Thames Tideway Tunnel

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (0)

Developer's Application (406)

Acceptance (28)

Pre Examination (59)

Examination (1978)

Decision (41)

Decided (91)

Date

SourceDescription
Other
Size: 179 MB
131112 W010001 Audio Recording Part 3
Part 3 of the recording of the hearing on 12 November '13.
Other
Size: 43 MB
131111 W010001 Audio Recording Part 1
Part 1 of the recording of the hearing on 11 November '13.
Other
audio recording
Size: 53 MB
140220 WW010001 Issue Specific Hearing Recording AM Part 1
Part 1 of the AM recording of the hearing on 20 February '14
Other
Size: 119 MB
131111 W010001 Audio Recording Part 2
Part 2 of the recording of the hearing on 11 November '13.
Other
Size: 76 KB
APP198.09 Response to the Cory Environmental 3 March 2014 submission
Other
Size: 182 KB
APP207.01 River Transport Strategy - Drafting Notes
Other
Size: 77 KB
APP214.03 Position Statement - Cannon Wharf
Other
Size: 524 KB
140121 Thames Tideway Tunnel RIES
The Examining Authority's Report on the Implications for European Sites
Other
Size: 297 KB
APP213.02 Exceptional Hardship Procedure - Comparite against 3 March 2014
Other
Size: 1,002 KB
APP208.01.03 ES Update Report Appendices - 11 March 2014 - Sediment Fluxes in the Tidal Thames
Other
Size: 379 KB
APP208.01.12 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables King George's Park
Other
Size: 69 MB
131114 W010001 Audio Recording Part 2
Part 2 of the recording of the hearing on 14 November '13.
Other
Size: 89 MB
131115 W010001 Audio Recording Part 2
Part 2 of the recording of the hearing on 15 November '13.
Other
Size: 237 KB
130926 WW010001 Rule 8 Letter
A letter setting out procedrual decisions made at and following the Preliminary Meeting. This letter attaches the timetable for the examination.
Other
Size: 42 KB
s102A notice
A letter notifying the applicant that a party has become an Interested Party under S102A of the Planning Act 2008
Other
Size: 64 KB
131015 WW010001 Hearing notice and changes decision
Notification of dates, times and places of hearings and a procedural decision on changes to the application.
Other
Size: 45 KB
130926 WW010001 S102A Notice
A letter notifying the applicant that parties have become Interested Parties under S102A of the Planning Act 2008.
Other
Size: 227 KB
130926 WW010001 Panels First Written Questions
Panel's First Written Questions. This is the document referred to in the Panel's letter of 26 September 2013
Other
Size: 4 MB
131107 WW010001 Section 131 and 132 App 3c Schedule of Land - Appendix B (ii)
For information only - The application to which this document relates will not be examined as part of the examination of this DCO application.
Other
Size: 2 MB
APP54 Thames Water Historic Environment
Other
Other
Size: 128 KB
131107 WW010001 Section 131 and 132 App 3 Schedule of Land
For information only - The application to which this document relates will not be examined as part of the examination of this DCO application.
Other
Size: 43 KB
131127 WW010001 S102A notice
A letter notifying the applicant that parties have become Interested Parties under s102A of the Planning Act 2008
Other
Size: 88 KB
131219 W010001 Hearing and Site Visit Notice
Notification of dates, times and places of hearings and site vists, and other matters.
Other
Size: 122 KB
140220 Information Request
Examining authority?s request for information ? responses to be received by the Examining authority on or before 3 March 2014
Other
Size: 14 MB
131107 WW010001 Section 131 and 132 App 4 Plans of Affected Sites
For information only - The application to which this document relates will not be examined as part of the examination of this DCO application.
Other
Size: 353 KB
APP88 Covering Letter (DCO CoCP and S106)
Other
Size: 628 KB
APP56.04.07 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Kirtling Street
Other
Size: 964 KB
APP56.04.06 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Cremorne Wharf Depot
Other
Size: 100 KB
140130 WW010001 TTT s95A Appointment & Hearing Notice
Appointment of examiners and hearing notice relating to the closed hearing
Other
Size: 83 KB
131015 WW010001 Changes decision reasoning
This is the document referred to in the procedural decision of 15 October 2013.
Other
Size: 47 KB
140108 WW010001 Hearing Notice
Notification of the date, time and place of a hearing.
Other
Size: 44 KB
131104 WWW010001 S102A notice
A letter notifying the applicant that parties have become Interested Parties under s102A of the Planning Act 2008
Other
Size: 74 KB
140220 Timetable amendment and other matters
Examining authority?s request for further information, notification of variation of the timetable and notification of accompanied site inspection.
Other
Size: 805 KB
APP56.04.11 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Earl Pumping Station
Other
Size: 1 MB
131107 WW010001 Section 131 and 132 App 2 Supporting Statement
For information only - The application to which this document relates will not be examined as part of the examination of this DCO application.
Other
Size: 153 KB
131203 WW010001 Unity Harvey letter appreciation
Other
Size: 382 KB
131107 WW010001 Section 131 and 132 App 1 Covering Letter
For information only - The application to which this document relates will not be examined as part of the examination of this DCO application.
Other
Size: 66 KB
130912 WW010001 TTT PM Note
A note of the Preliminary Meeting
Other
audio recording
Size: 90 MB
140123 WW010001 Audio Recording Part 1 (PM)
Part 1 of the PM recording of the hearing on 23 January '14
Other
audio recording
Size: 62 MB
140123 WW010001 Audio Recording Part 2 (AM)
Part 2 of the AM recording of the hearing on 23 January '14
Other
audio recording
Size: 57 MB
140123 WW010001 Audio Recording Part 3 (PM)
Part 3 of the PM recording of the hearing on 23 January '14
Other
audio recording
Size: 79 MB
140123 WW010001 Audio Recording Part 4 (PM)
Part 4 of the PM recording of the hearing on 23 January '14
Other
Other
Size: 452 KB
131209 WW010001 Section 131 and 132 application clarifications regarding valuation references
For information only - The application to which this document relates will not be examined as part of the examination of this DCO application
Other
Size: 737 KB
APP56.04.03 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Barn Elms
Other
Size: 747 KB
APP56.04.08 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Shad Thames Pumping Station
Other
Size: 38 KB
130926 WW010001 Appointment Under S101
Letters of appointment under S101 of the PA2008. These letters are referred to in the Panel's letter of 26 September 2013.
Other
Size: 246 KB
131219 W010001 Panels Second Written Questions
Panel's Second Written Questions. This is the document referred to in the Panel's letter of 19 December 2013
Other
Size: 23 KB
Other
Size: 7 MB
9.15.121 Tunnel and Bridge Assessments LUL Jubilee Line Tunnels (London Bridge to Bermondsey)
Other
Size: 7 MB
9.15.55 Tunnel and Bridge Assessments Chelsea Bridge
Other
Size: 327 KB
9.04.01 Errata 7.10.21 Transport Assessment Greenwich Pumping Station
Other
Size: 4 MB
APP119.08 Section 106 Agreement - City of London
Other
Size: 497 KB
APP131.01.26 ES Update Report Appendices - February 2014 - Summary Assessment Tables King Edward Memorial Park
Other
Size: 8 MB
9.15.46 Tunnel and Bridge Assessments Waterloo Bridge Structure No BR015
Other
Size: 1 MB
9.22.01 COCP Part B Acton Storm Tanks Comparite
Other
Size: 27 MB
9.16.01 Generic List of Mitigation Strategies River Wall Screening and Assessment Reports Part 3
Other
Size: 36 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Albert Embankment Foreshore
Other
Size: 1 MB
9.22.19 COCP Part B Earl Pumping Station Comparite
Other
Size: 1 MB
APP132.01 Summary of Additional Mitigation Measures and Revisions to Compensation Policies - Comparite
Other
Size: 1 MB
9.05 Book of Plans Section 18 Victoria Embankment Foreshore
Other
Size: 2 MB
9.05 Book of Plans Section 1 Works Plans and Sections
Other
Size: 335 KB
9.02.03 Crown Land and Interests RB Kensington Chelsea
Other
Size: 21 MB
9.15.37 Tunnel and Bridge Assessments Victoria Embankment Services Subway
Other
Size: 328 KB
9.04.01 Errata 7.10.15 Transport Assessment Blackfriars Bridge Foreshore
Other
Size: 677 KB
9.22.16 COCP Part B Shad Thames Pumping Station Revised
Other
Size: 19 MB
9.15.74 Tunnel and Bridge Assessments Tunnel and Bridge Assessments Network Rail Deptford Creek Lifting Bridge
Other
Size: 3 MB
9.11.13 King Georges Park
Late Submission
Other
Size: 397 KB
9.04.01 Errata 6.2.13 Environmental Statement Volume 13 Chelsea Embankment Foreshore
Other
Size: 15 MB
9.10.01 Site Suitability Reports Heckford Street
Other
Size: 7 MB
9.09.05 HR Wallingford Detailed Scour Assessment Tideway Walk (Kirtling Street Heathwall)
Other
Size: 1 MB
9.05 Book of Plans Section 17 Albert Embankment Foreshore
Other
Size: 1 MB
9.22.09 COCP Part B Cremorne Wharf Depot Comparite
Other
Size: 74 MB
22 November session 2
Part 2 of the recording of the hearing on 22 November '13.
Other
Size: 112 KB
140117 WW010001 CA2 Agenda Final
Other
Size: 130 MB
20 November session 2
Part 2 of the recording of the hearing on 20 November '13.
Other
Size: 5 MB
20 November session 1
Part 1 of the recording of the hearing on 20 November '13
Other
Size: 54 MB
22 November session 1 (part 2)
Part 1.2 of the recording of the hearing on 22 November '13.
Other
Size: 20 MB
20 November session 3
Part 3 of the recording of the hearing on 20 November '13.
Other
Size: 98 KB
140117 WW010001 Transport and Traffic ISH Agenda
Other
Size: 16 MB
121029 WW010001 SV Itinerary
An itinerary and route plans for the accompanied site visit on 29 October 2013
Other
audio recording
Size: 57 MB
140130 WW010001 Open Floor Hearing Recording part 2
Part 2 of the recording of the hearing on 30 January '14.
Other
audio recording
Size: 118 MB
140120 WW010001 Audio Recording (AM)
AM recording of the hearing on 20 January '14
Other
audio recording
Size: 62 MB
140130 WW010001 Open Floor Hearing Recording Part 1
Part 1 of the recording of the hearing on 30 January '14.
Other
audio recording
Size: 81 MB
140124 WW010001 Audio Recording Part 1 (AM)
Part 1 of the AM recording of the hearing on 24 January '14
Other
audio recording
Size: 136 MB
140214 WW010001 Issue Specific Hearing Recording AM Part 1
Part 1 of the recording of the AM hearing on 4 February '14.
