You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (6)
Developer's Application (258)
- All Documents
- Application Form (5)
- Compulsory Acquisition Information (5)
- Draft Development Consent Orders (2)
- Environmental Statement (123)
- Other Documents (30)
- Plans (19)
- Reports (74)
Acceptance (10)
Pre Examination (44)
Examination (809)
- All Documents
- Additional Submissions (28)
- Compulsory Acquisition Hearing 1 (3)
- Deadline 1 (82)
- Deadline 2 (99)
- Deadline 3 (60)
- Deadline 4 (66)
- Deadline 4a (2)
- Deadline 5 (125)
- Deadline 5a (32)
- Deadline 6 (70)
- Deadline 7 (111)
- Deadline 8 (32)
- Hearing Agenda (14)
- Hearing Notice (2)
- Issue Specific Hearing 1 (ISH1) (9)
- Issue Specific Hearing 10 (ISH10) (7)
- Issue Specific Hearing 11 (ISH11) (5)
- Issue Specific Hearing 12 (ISH12) (5)
- Issue Specific Hearing 2 (ISH2) (5)
- Issue Specific Hearing 3 (ISH3) (3)
- Issue Specific Hearing 4 (ISH4) (5)
- Issue Specific Hearing 5 (ISH5) (5)
- Issue Specific Hearing 6 (ISH6) (5)
- Issue Specific Hearing 7 (ISH7) (7)
- Issue Specific Hearing 8 (ISH8) (5)
- Issue Specific Hearing 9 (ISH9) (3)
- Open Floor Hearing 1 (3)
- Preliminary meeting note (1)
- Procedural Decisions (14)
- Report on the Implications for European Sites (RIES) (1)
Decision (56)
- All Documents
- Other Documents (1)
- Secretary of State Consultation (16)
- Secretary of State Consultation 2 (3)
- Secretary of State Consultation 3 (11)
- Secretary of State Consultation 4 (11)
- Secretary of State Consultation 5 (6)
- Secretary of State Consultation 6 (3)
- Secretary of State Consultation 7 (4)
- Secretary of State Consultation 8 (1)
Decided (0)
Source | Description |
---|---|
Other |
East Riding of Yorkshire Council (PDF, 2 KB)
Deadline 1 Submission - Additional information to accompany Local Impact Report (LIR)
|
Other |
East Riding of Yorkshire Council (PDF, 1 KB)
Deadline 1 Submission - Submission of suggested sites for the ExA to visit on either an unaccompanied basis or as part of an Accompanied Site Inspection (ASI), if one is required
|
Other |
East Riding of Yorkshire Council (PDF, 257 KB)
Deadline 1 Submission - Local Impact Reports (LIRs) from local authorities
|
Other |
Lockington Parish Council (PDF, 401 KB)
Deadline 1 Submission
|
Other |
Marine Management Organisation (PDF, 2 MB)
Deadline 1 Submission - Written representation, Comments on Relevant Representations, Initial Statements of Common Ground (SoCG), Comments on revised documents
|
Other |
Max Rowe on behalf of Harbour Energy (PDF, 70 KB)
Deadline 1 Submission - Clarification of interested party; Notification of wish to have future correspondence received electronically; Preliminary response to Examining Authority's written questions and requests for information (ExQ1)
|
Other |
National Grid Carbon Limited (PDF, 93 KB)
Deadline 1 Submission - Text for inclusion in Initial Statements of Common Ground (SoCGs) requested by the Examining Authority
|
Other |
National Grid Carbon Limited (PDF, 1 KB)
Deadline 1 Submission - Information to accompany text for inclusion in Initial Statements of Common Ground (SoCGs) requested by the Examining Authority
|
Other |
NEO Energy (SNS) Limited (NEO) (PDF, 398 KB)
Deadline 1 Submission - Notification of wish to speak at any of the Issue Specific Hearings (ISHs)
|
Other |
Orsted Hornsea Project Four Limited (PDF, 396 KB)
Deadline 1 Submission - C1.1.1 Schedule of Change draft Development Consent Order (draft DCO) and Deemed Marine Licences (Tracked)
|
Other |
Orsted Hornsea Project Four Limited (PDF, 11 MB)
Late Deadline 1 Submission - B2.2 : Report to Inform Appropriate Assessment Part 1 (Clean) Revision: 02 Accepted at the discretion of the Examining Authority
|
Other |
Orsted Hornsea Project Four Limited (PDF, 1 MB)
Deadline 1 Submission - G1.1 Overarching Acronyms List Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 6 MB)
Deadline 1 Submission - A1.4 Volume A4, Chapter 4 : Project Description (Tracked) Revision: 3
|
Other |
Orsted Hornsea Project Four Limited (PDF, 7 MB)
Deadline 1 Submission - G1.9 Applicant’s comments on Relevant Representations Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 1 MB)
Deadline 1 Submission - A revised version of the draft Development Consent Order (draft DCO) (Clean)
