Preesall Saltfield Underground Gas Storage

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (0)

Developer's Application (265)

Acceptance (0)

Pre Examination (33)

Examination (182)

Decision (36)

Decided (329)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 9 MB
2.5 m Wellhead Compounds and Indicative Cavern Layout
Other
Size: 7 MB
2.5 n Pipeline and Brine Outfall
Other
Size: 15 MB
2.5 b Pipelines-Brine Outfall
Other
Size: 38 MB
2.5 g Gas Compressor Compound
Other
Size: 17 MB
2.5.a Temporary Construction Compounds
Other
Size: 28 MB
2.3.Work Plans
Other
Size: 27 MB
2.5 k Hazardous Substance Aplication
Other
Size: 20 MB
2.5 d Seawater Pump Station
Other
Size: 36 MB
2.5 o General
Other
Size: 4 MB
2.5 j Metering Station
Other
Size: 36 MB
2.5 f Gas Storage Cavern and Wellhead Compounds
Other
Size: 14 MB
2.5 i Proposed Access Road
Other
Size: 39 MB
2.5 e Booster Pump Station
Other
Size: 47 MB
2.5 c Master Plans
Other
Size: 26 MB
2.1 Application Boundary
Other
Size: 22 MB
2.5 h Security Entrance and Support Facilities
Other
Size: 6 MB
2.5 l Directionally Drilled River Crossings
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.