A30 Temple to Higher Carblake Improvement

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (25)

Developer's Application (98)

Acceptance (5)

Pre Examination (22)

Examination (240)

Decision (7)

Decided (5)

Date

SourceDescription
Other
Size: 334 KB
Cornwall Council
Response to the Examining Authority's request for further information dated 4 August 2014 (deadline 11.59pm on 6 August 2014).
Other
Size: 175 KB
Cornwall Council
Submission from Cornwall Council comprising comments on Blisland Commoners? Association?s response to request for further information dated 25 July 2014. The ExA accepted this as an additional submission on 6 August 2014.
Other
Size: 200 KB
Cornwall Council
Response to the Examining Authority's request for further information dated 4 August 2014 (deadline 11.59pm on 6 August 2014) comprising updated Application Document List (v4).
Other
Size: 312 KB
Cornwall Council
Response to the Examining Authority's request for further information dated 4 August 2014 (deadline 11.59pm on 6 August 2014) comprising updated Mitigation Tracker (v5).
Other
Size: 281 KB
Cornwall Council
Response to the Examining Authority's request for further information dated 4 August 2014 (deadline 11.59pm on 6 August 2014) comprising updated Environmental Mitigation Schedule (v3).
Other
Size: 113 KB
Ian Lamond on behalf of Bruce Robertson and Trago Mills Limited
Letter to the ExA from Ian Lamond on behalf of Bruce Robertson and Trago Mills Ltd. The ExA accepted this as an additional submission on 6 August 2014.
Other
Size: 67 KB
Notification of Completion of ExA Examination
Other
Size: 9 KB
Altarnun Parish Council
Submission from Altarnun Parish Council; a non-interested party. The ExA accepted this as an additional submission on 4 August 2014
Other
Other
Size: 1 MB
Cornwall Council
Submission from Cornwall Council comprising response to letter from Natural England. The ExA accepted this as an additional submission on 1 August 2014.
Other
Size: 199 KB
Cornwall Council
Submission from Cornwall Council comprising updated Application Document List (v3a). The ExA accepted this as an additional submission on 1 August 2014
Other
Size: 18 KB
Environment Agency
Response to the Examining Authority's request for further information dated 25 July 2014 (deadline 12 noon on 1 August 2014)
Other
Size: 199 KB
Cornwall Council
Submission from Cornwall Council comprising updated Application Documents List (v3). The ExA accepted this as an additional submission on 1 August 2014.
Other
Size: 133 KB
Cornwall Council
Submission from Cornwall Council comprising update on Road Safety Audit 2. The ExA accepted this as an additional submission on 1 August 2014
Other
Size: 58 KB
Blisland Commoner's Association
Response to the Examining Authority's request for further information dated 25 July 2014 (deadline 12 noon on 1 August 2014)
Other
Size: 236 KB
English Heritage
Response to the Examining Authority's request for further information dated 25 July 2014 (deadline 12 noon on 1 August 2014)
Other
Size: 147 KB
Natural England
Response to letter from Cornwall Council following the applicant's recently completed NVC Assessment on the Option M5 replacement land for SSSI. The ExA accepted this as an additional submission on 1 August 2014.
Other
Size: 45 KB
Cornwall Council (as ordinary watercourse regulator)
Response to the Examining Authority's request for further information dated 25 July 2014 (deadline 12 noon on 1 August 2014)
Other
Size: 195 KB
Natural England
Response to the Examining Authority's request for further information dated 25 July 2014 (deadline 12 noon on 1 August 2014)
Other
Size: 9 MB
Cornwall Council
Response to the Examining Authority's request for further information dated 25 July 2014 (deadline 12 noon on 1 August 2014)
Other
Size: 747 KB
Jan Trefusis
Response to the Examining Authority's request for further information dated 25 July 2014 (deadline 12 noon on 1 August 2014)
Other
Size: 20 KB
Environment Agency
Submission from the Environment Agency comprising response to applicant's provision of annotated attenuation basin plans. The ExA accepted this as an additional submission on 1 August 2014.
Other
Size: 183 KB
Cornwall Council
Letter Cornwall Council to Natural England following the applicant's recently completed NVC Assessment on the Option M5 replacement land for SSSI. The ExA accepted this as an additional submission on 29 July 2014.
Other
Size: 601 KB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising v8 draft Development Consent Order - with track changes from v1
Other
Size: 164 KB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising written summary of oral submissions put at the Higher Carblake compulsory acquisition hearing held on 22 July 2014
Other
Size: 7 MB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising Higher Carblake ? Vehicle Swept Paths of Existing & Proposed Junction
Other
Size: 539 KB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising v8 draft Development Consent Order - with track changes from v7
Other
Size: 504 KB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising v8 draft Development Consent Order - clean
Other
Size: 128 KB
SM Facer on behalf of Bodmin Town Council
Submission from Bodmin Town Council; a non-interested party. The ExA accepted this as an additional submission on 29 July 2014.
Other
Size: 2 MB
Cornwall Council
Correspondence between Cornwall Council and the Environment Agency regarding surface water attenuation basin drawings. The ExA accepted this as an additional submission on 30 July 2014.
