You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (90)
- All Documents
- Correspondence (1)
- Environmental Impact Assessment (10)
- Land Rights (76)
- Meetings (3)
Developer's Application (156)
- All Documents
- Application Form (2)
- Compulsory Acquisition Information (3)
- Draft Development Consent Orders (2)
- Drawings (30)
- Environmental Statement (106)
- Other Documents (1)
- Photographs (1)
- Reports (11)
Acceptance (10)
Pre Examination (12)
Examination (213)
- All Documents
- Additional Submissions (5)
- + Deadline (39)
- Deadline 2 (19)
- Deadline 3 (23)
- Deadline 4 (22)
- Deadline 5 (2)
- Deadline 6 (14)
- Deadline 7 (19)
- Deadline 8 (10)
- Deadline 9 (9)
- Examination Library (1)
- + Hearing (18)
- + Meeting (12)
- Notification of Hearings and Site Inspection (1)
- Other Documents (1)
- + Procedural Decision (4)
- Procedural Decisions (9)
- Rule 8 letter - notification of timetable for the examination (1)
- + Site Visit (3)
Decision (24)
Decided (3)
- All Documents
- Correction Notice (1)
- Correction Order (1)
- s51 advice (1)
Source | Description |
---|---|
Other |
Wrexham County Borough Council (PDF, 83 KB)
This communication was received before the Preliminary Meeting. As pre-examination correspondence, it was at that time considered on an administrative basis only. It clarified that this was a representation from the Economic Development Team. It was used to adjust the published title of RR-040 to reflect that rather than representing the views of the council as a whole, it was a representation from the Economic Development Team. It is published now to confirm that position
|
Other |
Notification of Completion of ExA Examination (PDF, 79 KB)
|
Other |
Unaccompanied Site Inspection Note (PDF, 171 KB)
The ExA's note of their unaccompanied site inspection undertaken on 18 January 2017.
|
Other |
Welsh Government (PDF, 210 KB)
Response to the Examining Authority's request for further information
|
Other |
Wrexham County Borough Council (PDF, 37 KB)
Response to the Examining Authority's request for further information
|
Other |
Wrexham Power Limited (PDF, 37 KB)
Covering letter for Deadline 9 representations
|
Other |
Wrexham Power Limited (PDF, 2 MB)
Explanatory Memorandum to Draft Development Consent Order (Revision 2)
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Comparison version of Revision 1 and Revision 2 of the Explanatory Memorandum
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Draft Development Consent Order (Revision 7)
|
Other |
Wrexham Power Limited (PDF, 4 MB)
2.2 Land Plans including Crown Land (Revision 5)
|
Other |
Wrexham Power Limited (PDF, 873 KB)
Response to representations made at Deadline 8
|
Other |
Wrexham Power Limited (PDF, 1,003 KB)
Response to Chris Briggs Deadline 7 submission
|
Other |
National Grid Gas Plc (PDF, 34 KB)
Withdrawing representations in respect of the Application.
