Yorkshire and Humber CCS Cross Country Pipeline

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (13)

Developer's Application (207)

Acceptance (24)

Pre Examination (4)

Examination (335)

Decision (32)

Decided (0)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
National Grid Carbon Limited (PDF, 2 MB)
2.3 Work Plan Sheet 25 of 25. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 340 KB)
2.6 Crown Land 2. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 10 MB)
5.4.1-5.4.12 No significant Effects Report Appendices Revision B. Pre-Examination submission received on 14 November 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 8 MB)
2.6 Crown Land Overview. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.14 Barmston Parameter Plans Revision B. Pre-Examination submission received on 14 November 2014 -accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 253 KB)
2.6 Crown Land 3. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 36 MB)
6.9.5 Great Crested Newt Survey Revision B. Pre-Examination submission received on 14 November 2014 -accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.1 Land Plan Sheet 2 of 25. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.3 Work Plan Sheet 24 of 25. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 1 MB)
2.3 Work Plan Sheet 15 of 25. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 1 MB)
5.4 No Significant Effects Report Revision B. Pre-Examination submission received on 14 November 2014 -accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 33 KB)
Book of Reference Comparison. Pre-Examination submission received on 14 November 2014 -accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.3 Work Plan Sheet 2 of 25. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 272 KB)
2.6 Crown Land 1. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.3 Work Plan Sheet 20 of 25. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
2.72 PLANS OF STATUTORY NON-STATUTORY ENVIRONMENTAL SITES AND FEATURES Maps 0-10 (PDF, 10 MB)
Other
6.10.5 Geophysical Survey Part 18 (PDF, 34 MB)
Other
6.10.5 Geophysical Survey Part 5 (PDF, 40 MB)
Other
6.13 Noise and Vibration (PDF, 16 MB)
Other
6.19 Glossary and Acronyms (PDF, 172 KB)
Other
6.3.2 Crossing Methods (PDF, 426 KB)
Other
6.10.5 Geophysical Survey Part 23 (PDF, 18 MB)
Other
6.21 Statement of Combined Effects (PDF, 3 MB)
Other
1.1 List of Application Documents (PDF, 128 KB)
Other
2.14 BARMSTON PUMPING STATION PARAMETER PLAN (PDF, 794 KB)
Other
6.5 Environmental Impact Assessment Process (PDF, 9 MB)
Other
2.5 Hedgerow Plans Sheets 13-25 (PDF, 18 MB)
Other
5.1 Consultation Report Part 3 (PDF, 48 MB)
Other
6.3 Onshore Scheme Description (PDF, 18 MB)
Other
6.7.4 Report on Ground Investigation Report No. 762402RLX-3 (PDF, 5 MB)