Other
audio recording
Size: 82 MB
140220 WW010001 Issue Specific Hearing Recording PM Part 1
Part 1 of the PM recording of the hearing on 20 February '14
Other
Size: 3 MB
APP208.01.22 ES Update Report Appendices - 11 March 2014 - Victoria Embankment Foreshore Vessel Relocation
Other
Size: 397 KB
APP208.01.06 ES Update Report Appendices - 11 March 2014 - The Treatment of Operational Derogations in the ES
Other
Size: 95 MB
131115 W010001 Audio Recording Part 1
Part 1 of the recording of the hearing on 15 November '13.
Other
audio recording
Size: 88 MB
140121 WW010001 Audio Recording Part 1 (PM)
Part 1 of the PM recording of the hearing on 21 January '14
Other
Size: 84 KB
131104 WW010001 11 to 15 Nov Issue Specific Hearings AGENDAS
Agendas for the Issue Specific Hearings being held between 11 and 15 November 2013 (inclusive)
Other
Size: 44 KB
140107 WW010001 Second ISH draft DCO Agenda
Agenda for the Issue Specific Hearing to be held on 20 January to 21 January 2014 (inclusive).
Other
Size: 60 KB
Other
audio recording
Size: 52 MB
140124 WW010001 Audio Recording Part 2 (AM)
Part 2 of the AM recording of the hearing on 24 January '14
Other
audio recording
Size: 18 MB
140205 WW010001 Noise and vibration issue specific hearing audio recording - part 4
Part 4 of the recording of the hearing on 5 February '14.
Other
audio recording
Size: 17 MB
140205 WW010001 Noise and vibration issue specific hearing audio recording - part 1
Part 1 of the recording of the hearing on 5 February '14.
Other
audio recording
Size: 123 MB
131127 WW010001 Audio Recording Part 3
Part 3 of the recording of the hearing on 27 November '13
Other
audio recording
Size: 3 MB
140129 WW010001 Open Floor Hearing Recording Part 2
Part 2 of the recording of the hearing on 29 January '14.
Other
Size: 297 KB
APP208.01.33 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Minor Works Site
Other
Size: 359 KB
APP209.06 Letters to Local Planning Authorities relating to Legal Agreements and Section 106 Unilateral Undertaking
Other
Size: 359 KB
APP198.25 Response to the London Borough of Tower Hamlets 3 March 2014 submission
Other
Size: 319 KB
APP198.06 Response to the British Telecommunications Plc. 3 March 2014 submission
Other
Size: 13 MB
19 November session 2
Part 2 of the recording of the hearing on 19 November '13
Other
Size: 14 MB
19 November session 1
Part 1 of the recording of the hearing on 19 November '13
Other
Size: 77 MB
131114 W010001 Audio Recording Part 3
Part 3 of the recording of the hearing on 14 November '13.
Other
Size: 926 KB
APP201 Section 127 Schedule
Other
Size: 11 MB
APP208.01.04 ES Update Report Appendices - 11 March 2014 - Scour and Accretion Strategy - Temporary and Permanent Works
Other
Size: 531 KB
APP208.01.23 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Blackfriars Bridge Foreshore
Other
Size: 185 KB
APP198.19 Response to the Livetts Launches 3 March 2014 submission
Other
Size: 404 KB
APP208.01.28 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Earl Pumping Station
Other
Size: 370 KB
APP208.01.31 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Abbey Mills Pumping Station
Other
Size: 139 KB
APP198.11 Response to the David Starkie 3 March 2014 submission
Other
audio recording
Size: 2 MB
140205 WW010001 Noise and vibration issue specific hearing audio recording - part 5
Part 5 of the recording of the hearing on 5 February '14.
Other
Size: 86 MB
21 November session 1
Part 1 of the recording of the hearing on 21 November '13
Other
audio recording
Size: 110 MB
140220 WW010001 Issue Specific Hearing Recording PM Part 2
Part 2 of the PM recording of the hearing on 20 February '14
Other
audio recording
Size: 79 MB
140220 WW010001 Issue Specific Hearing Recording AM Part 2
Part 2 of the AM recording of the hearing on 20 February '14
Other
Size: 89 KB
APP206.03 Design Principles - Comparite against 28 February 2013 (Extract)
Other
Size: 234 KB
131125 WW010001 Environment Agency Securing Mechanism and Encroachment briefing note part 1
Response by the Environment Agency to questions posed by the Examining Authority
Other
Size: 217 KB
APP198.31 Response to the Mark and Mary Hale on behalf of Nine Elms Piers Ltd 3 March 2014 submission
Other
Size: 3 MB
APP204.04 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) DCO - Comparite against 28 February 2013
Other
Size: 403 KB
APP208.01.29 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Deptford Church Street
Other
Size: 257 KB
APP198.13 Response to the Environment Agency 3 March 2014 submission
Other
Size: 1,023 KB
APP210.02 Non-statutory Off-site Mitigation and Compensation Policy - Comparite against 3 March 2014
Other
Size: 1 MB
APP205.01 Code of Construction Practice Part A General Requirements - 11 March 2014
Other
audio recording
Size: 63 MB
140129 WW010001 Open Floor Hearing Recording Part 1
Part 1 of the recording of the hearing on 29 January '14.
Other
Size: 28 MB
21 November session 2
Part 2 of the recording of the hearing on 21 November '13
Other
audio recording
Size: 141 MB
131127 WW010001 Audio Recording Part 1
Part 1 of the recording of the hearing on 27 November '13
Other
Size: 391 KB
APP208.01.15 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Cremorne Wharf Depot
Other
Size: 411 KB
APP208.01.09 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Barn Elms
Other
Size: 130 KB
APP198.10 Response to the Councillor Anood Al- Samerai 3 March 2014 submission
Other
Size: 313 KB
APP208.01.25 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Shad Thames Pumping Station
Other
Size: 266 KB
APP198.03 Response to the Ann Rosenberg on behalf of Carnwath Road Coalition 3 March 2014 submission
Other
Size: 76 KB
APP198.23 Response to the London Borough of Newham 3 March 2014 submission
Other
Size: 4 MB
APP202 Section 138 Schedule
Other
Size: 160 KB
APP198.33 Response to the Roland Gilmore 3 March 2014 submission
Other
Size: 309 KB
APP215.05 11 March 2014 Update to Statement of Common Ground - Cory Environmental
Other
Size: 16 MB
APP209.03 Legal Agreement for Securing of Off-site Mitigation Policies and Resources for Local Planning Authorities
Other
Size: 479 KB
APP197 Covering Letter
Other
Size: 4 MB
APP208.01.24 ES Update Report Appendices - 11 March 2014 - Blackfriars Bridge Foreshore Vessel Relocations
Other
Size: 478 KB
APP208.01.27 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables King Edward Memorial Park
Other
Size: 203 KB
APP208.01.05 ES Update Report Appendices - 11 March 2014 - Summary of Changes Between ES and the ES Update Report
Other
Size: 178 KB
APP198.30 Response to the Marine Management Organisation 3 March 2014 submission
Other
Size: 234 KB
APP216 City of London Asset Protection Letter
Other
Size: 86 KB
APP206.02 Design Principles - Comparite against 3 March 2014 (Extract)
Other
Size: 127 KB
APP198.32 Response to the Port of London Authority 3 March 2014 submission
Other
Size: 143 KB
APP198.28 Response to the Marc Hearn 3 March 2014 submission
Other
Size: 143 KB
APP198.02 Response to the Andrew Whetnall 3 March 2014 submission
Other
Size: 74 KB
APP198.35 Response to the St George 3 March 2014 submission
Other
Size: 380 KB
APP208.01.02 ES Update Report Appendices - 11 March 2014 - Updated ES Vol.3 Project Wide Effects Sec.14 Surface Water
Other
Size: 4 MB
APP203.01 Mitigation Route Map - 11 March 2014
Other
Size: 58 MB
131114 W010001 Audio Recording Part 1
Part 1 of the recording of the hearing on 14 November '13.
Other
Size: 1 MB
APP210.01 Non-statutory Off-site Mitigation and Compensation Policy - Update 11 March
Other
Size: 388 KB
APP200 Errata
Other
Size: 10 MB
APP208.01.21 ES Update Report Appendices - 11 March 2014 - Visualisations - Victoria Embankment Foreshore
Other
Size: 75 KB
APP198.37 Response to the Sue Lawes on behalf of Crossfields TRA 3 March 2014 submission
Other
Size: 205 KB
APP204.01 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) DCO - Drafting Notes
Other
Size: 731 KB
APP206.01 Design Principles - 11 March 2014
Other
Size: 4 MB
APP208.01 Environmental Statement Update Report - 11 March 2014
Other
Size: 2 MB
APP215.03 11 March 2014 Update to Statement of Common Ground - Environment Agency
Other
Size: 463 KB
APP198.24 Response to the London Borough of Southwark 3 March 2014 submission
Other
Size: 385 KB
APP208.01.07 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Acton Storm Tanks
Other
Size: 453 KB
APP198.20 Response to the London Borough of Hammersmith and Fulham 3 March 2014 submission
Other
Size: 249 KB
APP215.02 11 March 2014 Update to Statement of Common Ground - Port of London Authority
Other
Size: 500 KB
APP208.01.10 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Putney Embankment Foreshore
Other
Size: 2 MB
APP204.03 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) DCO - Comparite against 3 March 2014
Other
Size: 478 KB
APP208.01.19 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Albert Embankment Foreshore
Other
Size: 2 MB
APP204.02 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) DCO - 11 March 2014
Other
Size: 439 KB
APP208.01.26 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Chambers Wharf
Other
Size: 419 KB
APP208.01.18 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Heathwall Pumping Station
Other
Size: 77 KB
APP215.04 11 March 2014 Update to Statement of Common Ground - British Telecommunications Plc
Other
Size: 265 KB
APP198.12 Response to the Historic Buildings and Monuments Commission for England (HBMCE) 3 March 2014 submission
Other
Size: 90 KB
APP205.02 Code of Construction Practice Part A General Requirements - Comparite against 3 March 2014 (Extract)
Other
Size: 433 KB
APP208.01.17 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Kirtling Street
Other
Size: 374 KB
APP208.01.01 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables - Project wide
Other
Size: 30 KB
131125 WW010001 Environment Agency Securing Mechanism and Encroachment briefing note part 2
Response by the Environment Agency to questions posed by the Examining Authority
Other
Size: 3 MB
APP215.01 11 March 2014 Update to Statement of Common Ground - Transport for London
Other
Size: 4 MB
APP208.02 Environmental Statement Update Report - Comparite with March 3 2014
Other
Size: 298 KB
APP198.14 Response to the Eversheds on behalf of Luna House 3 March 2014 submission
Other
Size: 3 MB
APP56 Thames Water Noise and Disturbance
Other
Size: 10 MB
APP54.13.01 SUPPORTING APPENDIX Victoria Embankment Foreshore - Additional Visualisations
Other
Size: 75 KB
APP198.38 Response to the Surrey Quays 3 March 2014 submission
Other
Size: 404 KB
APP207.03 River Transport Strategy - Comparite to 3 March 2014
Other
Size: 203 KB
APP198.04 Response to the Anthony Alexander Arhaq Housing 3 March 2014 submission
Other
Size: 191 KB
APP198.22 Response to the London Borough of Lewisham 3 March 2014 submission
Other
Size: 4 MB
APP203.02 Mitigation Route Map - Comparite against 3 March 2014
Other
Size: 472 KB
APP198.07 Response to the City of London 3 March 2014 Submission
Other
Size: 745 KB
APP56.04.10 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - King Edward Memorial Park Foreshore
Other
Other
Size: 12 MB
131107 WW010001 Section 131 and 132 App 3b Schedule of Land - Appendix B (i)
For information only - The application to which this document relates will not be examined as part of the examination of this DCO application.
