The Sizewell C Project

The views expressed in this page do not represent those of the Planning Inspectorate. This page consists of content submitted to the Planning Inspectorate by the public and other interested parties, giving their views of this proposal.

The Sizewell C Project

Received 09 July 2020
From Henrietta Palmer

Representation

I wish to register that I protest against the proposed Sizewell C development . 1) Devestation to local environment 2) whatever attempts are made by EDFs to deal with the traffic it will nonetheless be utterly overwhelming for the local population; the dust and noise from the lorry traffic will be dreadful for many years; Sizewell Gap is already very busy and that will double at least, with the noise from pile driving 24/7 for 2 years 3) a lot of projects are planned for the area at pretty much the same time 4) the design of the plans are outdated; there isn't any need to have a nuclear power station like that now when there are smaller more mobile alternatives 5) I am storing the waste at Sizewell I wish to endorse the Relevant Representation submitted by Stop Sizewell C Henrietta Palmer