|
Other |
Natural England (PDF, 197 KB)
Response to Deadlines 7 and 8
|
Other |
Susan Harber (PDF, 89 KB)
Copy of BBC News article dated 9 January 2017
|
Other |
Wales and West Utilities (PDF, 249 KB)
Response to the Deadline 8 Questions and associated plan
|
Other |
Wrexham Power Limited (PDF, 540 KB)
Responses to the Examining Authority request for further information (including responses to questions issued on 9 January 2017 and responses to representations from Interested Parties at Deadline 7)
|
Other |
Wrexham Power Limited (PDF, 60 KB)
Covering letter for Deadline 8 representations
|
Other |
Wrexham Power Limited (PDF, 38 KB)
Updated Book of Reference (Revision 3)
|
Other |
Wrexham Power Limited (PDF, 437 KB)
Response to Chris Briggs late response to Rule 17 letter dated 12 December 2016
|
Other |
Wrexham Power Limited (PDF, 38 KB)
Schedule of Changes relating to the updated Book of Reference (Revision 3)
|
Other |
Wrexham Power Limited (PDF, 38 KB)
Book of Reference - comparison version of Revision 2 and Revision 3
|
Other |
Chris Briggs (PDF, 456 KB)
Response to Rule 17 letter dated 12 December 2016- Late Submission accepted at the discretion of the ExA
|
Other | |
Other |
Rule 17 Questions of 9 January 2017 (PDF, 73 KB)
ExA's Rule 17 Questions of 9 January 2017
|
Other |
Earthworm Energy Plc Ltd (PDF, 65 KB)
Response to Rule 17 letter dated 12 December 2016
|
Other |
Kellogg Company of Great Britain Limited (PDF, 1 MB)
Response to Rule 17 letter dated 12 December 2016
|
Other |
National Grid Gas Plc (PDF, 32 KB)
Update on the protective provisions submitted by the Applicant in the draft Development Consent Order at deadline 6
|
Other |
Natural Resources Wales (PDF, 345 KB)
Response to Rule 17 letter dated 12 December 2016
|
Other |
Rostons Limited on behalf of Frederick Ronald Done, T G Ellis, PB, J and SC Edwards (PDF, 138 KB)
Response to Rule 17 letter dated 12 December 2016
|
Other |
Wales and West Utilities (PDF, 46 KB)
Response to Rule 17 letter dated 12 December 2016
|
Other |
Wrexham County Borough Council (PDF, 65 KB)
Response to Rule 17 letter dated 12 December 2016
|
Other |
Wrexham Power Limited (PDF, 71 KB)
Covering letter for Deadline 7 representations
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Draft Development Consent Order (Revision 6)
|
Other |
Wrexham Power Limited (PDF, 336 KB)
Schedule of changes to the Land Plans
|
Other |
Wrexham Power Limited (PDF, 783 KB)
Responses to ExA’s comments on the Draft Development Consent Order
|
Other |
Wrexham Power Limited (PDF, 4 MB)
Land Plans including Crown Land (Revision 4)
|
Other |
Wrexham Power Limited (PDF, 2 MB)
Explanatory Memorandum to Draft Development Consent Order
|
Other |
Wrexham Power Limited (PDF, 2 MB)
Response to Rule 17 letter dated 12 December 2016
|
Other |
Wrexham Power Limited (PDF, 38 KB)
Schedule of changes relating to the updated Book of Reference
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Comparison version of Revision 0 and Revision 1 of the Draft Development Consent Order Explanatory Memorandum
|
Other |
Wrexham Power Limited (PDF, 890 KB)
Comparison version of Revision 5 and Revision 6 of the Draft Development Consent Order
|
Other |
Wrexham Power Limited (PDF, 4 MB)
Statement of Common Ground between Wrexham Power Limited and Wrexham County Borough Council
|
Other |
Report on the Implications for European Sites (PDF, 231 KB)
Report on the Implications for European Sites (RIES) issued by the Examining Authority on 12 December 2016.
|
Other | |
Other |
Examining Authority's Request for Futher Information (PDF, 63 KB)
|
Other |
Rule 17 Letter (PDF, 52 KB)
|
Other |
Chris Briggs (PDF, 85 KB)
Emissions data for Deeside Power Station sourced from NRW. Accepted at the discretion of the Examining Authority
|
Other |
Wrexham Power Limited (PDF, 38 KB)
Letter in respect of the Compulsory Acquisition of rights over land owned by Mr Owen. This was accepted at the discretion of the Examining Authority
|
Other |
Chris Briggs (PDF, 23 KB)
Freedom of Information request sent to Natural Resources Wales
|
Other |
Chris Briggs (PDF, 295 KB)
Combined Cycle Gas Turbine Emission Plumes
|
Other |
Joanna Roberts (PDF, 324 KB)
Written representation following the Issue Specific hearing on the Environment and Other Issues held on 23 November 2016- Late Submission accepted at the discretion of the ExA
|
Other |
Natural Resources Wales (PDF, 128 KB)
Response to Deadline 6 - Covering Letter
|
Other |
Natural Resources Wales (PDF, 202 KB)
Annex A - Summary of Oral Representations made at the Issue Specific hearing on Environmental and Other Issues of 23 November 2016
|
Other |
Natural Resources Wales (PDF, 181 KB)
Annex B - Answers to questions asked by the ExA at the Issue Specific hearing on Environmental and Other Issues held on 23 November 2016
|
Other |
Natural Resources Wales (PDF, 207 KB)
Freedom of information request from Mr Briggs and Natural Resources Wales' response
|
Other |
Wrexham Power Limited (PDF, 854 KB)
Joint statement between solicitors for the Applicant and solicitors for Mr Owen.