Other
7.7.1 Drainage Design Sheets 13-25 (PDF, 20 MB)
Other
4.2 Funding Statement (PDF, 276 KB)
Other
2.29 Camblesforth Multi-Junction Elevations (Operational Site) (PDF, 1 MB)
Other
2.16 BARMSTON PUMPING STATION INDICATIVE LANDSCAPE STRATEGY (PDF, 8 MB)
Other
6.4 EIA Consultation (PDF, 394 KB)
Other
6.17 Cumulative Effects Assessment (PDF, 2 MB)
Other
2.54 DRAX PIG TRAP TEMPORARY CONSTRUCTION VEHICULAR ACCESS (NEW ROAD) (PDF, 444 KB)
Other
4.1 Statement of Reasons (PDF, 751 KB)
Other
5.2.7-5.2.14 Flood Risk Assessment Appendices (PDF, 4 MB)
Other
6.10.5 Geophysical Survey Part 24 (PDF, 39 MB)
Other
2.39 Dalton Block Valve Planning Arrangement (PDF, 530 KB)
Other
6.10.5 Geophysical Survey Part 20 (PDF, 371 KB)
Other
2.55 CAMBLESFORTH MULTI-JUNCTION PERMANENT VEHICULAR ACCESS (A645) (PDF, 499 KB)
Other
6.4.7 Safety Statement (PDF, 820 KB)
Other
6.10.5 Geophysical Survey Part 16 (PDF, 42 MB)
Other
2.53 Typical Temporary Access From Highway No Flumed Ditch Crossing (PDF, 147 KB)
Other
4.3 Book of Reference (parts 1-5) (PDF, 33 KB)
Other
2.65 CAMBLESFORTH MULTI-JUNCTION PERMANENT VEHICULAR ACCESS (A645) VEHICULAR SWEPT PATH ANALYSIS (PDF, 350 KB)
Other
6.15 Socio-Economics (PDF, 15 MB)
Other
2.36 Tollingham Block Valve Elevations (Operational Site) (PDF, 868 KB)
Other
6.8.1 Local Planning Policy (PDF, 292 KB)
Other
3.2 Draft Explanatory Memorandum (PDF, 2 MB)
Other
6.4.5 Scoping Opinion Responses (PDF, 355 KB)
Other
2.18 Drax Pig Trap Planning Arrangement (PDF, 253 KB)
Other
2.43 Dalton Block Valve Elevations (Operational Site) (PDF, 956 KB)
Other
6.10.5 Geophysical Survey Part 15 (PDF, 373 KB)
Other
7.8 Proposed Scheme Report Part 5 (PDF, 32 MB)
Other
5.2 Flood Risk Assessment (PDF, 5 MB)
Other
2.17 Drax Pig Trap Location Plan (PDF, 340 KB)
Other
2.63 DRIFFIELD CONSTRUCTION COMPOUND TEMPORARY VEHICULAR ACCESS (A614) (PDF, 492 KB)
Other
6.10.5 Geophysical Survey Part 7 (PDF, 21 MB)
Other
6.10.5 Geophysical Survey Part 17 (PDF, 33 MB)
Other
2.3 Works Plans Sheets 13-25 (PDF, 17 MB)
Other
6.12 Air Quality (PDF, 8 MB)
Other
6.7.7 Report on Ground Investigation Report No. 762402L (PDF, 15 MB)
Other
7.7.1 Drainage Design Sheets 0-12 (PDF, 24 MB)
Other
5.1 Consultation Report Part 2 (PDF, 38 MB)
Other
5.3 Statement of Statutory Nuisance (PDF, 697 KB)
Other
2.23 Drax Pig Trap Planting Drawing (PDF, 429 KB)
Other
6.10.5 Geophysical Survey Part 14 (PDF, 31 MB)
Other
2.13 BARMSTON PUMPING STATION NITROGEN AIR BUILDING (PDF, 694 KB)
Other
2.45 Skerne Block Valve Location Plan (PDF, 523 KB)
Other
7.8 Proposed Scheme Report Part 2 (PDF, 12 MB)
Other
6.7.5 Report on Ground Investigation Report No. 762402RLX-5 (PDF, 5 MB)
Other
6.10.1-6.10.4 Archaeology and Cultural Heritage Appendices (PDF, 2 MB)
Other
2.32 Tollingham Block Valve Planning Arrangement (PDF, 499 KB)
