Glyn Rhonwy Pumped Storage

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (3)

Developer's Application (236)

Acceptance (8)

Pre Examination (16)

Examination (407)

Decision (22)

Decided (2)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 164 MB
Vol3B Appendix 2.1 2012 ES
Other
Size: 165 MB
Vol3D Appendix 2.5c Draft Environmental Statement Figures
Other
Size: 115 MB
Vol3G Appendix 8.1 Glyn Rhonwy Report
Other
Size: 2 MB
Vol4A Fig 4.1 Development Overview
Other
Size: 2 MB
Vol3I Appendix 13.2 Baseline Noise Survey
Other
Size: 1 MB
2.05 Indicative Site Layout Plan ISSUED
Other
Size: 199 KB
Vol4B Contents Page
Other
Size: 2 MB
Vol4A Figure 3.9 Design Review 6 DCO Scoping
Other
Size: 2 MB
Vol4B Fig 6.2 Landscape Designations
Other
Size: 5 MB
2.09.1 Rights of Way Plan (Existing) ISSUED
Other
Size: 47 MB
5.01 Consultation Report ISSUED
Other
Size: 199 KB
Vol4A Contents Page
Other
Size: 432 KB
Vol4A Fig 4.5 Indicative Layout of Q6 and Power House
Other
Size: 220 KB
Vol4A Fig 4.11 Indicative Section of Turbine Hall Shaft
Other
Size: 1 MB
2.04.1 Works Plans Sheet 1 ISSUED
Other
Size: 2 MB
Vol3H Appendix 8.4 MOD letter
Other
Size: 36 MB
Vol3F Appendix 7.18 Bat Licence
Other
Size: 787 KB
Vol3I Appendix 17.1 Horizon Meeting
Other
Size: 337 KB
2.06.7 Indicative Elevation Section Above Ground Buildings ISSUED
Other
Size: 102 KB
Vol4A Fig 4.3 Indicative Cross Section of Q1
Other
Size: 2 MB
Vol4B Fig 6.4d Viewpt 4 Llanberis Lake Railway
Other
Size: 354 KB
3.02 Explanatory Memorandum
Other
Size: 3 MB
Vol3E Appendix 7.9 CEP Tower cons bat and protected species survey
Other
Size: 2 MB
Vol4C Figure 10.1 Flood Risk Map
Other
Size: 1,018 KB
4.02W Funding Statement cymraeg ISSUED
Other
Size: 10 MB
Vol3E Appendix 7.14 Summer Bat Report
Other
Size: 289 KB
Vol2B Ch15 Socio-Economics ISSUED
Other
Size: 2 MB
Vol4A Figure 3.8 Design Review 4 Approved Scheme
Other
Size: 337 KB
Vol2B Ch9 Water Resources ISSUED
Other
Size: 2 MB
Vol4B Fig 6.4b Viewpoint 2 Moel Eilio
Other
Size: 3 MB
Vol4C Figure 8.1 Geological Map
Other
Size: 2 MB
Vol4C Figure 8.3 Preliminary GI Works
Other
Size: 256 KB
8.04 Glossary ISSUED
Other
Size: 546 KB
Vol3E Appendix 7.8 Lichen Habitat Report
Other
Size: 335 KB
2.06.3 Indicative Elevation Section Ex Slate Mounds ISSUED
Other
Size: 294 KB
Vol3I Appendix 15.1 Labour Market Statistics
Other
Size: 1 MB
Vol3E Appendix 7.13 CEP QB Bat Report 2011-2012
Other
Size: 17 MB
Vol3E Appendix 7.6 Arboricultural Assessment
Other
Size: 187 KB
Vol2A Ch2 EIA Consultation ISSUED
Other
Size: 14 MB
Vol3C Appendix 2.2 Scoping Letter
Other
Size: 26 MB
Vol3C Appendix 2.3 Glyn Rhonwy Scoping Report ISSUED
Other
Size: 3 MB
Vol4A Figure 3.3 Snowdonia National Park Designation
Other
Size: 3 MB
Vol4A Figure 1.1 Location Plan
Other
Size: 2 MB
5.01.1W Consultation Report Summary cymraeg ISSUED
Other
Size: 358 KB
Vol4A Fig 4.12 Indicative Layout Q6 Spillway Pump
Other
Size: 2 MB