|
Other |
Wrexham Power Limited (PDF, 963 KB)
Comparison version of Revision 4 and Revision 5 of the Draft Development Consent Order
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Draft Development Consent Order (Revision 5)
|
Other |
Wrexham Power Limited (PDF, 529 KB)
Written summary of oral submissions put at the Issue Specific hearing on the Draft Development Consent Order held on 24 Nov 2016
|
Other |
Wrexham Power Limited (PDF, 787 KB)
Signed Statement of Common Ground between the Applicant and Natural Resources Wales
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Written summary of oral submissions put at the Issue Specific hearing on the Environment and Other Issues held on 23 November 2016
|
Other |
Wrexham Power Limited (PDF, 407 KB)
Written summary of oral submissions put at the Compulsory Acquisition Hearing held on 24 Nov 2016
|
Other |
Audio of the Compulsory Acquisition Hearing (PDF, 35 KB)
Audio of the Compulsory Acquisition Hearing of 24 November 2016
|
Other |
Audio of the DCO Issue Specific Hearing (Part 1) (PDF, 34 KB)
Audio of the DCO Issue Specific Hearing on the Draft DCO of 24 November 2016
|
Other |
Audio of the DCO Issue Specific Hearing (Part 2) (PDF, 34 KB)
Audio of the DCO Issue Specific Hearing on the Draft DCO of 24 November 2016
|
Other |
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 1) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 23 November 2016
|
Other |
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 2) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 23 November 2016
|
Other |
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 3) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 23 November 2016
|
Other |
Natural Resources Wales (PDF, 61 KB)
Further Response to the ExA’s Second Written Questions
|
Other |
Wrexham Power Limited (PDF, 987 KB)
Comments on submissions made at Deadline 4
|
Other |
Unaccompanied Site Inspection Note (PDF, 45 KB)
The ExA's note of their unaccompanied site inspection undertaken 23 and 24 November 2016
|
Other |
Unaccompanied site inspection note (PDF, 155 KB)
The ExA's note of their unaccompanied site inspection undertaken 22 November 2016
|
Other |
Clwyd Powys Archaeological Trust (PDF, 66 KB)
Update on negotiations with the Applicant in advance of the November hearings. This was accepted at the discretion of the Examining Authority
|
Other |
Wales and West Utilities (PDF, 201 KB)
Update on negotiations with the Applicant in advance of the November hearings. This was accepted at the discretion of the Examining Authority
|
Other | |
Other |
Wrexham Power Limited (PDF, 4 MB)
Land Plans - Late Submission accepted at the discretion of the ExA
|
Other |
Chris Briggs (PDF, 744 KB)
Representation about stack and noise emissions
|
Other |
Dwr Cymru Welsh Water (PDF, 536 KB)
Response to ExA's Second Written Questions
|
Other |
Kellogg Company of Great Britain Limited (PDF, 2 MB)
Response to the ExA’s Second Written Questions
|
Other |
Natural England (PDF, 209 KB)
Response to the ExA’s Second Written Questions
|
Other |
Natural Resources Wales (PDF, 126 KB)
Response to the ExA’s Second Written Questions
|
Other |
Wrexham County Borough Council (PDF, 103 KB)
Response to ExA's Second Written Questions.
