Internal Power Generation Enhancement for Port Talbot Steelworks

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (5)

Developer's Application (213)

Acceptance (6)

Pre Examination (3)

Examination (82)

Decision (15)

Decided (0)

Transboundary Documents
Date

SourceDescription
Other
Size: 6 MB
Ben Lewis (GVA) on behalf of Tata Steel UK Limited
High Level Assessment of Major Accident Hazards
Other
Size: 1 MB
Ben Lewis (GVA) on behalf of Tata Steel UK Limited
Design Principles Document
Other
Size: 957 KB
Ben Lewis (GVA) on behalf of Tata Steel UK Limited
Draft Development Consent Order (Revision 3)
Other
Size: 45 KB
Ben Lewis (GVA) on behalf of Tata Steel UK Limited
Book of Reference (Revision 1)
Other
Size: 1 MB
Ben Lewis (GVA) on behalf of Tata Steel UK Limited
Explanatory notes on the draft Development Consent Order (Revision 3) including Comparison of Revision 2 and Revision 3
Other
Size: 45 KB
Ben Lewis (GVA) on behalf of Tata Steel UK Limited
Explanatory comments on revised Book of Reference and comparison with submission version
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.