Other
Size: 20 KB
Environment Agency
Correspondence from the Environment Agency regarding surface water attenuation basin drawings. The ExA accepted this as an additional submission on 29 July 2014.
Other
Size: 2 MB
Jo Maynard on behalf of Mr R Cornelius
Letter to the ExA from Stags on behalf of Mr R Cornelius. The ExA accepted this as an additional submission on 28 July 2014.
Other
Size: 169 KB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising LEMP ? Schedule of Works for Delivery of SSSI Notification Features on Replacement Land
Other
Size: 33 MB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising v3 draft CEMP (Part 1)
Other
Size: 19 MB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising v3 LEMP - with track changes from v2
Other
Size: 19 MB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising v3 LEMP - clean
Other
Size: 310 KB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising v4 Mitigation Tracker
Other
Size: 5 MB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising an Option M5 Deed of Variation Plan
Other
Size: 38 MB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising v3 draft CEMP (Part 4)
Other
Size: 199 KB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising a revised application documents list
Other
Size: 38 MB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising v3 draft CEMP (Part 3)
Other
Size: 2 MB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising National Vegetation Classification Assessment 2014
Other
Size: 278 KB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising v2 Environmental Mitigation Schedule
Other
Size: 36 MB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising v3 draft CEMP (Part 2)
Other
Size: 146 KB
Cornwall Council
Submission to Deadline VII (12 noon on 29 July 2014) comprising Dormouse inteim survey results.
Other
Size: 5 MB
Jo Maynard on behalf of Mr and Mrs SJ Gibson
Submission to Deadline VII (12 noon on 29 July 2014) comprising written summary of oral submissions put at the Higher Carblake compulsory acquisition hearing held on 22 July 2014
Other
Size: 66 KB
Michael Martin on behalf of Temple to Bodmin A30 Action Group
Submission to Deadline VII (12 noon on 29 July 2014) comprising written summary of oral submissions put at the Higher Carblake compulsory acquisition hearing held on 22 July 2014
Other
Size: 2 MB
Ian Lamond on behalf of Bruce Robertson and Trago Mills Limited
Submission to Deadline VII (12 noon on 29 July 2014) comprising written summary of oral submissions put at the Higher Carblake compulsory acquisition hearing held on 22 July 2014 and FOI correspondence
Other
Size: 98 KB
Compulsory acquisition hearing on matters relating to Higher Carblake - Final Agenda
Final agenda for the compulsory acquisition hearing on matters relating to Higher Carblake scheduled for 22 July 2014 at 10am
Other
Size: 96 KB
Request for further information dated 25th July 2014
Other
audio recording
Size: 142 MB
Part 3 of CAH Audio Recording
Part 3 of the audio recording of the Compulsory Acquisition Hearing on matters relating to Higher Carblake held on 22 July 2014
Other
Size: 3 MB
Ian Lamond on behalf of Bruce Robertson and Trago Mills Limited
Cornwall Council response to Environmental Information Regulation 2004 and Freedom of Information Act 2000 request by Ian Lamond on behalf of Bruce Robertson and Trago Mills Limited. The ExA accepted this as an additional submission on 22 July 2014
Other
Size: 320 KB
Cornwall Council
Cornwall Council response to Supplementary Written Representation by MJ Paddle on behalf of Bruce Robertson and Trago Mills Limited. The ExA accepted this as an additional submission on 22 July 2014
Other
Size: 207 KB
Ian Lamond on behalf of Bruce Robertson and Trago Mills Limited
Correspondence from Ian Lamond on behalf of Bruce Robertson and Trago Mills Limited to Cornwall Council. The ExA accepted this as an additional submission on 17 July 2014
Other
Size: 22 KB
Compulsory acquisition hearing on matters relating to Higher Carblake - Draft Agenda
Draft agenda for the compulsory acquisition hearing on matters relating to Higher Carblake scheduled for 22 July 2014 at 10am
Other
audio recording
Size: 80 MB
Part 2 of CAH Audio Recording
Part 2 of the audio recording of the Compulsory Acquisition Hearing on matters relating to Higher Carblake held on 22 July 2014
Other
audio recording
Size: 98 MB
Part 1 of CAH Audio Recording
Part 1 of the audio recording of the Compulsory Acquisition Hearing on matters relating to Higher Carblake held on 22 July 2014
Other
Size: 1 MB
Ian Lamond on behalf of Bruce Robertson and Trago Mills Ltd
Submission to the Compulsory Acquisition Hearing on Higher Carblake held on 22 July 2014
Other
Size: 391 KB
Cornwall Council
Submission to the Compulsory Acquisition Hearing on Higher Carblake held on 22 July 2014 comprising applicant's updated CV's of key personnel
Other
Size: 5 MB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 5 MB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 21 MB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 8 MB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 19 MB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 602 KB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 503 KB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 19 MB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 5 MB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 2 MB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 774 KB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 1 MB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 14 MB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 5 MB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 539 KB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 4 MB
Cornwall Council
Information provided by Cornwall Council to accompany proposed substitution of replacement common land. The ExA accepted this as an additional submission on 18 July 2014.
