White Rose Carbon Capture and Storage Project

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (4)

Developer's Application (83)

Acceptance (16)

Pre Examination (5)

Examination (184)

Decision (8)

Decided (0)

Date

SourceDescription
Other
Size: 10 KB
Agenda for the Issue Specific Hearing
Agenda for ISH into the draft Development Consent Order on Thursday 2 July 2015
Other
Size: 130 KB
Rule 17 Notification of Request for further information and Variation of timetable
Other
Size: 89 KB
Notification of Hearings and Accompanied Site Inspection
Notification letter by ExA for an Issue Specific Hearing, Open Floor Hearing, Compulsory Acquisition Hearing and Accompanied Site Inspection.
Other
Size: 38 KB
Capture Power Limited Notice of Hearings
Notice by the applicant regarding the Issue Specific Hearing, Open Floor Hearing and Compulsory Acquisition Hearing
Other
Size: 78 KB
Rule 17 - Notification of procedural decision and request for further information
The notification letter provides links to the Report on the Implications for European Sites (RIES) and Revised draft Development Consent Order (dDCO) issued today by the Examining Authority
Other
Size: 4 MB
White Rose Carbon Capture Storage itinerary
Itinerary for the WRCCS Accompanied Site Inspection on Friday 3 July 2015
Other
audio recording
Size: 47 MB
Preliminary Meeting audio recording
Other
audio recording
Size: 90 MB
Issue Specific Hearing into Environmental Impact Matters ( Audio Recording - PART II)
Audio Recording (PART II) of the ISH into Environmental Impact Matters held during the day, on Wednesday 1 July 2015 at the Lowther Hotel.
Other
Size: 462 KB
Examining Authority's revised draft Development Consent Order (dDCO)
Examining Authority's revised draft Development Consent Order (dDCO) taking issues raised and comments into account
Other
Size: 210 KB
Document Library
Other
Size: 112 KB
ExA First Written Questions (Final)
Other
audio recording
Size: 29 MB
Issue Specific Hearing into draft Development Consent Order
Audio Recording of the ISH into draft DCO held in the afternoon, on Thursday 2 July 2015 at the Lowther Hotel.
Other
Size: 165 KB
White Rose CCS Rule 8 letter
Other
audio recording
Size: 76 MB
Issue Specific Hearing into Environmental Impact Matters (Audio Recording - PART I)
Audio Recording (PART I) of the ISH into Environmental Impact Matters held during the day, on Wednesday 1 July 2015 at the Lowther Hotel.
Other
Size: 10 KB
Agenda for the Compulsory Acquisition Hearing
Agenda for CA Hearing on Thursday 2 July 2015
Other
Size: 50 KB
White Rose CCS Preliminary Meeting Note
This meeting note is not a full transcript of the Preliminary Meeting but a summary of key points discussed and responses given.
Other
Size: 69 KB
Examining Authority's Second Written Questions
Other
Size: 634 KB
Report on the Implications for European Sites (RIES)
Other
audio recording
Size: 1 MB
Open floor hearing
Audio Recording of the OFH held in the evening, on Wednesday 1 July 2015 at the Lowther Hotel.
Other
Size: 11 KB
Agenda for the Issue Specific Hearing
Agenda for ISH into Environmental Matters on Wednesday 1 July 2015
Other
Size: 68 KB
Rule 17 Notification of request for further information
Other
Other
Size: 33 KB
Compulsory Acquisition hearing
Audio Recording of the CA Hearing held in the morning, on Thursday 2 July 2015 at the Lowther Hotel.
