Hinkley Point C New Nuclear Power Station

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (1)

Developer's Application (308)

Acceptance (0)

Pre Examination (38)

Examination (599)

Decision (50)

Decided (186)

Date

SourceDescription
Other
Size: 251 KB
Department for Business, Energy and Industrial Strategy
Decision Letter
Other
Size: 315 KB
Department for Business, Energy and Industrial Strategy
Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018
Other
Size: 84 KB
EDF Energy
Further correspondence regarding Non Material Change Consultation
Other
Size: 69 KB
Environment Agency
Further correspondence regarding Non Material Change Consultation
Other
Size: 6 MB
EDF Energy
Comments on Responses to Non Material Change Consultation
Other
Size: 245 KB
Stop Hinkley
Response to Non Material Change Consultation
Other
Size: 120 KB
Edward A Heath
Late Response to Non Material Change Consultation
Other
Size: 294 KB
Stogursey Parish Council
Response to Non Material Change Consultation
Other
Size: 14 KB
D L Buller
Response to Non Material Change Consultation
Other
Size: 176 KB
Somerset County Council
Response to Non Material Change Consultation
Other
Size: 257 KB
The Fairfield Estate
Response to Non Material Change Consultation
Other
Size: 16 KB
Stephen Wardle
Response to Non Material Change Consultation
Other
Size: 14 KB
Timothy Kaye
Response to Non Material Change Consultation
Other
Size: 16 KB
Graham and Jean Howard
Response to Non Material Change Consultation
Other
Size: 170 KB
West Somerset Council
Response to Non Material Change Consultation
Other
Size: 64 KB
West Hinkley Action Group
Response to Non Material Change Consultation
Other
Size: 15 KB
Helga Staddon
Response to Non Material Change Consultation
Other
Size: 16 KB
Susan Goss
Response to Non Material Change Consultation
Other
Size: 471 KB
Quantock Hills AONB Service
Response to Non Material Change Consultation
Other
Size: 134 KB
Natural England
Response to Non Material Change Consultation
Other
Size: 298 KB
Marine Management Organisation
Response to Non Material Change Consultation
Other
Size: 321 KB
Sedgemoor District Council
Response to Non Material Change Consultation
Other
Size: 39 KB
Jane Taunton
Response to Non Material Change Consultation
Other
Size: 18 KB
Teresa Miller
Response to Non Material Change Consultation
Other
Size: 16 KB
Pauline Kaye
Response to Non Material Change Consultation
Other
Size: 40 KB
Environment Agency
Response to Non Material Change Consultation
Other
Size: 283 KB
Stogursey Parish Council
Response to Non Material Change Consultation
Other
Size: 5 MB
EDF Energy
Consultation and publicity statement in connection with the non-material change application of 28 September 2017
Other
Size: 815 KB
EDF Energy
Draft Amendment Order - Tracked Changes
Other
Size: 10 MB
EDF Energy
Appendix 6 (C) - Computer Generated Images Original Submitted With DCO Application
Other
Size: 10 MB
EDF Energy
Appendix 6 (D) - Computer Generated Images Revised Incorporating Proposed Changes
Other
Size: 911 KB
EDF Energy
Appendix 7 (A) - Indicative Jetty Plans
Other
Size: 3 MB
EDF Energy
Sea Wall (Incorporating Coastal Footpath) - HINK-A2-HSW-00-GA-004
Other
Size: 2 MB
EDF Energy
