Cynllunio Seilwaith Cenedlaethol

  • English
  • Cwestiynau cyffredin
  • Cysylltu â ni
  • Map o’r safle
Ymholiadau: 0303 444 5000
Skip to main content
 

Main menu

    • Hafan
    • Prosiectau
      • Fferm Wynt Alltraeth Awel y Môr
      • Piblinell Carbon Deuocsid HyNet North West
      • Green Gen Vyrnwy Frankton
      • Fferm Solar Maen Hir
      • Future Energy Llanwern Solar Project
      • Fferm Wynt Alltraeth Mona
      • Prosiect Pŵer Carbon Isel Cei Connah
      • Abergelli Power
      • Brechfa Forest Connection
      • Brechfa Forest West Wind Farm
      • Cysylltiad Ffermydd Gwynt Gogledd Cymru
      • Cysylltiad Gogledd Cymru
      • Fferm Wynt Coedwig Clocaenog
      • Hirwaun Power Station
      • Internal Power Generation Enhancement for Port Talbot Steelworks
      • Mid Wales Electricity Connection (N Grid)
      • Mynydd y Gwynt Wind Farm
      • South Hook Combined Heat & Power Station
      • SP Mid Wales (Electricity) Connections Project (SP Manweb)
      • Storfa Bwmpio Glyn Rhonwy
      • Tidal Lagoon Cardiff
      • Tidal Lagoon Newport
      • Tidal Lagoon Swansea Bay
      • Wrexham Energy Centre
    • Y broses o wneud cais
      • Rôl yr Arolygiaeth Gynllunio
      • Y broses
      • Cymryd rhan yn y broses
      • Gwasanaeth cyn ymgeisio ar gyfer ymgeiswyr
      • Cyflwyno cais am ganiatâd datblygu
      • Ffioedd gwneud cais
      • Archif Ffioedd gwneud cais
      • Costau
      • Cwestiynau cyffredin
    • Deddfwriaeth a chyngor
      • Deddfwriaeth
      • Canllawiau
      • Nodiadau cyngor
      • Dogfennau enghreifftiol
      • Datganiadau Polisi Cenedlaethol
      • Cofrestr cyngor
    • Cymorth
      • Am y wefan Cynllunio Seilwaith Cenedlaethol
      • Datganiad hygyrchedd
      • Telerau ac Amodau
      • Chwcis
      • Preifatrwydd
      • Rhestr termau
      • Yr iaith Gymraeg
      • Map o’r safle
      • Dolenni defnyddiol
      • Cysylltu â ni
  1. Penderfyniad
  2. Penderfynwyd
  3. Tynnwyd yn ôl
Darganfod rhagor am y broses- >
Gorsafoedd Cynhyrchu:

Brechfa Forest West Wind Farm

gan RWE Npower Renewables
View this project in English
information icon

Mae’r dogfennau archwiliad sy’n ymwneud â’r prosiect hwn wedi’u harchifo ac nid ydynt ar gael ar y wefan hon mwyach. Gellir gweld penderfyniad yr Ysgrifennydd Gwladol a Gorchymyn Caniatâd Datblygu ar y tab Dogfennau.

I ddarganfod ble i weld y Dogfennau Ardystiedig, cyfeiriwch at y manylion cyswllt a nodir yn Nodyn Esboniadol y Gorchymyn Caniatâd Datblygu.

22/05/2020
  1. Trosolwg
  2. Cyngor a51
  3. Dogfennau
  4. Sylwadau perthnasol

Brechfa Forest West Wind Farm

BlaenorolGweld popethNesaf
Enquiry received via email

Brechfa Forest West Wind Farm

09/12/2011
Rhodri Glyn Thomas

Cyngor a roddwyd

“

Please see attached documents

”

Atodiad 5
Atodiad 5
Atodiad 2
Atodiad 2
Atodiad 1
Atodiad 1
Atodiad 4
Atodiad 4
Atodiad 3
Atodiad 3
Atodiad 6
Atodiad 6

Am y prosiect hwn

Penderfynwyd ar y cais hwn cyn i’’r gweithdrefnau presennol gael eu rhoi ar waith. O ganlyniad, nid yw’’r holl gynnwys a luniwyd gan yr Arolygiaeth Gynllunio wedi’’i gyfieithu i’’r Gymraeg.

The proposed development comprises the construction and operation of 28 wind turbine generators of up to 145 metres in height and other infrastructure integral to the construction and/or operation of the wind farm. The wind farm will have an installed capacity of between 56 and 84 megawatts. A full list of the works comprised in the proposed wind farm can be found at Schedule 1 of the draft Development Consent Order. Additional Note: The developer has also proposed a smaller wind farm within the Brechfa forest known as Brechfa east. As the proposal is below the threshold for a nationally significant infrastructure project, the application will be submitted to the local authority.

Lleoliad y prosiect

Carmarthenshire, Wales

Gwybodaeth Gyswllt

tim achos yr Arolygiaeth Gynllunio:
brechfawest@pins.gsi.gov.uk
0303 444 5000

Datblygwr:
Bethan Thomas - ffôn01639816180

Map o’r safle – Telerau ac Amodau – Hygyrchedd – Preifatrwydd ymlaen GOV.UK – Chwcis
Cynnwys y wefan: Hawlfraint 2017 Yr Arolygiaeth Gynllunio

Dywedwch wrthym a ydych yn derbyn cwcis

 

Rydym yn defnyddio’r Rydym yn defnyddio cwcis i gasglu gwybodaeth am sut rydych chi’n defnyddio’r wefan Cynllunio Seilwaith Cenedlaethol. Rydym yn defnyddio’r wybodaeth hon i sicrhau bod y wefan yn gweithio cystal ag y bo modd, ac i wella gwasanaethau’r llywodraeth.

 

Gallwch ddod o hyd i fwy o wybodaeth ar ein tudalen preifatrwydd.

 

Cwcis ar y wefan Seilwaith Cenedlaethol
Cynllunio Seilwaith Cenedlaethol

Ffeiliau sy’n cael eu cadw ar eich ffôn, llechen neu gyfrifiadur pan fyddwch yn ymweld â gwefan yw cwcis.

Rydym yn defnyddio cwcis i gadw gwybodaeth am sut rydych yn defnyddio’r wefan Seilwaith Cenedlaethol, fel y tudalennau rydych yn ymweld â nhw.

Cwcis Angenrheidiol

Mae’r cwcis hanfodol hyn yn gwneud pethau fel gwarchod y wefan rhag cael ei defnyddio’n faleisus. Mae angen eu galluogi bob tro.

Dysgwch fwy am y cwcis ar y wefan Seilwaith Cenedlaethol

Cwcis sy’n mesur eich defnydd o’r wefan

Cwcis sy’n mesur eich defnydd o’r wefan

Rydym yn defnyddio Google Analytics i fesur sut rydych chi’n defnyddio’r wefan er mwyn i ni allu ei gwella ar sail anghenion defnyddwyr. Nid ydym yn caniatáu i Google ddefnyddio na rhannu’r data ar sut rydych chi’n defnyddio’r wefan hon.

Mae Google Analytics yn gosod cwcis sy’n cadw gwybodaeth ddienw am:

  • sut gwnaethoch chi gyrraedd y wefan
  • ytudalennau rydych yn ymweld â nhw ar y wefan hon a faint o amser rydych yn ei dreulio ar bob tudalen
  • beth rydych yn clicio arno tra’r ydych yn ymweld â’r wefan

Please enable Strictly Necessary Cookies first so that we can save your preferences!