You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (13)
Developer's Application (207)
- All Documents
- Application Form (5)
- Compulsory Acquisition Information (3)
- Draft Development Consent Orders (2)
- Environmental Statement (85)
- Other Documents (14)
- Plans (73)
- Post submission changes (15)
- Reports (10)
Acceptance (24)
Pre Examination (4)
- All Documents
- Other (2)
- Procedural Decisions (2)
Examination (335)
- All Documents
- Additional Submissions (19)
- Correspondence (2)
- Deadline 1 - 18 December 2014 (103)
- Deadline 2 - 20 January 2015 (22)
- Deadline 3 - 17 February 2015 (40)
- Deadline 4 - 4 March 2015 (38)
- Deadline 5 - 26 March 2015 (17)
- Deadline 6 - 1 April 2015 (15)
- Deadline 7 - 16 April 2015 (12)
- Deadline 8 - 24 April 2015 (23)
- Development Consent Order (2)
- Environmental Impact Assessment (1)
- + Hearings (19)
- Itinerary for the Accompanied Site Visit .pdf (1)
- Other (4)
- Preliminary Meeting (11)
- Procedural Decisions (6)
Decision (32)
- All Documents
- DCO decision letter (SoS)(refuse) (1)
- DECC Consulation (1)
- + DECC Consultation (22)
- Other (2)
- Other Documents (5)
- Procedural Decisions (1)
Decided (0)
Source | Description |
---|---|
Other |
National Farmers Union (PDF, 82 KB)
Written Representation and Response to the Examining Authority's First Written Questions. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 195 KB)
18.5 List of Documents prior to end of Examination submitted 18 May 2015
|
Other |
Environment Agency (PDF, 80 KB)
Close of Examination Letter submitted 19 May 2015
|
Other |
National Grid Carbon Limited (PDF, 521 KB)
Explanatory Memorandum of comparison of application draft DCO Revision A with Final draft DCO Revision G. Submitted on 15 May 2015
|
Other |
National Grid Carbon Limited (PDF, 4 MB)
18.3 Agreed Statement of Mineral Sterilisation with W C Watts submitted 18 May 2015
|
Other |
National Grid Carbon Limited (PDF, 743 KB)
Comparison of application draft DCO Revision A with Final draft DCO Revision G. Submitted on 15 May 2015
|
Other |
National Grid Carbon Limited (PDF, 5 MB)
18.1 Position in respect of statutory undertakers and others submitted 18 May 2015
|
Other |
National Grid Carbon Limited (PDF, 519 KB)
18.4 Closure of Examination submissions cover letter submitted 18 May 2015
|
Other |
National Grid Carbon Limited (PDF, 472 KB)
18.2 Joint Statement with Network Rail submitted 18 May 2015
|
Other |
Network Rail Infrastructure Limited (PDF, 969 KB)
Joint Statement of Network Rail and National Grid Carbon Limited. Submitted on 18 May 2015
|
Other |
Northern Powergrid (PDF, 379 KB)
Clarification that Northern Powergrid has concluded contractual documentation in relation to the protection of its plant and apparatus with the applicant, and withdrawal of representations.
|
Other |
Yorkshire Water (PDF, 74 KB)
Clarification that Yorkshire Water has concluded contractual documentation in relation to the protection of its plant and apparatus with the applicant, and withdrawal of representations.
|
Other |
Northern Gas Networks (PDF, 600 KB)
Clarification that Northern Gas Networks has concluded contractual documentation in relation to the protection of its plant and apparatus with the applicant.
|
Other |
National Grid Electricity Transmission Plc (PDF, 69 KB)
Clarification that NGET has concluded contractual documentation in relation to the protection of its plant and apparatus with the applicant.
|
Other |
National Grid Gas Plc (PDF, 69 KB)
Clarification that NGG has concluded contractual documentation in relation to the protection of its plant and apparatus with the applicant.
|
Other |
Capture Power Limited (PDF, 260 KB)
Withdrawal of representation relating to Compulsory Acquisition. Accepted at the discretion of the Examining Authority
|
Other |
Kirkburn Parish Council. (PDF, 127 KB)
Late submission for Deadline 3 of 17 February 2015 ? not published earlier as sent to incorrect email address.
