Yorkshire and Humber CCS Cross Country Pipeline

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (13)

Developer's Application (207)

Acceptance (24)

Pre Examination (4)

Examination (335)

Decision (32)

Decided (0)

Date

SourceDescription
Other
Examining Authority Recommendation Report (PDF, 828 KB)
Other
Examining Authority Recommendation Report - Appendix A to D (PDF, 1 MB)
Other
Notice of the Decision by the SoS (Reg 23) (PDF, 74 KB)
Other
Secretary of State Decision Letter including the Statement of Reasons (PDF, 925 KB)
Other
Submissions received after the close of Examination (PDF, 143 KB)
Other
National Farmers Union (PDF, 82 KB)
Written Representation and Response to the Examining Authority's First Written Questions. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 64 KB)
Response to the Consultation Letter from the Department of Energy and Climate Change dated 26 May 2016.
Other
Yorkshire and Humber CCS Cross Country Pipeline Consultation Letter to the Applicant (PDF, 94 KB)
Letter from the Department of Energy and Climate Change to National Grid Carbon Limited - Requesting further comments
Other
Yorkshire and Humber Pipeline Letter from Secretary of State regarding Extension (PDF, 144 KB)
Letter from the Department of Energy and Climate Change regarding an Extension to the deadline for the decision on the application
Other
National Grid Carbon Limited (PDF, 64 KB)
Response to the Consultation Letter from the Department of Energy and Climate Change dated 26 May 2016
Other
National Grid Carbon Limited (PDF, 30 KB)
Response to the Consultation Letter from the Secretary of State for Energy and Climate Change dated 18 February 2016
Other
Other
National Grid Carbon Limited (PDF, 979 KB)
Response to the Consultation Letter from the Secretary of State for Energy and Climate Change dated 20 November 2015
Other
W Clifford Watts Limited (PDF, 1 MB)
Response to the Consultation Letter from the Secretary of State for Energy and Climate Change dated 20 November 2015
Other
Other
Other
W. Clifford Watts Ltd (PDF, 307 KB)
Covering Letter and Response to DECC Consultation Letter dated 30 September 2015
Other
W. Clifford Watts Ltd (PDF, 110 KB)
Response to DECC Consultation Letter dated 30 September 2015
Other
Capture Power Ltd (PDF, 4 MB)
Response to DECC Consultation Letter dated 30 September 2015
Other
Environment Agency (PDF, 67 KB)
Response to DECC Consultation Letter dated 30 September 2015
Other
National Grid Carbon Limited (PDF, 535 KB)
Response to DECC Consultation Letter dated 30 September 2015
Other
Natural England (PDF, 84 KB)
Response to DECC Consultation Letter dated 30 September 2015
Other
Network Rail (PDF, 258 KB)
Response to DECC Consultation Letter dated 30 September 2015
Other
Third DECC Consultation Letter dated 30 September 2015 (PDF, 35 KB)
Other
Second DECC consultation letter (PDF, 40 KB)
Other
National Grid Carbon Limited (PDF, 326 KB)
Response to DECC Consultation Letter dated 11 September 2015
Other
East Riding of Yorkshire Council (PDF, 21 KB)
Response to DECC Consultation Letter dated 11 September 2015
Other
Network Rail (PDF, 3 MB)
Response to DECC Consultation Letter dated 11 September 2015
Other
W. Clifford Watts Ltd (PDF, 1 MB)
Response to DECC Consultation Letter dated 11 September 2015
Other
W. Clifford Watts Ltd (PDF, 244 KB)
Response to DECC Consultation Letter dated 11 September 2015
Other
W. Clifford Watts Ltd (PDF, 242 KB)
Response to DECC Consultation Letter dated 11 September 2015
Other
DECC consultation letter (PDF, 41 KB)
Other
Notification of Completion of ExA Examination (PDF, 67 KB)
Other
National Grid Carbon Limited (PDF, 195 KB)
18.5 List of Documents prior to end of Examination submitted 18 May 2015
Other
Environment Agency (PDF, 80 KB)
Close of Examination Letter submitted 19 May 2015
Other
National Grid Carbon Limited (PDF, 521 KB)
Explanatory Memorandum of comparison of application draft DCO Revision A with Final draft DCO Revision G. Submitted on 15 May 2015
Other
National Grid Carbon Limited (PDF, 4 MB)
18.3 Agreed Statement of Mineral Sterilisation with W C Watts submitted 18 May 2015
Other
National Grid Carbon Limited (PDF, 743 KB)
Comparison of application draft DCO Revision A with Final draft DCO Revision G. Submitted on 15 May 2015
Other
National Grid Carbon Limited (PDF, 5 MB)
18.1 Position in respect of statutory undertakers and others submitted 18 May 2015
Other
National Grid Carbon Limited (PDF, 519 KB)
18.4 Closure of Examination submissions cover letter submitted 18 May 2015
Other
National Grid Carbon Limited (PDF, 472 KB)
18.2 Joint Statement with Network Rail submitted 18 May 2015
Other
Network Rail Infrastructure Limited (PDF, 969 KB)
Joint Statement of Network Rail and National Grid Carbon Limited. Submitted on 18 May 2015
Other
Northern Powergrid (PDF, 379 KB)
Clarification that Northern Powergrid has concluded contractual documentation in relation to the protection of its plant and apparatus with the applicant, and withdrawal of representations.
Other
Yorkshire Water (PDF, 74 KB)
Clarification that Yorkshire Water has concluded contractual documentation in relation to the protection of its plant and apparatus with the applicant, and withdrawal of representations.
Other
Northern Gas Networks (PDF, 600 KB)
Clarification that Northern Gas Networks has concluded contractual documentation in relation to the protection of its plant and apparatus with the applicant.
Other
National Grid Electricity Transmission Plc (PDF, 69 KB)
Clarification that NGET has concluded contractual documentation in relation to the protection of its plant and apparatus with the applicant.
Other
National Grid Gas Plc (PDF, 69 KB)
Clarification that NGG has concluded contractual documentation in relation to the protection of its plant and apparatus with the applicant.
Other
Capture Power Limited (PDF, 260 KB)
Withdrawal of representation relating to Compulsory Acquisition. Accepted at the discretion of the Examining Authority
Other
Kirkburn Parish Council. (PDF, 127 KB)
Late submission for Deadline 3 of 17 February 2015 ? not published earlier as sent to incorrect email address.
