Hinkley Point C New Nuclear Power Station

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (1)

Developer's Application (308)

Acceptance (0)

Pre Examination (38)

Examination (599)

Decision (50)

Decided (186)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 101 MB
3.1 - Consultation Report - Appendices 1
Other
Size: 407 KB
5. Waste Management Strategy 1
Other
Size: 4 MB
16. Williton Theme 1
Other
Size: 11 MB
3.4 Overarching Flood Risk Assessment Report 1
Other
Size: 2 MB
23. Consultation Theme 1
Other
Size: 14 MB
3.7 Cannington Bypass Flood Risk Assessment 1
Other
Size: 3 MB
18. Bridgwater A Theme 1
Other
Size: 32 MB
3.13 Cannington Flood Risk Assessment Modelling Report 1
Other
Size: 691 KB
4. Sustainability Strategy 1
Other
Size: 459 KB
22. Planning Strategy Theme 1
Other
Size: 1 MB
24. Issues beyond the scope Theme 1
Other
Size: 2 MB
20. Junction 23 Theme 1
Other
Size: 21 MB
3.10 Junction 23 Flood Risk Assessment 1
Other
Size: 8 MB
11. Hinkley point C Main Site Environmental Theme 1
Other
Size: 10 MB
3. Socio-economic and Procurement 1
Other
Size: 31 MB
3.6 Bridgwater C Flood Risk Assessment 1
Other
Size: 1 MB
7. Health Impact Assessment Theme 1
Other
Size: 5 MB
13. Cannington Theme 1
Other
Size: 2 MB
19. Bridgwater C Theme 1
Other
Size: 2 MB
8. Environmental Impact Assessment Theme 1
Other
Size: 4 MB
21. Junction 24 Theme 1
Other
Size: 4 MB
1. Accommodation Theme 1
Other
Size: 29 MB
3.9 Combwich Flood Risk Assessment 1
Other
Size: 7 MB
15. Combwich Theme 1
Other
Size: 5 MB
10. Hinkley Point C Main Site Theme 1
Other
Size: 11 MB
2. Transport Theme 1
Other
Size: 17 MB
3.11 Junction 24 Flood Risk Assessment 1
Other
Size: 2 MB
12. On-site Accommodation Campus Theme 1
Other
Size: 17 MB
3.12 Williton Flood Risk Assessment 1
Other
Size: 760 KB
3.15 Environmental Protection Act Statement 1
Other
Size: 22 MB
3.16 Hinkley Point C Project Report to Infrom Habitats Regulations Assessment 1
Other
Size: 85 KB
17. Bridgwater (Discounted) Theme 1
Other
Size: 7 MB
3.8 Cannington Park and Ride Flood Risk Assessment 1
Other
Size: 1 MB
9. Habitat Regulation Assessment Theme 1
Other
Size: 7 MB
3.1 - Consultation Report 1
Other
Size: 37 MB
3.5 Bridgwater A Flood Risk Assessment 1
Other
Size: 5 MB
14. Cannington Bypass Theme 1
Other
Size: 197 KB
6. Environmental Mitigation Strategy Theme 1
Other
Size: 36 MB
3.14 Combwich and Junction 23 Flood Risk Assessment Modelling Report 1
Other
Size: 9 MB
3.3 Highway Improvements Flood Risk Assessment 1
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.