Glyn Rhonwy Pumped Storage

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (3)

Developer's Application (236)

Acceptance (8)

Pre Examination (16)

Examination (397)

Decision (22)

Decided (31)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Vol4E Fig 13.1 Noise Monitoring Locations (PDF, 2 MB)
Other
Vol3I Appendix 9.3 Water Sampling Results 2012 (PDF, 2 MB)
Other
Vol4B Fig 6.4l Viewpoint 12 Hebron Station (PDF, 2 MB)
Other
Vol3I Appendix 10.1 Flood Consequences Assessment (PDF, 5 MB)
Other
Vol4A Fig 4.13 Indicative Section of Pumping Station (PDF, 147 KB)
Other
Vol2A Ch1 Introduction ISSUED (PDF, 194 KB)
Other
Vol4E Contents Page (PDF, 198 KB)
Other
Vol3F Appendix 7.19 Quarry Aquatic Report (PDF, 2 MB)
Other
Vol3H Appendix 8.3 Historical OS Maps (PDF, 21 MB)
Other
Vol4B Fig 7.1.1 - 7.1.6 Phase 1 Habitat Maps (PDF, 8 MB)
Other
Vol2A Ch8 Geology Ground Conditions ISSUED (PDF, 135 KB)
Other
Vol3I Appendix 13.1 Additional Noise Information (PDF, 1 MB)
Other
Vol3D Appendix 2.5a Draft Environmental Statement NTS (PDF, 23 MB)
Other
Vol4C Figure 11.4 Third Ed Ord Survey Plan 1914 (PDF, 2 MB)
Other
Vol4B Fig 6.4g Viewpoint 7 Cefn-Du (PDF, 2 MB)
Other
Vol4E Fig 15.4 Operation Diversions (PDF, 2 MB)
Other
Vol4A Figure 3.5 Design Review 1 Scoping Report (PDF, 2 MB)
Other
Vol4B Fig 6.4c Viewpoint 3 Glyder Fawr (PDF, 2 MB)
Other
Vol4B Figure 7.4 Fungi (PDF, 2 MB)
Other
Vol4A Figure 3.10 Design Review 7 DCO Draft ES (PDF, 2 MB)
Other
Vol4B Fig 6.4i Viewpoint 9 Dolbadarn Castle (PDF, 2 MB)
Other
Vol3I Appendix 9.4 Water Sampling Results 2015 (PDF, 8 MB)
Other
Vol4B Figure 7.5 Reptiles (PDF, 2 MB)
Other
Vol3H Appendix 8.5 Zetica (2015) UXO Desk Study Report (PDF, 6 MB)
Other
Vol3I Appendix 11.4 Written Scheme of Investigation (PDF, 408 KB)
Other
Vol4A Figure 1.2 Order Limits (PDF, 2 MB)
Other
Vol3D Appendix 2.5b Draft Environmental Statement Main text (PDF, 5 MB)
Other
Vol3E Appendix 6.1 ASIDOHL (PDF, 909 KB)
Other
6.01 Non Technical Summary ISSUED (PDF, 5 MB)
Other
Vol4E Fig 13.3 Power House Construction Noise (PDF, 3 MB)
Other
Vol4A Figure 1.3 Unitary Boundaries (PDF, 2 MB)
Other
Vol4D Fig 12.5 Swept Path Analysis A4086 Junction (PDF, 277 KB)
Other
Vol2A Ch6 Landscape ISSUED (PDF, 343 KB)
Other
Vol4C Contents Page (PDF, 198 KB)
Other
Vol2B Ch12 Transport ISSUED (PDF, 2 MB)
Other
Vol3E Appendix 7.4 Addendum to Botanical Survey September (PDF, 1 MB)
Other
Vol3E Appendix 7.3 Addendum to Botanical Surveys August (PDF, 1 MB)
Other
Vol4E Fig 14.1 Air Quality Receptor Locations (PDF, 2 MB)
Other
Vol2B Ch10 Flood Risk ISSUED (PDF, 204 KB)
Other
Vol3I Appendix 15.2 2012 Accom Questionnaire Responses (PDF, 4 MB)
Other