Vol4B Fig 6.4k Viewpoint 11 Elidir Fach
Other
Size: 1 MB
Vol3E Appendix 2.8 NRW Correspondence
Other
Size: 6 MB
2.07.2 Sites of Landscape Importance ISSUED
Other
Size: 399 KB
Vol3I Appendix 11.1 Known Archaeology
Other
Size: 105 KB
Vol3I Appendix 11.3 Aerial Photographs
Other
Size: 457 KB
2.06.4 Indicative Elevation Section Penstock Inlet Outlet Config ISSUED
Other
Size: 2 MB
Vol4E Fig 15.3 Construction Diversions
Other
Size: 175 KB
Vol2B Ch17 Cumulative Effects ISSUED
Other
Size: 3 MB
7.01 Grid Connection Statement ISSUED
Other
Size: 406 KB
2.03.2 Land Plans Sheet 2 ISSUED
Other
Size: 2 MB
Vol4B Fig 6.3 Zone of Theoretical Visibility Viewshed Map
Other
Size: 135 KB
Vol2B Ch18 Schedule of Mitigation ISSUED
Other
Size: 5 MB
2.09.4 Access Plan ISSUED
Other
Size: 9 MB
Vol3I Appendix 16.1 CoCP
Other
Size: 614 KB
Vol4D Fig 12.3 Max Articulated Vehicle
Other
Size: 19 KB
Vol3D Appendix 2.5d Draft Environmental Statement Appendices 1
Other
Size: 273 KB
2.06.9 Indicative Elevation Section Q6 ISSUED
Other
Size: 1 MB
1. 01W Introduction to the Applicant ISSUED Cymraeg
Other
Size: 382 KB
2.10.2 Crown Land Plans Sheet 2 ISSUED
Other
Size: 6 MB
4.04 Common Access Land and PRoW Strategy
Other
Size: 19 KB
Vol3D Appendix 2.5c Draft Environmental Statement Figures 1
Other
Size: 2 MB
Vol4C Figure 9.3 Water Sampling Locations
Other
Size: 817 KB
5.03 No Significant Effects Report ISSUED
Other
Size: 498 KB
2.05.5 Indicative Site Layout Plan Sheet 5 ISSUED
Other
Size: 2 MB
Vol4C Figure 11.1 Known Archaeology
Other
Size: 3 MB
Vol4E Fig 15.2 Public Rights of Way
Other
Size: 2 MB
Vol3H Appendix 8.6 Zetica Report (Cefn Du)
Other
Size: 2 MB
Vol4E Fig 13.7 Penstock Nightime Construction Noise
Other
Size: 606 KB
Vol4D Fig 12.2 Low Loader JCB Dozer
Other
Size: 2 MB
Vol4A Figure 3.4 Site Description
Other
Size: 884 KB
8.02W Planning Statement Summary cymraeg ISSUED
Other
Size: 381 KB
1.01 Introduction to the Applicant ISSUED
Other
Size: 2 MB
Vol4A Fig 4.16 Construction Routes
Other
Size: 93 KB
Vol3I Appendix 12.2 Construction Traffic Impacts
Other
Size: 164 KB
Vol4A Fig 4.8 Indicative Cross Section of Penstock
Other
Size: 2 MB
Vol4C Figure 9.2 Surface Water Catchments
Other
Size: 3 MB
Vol3E Appendix 7.2 Botanical Survey Report
Other
Size: 991 KB
2.05.2 Indicative Site Layout Plan Sheet 2 ISSUED
Other
Size: 3 MB
Vol4B Figure 7.6 Statutory Designated Sites
Other
Size: 2 MB
Vol4B Fig 6.4e Viewpoint 5 Llanberis A4086
Other
Size: 917 KB
Vol2A Ch7 Ecology ISSUED
Other
Size: 323 KB
2.06.11 Indicative Elevation Section Pumping Station ISSUED
Other
Size: 355 KB
Vol2B Ch13 Noise Vibration ISSUED
Other
Size: 3 MB
Vol4E Fig 13.6 Pumping Station Construction Noise
Other
Size: 207 KB
Vol3E Appendix 2.7 Gwynedd Council Correspondence
Other
Size: 3 MB
Vol4C Figure 7.7 Non Statutory Designated Sites
Other
Size: 264 KB
Vol2B Ch11 Archaeology Cultural Heritage ISSUED
Other
Size: 2 MB