|
Other |
Government Pipelines and Storage System (PDF, 41 KB)
Late submission for Deadline 8 of 24 April 2015. Accepted at the discretion of the Examining Authority
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.3 Works Plan Sheet 19. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 425 KB)
17.5 Deadline 8 Cover Letter. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
2.63 Driffield Construction Compound Temporary Vehicular Access (A614). Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 33 KB)
4.3 Book of Reference (Rev D). Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 425 KB)
2.71 Driffield Construction Compound Temporary Vehicular Swept Path Analysis. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
2.27 Multi Junction Elevations (S+W). Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 4 MB)
2.1 Land Plan Sheet 17. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 745 KB)
2.25 Multi Junction Planning Arrangement. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
3.8 Commentary on Revision G of the Final Draft Development Consent Order. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
17.1 Explanatory Note to Accompany Deadline 8 Submission. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 55 KB)
17.2 Position in respect of statutory undertakers and others. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 33 KB)
17.4 Book of Reference extracts with track changes (Parts 1 and 4). Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 873 KB)
2.29 Multi Junction Elevations (Operational Site). Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
3.2 Revised Explanatory Memorandum (Rev G). Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 997 KB)
2.30 Multi Junction Planting Drawing. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 264 KB)
17.6 List of Deadline 8 Documents. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 33 KB)
17.3 Updated Schedule of Compulsory Acquisition. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 4 MB)
2.1 Land Plan Sheet 19. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 367 KB)
2.4 Access Plan Sheet 19. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 910 KB)
3.1 Final Draft Development Consent Order (Rev G). Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.5 Hedgerow Plan Sheet 19. Submission for Deadline 8 of 24 April 2015
|
Other |
National Grid Carbon Limited (PDF, 729 KB)
2.26 Multi Junction Elevations (N+E). Submission for Deadline 8 of 24 April 2015
|
Other |
Capture Power Ltd (PDF, 121 KB)
Response to Rule 17 Letter dated 8 April 2015. Submission for Deadline 7 of 16 April 2015
|
Other |
Drax Power Limited (PDF, 682 KB)
Update on property negotiations between Drax Power Limited and National Grid Carbon Limited. Submission for Deadline 7 of 16 April 2015
|
Other |
East Riding of Yorkshire Council (PDF, 45 KB)
Update on Section 38 Agreement. Submission for Deadline 7 of 16 April 2015
|
Other |
Environment Agency (PDF, 115 KB)
Outstanding Matters in response to Rule 17 Letter dated 8 April 2015 . Submission for Deadline 7 of 16 April 2015
|
Other |
INEOS Manufacturing (Hull) Limited (PDF, 117 KB)
Response to Rule 17 Letter dated 8 April 2015. Submission for Deadline 7 of 16 April 2015
|
Other |
Marine Management Organisation (PDF, 130 KB)
Response to Rule 17 Letter dated 8 April 2015 . Submission for Deadline 7 of 16 April 2015
|
Other |
National Grid Carbon Limited (PDF, 4 MB)
16.1 Responses to Matters Raised in Rule 17 Letter dated 8 April 2015. Submission for Deadline 7 of 16 April 2015
|
Other |
National Grid Carbon Limited (PDF, 267 KB)
16.2 Deadline 7 Cover Letter
|
Other |
Network Rail Infrastructure Limited (PDF, 17 KB)
Joint Response with National Grid Carbon Limited: Update on agreements. Submission for Deadline 7 of 16 April 2015
|
Other |
North Yorkshire County Council (PDF, 100 KB)
Response to Rule 17 Letter dated 8 April 2015. Submission for Deadline 7 of 16 April 2015
|
Other |
Northern Powergrid (Yorkshire) plc (PDF, 20 KB)
Update on protective provisions agreement between Northern Powergrid (Yorkshire) plc and National Grid Carbon Limited. Submission for Deadline 7 of 16 April 2015
|
Other |
Yorkshire Water (PDF, 124 KB)
Update on Asset Protection Agreement between Yorkshire Water and National Grid Carbon Limited. Submission for Deadline 7 of 16 April 2015
|
Other |
Rule 17, Rule 8(3) and Rule 9 (PDF, 88 KB)
Request for further information, acceptance of non material amendments to the application, and notification of amendment to the Examination timetable
|
Other |
Highways Agency (PDF, 1,001 KB)
Letter dated 27 March 2015 relating to the Crown?s interest in land within Plots 740-744. Submission for Deadline 6 of 1 April 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
2.19 Drax Pig Trap Elevations N+E Rev C. Submission for Deadline 6 of 1 April 2015..
|
Other |
National Grid Carbon Limited (PDF, 344 KB)
15.4 Deadline 6 Cover Letter. Submission for Deadline 6 of 1 April 2015.
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
2.20 Drax Pig Trap Elevations S+W Rev C. Submission for Deadline 6 of 1 April 2015.
|
Other |
National Grid Carbon Limited (PDF, 579 KB)
2.18 Drax Pig Trap Planning Arrangement Rev C. Submission for Deadline 6 of 1 April 2015.
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
3 2 Explanatory memorandum Rev F. Submission for Deadline 6 of 1 April 2015.
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
2.22 Drax Pig Trap Elevations Operational Site Rev C. Submission for Deadline 6 of 1 April 2015.
|
Other |
National Grid Carbon Limited (PDF, 206 KB)
15.3 List of Deadline 6 Documents. Submission for Deadline 6 of 1 April 2015.
|
Other |
National Grid Carbon Limited (PDF, 33 KB)
15.2 Updated Compulsory Acquisition Schedule. Submission for Deadline 6 of 1 April 2015.
|
Other |
National Grid Carbon Limited (PDF, 15 MB)
7 5 Code of Construction Practice (Rev E) FINAL. Submission for Deadline 6 of 1 April 2015.
|
Other |
National Grid Carbon Limited (PDF, 349 KB)
3. 7 Commentary on Revision F of the Draft Development Consent Order. Submission for Deadline 6 of 1 April 2015.
|
Other |
National Grid Carbon Limited (PDF, 932 KB)
Supplement to document 15.1 relating to Cathodic Protection. Accepted at the discretion of the Examining Authority. Submission for Deadline 6 of 1 April 2015
|
Other |
National Grid Carbon Limited (PDF, 848 KB)
3.1 Draft Development Consent Order Rev F. Submission for Deadline 6 of 1 April 2015.
|
Other |
National Grid Carbon Limited (PDF, 517 KB)
15.1 Submission on Cathodic Protection. Submission for Deadline 6 of 1 April 2015.
|
Other |
Natural England (PDF, 49 KB)
Correspondence to the Planning Inspectorate including ?No Comments? on the Report on the Implications for European Sites. Submission for Deadline 6 of 1 April 2015
|
Other |
Marine Management Organisation (PDF, 180 KB)
Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015. Submission for Deadline 5 of 26 March 2015.