Other
Size: 49 KB
Cornwall Council
Errata sheet to submission from Cornwall Council comprising assessment of Mr Robertson?s alternative access arrangements for Higher Carblake (Technical Note 05). The ExA accepted this as an additional submission on 18 July 2014
Other
Size: 431 KB
Cornwall Council
Submission to the Issue Specific Hearing on Mitigation held at 10am on 23 June 2014 comprising of the applicant's CVs of key personnel
Other
Size: 790 KB
Cornwall Council
Submission to the Open Floor Hearing held at 10am on 27 June 2014 comprising of version 5.2 of the Development Consent Order (DCO) (tracked)
Other
Size: 3 MB
Christopher Anderson on behalf of Rupert Hanbury-Tenison
Submission to the Issue Specific Hearing on highway design held at 2pm on 25 June 2014
Other
Size: 2 MB
Cornwall Council
Submission to Deadline VI (12 noon on 3 July 2014) comprising of a Statement of Common Ground between Cornwall Council and Environment Agency
Other
Size: 181 KB
Michael Martin on behalf of Temple to Bodmin A30 Action Group
Response to the Examining Authority's request for further information dated 20 June 2014 (deadline 12 noon on 4 July 2014)
Other
Size: 146 KB
Cornwall Council
Submission to Deadline VI (12 noon on 3 July 2014) comprising a written summary of an oral case put at the Issue Specific Hearing on Mitigating Measures held on 23 June 2014
Other
Size: 747 KB
Ian Lamond on behalf of Bruce Robertson and Trago Mills Limited
Submission to the Issue Specific Hearing on highway design held at 2pm on 25 June 2014
Other
Size: 103 KB
David Stevens on behalf of Cardinham Parish Council
Response to the Examining Authority's request for further information dated 20 June 2014 (deadline 12 noon on 4 July 2014)
Other
Size: 36 KB
Lesley Martin
Response to the Examining Authority's request for further information dated 20 June 2014 (deadline 12 noon on 4 July 2014)
Other
Size: 142 KB
MJ Paddle on behalf of Bruce Robertson and Trago Mills Limited
Response to the Examining Authority's request for further information dated 20 June 2014 (deadline 12 noon on 4 July 2014)
Other
Size: 217 KB
Cornwall Council
Submission to Deadline VI (12 noon on 3 July 2014) comprising a written summary of an oral case put at the Issue Specific Hearing on Highway Design held on 25 June 2014
Other
Size: 340 KB
Mark Bunt on behalf of Mr and Mrs Underwood
Response to the Examining Authority's request for further information dated 20 June 2014 (deadline 12 noon on 4 July 2014)
Other
Size: 440 KB
Natural England
Submission to Deadline VI (12 noon on 3 July 2014) comprising a written summary of an oral case put at the hearings held between 23 and 27 June 2014 and response to the Examining Authority's request for further information dated 20 June 2014 (deadline 12 noon on 4 July 2014). The former part of this submission was accepted late by the Examining Authority on 4 July 2014
Other
Size: 504 KB
Cornwall Council
Response to the Examining Authority's request for further information dated 20 June 2014 (deadline 12 noon on 4 July 2014)
Other
Size: 138 KB
Cornwall Council
Submission to Deadline VI (12 noon on 3 July 2014) comprising a written summary of an oral case put at the Open Floor Hearing held on 27 June 2014
Other
Size: 109 KB
Peter and Sue Crier
Response to the Examining Authority's request for further information dated 20 June 2014 (deadline 12 noon on 4 July 2014)
Other
Size: 336 KB
Mark Bunt on behalf of Mr and Mrs Hendry
Response to the Examining Authority's request for further information dated 20 June 2014 (deadline 12 noon on 4 July 2014)
Other
Size: 142 KB
Cornwall Council
Submission to Deadline VI (12 noon on 3 July 2014) comprising a written summary of an oral case put at the Compulsory Acquisition Hearing 2 held on 26 June 2014
Other
Size: 143 KB
Cornwall Council
Submission to Deadline VI (12 noon on 3 July 2014) comprising a written summary of an oral case put at the second Issue Specific Hearing on the draft DCO held on 23 June 2014
Other
Size: 189 KB
Michael Martin on behalf of Temple to Bodmin A30 Action Group
Submission to Deadline VI (12 noon on 3 July 2014) comprising a written summary of an oral case put at the hearings held between 23 and 27 June 2014
Other
Size: 151 KB
Cornwall Council
Submission to Deadline VI (12 noon on 3 July 2014) comprising a written summary of an oral case put at the Issue Specific Hearing on Landscape and Ecology held on 25 June 2014
Other
Size: 127 KB
Cornwall Council
Submission to Deadline VI (12 noon on 3 July 2014) comprising of the applicant's note on the LEMP schedule
Other
Size: 345 KB
Cornwall Council
Submission to the Issue Specific Hearing on Mitigation held at 10am on 23 June 2014 comprising of an errata to the applicant's draft Landscape and Ecology Mitigation Plan (LEMP)
Other
Size: 139 KB
Cornwall Council
Submission to Deadline VI (12 noon on 3 July 2014) comprising a written summary of an oral case put at the Compulsory Acquisition Hearing 1 (Common Land) held on 26 June 2014
Other
Size: 1 MB
Jo Maynard on behalf of Mr and Mrs SJ Gibson
Submission to Deadline VI (12 noon on 3 July 2014) comprising a written summary of an oral case put at the hearings held between 23 and 27 June 2014
Other
Size: 502 KB
Cornwall Council
Submission to Deadline VI (12 noon on 3 July 2014) comprising of the revised draft Development Consent Order (DCO) (clean)
Other
Size: 3 MB
Christopher Anderson on behalf of Robert Hanbury-Tenison
Submission to Deadline VI (12 noon on 3 July 2014) comprising a written summary of an oral case put at the hearings held between 23 and 27 June 2014