|
Other |
Orsted Hornsea Project Four Limited (PDF, 2 MB)
Deadline 1 Submission - F2.3 Outline Ecological Management Plan (Clean) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 380 KB)
Deadline 1 Submission - G1.10 Clarification Note on Peak Herring Spawning Period and Seasonal Piling Restriction Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 545 KB)
Deadline 1 Submission - B2.7.2 Volume B2, Annex 7.2: Compensation measures for Flamborough and Filey Coast (FFC) Special Protection Area (SPA): Kittiwake Offshore Artificial Nesting Roadmap (Clean) Revision 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 250 KB)
Deadline 1 Submission - G1.43 Examination Deliverables Summary Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 403 KB)
Deadline 1 Submission - B2.7.4 Volume B2, Annex 7.4: Compensation measures for Flamborough and Filey Coast (FFC) Special Protection Area (SPA): Kittiwake Onshore Artificial Nesting Roadmap (Clean) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 1 MB)
Deadline 1 Submission - B2.8.4 Volume B2, Annex 8.4: Compensation measures for Flamborough and Filey Coast (FFC) Special Protection Area (SPA): Predator Eradication: Roadmap (Clean) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 2 MB)
Deadline 1 Submission - F2.3 Outline Ecological Management Plan (Tracked) Revision: 03
|
Other |
Orsted Hornsea Project Four Limited (PDF, 3 MB)
Deadline 1 Submission - G1.21 Statements of Common Ground between Hornsea Project Four, the Holderness Fishing Industry Group and the National Federation of Fisherman's Organisations Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 790 KB)
Deadline 1 Submission - G1.41 Calculation Methods of Hornsea Fours Proposed Compensation Measures for Features of the Flamborough and Filey Coast (FFC) Special Protection Area (SPA
|
Other |
Orsted Hornsea Project Four Limited (PDF, 33 MB)
Deadline 1 Submission - G1.42 Compensation measures for Flamborough and Filey Coast (FFC) Special Protection Area (SPA: Gannet Bycatch Reduction: Ecological Evidence Revision: 1
|
Other |
Orsted Hornsea Project Four Limited (PDF, 247 KB)
Deadline 1 Submission - G1.49 Accompanied Site Inspection (ASI) Input from the Applicant Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 1 MB)
Deadline 1 Submission - B2.2.C Annex C of B2.2: Report to Inform Appropriate Assessment: Integrity Matrices (Tracked) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 441 KB)
Deadline 1 Submission - B2.7.4 Volume B2, Annex 7.4: Compensation measures for Flamborough and Filey Coast (FFC) Special Protection Area (SPA): Kittiwake Onshore Artificial Nesting Roadmap (Tracked) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 1 MB)
Deadline 1 Submission - F2.8 Outline Landscape Management Plan (Clean) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 1,006 KB)
Deadline 1 Submission - G1.47 Auk Displacement and Mortality Evidence Review Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 1 MB)
Deadline 1 Submission - G1.50 Compensation measures for Flamborough and Filey Coast (FFC) Special Protection Area (SPA): Derogation and Compensation Update Position Statement Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 3 MB)
Deadline 1 Submission - F2.9 Outline Fisheries Coexistence and Liaison Plan (Clean) Revision: B
|
Other |
Orsted Hornsea Project Four Limited (PDF, 3 MB)
Deadline 1 Submission - G1.33 Predator eradication island suitability assessment: Bailiwick of Guernsey Revision: 1.1
|
Other |
Orsted Hornsea Project Four Limited (PDF, 2 MB)
Deadline 1 Submission - B2.5 Volume B2, Chapter 5: Habitats Regulations Assessment Without Prejudice Derogation Case Part 1-3 (Clean) Revision: 2
|
Other |
Orsted Hornsea Project Four Limited (PDF, 922 KB)
Deadline 1 Submission - G1.25 Statement of Common Ground between Hornsea Project Four and the Maritime Coastguard Agency Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 1 MB)
Deadline 1 Submission - B2.8.2 Volume B2, Annex 8.2: Compensation measures for Flamborough and Filey Coast (FFC) Special Protection Area (SPA): Guillemot and Razorbill Bycatch Reduction: Roadmap (Tracked) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 473 KB)