Appendix 7 (B) - HPC Jetty Discharge HRA Report
Other
Size: 1 MB
EDF Energy
Appendix 2 – Revised Development Consent Order Site Layout Plan & HPC Site Parameter Plan
Other
Size: 1 MB
EDF Energy
Somerset Otter Group Consultation Letter
Other
Size: 503 KB
EDF Energy
Appendix 5 – Landscape and Visual Impact Assessment Viewpoint Location Plans Figure 2 – Long Range Views
Other
Size: 933 KB
EDF Energy
Letters to Deposit Locations - EDF Energy Visitor Centre
Other
Size: 210 KB
EDF Energy
Stakeholder Consultee Letter
Other
Size: 2 MB
EDF Energy
Sedgemoor and West Somerset Green Party Consultation Letter
Other
Size: 1 MB
EDF Energy
Appendix 1 – Development Consent Order Consented Site Layout Plan & HPC Site Parameter Plan
Other
Size: 1 MB
EDF Energy
Application Statement
Other
Size: 20 KB
EDF Energy
Agreed Stakeholder Contact List
Other
Size: 1 MB
EDF Energy
Bridgwater Bay Wildfowlers Association Consultation Letter
Other
Size: 176 KB
EDF Energy
Emergency Diesel Generator - D/ Cooling Water Discharge Weir (Building) / Battery Load Bank - HINK-A2-HD-04-DT-001
Other
Size: 181 KB
EDF Energy
Unit 2: Reactor Bldg / Fuel Bldg / Fuel Bldg Hall / Boron Storage / Safeguard Bldgs / Nuclear Auxiliary Bldg / Access Tower - HINK-A2-HR-02-DT-001
Other
Size: 178 KB
EDF Energy
Unit 1: Reactor Bldg / Fuel Bldg / Fuel Bldg Hall / Boron Storage / Safeguard Bldgs / Nuclear Auxiliary Bldg / Access Tower - HINK-A2-HR-01-DT-001
Other
Size: 958 KB
EDF Energy
Letters to Deposit Locations - Sedgemoor District Council
Other
Size: 122 KB
EDF Energy
Interim Spent Fuel Store - HINK-A2-HHK-00-GE-001
Other
Size: 272 KB
EDF Energy
Unit 2: Gas Insulated Switch Gear / Main Transformer /Unit Transformer / Auxiliary Transformer - HINK-A2-HT-02-DT-001
Other
Size: 404 KB
EDF Energy
Unit 2: Cooling Water Pumphouse / Forebay / Outfall Pond/ Service Access Buildings 6 and 8 - HINK-A2-HP-02-GP-030
Other
Size: 426 KB
EDF Energy
Appendix 5 – Landscape and Visual Impact Assessment Viewpoint Location Plans Figure 1 – Short and Medium Range Views
Other
Size: 203 KB
EDF Energy
Emergency Diesel Generator A / Cooling Water Discharge Weir Building / Underground Tunnel Highpoint - HINK-A2-HD-01-GE-001
Other
Size: 208 KB
EDF Energy
Unit 2: Reactor Bldg / Fuel Bldg / Fuel Bldg Hall / Boron Storage/ Safeguard Bldgs / Nuclear Auxiliary Bldg / Access Tower/ Service Access Building 3 - HINK-A2-HR-02-GE-001
Other
Size: 4 MB
EDF Energy
Appendix 7 (C) - HPC Jetty Discharge Modelling
Other
Size: 175 KB
EDF Energy
Auxiliary Administration Centre - HINK-A2-HUC-00-GE-001
Other
Size: 167 KB
EDF Energy
Back Up Power Containerised Generator 2 - HINK-A2-LLV-00-GA-001
Other
Size: 233 KB
EDF Energy
Unit 1: Fire-Fighting Water Building - HINK-A2-HOJ-01-GA-003
Other
Size: 394 KB
EDF Energy
Unit 1: Cooling Water Pumphouse / Forebay / Outfall Pond/ Service Access Buildings 5 and 7 - HINK-A2-HP-01-GP-030
Other
Size: 52 KB
EDF Energy
Draft Amendment Order
Other
Size: 176 KB
EDF Energy
Emergency Diesel Generator B / Cooling Water Discharge Weir Building / Battery Load Bank - HINK-A2-HD-02-DT-001
Other
Size: 257 KB
EDF Energy
Unit 2: Cooling Water Pumphouse / Forebay / Outfall Pond/ Service Access Buildings 6 and 8 - HINK-A2-HP-02-GE-001
Other
Size: 171 KB
