Silvertown Tunnel

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (4)

Developer's Application (108)

Acceptance (10)

Pre Examination (31)

Examination (673)

Decision (69)

Decided (0)

Date

SourceDescription
Other
Size: 967 KB
Transport for London
Further email regarding non material change consultation publicity. Late submission for Deadline 3 accepted at the discretion of the Examining Authority
Other
Size: 40 KB
Transport for London
Email regarding non material change consultation publicity
Other
Size: 276 KB
Transport for London
8.60 Written Summary for Traffic and Transport Modelling ISH on 17 January 2017
Other
Size: 5 MB
Transport for London
8.71 Response to Action Point 3 from the ISH on 17 January 2017
Other
Size: 1 MB
Transport for London
3.1 Draft DCO Revision 3 (Tracked changes)
Other
Size: 8 MB
Transport for London
8.63 Written Summary for CAH on 20 January 2017
Other
Size: 354 KB
Transport for London
8.73 Response to Action Point 8.2 from the ISH on 17 January 2017
Other
Size: 2 MB
Transport for London
8.70 Response to Action Points 1 and 2 from the ISH on 17 January 2017
Other
Size: 118 KB
Transport for London
SoCG019 Statement of Common Ground with Historic England
Other
Size: 33 KB
London Borough of Tower Hamlets
Post Hearing Submission
Other
Size: 80 KB
Dominic Leggett
Post Hearing Submission
Other
Size: 97 KB
Transport for London
SoCG023 Statement of Common Ground with Health and Safety Executive
Other
Size: 2 MB
Transport for London
8.66 Slurry Tunnel Boring Machine (TBM) and Treatment Plant Environmental Appraisal
Other
Size: 216 KB
Brenntag UK Limited
Post Hearing Submission
Other
Size: 6 MB
Transport for London
8.76 Appendices 1-6 to Written Summary for Environmental ISH of 18 January 2017
Other
Size: 129 KB
Transport for London
8.59 Applicant's Update Note
Other
Size: 65 KB
Thames Water
Post Hearing Submission
Other
Size: 629 KB
Transport for London
8.72 Response to Action Point 6, 7 and 8.1 from the ISH on 17 January 2017
Other
Size: 221 KB
Transport for London
8.74 Response to Action Points 12 and 13 from the ISH on 17 January 2017
Other
Size: 23 MB
Darryl Chamberlain
Submission for Deadline 3
Other
Size: 918 KB
Health and Safety Executive
Post Hearing Submission
Other
Size: 123 KB
Transport for London
8.67 Application and Examination Document Tracker
Other
Size: 143 KB
Transport for London
SoCG001 Statement of Common Ground with Natural England
Other
Size: 694 KB
Transport for London
3.1 Draft DCO Revision 3
Other
Size: 1 MB
London Borough of Newham
Post Hearing Submission
Other
Size: 696 KB
Transport for London
8.62 Written Summary for dDCO ISH on 19 January 2017
Other
Size: 88 KB
Transport for London
SoCG002 Statement of Common Ground with Highways England
Other
Size: 3 MB
London Borough of Southwark
Post Hearing Submission
Other
Size: 793 KB
Westcombe Society
Post Hearing Submission
Other
Size: 76 KB
Transport for London
8.58 Deadline 3 Cover Letter
Other
Size: 197 KB
Transport for London
8.68 Environmental Documents Structure Diagram
Other
Size: 62 KB
Rebecca Moore
Post Hearing Submission
Other
Size: 2 MB
Transport for London
8.69 Impact of the Scheme on Low Income Residents
Other
Size: 230 KB
Environment Agency
Post Hearing Submission
Other
Size: 2 MB
Royal Borough of Greenwich
Post Hearing Submission
Other
Size: 54 KB
No to Silvertown Tunnel
Post Hearing Submission
Other
Size: 166 KB
Royal Mail Group Limited
Correspondence with Applicant
Other
Size: 187 KB
Transport for London
8.75 Response to Action Point 14 from the ISH on 17 January 2017
Other
Size: 9 MB
Port of London Authority
Post Hearing Submission
Other
Size: 413 KB
Emily and Mike Norton
Post Hearing Submission
Other
Size: 63 KB
Public Health England
Post Hearing Submission
Other
Size: 2 MB
London City Airport
Further Post Hearing Submission
Other
Size: 6 MB
Transport for London
8.77 Appendices 7-13 to Written Summary for Environmental ISH 18 January 2017
Other
Size: 363 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 3 (Tracked changes)
Other
Size: 1 MB
Transport for London
8.65 Environmental Appraisal of Precast Concrete (PCC) Segment Manufacturing Plant
Other
Size: 174 KB
Transport for London
7.10 Consent and Agreements Position Statement Revision 1
Other
Size: 133 KB
Transport for London
SoCG005 Statement of Common Ground with Environment Agency
Other
Size: 220 KB
Marine Management Organisation
Post Hearing Submission
Other
Size: 1 MB
London Borough of Lewisham
Post Hearing Submission
Other
Size: 248 KB
London Borough of Hackney
Post Hearing Submission
Other
Size: 221 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 3
Other
Size: 4 MB
Transport for London
2.5 Work Plans Revision 1
Other
Size: 727 KB
Lidoka Estates Ltd
Post Hearing Submission
Other
Size: 541 KB
Transport for London
8.61 Written Summary for Air Quality, Noise and other Environmental Issues ISH on 18 January 2017
Other
Size: 771 KB
Mark Barnes
Post Hearing Submission
Other
Size: 494 KB
Southern Gas Networks and Birch Sites Limited
Submission for Deadline 3
Other
Size: 126 KB
Transport for London
8.64 Document Explaining DCO Amendments
Other
Size: 338 KB
London City Airport
Post Hearing Submission
Other
Size: 261 KB
Tarmac Trading Limited
Post Hearing Submission
Other
Size: 189 KB
Friends of the Earth
Post Hearing Submission
Other
Size: 169 KB
Transport for London
7.10 Consent and Agreements Position Statement Revision 1 (Tracked changes)
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.