4.4 WEC ES CH09 Appendix 9.3 Baseline noise monitoring and contour map (PDF, 938 KB)
Other
6.2.10 WEC ES Ch10 - Landscape and visual (PDF, 1 MB)
Other
2.8.5 WEC Existing Site and Illustrative Vegetation Loss Sheet 5 of 7 (PDF, 2 MB)
Other
3.2 WEC Explanatory Memorandum to Draft Order for the WEC (PDF, 1 MB)
Other
6.3.7 WEC ES CH09 Fig 9.1 Noise sensitive receivers (PDF, 1 MB)
Other
6.2.18 WEC ES Ch18 - In-combination effects (PDF, 800 KB)
Other
6.2.20 WEC ES Ch20 - Conclusions (PDF, 567 KB)
Other
2.4 WEC Access and Rights of Way Plan (PDF, 4 MB)
Other
6.3.8 WEC ES CH10 Figure 10.4b Photomontage VP locations east (PDF, 3 MB)
Other
6.4.8 WEC ES CH13 Appendix 13.2 Envirocheck (PDF, 8 MB)
Other
6.4.7 WEC ES CH12 Appendix 12.1 Heritage Gazetteer (PDF, 652 KB)
Other
6.3.5 WEC ES CH07 Fig 7.1 Study Area (PDF, 2 MB)
Other
6.4.4 WEC ES CH09 Appendix 9.2 Consultation (PDF, 803 KB)
Other
6.4.3 WEC ES CH08 Appendix 8.3 Correspondence (PDF, 1 MB)
Other
6.3.6 WEC ES CH08 Fig 8.2 Air Quality Monitoring Sites (PDF, 3 MB)
Other
6.2.6 WEC ES Ch6 - Socio-economics (PDF, 1 MB)
Other
6.4.5 WEC ES CH10 Appendix 10.6 Landscape effects (PDF, 393 KB)
Other
2.9.7 Illustrative Landscape within WEC Site Sheet 4 of 7 (PDF, 1 MB)
Other
2.9.7 Illustrative Landscape within WEC Site Sheet 5 of 7 (PDF, 1 MB)
Other
7.1 WEC Photos and Photomontages Report (PDF, 8 MB)
Other
6.4.2 WEC ES CH07 Appendix 7.2 Base Traffic Data and Calculations (PDF, 1 MB)
Other
6.2.17 WEC ES Ch17 - Health Safety and Security (PDF, 869 KB)
Other
Denbighshire County Council (PDF, 216 KB)
Adequacy of Consultation representation from Denbighshire County Council
Other
6.4.10 WEC ES CH15 Appendix 15.1 Waste assumptions (PDF, 430 KB)
Other
6.4.2 WEC ES CH07 Appendix 7.5 CTMP (PDF, 674 KB)
Other
3.1 WEC Draft Development Consent Order (PDF, 577 KB)
Other
6.4.5 WEC ES CH10 Appendix 10.4 Landscape baseline (PDF, 352 KB)
Other
6.4.2 WEC ES CH07 Appendix 7.3 Accident data (PDF, 671 KB)
Other
6.1 WEC ES Volume 1 Non-Technical Summary (Welsh) (PDF, 2 MB)
Other
6.3.10 WEC ES Ch12 Figure 12.2 Non-designated heritage assets (PDF, 2 MB)
Other
5.4 WEC Level 2 Flood Consequence Assessment (PDF, 3 MB)
Other
6.2.3 WEC ES Ch3 - Site selection alternatives and design evolution (PDF, 1 MB)
Other
6.4.6 WEC ES CH11 Appendix 11.1 Phase 1 Target Notes (PDF, 267 KB)
Other
Cheshire West and Chester Council (PDF, 121 KB)
Adequacy of Consultation representation from Cheshire West and Chester Council
Other
6.4.9 WEC ES CH14 Appendix 14.3 Foul and Surface Water Drainage Strategy (PDF, 11 MB)
Other
2.1.1 WEC Location Plan (PDF, 489 KB)
Other