Other
Size: 134 KB
APP198.18 Response to the Larry Broomhead of Wrayburn Residents Together 3 March 2014 submission
Other
Size: 1 MB
APP199 Guide to the Application
Other
Size: 174 KB
APP198.05 Response to the Brian Chadwick 3 March 2014 submission
Other
Size: 82 MB
9.16.03 Generic List of Mitigation Strategies Standard Inspections Report Part5
Other
Size: 291 KB
APP163 Response to the ExA's request for information - Q53 - DCO Drafting and Related Matters
Other
Size: 336 KB
9.02.04 Crown Land and Interests LB Lambeth
Other
Size: 1 MB
9.21.03 Correct COCP Part A General Requirements Revised
Other
Size: 62 KB
131213 WW010001 Minerva (Wandsworth) Ltd details of documents circulated at 5 Dec CAH
Information Regarding Minerva (Wansdworth) Limited - details of plans circulated at 5 December Compulsory Acquisition Hearing
Other
audio recording
Size: 46 MB
140121 WW010001 Audio Recording Part 2 (PM)
Part 2 of the PM recording of the hearing on 21 January '14
Other
Size: 437 KB
APP208.01.13 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Carnwath Road Riverside
Other
Size: 582 KB
APP207.02 River Transport Strategy - Update 11 March 2014
Other
Size: 313 KB
APP208.01.32 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Beckton Sewage Treatment Works
Other
Size: 140 KB
APP198.15 Response to the Free Trade Wharf 3 March 2014 submission
Other
Size: 483 KB
APP208.01.16 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Chelsea Embankment Foreshore
Other
Size: 251 KB
APP198.36 Response to the St James Group 3 March 2014 submission
Other
Size: 352 KB
APP208.01.14 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Falconbrook Pumping Station
Other
Size: 33 KB
9.06.07 Order Land Schedule RB Kensington Chelsea
Other
Size: 5 MB
9.09.08 HR Wallingford Detailed Scour Assessment Chambers Wharf
Other
Size: 344 KB
9.04.01 Errata 6.2.05 Environmental Statement Volume 5 Hammersmith Pumping Station
Other
Size: 97 MB
130912 WW010001 TTT PM Audio part1
The first of two parts of an audio recording of the Preliminary Meeting
Other
Size: 19 MB
9.14 Hungerford Bridge Assessment
Other
Size: 15 MB
9.15.22 Tunnel and Bridge Assessments Chelsea River Bridge
Other
Size: 418 KB
9.04.01 Errata 7.04 Design and Access Statement
Other
Size: 17 MB
9.15.25 Tunnel and Bridge Assessments Blackfriars Rail Bridge
Other
Size: 2 MB
9.15.81 Tunnel and Bridge Assessments Atlantic Wharf Footbridge
Other
Size: 65 MB
9.16.03 Generic List of Mitigation Strategies Standard Inspections Report Part3
Other
Size: 1 MB
APP130 River Transport Strategy
Other
Size: 2 MB
APP119.05 Section 106 Agreement - London Borough of Hammersmith and Fulham
Other
Size: 412 KB
9.04.01 Errata 2.01 2.29 Book of Plans
Other
Size: 24 MB
9.10.01 Site Suitability Reports Abbey Mills
Other
Size: 5 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Victoria Embankment Foreshore
Other
Size: 4 MB
9.15.77 Tunnel and Bridge Assessments British Waterways Limehouse Cut Structure No 9
Other
Size: 377 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule City of Westminster
Other
Size: 65 MB
9.16.03 Generic List of Mitigation Strategies Standard Inspections Report Part6
Other
Size: 35 KB
140107 WW010001 Additional Open Floor Hearings Agenda
Agenda for Open Floor Hearings being held between 29 January and 5 February 2014 (inclusive)
Other
Size: 84 KB
131118 WW010001 Compulsory Acquisition Hearings Agenda
Agenda for the Compulsory Acquisition Hearings to be held Thursday 28 Nov to Friday 20 Dec 2013 and 14 to 17 Jan 2014 (excluding Mondays)
Other
Size: 35 KB
140107 WW010001 CA Hearings Week 5 Agenda
Agenda for the Compulsory Acquisition Hearings to be held 14 to 17 January 2014 (inclusive)
Other
Size: 328 KB
131107 WW010001 Section 131 and 132 App 3a Schedule of Land - Appendix A
For information only - The application to which this document relates will not be examined as part of the examination of this DCO application.
Other
Size: 43 KB
131104 WW010001 Open Floor Hearings AGENDA
Agenda for Open Floor Hearings being held between 19 and 23 November 2013 (inclusive)
Other
Size: 4 MB
9.15.58 Tunnel and Bridge Assessments CSO Works Interface Assessment Vauxhall Bridge
Other
Size: 796 KB
9.22.06 COCP Part B King Georges Park Revised
Other
Size: 437 KB
APP131.01.25 ES Update Report Appendices - February 2014 - Summary Assessment Tables Chambers Wharf
Other
Size: 213 KB
131126 WW010001 Section 131 and 132 application supplementary supporting information
For information only - The application to which this document relates will not be examined as part of the examination of this DCO application.
Other
audio recording
Size: 120 MB
140124 WW010001 Audio Recording Part 2 (PM)
Part 2 of the PM recording of the hearing on 24 January '14
Other
Size: 43 KB
131002 WW010001 applicant proposed changes procedure
Response to applicant providing advice about the recommended procedure to follow to advertise their proposed changes to the application
Other
Size: 42 KB
140109 WW010001 s102A notice
A letter notifying the applicant that a party has become an Interested Party under s102A of the Planning Act 2008
Other
Size: 44 KB
140120 WW010001 S102A notice
A letter notifying the applicant that parties have become Interested Parties under s102A of the Planning Act 2008
Other
Size: 127 KB
131001 WW010001 TWUL query re advertsing proposed changes
Letter from the applicant seeking advice about how to advertise the proposed changes to the application
Other
Size: 26 KB
131106 WW010001 LLDC status of submission
Letter to London Legacy Development Corporation clarifying the status of their submission as a Written Representation, rather than a Local Impact Report.
Other
Size: 26 KB
131108 WW010001 Hand F Council letter re concerns about the exam timetable
Letter from Hammersmith and Fulham Council raising concerns about the lack of preparation time for issue specific hearings (11 to 15 Nov 2013)
Other
Size: 68 KB
140213 WW010001 S102A notice
A letter notifying the applicant that a party has become an Interested Party under S102A of the Planning Act 2008
Other
audio recording
Size: 24 MB
140205 WW010001 Open floor hearing AHOY Centre part 1
Part 1 of the recording of the hearing on 05 February '14
Other
Size: 36 MB
23 November (part 2)
Part 2 of the recording of the hearing on 23 November '13.
Other
audio recording
Size: 829 KB
140205 WW010001 Open floor hearing AHOY Centre part 2
Part 2 of the recording of the hearing on 05 February '14
Other
audio recording
Size: 168 MB
140220 WW010001 Issue Specific Hearing Recording PM Part 3
Part 3 of the PM recording of the hearing on 20 February '14
Other
Size: 11 MB
9.15.83 Tunnel and Bridge Assessments Network Rail Browne House and Farrer House Viaduct
Other
Size: 382 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule Preliminary Sheets
Other
Size: 9 MB
9.15.53 Tunnel and Bridge Assessments Battersea Road Bridge
Other
Size: 327 KB
9.04.01 Errata 7.10.06 Transport Assessment King Georges Park
Other
Size: 4 MB
9.15.91 Tunnel and Bridge Assessments Network Rail Bridge over Limehouse Cut and River Lee
Other
Size: 343 KB
9.04.01 Errata 6.2.15 Environmental Statement Volume 15 Heathwell Pumping Station
Other
Size: 1 MB
9.22.15 COCP Part B Blackfriars Bridge Foreshore Comparite
Other
Size: 25 MB
9.15.02 Bell Lane Creek Cable Bridge
Other
Size: 25 MB
9.10.01 Site Suitability Reports Barn Elms 2
Other
Size: 9 MB
9.15.115 Tunnel and Bridge Assessments Service Bridge (EL30) over Surrey Quays Station
Other
Size: 919 KB
9.05 Book of Plans Section 20 Shad Thames Pumping Station
Other
Other
Size: 528 KB
APP125.47 Code of Construction Practice Part B Site Specific Requirements - Beckton Sewage Treatment Works - Revised 12 February 2014
Other
Size: 538 KB
APP131.01.22 ES Update Report Appendices - February 2014 - Summary Assessment Tables Blackfriars Bridge Foreshore
Other
Size: 5 MB
APP137 Mitigation Route Map - Comparite against 23 September 2013
Other
Size: 379 KB
APP116.22 Statement of Common Ground - Canal and River Trust
Other
Size: 444 KB
APP131.01.16 ES Update Report Appendices - February 2014 - Summary Assessment Tables Kirtling Street
Other
Size: 422 KB
9.04.01 Errata 5.3 Heritage Statement
Other
Size: 336 KB
9.02.02 Crown Land and Interests City of Westminster