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Objection Schedule (Revision 2)
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Comments on submissions made at Examination Deadline 3
|
Other |
Wrexham Power Limited (PDF, 2 MB)
Covering letter for Deadline 4 submissions
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Response to the ExA's Second Written Questions
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Draft Development Consent Order (Revision 4)
|
Other |
Wrexham Power Limited (PDF, 38 KB)
Updated Book of Reference (Revision 2)
|
Other |
Wrexham Power Limited (PDF, 38 KB)
Book of Reference - comparison version of Revision 1 and Revision 2
|
Other |
Wrexham Power Limited (PDF, 838 KB)
Comparison version of Revision 3 and Revision 4 of the Draft Development Consent Order
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Comparison version of Revision 1 and Revision 2 of Environmental Statement Appendix: Construction Environmental Management Plan
|
Other |
Wrexham Power Limited (PDF, 4 MB)
Landscape and Visual Impact Assessment Photomontage Report
|
Other |
Wrexham Power Limited (PDF, 9 MB)
Environmental Statement Appendix: Foul and Surface Water Drainage Strategy - Revision 1
|
Other |
Wrexham Power Limited (PDF, 136 KB)
Update regarding the Draft Development Consent Order following the Compulsory Acquisition Hearing held on 29 September 2016
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Environmental Statement Appendix: Construction Environmental Management Plan (Revision 2)
|
Other |
Wrexham Power Limited (PDF, 9 MB)
Comparison version of Revision 0 and Revision 1 of the Environmental Statement Appendix: Foul and Surface Water Drainage Strategy
|
Other |
Wrexham Power Limited (PDF, 5 MB)
Water Framework Directive Report
|
Other | |
Other |
ExA Second Written Questions (PDF, 204 KB)
ExA Second Written Questions
|
Other |
Notification of Second Written Questions (PDF, 109 KB)
Notification of Second Written Questions
|
Other |
Joanna Roberts (PDF, 2 MB)
Update to Deadline 3 submission (REP3-022) - accepted at the discretion of the ExA on 20 October 2016
|
Other |
Joanna Roberts (PDF, 630 KB)
Written summary of oral submissions put at the Issue Specific hearing on Environmental and Other Issues held on 28 and 29 September 2016
|
Other |
Rostons Limited on behalf of Frederick Ronald Done, T G Ellis, PB, J and SC Edwards (PDF, 121 KB)
Update regarding clients land agreements with the Applicant - accepted at the discretion of the ExA
|
Other |
Chris Briggs (PDF, 24 KB)
Written summary of oral submissions put at hearings held between 27 and 29 September 2016
|
Other |
Dennis and Angela Edwards (PDF, 374 KB)
Written summaries of oral submissions put at hearings held between 27 and 29 September 2016
|
Other |
Kath Briggs (PDF, 20 KB)
Written summary of oral submission made on 28 September 2016
|
Other |
Kellogg Company of Great Britain Limited (PDF, 137 KB)
Comments on the Applicant's response to Kellogg's Written Representation.