Wrexham County Borough Council (PDF, 134 KB)
Adequacy of Consultation representation from Wrexham County Borough Council
Other
2.1.2 WEC Existing Site Layout Sheet 2 of 3 (PDF, 1 MB)
Other
6.4.4 WEC ES CH09 Appendix 9.1 Guidance and equipment tables (PDF, 257 KB)
Other
5.1 WEC Consultation Report Welsh Summary (PDF, 252 KB)
Other
2.6 WEC Proposed foul and surface water drainage strategy (PDF, 3 MB)
Other
6.4.5 WEC ES CH10 Appendix 10.7 Visual effects (PDF, 541 KB)
Other
2.8.1 WEC Existing Site and Illustrative Vegetation Loss Sheet 1 of 7 (PDF, 2 MB)
Other
2.1.2 WEC Existing Site Layout Sheet 1 of 3 (PDF, 1 MB)
Other
6.4.9 WEC ES CH14 Appendix 14.1 WFD screening assessment (PDF, 210 KB)
Other
6.3.8 WEC ES CH10 Figure 10.1a ZTV West (PDF, 4 MB)
Other
6.2.19 WEC ES Ch19 - Mitigation summary (PDF, 616 KB)
Other
2.7.2 WEC Illustrative Gas and Electrical Connection Plans Sheet 2 of 3 (PDF, 1 MB)
Other
2.8.4 WEC Existing Site and Illustrative Vegetation Loss Sheet 4 of 7 (PDF, 2 MB)
Other
6.3.5 WEC ES CH07 Fig 7.5 Traffic Survey Locations (PDF, 1 MB)
Other
6.4.6 WEC ES CH11 Appendix 11.5 Draft Bat licence (PDF, 921 KB)
Other
Shropshire Council (PDF, 191 KB)
Adequacy of Consultation representation from Shropshire Council
Other
6.3.2 WEC ES CH04 Fig 4.1 Location Plan and Order Land (PDF, 2 MB)
Other
6.4.6 WEC ES CH11 Appendix 11.4 Ecology consultation (PDF, 464 KB)
Other
6.3.8 WEC ES CH10 Figure 10.5 LVIA Rep VPS (PDF, 3 MB)
Other
6.2.9 WEC ES Ch9 - Noise and vibration (PDF, 1 MB)
Other
2.9.7 Illustrative Landscape within WEC Site Sheet 1 of 7 (PDF, 3 MB)
Other
6.3.1 WEC ES CH01 Fig 1.1 Location Plan (PDF, 5 MB)
Other
6.4.8 WEC ES CH13 Appendix 13.4 SKM Enviros Acorn Power Phase 1 Desk Study 2010 (PDF, 1 MB)
Other
6.4.1 WEC ES CH05 Appendix 5.1 Scoping Opinion (PDF, 4 MB)
Other
8.1 WEC Grid Connection Statement (PDF, 434 KB)
Other
6.4.6 WEC ES CH11 Appendix 11.6 Draft GCN license (PDF, 2 MB)
Other
1.1 WEC Application Form (PDF, 12 MB)
Other
5.2 WEC Planning Statement (PDF, 2 MB)
Other
2.7.1 WEC Illustrative Gas and Electrical Connection Plans Sheet 1 of 3 (PDF, 1 MB)
Other
2.3 WEC Works Plan (PDF, 479 KB)
Other
2.7.3 WEC Illustrative Gas and Electrical Connection Plans Sheet 3 of 3 (PDF, 1 MB)
Other
6.3.8 WEC ES CH10 Figure 10.1b ZTV East (PDF, 3 MB)
Other
6.3.9 WEC ES CH11 Figure 11.4 Study areas for Otter and water voles (PDF, 2 MB)
Other
6.2.7 WEC ES Ch7 - Transport and traffic (PDF, 2 MB)
Other
6.3.5 WEC ES CH07 Fig 7.3 GC Construction Traffic Route (PDF, 2 MB)
Other
5.6 WEC Other Consents and Licences (PDF, 360 KB)
Other
6.4.8 WEC ES CH13 Appendix 13.6 Consultation (PDF, 613 KB)