Other
Size: 13 MB
9.15.68 Tunnel and Bridge Assessments LUL Northern Line Tunnels (Abandoned CSLR)
Other
Size: 713 KB
9.22.09 COCP Part B Cremorne Wharf Depot Revised
Other
Size: 28 MB
9.15.99 Tunnel and Bridge Assessments Tunnel Asset TU058 Limehouse Link Tunnel
Other
Size: 536 KB
APP125.33 Code of Construction Practice Part B Site Specific Requirements - Shad Thames Pumping Station - Revised 12 February 2014
Other
Size: 1 MB
APP125.01 Code of Construction Practice Part A General Requirements - Revised 12 February 2014
Other
Size: 11 MB
9.15.08 Thames to Lee Valley Raw Water Main
Other
Size: 22 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Abbey Mills Pumping Station
Other
Size: 2 MB
APP124.02 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order - Revised 12 February 2014
Other
Size: 22 MB
APP119.14 Section 106 Agreement - London Borough of Southwark
Other
Size: 12 MB
9.15.64 Tunnel and Bridge Assessments LUL Jubilee Line Tunnels (Westminster to Waterloo)
Other
Size: 327 KB
9.04.01 Errata 7.10.09 Transport Assessment Cremorne Wharf Depot
Other
Size: 2 MB
9.11.21 Shad Thames Pumping Station
Late Submission
Other
Size: 2 MB
APP124.02 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order - Comparite against 3 February 2014
Other
Size: 30 MB
APP119.13 Section 106 Agreement - London Borough of Lewisham
Other
Size: 381 KB
APP131.01.10 ES Update Report Appendices - February 2014 - Summary Assessment Tables Dormay Street
Other
Size: 13 MB
9.16.01 Generic List of Mitigation Strategies River Wall Screening and Assessment Reports Part 2
Other
Size: 6 MB
9.15.120 Tunnel and Bridge Assessments Crossrail Line 1 (Limehouse Basin)
Other
Size: 6 MB
9.15.92 Tunnel and Bridge Assessments Canal and River Trust Three Mills Lock Public Footbridge
Other
Size: 7 MB
9.11.18 Albert Embankment Foreshore
Late Submission
Other
Size: 5 MB
APP119.06 Section 106 Agreement - London Borough of Wandsworth
Other
Size: 582 KB
APP116.13 Statement of Common Ground - London Borough of Lewisham
Other
Size: 385 KB
APP131.01.11 ES Update Report Appendices - February 2014 - Summary Assessment Tables King George's Park
Other
Size: 329 KB
9.04.01 Errata 7.10.07 Transport Assessment Carnwath Road Riverside
Other
Size: 7 MB
9.15.23 Tunnel and Bridge Assessments Grosvenor Rail Bridge
Other
Size: 36 MB
9.16.03 Generic List of Mitigation Strategies Standard Inspections Report Part1
Other
Size: 4 MB
APP184.02 ES Update Report - Comparite 14 February 2014
Other
Size: 383 KB
APP184.01.30 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Greenwich Pumping Station
Other
Size: 33 KB
APP138.04 Book of Reference - London Borough of Ealing (parts 1 to 5)
Other
Size: 393 KB
9.04.01 Errata 6.2.19 Environmental Statement Volume 19 Shad Thames Pumping Station
Other
Size: 4 MB
9.15.31 Tunnel and Bridge Assessments Cable and Wireless Tower Subway Crossing
Other
Size: 679 KB
9.22.14 COCP Part B Victoria Embankment Foreshore Revised
Other
Size: 8 MB
9.11.11 Putney Embankment Foreshore
Late Submission
Other
Size: 33 KB
9.06.01 Order Land Schedule City of London
Other
Size: 76 KB
APP116.23 Statement of Common Ground - Network Rail
Other
Size: 6 MB
9.11.02 Noise Contours and Assessment Summary Plans Carnwath Road Riverside
Other
Size: 68 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Carnwath Road Riverside Part2
Other
Size: 344 KB
9.04.01 Errata 6.2.24 Environmental Statement Volume 24 Greenwich Pumping Station
Other
Size: 329 KB
APP131.01.24 ES Update Report Appendices - February 2014 - Summary Assessment Tables Shad Thames Pumping Station
Other
Size: 697 KB
APP178.27 CoCP Part B Site Specific Requirements - Albert Embankment Foreshore - Revised 3 March 2014
Other
Size: 472 KB
9.03.02 Statutory Tests Relating to Statutory Undertakers Rights and Aparatus and Draft Certificates
Other
Size: 399 KB
9.15.57 Tunnel and Bridge Assessments Vauxhall Road Bridge (Assessment Certificate)
Other
Size: 1 MB
9.22.02 COCP Part B Hammersmith Pumping Station Comparite
Other
Size: 995 KB
9.22.22 COCP Part B Abbey Mills Pumping Station Comparite
Other
Size: 693 KB
APP125.27 Code of Construction Practice Part B Site Specific Requirements - Albert Embankment Foreshore - Revised 12 February 2014
Other
Size: 1,003 KB
APP184.01.03 ES Update Report Appendices - 3 March 2014 - Sediment Fluxes in the Tidal Thames
Other
Size: 670 KB
9.22.23 COCP Part B Beckton Sewage Treatment Works Revised
Other
Size: 8 MB
9.11.08 Acton Storm Tanks
Late Submission
Other
Size: 1 MB
APP116.24 Statement of Common Ground - National Grid
Other
Size: 13 MB
9.15.19 Stamford Brook Bridges
Other
Size: 383 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule RB Kensington Chelsea
Other
Size: 4 MB
9.15.110 Tunnel and Bridge Assessments DLR Limehouse Cut Bridge on the DLR North Route
Other
Size: 4 MB
9.15.14 Wandle Creek Footbridge
Other
Size: 671 KB
9.22.24 COCP Part B Bekesbourne Street Revised
Other
Size: 23 MB
9.05 Book of Plans Section 2 Land Acquisition Plans
Other
Size: 3 MB
APP158 Written summaries of the cases put orally at the hearings held 21 February 2014
Other
Size: 647 KB
APP159.10 3 March 2014 Update to SoCG - Royal Borough of Kensington and Chelsea
Other
Size: 376 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule RB Greenwich
Other
Size: 7 MB
9.15.79 Tunnel and Bridge Assessments British Waterways Narrow Street Swing Bridge
Other
Size: 365 KB
APP131.01.30 ES Update Report Appendices - February 2014 - Summary Assessment Tables Abbey Mills Pumping Station
Other
Size: 397 KB
9.11.01 Noise Contours and Assessment Summary Plans Explanatory Note
Other
Size: 777 KB
9.22.01 COCP Part B Acton Storm Tanks Revised
Other
Size: 176 KB
APP131.01.05 ES Update Report Appendices - February 2014 - Summary of changes between ES and the ES Update Report
Other
Size: 33 KB
APP139.04 Order Land Schedule - Royal Borough of Greenwich
Other
Size: 337 KB
9.04.01 Errata 7.10.18 Transport Assessment King Edward Memorial Park Foreshore
Other
Size: 430 KB
9.08 Estuarine Habitat Calculation Method
Other
Size: 3 MB
9.15.117 Tunnel and Bridge Assessments Form A Approval in Principle for Brunel Thames Tunnel Preliminary Impact Assessment
Other
Size: 328 KB
9.04.01 Errata 7.10.17 Transport Assessment Chambers Wharf
Other
Size: 4 MB
9.11.20 Blackfriars Bridge Foreshore
Late Submission
Other
Size: 1 MB
APP133 Non-statutory Off-site Mitigation and Compensation Policy
Other
Size: 20 MB
9.15.87 Tunnel and Bridge Assessments Gas Pipe Bridge over the River Lee at Abbey Mills
Other
Size: 582 KB
APP125.34 Code of Construction Practice Part B Site Specific Requirements - Shad Thames Pumping Station - Comparite against 3 February 2014
Other
Size: 729 KB
APP116.02 Statement of Common Ground - London Borough of Ealing
Other
Size: 6 MB
9.15.27 Tunnel and Bridge Assessments Battersea B Power Station Cable Tunnel
Other
Size: 321 KB
APP116.15 Statement of Common Ground - London Borough of Tower Hamlets
Other
Size: 358 KB
9.04.01 Errata 6.2.20 Environmental Statement Volume 20 Chambers Wharf
Other
Size: 11 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Dormay Street
Other
Size: 393 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Newham
Other
Size: 8 MB
9.11.07 Noise Contours and Assessment Summary Plans Greenwich Pumping Station
Other
Size: 706 KB
9.22.08 COCP Part B Falconbrook Pumping Station Revised
Other
Size: 366 KB
APP135 Settlement Deed
Other
Size: 347 KB
9.04.01 Errata 6.2.23 Environmental Statement Volume 23 Deptford Church Street
Other
Size: 328 KB
9.04.01 Errata 7.10.12 Transport Assessment Heathwall Pumping Station
Other
Size: 25 MB
9.10.01 Site Suitability Reports King Edward Memorial Park
Other
Size: 5 MB
9.04.03 Errata Drawings Omitted from the Open Space Assessment (7.06)
Other
Size: 14 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Kirtling Street
Other
Size: 6 MB
9.15.116 Tunnel and Bridge Assessments Pipe Crossing, PC252 under Surrey Quays Station
Other
Size: 440 KB
APP185 Summary of Additional Mitigation Measures and Revisions to Compensation Policies
Other
Size: 15 MB
9.05 Book of Plans Section 4 Crown and Special Category Land Plans
Other
Size: 178 MB
131111 W010001 Audio Recording Part 3
Part 3 of the recording of the hearing on 11 November '13.