Other
Size: 597 KB
Cornwall Council
Submission to Deadline VI (12 noon on 3 July 2014) comprising of the revised draft Development Consent Order (DCO) (with track changes from v1)
Other
Size: 655 KB
Jo Maynard on behalf of Mr R Cornelius
Submission to Deadline VI (12 noon on 3 July 2014) comprising a written summary of an oral case put at the Issue Specific Hearing on Highway Design held on 25 June 2014
Other
Size: 1 MB
Jo Maynard on behalf of Ms SE Outlaw and Mr IG Miles
Submission to Deadline VI (12 noon on 3 July 2014) comprising a written summary of an oral case put at the hearings held between 23 and 27 June 2014
Other
Size: 557 KB
Cornwall Council
Submission to Deadline VI (12 noon on 3 July 2014) comprising of the revised draft Development Consent Order (DCO) (with track changes from v5)
Other
Size: 24 MB
Cornwall Council
Submission to Deadline VI (12 noon on 3 July 2014) comprising of the revised Funding Statement
Other
audio recording
Size: 178 MB
CAH Audio Recording PM
Audio recording of the Compulsory Acquisition Hearing relating to general acquisition matters held on the afternoon of 26 June 2014
Other
audio recording
Size: 112 MB
OFH Audio Recording AM
Audio recording of the Open Floor Hearing held on the morning of 27 June 2014
Other
audio recording
Size: 68 MB
ISH Audio Recording AM
Audio recording of the Issue Specific Hearing on mitigation measures held on the morning of 23 June 2014
Other
Size: 72 KB
Notification of hearing adjournment
Other
audio recording
Size: 95 MB
CAH Audio Recording AM
Audio recording of the Compulsory Acquisition Hearing relating to the acquisition of common land held on the morning of 26 June 2014
Other
audio recording
Size: 38 MB
ISH Audio Recording AM
Audio recording of the Issue Specific Hearing on landscape and visual impacts and ecology held on the morning of 25 June 2014
Other
audio recording
Size: 94 MB
ISH Audio Recording PM
Audio recording of the Issue Specific Hearing on highway design held on the afternoon of 25 June 2014
Other
audio recording
Size: 59 MB
ISH Audio Recording PM
Audio recording of the second Issue Specific Hearing on the draft DCO held on the afternoon of 23 June 2014
Other
Size: 75 KB
Open Floor Hearing Final Agenda
Final agenda for the Open Floor Hearing held on 27 June 2014 at 10am
Other
Size: 81 KB
Compulsory Acquisition Hearing 2 Final Agenda
Final agenda for the Compulsory Acquisition Hearing including issues relating to general compulsory acquisition matters held on 26 June 2014 at 2pm
Other
Size: 130 KB
Issue Specific Hearing on Mitigation Measures Final Agenda
Final agenda for the Issue Specific Hearing on Mitigation held on 23 June 2014 at 10am
Other
Size: 94 KB
Compulsory Acquisition Hearing 1 Final Agenda
Final agenda for the Compulsory Acquisition Hearing including issues relating to compulsory acquisition of common land held on 26 June 2014 at 10am
Other
Size: 121 KB
Issue Specific Hearing on Landscape & Visual Impact and Ecology Final Agenda
Final agenda for the Issue Specific Hearing on landscape & visual impact and ecology held on 25 June 2014 at 10am
Other
Size: 91 KB
Issue Specific Hearing on Highway Design Final Agenda
Final agenda for the Issue Specific Hearing on highway design held on 25 June 2014 at 2pm
Other
Size: 108 KB
Second Issue Specific Hearing on the draft DCO Final Agenda
Final agenda for the second Issue Specific Hearing on the draft Development Consent Order (DCO) held on 23 June 2014 at 2pm
Other
Size: 105 KB
Draft agenda for the Compulsory Acquisition Hearing including issues relating to compulsory acquisition of common land
Draft agenda for the Compulsory Acquisition Hearing including issues relating to compulsory acquisition of common land scheduled for 26 June 2014 at 10am
Other
Size: 75 KB
Draft agenda for the Open Floor Hearing
Draft agenda for the Open Floor Hearing scheduled for 27 June 2014 at 10am
Other
Size: 708 KB
Ian Lamond on behalf of Bruce Robertson and Trago Mills Limited
Request made to ExA by Ian Lamond on behalf of Bruce Robertson and Trago Mills Limited. The ExA accepted this as an additional submission on 19 June 2014
Other
Size: 72 KB
Request for further information
Other
Size: 107 KB
Draft agenda for the second Issue Specific Hearing on the draft DCO
Draft agenda for the second Issue Specific Hearing on the draft Development Consent Order (DCO) scheduled for 23 June 2014 at 2pm
Other
Size: 103 KB
Draft agenda for the Issue Specific Hearing on highway design
Draft agenda for the Issue Specific Hearing on highway design scheduled for 25 June 2014 at 2pm
Other
Size: 106 KB
Draft agenda for the Issue Specific Hearing on landscape visual impact and ecology
Draft agenda for the Issue Specific Hearing on landscape visual impact and ecology scheduled for 25 June 2014 at 10am
Other
Size: 103 KB
Draft agenda for the Issue Specific Hearing on Mitigation
Draft agenda for the Issue Specific Hearing on Mitigation scheduled for 23 June 2014 at 10am
Other
Size: 19 MB
Cornwall Council
Submission from Cornwall Council comprising assessment of Mr Robertson?s alternative access arrangements for Higher Carblake (Technical Note 05). The ExA accepted this as an additional submission on 13 June 2014
Other
Size: 91 KB
Rule 9 Notification
Notification of procedural decision about how the application is to be examined
Other
Size: 120 MB
Cornwall Council
Submission to Deadline V (12 noon on 11 June 2014) comprising comments by interested parties on responses to ExA's second written questions.