|
Other |
National Grid Carbon Limited (PDF, 200 KB)
7.7 Drainage Report Rev B FINAL. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
3.6 Commentary on Revision E of the Draft Development Consent Order. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
|
Other |
National Grid Carbon Limited (PDF, 33 KB)
14 6 Submission on Updated Book of Reference Submitted at Deadline 5. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
|
Other |
National Grid Carbon Limited (PDF, 990 KB)
9.2 Signed Statement of Common Ground between East Riding of Yorkshire Council and National Grid. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
|
Other |
National Grid Carbon Limited (PDF, 342 KB)
14.2 Response to matters raised at Deadline 4 - Enhancement. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
|
Other |
National Grid Carbon Limited (PDF, 261 KB)
14.7 List of Deadline 5 Documents. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
|
Other |
National Grid Carbon Limited (PDF, 33 KB)
14.3 Updated Compulsory Acquisition Schedule. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
|
Other |
National Grid Carbon Limited (PDF, 893 KB)
3.1 Draft Development Consent Order (Rev E). Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
|
Other |
National Grid Carbon Limited (PDF, 237 KB)
14.5 Errata Sheet. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
|
Other |
National Grid Carbon Limited (PDF, 557 KB)
14.1 Responses to matters raised in Rule 17 Letter. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
|
Other |
National Grid Carbon Limited (PDF, 33 KB)
4.3 Book of Reference (Rev C). Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
|
Other |
National Grid Carbon Limited (PDF, 343 KB)
14.8 Deadline 5 Cover Letter. Submissions for Deadline 5 of 26 March 2015. Includes comments on the Report on the Implications for European Sites
|
Other |
National Grid Carbon Limited (PDF, 344 KB)
14.4 Updated Schedule of Statutory Undertakers. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
3.2 Explanatory Memorandum (Rev E). Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
|
Other |
North Yorkshire County Council and Selby District council (PDF, 67 KB)
Joint Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015. Submission for Deadline 5 of 26 March 2015.
|
Other |
The Crown Estate (PDF, 125 KB)
Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015. Submission for Deadline 5 of 26 March 2015.
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
9.6 Signed Statement of Common Ground between Environment Agency and National Grid at Deadline 3. Signed on 2 and 9 March 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
9.12 Signed Statement of Common Ground between Ouse and Humber Drainage Board and National Grid at Deadline 3. Signed on 23 February and 9 March 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
9.7 Signed Statement of Common Ground between Marine Management Organisation and National Grid at Deadline 3. Signed on 2 and 9 March 2015
|
Other |
National Grid Carbon Limited (PDF, 3 MB)
9.1 Signed Statement of Common Ground between North Yorkshire County Council and National Grid at Deadline 3. Signed on 3 and 9 March 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
9.7 Signed Statement of Common Ground between Marine Management Organisation and National Grid at Deadline 4. Signed on 11 and 13 March 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
9.10 Signed Statement of Common Ground between Selby Area IDB and National Grid at Deadline 3. Signed on 5 and 13 March 2015
|
Other |
R17 request for further information (PDF, 198 KB)
|
Other |
National Grid Carbon Limited (PDF, 533 KB)
9.5 Signed Statement of Common Ground between Natural England and National Grid. Submission for Deadline 3 of 17 February 2015
|
Other |
Report on the Implications for European Sites (RIES) (PDF, 449 KB)
Report on the Implications for European Sites (RIES) issued by the Examining Authority on 11 March 2015
|
Other |
Environment Agency (PDF, 83 KB)
Submission for Deadline 4 of 4 March 2015
|
Other |
Marine Management Organisation (PDF, 224 KB)
Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 492 KB)
9.7 Statement of Common Ground between Marine Management Organisation and National Grid at Deadline 4 Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 498 KB)
2.32 Tollingham Block Valve Planning Arrangement Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
2.19 Drax Pig Trap Elevations (N+E) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 33 KB)
13.3 Updated Schedule of Compulsory Acquisition Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 460 KB)
2.48 Skerne Block Valve Elevations (S+W) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 821 KB)
3.1 Draft Development Consent Order (Rev D) Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 519 KB)
13.6 Deadline 4 Cover Letter Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
3.2 Explanatory Memorandum (Rev D) Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 579 KB)
2.18 Drax Pig Trap Planning Arrangement Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 539 KB)
2.39 Dalton Block Valve Planning Arrangement Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 458 KB)
2.34 Tollingham Block Valve Elevations (S+W) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 486 KB)
2.47 Skerne Block Valve Elevations (N+E) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 690 KB)
2.26 Camblesforth Multi-Junction Elevations (N+E) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 556 KB)
2.46 Skerne Block Valve Planning Arrangement Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 475 KB)
2.33 Tollingham Block Valve Elevations (N+E) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 696 KB)
2.27 Camblesforth Multi-Junction Elevations (S+W) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 811 KB)
2.29 Camblesforth Multi-Junction Elevations (Operational Site) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 464 KB)
2.40 Dalton Block Valve Elevations (N+E) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 535 KB)
2.36 Tollingham Block Valve Elevations (Operational Site) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
3.5 Commentary on Revision D of the Draft Development Consent Order Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 58 KB)
13.2 Errata Sheet Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 3 MB)
9.3 Signed Statement of Common Ground between Selby District Council and National Grid. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 62 KB)
13.5 List of Deadline 4 Documents Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 459 KB)
2.41 Dalton Block Valve Elevations (S+W) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 515 KB)
2.43 Dalton Block Valve Elevations (Operational Site) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 510 KB)
2.50 Skerne Block Valve Elevations (Operational Site) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
2.20 Drax Pig Trap Elevations (S+W) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 15 MB)
7.5 Code of Construction Practice (Rev D) Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
13.1 Responses to matters raised at Deadline 3 Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
2.22 Drax Pig Trap Elevations (Operational Site) Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.25 Camblesforth Multi-Junction Planning Arrangement Rev B. Submission for Deadline 4 of 4 March 2015
|
Other |
National Grid Carbon Limited (PDF, 254 KB)
13.4 Position in respect of statutory undertakers and others Submission for Deadline 4 of 4 March 2015
|
Other |
Network Rail Infrastructure Limited (PDF, 96 KB)
Comments on the applicant?s revised draft Development Consent Order. Submission for Deadline 4 of 4 March 2015
|
Other |
North Yorkshire County Council (PDF, 305 KB)
Response to the applicant?s Biodiversity Protocol. Submission for Deadline 4 of 4 March 2015
|
Other |
Yorkshire Wildlife Trust (PDF, 1 MB)
Clarification of the Trust?s approach to biodiversity enhancement. Submission for Deadline 4 of 4 March 2015
|
Other |
Alan Marsland (PDF, 133 KB)
Revised submission accepted at the discretion of the Examining Authority. This replaces the version submitted for Deadline 3 of 17 February 2015.