Other
Government Pipelines and Storage System (PDF, 41 KB)
Late submission for Deadline 8 of 24 April 2015. Accepted at the discretion of the Examining Authority
Other
National Grid Carbon Limited (PDF, 2 MB)
2.3 Works Plan Sheet 19. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 425 KB)
17.5 Deadline 8 Cover Letter. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
2.63 Driffield Construction Compound Temporary Vehicular Access (A614). Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 33 KB)
4.3 Book of Reference (Rev D). Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 425 KB)
2.71 Driffield Construction Compound Temporary Vehicular Swept Path Analysis. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
2.27 Multi Junction Elevations (S+W). Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 4 MB)
2.1 Land Plan Sheet 17. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 745 KB)
2.25 Multi Junction Planning Arrangement. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
3.8 Commentary on Revision G of the Final Draft Development Consent Order. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
17.1 Explanatory Note to Accompany Deadline 8 Submission. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 55 KB)
17.2 Position in respect of statutory undertakers and others. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 33 KB)
17.4 Book of Reference extracts with track changes (Parts 1 and 4). Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 873 KB)
2.29 Multi Junction Elevations (Operational Site). Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 2 MB)
3.2 Revised Explanatory Memorandum (Rev G). Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 997 KB)
2.30 Multi Junction Planting Drawing. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 264 KB)
17.6 List of Deadline 8 Documents. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 33 KB)
17.3 Updated Schedule of Compulsory Acquisition. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 4 MB)
2.1 Land Plan Sheet 19. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 367 KB)
2.4 Access Plan Sheet 19. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 910 KB)
3.1 Final Draft Development Consent Order (Rev G). Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 2 MB)
2.5 Hedgerow Plan Sheet 19. Submission for Deadline 8 of 24 April 2015
Other
National Grid Carbon Limited (PDF, 729 KB)
2.26 Multi Junction Elevations (N+E). Submission for Deadline 8 of 24 April 2015
Other
Capture Power Ltd (PDF, 121 KB)
Response to Rule 17 Letter dated 8 April 2015. Submission for Deadline 7 of 16 April 2015
Other
Drax Power Limited (PDF, 682 KB)
Update on property negotiations between Drax Power Limited and National Grid Carbon Limited. Submission for Deadline 7 of 16 April 2015
Other
East Riding of Yorkshire Council (PDF, 45 KB)
Update on Section 38 Agreement. Submission for Deadline 7 of 16 April 2015
Other
Environment Agency (PDF, 115 KB)
Outstanding Matters in response to Rule 17 Letter dated 8 April 2015 . Submission for Deadline 7 of 16 April 2015
Other
INEOS Manufacturing (Hull) Limited (PDF, 117 KB)
Response to Rule 17 Letter dated 8 April 2015. Submission for Deadline 7 of 16 April 2015
Other
Marine Management Organisation (PDF, 130 KB)
Response to Rule 17 Letter dated 8 April 2015 . Submission for Deadline 7 of 16 April 2015
Other
National Grid Carbon Limited (PDF, 4 MB)
16.1 Responses to Matters Raised in Rule 17 Letter dated 8 April 2015. Submission for Deadline 7 of 16 April 2015
Other
National Grid Carbon Limited (PDF, 267 KB)
16.2 Deadline 7 Cover Letter
Other
Network Rail Infrastructure Limited (PDF, 17 KB)
Joint Response with National Grid Carbon Limited: Update on agreements. Submission for Deadline 7 of 16 April 2015
Other
North Yorkshire County Council (PDF, 100 KB)
Response to Rule 17 Letter dated 8 April 2015. Submission for Deadline 7 of 16 April 2015
Other
Northern Powergrid (Yorkshire) plc (PDF, 20 KB)
Update on protective provisions agreement between Northern Powergrid (Yorkshire) plc and National Grid Carbon Limited. Submission for Deadline 7 of 16 April 2015
Other
Yorkshire Water (PDF, 124 KB)
Update on Asset Protection Agreement between Yorkshire Water and National Grid Carbon Limited. Submission for Deadline 7 of 16 April 2015
Other
Rule 17, Rule 8(3) and Rule 9 (PDF, 88 KB)
Request for further information, acceptance of non material amendments to the application, and notification of amendment to the Examination timetable
Other
Highways Agency (PDF, 1,001 KB)
Letter dated 27 March 2015 relating to the Crown?s interest in land within Plots 740-744. Submission for Deadline 6 of 1 April 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
2.19 Drax Pig Trap Elevations N+E Rev C. Submission for Deadline 6 of 1 April 2015..
Other
National Grid Carbon Limited (PDF, 344 KB)
15.4 Deadline 6 Cover Letter. Submission for Deadline 6 of 1 April 2015.
Other
National Grid Carbon Limited (PDF, 1 MB)
2.20 Drax Pig Trap Elevations S+W Rev C. Submission for Deadline 6 of 1 April 2015.
Other
National Grid Carbon Limited (PDF, 579 KB)
2.18 Drax Pig Trap Planning Arrangement Rev C. Submission for Deadline 6 of 1 April 2015.
Other
National Grid Carbon Limited (PDF, 2 MB)
3 2 Explanatory memorandum Rev F. Submission for Deadline 6 of 1 April 2015.
Other
National Grid Carbon Limited (PDF, 1 MB)
2.22 Drax Pig Trap Elevations Operational Site Rev C. Submission for Deadline 6 of 1 April 2015.
Other
National Grid Carbon Limited (PDF, 206 KB)
15.3 List of Deadline 6 Documents. Submission for Deadline 6 of 1 April 2015.
Other
National Grid Carbon Limited (PDF, 33 KB)
15.2 Updated Compulsory Acquisition Schedule. Submission for Deadline 6 of 1 April 2015.
Other
National Grid Carbon Limited (PDF, 15 MB)
7 5 Code of Construction Practice (Rev E) FINAL. Submission for Deadline 6 of 1 April 2015.
Other
National Grid Carbon Limited (PDF, 349 KB)
3. 7 Commentary on Revision F of the Draft Development Consent Order. Submission for Deadline 6 of 1 April 2015.
Other
National Grid Carbon Limited (PDF, 932 KB)
Supplement to document 15.1 relating to Cathodic Protection. Accepted at the discretion of the Examining Authority. Submission for Deadline 6 of 1 April 2015
Other
National Grid Carbon Limited (PDF, 848 KB)
3.1 Draft Development Consent Order Rev F. Submission for Deadline 6 of 1 April 2015.
Other
National Grid Carbon Limited (PDF, 517 KB)
15.1 Submission on Cathodic Protection. Submission for Deadline 6 of 1 April 2015.
Other
Natural England (PDF, 49 KB)
Correspondence to the Planning Inspectorate including ?No Comments? on the Report on the Implications for European Sites. Submission for Deadline 6 of 1 April 2015
Other
Marine Management Organisation (PDF, 180 KB)
Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015. Submission for Deadline 5 of 26 March 2015.