Other
6.7.2 Report on Ground Investigation Report No. 762402T2 (PDF, 34 MB)
Other
3.1 Draft Development Consent Order (PDF, 679 KB)
Other
2.68 SKERNE BLOCK VALVE PERMANENT VEHICULAR ACCESS (MAIN STREET SKERNE) VEHICULAR SWEPT PATH ANALYSIS (PDF, 394 KB)
Other
6.10.5 Geophysical Survey Part 22 (PDF, 27 MB)
Other
7.8 Proposed Scheme Report Part 3 (PDF, 42 MB)
Other
2.33 Tollingham Block Valve Elevations (N E) (PDF, 648 KB)
Other
6.9.6 Bat Survey Report (PDF, 9 MB)
Other
7.8 Proposed Scheme Report Part 1 (PDF, 50 MB)
Other
6.13.1-6.13.3 Noise and Vibration Appendices (PDF, 3 MB)
Other
2.3 Works Plans Sheets 0-12 (PDF, 21 MB)
Other
7.3 Design and Access Statement (PDF, 21 MB)
Other
2.1 Land Plans Sheets 0-26 (PDF, 50 MB)
Other
6.8 Land Use and Agriculture (PDF, 44 MB)
Other
2.9 BARMSTON PUMPING STATION Location Plan (PDF, 629 KB)
Other
5.1 Consultation Report Part 1 (PDF, 31 MB)
Other
6.7.6 Report on Ground Investigation Report No. 762402RVX-6 (PDF, 16 MB)
Other
1.5 Newspaper Notices (PDF, 12 MB)
Other
2.37 Tollingham Block Valve Planting Drawing (PDF, 720 KB)
Other
2.4 Access Rights of Way and Stopping Up Plans Sheets 0-12 (PDF, 20 MB)
Other
5.2.1-5.2.6 Flood Risk Assessment Appendices (PDF, 6 MB)
Other
2.20 Drax Pig Trap Elevations (S W) (PDF, 550 KB)
Other
7.4 Need Case (PDF, 1,003 KB)
Other
7.5 Code of Construction Practice (PDF, 9 MB)
Other
6.10 Archaeology and Cultural Heritage (PDF, 8 MB)
Other
6.7 Geology Hydrogeology and Ground Conditions (PDF, 36 MB)
Other
2.47 Skerne Block Valve Elevations (N E) (PDF, 661 KB)
Other
1.3 Application Form (PDF, 139 KB)
Other
2.42 Dalton Block Valve 3D Visualisation (Isometric) (PDF, 1 MB)
Other
7.1 Planning Statement (PDF, 615 KB)
Other
2.4 Access Rights of Way and Stopping Up Plans Sheets 13-25 (PDF, 17 MB)
Other
6.10.5 Geophysical Survey Part 3 (PDF, 29 MB)
Other
2.12 BARMSTON PUMPING STATION ADMINISTRATION WORKSHOP SWITCHOUSE BUILDINGS (PDF, 465 KB)
Other
6.12.1 Dust Assessment Methodology (PDF, 99 KB)
Other
6.17.1 Intra Project Cumulative Effects Screening Assessment (PDF, 396 KB)
Other
6.10.5 Geophysical Survey Part 4 (PDF, 373 KB)
Other
6.15.2-6.15.3 Socio-Economics Appendices (PDF, 4 MB)
Other
2.27 Camblesforth Multi-Junction Elevations (S W) (PDF, 630 KB)
Other
6.10.5 Geophysical Survey Part 13 (PDF, 28 MB)
Other
2.26 Camblesforth Multi-Junction Elevations (N E) (PDF, 662 KB)
Other
7.7 Drainage Report (PDF, 293 KB)
Other
2.74 Regulation 5(2)(l) and 5(2)(m) Assessment Reference Document (PDF, 74 KB)
Other
2.5 Hedgerow Plans Sheet 0-12 (PDF, 21 MB)
Other
6.4.3 Scoping Opinion (PDF, 22 MB)
Other
6.4.9 Stakeholder Meeting Minutes (PDF, 1 MB)
Other
2.60 BARMSTON PUMPING STATION PERMANENT VEHICULAR ACCESS (SANDS ROAD) (PDF, 300 KB)
Other
6.3.1 Crossing Schedule (PDF, 135 KB)
Other
