Preesall Saltfield Underground Gas Storage

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (0)

Developer's Application (265)

Acceptance (0)

Pre Examination (33)

Examination (182)

Decision (36)

Decided (329)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 45 MB
9.2.2 Geological Summary Report
Other
Size: 457 KB
9.4.6 Technical Explanation of Draft DCO Schedule 1
Other
Size: 2 MB
9.2.5 Review of the Proposed Drilling and Completion Programmes
Other
Size: 4 MB
9.1.3 Project Overview
Other
Size: 4 MB
9.1.5 Preesall Needs Case
Other
Size: 8 MB
9.1.6 Construction Report
Other
Size: 4 MB
9.1.8 Health Impact Appendices
Other
Size: 8 MB
9.1.2 Design and Access Statement
Other
Size: 11 MB
9.2.1 Legacy Brinewell Impact Assessment
Other
Size: 2 MB
4.2 Application for Deemed Marine Consent
Other
Size: 139 KB
9.1.4 Development Consent Obligations (Draft Heads of Terms)
Other
Size: 12 MB
9.2.4 Assessment of Brinewell 45 Incident (Subsurface Aspects)
Other
Size: 34 MB
9.2.3 NTS Interconnector Preesall Subsidence Assessment Report
Other
Size: 18 MB
9.1.7 Health Impact Assessment
Other
Size: 36 MB
9.2.6 Gas Interconnector Pipeline to the NTS
Other
Size: 15 MB
9.3.1 Risk Assessment
Other
Size: 4 MB
9.1.1 Planning and Sustainability Statement
Other
Size: 25 MB
9.2.7 Seismic Desk Study
Other
Size: 11 MB
4.1 Application for Deemed Hazardous Substances Consent
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.