|
Other |
East Riding of Yorkshire Council (PDF, 10 MB)
Information requested by the Examining Authority at the Minerals Hearing of 4 February 2015. Late submission for Deadline 3 accepted at the discretion of the Examining Authority.
|
Other |
Network Rail Infrastructure Limited (PDF, 110 KB)
Correspondence received outside a deadline accepted at the discretion of the Examining Authority
|
Other |
Natural England (PDF, 261 KB)
Summary of representation at Biodiversity Hearing of 4 February 2015. Submission for Deadline 3 of 17 February 2015
|
Other |
Dr Vincini (PDF, 26 KB)
Submission for Deadline 3 of 17 February 2015
|
Other |
Marine Management Organisation (PDF, 136 KB)
Summary of representation at draft Development Consent Order Hearing of 29 January 2015.Submission for Deadline 3 of 17 February 2015
|
Other |
Mineral Products Association, W Clifford Watts Ltd and Others (PDF, 18 MB)
Objectors Rebuttal to National Grid Carbon Limited Minerals Report ? Park Farm Quarry documents and Sterilisation Calculation plan. Submission for Deadline 3 of 17 February 2015
|
Other |
Mineral Products Association, W Clifford Watts Ltd and Others (PDF, 1 MB)
Objectors rebuttal to National Grid Carbon Limited Minerals Report ? Appendix B and C and Plan 1. Submission for Deadline 3 of 17 February 2015
|
Other |
Mineral Products Association, W Clifford Watts Ltd and Others (PDF, 3 MB)
Objectors Rebuttal to National Grid Carbon Limited Minerals Report ? Appendix A. Submission for Deadline 3 of 17 February 2015
|
Other |
Mr and Mrs Thompson (PDF, 803 KB)
Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.4 Access Rights of Way and Stopping Up Plans Sheet 1 of 25 Rev C. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 88 KB)
Clarification of draft Development Consent Order. Late submission for Deadline 3 of 17 February 2015, accepted at the discretion of the Examining Authority
|
Other |
National Grid Carbon Limited (PDF, 416 KB)
9.7 Statement of Common Ground between Marine Management Organisation and National Grid at Deadline 3. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 539 KB)
9.1 Statement of Common Ground between North Yorkshire County Council and National Grid at Deadline 3. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 58 MB)
7.7.1 Drainage Design Sheets 0-16 and 19-23 Rev B and Sheets 17, 18, 24 and 25 Rev C. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 86 KB)
12.3 Position in respect of statutory undertakers and others. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 534 KB)
9.10 Statement of Common Ground between Selby Area IDB and National Grid at Deadline 3. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 527 KB)
9.12 Statement of Common Ground between Ouse and Humber Drainage Board and National Grid at Deadline 3. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 87 KB)
12.2 Response to MPA Lift and Shift Provision. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
7.5 Code of Construction Practice (Rev C). Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 291 KB)
12.5 Protocol for Delivering Biodiversity Enhancement.Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 628 KB)
9.2 Statement of Common Ground Between East Riding of Yorkshire Council and National Grid at Deadline 3. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 33 KB)
12.4 Updated Schedule of Compulsory Acquisition. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 687 KB)
3.1 Draft Development Consent Order (Rev C). Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
3.4 Commentary on Revision C of the Draft Development Consent Order. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 1,016 KB)
12.6 Tracked Changed Comparison Version of the CoCP from Submission Version to Rev C. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 63 KB)
12.9 List of Deadline 3 Documents. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 248 KB)
12.7 Schedule of Actions as Requested by PINS Case Manager. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 591 KB)
9.6 Statement of Common Ground between Environment Agency and National Grid at Deadline 3. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 5 MB)
12.1 Written Summaries of Oral Evidence and Supporting Information Report. Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
3.2 Explanatory Memorandum (Rev C). Submission for Deadline 3 of 17 February 2015
|
Other |
National Grid Carbon Limited (PDF, 263 KB)
12.8 Deadline 3 Cover Letter. Submission for Deadline 3 of 17 February 2015
|
Other |
North Yorkshire County Council (PDF, 4 MB)
Submission for Deadline 3 of 17 February 2015
|
Other |
W Clifford Watts Ltd (PDF, 14 MB)
David Watts- presentation to the Compulsory Acquisition Hearing of 5 February 2015 and supporting documents. Submission for Deadline 3 of 17 February 2015
|
Other |
Audio Recording Part 1 (PDF, 31 KB)
Compulsory Acquisition Hearing of 5 February 2015 Part 1
|
Other |
Audio Recording Part 2 (PDF, 31 KB)
Compulsory Acquisition Hearing of 5 February 2015 Part 2
|
Other |
Network Rail Infrastructure Limited (PDF, 1 MB)
Late submission for Compulsory Acquisition Hearing of 5 February 2015. Accepted at the discretion of the Examining Authority
|
Other |
Notification of cancellation of Hearing (PDF, 100 KB)
Notification that the Any Residual Issues Hearing scheduled for Friday 6 February 2015 has been cancelled
|
Other |
Audio Recording Part 3 (PDF, 31 KB)
Biodiversity Hearing of 4 February 2015
|
Other |
Audio Recording Part 1 (PDF, 31 KB)
Minerals Hearing of 4 February 2015 Part 1
|
Other |
Audio Recording Part 2 (PDF, 31 KB)
Minerals Hearing of 4 February 2015 Part 2
|
Other |
Audio Recording Part 2 (PDF, 31 KB)
Construction Operations Hearing (including water resources, drainage and reinstatement) of 3 February 2015
|
Other |
Audio Recording Part 3 (PDF, 31 KB)
Construction Operations Hearing (including water resources, drainage and reinstatement) of 3 February 2015
|
Other |
Audio Recording Part 1 (PDF, 31 KB)
Construction Operations Hearing (including water resources, drainage and reinstatement) of 3 February 2015
|
Other |
Mineral Products Association (PDF, 30 KB)
Amendment to the Proposed Lift and Shift Provisions for Park Farm Quarry and The Diversion Provisions submitted at the Issue-specific hearing on the draft Development Consent Order of 29 January 2015. Amendment submitted to and accepted by the ExA on 30 January 2015.
