Tidal Lagoon Swansea Bay

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (7)

Developer's Application (548)

Acceptance (6)

Pre Examination (27)

Examination (739)

Decision (35)

Decided (23)

Date

The selected filter includes comments received by the Planning Inspectorate regarding:

  1. the representations made on the application (including responses to the Examining authority’s first round of questions) and
  2. the responses to the Examining authority’s subsequent round of questions.

The Planning Inspectorate is required to make these comments available in accordance with Rule 3(5) and Rule 21 of the Infrastructure Planning (Examination Procedure) Rules 2010.

SourceDescription
Other
Size: 5 MB
Natural Resources Wales
2 4 12 Eastern Landfall Plan. Appended to WFD report to replace zip file link. Submitted by NRW at 16:02 on 10 December 2014. Received late due to a technical issue relating to the size of the email.
Other
Size: 156 KB
Natural Resources Wales
Response to Rule 17 letter submitted by NRW at 16:02 on 10 December 2014. Received late due to a technical issue relating to the size of the email.
Other
Size: 4 MB
Natural Resources Wales
2 4 13 Eastern Landfall Sections. Appended to WFD report to replace zip file link. Submitted by NRW at 16:02 on 10 December 2014. Received late due to a technical issue relating to the size of the email.
Other
Size: 78 KB
Natural Resources Wales
14A Note clarifying jobs figures in 22 5 3 16 of ES.Appended to WFD report to replace zip file link. Submitted by NRW at 16:02 on 10 December 2014. Received late due to a technical issue relating to the size of the email.
Other
Size: 4 MB
Natural Resources Wales
2 4 17 Saltmarsh Sections. Appended to WFD report to replace zip file link. Submitted by NRW at 16:02 on 10 December 2014. Received late due to a technical issue relating to the size of the email.
Other
Size: 488 KB
Natural Resources Wales
Final Water Framework Directive report submitted by NRW at 16:02 on 10 December 2014. Received late due to a technical issue relating to the size of the email.
Other
Size: 813 KB
Natural Resources Wales
TLSB response NRW Art 4 7 info requirements. Appended to WFD report to replace zip file link. Submitted by NRW at 16:02 on 10 December 2014. Received late due to a technical issue relating to the size of the email.
Other
Size: 5 MB
Natural Resources Wales
2 4 16 Saltmarsh Plan. Appended to WFD report to replace zip file link. Submitted by NRW at 16:02 on 10 December 2014. Received late due to a technical issue relating to the size of the email.
Other
Size: 44 KB
Natural Resources Wales
14B Note on jobs associated with turbine assembly plant. Appended to WFD report to replace zip file link. Submitted by NRW at 16:02 on 10 December 2014. Received late due to a technical issue relating to the size of the email.
Other
Size: 669 KB
Natural Resources Wales
Email submitted by NRW at 16:02 on 10 December 2014. Received late due to a technical issue relating to the size of the email.
Other
Size: 167 KB
Natural Resources Wales
Representation accepted by the Examining Authority in to the examination. Response to TLSB Deadline VIII Submission - factual correction.
Other
Size: 309 KB
Natural Resources Wales
Representation accepted by the Examining Authority in to the examination.
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.