6.7.1 Report on Ground Investigation Report No. 762402 - Part 2 of 3 (PDF, 18 MB)
Other
6.18 Summary of Residual Effects (PDF, 785 KB)
Other
2.44 Dalton Block Valve Planting Drawing (PDF, 700 KB)
Other
6.4.2 Scoping Report (PDF, 44 MB)
Other
2.51 Skerne Block Valve Planting Drawing (PDF, 744 KB)
Other
2.11 BARMSTON PUMPING STATION Pumping Buildings A-H (PDF, 728 KB)
Other
2.49 Skerne Block Valve 3D Visualisation (Isometric) (PDF, 2 MB)
Other
6.9 Ecology and Nature Conservation (PDF, 25 MB)
Other
2.35 Tollingham Block Valve 3D Visualisation (Isometric) (PDF, 2 MB)
Other
6.7.1 Report on Ground Investigation Report No. 762402 - Part 1 of 3 (PDF, 40 MB)
Other
2.34 Tollingham Block Valve Elevations (S W) (PDF, 611 KB)
Other
2.15 BARMSTON PUMPING STATION PROPOSED SITE SECTIONS (PDF, 505 KB)
Other
2.30 Camblesforth Multi-Junction Planting Drawing (PDF, 898 KB)
Other
6.9.9 Ornithological Report (PDF, 23 MB)
Other
6.6 Water Resources and Flood Risk (PDF, 28 MB)
Other
6.9.11 Landfall Intertidal Phase 1 Survey Report (PDF, 6 MB)
Other
6.14 Traffic Transport and Access (PDF, 19 MB)
Other
6.9.8 Reptile Survey Report (PDF, 4 MB)
Other
6.11 Landscape and Visual Assessment (PDF, 44 MB)
Other
6.14.4 Transport Assessment (PDF, 27 MB)
Other
6.9.1 Local Planning Policies - Ecology (PDF, 265 KB)
Other
6.9.7 Otter and Water Vole Report (PDF, 8 MB)
Other
6.10.5 Geophysical Survey Part 8 (PDF, 21 MB)
Other
2.73 PLANS OF STATUTORY NON-STATUTORY SITES AND FEATURES OF THE HISTORIC ENVIRONMENT Maps 0-10 (PDF, 10 MB)
Other
2.28 Camblesforth Multi-Junction 3D Visulisation (isometric) (PDF, 2 MB)
Other
5.1 Consultation Report Part 4 (PDF, 40 MB)
Other
6.10.5 Geophysical Survey Part 10 (PDF, 43 MB)
Other
2.25 Camblesforth Multi-Junction Planning Arrangement (PDF, 742 KB)
Other
2.59 BARMSTON PUMPING STATION PERMANENT VEHICULAR ACCESS (SANDS ROAD) (PDF, 259 KB)
Other
6.10.5 Geophysical Survey Part 1 (PDF, 363 KB)
Other
2.66 TOLLINGHAM BLOCK VALVE PERMANENT VEHICULAR ACCESS (SKIFF LANE) VEHICULAR SWEPT PATH ANALYSIS (PDF, 320 KB)
Other
1.6 Navigation Document (PDF, 160 KB)
Other
2.67 DALTON BLOCK VALVE PERMANENT VEHICULAR ACCESS (LUND WOLD ROAD) VEHICULAR SWEPT PATH ANALYSIS (PDF, 389 KB)
Other
6.9.5 Great Crested Newt Survey Report (PDF, 10 MB)
Other
2.31 Tollingham Block Valve Location Plan (PDF, 526 KB)
Other
6.10.5 Geophysical Survey Part 19 (PDF, 16 MB)
Other
6.10.5 Geophysical Survey Part 12 (PDF, 25 MB)
Other
2.40 Dalton Block Valve Elevations (N E) (PDF, 695 KB)
Other
6.4.4 Schedule of Responses to the Scoping Opinion (PDF, 661 KB)
Other
6.10.5 Geophysical Survey Part 2 (PDF, 39 MB)
Other
6.1 Introduction (PDF, 678 KB)
Other
2.57 DALTON BLOCK VALVE PERMANENT VEHICULAR ACCESS (LUND WOLD ROAD) (PDF, 353 KB)
Other
2.64 DRAX PIG TRAP TEMPORARY CONSTRUCTION VEHICULAR ACCESS (NEW ROAD) VEHICULAR SWEPT PATH ANALYSIS (PDF, 325 KB)