|
Other |
Mineral Products Association (PDF, 66 KB)
Proposed Lift and Shift Provisions for Park Farm Quarry and The Diversion Provisions. Submitted as a paper copy at the Issue-specific hearing on the draft Development Consent Order of 29 January 2015
|
Other |
Glendon Estate (PDF, 352 KB)
Pre-hearing submission: Withdrawal of representations relating to hearings on 3-5 January 2015. Accepted at the discretion of the Examining Authority
|
Other |
Mineral Products Association, W Clifford Watts Ltd. and Others (PDF, 12 KB)
Pre-hearing submission. Accepted at the discretion of the Examining Authority
|
Other |
National Farmers Union (PDF, 188 KB)
Pre-hearing submission. Accepted at the discretion of the Examining Authority
|
Other |
Audio Recording Part 2 (PDF, 31 KB)
Draft Development Consent Order Hearing 29 January 2015 - Part 2
|
Other |
Audio Recording Part 1 (PDF, 31 KB)
Draft Development Consent Order Hearing 29 January 2015 - Part 1
|
Other |
Canal and River Trust (PDF, 95 KB)
Clarification of discussions with the applicant relating to the Code of Practice for Works affecting the Canal and River Trust. Accepted at the discretion of the Examining Authority
|
Other |
Network Rail Infrastructure Limited (PDF, 773 KB)
Update on negotiations with the applicant relating to Protective Provisions. Accepted at the discretion of the Examining Authority
|
Other |
Open Floor Hearing 28 January 2015 (PDF, 31 KB)
Audio recording
|
Other |
Environment Agency (PDF, 171 KB)
Supplementary to Response to notification of accompanied site visit and hearings letter dated 2 January 2015. Accepted at the discretion of the Examining Authority
|
Other |
National Grid Carbon Limited (PDF, 816 KB)
11.8 Project Habitat Regulations Assessment Report. Late submission for Deadline 2 of 20 January 2015 accepted at the discretion of the Examining Authority
|
Other |
National Grid Carbon Limited (PDF, 607 KB)
Document 11.9.1 Integrity Matrices. Late submission for Deadline 2 of 20 January 2015 accepted at the discretion of the Examining Authority
|
Other |
National Grid Carbon Limited (PDF, 3 MB)
11.9 Offshore Scheme Shadow Appropriate Assessment Report. Late submission for Deadline 2 of 20 January 2015 accepted at the discretion of the Examining Authority
|
Other |
Notice of procedural decision (PDF, 75 KB)
Acceptance of non-material changes to the application.
|
Other |
Capture Power Limited (PDF, 62 KB)
Response to notification of accompanied site visit and hearings letter dated 2 January 2015. Including comments on Capture Power Limited?s Development Consent Order application at Drax Power Station
|
Other |
Environment Agency (PDF, 102 KB)
Response to notification of accompanied site visit and hearings letter dated 2 January 2015. Including comments on documents from Deadlines 1 and 2
|
Other |
Mr Webb-Ingall (PDF, 10 KB)
Response to notification of accompanied site visit and hearings letter dated 2 January 2015. Including comments on alternative site for temporary vehicle park
|
Other |
National Farmers Union (PDF, 97 KB)
Response to notification of accompanied site visit and hearings letter dated 2 January 2015. Including comments on the Basic Payment Scheme
|
Other | |
Other |
Itinerary for the Accompanied Site Visit (PDF, 4 MB)
|
Other |
Environment Agency (PDF, 162 KB)
Environment Agency?s response to comments on their Relevant Representation. Submission for Deadline 2 of 20 January 2015
|
Other |
G L Riby (PDF, 1 MB)
Drainage plans ? evidence for hearings. Submission for Deadline 2 of 20 January 2015
|
Other |
Glendon Estate (PDF, 2 MB)
Plans relating to temporary construction route ? evidence for hearings. Submission for Deadline 2 of 20 January 2015
|
Other |
Glendon Estate (PDF, 11 MB)
Documents relating to Minerals issues ? evidence for hearings. Submission for Deadline 2 of 20 January 2015
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
3.2 Explanatory Memorandum (Rev B) submission for Deadline 2 of 20 January 2015
|
Other |
National Grid Carbon Limited (PDF, 57 KB)
11.7 List of Deadline 2 Documents. Submission for Deadline 2 of 20 January 2015.
|
Other |
National Grid Carbon Limited (PDF, 3 MB)