Vol4B Fig 6.4j Viewpt 10 Public Footpath West Llanberis
Other
Size: 357 KB
5.04 Details of Other Consents and Licences ISSUED
Other
Size: 1 MB
Vol3I Appendix 9.2 Private water supplies letter 2012
Other
Size: 452 KB
Vol3E Appendix 7.12 Otter Species Survey
Other
Size: 1 MB
2.04.3 Works Plans Sheet 3 ISSUED
Other
Size: 606 KB
Vol4D Fig 12.1 Low Loader Cat Dozer
Other
Size: 13 MB
Vol3I Appendix 9.1 WFD Assessment
Other
Size: 5 MB
2.09.3 Rights of Way Plan (Operation) ISSUED
Other
Size: 264 KB
6.03 Front Cover Contents Page
Other
Size: 344 KB
Vol4A Fig 4.2 Indicative Q1 Layout
Other
Size: 235 KB
6.02 Front Cover Contents Page
Other
Size: 2 MB
Vol4E Fig 13.5 Penstock Construction Noise
Other
Size: 8 MB
Vol3F Appendix 7.20 Breeding Bird Report 2015
Other
Size: 2 MB
2.10 Crown Land Plans Key Plan ISSUED
Other
Size: 179 KB
1.02 Application Form ISSUED
Other
Size: 2 MB
Vol4B Fig 6.1 Landscape Character Areas
Other
Size: 2 MB
Vol3I Appendix 12.1 Accident Locations
Other
Size: 3 MB
Vol4E Fig 13.4 Q6 Tailpond Construction Noise
Other
Size: 867 KB
2.03.1 Land Plans Sheet 1 ISSUED
Other
Size: 2 MB
Vol4A Figure 3.7 Design Review 3 Consultation Review
Other
Size: 1 MB
Vol4C Figure 8.2 Oblique Aerial Photograph
Other
Size: 2 MB
Vol4C Figure 11.2 First Ed Ord Survey Plan 1888
Other
Size: 254 KB
Vol3E Appendix 2.6 Minutes of Gwynedd Council and NRW Meetings
Other
Size: 2 MB
Vol3F Appendix 7.17 TPO Records
Other
Size: 35 MB
Vol3H Appendix 8.7 Utilities
Other
Size: 7 MB
Vol3E Appendix 7.7 Fungi Habitat Report
Other
Size: 231 KB
Vol4E Fig 12.7 2017 Base Traffic Flows
Other
Size: 121 MB
Vol3D Appendix 2.5d Draft Environmental Statement Appendices
Other
Size: 161 KB
Vol4A Fig 4.15 Indicative Section Elevation Slate Mounds
Other
Size: 242 KB
5.02 Statutory Nuisance ISSUED
Other
Size: 3 MB
Vol4C Figure 9.5 Protected Areas
Other
Size: 245 KB
Vol2B Ch16 Environmental Management ISSUED
Other
Size: 1 MB
Vol3E Appendix 7.10 Reptile Habitat Report
Other
Size: 5 MB
2.01 Site Location Plan ISSUED
Other
Size: 2 MB
Vol4B Figure 7.3 Lichen
Other
Size: 2 MB
Vol4B Fig 6.4h Viewpoint 8 Dinorwig
Other
Size: 299 KB
Vol4A Fig 4.4 Indicative Section Q1 Relief Spillway
Other
Size: 7 MB
2.07.1 Nature Conservation Site Habitats and Diversity Features ISSUED
Other
Size: 1 MB
Vol3E Appendix 7.5 Freshwater EIA 2012
Other
Size: 3 MB
Vol4E Fig 13.2 Q1 Headpond Construction Noise
Other
Size: 866 KB
Vol3I Appendix 9.5 Private Water Supply Letter 2015
Other
Size: 3 MB
Vol4A Fig 4.14 Indicative Route of Electrical Connection
Other
Size: 164 KB
Vol4A Fig 4.10 Indicative Elevation of Power House Anc
Other
Size: 339 KB
2.06.5 Indicative Elevation Section Penstock Config ISSUED
Other
Size: 10 MB
Vol3E Appendix 7.11 Breeding Bird Report 2013
Other
Size: 15 MB
8.03W Design Access Statement Cymraeg ISSUED
Other
Size: 2 MB
Vol4A Figure 3.11 Design Review 8 DCO Development
Other
Size: 145 KB
Vol2A Ch4 Project Description ISSUED
Other
