Thames Tideway Tunnel

The views expressed in this page do not represent those of the Planning Inspectorate. This page consists of content submitted to the Planning Inspectorate by the public and other interested parties, giving their views of this proposal.

Thames Tideway Tunnel

Received 22 April 2013
From David Roberts

Representation

Re. Protection measures
We live at   ,   ,     . According to your plans the proposed works on Barn Elm Fields will be directly outside our bedroom windows. I am a shift worker (paramedic), i also have two school age children and a partner with irregular hours seven days a week and would obviously be disturbed by any works in this area. I need to know the extent of these planned works ie. 24 hrs working, flood lit, noise levels, start and finish dates. Also what protective measures you are prepared to put in place to assure that our living situation does not become impossible.