11.1 Responses to Matters Raised at Deadline 1. Submission for Deadline 2 of 20 January 2015.
|
Other |
National Grid Carbon Limited (PDF, 33 KB)
11.5 Schedule of Compulsory Acquisition. Submission for Deadline 2 of 20 January 2015.
|
Other |
National Grid Carbon Limited (PDF, 3 MB)
2.4 Access Rights of Way and Stopping Up Plans Sheet 1 of 25 (Rev B) submission for Deadline 2 of 20 January 2015
|
Other |
National Grid Carbon Limited (PDF, 33 KB)
4.3 Book of Reference (Rev B) Parts 1 and 3. Submission for Deadline 2 of 20 January 2015.
|
Other |
National Grid Carbon Limited (PDF, 7 MB)
11.2 Minerals Report. Submission for Deadline 2 of 20 January 2015.
|
Other |
National Grid Carbon Limited (PDF, 4 MB)
11.3 Offshore Scheme Technical Evidence Report. Submission for Deadline 2 of 20 January 2015.
|
Other |
National Grid Carbon Limited (PDF, 816 KB)
3.1 Draft Development Consent Order (Rev B) submission for Deadline 2 of 20 January 2015
|
Other |
National Grid Carbon Limited (PDF, 625 KB)
7.1.1 Addendum to Planning Statement. Submission for Deadline 2 of 20 January 2015.
|
Other |
National Grid Carbon Limited (PDF, 3 MB)
2.7 Deemed Marine Licence Coordinates Sheet 1 of 1 (Rev C) submission for Deadline 2 of 20 January 2015
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
7.5 Code of Construction Practice (Rev B). Submission for Deadline 2 of 20 January 2015.
|
Other |
National Grid Carbon Limited (PDF, 8 MB)
3.3 Commentary on Revision B of the Draft Development Consent Order submission for Deadline 2 of 20 January 2015
|
Other |
National Grid Carbon Limited (PDF, 248 KB)
11.6 Deadline 2 Cover Letter. Submission for Deadline 2 of 20 January 2015.
|
Other |
North Yorkshire County Council and Selby District Council (PDF, 2 MB)
Joint Local Impact Report ? previously published as submission for Deadline 1 of 18 December 2014. Errata sheet added and accepted as a late submission for Deadline 2 of 20 January 2015 at the discretion of the Examining Authority
|
Other |
National Grid Carbon Limited (PDF, 441 KB)
Notice of issue-specific and compulsory acquisition hearings of 3 - 6 February 2015.
|
Other |
Peter Mawer, Land Agent for the Glendon Estate (PDF, 202 KB)
Notification of intention to attend hearings and suggested locations for accompanied site visit. Late submission for Deadline 1 of 18 December 2014 accepted at the discretion of The Examining Authority
|
Other |
National Grid Carbon Limited (PDF, 439 KB)
Notice of open floor and issue specific hearings of 28 & 29 January 2015.
|
Other |
Notification of Hearings (PDF, 92 KB)
|
Other |
National Grid Carbon Limited (PDF, 48 MB)
10.2 Responses to ExA's first written questions. Submission for Deadline 1 of 18 December 2014
|
Other |
Barmston and Fraisthorpe Parish Council (PDF, 421 KB)
Notification of attendance at accompanied site visit and suggested location. Submission for Deadline 1 of 18 December 2014
|
Other |
Canal and River Trust (PDF, 19 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
|
Other |
Capture Power Limited (PDF, 284 KB)
Written Representation and Notification ? attending and speaking at Compulsory Acquisition Hearing. Submission for Deadline 1 of 18 December 2014
|
Other |
Dr Vincini (PDF, 95 KB)
Notification of attendance at accompanied site visit and suggested location. Submission for Deadline 1 of 18 December 2014
|
Other |
Dr Vincini (PDF, 86 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
|
Other |
Dr Vincini (PDF, 75 KB)
Notification of intention Compulsory Acquisition Hearing. Submission for Deadline 1 of 18 December 2014
|
Other |
East Riding of Yorkshire Council (PDF, 149 KB)
Response to the Examining Authority?s First Written Questions . Submission for Deadline 1 of 18 December 2014
|
Other |
East Riding of Yorkshire Council (PDF, 482 KB)
Local Impact Report, and two appendixes: Letter from AECOM, Planning Committee Minutes. Submission for Deadline 1 of 18 December 2014
|
Other |
Environment Agency (PDF, 938 KB)
Written Representation, Summary of Written Representation, Summary of Relevant Representations, Response to Examining Authority?s first written questions. Submission for Deadline 1 of 18 December 2014
|
Other |
George Copeland (PDF, 39 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
|
Other |
Government Pipeline and Storage Systems (PDF, 317 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
|
Other |
Homes and Communities Agency (PDF, 31 KB)
No comments and do not wish to be notified further. Submission for Deadline 1 of 18 December 2014
|
Other |
Marine Management Organisation (PDF, 419 KB)
Written Representation and Response to the Examining Authority?s First Written Questions . Submission for Deadline 1 of 18 December 2014
|
Other |
Messrs Wright (PDF, 301 KB)
Written Representation and Notification of intention to attend hearings and Accompanied Site Visit. Submission for Deadline 1 of 18 December 2014
|
Other |
Mineral Products Association, W Clifford Watts Ltd. and Others (PDF, 2 MB)
Appendices to submission for Deadline 1. Appendix 4:Park Farm Geotechnical Final Report. Submission for Deadline 1 of 18 December 2014
|
Other |
Mineral Products Association, W Clifford Watts Ltd. and Others (PDF, 2 MB)
Appendices to submission for Deadline 1. Appendix 3: Barfhill Final Report Appendix 6: Stonehills final Report. Submission for Deadline 1 of 18 December 2014
|
Other |
Mineral Products Association,W Clifford Watts Ltd and Others (PDF, 509 KB)
Notifications and Written Representations. Submission for Deadline 1 of 18 December 2014
|
Other |
Mr and Mrs Atkinson (PDF, 321 KB)
Written Representation and Notification of intention to attend hearings and Accompanied Site Visit. Submission for Deadline 1 of 18 December 2014
|
Other |
Mr C J Marshall (PDF, 169 KB)
Written Representation and notification of intent to attend hearings and accompanied site visit. Submission for Deadline 1 of 18 December 2014
|
Other |
Mr G L Riby (PDF, 174 KB)
Written Representation and notification of intent to attend hearings and accompanied site visit. Submission for Deadline 1 of 18 December 2014
|
Other |
Mr G Warkup (PDF, 175 KB)
Written Representation and notification of intent to attend hearings and accompanied site visit. Submission for Deadline 1 of 18 December 2014
|
Other |
Mr J A Southwell (PDF, 35 KB)
Notification ? not attending hearings or accompanied site visit. Submission for Deadline 1 of 18 December 2014
|
Other |
Mr J P Thompson and Mrs O J Thompson (PDF, 142 KB)