Other
National Grid Carbon Limited (PDF, 200 KB)
7.7 Drainage Report Rev B FINAL. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
3.6 Commentary on Revision E of the Draft Development Consent Order. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
Other
National Grid Carbon Limited (PDF, 33 KB)
14 6 Submission on Updated Book of Reference Submitted at Deadline 5. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
Other
National Grid Carbon Limited (PDF, 990 KB)
9.2 Signed Statement of Common Ground between East Riding of Yorkshire Council and National Grid. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
Other
National Grid Carbon Limited (PDF, 342 KB)
14.2 Response to matters raised at Deadline 4 - Enhancement. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
Other
National Grid Carbon Limited (PDF, 261 KB)
14.7 List of Deadline 5 Documents. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
Other
National Grid Carbon Limited (PDF, 33 KB)
14.3 Updated Compulsory Acquisition Schedule. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
Other
National Grid Carbon Limited (PDF, 893 KB)
3.1 Draft Development Consent Order (Rev E). Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
Other
National Grid Carbon Limited (PDF, 237 KB)
14.5 Errata Sheet. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
Other
National Grid Carbon Limited (PDF, 557 KB)
14.1 Responses to matters raised in Rule 17 Letter. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
Other
National Grid Carbon Limited (PDF, 33 KB)
4.3 Book of Reference (Rev C). Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
Other
National Grid Carbon Limited (PDF, 343 KB)
14.8 Deadline 5 Cover Letter. Submissions for Deadline 5 of 26 March 2015. Includes comments on the Report on the Implications for European Sites
Other
National Grid Carbon Limited (PDF, 344 KB)
14.4 Updated Schedule of Statutory Undertakers. Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
Other
National Grid Carbon Limited (PDF, 2 MB)
3.2 Explanatory Memorandum (Rev E). Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015 and other submissions for Deadline 5 of 26 March 2015
Other
North Yorkshire County Council and Selby District council (PDF, 67 KB)
Joint Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015. Submission for Deadline 5 of 26 March 2015.
Other
The Crown Estate (PDF, 125 KB)
Response to the Rule 17 letter issued by the Examining Authority on 18 March 2015. Submission for Deadline 5 of 26 March 2015.
Other
National Grid Carbon Limited (PDF, 1 MB)
9.6 Signed Statement of Common Ground between Environment Agency and National Grid at Deadline 3. Signed on 2 and 9 March 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
9.12 Signed Statement of Common Ground between Ouse and Humber Drainage Board and National Grid at Deadline 3. Signed on 23 February and 9 March 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
9.7 Signed Statement of Common Ground between Marine Management Organisation and National Grid at Deadline 3. Signed on 2 and 9 March 2015
Other
National Grid Carbon Limited (PDF, 3 MB)
9.1 Signed Statement of Common Ground between North Yorkshire County Council and National Grid at Deadline 3. Signed on 3 and 9 March 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
9.7 Signed Statement of Common Ground between Marine Management Organisation and National Grid at Deadline 4. Signed on 11 and 13 March 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
9.10 Signed Statement of Common Ground between Selby Area IDB and National Grid at Deadline 3. Signed on 5 and 13 March 2015
Other
R17 request for further information (PDF, 198 KB)
Other
National Grid Carbon Limited (PDF, 533 KB)
9.5 Signed Statement of Common Ground between Natural England and National Grid. Submission for Deadline 3 of 17 February 2015
Other
Report on the Implications for European Sites (RIES) (PDF, 449 KB)
Report on the Implications for European Sites (RIES) issued by the Examining Authority on 11 March 2015
Other
Environment Agency (PDF, 83 KB)
Submission for Deadline 4 of 4 March 2015
Other
Marine Management Organisation (PDF, 224 KB)
Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 492 KB)
9.7 Statement of Common Ground between Marine Management Organisation and National Grid at Deadline 4 Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 498 KB)
2.32 Tollingham Block Valve Planning Arrangement Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
2.19 Drax Pig Trap Elevations (N+E) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 33 KB)
13.3 Updated Schedule of Compulsory Acquisition Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 460 KB)
2.48 Skerne Block Valve Elevations (S+W) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 821 KB)
3.1 Draft Development Consent Order (Rev D) Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 519 KB)
13.6 Deadline 4 Cover Letter Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 2 MB)
3.2 Explanatory Memorandum (Rev D) Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 579 KB)
2.18 Drax Pig Trap Planning Arrangement Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 539 KB)
2.39 Dalton Block Valve Planning Arrangement Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 458 KB)
2.34 Tollingham Block Valve Elevations (S+W) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 486 KB)
2.47 Skerne Block Valve Elevations (N+E) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 690 KB)
2.26 Camblesforth Multi-Junction Elevations (N+E) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 556 KB)
2.46 Skerne Block Valve Planning Arrangement Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 475 KB)
2.33 Tollingham Block Valve Elevations (N+E) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 696 KB)
2.27 Camblesforth Multi-Junction Elevations (S+W) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 811 KB)
2.29 Camblesforth Multi-Junction Elevations (Operational Site) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 464 KB)
2.40 Dalton Block Valve Elevations (N+E) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 535 KB)
2.36 Tollingham Block Valve Elevations (Operational Site) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 2 MB)
3.5 Commentary on Revision D of the Draft Development Consent Order Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 58 KB)
13.2 Errata Sheet Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 3 MB)
9.3 Signed Statement of Common Ground between Selby District Council and National Grid. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 62 KB)
13.5 List of Deadline 4 Documents Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 459 KB)
2.41 Dalton Block Valve Elevations (S+W) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 515 KB)
2.43 Dalton Block Valve Elevations (Operational Site) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 510 KB)
2.50 Skerne Block Valve Elevations (Operational Site) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
2.20 Drax Pig Trap Elevations (S+W) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 15 MB)
7.5 Code of Construction Practice (Rev D) Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 2 MB)
13.1 Responses to matters raised at Deadline 3 Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
2.22 Drax Pig Trap Elevations (Operational Site) Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 2 MB)
2.25 Camblesforth Multi-Junction Planning Arrangement Rev B. Submission for Deadline 4 of 4 March 2015
Other
National Grid Carbon Limited (PDF, 254 KB)
13.4 Position in respect of statutory undertakers and others Submission for Deadline 4 of 4 March 2015
Other
Network Rail Infrastructure Limited (PDF, 96 KB)
Comments on the applicant?s revised draft Development Consent Order. Submission for Deadline 4 of 4 March 2015
Other
North Yorkshire County Council (PDF, 305 KB)
Response to the applicant?s Biodiversity Protocol. Submission for Deadline 4 of 4 March 2015
Other
Yorkshire Wildlife Trust (PDF, 1 MB)
Clarification of the Trust?s approach to biodiversity enhancement. Submission for Deadline 4 of 4 March 2015
Other
Alan Marsland (PDF, 133 KB)
Revised submission accepted at the discretion of the Examining Authority. This replaces the version submitted for Deadline 3 of 17 February 2015.
Other
East Riding of Yorkshire Council (PDF, 10 MB)
Information requested by the Examining Authority at the Minerals Hearing of 4 February 2015. Late submission for Deadline 3 accepted at the discretion of the Examining Authority.