EDF Energy
Hot Laundry / Hot Workshop / Hot Warehouse /Facilities for Decontamination / Effluent Tanks / Refuelling Water Storage Tank / Battery Load Bank - HINK-A2-HV-00-DT-001
Other
Size: 120 KB
EDF Energy
Application Covering Letter
Other
Size: 176 KB
EDF Energy
Unit 1: Cooling Water Pumphouse / Forebay / Outfall Pond/ Service Access Buildings 5 and 7- HINK-A2-HP-01-DT-001
Other
Size: 204 KB
EDF Energy
Unit 2: Reactor Bldg / Fuel Bldg / Fuel Bldg Hall / Boron Storage/ Safeguard Bldgs / Nuclear Auxiliary Bldg / Access Tower/ Service Access Building 3 - HINK-A2-HR-02-GP-090
Other
Size: 195 KB
EDF Energy
Emergency Diesel Generator B / Cooling Water Discharge Weir Building / Battery Load Bank - HINK-A2-HD-02-GE-001
Other
Size: 177 KB
EDF Energy
Unit 2: Gas Insulated Switch Gear / Main Transformer /Unit Transformer / Auxiliary Transformer - HINK-A2-HT-02-GP-003
Other
Size: 411 KB
EDF Energy
Unit 1: Gas Insulated Switch Gear / Main Transformer /Unit Transformer / Auxiliary Transformer - HINK-A2-HT-01-GE-001
Other
Size: 173 KB
EDF Energy
Emergency Diesel Generator - C/ Cooling Water Discharge Weir Building / Underground Tunnel Highpoint - HINK-A2-HD-03-DT-001
Other
Size: 174 KB
EDF Energy
Unit 1: Fire-Fighting Water Building - HINK-A2-HOJ-01-DT-001
Other
Size: 272 KB
EDF Energy
Unit 1: Gas Insulated Switch Gear / Main Transformer /Unit Transformer / Auxiliary Transformer - HINK-A2-HT-01-DT-001
Other
Size: 191 KB
EDF Energy
Hot Laundry / Hot Workshop / Hot Warehouse /Facilities for Decontamination / Effluent Tanks / Refuelling Water Storage Tank / Battery Load Bank - HINK-A2-HV-00-GE-001
Other
Size: 199 KB
EDF Energy
Emergency Diesel Generator - C/ Cooling Water Discharge Weir Building / Underground Tunnel Highpoint - HINK-A2-HD-03-GP-040
Other
Size: 196 KB
EDF Energy
Off-site Vehicle Search Area - HINK-A2-VSA-00-GA-001
Other
Size: 202 KB
EDF Energy
Unit 2: Reactor Bldg / Fuel Bldg / Fuel Bldg Hall / Boron Storage/ Safeguard Bldgs / Nuclear Auxiliary Bldg / Access Tower/ Service Access Building 3 - HINK-A2-HR-02-GE-002
Other
Size: 174 KB
EDF Energy
Unit 2: Fire-Fighting Water Building - HINK-A2-HOJ-02-DT-001
Other
Size: 195 KB
EDF Energy
Emergency Diesel Generator - D/ Cooling Water Discharge Weir (Building) / Battery Load Bank - HINK-A2-HD-04-GE-001
Other
Size: 951 KB
EDF Energy
Letters to Deposit Locations - West Somerset District Council
Other
Size: 203 KB
EDF Energy
Emergency Diesel Generator - C/ Cooling Water Discharge Weir Building / Underground Tunnel Highpoint - HINK-A2-HD-03-GE-001
Other
Size: 232 KB
EDF Energy
Unit 2: Fire-Fighting Water Building - HINK-A2-HOJ-02-GA-003
Other
Size: 199 KB
EDF Energy
Emergency Diesel Generator A / Cooling Water Discharge Weir Building / Underground Tunnel Highpoint - HINK-A2-HD-01-GP-040
Other
Size: 178 KB
EDF Energy
Degassed Water Storage Tanks / Valve Room - HINK-A2-REA-00-GA-001
Other
Size: 200 KB
EDF Energy
Unit 1: Reactor Bldg / Fuel Bldg / Fuel Bldg Hall / Boron Storage/ Safeguard Bldgs / Nuclear Auxiliary Bldg / Access Tower/ Service Access Building 2 - HINK-A2-HR-01-GE-002
Other
Size: 206 KB
EDF Energy
Unit 1: Reactor Bldg / Fuel Bldg / Fuel Bldg Hall / Boron Storage/ Safeguard Bldgs / Nuclear Auxiliary Bldg / Access Tower/ Service Access Building 2 - HINK-A2-HR-01-GE-001