|
Other |
Michael Morris (PDF, 4 MB)
Written summaries of oral submissions put at hearings held between 27 and 29 September 2016
|
Other |
Ms Elizabeth Cross (PDF, 41 KB)
Representation following the hearings held between 27 and 29 September 2016
|
Other |
Ms Fay Green on behalf of St. Paul's School (PDF, 38 KB)
Representation following the hearings held between 27 and 29 September 2016
|
Other |
Natural Resources Wales (PDF, 477 KB)
Written summaries of oral submissions put at hearings held between 27 and 29 September 2016
|
Other |
Robert Eccleston (PDF, 16 KB)
Written summaries of oral submissions put at hearings held between 27 and 29 September 2016
|
Other |
Susan Harber (PDF, 38 KB)
Written summary of oral submission made on 28 September 2016
|
Other |
Wrexham Power Limited (PDF, 2 MB)
Composite Kingmoor Park and Power Station Complex Plan
|
Other |
Wrexham Power Limited (PDF, 621 KB)
Draft Development Consent Order (Revision 3)
|
Other |
Wrexham Power Limited (PDF, 75 KB)
Covering letter for Deadline 3 representations
|
Other |
Wrexham Power Limited (PDF, 3 MB)
Written summary of oral case put at the Issue Specific hearing on Environmental and Other Issues on 28 September 2016
|
Other |
Wrexham Power Limited (PDF, 2 MB)
Distances from Power Station Complex Plan
|
Other |
Wrexham Power Limited (PDF, 2 MB)
Written summary of oral case put at the Issue Specific hearing on Environmental and Other Issues on 29 September 2016
|
Other |
Wrexham Power Limited (PDF, 386 KB)
Written summary of oral submissions put at the Issue Specific hearing on the Draft Development Consent Order
|
Other |
Wrexham Power Limited (PDF, 2 MB)
Written summary of oral submission put at the Compulsory Acquisition Hearing
|
Other |
Wrexham Power Limited (PDF, 660 KB)
Photographs of Owens Corning Structures
|
Other |
Wrexham Power Limited (PDF, 2 MB)
Distances from Stacks Plan
|
Other |
Wrexham Power Limited (PDF, 753 KB)
Comparison version of Revision 2 and Revision 3 of the Draft Development Consent Order
|
Other |
Audio of the Compulsory Acquisition Hearing (Part 1) (PDF, 35 KB)
Audio of the Compulsory Acquisition Hearing of 29 September 2016
|
Other |
Audio of the Compulsory Acquisition Hearing (Part 2) (PDF, 35 KB)
Audio of the Compulsory Acquisition Hearing of 29 September 2016
|
Other |
Audio of the DCO Issue Specific Hearing (Part 1) (PDF, 34 KB)
Audio of the DCO Issue Specific Hearing on the Draft DCO of 28 September 2016
|
Other |
Audio of the DCO Issue Specific Hearing (Part 2) (PDF, 34 KB)
Audio of the DCO Issue Specific Hearing on the Draft DCO of 28 September 2016
|
Other |
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 1) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 28 September 2016
|
Other |
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 2) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 28 September 2016
|
Other |
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 3) (PDF, 35 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 29 September 2016
|
Other |
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 4) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 29 September 2016
|
Other |
Audio of the Issue Specific Hearing on the Environment and Other Issues (Part 5) (PDF, 34 KB)
Audio of the Issue Specific Hearing on the Environment and Other Issues of 29 September 2016
|
Other |
Audio of the Open Floor Hearing (PDF, 34 KB)
Audio of the Open Floor Hearing on 28 September 2016
|
Other |
Unaccompanied Site Inspection Note 2 (PDF, 171 KB)
Note of the second Unaccompanied Site Inspection on 28 September 2016
|
Other |
Chris Briggs (PDF, 45 KB)
Comments on the Accompanied Site Inspection
|
Other |
Jonathan Young (PDF, 37 KB)
Written submission in advance of the September Hearings
|
Other |