Vol4A Fig 4.9 Indicative Layout Power House Ancil (PDF, 258 KB)
Other
Vol4E Fig 12.6 2012 Base Traffic Flows (PDF, 134 KB)
Other
Vol4D Fig 12.4 Swept Path Analysis A4086 Junction (PDF, 261 KB)
Other
Vol2B Ch14 Air Quality ISSUED (PDF, 234 KB)
Other
Vol4D Contents Page (PDF, 198 KB)
Other
Vol4A Figure 3.1 Ecological Designations (PDF, 3 MB)
Other
Vol4A Fig 4.6 Indicative Cross Section Q6 Dam Reservoir (PDF, 98 KB)
Other
Vol4B Fig 6.4a Viewpoint 1 Snowdon (PDF, 2 MB)
Other
Vol3G Appendix 8.2 Borehole logs (PDF, 3 MB)
Other
Vol3C Appendix 2.4 SoS Scoping Opinion (PDF, 4 MB)
Other
Vol2A Ch3 Design Evo Alternatives ISSUED (PDF, 2 MB)
Other
Vol4A Figure 3.6 Design Review 2 Engineering Review (PDF, 2 MB)
Other
Vol4B Fig 6.4f Viewpoint 6 Pen-y-llyn (PDF, 2 MB)
Other
Vol4C Figure 7.8 Bat Designated Sites (PDF, 2 MB)
Other
Vol4B Figure 7.2 Tree Preservation Orders (PDF, 2 MB)
Other
Vol3I Appendix 11.2 Archaeology Photographs (PDF, 2 MB)
Other
Vol4E Fig 17.1 Cumulative Sites (PDF, 2 MB)
Other
Vol3A Appendix 1.1 TCPA Decision Notice (PDF, 11 MB)
Other
Vol3E Appendix 7.15 Bat Mitgation Report (PDF, 14 MB)
Other
Vol4A Figure 3.2 Landscape Designations (PDF, 5 MB)
Other
Vol4C Figure 9.4 Water Framework Directives (PDF, 3 MB)
Other
Vol3F Appendix 7.16 Winter Bat Report 2014 (PDF, 8 MB)
Other
Vol4E Fig 15.1 Location of Tourism Attractions (PDF, 2 MB)
Other
Vol4A Fig 4.7 Indicative Cross Section Q6 Scour Tower (PDF, 180 KB)
Other
Vol4C Figure 11.3 Second Ed Ord Survey Plan 1899 (PDF, 2 MB)
Other
Vol3E Appendix 7.1 Glyn Rhonwy Phase 1 Habitat Report (PDF, 17 MB)
Other
Vol4C Figure 9.1 Private Water Supplies (PDF, 2 MB)
Other
Vol2A Ch5 Policy Context ISSUED (PDF, 72 KB)
Other
6.04 Front Cover Contents Page (PDF, 203 KB)
Other
Vol2A Ch4 Project Description ISSUED (PDF, 145 KB)
Other
Vol4A Figure 3.11 Design Review 8 DCO Development (PDF, 2 MB)
Other
Vol3E Appendix 7.11 Breeding Bird Report 2013 (PDF, 10 MB)
Other
Vol4A Fig 4.10 Indicative Elevation of Power House Anc (PDF, 164 KB)
Other
Vol4A Fig 4.14 Indicative Route of Electrical Connection (PDF, 3 MB)
Other
Vol3I Appendix 9.5 Private Water Supply Letter 2015 (PDF, 866 KB)
Other
Vol4E Fig 13.2 Q1 Headpond Construction Noise (PDF, 3 MB)
Other
Vol3E Appendix 7.5 Freshwater EIA 2012 (PDF, 1 MB)
Other
Vol4A Fig 4.4 Indicative Section Q1 Relief Spillway (PDF, 299 KB)
Other
Vol4B Fig 6.4h Viewpoint 8 Dinorwig (PDF, 2 MB)
Other
Vol4B Figure 7.3 Lichen (PDF, 2 MB)
Other
Vol3E Appendix 7.10 Reptile Habitat Report (PDF, 1 MB)
Other
Vol2B Ch16 Environmental Management ISSUED (PDF, 245 KB)
Other
Vol4C Figure 9.5 Protected Areas (PDF, 3 MB)
Other
Vol4A Fig 4.15 Indicative Section Elevation Slate Mounds (PDF, 161 KB)
Other