Other
Size: 2 MB
APP116.19 Statement of Common Ground - Environment Agency
Other
Size: 317 KB
APP196 ExA Request for OUTSTANDING EVIDENCE and or ALTERNATIVE DRAFTING (Item 24) 15 November 2013 ISH
Other
Size: 906 KB
9.01 Covering Letter
Other
Size: 343 KB
9.04.01 Errata 6.2.25 Environmental Statement Volume 25 Abbey Mills Pumping Station
Other
Size: 11 MB
9.15.80 Tunnel and Bridge Assessments Network Rail Harts Wharf Viaduct
Other
Size: 1 MB
9.05 Book of Plans Section 24 Greenwich Pumping Station
Other
Size: 702 KB
APP132 Summary of Additional Mitigation Measures and Revisions to Compensation Policies
Other
Size: 680 KB
APP125.42 Code of Construction Practice Part B Site Specific Requirements - Deptford Church Street - Comparite against 3 February 2014
Other
Size: 395 KB
APP184.01.09 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Barn Elms
Other
Size: 33 KB
9.06.09 Order Land Schedule LB Lewisham
Other
Size: 11 MB
9.15.65 Tunnel and Bridge Assessments LUL Northern Line Tunnels (Charing Cross Branch)
Other
Size: 9 MB
9.15.89 Tunnel and Bridge Assessments Cable Bridges over Limehouse Cut at Violet Road
Other
Size: 11 MB
9.15.07 Thames to Lee Valley Raw Water Main
Other
Size: 1,004 KB
9.22.17 COCP Part B Chambers Wharf Comparite
Other
Size: 342 KB
9.04.01 Errata 7.05 Final Report on Site Selection Process
Other
Size: 18 MB
9.10.01 Site Suitability Reports Chambers Wharf
Other
Size: 12 MB
9.15.86 Tunnel and Bridge Assessments Network Rail Mechanics Path Viaduct
Other
Size: 4 MB
9.15.38 Tunnel and Bridge Assessments TWUL Cross Thames Link Tunnel
Other
Size: 8 MB
9.15.49 Tunnel and Bridge Assessments Southwark Bridge (A300) Structure No 33 T02 (BR019)
Other
Size: 63 MB
9.18 Ground Investigation Report on Route Geology Part2
Other
Size: 77 KB
APP116.27 Statement of Common Ground - Cory Environmental Ltd
Other
Size: 400 KB
APP131.01.08 ES Update Report Appendices - February 2014 - Summary Assessment Tables Barn Elms
Other
Size: 168 KB
APP169 Response to the ExA's request for information - Q59 - Site Selection and Drive Strategy
Other
Size: 343 KB
9.04.01 Errata 6.2.12 Environmental Statement Volume 12 Cremorne Wharf Depot
Other
Size: 1 MB
9.10.03 Excavated Materials Options Assessment (EMOA) Annex C1 to C3
Other
Size: 4 MB
9.15.114 Tunnel and Bridge Assessments LUL District Line Bridge over Limehouse Cut and River Lee
Other
Size: 5 MB
9.11.05 Noise Contours and Assessment Summary Plans King Edward Memorial Park Foreshore
Other
Size: 363 KB
9.04.01 Errata 6.2.14 Environmental Statement Volume 14 Kirtling Street
Other
Size: 4 MB
9.05 Book of Plans Section 5 Barn Elms
Other
Size: 594 KB
Other
Size: 369 KB
APP184.01.11 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Dormay Street
Other
Size: 380 KB
APP184.01.02 ES Update Report Appendices - 3 March 2014 - Updated ES Vol.3 Project Wide Effects Sec.14 Surface Water
Other
Size: 517 KB
APP184.01.23 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Blackfriars Bridge Foreshore
Other
Size: 460 KB
APP160 Response to the ExA's request for information - Q50 - Air Quality and Emissions
Other
Size: 349 KB
9.04.01 Errata 6.2.27 Environmental Statement Volume 27 Minor Works Sites
Other
Size: 383 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Richmond upon Thames
Other
Size: 9 MB
9.15.112 Tunnel and Bridge Assessments DLR Brick Arch Viaduct at Island Row
Other
Size: 1,021 KB
9.05 Book of Plans Section 12 Falconbrook Pumping Station
Other
Size: 347 KB
9.04.01 Errata 6.2.06 Environmental Statement Volume 6 Barn Elms
Other
Size: 296 KB
APP134 Exceptional Hardship Procedure
Other
Size: 548 KB
APP125.29 Code of Construction Practice Part B Site Specific Requirements - Victoria Embankment Foreshore - Revised 12 February 2014
Other
Size: 4 MB
APP131 ES Update Report - February 2014
Other
Size: 552 KB
APP178.29 CoCP Part B Site Specific Requirements - Victoria Embankment Foreshore - Revised 3 March 2014
Other
Size: 728 KB
APP178.14 CoCP Part B Site Specific Requirements - King George's Park - Comparite 12 February 2014
Other
Size: 9 MB
9.15.09 Ring Main Barnes to Kew Section
Other
Size: 787 KB
9.13 Third Party Verification for Settlement Reports
Other
Size: 4 MB
9.15.105 Tunnel and Bridge Assessments Bow Common Lane Bridge Structure No BR407
Other
Size: 6 MB
9.11.10 Barn Elms
Late Submission
Other
Size: 1 MB
APP116.20 Statement of Common Ground - Historic Buildings and Monuments Commission for England (English Heritage)
Other
Size: 987 KB
APP116.21 Statement of Common Ground - London Legacy Development Corporation
Other
Size: 433 KB
APP131.01.12 ES Update Report Appendices - February 2014 - Summary Assessment Tables Carnwath Road Riverside
Other
Size: 9 MB
APP120.05 Plans referred to in final draft DCO as submitted to ExA 3 March 2014 - Section 4.2 - Approved Plans
Other
Size: 371 KB
APP188 Noise Limits Paper - Update 3 March 2014
Other
Size: 92 KB
APP175 Letter from The Duchy of Cornwall regarding Section 135 of the Planning Act 2008
Other
Size: 13 MB
9.15.03 Wandsworth Town Viaduct Arches 13 to 19
Other
Size: 454 KB
9.04.01 Errata 7.18 Engineering Design Statement
Other
Size: 15 MB
9.15.45 Tunnel and Bridge Assessments Golden Jubilee Footbridges (Downstream and Upstream)
Other
Size: 2 MB
APP119.07 Section 106 agreement - London Borough of Lambeth
Other
Size: 375 KB
APP184.01.08 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Hammersmith Pumping Station
Other
Size: 5 MB
9.07 Mitigation Route Map
Other
Size: 11 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Cremorne Wharf Depot
Other
Size: 33 KB
9.06.13 Order Land Schedule LB Tower Hamlets
Other
Size: 15 MB
9.10.01 Engineering Options Report Appendices Abbey Mills Route
Other
Size: 13 MB
9.15.32 Tunnel and Bridge Assessments Battersea Discharge Tunnel
Other
Size: 738 KB
APP125.28 Code of Construction Practice Part B Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014
Other
Size: 354 KB
APP184.01.14 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Falconbrook Pumping Station
Other
Size: 17 MB
APP184.01.04 ES Update Report Appendices - 3 March 2014 - Scour and Accretion Strategy - Temporary and Permanent Works
Other
Size: 33 KB
APP138.08 Book of Reference - Royal Borough of Kensington and Chelsea (parts 1 to 5)
Other
Size: 355 KB
9.04.01 Errata 6.2.10 Environmental Statement Volume 10 Carnwath Road Riverside
Other
Size: 336 KB
9.02.05 Crown Land and Interests LB Tower Hamlets
Other
Size: 718 KB
9.22.05 COCP Part B Dormay Street Revised
Other
Size: 685 KB
9.22.18 COCP Part B King Edward Memorial Park Foreshore Revised
Other
Size: 396 KB
9.04.01 Errata 7.10.02 Transport Assessment Hammersmith Pumping Station
Other
Size: 410 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Hammersmith Fulham
Other
Size: 6 MB
9.15.48 Tunnel and Bridge Assessments Blackfriars Bridge (A201) Structure No 33 T01 (BR016)
Other
Size: 958 KB
9.22.10 COCP Part B Chelsea Embankment Foreshore Comparite
Other
Size: 329 KB
APP114 Covering Letter
Other
Size: 3 MB
APP128 Groundwater Environment Management - Dewatering and Monitoring Strategy
Other
Size: 625 KB
APP125.17 Code of Construction Practice Part B Site Specific Requirements - Falconbrook Pumping Station - Revised 12 February 2014
Other
Size: 1 MB
APP166 Response to the ExA's request for information - Q56 - Land Use including Regeneration and Open Space
Other
Size: 3 MB
9.15.12 Putney Road Bridge
Other
Size: 49 MB
9.16.03 Generic List of Mitigation Strategies Standard Inspections Report Part2
Other
Size: 327 KB
9.04.01 Errata 7.10.19 Transport Assessment Earl Pumping Station
Other
Size: 589 KB
APP125.39 Code of Construction Practice Part B Site Specific Requirements - Earl Pumping Station - Revised 12 February 2014
Other
Size: 107 KB
APP121.02 Letter from the Department for Work and Pensions regarding Section 135 of the Planning Act 2008
Other
Size: 2 MB
APP153 Overarching Archaeological Written Scheme of Investigation (OAWSI)
LATE SUBMISSION
Other
Size: 958 KB
APP118 Drawing Schedule
Other
Size: 961 KB
APP159.02 3 March 2014 Update to SoCG - London Borough of Southwark
Other
Size: 7 MB
9.15.54 Tunnel and Bridge Assessments Albert Bridge
Other
Size: 7 MB
9.15.113 Tunnel and Bridge Assessments Lower Road Bridge (EL31) over Surrey Quays Station
Other
Size: 13 MB
9.09.01 HR Wallingford Detailed Scour Assessment Putney Embankment Foreshore
Other
Size: 972 KB
9.22.23 COCP Part B Beckton Sewage Treatment Works Comparite
Other
Size: 5 MB
9.11.19 Victoria Embankment Foreshore
Late Submission
Other
Size: 192 KB
Other
Size: 76 KB
APP116.29 Statement of Common Ground - Vodafone Limited
Other
Size: 33 KB
APP139.08 Order Land Schedule - London Borough of Lambeth
Other
Size: 3 MB
APP177.02 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) DCO - Comparite 28 February 2013
Other
Size: 14 MB
9.15.11 Putney Road Bridge
Other
Size: 22 MB
9.16.02 Generic List of Mitigation StrategiesGeneric List of Mitigation Strategies River Wall Mitigation Options Report
Other
Size: 479 KB
9.10.05 Report on Long Term Settlement
Other
Size: 328 KB
9.04.01 Errata 7.10.10 Transport Assessment Chelsea Embankment Foreshore
Other
Size: 601 KB
APP125.15 Code of Construction Practice Part B Site Specific Requirements - Carnwath Road Riverside - Revised 12 February 2014
Other
Size: 76 KB
APP116.18 Statement of Common Ground - Port of London Authority
Other
Size: 4 MB
APP192 Mitigation Route Map
Other
Size: 781 KB
APP170 Response to the ExA's request for information - Q60 - Socio-economic Effects
Other
Size: 2 MB
9.10.03 Excavated Materials Options Assessment (EMOA) Main Report
Other
Size: 13 MB
9.15.62 Tunnel and Bridge Assessments LUL Victoria Line Tunnels (Vauxhall to Pimlico)
Other
Size: 593 KB
APP125.25 Code of Construction Practice Part B Site Specific Requirements - Heathwall Pumping Station - Revised 12 February 2014
Other
Size: 77 KB
APP116.25 Statement of Common Ground - British Telecommunications Plc