Other
Network Rail Infrastructure Limited (PDF, 110 KB)
Correspondence received outside a deadline accepted at the discretion of the Examining Authority
Other
Natural England (PDF, 261 KB)
Summary of representation at Biodiversity Hearing of 4 February 2015. Submission for Deadline 3 of 17 February 2015
Other
Dr Vincini (PDF, 26 KB)
Submission for Deadline 3 of 17 February 2015
Other
Marine Management Organisation (PDF, 136 KB)
Summary of representation at draft Development Consent Order Hearing of 29 January 2015.Submission for Deadline 3 of 17 February 2015
Other
Mineral Products Association, W Clifford Watts Ltd and Others (PDF, 18 MB)
Objectors Rebuttal to National Grid Carbon Limited Minerals Report ? Park Farm Quarry documents and Sterilisation Calculation plan. Submission for Deadline 3 of 17 February 2015
Other
Mineral Products Association, W Clifford Watts Ltd and Others (PDF, 1 MB)
Objectors rebuttal to National Grid Carbon Limited Minerals Report ? Appendix B and C and Plan 1. Submission for Deadline 3 of 17 February 2015
Other
Mineral Products Association, W Clifford Watts Ltd and Others (PDF, 3 MB)
Objectors Rebuttal to National Grid Carbon Limited Minerals Report ? Appendix A. Submission for Deadline 3 of 17 February 2015
Other
Mr and Mrs Thompson (PDF, 803 KB)
Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 2 MB)
2.4 Access Rights of Way and Stopping Up Plans Sheet 1 of 25 Rev C. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 88 KB)
Clarification of draft Development Consent Order. Late submission for Deadline 3 of 17 February 2015, accepted at the discretion of the Examining Authority
Other
National Grid Carbon Limited (PDF, 416 KB)
9.7 Statement of Common Ground between Marine Management Organisation and National Grid at Deadline 3. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 539 KB)
9.1 Statement of Common Ground between North Yorkshire County Council and National Grid at Deadline 3. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 58 MB)
7.7.1 Drainage Design Sheets 0-16 and 19-23 Rev B and Sheets 17, 18, 24 and 25 Rev C. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 86 KB)
12.3 Position in respect of statutory undertakers and others. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 534 KB)
9.10 Statement of Common Ground between Selby Area IDB and National Grid at Deadline 3. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 527 KB)
9.12 Statement of Common Ground between Ouse and Humber Drainage Board and National Grid at Deadline 3. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 87 KB)
12.2 Response to MPA Lift and Shift Provision. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
7.5 Code of Construction Practice (Rev C). Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 291 KB)
12.5 Protocol for Delivering Biodiversity Enhancement.Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 628 KB)
9.2 Statement of Common Ground Between East Riding of Yorkshire Council and National Grid at Deadline 3. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 33 KB)
12.4 Updated Schedule of Compulsory Acquisition. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 687 KB)
3.1 Draft Development Consent Order (Rev C). Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
3.4 Commentary on Revision C of the Draft Development Consent Order. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 1,016 KB)
12.6 Tracked Changed Comparison Version of the CoCP from Submission Version to Rev C. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 63 KB)
12.9 List of Deadline 3 Documents. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 248 KB)
12.7 Schedule of Actions as Requested by PINS Case Manager. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 591 KB)
9.6 Statement of Common Ground between Environment Agency and National Grid at Deadline 3. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 5 MB)
12.1 Written Summaries of Oral Evidence and Supporting Information Report. Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 2 MB)
3.2 Explanatory Memorandum (Rev C). Submission for Deadline 3 of 17 February 2015
Other
National Grid Carbon Limited (PDF, 263 KB)
12.8 Deadline 3 Cover Letter. Submission for Deadline 3 of 17 February 2015
Other
North Yorkshire County Council (PDF, 4 MB)
Submission for Deadline 3 of 17 February 2015
Other
W Clifford Watts Ltd (PDF, 14 MB)
David Watts- presentation to the Compulsory Acquisition Hearing of 5 February 2015 and supporting documents. Submission for Deadline 3 of 17 February 2015
Other
Audio Recording Part 1 (PDF, 31 KB)
Compulsory Acquisition Hearing of 5 February 2015 Part 1
Other
Audio Recording Part 2 (PDF, 31 KB)
Compulsory Acquisition Hearing of 5 February 2015 Part 2
Other
Network Rail Infrastructure Limited (PDF, 1 MB)
Late submission for Compulsory Acquisition Hearing of 5 February 2015. Accepted at the discretion of the Examining Authority
Other
Notification of cancellation of Hearing (PDF, 100 KB)
Notification that the Any Residual Issues Hearing scheduled for Friday 6 February 2015 has been cancelled
Other
Audio Recording Part 3 (PDF, 31 KB)
Biodiversity Hearing of 4 February 2015
Other
Audio Recording Part 1 (PDF, 31 KB)
Minerals Hearing of 4 February 2015 Part 1
Other
Audio Recording Part 2 (PDF, 31 KB)
Minerals Hearing of 4 February 2015 Part 2
Other
Audio Recording Part 2 (PDF, 31 KB)
Construction Operations Hearing (including water resources, drainage and reinstatement) of 3 February 2015
Other
Audio Recording Part 3 (PDF, 31 KB)
Construction Operations Hearing (including water resources, drainage and reinstatement) of 3 February 2015
Other
Audio Recording Part 1 (PDF, 31 KB)
Construction Operations Hearing (including water resources, drainage and reinstatement) of 3 February 2015
Other
Mineral Products Association (PDF, 30 KB)
Amendment to the Proposed Lift and Shift Provisions for Park Farm Quarry and The Diversion Provisions submitted at the Issue-specific hearing on the draft Development Consent Order of 29 January 2015. Amendment submitted to and accepted by the ExA on 30 January 2015.
Other
Mineral Products Association (PDF, 66 KB)
Proposed Lift and Shift Provisions for Park Farm Quarry and The Diversion Provisions. Submitted as a paper copy at the Issue-specific hearing on the draft Development Consent Order of 29 January 2015
Other
Glendon Estate (PDF, 352 KB)
Pre-hearing submission: Withdrawal of representations relating to hearings on 3-5 January 2015. Accepted at the discretion of the Examining Authority
Other
Mineral Products Association, W Clifford Watts Ltd. and Others (PDF, 12 KB)
Pre-hearing submission. Accepted at the discretion of the Examining Authority
Other
National Farmers Union (PDF, 188 KB)
Pre-hearing submission. Accepted at the discretion of the Examining Authority
Other
Audio Recording Part 2 (PDF, 31 KB)
Draft Development Consent Order Hearing 29 January 2015 - Part 2
Other
Audio Recording Part 1 (PDF, 31 KB)
Draft Development Consent Order Hearing 29 January 2015 - Part 1
Other
Canal and River Trust (PDF, 95 KB)
Clarification of discussions with the applicant relating to the Code of Practice for Works affecting the Canal and River Trust. Accepted at the discretion of the Examining Authority
Other
Network Rail Infrastructure Limited (PDF, 773 KB)
Update on negotiations with the applicant relating to Protective Provisions. Accepted at the discretion of the Examining Authority
Other
Open Floor Hearing 28 January 2015 (PDF, 31 KB)
Audio recording
Other
Environment Agency (PDF, 171 KB)
Supplementary to Response to notification of accompanied site visit and hearings letter dated 2 January 2015. Accepted at the discretion of the Examining Authority
Other
National Grid Carbon Limited (PDF, 816 KB)
11.8 Project Habitat Regulations Assessment Report. Late submission for Deadline 2 of 20 January 2015 accepted at the discretion of the Examining Authority
Other
National Grid Carbon Limited (PDF, 607 KB)
Document 11.9.1 Integrity Matrices. Late submission for Deadline 2 of 20 January 2015 accepted at the discretion of the Examining Authority
Other
National Grid Carbon Limited (PDF, 3 MB)
11.9 Offshore Scheme Shadow Appropriate Assessment Report. Late submission for Deadline 2 of 20 January 2015 accepted at the discretion of the Examining Authority
Other
Notice of procedural decision (PDF, 75 KB)
Acceptance of non-material changes to the application.