Other
Size: 176 KB
EDF Energy
Unit 1: Gas Insulated Switch Gear / Main Transformer /Unit Transformer / Auxiliary Transformer - HINK-A2-HT-01-GP-003
Other
Size: 166 KB
EDF Energy
Auxiliary Administration Centre - HINK-A2-HUC-00-GP-020
Other
Size: 16 MB
EDF Energy
Appendix 6 (B) - Illustrative Masterplan Revised Incorporating Proposed Changes.pdf
Other
Size: 922 KB
EDF Energy
Sea Wall (Incorporating Coastal Footpath) - HINK-A2-HSW-00-GA-001
Other
Size: 196 KB
EDF Energy
Emergency Diesel Generator - D/ Cooling Water Discharge Weir (Building) / Battery Load Bank - HINK-A2-HD-04-GP-040
Other
Size: 635 KB
EDF Energy
Appendix 4 – Illustrative Plans Indicating Changes Figure A - Proposed Changes Outside Parameters
Other
Size: 167 KB
EDF Energy
Back Up Power Containerised Generator 3 - HINK-A2-LLW-00-GA-001
Other
Size: 254 KB
EDF Energy
Unit 1: Cooling Water Pumphouse / Forebay / Outfall Pond - HINK-A2-HP-01-GE-001
Other
Size: 197 KB
EDF Energy
Emergency Diesel Generator B / Cooling Water Discharge Weir Building / Battery Load Bank - HINK-A2-HD-02-GP-040
Other
Size: 176 KB
EDF Energy
Unit 2: Cooling Water Pumphouse / Forebay / Outfall Pond/ Service Access BuildingS 6 and 8 - HINK-A2-HP-02-DT-001
Other
Size: 177 KB
EDF Energy
Emergency Diesel Generator A / Cooling Water Discharge Weir Building / Underground Tunnel Highpoint - HINK-A2-HD-01-DT-001
Other
Size: 114 KB
EDF Energy
Equipment Store (For Spent Fuel Store) - HINK-A2-HHX-00-GA-001
Other
Size: 124 KB
EDF Energy
Interim Spent Fuel Store - HINK-A2-HHK-00-GE-002
Other
Size: 14 MB
EDF Energy
Appendix 6 (A) - Illustrative Masterplan Original Submitted with DCO Application.pdf
Other
Size: 185 KB
EDF Energy
Auxiliary Administration Centre - HINK-A2-HUC-00-GE-002
Other
Size: 177 KB
EDF Energy
Hot Laundry / Hot workshop / Hot warehouse /Facilities for Decontamination / Effluent Tanks / Refuelling Water Storage Tank / Battery Load Bank - HINK-A2-HV-00-GP-020
Other
Size: 526 KB
EDF Energy
HPC Permanent Development Site - HINK-A1-SL-00-GA-002
Other
Size: 167 KB
EDF Energy
Auxiliary Administration Centre - HINK-A2-HUC-00-DT-001
Other
Size: 166 KB
EDF Energy
Back Up Power Containerised Generator 1 - HINK-A2-LLY-00-GA-001
Other
Size: 767 KB
EDF Energy
HPC Permanent Development Site - HINK-A1-SL-00-GA-010
Other
Size: 815 KB
EDF Energy
Appendix 3 – Draft Amendments to Development Consent Order (Tracked Changes)
Other
Size: 418 KB
EDF Energy
Unit 2: Gas Insulated Switch Gear / Main Transformer /Unit Transformer / Auxiliary Transformer - HINK-A2-HT-02-GE-001
Other
Size: 200 KB
EDF Energy
Unit 1: Reactor Bldg / Fuel Bldg / Fuel Bldg Hall / Boron Storage / Safeguard Bldgs / Nuclear Auxiliary Bldg / Access Tower / Service Access Building 2 - HINK-A2-HR-01-GP-090
Other
Size: 121 KB
EDF Energy
Interim Spent Fuel Store - HINK-A2-HHK-00-GP-000
Other
Size: 197 KB
EDF Energy
Consultee List for Non Material Change 3
Other
Size: 1 MB
EDF Energy
Request for Non Material Change 3
Other
Size: 106 KB
Department for Business, Energy and Industrial Strategy
Letter to EDF Energy regarding proposed Non Material Change Application
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.