Other
6.4.7 WEC ES CH12 Appendix 12.2 Archaeological baseline assessment (PDF, 1 MB)
Other
1.2 WEC Copy of Newspaper Notices (PDF, 2 MB)
Other
6.2.16 WEC ES Ch16 - Land Use (PDF, 1 MB)
Other
6.2.12 WEC ES Ch12 - Cultural Heritage (PDF, 990 KB)
Other
6.4.3 WEC ES CH08 Appendix 8.2 Stack height sensitivity study (PDF, 437 KB)
Other
2.5.1 WEC Illustrative Power Station Complex Site Layout Plan (PDF, 2 MB)
Other
6.2.4 WEC ES Ch4 - The proposed development (PDF, 3 MB)
Other
2.8.7 WEC Existing Site and Illustrative Vegetation Loss Sheet 7 of 7 (PDF, 1 MB)
Other
2.5.5 WEC Illustrative Power Station Complex Isometric View (PDF, 1 MB)
Other
6.2.2 WEC ES Ch2 - Planning and Legislative Context (PDF, 820 KB)
Other
2.9.7 Illustrative Landscape within WEC Site Sheet 7 of 7 (PDF, 1 MB)
Other
4.3 WEC Book of Reference (PDF, 38 KB)
Other
6.3.8 WEC ES CH10 Figure 10.2a Topography West (PDF, 4 MB)
Other
6.3.2 WEC ES CH04 Fig 4.5 Env Constraints (PDF, 4 MB)
Other
5.1 WEC Consultation Report Appendix One (PDF, 27 MB)
Other
5.1 WEC Consultation Report FINAL (PDF, 35 MB)
Other
Meeting Note Final 23 September 2015 (PDF, 79 KB)
Other
Teleconference Meeting Note Final 7 July 2014 (PDF, 88 KB)
Other
Teleconference Meeting Note Final 4 December 2014 (PDF, 44 KB)
Other
Wrexham Acknowledgement of Receipt of Information (PDF, 119 KB)
Other
Late scoping consultation responses 2nd Scoping Request (PDF, 139 KB)
Late scoping consultation responses.
Other
WEC Scoping Opinion 2nd Request (PDF, 4 MB)
April 2014 Scoping Opinion for Wrexham Energy Centre
Other
Wrexham Energy Centre Scoping Report (3) (PDF, 3 MB)
Wrexham Energy Centre Scoping Report location map March 2014
Other
Wrexham Energy Centre Scoping Report(1) (PDF, 4 MB)
Wrexham Energy Scoping Report March 2014
Other
Wrexham Energy Scoping Report(2) (PDF, 8 MB)
Wrexham Energy Centre Scoping Report appendices March 2014
Other
130415 S53 Wrexham Recommendation Report Parcel 3 (PDF, 387 KB)
Other
130410 S53.Schedule of correspondence Wrexham Parcel 2 (PDF, 33 KB)
Other
DOC 14 Extension request response (PDF, 44 KB)
Other
DOC 3E Extension request (PDF, 6 MB)
Request from landonwer for deadline extension in relation to S53 request
Other
DOC 7G response to S53 application (PDF, 7 MB)
Landowner response to S53 application
Other
S53 application DOC 1 SECTION 7 (PDF, 284 KB)
S53 application documents
Other
S53 application DOC 1 SECTION 9.6 (PDF, 9 MB)
S53 application documents
Other
1300617 EN010055 S53 Authorisation Request 1 Authorisation Notice final.doc (PDF, 376 KB)
Section 53 authorisation for land parcel 1.