Size: 203 KB
6.04 Front Cover Contents Page
Other
Size: 72 KB
Vol2A Ch5 Policy Context ISSUED
Other
Size: 2 MB
Vol4C Figure 9.1 Private Water Supplies
Other
Size: 17 MB
Vol3E Appendix 7.1 Glyn Rhonwy Phase 1 Habitat Report
Other
Size: 2 MB
Vol4C Figure 11.3 Second Ed Ord Survey Plan 1899
Other
Size: 180 KB
Vol4A Fig 4.7 Indicative Cross Section Q6 Scour Tower
Other
Size: 2 MB
Vol4E Fig 15.1 Location of Tourism Attractions
Other
Size: 8 MB
Vol3F Appendix 7.16 Winter Bat Report 2014
Other
Size: 3 MB
Vol4C Figure 9.4 Water Framework Directives
Other
Size: 26 MB
8.01 Planning Statement ISSUED
Other
Size: 5 MB
Vol4A Figure 3.2 Landscape Designations
Other
Size: 14 MB
Vol3E Appendix 7.15 Bat Mitgation Report
Other
Size: 846 KB
2.10.1 Crown Land Plans Sheet 1 ISSUED
Other
Size: 6 MB
2.08 Historic Environment Features ISSUED
Other
Size: 11 MB
Vol3A Appendix 1.1 TCPA Decision Notice
Other
Size: 2 MB
Vol4E Fig 17.1 Cumulative Sites
Other
Size: 2 MB
Vol3I Appendix 11.2 Archaeology Photographs
Other
Size: 2 MB
Vol4B Figure 7.2 Tree Preservation Orders
Other
Size: 2 MB
Vol4C Figure 7.8 Bat Designated Sites
Other
Size: 2 MB
Vol4B Fig 6.4f Viewpoint 6 Pen-y-llyn
Other
Size: 5 MB
2.09.2 Rights of Way Plan (Construction) ISSUED
Other
Size: 2 MB
Vol4A Figure 3.6 Design Review 2 Engineering Review
Other
Size: 2 MB
Vol2A Ch3 Design Evo Alternatives ISSUED
Other
Size: 517 KB
2.05.1 Indicative Site Layout Plan Sheet 1 ISSUED
Other
Size: 4 MB
Vol3C Appendix 2.4 SoS Scoping Opinion
Other
Size: 5 MB
2.02 Existing Site Location Plan ISSUED
Other
Size: 3 MB
Vol3G Appendix 8.2 Borehole logs
Other
Size: 523 KB
4.01 Statement of Reasons
Other
Size: 2 MB
Vol4B Fig 6.4a Viewpoint 1 Snowdon
Other
Size: 98 KB
Vol4A Fig 4.6 Indicative Cross Section Q6 Dam Reservoir
Other
Size: 3 MB
Vol4A Figure 3.1 Ecological Designations
Other
Size: 703 KB
3.01 Draft Development Consent Order
Other
Size: 198 KB
Vol4D Contents Page
Other
Size: 234 KB
Vol2B Ch14 Air Quality ISSUED
Other
Size: 431 KB
2.05.3 Indicative Site Layout Plan Sheet 3 ISSUED
Other
Size: 261 KB
Vol4D Fig 12.4 Swept Path Analysis A4086 Junction
Other
Size: 134 KB
Vol4E Fig 12.6 2012 Base Traffic Flows
Other
Size: 12 MB
8.03 Design Access Statement ISSUED
Other
Size: 258 KB
Vol4A Fig 4.9 Indicative Layout Power House Ancil
Other
Size: 4 MB
Vol3I Appendix 15.2 2012 Accom Questionnaire Responses
Other
Size: 6 MB
2.07.3 Water Bodies in a River Basin Management Plan ISSUED
Other
Size: 5 MB
2.04 Works Plans Key Plan ISSUED
Other
Size: 204 KB
Vol2B Ch10 Flood Risk ISSUED
Other
Size: 2 MB
Vol4E Fig 14.1 Air Quality Receptor Locations
Other
Size: 1 MB
Vol3E Appendix 7.3 Addendum to Botanical Surveys August
Other
Size: 1 MB
Vol3E Appendix 7.4 Addendum to Botanical Survey September
Other
Size: 2 MB
Vol2B Ch12 Transport ISSUED
Other
Size: 198 KB
Vol4C Contents Page
Other
Size: 343 KB
Vol2A Ch6 Landscape ISSUED
Other
Size: 277 KB