Other
Capture Power Limited (PDF, 62 KB)
Response to notification of accompanied site visit and hearings letter dated 2 January 2015. Including comments on Capture Power Limited?s Development Consent Order application at Drax Power Station
Other
Environment Agency (PDF, 102 KB)
Response to notification of accompanied site visit and hearings letter dated 2 January 2015. Including comments on documents from Deadlines 1 and 2
Other
Mr Webb-Ingall (PDF, 10 KB)
Response to notification of accompanied site visit and hearings letter dated 2 January 2015. Including comments on alternative site for temporary vehicle park
Other
National Farmers Union (PDF, 97 KB)
Response to notification of accompanied site visit and hearings letter dated 2 January 2015. Including comments on the Basic Payment Scheme
Other
Agendas for Issue-specific and Compulsory Acquisition hearings (PDF, 109 KB)
Other
Itinerary for the Accompanied Site Visit (PDF, 4 MB)
Other
Environment Agency (PDF, 162 KB)
Environment Agency?s response to comments on their Relevant Representation. Submission for Deadline 2 of 20 January 2015
Other
G L Riby (PDF, 1 MB)
Drainage plans ? evidence for hearings. Submission for Deadline 2 of 20 January 2015
Other
Glendon Estate (PDF, 2 MB)
Plans relating to temporary construction route ? evidence for hearings. Submission for Deadline 2 of 20 January 2015
Other
Glendon Estate (PDF, 11 MB)
Documents relating to Minerals issues ? evidence for hearings. Submission for Deadline 2 of 20 January 2015
Other
National Grid Carbon Limited (PDF, 2 MB)
3.2 Explanatory Memorandum (Rev B) submission for Deadline 2 of 20 January 2015
Other
National Grid Carbon Limited (PDF, 57 KB)
11.7 List of Deadline 2 Documents. Submission for Deadline 2 of 20 January 2015.
Other
National Grid Carbon Limited (PDF, 3 MB)
11.1 Responses to Matters Raised at Deadline 1. Submission for Deadline 2 of 20 January 2015.
Other
National Grid Carbon Limited (PDF, 33 KB)
11.5 Schedule of Compulsory Acquisition. Submission for Deadline 2 of 20 January 2015.
Other
National Grid Carbon Limited (PDF, 3 MB)
2.4 Access Rights of Way and Stopping Up Plans Sheet 1 of 25 (Rev B) submission for Deadline 2 of 20 January 2015
Other
National Grid Carbon Limited (PDF, 33 KB)
4.3 Book of Reference (Rev B) Parts 1 and 3. Submission for Deadline 2 of 20 January 2015.
Other
National Grid Carbon Limited (PDF, 7 MB)
11.2 Minerals Report. Submission for Deadline 2 of 20 January 2015.
Other
National Grid Carbon Limited (PDF, 4 MB)
11.3 Offshore Scheme Technical Evidence Report. Submission for Deadline 2 of 20 January 2015.
Other
National Grid Carbon Limited (PDF, 816 KB)
3.1 Draft Development Consent Order (Rev B) submission for Deadline 2 of 20 January 2015
Other
National Grid Carbon Limited (PDF, 625 KB)
7.1.1 Addendum to Planning Statement. Submission for Deadline 2 of 20 January 2015.
Other
National Grid Carbon Limited (PDF, 3 MB)
2.7 Deemed Marine Licence Coordinates Sheet 1 of 1 (Rev C) submission for Deadline 2 of 20 January 2015
Other
National Grid Carbon Limited (PDF, 1 MB)
7.5 Code of Construction Practice (Rev B). Submission for Deadline 2 of 20 January 2015.
Other
National Grid Carbon Limited (PDF, 8 MB)
3.3 Commentary on Revision B of the Draft Development Consent Order submission for Deadline 2 of 20 January 2015
Other
National Grid Carbon Limited (PDF, 248 KB)
11.6 Deadline 2 Cover Letter. Submission for Deadline 2 of 20 January 2015.
Other
North Yorkshire County Council and Selby District Council (PDF, 2 MB)
Joint Local Impact Report ? previously published as submission for Deadline 1 of 18 December 2014. Errata sheet added and accepted as a late submission for Deadline 2 of 20 January 2015 at the discretion of the Examining Authority
Other
National Grid Carbon Limited (PDF, 441 KB)
Notice of issue-specific and compulsory acquisition hearings of 3 - 6 February 2015.
Other
Peter Mawer, Land Agent for the Glendon Estate (PDF, 202 KB)
Notification of intention to attend hearings and suggested locations for accompanied site visit. Late submission for Deadline 1 of 18 December 2014 accepted at the discretion of The Examining Authority
Other
National Grid Carbon Limited (PDF, 439 KB)
Notice of open floor and issue specific hearings of 28 & 29 January 2015.