Other
Size: 166 KB
Cornwall Coucil
Submission from Cornwall Council comprising comments on responses to written representations. The ExA accepted this as an additional submission on 12 June 2014
Other
Size: 31 MB
Cornwall Council
Itinerary for the Accompanied Site Inspection (ASI) part 1 - scheduled for 24 June 2014
Other
Size: 25 MB
Cornwall Council
Itinerary for the Accompanied Site Inspection (ASI) part 2 - scheduled for 24 June 2014
Other
Size: 158 KB
Ian Lamond on behalf of Bruce Robertson and Trago Mills Limited
Request made to ExA by Ian Lamond on behalf of Bruce Robertson and Trago Mills Limited. The ExA accepted this as an additional submission on 10 June 2014
Other
Size: 504 KB
Cornwall Council
Response to the Examining Authority's request for further information (deadline 12 noon on 6 June 2014) comprising of the revised draft Development Consent Order (DCO) - version 4 (clean)
Other
Size: 523 KB
Cornwall Council
Response to the Examining Authority's request for further information (deadline 12 noon on 6 June 2014) comprising of the revised draft Development Consent Order (DCO) - version 5 (with track changes from v1)
Other
Size: 541 KB
Cornwall Council
Response to the Examining Authority's request for further information (deadline 12 noon on 6 June 2014) comprising of the revised draft Development Consent Order (DCO) - version 5 (with track changes from v4)
Other
Size: 36 MB
Cornwall Council
Response to the Examining Authority's request for further information (deadline 12 noon on 6 June 2014) comprising of part 2 of the revised draft Construction Environment Management Plan (CEMP) - version 2
Other
Size: 2 MB
Cornwall Council
Response to the Examining Authority's request for further information (deadline 12 noon on 6 June 2014)
Other
Size: 32 MB
Cornwall Council
Response to the Examining Authority's request for further information (deadline 12 noon on 6 June 2014) comprising of part 1 of the revised draft Construction Environment Management Plan (CEMP) - version 2
Other
Size: 73 MB
Cornwall Council
Response to the Examining Authority's request for further information (deadline 12 noon on 6 June 2014) comprising of part 3 of the revised draft Construction Environment Management Plan (CEMP) - version 2
Other
Size: 273 KB
Cornwall Council
Response to the Examining Authority's request for further information (deadline 12 noon on 6 June 2014) comprising of the Environment Mitigation Schedule
Other
Size: 18 MB
Cornwall Council
Response to the Examining Authority's request for further information (deadline 12 noon on 6 June 2014) comprising of the revised draft Landscape and Ecology Management Plan (LEMP) - version 2 (with track changes from v1)
Other
Size: 18 MB
Cornwall Council
Response to the Examining Authority's request for further information (deadline 12 noon on 6 June 2014) comprising of the revised draft Landscape and Ecology Management Plan (LEMP) - version 2 (clean)
Other
Size: 115 KB
Natural England
Response to the Examining Authority's request for further information (deadline 12 noon on 6 June 2014)
Other
Size: 253 KB
Ian Lamond on behalf of Bruce Robertson & Trago Mills Limited
Request made to ExA by Ian Lamond on behalf of Bruce Robertson and Trago Mills Ltd. The ExA accepted this as an additional submission on 30 May 2014
Other
Size: 107 KB
Notification of procedural decision about how the application is to be examined
Other
Size: 119 KB
Cornwall Council
Copy of applicant?s notification of issue specific, open floor, and compulsory acquisition hearings under Rule 13(6) of The Infrastructure Planning (Examination Procedure) Rules 2010
Other
Size: 189 KB
Highways Agency
Late submission to Deadline IV (12 noon on 21 May 2014) comprising of response to the Examining Authority's second round of written questions issued on 30 April 2014. Accepted by the Examining Authority to be read in conjunction with the examination on 27 May 2014.