Deadline 1 Submission - B2.8.2 Volume B2, Annex 8.2: Compensation measures for Flamborough and Filey Coast (FFC) Special Protection Area (SPA): Guillemot and Razorbill Bycatch Reduction: Roadmap (Clean) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 2 MB)
Deadline 1 Submission - G1.20 Statement of Common Ground between Hornsea Project Four and The UK Chamber of Shipping Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 1 MB)
Deadline 1 Submission - G1.13 Statement of Common Ground between Hornsea Project Four and Natural England: Other Offshore Matters Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 4 MB)
Deadline 1 Submission - F2.2 Outline Code of Construction Practice (Clean) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 317 KB)
Deadline 1 Submission - G1.45 Overarching Glossary List Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 12 MB)
Deadline 1 Submission - B2.2: Report to Inform Appropriate Assessment Part 1 (Tracked) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 25 MB)
Deadline 1 Submission - A1.4 Volume A4 Chapter 4 : Project Description (Clean) Revision : 3
|
Other |
Orsted Hornsea Project Four Limited (PDF, 358 KB)
Deadline 1 Submission - G1.14 Statement of Common Ground between Hornsea Project Four and Historic England
|
Other |
Orsted Hornsea Project Four Limited (PDF, 2 MB)
Deadline 1 Submission - A revised version of the draft Development Consent Order (draft DCO) (Tracked)
|
Other |
Orsted Hornsea Project Four Limited (PDF, 2 MB)
Deadline 1 Submission - G1.32 Applicant’s Statement of Commonality of Statements of Common Ground Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 407 KB)
Deadline 1 Submission - G1.40 Marine Plan Policy Review Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 524 KB)
Deadline 1 Submission - G1.22 Statement of Common Ground between Hornsea Project Four and the Royal Society for the Protection of Birds (RSPB): Offshore and Intertidal Ornithology, Derogation and Compensation Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 309 KB)
Deadline 1 Submission - G1.26 Statement of Common Ground between Hornsea Project Four and Trinity House Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 321 KB)
Deadline 1 Submission - G1.30 Statement of Common Ground between Hornsea Project Four and The Ministry of Defence (MOD) Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 1 MB)
Deadline 1 Submission - G1.17 Statement of Common Ground between Hornsea Project Four and the Marine Management Organisation Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 889 KB)
Deadline 1 Submission - G1.31 Statement of Common Ground between Hornsea Project Four and NATS (En Route) plc (NATS) Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 24 MB)
Deadline 1 Submission - G1.29 Position Statement between Hornsea Project Four and BP Exploration Operating Company Limited (BP)
|
Other |
Orsted Hornsea Project Four Limited (PDF, 4 MB)
Deadline 1 Submission - F2.2 Outline Code of Construction Practice (Tracked) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 570 KB)
Deadline 1 Submission - G1.44 Clarification Note on Marine Sediment Contaminants Revision: 1
|
Other |
Orsted Hornsea Project Four Limited (PDF, 2 MB)
Deadline 1 Submission - F3.4 Statement of Common Ground between Hornsea Project Four and Natural England: Derogation Matters Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 2 MB)
Deadline 1 Submission - G1.11 Hornsea Project Four and National Grid Interconnector Holdings Limited (NGIHL) Continental Link Position Statement Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 53 MB)
Late Deadline 1 Submission - B1.1.33 Volume B1 Annex 1.33 Stakeholder Working Group Meetings, Letters of Comfort and Letters of No Objection Revision: 3 (Tracked) - Accepted at the discretion of the Examining Authority
|
Other |
Orsted Hornsea Project Four Limited (PDF, 224 KB)
Deadline 1 Submission - G1.16 Position Statement between Hornsea Project Four and National Grid Gas PLC Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 2 MB)
Deadline 1 Submission - G1.18 Statement of Common Ground between Hornsea Project Four and Natural England: Offshore and Intertidal Ornithology Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 255 KB)