Other
Notification of Hearings (PDF, 92 KB)
Other
National Grid Carbon Limited (PDF, 48 MB)
10.2 Responses to ExA's first written questions. Submission for Deadline 1 of 18 December 2014
Other
Barmston and Fraisthorpe Parish Council (PDF, 421 KB)
Notification of attendance at accompanied site visit and suggested location. Submission for Deadline 1 of 18 December 2014
Other
Canal and River Trust (PDF, 19 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
Other
Capture Power Limited (PDF, 284 KB)
Written Representation and Notification ? attending and speaking at Compulsory Acquisition Hearing. Submission for Deadline 1 of 18 December 2014
Other
Dr Vincini (PDF, 95 KB)
Notification of attendance at accompanied site visit and suggested location. Submission for Deadline 1 of 18 December 2014
Other
Dr Vincini (PDF, 86 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
Other
Dr Vincini (PDF, 75 KB)
Notification of intention Compulsory Acquisition Hearing. Submission for Deadline 1 of 18 December 2014
Other
East Riding of Yorkshire Council (PDF, 149 KB)
Response to the Examining Authority?s First Written Questions . Submission for Deadline 1 of 18 December 2014
Other
East Riding of Yorkshire Council (PDF, 482 KB)
Local Impact Report, and two appendixes: Letter from AECOM, Planning Committee Minutes. Submission for Deadline 1 of 18 December 2014
Other
Environment Agency (PDF, 938 KB)
Written Representation, Summary of Written Representation, Summary of Relevant Representations, Response to Examining Authority?s first written questions. Submission for Deadline 1 of 18 December 2014
Other
George Copeland (PDF, 39 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
Other
Government Pipeline and Storage Systems (PDF, 317 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
Other
Homes and Communities Agency (PDF, 31 KB)
No comments and do not wish to be notified further. Submission for Deadline 1 of 18 December 2014
Other
Marine Management Organisation (PDF, 419 KB)
Written Representation and Response to the Examining Authority?s First Written Questions . Submission for Deadline 1 of 18 December 2014
Other
Messrs Wright (PDF, 301 KB)
Written Representation and Notification of intention to attend hearings and Accompanied Site Visit. Submission for Deadline 1 of 18 December 2014
Other
Mineral Products Association, W Clifford Watts Ltd. and Others (PDF, 2 MB)
Appendices to submission for Deadline 1. Appendix 4:Park Farm Geotechnical Final Report. Submission for Deadline 1 of 18 December 2014
Other
Mineral Products Association, W Clifford Watts Ltd. and Others (PDF, 2 MB)
Appendices to submission for Deadline 1. Appendix 3: Barfhill Final Report Appendix 6: Stonehills final Report. Submission for Deadline 1 of 18 December 2014
Other
Mineral Products Association,W Clifford Watts Ltd and Others (PDF, 509 KB)
Notifications and Written Representations. Submission for Deadline 1 of 18 December 2014
Other
Mr and Mrs Atkinson (PDF, 321 KB)
Written Representation and Notification of intention to attend hearings and Accompanied Site Visit. Submission for Deadline 1 of 18 December 2014
Other
Mr C J Marshall (PDF, 169 KB)
Written Representation and notification of intent to attend hearings and accompanied site visit. Submission for Deadline 1 of 18 December 2014
Other
Mr G L Riby (PDF, 174 KB)
Written Representation and notification of intent to attend hearings and accompanied site visit. Submission for Deadline 1 of 18 December 2014
Other
Mr G Warkup (PDF, 175 KB)
Written Representation and notification of intent to attend hearings and accompanied site visit. Submission for Deadline 1 of 18 December 2014
Other
Mr J A Southwell (PDF, 35 KB)
Notification ? not attending hearings or accompanied site visit. Submission for Deadline 1 of 18 December 2014
Other
Mr J P Thompson and Mrs O J Thompson (PDF, 142 KB)
Written Representation and Notification ? not speaking at hearings or attending accompanied site visit. Submission for Deadline 1 of 18 December 2014
Other
Mr R Hall (PDF, 137 KB)
Written Representation and Notification ? not speaking at hearings or attending accompanied site visit. Submission for Deadline 1 of 18 December 2014
Other
Mr S R Craven and Mr R R Craven (PDF, 135 KB)
Written Representation and Notification ? ? not speaking at hearings or attending accompanied site visit. Submission for Deadline 1 of 18 December 2014
Other
Mr Stephen Harper (PDF, 35 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
Other
Mrs M E Payne (PDF, 138 KB)
Written Representation and Notification ? not speaking at hearings or attending accompanied site visit. Submission for Deadline 1 of 18 December 2014
Other
Mrs Webb-Ingall (PDF, 180 KB)
Written Representation and suggested accompanied site visit location. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.3 Works Plans sheet 17 of 25 revision B. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.5 Hedgerow Plans sheet 24 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 2 MB)
2.3 Works Plans sheet 25 of 25 revision B. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.4 Access Rights of Way and Stopping Up Plans sheet 25 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 3 MB)
7.7.1 Drainage Design sheet 25 of 25 revision B Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 679 KB)
9.3 Statement of Common Ground between Selby District Council and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 5 MB)
10.2.4 Traffic Route Plan Map 3 of 3. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 3 MB)
7.7.1 Drainage Design sheet 24 of 25 revision B Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.5 Hedgerow Plans sheet 25 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 547 KB)
9.10 Statement of Common Ground between Selby Area IDB and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 497 KB)
9.7 Statement of Common Ground between Marine Management Organisation and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 3 MB)
7.7.1 Drainage Design sheet 17 of 25 revision B Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 627 KB)
2.9 BARMSTON PUMPING STATION Location Plan revision B. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 2 MB)
2.4 Access Rights of Way and Stopping Up Plans sheet 24 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 2 MB)
2.5 Hedgerow Plans sheet 18 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 1,006 KB)
5.4.9 Screening Matrices Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 3 MB)
7.7.1 Drainage Design sheet 18 of 25 revision B Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 1 MB)
9.5 Statement of Common Ground between Natural England and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 1 MB)
10.3.1 Assessment of effects on strategic road network. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 6 MB)
10.2.4 Traffic Route Plan Map 2 of 3. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 4 MB)
10.1 Order Limits Revision Comparison sheet 3 of 3 revision A. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 625 KB)
9.1 Statement of Common Ground between North Yorkshire County Council and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 265 KB)
10.6 Deadline 1 Cover Letter. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 293 KB)
10.3.2 Legal submissions in respect of ecological mitigation. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 799 KB)
9.2 Statement of Common Ground between East Riding of Yorkshire Council and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 65 KB)
10.7 List of Deadline 1 Documents. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 2 MB)
2.4 Access Rights of Way and Stopping Up Plans sheet 18 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 3 MB)
10.3 Comments on Relevant Representations. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 4 MB)
10.1 Order Limits Revision Comparison sheet 2 of 3 revision A. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 1 MB)
9.8 Signed Statement of Common Ground between Highways Agency and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.1 Land Plans (to include Land Affected Plans) sheet 18 of 25 revision G. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 240 KB)
7.7.2 Addendum to Drainage Report Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.3 Works Plans sheet 24 of 25 revision B. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.1 Land Plans (to include Land Affected Plans) sheet 17 of 25 revision G. Submission for Deadline 1 of 18 December 2014?