Written Representation and Notification ? not speaking at hearings or attending accompanied site visit. Submission for Deadline 1 of 18 December 2014
|
Other |
Mr R Hall (PDF, 137 KB)
Written Representation and Notification ? not speaking at hearings or attending accompanied site visit. Submission for Deadline 1 of 18 December 2014
|
Other |
Mr S R Craven and Mr R R Craven (PDF, 135 KB)
Written Representation and Notification ? ? not speaking at hearings or attending accompanied site visit. Submission for Deadline 1 of 18 December 2014
|
Other |
Mr Stephen Harper (PDF, 35 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
|
Other |
Mrs M E Payne (PDF, 138 KB)
Written Representation and Notification ? not speaking at hearings or attending accompanied site visit. Submission for Deadline 1 of 18 December 2014
|
Other |
Mrs Webb-Ingall (PDF, 180 KB)
Written Representation and suggested accompanied site visit location. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.3 Works Plans sheet 17 of 25 revision B. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.5 Hedgerow Plans sheet 24 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.3 Works Plans sheet 25 of 25 revision B. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.4 Access Rights of Way and Stopping Up Plans sheet 25 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 3 MB)
7.7.1 Drainage Design sheet 25 of 25 revision B Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 679 KB)
9.3 Statement of Common Ground between Selby District Council and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 5 MB)
10.2.4 Traffic Route Plan Map 3 of 3. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 3 MB)
7.7.1 Drainage Design sheet 24 of 25 revision B Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.5 Hedgerow Plans sheet 25 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 547 KB)
9.10 Statement of Common Ground between Selby Area IDB and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 497 KB)
9.7 Statement of Common Ground between Marine Management Organisation and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 3 MB)
7.7.1 Drainage Design sheet 17 of 25 revision B Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 627 KB)
2.9 BARMSTON PUMPING STATION Location Plan revision B. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.4 Access Rights of Way and Stopping Up Plans sheet 24 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.5 Hedgerow Plans sheet 18 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 1,006 KB)
5.4.9 Screening Matrices Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 3 MB)
7.7.1 Drainage Design sheet 18 of 25 revision B Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
9.5 Statement of Common Ground between Natural England and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
10.3.1 Assessment of effects on strategic road network. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 6 MB)
10.2.4 Traffic Route Plan Map 2 of 3. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 4 MB)
10.1 Order Limits Revision Comparison sheet 3 of 3 revision A. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 625 KB)
9.1 Statement of Common Ground between North Yorkshire County Council and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 265 KB)
10.6 Deadline 1 Cover Letter. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 293 KB)
10.3.2 Legal submissions in respect of ecological mitigation. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 799 KB)
9.2 Statement of Common Ground between East Riding of Yorkshire Council and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 65 KB)
10.7 List of Deadline 1 Documents. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.4 Access Rights of Way and Stopping Up Plans sheet 18 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 3 MB)
10.3 Comments on Relevant Representations. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 4 MB)
10.1 Order Limits Revision Comparison sheet 2 of 3 revision A. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
9.8 Signed Statement of Common Ground between Highways Agency and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.1 Land Plans (to include Land Affected Plans) sheet 18 of 25 revision G. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 240 KB)
7.7.2 Addendum to Drainage Report Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.3 Works Plans sheet 24 of 25 revision B. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.1 Land Plans (to include Land Affected Plans) sheet 17 of 25 revision G. Submission for Deadline 1 of 18 December 2014?
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.5 Hedgerow Plans sheet 17 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid carbon Limited (PDF, 2 MB)
2.7 Deemed Marine Licence Coordinates revision B. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 474 KB)
10.3.6 Letter of No Impediment. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 4 MB)
10.1 Order Limits Revision Comparison sheet 1 of 3 revision A. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 538 KB)
9.12 Statement of Common Ground between Ouse and Humber Drainage Board and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
9.11 Signed Statement of Common Ground between Beverley and North Holderness IDB and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 1 MB)
9.9 Signed Statement of Common Ground between Trinity House and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.3 Works Plans sheet 18 of 25 revision B. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 78 KB)
10.5 Accompanied Site Visit Suggested Itinerary. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 619 KB)
9.6 Statement of Common Ground between Environment Agency and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 5 MB)
10.2.4 Traffic Route Plan Map 1 of 3. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 33 KB)
10.4 Schedule of Compulsory Acquisition. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.4 Access Rights of Way and Stopping Up Plans sheet 17 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 527 KB)
10.2.2 Organisation of Project Control Documents. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 3 MB)
9.4 Signed Statement of Common Ground between English Heritage and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.1 Land Plans (to include Land Affected Plans) sheet 24 of 25 revision G. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