Vol3D Appendix 2.5d Draft Environmental Statement Appendices (PDF, 121 MB)
Other
Vol4E Fig 12.7 2017 Base Traffic Flows (PDF, 231 KB)
Other
Vol3E Appendix 7.7 Fungi Habitat Report (PDF, 7 MB)
Other
Vol3H Appendix 8.7 Utilities (PDF, 35 MB)
Other
Vol3F Appendix 7.17 TPO Records (PDF, 2 MB)
Other
Vol3E Appendix 2.6 Minutes of Gwynedd Council and NRW Meetings (PDF, 254 KB)
Other
Vol4C Figure 11.2 First Ed Ord Survey Plan 1888 (PDF, 2 MB)
Other
Vol4C Figure 8.2 Oblique Aerial Photograph (PDF, 1 MB)
Other
Vol4A Figure 3.7 Design Review 3 Consultation Review (PDF, 2 MB)
Other
Vol4E Fig 13.4 Q6 Tailpond Construction Noise (PDF, 3 MB)
Other
Vol3I Appendix 12.1 Accident Locations (PDF, 2 MB)
Other
Vol4B Fig 6.1 Landscape Character Areas (PDF, 2 MB)
Other
Vol3F Appendix 7.20 Breeding Bird Report 2015 (PDF, 8 MB)
Other
Vol4E Fig 13.5 Penstock Construction Noise (PDF, 2 MB)
Other
6.02 Front Cover Contents Page (PDF, 235 KB)
Other
Vol4A Fig 4.2 Indicative Q1 Layout (PDF, 344 KB)
Other
6.03 Front Cover Contents Page (PDF, 264 KB)
Other
Vol3I Appendix 9.1 WFD Assessment (PDF, 13 MB)
Other
Vol4D Fig 12.1 Low Loader Cat Dozer (PDF, 606 KB)
Other
Vol3E Appendix 7.12 Otter Species Survey (PDF, 452 KB)
Other
Vol3I Appendix 9.2 Private water supplies letter 2012 (PDF, 1 MB)
Other
Vol4B Fig 6.4j Viewpt 10 Public Footpath West Llanberis (PDF, 2 MB)
Other
Vol2B Ch11 Archaeology Cultural Heritage ISSUED (PDF, 264 KB)
Other
Vol4C Figure 7.7 Non Statutory Designated Sites (PDF, 3 MB)
Other
Vol3E Appendix 2.7 Gwynedd Council Correspondence (PDF, 207 KB)
Other
Vol4E Fig 13.6 Pumping Station Construction Noise (PDF, 3 MB)
Other
Vol2B Ch13 Noise Vibration ISSUED (PDF, 355 KB)
Other
Vol2A Ch7 Ecology ISSUED (PDF, 917 KB)
Other
Vol4B Fig 6.4e Viewpoint 5 Llanberis A4086 (PDF, 2 MB)
Other
Vol4B Figure 7.6 Statutory Designated Sites (PDF, 3 MB)
Other
Vol3E Appendix 7.2 Botanical Survey Report (PDF, 3 MB)
Other
Vol4C Figure 9.2 Surface Water Catchments (PDF, 2 MB)
Other
Vol4A Fig 4.8 Indicative Cross Section of Penstock (PDF, 164 KB)
Other
Vol3I Appendix 12.2 Construction Traffic Impacts (PDF, 93 KB)
Other
Vol4A Fig 4.16 Construction Routes (PDF, 2 MB)
Other
Vol4A Figure 3.4 Site Description (PDF, 2 MB)
Other
Vol4D Fig 12.2 Low Loader JCB Dozer (PDF, 606 KB)
Other
Vol4E Fig 13.7 Penstock Nightime Construction Noise (PDF, 2 MB)
Other
Vol3H Appendix 8.6 Zetica Report (Cefn Du) (PDF, 2 MB)
Other
Vol4E Fig 15.2 Public Rights of Way (PDF, 3 MB)
Other
Vol4C Figure 11.1 Known Archaeology (PDF, 2 MB)
Other
Vol4C Figure 9.3 Water Sampling Locations (PDF, 2 MB)
Other
Vol3D Appendix 2.5c Draft Environmental Statement Figures 1 (PDF, 19 KB)
Other
Vol3D Appendix 2.5d Draft Environmental Statement Appendices 1 (PDF, 19 KB)