Natural England (PDF, 289 KB)
Response to the ExA's First Written Questions: Section 1.2 - Biodiversity
|
Other |
Natural Resources Wales (PDF, 409 KB)
Response to the ExA's First Written Questions
|
Other |
Wrexham County Borough Council (PDF, 56 KB)
Update on the Local Impact Report
|
Other |
Wrexham Power Limited (PDF, 3 MB)
Response to the Local Impact Report prepared by Wrexham County Borough Council
|
Other |
Wrexham Power Limited (PDF, 9 MB)
Statement of Common Ground on the historic environment between the Welsh Government/ Cadw and Wrexham Power Limited
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Flood Consequence Assessment
|
Other |
Wrexham Power Limited (PDF, 4 MB)
Addendum to the Environmental Statement: Cumulative Effects Assessment – Electrical Connection
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Draft Development Consent Order (Revision 2)
|
Other |
Wrexham Power Limited (PDF, 68 KB)
Covering Letter for Deadline 2 submissions
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Updated Construction Environmental Management Plan (Revision 1)
|
Other |
Wrexham Power Limited (PDF, 750 KB)
Draft Development Consent Order - Comparison version of Revision 1 and Revision 2
|
Other |
Wrexham Power Limited (PDF, 609 KB)
Objections Schedule - Response to the ExA's First Written Questions- 1.4.4 and 1.4.6
|
Other |
Wrexham Power Limited (PDF, 4 MB)
Access Right of Way Plan (Revision 2)
|
Other |
Wrexham Power Limited (PDF, 974 KB)
Comments on responses to the ExA’s First Written Questions
|
Other |
Wrexham Power Limited (PDF, 4 MB)
Response to Written Representations
|
Other |
Wrexham Power Limited (PDF, 4 MB)
Land Plans (Revision 2)
|
Other |
Wrexham Power Limited (PDF, 662 KB)
Position paper on common ground between Natural Resources Wales and Wrexham Power Limited
|
Other | |
Other | |
Other |
Chris Briggs (PDF, 611 KB)
Response to the ExA's First Written Question 1.13.4 - Late Submission accepted at the discretion of the ExA
|
Other |
Chris Briggs (PDF, 419 KB)
Response to the ExA's First Written Question 1.1.13 - Late Submission accepted at the discretion of the ExA
|
Other |
Chris Briggs (PDF, 104 KB)
Written Representation
|
Other |
Clive Roberts (PDF, 181 KB)
Written Representation
|
Other |
Dennis and Angela Edwards (PDF, 108 KB)
Written Representation
|
Other |
Earthworm Energy Plc Ltd (PDF, 1 MB)
Written Representation
|
Other |
Joanna Roberts (PDF, 181 KB)
Written Representation
|
Other |
John Smith and Susan Davies (PDF, 16 KB)
Written Representation
|
Other |
Jonathan and Tamsin Young (PDF, 40 KB)
Written Representation
|
Other |
Kath Briggs (PDF, 82 KB)
Written Representation
|
Other |
Kellogg Company of Great Britain Limited (PDF, 314 KB)
Written Representation
|
Other |
Marian Hughes (PDF, 72 KB)
Written Representation
|
Other |
Mark Harber (PDF, 98 KB)
Written Representation - Accepted at the discretion of the Examining Authority
|
Other |
Michael Morris (PDF, 7 MB)
Response to the ExA's First Written Question 1.1.1
|
Other |
Michael Morris (PDF, 100 KB)
Written Representation
|
Other |
National Grid Gas (PDF, 51 KB)
Written Representation
|
Other |
Natural England (PDF, 73 KB)
Response to the ExA's First Written Questions and Written Representation
|
Other |
Natural Resources Wales (PDF, 623 KB)
Response to the ExA's First Written Questions and Written Representation
|
Other |
North Wales Wildlife Trust (PDF, 271 KB)
Written Representation- Accepted at the discretion of the Examining Authority
|
Other |
Public Health Wales (PDF, 157 KB)
Response to the ExA's First Written Question 1.13.1
|
Other |
Robert Eccleston (PDF, 18 KB)
Written Representation
|
Other |
Rostons Limited on behalf of Frederick Ronald Done, T G Ellis and Mr Edwards (PDF, 1 MB)
Written Representation