Other
Other
Size: 240 KB
Cornwall Council (Local Planning Authority)
Submission to Deadline IV (12 noon on 21 May 2014) comprising of responses to the Examining Authority's second round of written questions issued on 30 April 2014
Other
Size: 186 KB
Dominic Fairman on behalf of Blisland Commoners Association
Submission to Deadline IV (12 noon on 21 May 2014) comprising of responses to the Examining Authority's second round of written questions issued on 30 April 2014
Other
Size: 346 KB
Mark Bunt on behalf of Peter Underwood
Submission to Deadline IV (12 noon on 21 May 2014) comprising of responses to the Examining Authority's second round of written questions issued on 30 April 2014 and responses to oral representations given during the Issue Specific Hearing on the draft DCO held on 7 April 2014
Other
Size: 2 MB
Adrian Mansfield
Submission to Deadline IV (12 noon on 21 May 2014) comprising of responses to the Examining Authority's second round of written questions issued on 30 April 2014
Other
Size: 577 KB
Cornwall Council
Submission to Deadline IV (12 noon on 21 May 2014) comprising of the revised draft Development Consent Order (DCO) - version 4 (with track changes from v3)
Other
Size: 502 KB
Cornwall Council
Submission to Deadline IV (12 noon on 21 May 2014) comprising of the revised draft Development Consent Order (DCO) - version 4 (clean)
Other
Size: 521 KB
Cornwall Council
Submission to Deadline IV (12 noon on 21 May 2014) comprising of the revised draft Development Consent Order (DCO) - version 4 (with track changes from v1)
Other
Size: 49 KB
Ian Lamond on behalf of Charles Robertson (Developments) Limited
Submission to Deadline IV (12 noon on 21 May 2014) comprising of responses to the Examining Authority's second round of written questions issued on 30 April 2014
Other
Size: 24 KB
Environment Agency
Submission to Deadline IV (12 noon on 21 May 2014) comprising of responses to the Examining Authority's second round of written questions issued on 30 April 2014
Other
Size: 311 KB
Cornwall Council
Submission to Deadline IV (12 noon on 21 May 2014) comprising of National Networks National Policy Statement Commentary
Other
Size: 60 KB
Ian Lamond on behalf of Bruce Robertson
Submission to Deadline IV (12 noon on 21 May 2014) comprising of responses to the Examining Authority's second round of written questions issued on 30 April 2014
Other
Size: 198 KB
Natural England
Submission to Deadline IV (12 noon on 21 May 2014) comprising of responses to the Examining Authority's second round of written questions issued on 30 April 2014
Other
Size: 21 MB
Cornwall Council
Submission to Deadline IV (12 noon on 21 May 2014) comprising of part 1 of Cornwall Council's responses to the Examining Authority's second round of written questions issued on 30 April 2014
Other
Size: 496 KB
Cornwall Council
Submission to Deadline IV (12 noon on 21 May 2014) comprising of the revised Mitigation Schedule - version 3 (tracked changed from v2)
Other
Size: 25 MB
Cornwall Council
Submission to Deadline IV (12 noon on 21 May 2014) comprising of part 2 of Cornwall Council's responses to the Examining Authority's second round of written questions issued on 30 April 2014
Other
Size: 428 KB
Cornwall Council
Submission to Deadline IV (12 noon on 21 May 2014) comprising of the revised Mitigation Schedule - version 3 (clean)
Other
Size: 103 KB
Natural England
Technical note on Golden Plover relating to Cornwall Council/Natural England SOCG. The ExA accepted this as an additional submission on 2 May 2014.
Other
Size: 142 KB
Ian Lamond on behalf of Bruce Robertson & Trago Mills Limited
Request made to ExA by Ian Lamond on behalf of Bruce Robertson and Trago Mills Ltd. The ExA accepted this as an additional submission on 2 May 2014
Other
Size: 93 KB
Examining Authority's Second Written Questions
Other
Size: 72 KB
Notification of Second Round Questions
Other
Size: 8 MB
Cornwall Council
Applicant?s draft Landscape and Ecology Management Plan (LEMP). The ExA accepted this as an additional submission on 23 April 2014.