5.4.12 Flamborough Head SPA pSPA Offshore Usage. Submission for Deadline 1 of 18 December 2014.
|
Other |
National Grid Carbon Limited (PDF, 2 MB)
2.1 Land Plans (to include Land Affected Plans) sheet 25 of 25 revision G. Submission for Deadline 1 of 18 December 2014
|
Other |
National Grid Carbon Limited (PDF, 862 KB)
10.2.1 Schedule of Mitigation. Submission for Deadline 1 of 18 December 2014
|
Other |
Natural England (PDF, 204 KB)
Written Representation - Appendix D letter of no impediment with regard to the great crested newt licence application. Submission for Deadline 1 of 18 December 2014
|
Other |
Natural England (PDF, 621 KB)
Written Representation and Summary including: Appendix C Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 18 December 2014
|
Other |
Natural England (PDF, 7 MB)
Written Representation ? Appendix A Site maps. Submission for Deadline 1 of 18 December 2014
|
Other |
Natural England (PDF, 895 KB)
Appendix B Designated site conservation objectives and citations. Submission for Deadline 1 of 18 December 2014
|
Other |
Network Rail infrastructure Limited (PDF, 1 MB)
Written Representation and Notification ? provisionally attending and speaking at Development Consent Order and Compulsory Acquisition hearings. Submission for Deadline 1 of 18 December 2014
|
Other |
North Yorkshire County Council (PDF, 81 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 18 December 2014
|
Other |
Nottinghamshire County Council (PDF, 14 KB)
No comments and do not wish to be notified further. Submission for Deadline 1 of 18 December 2014
|
Other |
PH & AJ Blacker t/a BB Farms Ltd (PDF, 75 KB)
Notification of intention to attend accompanied site visit and Compulsory Acquisition Hearing. Submission for Deadline 1 of 18 December 2014
|
Other |
PH & AJ Blacker t/a BB Farms Ltd (PDF, 86 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
|
Other |
R G Kendall and Sons (PDF, 75 KB)
Written Representation and Notification ? not speaking at hearings or attending accompanied site visit. Submission for Deadline 1 of 18 December 2014
|
Other |
Selby District Council (PDF, 43 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 18 December 2014
|
Other |
Selby District Council (PDF, 2 MB)
Joint Local Impact Report with North Yorkshire County Council
|
Other |
The Glendon Estate (PDF, 169 KB)
Written Representation and notification of intent to attend hearings and accompanied site visit. Submission for Deadline 1 of 18 December 2014
|
Other |
The Trustees of the Market Weighton Church Estate (PDF, 75 KB)
Written Representation and Notification ? not speaking at hearings or attending accompanied site visit. Submission for Deadline 1 of 18 December 2014
|
Other |
Wakefield Council (PDF, 260 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
|
Other |
Yorkshire Water (PDF, 71 KB)
Response to Examining Authority?s First Written Questions. Submission for Deadline 1 of 18 December 2014
|
Other |
Yorkshire Wildlife Trust (PDF, 39 KB)
Notification by Statutory Party of wish to become an Interested Party - accepted by the Examining Authority. Submission for Deadline 1 of 18 December 2014
|
Other |
Mineral Products Association, W Clifford Watts Ltd. and Others (PDF, 1 MB)
Appendices to submission for Deadline 1. Appendix 1:Fisher German Letter Appendix 2: MPA response to Fisher German letter Appendix 5: Correspondence to applicant. Submission for Deadline 1 of 18 December 2014
|
Other |
Yorkshire Wildlife Trust (PDF, 875 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
|
Other |
Preliminary Meeting Note (PDF, 54 KB)
|
Other |
Examining Authoritys first written questions and requests for information (PDF, 220 KB)
The Examining Authority?s first written questions and requests for information issued by the Examining Authority on 25 November 2014
|
Other |
Rule 8 Letter (PDF, 146 KB)
Rule 8 letter issued by the Examining Authority on 25 November 2014
|
Other |
Alan Barker (PDF, 11 KB)
Submission for Preliminary Meeting on 19 November 2014
|
Other |
GTC group of companies (PDF, 46 KB)
Response to Rule 6 Letter-no comments. Accepted at Preliminary Meeting on 19 November 2014
|
Other |
National Farmers Union North East (PDF, 76 KB)
Response to Rule 6 Letter. Accepted at Preliminary Meeting on 19 November 2014
|
Other |
National Grid Carbon Limited (PDF, 71 KB)
Applicant?s covering letter - changes to application documents dated 12 August 2014
|
Other |
National Grid Carbon Limited (PDF, 400 KB)
Applicant?s covering letter - changes to application documents dated 31 October 2014
|
Other |
Natural England (PDF, 303 KB)
Response to Rule 6 Letter and attachments. Accepted at Preliminary Meeting on 19 November 2014
|
Other |
Network Rail (PDF, 37 KB)
Update on discussions with applicant related to Protective Provisions. Accepted at Preliminary Meeting on 19 November 2014
|
Other |
North Yorkshire Fire and Rescue (PDF, 57 KB)
Response to Rule 6 Letter. Accepted at Preliminary Meeting on 19 November 2014
|
Other |
Redcar and Cleveland Borough Council (PDF, 66 KB)
Response to Rule 6 Letter. Statement that they do not wish to be involved in the Examination. Accepted at Preliminary Meeting on 19 November 2014
|
Other |
Steve Harper (PDF, 61 KB)
Submission for Preliminary Meeting on 19 November 2014
|
Other |
Yorkshire Water (PDF, 46 KB)
Update on discussions with applicant related to Protective Provisions. Accepted at Preliminary Meeting on 19 November 2014
|
Other |
Preliminary Meeting Audio (PDF, 31 KB)
Audio recording of the Preliminary Meeting held at Bishop Burton College on 19 November 2014.
|