River Humber Gas Pipeline Replacement Project

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
6.3.3 Appendix 3.3 Alternatives - Crossing Options Report (PDF, 995 KB)
Other
6.8.4 Appendix 8.4 Paull Holme Strays Investigation Report (PDF, 2 MB)
Other
6.8.1 Appendix 8.1 Environment Agency and Local Authority Responses (PDF, 8 MB)
Other
6.8.7 Appendix 8.7 Information Relating to Stoneledge Field Investigation (PDF, 10 MB)
Other
6.6.4 Appendix 6.4 Geophysical Surveys Undertaken at Goxhill (PDF, 50 MB)
Other
6.11.1 Appendix 11.1 Agricultural Land Survey (PDF, 4 MB)
Other
6.13.2 Appendix 13.2 Initial Site Water Management Plan (PDF, 400 KB)
Other
6.8.6 Appendix 8.6 Geophysical Survey Report Part 1 (PDF, 13 MB)
Other
6.10.3 Appendix 10.3 Noise Model Outputs (PDF, 35 MB)
Other
6.8.8 Appendix 8.8 Responses from Lincolnshire Environmental Records Centre East Yorkshire RIGS Group (PDF, 1 MB)
Other
6.6.2 Appendix 6.2 Aerial Photograph Analysis at Paull (PDF, 6 MB)
Other
6.16 Screening Opinions (PDF, 1 MB)
Other
6.8.6 Appendix 8.6 Geophysical Survey Report Part 3 (PDF, 38 MB)
Other
6.19 Non-Technical Summary (PDF, 30 MB)
Other
6.3.2 Appendix 3.2 Alternatives - Route Corridor Investigation Study (PDF, 9 MB)
Other
6.8.5 Appendix 8.5 Chalk Report (PDF, 6 MB)
Other
6.4 EIA Methodology and Construction Environmental Management (PDF, 378 KB)
Other
6.1 Introduction (PDF, 3 MB)
Other
6.13.3 Appendix 13.3 Hydrogeological Impact Assessment (PDF, 6 MB)
Other
6.6.5 Appendix 6.5 South End Bypass Geophysical Survey (PDF, 3 MB)
Other
6.3 Design Iterations and Alternatives Considered (PDF, 12 MB)
Other
6.13 Water Resources (PDF, 10 MB)
Other
6.2 Scheme Description (PDF, 22 MB)
Other
6.4.2 Appendix 4.2 Section 42 Consultation Comments (PDF, 374 KB)
Other
6.5.1 Appendix 5.1 Dust Risk Assessment (PDF, 306 KB)
Other
6.8.6 Appendix 8.6 Geophysical Survey Report Part 2 (PDF, 38 MB)
Other
6.3.1 Appendix 3.1 Strategic Options Report (PDF, 13 MB)
Other
6.18 EIA Regulations Publicity Requirements (PDF, 473 KB)
Other
6.14 Cumulative Effects (PDF, 5 MB)
Other
6.7.1 Appendix 7.1 Technical Appendix (PDF, 47 MB)
Other
6.5 Air Quality (PDF, 8 MB)
Other
6.6.3 Appendix 6.3 Geophysical Surveys Undertaken at Paull (PDF, 5 MB)
Other
6.6 Cultural Heritage (PDF, 14 MB)
Other
6.8 Geology and Soils (PDF, 4 MB)
Other
6.13.1 Appendix 13.1 Water Framework Directive Assessment (PDF, 1 MB)
Other
6.8.2 Appendix 8.2 Desk Study Report Part 3 (PDF, 37 MB)
Other
6.15 Glossary (PDF, 311 KB)
Other
6.8.9 Appendix 8.9 Unexploded Ordnance Report (PDF, 19 MB)
Other
6.8.3 Appendix 8.3 Ground Investigation Report (PDF, 8 MB)
Other
6.8.2 Appendix 8.2 Desk Study Report Part 2 (PDF, 45 MB)
Other
6.17 Scoping Opinion (PDF, 3 MB)
Other
6.8.2 Appendix 8.2 Desk Study Report Part 1 (PDF, 50 MB)
Other
6.10.1 Appendix 10.1 Noise Monitoring Installation Sheets and Time History (PDF, 2 MB)
Other
6.7 Ecology and Nature Conservation (PDF, 46 MB)
Other
6.11 Socio-Economics and Land Use (PDF, 7 MB)
Other
6.4.1 Appendix 4.1 PINS Scoping Opinion Comments (PDF, 503 KB)
Other
6.10.2 Appendix 10.2 Noise Model Inputs (PDF, 407 KB)
Other
6.10 Noise and Vibration (PDF, 15 MB)
Other
6.9 Landscape and Visual Amenity (PDF, 15 MB)
Other
6.12 Traffic and Transport (PDF, 10 MB)
Other
6.6.1 Appendix 6.1 Desk-Based Assessment (PDF, 20 MB)