Other
Size: 147 KB
Martyn Coy on behalf of Canal & River Trust
Written Representation and Response to Examining Authority?s first written questions
Other
Size: 500 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
9.6 - Written Submissions - Issue Specific Hearing into draft DCO - 2 July 2015 - Rev. 1
Other
Size: 200 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.3 - Statement of Common Ground between Capture Power Ltd. and Natural England - Rev. 2
Other
Size: 428 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
1.3 - Application and Examination Documents Index - Rev. 9
Other
Size: 953 KB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 3.2 (appendix 4)
Other
Size: 923 KB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 3.2 (appendix 2)
Other
Size: 721 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.1 ? Statement of Common Ground between Capture Power Ltd. and North Yorkshire County Council and Selby District Council ? Rev. 4
Other
Size: 963 KB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 3.2 (appendix 6)
Other
Size: 19 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Covering email for Deadline VIII Submission
Other
Size: 507 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
8.5 ? Statement of Common Ground between Capture Power Ltd. and Yorkshire Wildlife Trust ? Rev. 1
Other
Size: 2 MB
Dalton Warner Davis LLP on behalf of Capture Power Limited
3.7 - Compulsory Acquisition - Funding Statement - Additional Information - Rev. 1
Other
Size: 866 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
Comments on Relevant Representations
Other
Size: 662 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
3.4 - Schedule of Statutory Undertakers ? Rev. 1
Other
Size: 1,018 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
2.1 - Draft Development Consent Order (DCO) - Rev 5
Other
Size: 99 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Covering email for Deadline VII Submission. NB documents 2, 3 & 4 will not be published.
Other
Size: 67 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
Covering email and notice of attendance at hearings and accompanied site inspection
Other
Size: 99 MB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 17.8 (appendix 2)
Other
Size: 3 MB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
6.4.5 - ES Volume 3 Section L - Habitats Regulations Assessment Report ? Rev. 7 (submitted in response to rule 8 letter procedural decision 6 ? annexe C)
Other
Size: 2 MB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 6.1 (appendix 1)
Other
Size: 105 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 5.6 (appendix 1)
Other
Size: 216 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.5 - Statement of Common Ground between Capture Power Ltd. and Yorkshire Wildlife Trust - Rev. 4
Other
Size: 85 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 4.8 (appendix 1)
Other
Size: 96 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 4.22 (appendix 1)
Other
Size: 782 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 5.1 (appendix 1)
Other
Size: 2 MB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 3.1 (appendix 1)
Other
Size: 2 MB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 3.2 (appendix 1)
Other
Size: 591 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.6 ? Statement of Common Ground between Capture Power Ltd. and the Environment Agency ? Rev. 2
Other
Size: 557 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
8.3 ? Statement of Common Ground between Capture Power Ltd. and Natural England ? Rev. 1
Other
Size: 2 MB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 6.2 (appendix 1)
Other
Size: 61 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Covering letter submitted with Deadline V documents
Other
Size: 2 MB
Capture Power Limited
9.1 ? Response to the Examining Authority?s first written questions ? Rev. 1
Other
Size: 6 MB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Response to Examining Authority?s second written questions
Other
Size: 938 KB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 3.2 (appendix 3)
Other
Size: 594 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
8.6 ? Statement of Common Ground between Capture Power Ltd. and the Environment Agency ? Rev. 1
Other
Size: 271 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
2.2 - Explanatory Memorandum - Revision 3
Other
Size: 394 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 4.12 (appendix 1)
Other
Size: 251 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
3.5 - Schedule of Third Party Rights Holders - Rev. 1
Other
Size: 205 KB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 3.2 (appendix 9)
Other
Size: 831 KB
Capture Power Limited
9.1 ? Response to question 1.4 (appendix 1)
Other
Size: 564 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
2.1 Draft Development Consent Order (DCO) ? Revision 4
Other
Size: 101 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Covering email for Deadline VI Submission
Other
Size: 5 MB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Executed S.106 Deed of Development Consent Obligations
Other
Size: 741 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
9.3 Comments on the Local Impact Report, Responses to the Examining Authority's First Written Questions and Written Representations - Rev 1
Other
Size: 191 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
1.3 Application and Examination Documents Index ? Revision 7
Other
Size: 2 MB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 17.9 (appendix 1)
Other
Size: 284 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.6 - Statement of Common Ground between Capture Power Ltd. and Environment Agency - Rev. 5
Other
Size: 310 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.3 - Signed Statement of Common Ground between Capture Power Ltd. and Natural England - Rev. 2
Other
Size: 265 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 4.2 (appendix 2)
Other
Size: 422 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
1.3? Application and Examination Documents Index ? Rev. 8
Other
Size: 628 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Comparison version of Draft DCO showing changes from the Acceptance version to Revision 5, dated 23 September 2015
Other
Size: 950 KB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 3.2 (appendix 7)
Other
Size: 24 KB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 6.8 (appendix 1)
Other
Size: 974 KB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 3.2 (appendix 5)
Other
Size: 470 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.1 - Statement of Common Ground between Capture Power Ltd. and North Yorkshire County Council and Selby District Council - Rev. 9
Other
Size: 4 MB
Dalton Warner Davis LLP on behalf of Capture Power Limited
4.10 ? Indicative Landscaping and Biodiveristy Framework Plan (sheet 2) ? Rev. 3
Other
Size: 351 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.2 - Signed Statement of Common Ground between Capture Power Ltd. and the Canal & River Trust - Rev. 2
Other
Size: 692 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Memorandum of Understanding (Signed). The Examining Authority has exercised its discretion and agreed to accept this as an additional submission.