|
Other |
SP Energy Networks (PDF, 54 KB)
Written Representations
|
Other |
Stephen Whitby (PDF, 237 KB)
Written Representation
|
Other |
Susan Harber (PDF, 95 KB)
Request for an Open Floor Hearing and Written Representation
|
Other |
Susan Harber (PDF, 15 KB)
Request for a Site Inspection
|
Other |
Wales and West Utilities (PDF, 227 KB)
Response to the ExA's First Written Questions
|
Other |
Wales and West Utilities (PDF, 207 KB)
Written Representation
|
Other |
Welsh Government (PDF, 273 KB)
Response to the ExA’s First Written Questions
|
Other |
Welsh Water (PDF, 78 KB)
Written Representation
|
Other |
Wrexham County Borough Council (PDF, 43 KB)
Written Representation
|
Other |
Wrexham Power Limited (PDF, 4 MB)
Site visit location plans
|
Other |
Wrexham Power Limited (PDF, 3 MB)
Appendices to the Response to the ExA's First Written Questions
|
Other |
Wrexham Power Limited (PDF, 2 MB)
Response to Relevant Representations
|
Other |
Wrexham Power Limited (PDF, 330 KB)
Update on Statements of Common Ground
|
Other |
Wrexham Power Limited (PDF, 2 MB)
Response to the ExA's First Written Questions
|
Other |
Wrexham Power Limited (PDF, 344 KB)
Site Visit Itinerary
|
Other |
Wrexham Power Limited (PDF, 624 KB)
Covering Letter
|
Other |
Wrexham Power Limited (PDF, 37 KB)
Updated position on Statements of Common Ground - Late Submission accepted at the discretion of the ExA
|
Other |
Examining Authority’s First Written Questions (PDF, 567 KB)
|
Other |
Note of Preliminary Meeting (PDF, 128 KB)
|
Other |
Rule 8 Letter (PDF, 379 KB)
|
Other |
Preliminary Meeting Audio (Part 2) (PDF, 34 KB)
Audio of the Preliminary Meeting 19 July 2016.
|
Other |
DCO Issue-Specific hearing - Audio (Part 2) (PDF, 34 KB)
Audio of the Issue-Specific hearing on the draft DCO of 19 July 2016.
|
Other |
DCO Issue-Specific hearing - Audio (Part 1) (PDF, 34 KB)
Audio of the Issue-Specific hearing on the draft DCO of 19 July 2016.
|
Other |
Preliminary Meeting Audio (Part 1) (PDF, 34 KB)
Audio of the Preliminary Meeting 19 July 2016.
|
Other |
Clive Roberts (PDF, 15 KB)
Written summary of oral case put at the Issue-Specific hearing on the draft DCO of 19 July 2016.
|
Other |
Natural Resources Wales (PDF, 189 KB)
Response to the Rule 6 Letter of 24 June 2016. This was accepted at the discretion of the Examining Authority.
|
Other |
Wrexham Power Limited (PDF, 572 KB)
Draft Development Consent Order (Comparison of Revision 0 and Revision 1). Submitted following the Preliminary Meeting and the Issue-Specific hearing on the draft DCO
|
Other |
Wrexham Power Limited (PDF, 627 KB)
Written summary of oral case put at the Issue-Specific hearing on the draft DCO of 19 July 2016.
|
Other |
Wrexham Power Limited (PDF, 38 KB)
Note explaining the changes made to the Book of Reference and which are detailed in the document titled "Schedule of Changes relating to the updated Book of Reference (Revision 1). Submitted following the Preliminary Meeting and the Issue-Specific hearing on the draft DCO.
|
Other |
Wrexham Power Limited (PDF, 1 MB)
Cover Letter for submissions following the Preliminary Meeting and the Issue-Specific hearing on the draft DCO
|
Other |
Wrexham Power Limited (PDF, 420 KB)
Draft Development Consent Order (Revision 1). Submitted following the Preliminary Meeting and the Issue-Specific hearing on the draft DCO.
|
Other |
Wrexham Power Limited (PDF, 3 MB)
Land Plans including Crown Land (Revision 1). Submitted following the Preliminary Meeting and the Issue-Specific hearing on the draft DCO
|
Other |
Wrexham Power Limited (PDF, 3 MB)
Access Rights of Way Plan (Revision 1). Key Plan and Sheet 1 to 3. Submitted following the Preliminary Meeting and the Issue-Specific hearing on the draft DCO.
|
Other |
Examination Library (PDF, 281 KB)
|