Other
130410 S53.Schedule of correspondence Wrexham Parcel 6 (PDF, 35 KB)
Other
130410 S53.Schedule of correspondence Wrexham Parcel 3 (PDF, 37 KB)
Other
DOC 9 Request for further information landowner (PDF, 54 KB)
PINS request for further information from landowner in relation to S53 application
Other
DOC 17 Request for extension (PDF, 2 MB)
Request from landonwer for deadline extension in relation to S53 request
Other
DOC 7 Covering letter (PDF, 7 MB)
Landowner response to S53 application
Other
DOC 15L Further response to S53 application (PDF, 287 KB)
Additional landowner correspondence.
Other
DOC 3B Extension request (PDF, 6 MB)
Request from landonwer for deadline extension in relation to S53 request
Other
DOC 3C Extension request (PDF, 6 MB)
Request from landonwer for deadline extension in relation to S53 request
Other
1300617 EN010055 S53 Authorisation Request 4 Authorisation Notice final.doc (PDF, 335 KB)
S53 Authorisation for land parcel 4.
Other
1300617 EN010055 S53 Authorisation Request 3 Authorisation Notice final.doc (PDF, 287 KB)
S53 Authorisation for land parcel 3.
Other
DOC 3D Extension request (PDF, 6 MB)
Request from landonwer for deadline extension in relation to S53 request
Other
S53 application DOC 1 SECTION 9.1 (PDF, 11 MB)
S53 application documents
Other
S53 application DOC 1 SECTION 9.2 (PDF, 32 MB)
S53 application documents
Other
DOC 15N WPL correspondence (PDF, 446 KB)
Additional applicant correspondence
Other
S53 application DOC 1 SECTION 6 (PDF, 3 MB)
S53 application documents
Other
S53 application DOC 1 SECTION 2 (PDF, 232 KB)
S53 application documents
Other
130415 S53 Wrexham Recomm report parcel 4.doc (PDF, 432 KB)
S53 Recommendation Report for land parcel 4
Other
DOC 7I Response to S53 application (PDF, 7 MB)
Landowner response to S53 application
Other
DOC 7J Response to S53 application (PDF, 6 MB)
Landowner response to S53 application
Other
1300617 EN010055 S53 Authorisation Request 5 Authorisation Notice final.doc (PDF, 335 KB)
S53 Authorisation for land parcel 5
Other
DOC 6 notification of extension (PDF, 22 KB)
PINS advice to applicant of deadline extension
Other
DOC 16 Correspondence to WPL (PDF, 4 MB)
Additional applicant correspondence
Other
S53 application DOC 1 SECTION 3 (PDF, 3 MB)
S53 application documents
Other
DOC 2 Map parcel 3 (PDF, 207 KB)
Map of land parcel 3
Other
130410 S53.Schedule of correspondence Wrexham Parcel 7 (PDF, 37 KB)
Other
DOC 2 Map parcel 7 (PDF, 300 KB)
Map of land parcel 7
Other
DOC 2 Map parcel 1 (PDF, 297 KB)
Map of land parcel 1
Other
DOC 12 Landowner response further information (PDF, 9 MB)
Landowner response to in relation to S53 request for further information
Other
S53 application DOC 1 SECTION 4 (PDF, 13 MB)
S53 application documents
Other
S53 application DOC 1 SECTION 8.4 (PDF, 4 MB)
Other
DOC 2 Map parcel 5 (PDF, 258 KB)
Map of land parcel 5
Other
DOC 2 Map parcel 4 (PDF, 258 KB)
Map of land parcel 4
Other
130415 S53 Wrexham Recomm report parcel 1.doc (PDF, 469 KB)
S53 Recommendation Report for land parcel 1
Other
130410 S53.Schedule of correspondence Wrexham Parcel 5 (PDF, 39 KB)
Other
DOC 7H response to S53 application (PDF, 7 MB)
Landowner response to S53 application
Other
S53 application DOC 1 SECTION 8.3 (PDF, 4 MB)
S53 application documents