Other
National Grid Carbon Limited (PDF, 2 MB)
2.5 Hedgerow Plans sheet 17 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
Other
National Grid carbon Limited (PDF, 2 MB)
2.7 Deemed Marine Licence Coordinates revision B. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 474 KB)
10.3.6 Letter of No Impediment. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 4 MB)
10.1 Order Limits Revision Comparison sheet 1 of 3 revision A. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 538 KB)
9.12 Statement of Common Ground between Ouse and Humber Drainage Board and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
9.11 Signed Statement of Common Ground between Beverley and North Holderness IDB and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 1 MB)
9.9 Signed Statement of Common Ground between Trinity House and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.3 Works Plans sheet 18 of 25 revision B. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 78 KB)
10.5 Accompanied Site Visit Suggested Itinerary. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 619 KB)
9.6 Statement of Common Ground between Environment Agency and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 5 MB)
10.2.4 Traffic Route Plan Map 1 of 3. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 33 KB)
10.4 Schedule of Compulsory Acquisition. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 2 MB)
2.4 Access Rights of Way and Stopping Up Plans sheet 17 of 25 revision B. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 527 KB)
10.2.2 Organisation of Project Control Documents. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 3 MB)
9.4 Signed Statement of Common Ground between English Heritage and National Grid at Deadline 1. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.1 Land Plans (to include Land Affected Plans) sheet 24 of 25 revision G. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
5.4.12 Flamborough Head SPA pSPA Offshore Usage. Submission for Deadline 1 of 18 December 2014.
Other
National Grid Carbon Limited (PDF, 2 MB)
2.1 Land Plans (to include Land Affected Plans) sheet 25 of 25 revision G. Submission for Deadline 1 of 18 December 2014
Other
National Grid Carbon Limited (PDF, 862 KB)
10.2.1 Schedule of Mitigation. Submission for Deadline 1 of 18 December 2014
Other
Natural England (PDF, 204 KB)
Written Representation - Appendix D letter of no impediment with regard to the great crested newt licence application. Submission for Deadline 1 of 18 December 2014
Other
Natural England (PDF, 621 KB)
Written Representation and Summary including: Appendix C Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 18 December 2014
Other
Natural England (PDF, 7 MB)
Written Representation ? Appendix A Site maps. Submission for Deadline 1 of 18 December 2014
Other
Natural England (PDF, 895 KB)
Appendix B Designated site conservation objectives and citations. Submission for Deadline 1 of 18 December 2014
Other
Network Rail infrastructure Limited (PDF, 1 MB)
Written Representation and Notification ? provisionally attending and speaking at Development Consent Order and Compulsory Acquisition hearings. Submission for Deadline 1 of 18 December 2014
Other
North Yorkshire County Council (PDF, 81 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 18 December 2014
Other
Nottinghamshire County Council (PDF, 14 KB)
No comments and do not wish to be notified further. Submission for Deadline 1 of 18 December 2014
Other
PH & AJ Blacker t/a BB Farms Ltd (PDF, 75 KB)
Notification of intention to attend accompanied site visit and Compulsory Acquisition Hearing. Submission for Deadline 1 of 18 December 2014
Other
PH & AJ Blacker t/a BB Farms Ltd (PDF, 86 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
Other
R G Kendall and Sons (PDF, 75 KB)
Written Representation and Notification ? not speaking at hearings or attending accompanied site visit. Submission for Deadline 1 of 18 December 2014
Other
Selby District Council (PDF, 43 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 18 December 2014
Other
Selby District Council (PDF, 2 MB)
Joint Local Impact Report with North Yorkshire County Council
Other
The Glendon Estate (PDF, 169 KB)
Written Representation and notification of intent to attend hearings and accompanied site visit. Submission for Deadline 1 of 18 December 2014
Other
The Trustees of the Market Weighton Church Estate (PDF, 75 KB)
Written Representation and Notification ? not speaking at hearings or attending accompanied site visit. Submission for Deadline 1 of 18 December 2014
Other
Wakefield Council (PDF, 260 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
Other
Yorkshire Water (PDF, 71 KB)
Response to Examining Authority?s First Written Questions. Submission for Deadline 1 of 18 December 2014
Other
Yorkshire Wildlife Trust (PDF, 39 KB)
Notification by Statutory Party of wish to become an Interested Party - accepted by the Examining Authority. Submission for Deadline 1 of 18 December 2014
Other
Mineral Products Association, W Clifford Watts Ltd. and Others (PDF, 1 MB)
Appendices to submission for Deadline 1. Appendix 1:Fisher German Letter Appendix 2: MPA response to Fisher German letter Appendix 5: Correspondence to applicant. Submission for Deadline 1 of 18 December 2014
Other
Yorkshire Wildlife Trust (PDF, 875 KB)
Written Representation. Submission for Deadline 1 of 18 December 2014
Other
Preliminary Meeting Note (PDF, 54 KB)
Other
Examining Authoritys first written questions and requests for information (PDF, 220 KB)
The Examining Authority?s first written questions and requests for information issued by the Examining Authority on 25 November 2014
Other
Rule 8 Letter (PDF, 146 KB)
Rule 8 letter issued by the Examining Authority on 25 November 2014
Other
Alan Barker (PDF, 11 KB)
Submission for Preliminary Meeting on 19 November 2014
Other
GTC group of companies (PDF, 46 KB)
Response to Rule 6 Letter-no comments. Accepted at Preliminary Meeting on 19 November 2014
Other
National Farmers Union North East (PDF, 76 KB)
Response to Rule 6 Letter. Accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.3 Work Plan Sheet 25 of 25. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 340 KB)
2.6 Crown Land 2. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 71 KB)
Applicant?s covering letter - changes to application documents dated 12 August 2014
Other
National Grid Carbon Limited (PDF, 10 MB)
5.4.1-5.4.12 No significant Effects Report Appendices Revision B. Pre-Examination submission received on 14 November 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 8 MB)
2.6 Crown Land Overview. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.14 Barmston Parameter Plans Revision B. Pre-Examination submission received on 14 November 2014 -accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 253 KB)
2.6 Crown Land 3. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 36 MB)
6.9.5 Great Crested Newt Survey Revision B. Pre-Examination submission received on 14 November 2014 -accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 400 KB)
Applicant?s covering letter - changes to application documents dated 31 October 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.1 Land Plan Sheet 2 of 25. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.3 Work Plan Sheet 24 of 25. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 1 MB)
2.3 Work Plan Sheet 15 of 25. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 1 MB)
5.4 No Significant Effects Report Revision B. Pre-Examination submission received on 14 November 2014 -accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 33 KB)
Book of Reference Comparison. Pre-Examination submission received on 14 November 2014 -accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.3 Work Plan Sheet 2 of 25. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 272 KB)
2.6 Crown Land 1. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
National Grid Carbon Limited (PDF, 2 MB)
2.3 Work Plan Sheet 20 of 25. Pre-Examination submission received on 14 August 2014 - accepted at Preliminary Meeting on 19 November 2014
Other
Natural England (PDF, 303 KB)
Response to Rule 6 Letter and attachments. Accepted at Preliminary Meeting on 19 November 2014
Other
Network Rail (PDF, 37 KB)
Update on discussions with applicant related to Protective Provisions. Accepted at Preliminary Meeting on 19 November 2014
Other
North Yorkshire Fire and Rescue (PDF, 57 KB)
Response to Rule 6 Letter. Accepted at Preliminary Meeting on 19 November 2014
Other
Redcar and Cleveland Borough Council (PDF, 66 KB)
Response to Rule 6 Letter. Statement that they do not wish to be involved in the Examination. Accepted at Preliminary Meeting on 19 November 2014
Other
Steve Harper (PDF, 61 KB)
Submission for Preliminary Meeting on 19 November 2014
Other
Yorkshire Water (PDF, 46 KB)
Update on discussions with applicant related to Protective Provisions. Accepted at Preliminary Meeting on 19 November 2014
Other
Preliminary Meeting Audio (PDF, 31 KB)
Audio recording of the Preliminary Meeting held at Bishop Burton College on 19 November 2014.