Other
Size: 45 KB
Cornwall Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of the updated Book of Reference
Other
Size: 563 KB
Cornwall Council
Submission to Deadline III (12 noon on 15 April 2014) comprising of the revised draft Development Consent Order (DCO) (with track changes from v2)
Other
Size: 172 KB
Cornwall Council
Submission to Deadline III (12 noon on 15 April 2014) comprising of post-hearing documents including any written summary of an oral case put at the Issue Specific Hearing on the draft DCO and any documents/amendments requested orally by the Examining Authority
Other
Size: 500 KB
Cornwall Council
Submission to Deadline III (12 noon on 15 April 2014) comprising of the revised draft Development Consent Order (DCO) (clean)
Other
Size: 514 KB
Cornwall Council
Submission to Deadline III (12 noon on 15 April 2014) comprising of the revised draft Development Consent Order (DCO) (with track changes from v1)
Other
Size: 684 KB
Ian Lamond on behalf of Charles Robertson (Developments) Ltd
Submission to Deadline III (12 noon on 15 April 2014) comprising of post-hearing documents including any written summary of an oral case put at the Issue Specific Hearing on the draft DCO and any documents/amendments requested orally by the Examining Authority
Other
Size: 1 MB
Jo Maynard on behalf of Mr and Mrs Gibson
Submission to Deadline III (12 noon on 15 April 2014) comprising of post-hearing documents including any written summary of an oral case put at the Issue Specific Hearing on the draft DCO and any documents/amendments requested orally by the Examining Authority
Other
Size: 684 KB
Ian Lamond on behalf of Bruce Robertson
Submission to Deadline III (12 noon on 15 April 2014) comprising of post-hearing documents including any written summary of an oral case put at the Issue Specific Hearing on the draft DCO and any documents/amendments requested orally by the Examining Authority
Other
Size: 838 KB
Jo Maynard on behalf of Mr R Cornelius
Submission to Deadline III (12 noon on 15 April 2014) comprising of post-hearing documents including any written summary of an oral case put at the Issue Specific Hearing on the draft DCO and any documents/amendments requested orally by the Examining Authority
Other
Size: 174 KB
Cornwall Council
Submission to Deadline III (12 noon on 15 April 2014) comprising of comments on Cornwall Council's (Local Authority) Local Impact Report submitted for Deadline II
Other
Size: 267 KB
Cornwall Council
Submission to Deadline III (12 noon on 15 April 2014) comprising of the revised Mitigation Schedule (track changed)
Other
Size: 388 KB
Cornwall Council
Submission to Deadline III (12 noon on 15 April 2014) comprising of comments on responses to the Examining Authority's first round of written questions issued on 24 February 2014
Other
Size: 138 KB
Cornwall Council
Submission to Deadline III (12 noon on 15 April 2014) comprising of the Private Agreements Schedule
Other
Size: 245 KB
Cornwall Council
Submission to Deadline III (12 noon on 15 April 2014) comprising of comments on responses to the Examining Authority's first round of written questions issued on 24 February 2014
Other
Size: 283 KB
Cornwall Council
Submission to Deadline III (12 noon on 15 April 2014) comprising of the revised Mitigation Schedule (clean)
Other
Size: 4 MB
Cornwall Council
Submission to Deadline III (12 noon on 15 April 2014) comprising of comments on Written Representations submitted for Deadline II
Other
Size: 45 KB
Cornwall Council
Submission to Deadline III (12 noon on 15 April 2014) comprising of the revised Book of Reference (clean)
Other
Size: 45 KB
Cornwall Council
Submission to Deadline III (12 noon on 15 April 2014) comprising of the revised Book of Reference (track changed)
Other
audio recording
Size: 174 MB
ISH Audio Recording
Audio recording of the Issue Specific Hearing on the draft DCO held on 7 April 2014
Other
Size: 43 MB
Itinerary for the Accompanied Site Inspection - 8 April 2014
Revised itinerary for the Accompanied Site Inspection (ASI) scheduled for 8 April 2014, which supersedes the itierary published on 2 April 2014
Other
Size: 521 KB
Cornwall Council
Applicant?s revised draft Development Consent Order with track changes. This supersedes the applicant's submission on 19 March 2014 (Deadline II). The ExA accepted this as an additional submission on 1 April 2014
Other
Size: 467 KB
Cornwall Council
Applicant?s revised draft Development Consent Order. This supersedes the applicant's submission on 19 March 2014 (Deadline II). The ExA accepted this as an additional submission on 1 April 2014
Other
Size: 105 KB
Agenda for the Issue Specific Hearing on the draft DCO
Revised agenda for the Issue Specific Hearing on the draft Development Consent Order (DCO) scheduled for 7 April 2014 at 10am, which supersedes the agenda published on 2 April 2014
Other
Size: 449 KB
Osborne Clark on behalf of Western Power Distribution (South West) Plc
Letter confirming Western Power Distribution (South West) Plc has resolved potential issues relevant to its interest in the A30 Temple to Higher Carblake Improvement Scheme and request for withdrawal of its Relevant Representation
Other
Size: 22 KB
Christopher Anderson on behalf of Rupert Hanbury-Tenison
Submission to Deadline II (12 noon on 19 March 2014) comprising of suggestions for the Accompanied Site Inspection scheduled for 8 April 2014
Other
Size: 49 MB
Cornwall Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of suggestions for the Accompanied Site Inspection scheduled for 8 April 2014
Other
Size: 8 MB
Cornwall Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of a Statement of Common Ground between Cornwall Council and Blisland Commoners Association
Other
Size: 8 MB
Ian Lamond on behalf of Bruce Robertson
Submission to Deadline II (12 noon on 19 March 2014) comprising of Written Representations and response to the Examining Authority's first round of written questions issued on 24 February 2014
Other
Size: 23 KB
Ian Lamond on behalf of Bruce Robertson and Charles Robertson (Developments) Limited)
Submission to Deadline II (12 noon on 19 March 2014) comprising of suggestions for the Accompanied Site Inspection scheduled for 8 April 2014
Other
Size: 300 KB
Highways Authority