Other
1300617 EN010055 S53 Authorisation Request 6 Authorisation Notice final.doc (PDF, 334 KB)
S53 authorisation notice for land parcel 6
Other
DOC 15M Further response S53 application (PDF, 60 KB)
Additional landowner correspondence
Other
S53 application DOC 1 SECTION 9.5 (PDF, 10 MB)
S53 application documents
Other
130410 S53.Schedule of correspondence Wrexham Parcel 4 (PDF, 39 KB)
Other
DOC 3A Extension request (PDF, 7 MB)
Request from landonwer for deadline extension in relation to S53 request
Other
DOC 17 Extension request (PDF, 2 MB)
Other
S53 application DOC 1 SECTION 8.5 (PDF, 4 MB)
S53 application documents
Other
S53 application DOC 1 SECTION 1 (PDF, 15 MB)
S53 application documents
Other
DOC 2 Map parcel 2 (PDF, 217 KB)
Map of land parcel 2
Other
S53 application DOC 1 SECTION 9.4 (PDF, 16 MB)
Other
S53 application DOC 1 SECTION 9.7 (PDF, 12 MB)
S53 application documents
Other
S53 application DOC 1 SECTION 9.3 (PDF, 12 MB)
S53 application documents
Other
DOC 13 Extension request (PDF, 19 KB)
Request from landonwer for deadline extension in relation to S53 request
Other
130415 S53 Wrexham Recomm report parcel 7.doc (PDF, 478 KB)
S53 Recommendation Report for land parcel 7
Other
1300617 EN010055 S53 Authorisation Request 7 Authorisation Notice final.doc (PDF, 380 KB)
S53 Authorisation for land parcel 7
Other
130410 S53.Schedule of correspondence Wrexham Parcel 1 (PDF, 37 KB)
Other
DOC 10 Further information request Landowner (PDF, 63 KB)
Request for further information from landowner in relation to S53 request
Other
DOC 11 Applicant further information (PDF, 3 MB)
Applicant response to request for further information on S53 request
Other
DOC 8 Email from WPL (PDF, 15 KB)
Further correspondence from applicant
Other
1300617 EN010055 S53 Authorisation Request 2 Authorisation Notice final.doc (PDF, 300 KB)
S53 Authorisation for land parcel 2.
Other
130415 S53 Wrexham Recomm report parcel 5.doc (PDF, 434 KB)
S53 Recommendation Report for land parcel 5
Other
DOC 2 Map parcel 6 (PDF, 257 KB)
Map of land parcel 6
Other
DOC 7F response to S53 application (PDF, 5 MB)
Landowner response to S53 application
Other
DOC 7K Response to S53 application (PDF, 7 MB)
Landowner response to S53 application
Other
Index for S53 application documents (PDF, 263 KB)
S53 application documents
Other
130415 S53 Wrexham Recomm report parcel 6.doc (PDF, 436 KB)
S53 Recommendation Report for land parcel 6
Other
DOC 4 response to extension request (PDF, 35 KB)
PINS response on requests for deadline extension
Other
S53 application DOC 1 SECTION 5 (PDF, 15 MB)
S53 application documents
Other
130415 S53 Wrexham Recomm report parcel 2.doc (PDF, 407 KB)
S53 Recommendation Report for land parcel 2
Other
DOC 18 Response to extension request (PDF, 44 KB)
PINS response on requests for deadline extension
Other
DOC 15 covering email (PDF, 24 KB)
Further correspondence from applicant
Other
S53 application DOC 1 SECTION 8.6 (PDF, 2 MB)
S53 application documents
Other
130128 Environment Agency Late Scoping Response (PDF, 122 KB)
Other
130103 Welsh Language Commissioner Late Scoping Response (PDF, 1 MB)
Other
130102 Fulcrum Pipelines Late Scoping Response (PDF, 61 KB)
Other
130109 EN010055 Scoping Opinion (PDF, 10 MB)
Other
121116 EN010055 Scoping Report (PDF, 5 MB)