Other
Vol4D Fig 12.3 Max Articulated Vehicle (PDF, 614 KB)
Other
Vol3I Appendix 16.1 CoCP (PDF, 9 MB)
Other
Vol2B Ch18 Schedule of Mitigation ISSUED (PDF, 135 KB)
Other
Vol4B Fig 6.3 Zone of Theoretical Visibility Viewshed Map (PDF, 2 MB)
Other
Vol2B Ch17 Cumulative Effects ISSUED (PDF, 175 KB)
Other
Vol4E Fig 15.3 Construction Diversions (PDF, 2 MB)
Other
Vol3I Appendix 11.3 Aerial Photographs (PDF, 105 KB)
Other
Vol3I Appendix 11.1 Known Archaeology (PDF, 399 KB)
Other
Vol3E Appendix 2.8 NRW Correspondence (PDF, 1 MB)
Other
Vol4B Fig 6.4k Viewpoint 11 Elidir Fach (PDF, 2 MB)
Other
Vol4A Fig 4.12 Indicative Layout Q6 Spillway Pump (PDF, 358 KB)
Other
Vol4A Figure 1.1 Location Plan (PDF, 3 MB)
Other
Vol4A Figure 3.3 Snowdonia National Park Designation (PDF, 3 MB)
Other
Vol3C Appendix 2.3 Glyn Rhonwy Scoping Report ISSUED (PDF, 26 MB)
Other
Vol3C Appendix 2.2 Scoping Letter (PDF, 14 MB)
Other
Vol2A Ch2 EIA Consultation ISSUED (PDF, 187 KB)
Other
Vol3E Appendix 7.6 Arboricultural Assessment (PDF, 17 MB)
Other
Vol3E Appendix 7.13 CEP QB Bat Report 2011-2012 (PDF, 1 MB)
Other
Vol3I Appendix 15.1 Labour Market Statistics (PDF, 294 KB)
Other
Vol3E Appendix 7.8 Lichen Habitat Report (PDF, 546 KB)
Other
Vol4C Figure 8.3 Preliminary GI Works (PDF, 2 MB)
Other
Vol4C Figure 8.1 Geological Map (PDF, 3 MB)
Other
Vol4B Fig 6.4b Viewpoint 2 Moel Eilio (PDF, 2 MB)
Other
Vol2B Ch9 Water Resources ISSUED (PDF, 337 KB)
Other
Vol4A Figure 3.8 Design Review 4 Approved Scheme (PDF, 2 MB)
Other
Vol2B Ch15 Socio-Economics ISSUED (PDF, 289 KB)
Other
Vol3E Appendix 7.14 Summer Bat Report (PDF, 10 MB)
Other
Vol4C Figure 10.1 Flood Risk Map (PDF, 2 MB)
Other
Vol3E Appendix 7.9 CEP Tower cons bat and protected species survey (PDF, 3 MB)
Other
Vol4B Fig 6.4d Viewpt 4 Llanberis Lake Railway (PDF, 2 MB)
Other
Vol4A Fig 4.3 Indicative Cross Section of Q1 (PDF, 102 KB)
Other
Vol3I Appendix 17.1 Horizon Meeting (PDF, 787 KB)
Other
Vol3F Appendix 7.18 Bat Licence (PDF, 36 MB)
Other
Vol3H Appendix 8.4 MOD letter (PDF, 2 MB)
Other
Vol4A Fig 4.11 Indicative Section of Turbine Hall Shaft (PDF, 220 KB)
Other
Vol4A Fig 4.5 Indicative Layout of Q6 and Power House (PDF, 432 KB)
Other
Vol4A Contents Page (PDF, 199 KB)
Other
Vol4B Fig 6.2 Landscape Designations (PDF, 2 MB)
Other
Vol4A Figure 3.9 Design Review 6 DCO Scoping (PDF, 2 MB)
Other
Vol4B Contents Page (PDF, 199 KB)
Other
Vol3I Appendix 13.2 Baseline Noise Survey (PDF, 2 MB)
Other
Vol4A Fig 4.1 Development Overview (PDF, 2 MB)
Other
Vol3G Appendix 8.1 Glyn Rhonwy Report (PDF, 115 MB)
Other
Vol3D Appendix 2.5c Draft Environmental Statement Figures (PDF, 165 MB)
Other
Vol3B Appendix 2.1 2012 ES (PDF, 164 MB)