Other
Size: 2 MB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.5 ? Signed Statement of Common Ground between Capture Power Ltd and Yorkshire Wildlife Trust ? Revision 5
Other
Size: 2 MB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 4.3 (appendix 1)
Other
Size: 648 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 15.1 (appendix 1)
Other
Size: 416 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
1.3 - Application Index - Rev. 5
Other
Size: 213 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
9.11 - Applicant?s Response to the Examining Authority?s Second Request for Further Information & Comments on Deadline 7 Submissions - Rev. 1
Other
Size: 551 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
6.5 Environmental Statement (ES) Mitigation Annex ? Revision 2
Other
Size: 559 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
6.5 - Environmental Statement (ES) Mitigation Annex - Rev. 3
Other
Size: 8 MB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 17.8 (appendix 1)
Other
Size: 455 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.1 - Statement of Common Ground between Capture Power Ltd. and North Yorkshire County Council and Selby District Council - Rev. 8
Other
Size: 189 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
2.4 Explanation of changes made to Draft Development Consent Order at deadline V ? Revision 2
Other
Size: 338 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 6.6 (appendix 1)
Other
Size: 351 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.4 - Signed Statement of Common Ground between Capture Power Ltd. and Historic England - Rev. 2
Other
Size: 215 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
9.10 - Summary of Noise Mitigation Measures - Rev. 1
Other
Size: 362 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.6 Signed Statement of Common Ground between Capture Power Ltd and Environment Agency ? Revision 6 - This document also contains an email dated 29 June 2015 confirming Environmental Permit Application duly made status.
Other
Size: 6 MB
Dalton Warner Davis LLP on behalf of Capture Power Limited
9.5 - Written Submissions - Issue Specific Hearing into Environmental Matters - 1 July 2015 - Rev. 1
Other
Size: 180 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 6.6 (appendix 2)
Other
Size: 609 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
4.10(i) ? Explanation of Changes made to the Indicative Landscaping and Biodiversity Framework Plan
Other
Size: 90 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 4.9 (appendix 1)
Other
Size: 567 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
2.1 - Draft Development Consent Order - Revision 3 - Track Change Version
Other
Size: 171 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 4.11 (appendix 1)
Other
Size: 170 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
5.3 Other Consents and Licences ? Revision 2
Other
Size: 198 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.5 - Statement of Common Ground between Capture Power Ltd. and Yorkshire Wildlife Trust - Rev. 2
Other
Size: 513 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
8.4 ? Statement of Common Ground between Capture Power Ltd. and Historic England ? Rev. 1
Other
Size: 163 KB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 3.2 (appendix 8)
Other
Size: 22 MB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 4.1 (appendix 1)
Other
Size: 3 MB
Dalton Warner Davis LLP on behalf of Capture Power Limited
4.10 ? Indicative Landscaping and Biodiveristy Framework Plan (sheet 1) ? Rev. 3
Other
Size: 254 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
3.4 - Schedule of Statutory Undertakers - Rev. 1
Other
Size: 5 MB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 4.15 (appendix 1)
Other
Size: 718 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
8.1 ? Statement of Common Ground between Capture Power Ltd. and North Yorkshire County Council and Selby District Council ? Rev. 2
Other
Size: 410 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
1.3 - Application Index - Rev. 3
Other
Size: 202 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.2 - Statement of Common Ground between Capture Power Ltd. and the Canal & River Trust - Rev. 2
Other
Size: 114 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
9.1 ? Response to Examining Authority?s question 6.1 (appendix 2). The Examining Authority has exercised its discretion and agreed to accept this as a late submission following Deadline 1
Other
Size: 77 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Covering email for Deadline II Submission
Other
Size: 690 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
9.10 - Summary of Noise Mitigation Measures - Rev. 2 (amended version of the document submitted at deadline VII). The Examining Authority has exercised its discretion and agreed to accept this as an additional submission.