Late submission to Deadline II (12 noon on 19 March 2014) comprising of responses to the Examining Authority's first round of written questions issued on 24 February 2014 accepted by the Examining Authority on 20 March 2014
Other
Size: 2 MB
Cornwall Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of a Statement of Common Ground between Cornwall Council and the Cyclist's Touring Club
Other
Size: 5 MB
Cornwall Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of comments on Relevant Representations
Other
Size: 71 KB
Devon County Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of Written Representations
Other
Size: 113 KB
Cornwall Council (Local Authority)
Late submission to Deadline II (12 noon on 19 March 2014) comprising of a Local Impact Report accepted by the Examining Authority on 20 March 2014
Other
Size: 10 KB
Martyn Aldis on behalf of Cyclists' Tourist Club
Submission to Deadline II (12 noon on 19 March 2014) comprising of responses to the Examining Authority's first round of written questions issued on 24 February 2014
Other
Size: 33 KB
Michael Martin on behalf of Temple to Bodmin A30 Action Group
Submission to Deadline II (12 noon on 19 March 2014) comprising of Written Representations
Other
Size: 194 KB
Mark Blunt on behalf of Peter Underwood
Submission to Deadline II (12 noon on 19 March 2014) comprising of responses to the Examining Authority's first round of written questions issued on 24 February 2014
Other
Size: 15 KB
John Martyn Aldis on behalf of Cyclists' Touring Club
Submission to Deadline II (12 noon on 19 March 2014) comprising of Written Representations
Other
Size: 43 KB
Lesley Martin
Submission to Deadline II (12 noon on 19 March 2014) comprising of Written Representations
Other
Size: 923 KB
Christopher Anderson on behalf of Rupert Hanbury-Tenison
Submission to Deadline II (12 noon on 19 March 2014) comprising of responses to the Examining Authority's first round of written questions issued on 24 February 2014
Other
Size: 3 MB
Cornwall Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of a Statement of Common Ground between Cornwall Council and Natural England
Other
Size: 5 MB
Cornwall Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of a Statement of Common Ground between Cornwall Council, English Heritage and Cornwall Historic Environment Service
Other
Size: 632 KB
Cornwall Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of revised draft Development Consent Order (clean)
Other
Size: 826 KB
Cornwall Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of a Statement of Common Ground between Cornwall Council and Western Power Distribution (South West) plc
Other
Size: 8 MB
Cornwall Council
Additional submission accepted by the Examining Authority on 20 March 2014
Other
Size: 396 KB
Cornwall Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of revised draft Development Consent Order (with track changes)
Other
Size: 467 KB
KCS Hicks on behalf of Graham Spittey
Submission to Deadline II (12 noon on 19 March 2014) comprising of Written Representations
Other
Size: 1 MB
Natural England
Submission to Deadline II (12 noon on 19 March 2014) comprising of Written Representations
Other
Size: 8 MB
Ian Lamond on behalf of Charles Robertson (Developments) Limited
Submission to Deadline II (12 noon on 19 March 2014) comprising of Written Representations and response to the Examining Authority's first round of written questions issued on 24 February 2014
Other
Size: 160 KB
Natural England
Submission to Deadline II (12 noon on 19 March 2014) comprising of responses to the Examining Authority's first round of written questions issued on 24 February 2014
Other
Size: 4 MB
Christopher Anderson on behalf of Rupert Hanbury-Tenison
Submission to Deadline II (12 noon on 19 March 2014) comprising of Written Representations
Other
Size: 78 KB
Environment Agency
Submission to Deadline II (12 noon on 19 March 2014) comprising of Written Representations
Other
Size: 26 MB
Cornwall Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of responses to the Examining Authority's first round of written questions issued on 24 February 2014 (Part 1)
Other
Size: 77 MB
Cornwall Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of responses to the Examining Authority's first round of written questions issued on 24 February 2014 (Part 2)
Other
Size: 1 MB
Michael Pennington on behalf of Victor Newman
Submission to Deadline II (12 noon on 19 March 2014) comprising of Written Representations
Other
Size: 3 MB
Cornwall Council
Submission to Deadline II (12 noon on 19 March 2014) comprising of responses to the Examining Authority's first round of written questions issued on 24 February 2014 (Part 3)
Other
Size: 723 KB
SM Facer on behalf of Bodmin Town Council
Submission to Deadline II from Bodmin Town Council; a non-interested party. The ExA accepted this as an additional submission on 18 March 2014.
Other
Size: 744 KB
Cornwall Council
Copy of applicant?s notification of issue specific hearing on the draft Development Consent Order under Rule 13(6) of The Infrastructure Planning (Examination Procedure) Rules 2010
Other
Size: 108 KB
Notification of Hearings ASI and timetable corrections
Other
Size: 20 KB
Environment Agency
Submission to Deadline I (12 noon on 3 March 2014) comprising comments on the other environmental information provided by the applicant on 8 January 2014 and published to the A30 Temple to Higher Carblake Improvement project webpage on 14 January 2014.
Other
Size: 39 KB
Blisland Commoners' Association
Submission to Deadline I (12 noon on 3 March 2014) comprising comments on the other environmental information provided by the applicant on 8 January 2014 and published to the A30 Temple to Higher Carblake Improvement project webpage on 14 January 2014.
Other
Size: 242 KB
Examining Authority's first written questions
The Examining Authority?s first written questions and requests for information
Other
Size: 255 KB
Rule 8 letter
Letter to parties including the examination timetable; details of the publication of the Examining Authority?s first written questions to parties; and other matters
Other
Size: 144 KB
Preliminary Meeting Note
Note of the Preliminary Meeting held on 6 February 2014
Other
audio recording
Size: 89 MB
Preliminary Meeting Audio
Audio Recording of the Preliminary Meeting held on 6 February 2014
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.