Other
6.10.5 Geophysical Survey Part 21 (PDF, 36 MB)
Other
6.20 Non Technical Summary (PDF, 53 MB)
Other
2.71 DRIFFIELD CONSTRUCTION COMPOUND TEMPORARY VEHICULAR ACCESS (A614) VEHICULAR SWEPT PATH ANALYSIS (PDF, 440 KB)
Other
6.7.3 Report on Ground Investigation Report No. 762402RVX-4 (PDF, 16 MB)
Other
2.48 Skerne Block Valve Elevations (S W) (PDF, 620 KB)
Other
2.56 TOLLINGHAM BLOCK VALVE PERMANENT VEHICULAR ACCESS (SKIFF LANE) (PDF, 312 KB)
Other
6.10.5 Geophysical Survey Part 9 (PDF, 384 KB)
Other
2.21 Drax Pig Trap 3D Visualisation (Isometric) (PDF, 6 MB)
Other
6.9.3 Hedgerow Survey Report (PDF, 6 MB)
Other
5.4.1-5.4.11 No Significant Effects Report Appendices (PDF, 3 MB)
Other
6.4.8 PEIR Addendum Responses (PDF, 1 MB)
Other
2.46 Skerne Block Valve Planning Arrangement (PDF, 542 KB)
Other
6.6.1-6.6.8 Water Resources and Flood Risk Appendices (PDF, 3 MB)
Other
2.61 WIDENING OF SANDS ROAD BETWEEN A165 JUNCTION AND SITE ACCESS (PDF, 351 KB)
Other
2.7 Deemed Marine Licence Coordinates (PDF, 2 MB)
Other
6.8.2 Planning Applications (PDF, 279 KB)
Other
6.11.1-6.11.6 Landscape and Visual Assessment Appendices (PDF, 7 MB)
Other
5.4 No Significant Effects Report (PDF, 3 MB)
Other
6.9.2 Ecology Desk Study and Consultation Information (PDF, 9 MB)
Other
2.19 Drax Pig Trap Elevations (N E) (PDF, 569 KB)
Other
6.4.1 Thematic group meeting minutes (PDF, 490 KB)
Other
2.10 BARMSTON PUMPING STATION Illustrative Site Layout (PDF, 825 KB)
Other
2.41 Dalton Block Valve Elevations (S W) (PDF, 658 KB)
Other
1.2 Covering Letter (PDF, 368 KB)
Other
6.10.5 Geophysical Survey Part 11 (PDF, 33 MB)
Other
2.38 Dalton Block Valve Location Plan (PDF, 309 KB)
Other
2.24 Camblesforth Multi-Junction Location Plan (PDF, 354 KB)
Other
2.58 SKERNE BLOCK VALVE PERMANENT VEHICULAR ACCESS (MAIN STREET SKERNE) (PDF, 374 KB)
Other
2.2 Plans showing Special Category Land Sheets 1-2 (PDF, 576 KB)
Other
6.14.1-6.14.3 Traffic Transport and Access Appendices (PDF, 16 MB)
Other
6.10.5 Geophysical Survey Part 6 (PDF, 33 MB)
Other
6.15.1 Beach User Report (PDF, 22 MB)
Other
2.22 Drax Pig Trap Elevations (Operational Site) (PDF, 1 MB)
Other
6.4.6 PEIR Responses (PDF, 2 MB)
Other
2.50 Skerne Block Valve Elevations (Operational Site) (PDF, 901 KB)
Other
2.52 Typical Temporary Access From Highway Flumed Ditch Crossing (PDF, 151 KB)
Other
2.69 BARMSTON PUMPING STATION PERMANENT VEHICULAR ACCESS (SANDS ROAD) VEHICULAR SWEPT PATH ANALYSIS (PDF, 374 KB)
Other
2.6 Crown Land Plans Sheets 1-3 (PDF, 791 KB)
Other
6.7.1 Report on Ground Investigation Report No. 762402 - Part 3 of 3 (PDF, 33 MB)
Other
7.6 Construction Report (PDF, 5 MB)
Other
7.8 Proposed Scheme Report Part 4 (PDF, 38 MB)
Other
6.2 Onshore Scheme Development and Alternatives (PDF, 17 MB)