Other
Size: 731 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Deadline III submission relating to planning permission for site raising and preparation works (2015/0229/EIA)
Other
Size: 1 MB
Dalton Warner Davis LLP on behalf of Capture Power Limited
3.6 - Compulsory Acquisition Status Update - Affected Parties - Rev. 2
Other
Size: 27 MB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 17.8 (appendix 3)
Other
Size: 21 MB
Dalton Warner Davis LLP on behalf of Capture Power Limited
9.4 - Non-statutory Consultation on Non-Material Amendments to the DCO Application ? Rev. 1
Other
Size: 901 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
6.5 - ES Mitigation Annex ? Rev. 1 (submitted in response to rule 8 letter procedural decision 5 ? annexe C)
Other
Size: 45 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
3.1 Book of Reference - Revision 5
Other
Size: 198 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.4 - Statement of Common Ground between Capture Power Ltd. and Historic England - Rev. 2
Other
Size: 720 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
2.4 - Explanation of Changes made to Draft Development Consent Order at Deadline 2 - Revision 1
Other
Size: 419 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
1.3? Application and Examination Documents Index ? Rev. 6
Other
Size: 474 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
3.6? Compulsory Acquisition Status Update ? Affected Parties ? Rev. 1
Other
Size: 189 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Capture Power Ltd - 1.3 - Application Index - Rev. 4
Other
Size: 760 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
8.1 - Statement of Common Ground between Capture Power Ltd. and North Yorkshire County Council and Selby District Council - Rev. 6
Other
Size: 47 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Covering email for Deadline III Submission
Other
Size: 428 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
1.3 - Application and Examination Documents Index - Rev. 10
Other
Size: 515 KB
Geoff Bullock (Dalton Warner Davis LLP) on behalf of Capture Power Limited
8.2 ? Statement of Common Ground between Capture Power Ltd. and the Canal & River Trust ? Rev. 1
Other
Size: 243 KB
Capture Power Limited
9.1 ? Response to Examining Authority?s question 15.1 (appendix 2)
Other
Size: 65 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Covering email for Deadline IV Submission
Other
Size: 3 MB
Dalton Warner Davis LLP on behalf of Capture Power Limited
4.4 - Access and Rights of Way Plans (Key Plan and Sheets 1 - 4) - Rev. v5
Other
Size: 610 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
9.9 - Applicant?s Response to the Examining Authority?s Request for Further Information - Rev. 1
Other
Size: 480 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
5.3 - Other Consents and Licences - Rev. 4
Other
Size: 92 KB
Capture Power Ltd
Covering email for Deadline IX Submission
Other
Size: 479 KB
Dalton Warner Davis LLP on behalf of Capture Power Ltd
5.3 - Other Consents and Licences - Rev. 3
Other
Size: 752 KB
Dalton Warner Davis LLP on behalf of Capture Power Ltd
8.1 - Statement of Common Ground between Capture Power Ltd. and North Yorkshire County Council and Selby District Council - Rev. 7
Other
Size: 656 KB
Capture Power Ltd
9.12 - Applicant?s Comments on Additional Submissions by Interested Parties- Rev. 1
Other
Size: 581 KB
Capture Power Ltd
8.1 - Statement of Common Ground between Capture Power Ltd. and North Yorkshire County Council and Selby District Council - Rev. 9 (signed version)
Other
Size: 816 KB
Dalton Warner Davis LLP on behalf of Capture Power Ltd