Late Deadline 1 Submission - A4.4.8 Pro-rata Annex Revision 02 (Tracked) - Accepted at the discretion of the Examining Authority
|
Other |
Orsted Hornsea Project Four Limited (PDF, 2 MB)
Deadline 1 Submission - B2.8.6 Volume B2, Annex 8.6: Compensation measures for Flamborough and Filey Coast (FFC) Special Protection Area (SPA): Fish Habitat Enhancement: Roadmap (Tracked) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 290 KB)
Deadline 1 Submission - A4.4.8 Pro-rata Annex Revision 02 (Clean)
|
Other |
Orsted Hornsea Project Four Limited (PDF, 1 MB)
Deadline 1 Submission - B2.2.C Annex C of B2.2: Report to Inform Appropriate Assessment: Integrity Matrices (Clean) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 2 MB)
Deadline 1 Submission - B2.8.6 Volume B2, Annex 8.6: Compensation measures for Flamborough and Filey Coast (FFC) Special Protection Area (SPA): Fish Habitat Enhancement: Roadmap (Clean) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 2 MB)
Deadline 1 Submission - B2.5 Volume B2, Chapter 5: Habitats Regulations Assessment Without Prejudice Derogation Case Part 1-3 (Tracked) Revision: 2
|
Other |
Orsted Hornsea Project Four Limited (PDF, 226 KB)
Deadline 1 Submission - G1.23 Position Statement between Hornsea Project Four and Network Rail Infrastructure Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 229 KB)
Deadline 1 Submission - G1.28 Position Statement between Hornsea Project Four and Northern Powergrid (Yorkshire) PLC Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 286 KB)
Deadline 1 Submission - G1.19 Statement of Common Ground between Hornsea Project Four and The Wildlife Trusts Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 371 KB)
Deadline 1 Submission - G1.12 Statement of Common Ground between Hornsea Project Four and Environment Agency Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 1 MB)
Deadline 1 Submission - B2.8.4 Volume B2, Annex 8.4: Compensation measures for Flamborough and Filey Coast (FFC) Special Protection Area (SPA): Predator Eradication: Roadmap (Tracked) Revision: 03
|
Other |
Orsted Hornsea Project Four Limited (PDF, 225 KB)
Deadline 1 Submission - G1.24 Position Statement between Hornsea Project Four and Northern Gas Networks Limited Revision 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 53 MB)
Late Deadline 1 Submission - B1.1.33 Volume B1 Annex 1.33 Stakeholder Working Group Meetings, Letters of Comfort and Letters of No Objection (Clean) Revision: 3 - Accepted at the discretion of the Examining Authority
|
Other |
Orsted Hornsea Project Four Limited (PDF, 119 KB)
Late Deadline 1 Submission - G.1.48 Revised Cover Letter - Accepted at the discretion of the Examining Authority
|
Other |
Orsted Hornsea Project Four Limited (PDF, 586 KB)
Deadline 1 Submission - B2.7.2 Volume B2, Annex 7.2: Compensation measures for Flamborough and Filey Coast (FFC) Special Protection Area (SPA): Kittiwake Offshore Artificial Nesting Roadmap (Tracked) Revision 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 1 MB)
Deadline 1 Submission - F2.8 Outline Landscape Management Plan (Tracked) Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 205 KB)
Deadline 1 Submission - G1.46 Clarification Note on Marine Processes Supplementary Work Scope of Works Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 226 KB)
Deadline 1 Submission - G1.27 Position Statement between Hornsea Project Four and National Grid Electricity Transmission PLC Revision: 01
|
Other |
Orsted Hornsea Project Four Limited (PDF, 517 KB)
Deadline 1 Submission - F3.1 Statement of Common Ground between Hornsea Project Four and East Riding of Yorkshire Council Revision: 02
|
Other |
Orsted Hornsea Project Four Limited (PDF, 3 MB)
Late Deadline 1 Submission - F2.9 Outline Fisheries Coexistence and Liaison Plan (Tracked) Revision: B - Accepted at the discretion of the Examining Authority
|
Other |
Outer Dowsing Offshore Wind Ltd (PDF, 604 KB)
Deadline 1 Submission - Accepted at the discretion of the Examining Authority
|
Other |
The Wildlife Trusts (PDF, 246 KB)
Deadline 1 Submission - Response to Examining Authority's written questions and requests for information(ExQ1)
|