Other
Size: 668 KB
APP154 Letter with additional information to 12 February 2014 Statement of Common Ground with the Environment Agency
LATE SUBMISSION
Other
Size: 613 KB
APP178.37 CoCP Part B Site Specific Requirements - King Edward Memorial Park Foreshore - Revised 3 March 2014
Other
Size: 1 MB
APP186 Non-statutory Off-site Mitigation and Compensation Policy
Other
Size: 24 MB
9.15.100 Tunnel and Bridge Assessments Tunnel Asset TU361 Jamaica Road Subway
Other
Size: 612 KB
APP125.37 Code of Construction Practice Part B Site Specific Requirements - King Edward Memorial Park Foreshore - Revised 12 February 2014
Other
Size: 615 KB
APP178.11 CoCP Part B Site Specific Requirements - Dormay Street - Revised 3 March 2014
Other
Size: 9 MB
9.15.71 Tunnel and Bridge Assessments LUL Waterloo and City Line Tunnels (Waterloo to Bank)
Other
Size: 427 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Lewisham
Other
Size: 8 MB
9.15.36 Tunnel and Bridge Assessments Wimbledon to Kensal Green Cable Tunnel
Other
Size: 9 MB
9.15.41 Tunnel and Bridge Assessments Lots Road Intake and Discharge Tunnels
Other
Size: 634 KB
APP125.40 Code of Construction Practice Part B Site Specific Requirements - Earl Pumping Station - Comparite against 3 February 2014
Other
Size: 646 KB
APP125.16 Code of Construction Practice Part B Site Specific Requirements - Carnwath Road Riverside - Comparite against 3 February 2014
Other
Size: 33 KB
APP138.02 Book of Reference - City of Westminster (parts 1 to 5)
Other
Size: 40 MB
APP120.01 Plans referred to in final draft DCO as submitted to ExA 3 March 2014 - Section 1 - Works Plans
Other
Size: 971 KB
APP178.01 CoCP Part A General Requirements - Revised 3 March 2014
Other
Size: 790 KB
9.05 Book of Plans Section 26 Bekesbourne Street
Other
Size: 389 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Hounslow
Other
Size: 14 MB
9.15.01 Bell Lane Creek Bridge
Other
Size: 3 MB
9.15.109 Tunnel and Bridge Assessments A12 Gillender Street (Limehouse Cut Four Mills) Bridge
Other
Size: 1 MB
APP116.08 Statement of Common Ground - City of London
Other
Size: 7 MB
9.11.04 Noise Contours and Assessment Summary Plans Chambers Wharf
Other
Size: 405 KB
9.04.01 Errata 7.20.02 Navigational Issues and Preliminary Risk Assessment
Other
Size: 680 KB
APP125.13 Code of Construction Practice Part B Site Specific Requirements - King George's Park - Revised 12 February 2014
Other
Size: 384 KB
APP140.01 Application for Certificates in Respect of Compulsory Acquisition of Open Space and Rights over Open Space - Covering Letter
Other
Size: 467 KB
APP115.03 Written summaries of the cases put orally at the hearings held on 7 February 2014
Other
Size: 17 MB
APP131.01.04 ES Update Report Appendices - February 2014 - Scour and Accretion Strategy - temporary and permanent works
Other
Size: 5 MB
9.15.61 Tunnel and Bridge Assessments Blackfriars Road Bridge Departure Ramp
Other
Size: 343 KB
9.04.01 Errata 7.10.01 Transport Assessment Acton Storm Tanks
Other
Size: 656 KB
Other
Size: 650 KB
APP125.08 Code of Construction Practice Part B Site Specific Requirements - Barn Elms - Comparite against 3 February 2014
Other
Size: 596 KB
APP178.25 CoCP Part B Site Specific Requirements - Heathwall Pumping Station - Revised 3 March 2014
Other
Size: 5 MB
9.15.35 Tunnel and Bridge Assessments Wimbledon to Pimlico Tunnel Crossing at Tideway Walk
Other
Size: 33 KB
9.06.10 Order Land Schedule LB Newham
Other
Size: 77 KB
APP116.32 Statement of Common Ground - PLA, LB Southwark, LB Newham and Thames Water
Other
Size: 1 MB
APP116.30 Statement of Common Ground - Private Landowners and Businesses
Other
Size: 4 MB
APP184.01 ES Update Report - 3 March 2014
Other
Size: 366 KB
APP174 Letter from The Crown Estate regarding Section 135 of the Planning Act 2008
Other
Size: 33 KB
APP139.07 Order Land Schedule - Royal Borough of Kensington and Chelsea
Other
Size: 176 KB
APP116.01 Statement of Common Ground - Summary
Other
Size: 8 MB
9.10.03 Excavated Materials Options Assessment (EMOA) Figures
Other
Size: 669 KB
9.22.24 COCP Part B Bekesbourne Street Comparite
Other
Size: 16 MB
9.15.44 Tunnel and Bridge Assessments Blackfriars Bridge Pedestrian Subway
Other
Size: 650 KB
APP178.16 CoCP Part B Site Specific Requirements - Carnwath Road Riverside - Comparite 12 February 2014
Other
Size: 1,018 KB
9.22.03 COCP Part B Barn Elms Comparite
Other
Size: 33 KB
9.06.14 Order Land Schedule LB Wandsworth
Other
Size: 204 KB
APP184.01.05 ES Update Report Appendices - 3 March 2014 - Summary of Changes Between ES and the ES Update Report
Other
Size: 445 KB
APP180.03 River Transport Strategy - Comparite 12 February 2014
Other
Size: 20 MB
APP120.02 Plans referred to in final draft DCO as submitted to ExA 3 March 2014 - Section 2 - Land Plans - B
Other
Size: 6 MB
9.15.102 Tunnel and Bridge Assessments Halfpenny Hatch Footbridge Structure No BR126
Other
Size: 865 KB
9.05 Book of Plans Section 16 Heathwall Pumping Station
Other
Size: 55 MB
9.16.03 Generic List of Mitigation Strategies Standard Inspections Report Part4
Other
Size: 2 MB
APP116.14 Statement of Common Ground - London Borough of Southwark
Other
Size: 33 KB
APP138.09 Book of Reference - London Borough of Lambeth (parts 1 to 5)
Other
Size: 922 KB
APP125.31 Code of Construction Practice Part B Site Specific Requirements - Blackfriars Bridge Foreshore - Revised 12 February 2014
Other
Size: 3 MB
APP124.02 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order - Comparite against 28 February 2013
Other
Size: 1 MB
APP116.10 Statement of Common Ground - Royal Borough of Kensington and Chelsea
Other
Size: 601 KB
APP125.07 Code of Construction Practice Part B Site Specific Requirements - Barn Elms - Revised 12 February 2014
Other
Size: 638 KB
APP125.26 Code of Construction Practice Part B Site Specific Requirements - Heathwall Pumping Station - Comparite against 3 February 2014
Other
Size: 632 KB
APP178.19 CoCP Part B Site Specific Requirements - Cremorne Wharf Depot - Revised 3 March 2014
Other
Size: 536 KB
APP159.04 3 March 2014 Update to SoCG - Network Rail
Other
Size: 416 KB
APP184.01.06 ES Update Report Appendices - 3 March 2014 - The Treatment of Operational Derogations in the ES
Other
Size: 33 KB
APP139.01 Order Land Schedule - City of Westminster
Other
Size: 378 KB
APP184.01.01 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables - Project wide
Other
Size: 668 KB
APP178.10 CoCP Part B Site Specific Requirements - Putney Embankment Foreshore - Comparite 12 February 2014
Other
Size: 964 KB
9.04.01 Errata 7.01 Planning Statement
Other
Size: 535 KB
9.04.01 Errata 7.06 Open Space Assessment
Other
Size: 11 MB
9.10.01 Site Suitability Reports Borthwick Wharf Foreshore
Other
Size: 363 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Ealing
Other
Size: 407 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Tower Hamlets
Other
Size: 2 MB
9.20.01 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order Revised
Other
Size: 652 KB
Other
Size: 33 KB
APP138.07 Book of Reference - London Borough of Hounslow (parts 1 to 5)
Other
Size: 25 MB
9.12 Pipework Schematics
Other
Size: 5 MB
9.05 Book of Plans Section 9 Carnwath Road Riverside
Other
Size: 15 MB
9.15.39 Tunnel and Bridge Assessments Battersea to Pimlico Tunnel
Other
Size: 9 MB
9.09.06 HR Wallingford Detailed Scour Assessment King Edward Memorial Park Foreshore
Other
Size: 10 MB
9.15.67 Tunnel and Bridge Assessments LUL Northern Line Tunnels (Bank Branch)
Other
Size: 6 MB
9.11.14 Falconbrook Pumping Station
Late Submission
Other
Size: 3 MB
9.15.90 Tunnel and Bridge Assessments Utility Bridge over Limehouse Cut at A13 Commercial Road
Other
Size: 1 MB
9.22.21 COCP Part B Greenwich Pumping Station Comparite
Other
Size: 945 KB
9.22.07 COCP Part B Carnwath Road Riverside Comparite
Other
Size: 6 MB
9.15.59 Tunnel and Bridge Assessments Lambeth Road Bridge
Other
Size: 11 MB
9.15.85 Tunnel and Bridge Assessments Network Rail Sun Wharf Viaduct
Other
Size: 13 MB
9.10.01 Site Suitability Reports King Edward Memorial Park Foreshore
Other
Size: 1 MB
9.22.08 COCP Part B Falconbrook Pumping Station Comparite
Other
Size: 447 KB
APP184.01.20 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Victoria Embankment Foreshore
Other
Size: 6 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Heathwall Pumping Station
Other
Size: 327 KB
9.04.01 Errata 7.10.14 Transport Assessment Victoria Embankment Foreshore
Other
Size: 902 KB
9.23.01 Design Principles Revised
Other
Size: 392 KB
APP131.01.29 ES Update Report Appendices - February 2014 - Summary Assessment Tables Greenwich Pumping Station
Other
Size: 39 MB
APP120.06 Plans referred to in final draft DCO as submitted to ExA 3 March 2014 - Sections 5 to 29 - Other Plans
Other
Size: 13 MB
9.15.15 Stamford Brook Bridges
Other
Size: 40 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Carnwath Road Riverside Part4
Other
Size: 980 KB
9.05 Book of Plans Section 25 King Edward Memorial Park Foreshore
Other
Size: 1 MB
9.05 Book of Plans Section 19 Blackfriars Bridge Foreshore
Other
Size: 22 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Putney Embankment Foreshore
Other
Size: 12 MB
APP119.11 Section 106 Agreement - London Borough of Newham
Other
Size: 430 KB
APP131.01.17 ES Update Report Appendices - February 2014 - Summary Assessment Tables Heathwall Pumping Station
Other
Size: 5 MB
9.15.33 Tunnel and Bridge Assessments Bankside Cable Tunnel
Other
Size: 963 KB
9.22.15 COCP Part B Blackfriars Bridge Foreshore Revised
Other
Size: 8 MB
9.15.75 Tunnel and Bridge Assessments National Grid Electric River Lee Footbridge at Abbey Mills
Other
Size: 433 KB
9.04.01 Errata 7.10.11 Transport Assessment Kirtling Street
Other
Size: 710 KB
9.22.03 COCP Part B Barn Elms Revised
Other
Size: 16 MB
9.15.50 Tunnel and Bridge Assessments London Bridge (A3) Structure No 33 T03 (BR021)
Other
Size: 428 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Southwark