9.8 - Applicant?s Comments on the Responses to the Examining Authority?s Second Written Questions
Other
Size: 429 KB
Capture Power Ltd
1.3 - Application and Examination Documents Index ? Rev. 11
Other
Size: 231 KB
Dalton Warner Davis LLP on behalf of Capture Power Ltd - Natural England letter confirming 'no impediment' to Badger Licence
Letter from Natural England confirming 'no impediment' to the issue of a Badger Licence
Other
Size: 4 MB
Dalton Warner Davis LLP on behalf of Capture Power Ltd - Report on Archaeological Evaluation
Report on Archaeological Evaluation
Other
Size: 3 MB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Submission to Issue Specific Hearing on Environmental Matters (1 July 2015). The Examining Authority exercised its discretion to accept this submission in advance of the ISH.
Other
Size: 238 KB
Dalton Warner Davis LLP on behalf of Capture Power Limited
Additional submission from Capture Power Ltd providing a Project and Funding Update. The Examining Authority has exercised its discretion and agreed to accept this as an additional submission.
Other
Size: 329 KB
DB Schenker Rail (UK)
Additional submission from DB Schenker Rail (UK) - The Examining Authority has exercised its discretion and agreed to accept this as an additional submission
Other
Size: 65 KB
Sam Kipling on behalf of Environment Agency
Deadline VII submission from Sam Kipling on behalf of Environment Agency
Other
Size: 143 KB
Environment Agency
Written Representation, hearing and site inspection notifications and information regarding a Statement of Common Ground. The Examining Authority has exercised its discretion and agreed to accept this as a late submission following Deadline 1
Other
Size: 209 KB
Sam Kipling on behalf of Environment Agency
Comments on the draft Statement of Common Ground with Capture Power Ltd and in relation to Carbon Capture & Storage and Carbon Capture Readiness
Other
Size: 206 KB
Sam Kipling on behalf of Environment Agency
Response to Examining Authority?s first written questions. The Examining Authority has exercised its discretion and agreed to accept this as a late submission following Deadline 1
Other
Size: 180 KB
Sam Kipling on behalf of Environment Agency
Comments on Draft DCO Revision 3 and a summary of the oral representations made at the Issue Specific Hearing on environmental issues
Other
Size: 14 KB
Sam Kipling on behalf of Environment Agency
Additional submission from the Environment Agency advising of delay in submitting representations for deadline I
Other
Size: 61 KB
Sam Kipling on behalf of Environment Agency
Additional submission from the Environment Agency - The Examining Authority has exercised its discretion and agreed to accept this as an additional submission.
Other
Size: 88 KB
Sam Kipling on behalf of Environment Agency
Summary of Relevant Representation. The Examining Authority has exercised its discretion and agreed to accept this as a late submission following Deadline 1
Other
Size: 93 KB
Environment Agency
Summary of Written Representation. The Examining Authority has exercised its discretion and agreed to accept this as a late submission following Deadline 1
Other
Size: 85 KB
Gamma Telecoms Ltd
Submission from Gamma Telecoms Ltd
Other
Size: 44 KB
Tom Anderson on behalf of GTC
Submission from Tom Anderson on behalf of the GTC Engineering group of companies
Other
Size: 41 KB
Tom Anderson on behalf of GTC
Deadline VII submission from Tom Anderson on behalf of Utility Grid Installations, Independent Pipelines, GTC Electric Network Company, Quadrant Pipelines and Independent Power Networks.