Vol4D Fig 12.5 Swept Path Analysis A4086 Junction
Other
Size: 2 MB
Vol4A Figure 1.3 Unitary Boundaries
Other
Size: 3 MB
Vol4E Fig 13.3 Power House Construction Noise
Other
Size: 5 MB
6.01 Non Technical Summary ISSUED
Other
Size: 909 KB
Vol3E Appendix 6.1 ASIDOHL
Other
Size: 12 MB
6.01W Non Technical Summary cymraeg ISSUED
Other
Size: 382 KB
2.06.2 Indicative Elevation Section Relief Valve Spillway Infrast ISSUED
Other
Size: 614 KB
5.01.1 Consultation Report Summary ISSUED
Other
Size: 605 KB
2.05.4 Indicative Site Layout Plan Sheet 4 ISSUED
Other
Size: 5 MB
Vol3D Appendix 2.5b Draft Environmental Statement Main text
Other
Size: 264 KB
2.06.12 Indicative Elevation Section Pumping Station Spillway ISSUED
Other
Size: 1 MB
2.04.2 Works Plans Sheet 2 ISSUED
Other
Size: 2 MB
Vol4A Figure 1.2 Order Limits
Other
Size: 370 KB
2.06.8 Indicative Elevation Section Tailrace Inlet Outlet Config ISSUED
Other
Size: 408 KB
Vol3I Appendix 11.4 Written Scheme of Investigation
Other
Size: 280 KB
8.02 Planning Statement Summary ISSUED
Other
Size: 6 MB
Vol3H Appendix 8.5 Zetica (2015) UXO Desk Study Report
Other
Size: 354 KB
2.06.10 Indicative Elevation Section Q6 Scour Tower ISSUED
Other
Size: 393 KB
2.06.6 Indicative Elevation Section Power House Turbine Shaft ISSUED
Other
Size: 2 MB
Vol4B Figure 7.5 Reptiles
Other
Size: 239 KB
2 Plans Drawings Sections Contents Page
Other
Size: 277 KB
2.06.1 Indicative Elevation Section Q1 ISSUED
Other
Size: 8 MB
Vol3I Appendix 9.4 Water Sampling Results 2015
Other
Size: 2 MB
Vol4B Fig 6.4i Viewpoint 9 Dolbadarn Castle
Other
Size: 2 MB
Vol4A Figure 3.10 Design Review 7 DCO Draft ES
Other
Size: 140 KB
4.03 Book of Reference
Other
Size: 2 MB
Vol4B Figure 7.4 Fungi
Other
Size: 2 MB
Vol4B Fig 6.4c Viewpoint 3 Glyder Fawr
Other
Size: 2 MB
Vol4A Figure 3.5 Design Review 1 Scoping Report
Other
Size: 2 MB
Vol4E Fig 15.4 Operation Diversions
Other
Size: 2 MB
Vol4B Fig 6.4g Viewpoint 7 Cefn-Du
Other
Size: 2 MB
Vol4C Figure 11.4 Third Ed Ord Survey Plan 1914
Other
Size: 23 MB
Vol3D Appendix 2.5a Draft Environmental Statement NTS
Other
Size: 1 MB
Vol3I Appendix 13.1 Additional Noise Information
Other
Size: 135 KB
Vol2A Ch8 Geology Ground Conditions ISSUED
Other
Size: 2 MB
2.03 Land Plans Key Plan ISSUED
Other
Size: 8 MB
Vol4B Fig 7.1.1 - 7.1.6 Phase 1 Habitat Maps
Other
Size: 304 KB
4.02 Funding Statement
Other
Size: 21 MB
Vol3H Appendix 8.3 Historical OS Maps
Other
Size: 2 MB
Vol3F Appendix 7.19 Quarry Aquatic Report
Other
Size: 198 KB
Vol4E Contents Page
Other
Size: 194 KB
Vol2A Ch1 Introduction ISSUED
Other
Size: 147 KB
Vol4A Fig 4.13 Indicative Section of Pumping Station
Other
Size: 5 MB
Vol3I Appendix 10.1 Flood Consequences Assessment
Other
Size: 2 MB
Vol4B Fig 6.4l Viewpoint 12 Hebron Station
Other
Size: 2 MB
Vol3I Appendix 9.3 Water Sampling Results 2012
Other
Size: 2 MB
Vol4E Fig 13.1 Noise Monitoring Locations
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.