Other
Size: 20 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Chambers Wharf
Other
Size: 749 KB
9.22.20 COCP Part B Depfort Church Street Revised
Other
Other
Size: 902 KB
APP126.01 Design Principles - Comparite against 28 February 2013
Other
Size: 616 KB
APP125.12 Code of Construction Practice Part B Site Specific Requirements - Dormay Street - Comparite against 3 February 2014
Other
Size: 401 KB
APP184.01.28 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Earl Pumping Station
Other
Size: 3 MB
APP141 Groundwater Environment Management - Dewatering and Monitoring Strategy
Other
Size: 23 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Blackfriars Bridge Foreshore
Other
Size: 8 MB
9.11.03 Noise Contours and Assessment Summary Plans Kirtling Street
Other
Size: 7 MB
9.15.56 Tunnel and Bridge Assessments Vauxhall Road Bridge
Other
Size: 649 KB
APP125.46 Code of Construction Practice Part B Site Specific Requirements - Abbey Mills Pumping Station - Comparite against 3 February 2014
Other
Size: 639 KB
APP125.03 Code of Construction Practice Part B Site Specific Requirements - Acton Storm Tanks - Revised 12 February 2014
Other
Size: 480 KB
APP131.01.18 ES Update Report Appendices - February 2014 - Summary Assessment Tables Albert Embankment Foreshore
Other
Size: 33 KB
APP138.06 Book of Reference - London Borough of Hammersmith and Fulham (parts 1 to 5)
Other
Size: 628 KB
APP178.17 CoCP Part B Site Specific Requirements - Falconbrook Pumping Station - Revised 3 March 2014
Other
Size: 16 MB
9.15.26 Tunnel and Bridge Assessments Cannon Street Rail Bridge
Other
Size: 42 MB
9.04.05 Corrections to the Assessment of Settlement Effects on the Historic Environment
Other
Size: 10 MB
9.15.43 Tunnel and Bridge Assessments Victoria Embankment Services Subway
Other
Size: 13 MB
9.15.16 Stamford Brook Bridges
Other
Size: 97 KB
APP140.03 Application for Certificates in Respect of Compulsory Acquisition of Open Space and Rights over Open Space - Schedule of Land
Other
Size: 2 MB
APP116.03 Statement of Common Ground - London Borough of Hammersmith and Fulham
Other
Size: 648 KB
APP125.43 Code of Construction Practice Part B Site Specific Requirements - Greenwich Pumping Station - Revised 12 February 2014
Other
Size: 605 KB
APP178.07 CoCP Part B Site Specific Requirements - Barn Elms - Revised 3 March 2014
Other
Size: 655 KB
APP156 Covering Letter
Other
Size: 5 MB
9.09.09 HR Wallingford Detailed Scour Assessment Carnwath Road Riverside
Other
Size: 36 KB
9.15.30 Tunnel and Bridge Assessments BT Openreach Blackfriars to St Pauls GPO Tunnel
Other
Size: 758 KB
9.22.21 COCP Part B Greenwich Pumping Station Revised
Other
Size: 15 MB
9.15.72 Tunnel and Bridge Assessments Waterloo and City Line at Blackfriars Bridge Foreshore
Other
Size: 8 MB
9.15.106 Tunnel and Bridge Assessments Oxestalls Roadbridge Structure No BR414
Other
Size: 602 KB
APP125.45 Code of Construction Practice Part B Site Specific Requirements - Abbey Mills Pumping Station - Revised 12 February 2014
Other
Size: 635 KB
APP125.24 Code of Construction Practice Part B Site Specific Requirements - Kirtling Street - Comparite against 3 February 2014
Other
Size: 341 KB
APP123 Errata
Other
Size: 269 KB
APP172 Response to the ExA's request for information - Q62 - Waste Management
Other
Size: 576 KB
APP178.48 CoCP Part B Site Specific Requirements - Beckton Sewage Treatment Works - Comparite 12 February 2014
Other
Size: 373 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Lambeth
Other
Size: 14 MB
9.10.01 Site Suitability Reports Deptford Church Street
Other
Size: 344 KB
9.04.01 Errata 6.2.11 Environmental Statement Volume 11 Falconbrook Pumping Station
Other
Size: 1 MB
9.15.06 Wimbledon to Kensal Green Tunnel Crossing
Other
Size: 74 MB
9.05 Book of Plans Section 3 Land Plans
Other
Size: 668 KB
APP125.18 Code of Construction Practice Part B Site Specific Requirements - Falconbrook Pumping Station - Comparite against 3 February 2014
Other
Size: 534 KB
APP125.35 Code of Construction Practice Part B Site Specific Requirements - Chambers Wharf - Revised 12 February 2014
Other
Size: 154 KB
Other
Size: 1 MB
APP140.02 Application for Certificates in Respect of Compulsory Acquisition of Open Space and Rights over Open Space - Supporting Statement
Other
Size: 477 KB
APP131.01.15 ES Update Report Appendices - February 2014 - Summary Assessment Tables Chelsea Embankment Foreshore
Other
Size: 177 KB
APP180.01 River Transport Strategy - Drafting Notes
Other
Size: 7 MB
9.15.95 Tunnel and Bridge Assessments Canal and River Trust Bow Locks Service Footbridge
Other
Size: 351 KB
9.04.01 Errata 6.2.17 Environmental Statement Volume 17 Victoria Embankment Foreshore
Other
Size: 21 MB
9.10.01 Site Suitability Reports Carnwath Road Riverside
Other
Size: 694 KB
9.22.22 COCP Part B Abbey Mills Pumping Station Revised
Other
Size: 5 MB
APP116.28 Statement of Common Ground - UK Power Networks
Other
Size: 446 KB
Other
Size: 367 KB
APP131.01.13 ES Update Report Appendices - February 2014 - Summary Assessment Tables Falconbrook Pumping Station
Other
Size: 315 KB
APP184.01.25 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Shad Thames Pumping Station
Other
Size: 541 KB
APP159.01 3 March 2014 Update to SoCG - London Borough of Lewisham
Other
Size: 611 KB
APP178.21 CoCP Part B Site Specific Requirements - Chelsea Embankment Foreshore - Revised 3 March 2014
Other
Size: 328 KB
9.04.01 Errata 7.10.08 Transport Assessment Falconbrook Pumping Station
Other
Size: 19 MB
9.15.101 Tunnel and Bridge Assessments Tunnel Asset TU378 Empsom Street Subway
Other
Size: 2 MB
9.15.10 Hammersmith Bridge
Other
Size: 16 MB
9.09.03 HR Wallingford Detailed Scour Assessment Blackfriars Bridge Foreshore
Other
Size: 835 KB
9.15.21 Armoury Way Road Bridge
Other
Size: 14 MB
9.09.04 HR Wallingford Detailed Scour Assessment Chelsea Embankment Foreshore
Other
Size: 33 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Carnwath Road Riverside Part1
Other
Size: 10 MB
9.15.84 Tunnel and Bridge Assessments Network Rail Railway Bridge over Creekside
Other
Size: 33 KB
9.04.01 Errata 4.3.01 to 4.3.14 Book of Reference
Other
Size: 5 MB
9.15.52 Tunnel and Bridge Assessments Wandsworth Road Bridge
Other
Size: 7 MB
9.15.13 Putney Rail Bridge over River Thames
Other
Size: 85 MB
9.18 Ground Investigation Report on Route Geology Part1
Other
Size: 588 KB
APP125.23 Code of Construction Practice Part B Site Specific Requirements - Kirtling Street - Revised 12 February 2014
Other
Size: 692 KB
APP125.44 Code of Construction Practice Part B Site Specific Requirements - Greenwich Pumping Station - Comparite against 3 February 2014
Other
Size: 1 MB
APP125.02 Code of Construction Practice Part A General Requirements - Comparite against 3 February 2014
Other
Size: 460 KB
APP131.01.19 ES Update Report Appendices - February 2014 - Summary Assessment Tables Victoria Embankment Foreshore
Other
Size: 285 KB
APP184.01.33 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Minor Works Site
Other
Size: 33 MB
APP120.02 Plans referred to in final draft DCO as submitted to ExA 3 March 2014 - Section 2 - Land Plans - A
Other
Size: 330 KB
APP177.01 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) DCO - Drafting Notes
Other
Size: 12 MB
9.15.63 Tunnel and Bridge Assessments Victoria Line at Albert Embankment
Other
Size: 35 MB
9.04.02 Errata Drawings Omitted from the Transport Assessment (7.10)
Other
Size: 6 MB
9.15.93 Tunnel and Bridge Assessments Canal and River Trust Three Mills Lock Service Footbridge
Other
Size: 810 KB
9.20.03 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order Comparite Model Provisions
Other
Size: 19 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report King Edward Memorial Park Foreshore
Other
Size: 40 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Greenwich Pumping Station
Other
Size: 3 MB
9.21.02 COCP Part A General Requirements Comparite
SUPERSEDED
Other
Size: 671 KB
APP125.06 Code of Construction Practice Part B Site Specific Requirements - Hammersmith Pumping Station - Comparite against 3 February 2014
Other
Size: 24 MB
APP119.09 Section 106 Agreement - City of Westminster
Other
Size: 3 MB
APP131.01.21 ES Update Report Appendices - February 2014 - Victoria Embankment Foreshore Vessel Relocation
Other
Size: 295 KB
APP189 Exceptional Hardship Procedure
Other
Size: 378 KB
APP184.01.12 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables King George's Park
Other
Size: 596 KB
APP178.30 CoCP Part B Site Specific Requirements - Victoria Embankment Foreshore - Comparite 12 February 2014
Other
Size: 795 KB
APP179.01 Design Principles - Comparite 12 February 2014
Other
Size: 561 KB
9.04.04 Errata Replacement Noise Tables
Other
Size: 36 KB
9.15.29 Tunnel and Bridge Assessments BT Open Reach St Martins Tunnel
Other
Size: 11 MB
9.09.02 HR Wallingford Detailed Scour Assessment Albert Embankment Foreshore
Other
Size: 9 MB
9.15.20 Retaining Wall D184 W85
Other
Size: 392 KB
9.04.01 Errata 6.2.09 Environmental Statement Volume 9 King Georges Park
Other
Size: 33 KB
9.06.04 Order Land Schedule RB Greenwich
Other
Size: 360 KB
APP121.01 Letter of Intent from The Crown Estate regarding Section 135 of the Planning Act 2008
Other
Size: 4 MB
APP184.01.24 ES Update Report Appendices - 3 March 2014 - Blackfriars Bridge Foreshore Vessel Relocations
Other
Size: 367 KB
APP190 Settlement Deed
Other
Size: 658 KB
APP178.38 CoCP Part B Site Specific Requirements - King Edward Memorial Park Foreshore - Comparite 12 February 2014
Other
Size: 33 KB
APP139.14 Order Land Schedule - London Borough of Wandsworth
Other
Size: 383 KB
9.03.01 Statutory Undertaker Land and Apparatus Schedule City of London
Other
Size: 23 MB
9.10.01 Site Suitability Reports Kings Stairs Gardens
Other
Size: 1 MB
9.15.119 Tunnel and Bridge Assessments Form BA Certificate of Assessment and Checking Brunel Thames Tunnel Preliminary Impact Assessment