Other
Size: 36 KB
Richard Crabtree on behalf of Homes and Communities Agency
Additional submission from the Homes and Communities Agency confirming that they do not intend to become an Interested Party
Other
Size: 18 KB
Kirkwood Stewart Young
Additional submission from Kirkwood Stewart Young
Other
Size: 200 KB
Louise Milnes on behalf of Selby District Council
Response to Examining Authority?s second written questions
Other
Size: 61 KB
James Copeland on behalf of National Farmers Union
Comments on responses to ExA's first written questions
Other
Size: 54 KB
James Copeland on behalf of National Farmers Union
Response to Examining Authority?s first written questions
Other
Size: 182 KB
Berwin Leighton Paisner on behalf of National Grid Electricity Transmission Plc
Letter giving an update on National Grid Electricity Transmission's negotiations with Capture Power Limited - The Examining Authority has exercised its discretion and agreed to accept this as an additional submission.
Other
Size: 175 KB
Berwin Leighton Paisner on behalf of National Grid Electricity Transmission Plc
Letter confirming withdrawal of objections to the Development Consent Order - The Examining Authority has exercised its discretion and agreed to accept this as an additional submission.
Other
Size: 425 KB
James Walsh on behalf of Natural England
Written Representation and Response to Examining Authority's first written questions
Other
Size: 22 KB
James Walsh on behalf of Natural England
Deadline VII submission from James Walsh on behalf of Natural England
Other
Size: 334 KB
NHS - North Yorkshire And Humber Area Team
Additional submission from NHS England confirming that they do not have any further comments to make - The Examining Authority has exercised its discretion and agreed to accept this as an additional submission.
Other
Size: 105 KB
North Yorkshire County Council
Response to Examining Authority's Request for further information in the Rule 17 letter dated 7 September 2015.
Other
Size: 64 KB
Rachel Wigginton on behalf of North Yorkshire County Council
Comments on any additional submissions (non-material change of application documents dated 13 April 2015 by applicant). The Examining Authority has exercised its discretion and agreed to accept this as a late submission following Deadline 1
Other
Size: 6 MB
Rachel Wigginton on behalf of North Yorkshire County Council and Selby District Council
Local Impact Report
Other
Size: 176 KB
Rachel Wigginton on behalf of North Yorkshire County Council and Selby District Council
Response to Examining Authority?s first written questions
Other
Size: 42 KB
Rachel Wigginton on behalf of North Yorkshire County Council and Selby District Council
Comment on Operational Noise ? Note on Technical Issues
Other
Size: 560 KB
Rachel Wigginton on behalf of North Yorkshire County Council and Selby District Council
Landscape Summary
Other
Size: 261 KB
Watson Burton LLP on behalf of Northern Powergrid (Yorkshire) plc
Submission updating Northern Powergrid?s position in relation to protected provisions.
Other
Size: 378 KB
Dan Parry-Jones (BNP Paribas Real Estate) on behalf of Royal Mail Group Ltd
Written Representation
Other
Size: 56 KB
Louise Milnes on behalf of Selby District Council
Written Representation
Other
Size: 72 KB
Selby District Council
Response to Examining Authority?s Request for further information in the Rule 17 letter dated 7 September 2015. Submitted for the deadline of 23 September 2015. LATE SUBMISSION
Other
Size: 171 KB
Selby District Council
Comments on any information and/responses received by the ExA for Deadline VIII ? The Examining Authority has exercised its discretion and agreed to accept this as a late submission following Deadline IX
Other
Size: 23 KB
Louise Milnes on behalf of Selby District Council
Response to Examining Authority?s Request for further information in the Rule 17 letter dated 30 September 2015
Other
Size: 1 MB
Dr Anne Westwood on behalf of The Crown Estate
Response to Examining Authority?s first written questions
Other
Size: 507 KB
Trinity House
Notification to become an Interested Party
Other
Size: 8 MB
Yorkshire Water
Letter confirming infrastructure owned and rights held by Yorkshire Water - The Examining Authority has exercised its discretion and agreed to accept this as an additional submission
Other
Size: 539 KB
Sara Robin on behalf of Yorkshire Wildlife Trust
Response to Examining Authority's first written questions
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.