Other
Size: 672 KB
9.22.07 COCP Part B Carnwath Road Riverside Revised
Other
Size: 5 MB
9.15.88 Tunnel and Bridge Assessments Gas Pipe Bridge over Limehouse Cut at Bow Common Bridge
Other
Size: 1 MB
9.22.05 COCP Part B Dormay Street Comparite
Other
Size: 961 KB
9.22.18 COCP Part B King Edward Memorial Park Foreshore Comparite
Other
Size: 14 MB
Other
Size: 909 KB
APP116.09 Statement of Common Ground - City of Westminster
Other
Size: 743 KB
APP179.01 Design Principles - Revised 3 March 2014
Other
Size: 606 KB
APP178.45 CoCP Part B Site Specific Requirements - Abbey Mills Pumping Station - Revised 3 March 2014
Other
Size: 583 KB
APP180.02 River Transport Strategy - Update 3 March 2014
Other
Size: 33 KB
APP139.03 Order Land Schedule - London Borough of Ealing
Other
Size: 10 MB
9.15.103 Tunnel and Bridge Assessments Twelvetrees Crescent Bridge Structure No BR403
Other
Size: 6 MB
9.15.82 Tunnel and Bridge Assessments Network Rail Railway Bridge over Deptford Church Street
Other
Size: 357 KB
9.15.24 Tunnel and Bridge Assessments Charing Cross Hungerford Rail Bridge
Other
Size: 346 KB
9.04.01 Errata 6.2.18 Environmental Statement Volume 18 Blackfriars Bridge Foreshore
Other
Size: 33 KB
9.06.03 Order Land Schedule LB Ealing
Other
Size: 902 KB
9.23.02 Design Principles Comparite
Other
Size: 1 MB
9.22.04 COCP Part B Putney Embankment Foreshore Comparite
Other
Size: 7 MB
9.11.09 Hammersmith Pumping Station
Late Submission
Other
Size: 76 KB
APP116.16 Statement of Common Ground - Mayor of London
Other
Size: 400 KB
APP131.01.06 ES Update Report Appendices - February 2014 - Summary Assessment Tables Acton Storm Tanks
Other
Size: 566 KB
APP178.49 CoCP Part B Site Specific Requirements - Bekesbourne Street - Revised 3 March 2014
Other
Size: 641 KB
APP178.24 CoCP Part B Site Specific Requirements - Kirtling Street - Comparite against 12 February 2014
Other
Size: 33 KB
APP138.12 Book of Reference - London Borough of Richmond upon Thames (parts 1 to 5)
Other
Size: 341 KB
9.04.01 Errata 7.10.03 Transport Assessment Barn Elms
Other
Size: 343 KB
9.04.01 Errata 6.2.07 Environmental Statement Volume 7 Putney Embankment Foreshore
Other
Size: 13 MB
9.15.18 Stamford Brook Bridges
Other
Size: 1,005 KB
9.05 Book of Plans Section 14 Chelsea Embankment Foreshore
Other
Size: 36 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Barn Elms
Other
Size: 399 KB
9.04.01 Errata 7.10 Transport Assessment Main Report
Other
Size: 328 KB
9.04.01 Errata 7.10.24 Transport Assessment Minor Works Sites
Other
Size: 16 MB
9.10.01 Site Suitability Reports Barn Elms 1
Other
Size: 492 KB
9.19 Engineering Design Statement Addendum
Other
Size: 562 KB
APP125.49 Code of Construction Practice Part B Site Specific Requirements - Bekesbourne Street - Revised 12 February 2014
Other
Size: 435 KB
APP150 Noise Limits Discussion Paper
LATE SUBMISSION
Other
Size: 593 KB
APP178.39 CoCP Part B Site Specific Requirements - Earl Pumping Station - Revised 3 March 2014
Other
Size: 629 KB
APP178.05 CoCP Part B Site Specific Requirements - Hammersmith Pumping Station - Revised 3 March 2014
Other
Size: 427 KB
APP184.01.26 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Chambers Wharf
Other
Size: 408 KB
APP184.01.18 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Heathwall Pumping Station
Other
Size: 402 KB
9.04.01 Errata 6.2.04 Environmental Statement Volume 4 Acton Storm Tanks
Other
Size: 13 MB
9.15.108 Tunnel and Bridge Assessments DLR Deptford Creek Viaduct
Other
Size: 6 MB
9.10.03 Excavated Materials Options Assessment (EMOA) Annex D9 to D16
Other
Size: 15 MB
9.15.70 Tunnel and Bridge Assessments LUL Bakerloo Line Tunnels (Waterloo to Embankment)
Other
Size: 428 KB
9.04.01 Errata 7.07 Sustainability Statement
Other
Size: 641 KB
9.22.12 COCP Part B Heathwall Pumping Station Comparite
Other
Size: 3 MB
9.15.118 Tunnel and Bridge Assessments Form AA Approval in Principle for Preliminary Impact Assessment of Brunel Thames Tunnel
Other
Size: 609 KB
APP125.50 Code of Construction Practice Part B Site Specific Requirements - Bekesbourne Street - Comparite against 3 February 2014
Other
Other
Size: 969 KB
Other
Size: 328 KB
APP131.01.31 ES Update Report Appendices - February 2014 - Summary Assessment Tables Beckton Sewage Treatment Works
Other
Size: 4 MB
APP131.01.23 ES Update Report Appendices - February 2014 - Blackfriars Bridge Foreshore Vessel Relocations
Other
Size: 421 KB
APP184.01.13 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Carnwath Road Riverside
Other
Size: 687 KB
APP178.04 CoCP Part B Site Specific Requirements - Acton Storm Tanks - Comparite 12 February 2014
Other
Size: 8 MB
9.15.60 Tunnel and Bridge Assessments Westminster Bridge
Other
Size: 641 KB
9.22.12 COCP Part B Heathwall Pumping Station Revised
Other
Size: 1 MB
9.10.04 Updated Terrestrial Ecology Survey
Other
Size: 991 KB
9.15.96 Tunnel and Bridge Assessments UK Power Networks Wellclose to New Cross Cable Tunnel
Other
Size: 4 MB
9.15.107 Tunnel and Bridge Assessments Blackhorse Bridge Structure No BR473
Other
Size: 6 MB
9.11.15 Cremorne Wharf Depot
Late Submission
Other
Size: 727 KB
APP125.14 Code of Construction Practice Part B Site Specific Requirements - King George's Park - Comparite against 3 February 2014
Other
Size: 369 KB
APP148 Covering Letter
LATE SUBMISSION
Other
Size: 381 KB
APP181 Unilateral Undertaking for Securing Noise Mitigation and Compensation Policies
Other
Size: 972 KB
APP178.32 CoCP Part B Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite 12 February 2014
Other
Size: 532 KB
APP178.47 CoCP Part B Site Specific Requirements - Beckton Sewage Treatment Works - Revised 3 March 2014
Other
Size: 352 KB
APP184.01.31 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Abbey Mills Pumping Station
Other
Size: 33 KB
APP139.05 Order Land Schedule - London Borough of Hammersmith and Fulham
Other
Size: 33 KB
APP138.13 Book of Reference - London Borough of Southwark (parts 1 to 5)
Other
Size: 341 KB
9.04.01 Errata 7.10.04 Transport Assessment Putney Embankment Foreshore
Other
Size: 331 KB
9.04.01 Errata 4.1 Statement of Reasons
Other
Size: 7 MB
9.15.51 Tunnel and Bridge Assessments Tower Bridge (A100) Structure No BR022
Other
Size: 336 KB
9.02.01 Crown Land and Interests City of London
Other
Size: 598 KB
9.15.47 Tunnel and Bridge Assessments Blackfriars Bridge Site Interface Assessment
Other
Size: 2 MB
9.21.01 COCP Part A General Requirements Revised
SUPERSEDED
Other
Size: 33 KB
9.06.02 Order Land Schedule City of Westminster
Other
Size: 21 MB
9.16.03 Generic List of Mitigation Strategies Enhanced Inspection Report Chelsea Embankment Foreshore
Other
Size: 270 KB
APP115.04 Written submission from Thames Water following the Open Floor Hearing at Deptford on 5 February 2014
Other
Size: 581 KB
APP125.36 Code of Construction Practice Part B Site Specific Requirements - Chambers Wharf - Comparite against 3 February 2014
Other
Size: 685 KB
APP125.04 Code of Construction Practice Part B Site Specific Requirements - Acton Storm Tanks - Comparite against 3 February 2014
Other
Size: 300 KB
APP131.01.32 ES Update Report Appendices - February 2014 - Summary Assessment Tables Minor Works Site
Other
Size: 651 KB
APP178.46 CoCP Part B Site Specific Requirements - Abbey Mills Pumping Station - Comparite 12 February 2014
Other
Size: 637 KB
APP178.40 CoCP Part B Site Specific Requirements - Earl Pumping Station - Comparite 12 February 2014
Other
Size: 611 KB
APP178.50 CoCP Part B Site Specific Requirements - Bekesbourne Street - Comparite 12 February 2014
Other
Size: 33 KB
APP138.03 Book of Reference - City of London (parts 1 to 5)
Other
Size: 3 MB
APP142 Excavated Material and Waste Commitments
Other
Size: 33 KB
9.06.05 Order Land Schedule LB Hammersmith Fulham
Other
Size: 4 MB
9.15.34 Tunnel and Bridge Assessments Wimbledon to Pimlico Tunnel Crossing at Thames Tunnel
Other
Size: 33 KB
9.06.08 Order Land Schedule LB Lambeth
Other
Size: 43 MB
9.15.40 Tunnel and Bridge Assessments TWUL Ring Main Battersea to Barrow Hill Section
Other
Size: 1 MB
9.22.13 COCP Part B Albert Embankment Foreshore Comparite
Other
Size: 4 MB
9.11.06 Noise Contours and Assessment Summary Plans Deptford Church Street
Other
Size: 667 KB
9.10.06 Funding Statement September 2013
Other
Size: 5 MB
9.15.104 Tunnel and Bridge Assessments Violet Road Bridge Structure No BR406
Other
Size: 4 MB
9.15.111 Tunnel and Bridge Assessments A1205 Burdett Road Bridge (Over Limehouse Cut)
Other
Size: 1 MB
9.21.04 Correct COCP Part A General Requirements Comparite
Other
Size: 1 MB
APP129 Excavated Material and Waste Commitments
Other
Size: 611 KB
APP125.11 Code of Construction Practice Part B Site Specific Requirements - Dormay Street - Revised 12 February 2014
Other
Size: 414 KB
APP131.01.28 ES Update Report Appendices - February 2014 - Summary Assessment Tables Deptford Church Street
Other
Size: 10 MB
APP131.01.20 ES Update Report Appendices - February 2014 - Visualisations - Victoria
Other
Size: 33 KB
APP138.15 Book of Reference - London Borough of Wandsworth (parts 1 to 5)
Other
Size: 660 KB
APP178.12 CoCP Part B Site Specific Requirements - Dormay Street - Comparite 12 February 2014
Other
Size: 101 KB
APP159.05 3 March 2014 Update to SoCG - Port of London Authority
Other
Size: 542 KB
APP161 Response to the ExA's request for information - Q51 - Biodiversity, Biological Environment & Ecology
Other
Size: 54 MB
9.16.01 Generic List of Mitigation Strategies River Wall Screening and Assessment Reports Part 1
Other
Size: 33 KB
9.06.12 Order Land Schedule LB Southwark
Other
Size: 1 MB
9.10.01 Engineering Options Report Abbey Mills Route
Other
Size: 6 MB
9.15.28 Tunnel and Bridge Assessments Battersea A Power Station Cable Tunnel
Other
Size: 6 MB
9.15.69 Tunnel and Bridge Assessments LUL District and Circle Line (Temple to Blackfriars)
Other
Size: 345 KB
9.04.01 Errata 6.2.16 Environmental Statement Volume 16 Albert Embankment Foreshore
Other