Other
National Grid Carbon Limited (PDF, 1 MB)
The applicant?s s132 application received on 18 June 2014 is now published. Following clarification on the arrangements for applications proposing compulsory acquisition of rights in open space taking account of the amendments brought into force by the Growth and Infrastructure Act 2013 these documents now form part of the examination.
Other
Letter to the Trans Pennine Trail (PDF, 69 KB)
Letter to Trans Pennine Trail in relation to its request to become an interested party under s.102A of the Planning Act 2008.
Other
Rule 6 letter (PDF, 157 KB)
Other
National Grid Carbon Limited (PDF, 33 KB)
Certificates of compliance with s.56 & s.59 of the Planning Act 2008 and Regulation 13 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Other
2.72 PLANS OF STATUTORY NON-STATUTORY ENVIRONMENTAL SITES AND FEATURES Maps 0-10 (PDF, 10 MB)
Other
6.10.5 Geophysical Survey Part 18 (PDF, 34 MB)
Other
6.10.5 Geophysical Survey Part 5 (PDF, 40 MB)
Other
6.13 Noise and Vibration (PDF, 16 MB)
Other
6.19 Glossary and Acronyms (PDF, 172 KB)
Other
6.3.2 Crossing Methods (PDF, 426 KB)
Other
6.10.5 Geophysical Survey Part 23 (PDF, 18 MB)
Other
6.21 Statement of Combined Effects (PDF, 3 MB)
Other
1.1 List of Application Documents (PDF, 128 KB)
Other
2.14 BARMSTON PUMPING STATION PARAMETER PLAN (PDF, 794 KB)
Other
6.5 Environmental Impact Assessment Process (PDF, 9 MB)
Other
2.5 Hedgerow Plans Sheets 13-25 (PDF, 18 MB)
Other
5.1 Consultation Report Part 3 (PDF, 48 MB)
Other
6.3 Onshore Scheme Description (PDF, 18 MB)
Other
6.7.4 Report on Ground Investigation Report No. 762402RLX-3 (PDF, 5 MB)
Other
7.7.1 Drainage Design Sheets 13-25 (PDF, 20 MB)
Other
4.2 Funding Statement (PDF, 276 KB)
Other
2.29 Camblesforth Multi-Junction Elevations (Operational Site) (PDF, 1 MB)
Other
2.16 BARMSTON PUMPING STATION INDICATIVE LANDSCAPE STRATEGY (PDF, 8 MB)
Other
6.4 EIA Consultation (PDF, 394 KB)
Other
6.17 Cumulative Effects Assessment (PDF, 2 MB)
Other
2.54 DRAX PIG TRAP TEMPORARY CONSTRUCTION VEHICULAR ACCESS (NEW ROAD) (PDF, 444 KB)
Other
4.1 Statement of Reasons (PDF, 751 KB)
Other
5.2.7-5.2.14 Flood Risk Assessment Appendices (PDF, 4 MB)
Other
6.10.5 Geophysical Survey Part 24 (PDF, 39 MB)
Other
2.39 Dalton Block Valve Planning Arrangement (PDF, 530 KB)
Other
6.10.5 Geophysical Survey Part 20 (PDF, 371 KB)
Other
2.55 CAMBLESFORTH MULTI-JUNCTION PERMANENT VEHICULAR ACCESS (A645) (PDF, 499 KB)
Other
6.4.7 Safety Statement (PDF, 820 KB)
Other
6.10.5 Geophysical Survey Part 16 (PDF, 42 MB)
Other
2.53 Typical Temporary Access From Highway No Flumed Ditch Crossing (PDF, 147 KB)
Other
4.3 Book of Reference (parts 1-5) (PDF, 33 KB)
Other
2.65 CAMBLESFORTH MULTI-JUNCTION PERMANENT VEHICULAR ACCESS (A645) VEHICULAR SWEPT PATH ANALYSIS (PDF, 350 KB)
Other
6.15 Socio-Economics (PDF, 15 MB)
Other
2.36 Tollingham Block Valve Elevations (Operational Site) (PDF, 868 KB)
Other
6.8.1 Local Planning Policy (PDF, 292 KB)
Other
3.2 Draft Explanatory Memorandum (PDF, 2 MB)
Other
6.4.5 Scoping Opinion Responses (PDF, 355 KB)
Other
2.18 Drax Pig Trap Planning Arrangement (PDF, 253 KB)
Other
2.43 Dalton Block Valve Elevations (Operational Site) (PDF, 956 KB)
Other
6.10.5 Geophysical Survey Part 15 (PDF, 373 KB)
Other
7.8 Proposed Scheme Report Part 5 (PDF, 32 MB)
Other
5.2 Flood Risk Assessment (PDF, 5 MB)
Other
2.17 Drax Pig Trap Location Plan (PDF, 340 KB)
Other
2.63 DRIFFIELD CONSTRUCTION COMPOUND TEMPORARY VEHICULAR ACCESS (A614) (PDF, 492 KB)
Other
6.10.5 Geophysical Survey Part 7 (PDF, 21 MB)
Other
6.10.5 Geophysical Survey Part 17 (PDF, 33 MB)
Other
2.3 Works Plans Sheets 13-25 (PDF, 17 MB)
Other
6.12 Air Quality (PDF, 8 MB)
Other
6.7.7 Report on Ground Investigation Report No. 762402L (PDF, 15 MB)
Other
7.7.1 Drainage Design Sheets 0-12 (PDF, 24 MB)
Other
5.1 Consultation Report Part 2 (PDF, 38 MB)
Other
5.3 Statement of Statutory Nuisance (PDF, 697 KB)
Other
2.23 Drax Pig Trap Planting Drawing (PDF, 429 KB)
Other
6.10.5 Geophysical Survey Part 14 (PDF, 31 MB)
Other
2.13 BARMSTON PUMPING STATION NITROGEN AIR BUILDING (PDF, 694 KB)
Other
2.45 Skerne Block Valve Location Plan (PDF, 523 KB)
Other
7.8 Proposed Scheme Report Part 2 (PDF, 12 MB)
Other
Yorkshire & Humber CCS Cross Country Pipeline - s55 checklist (PDF, 237 KB)
Other
6.7.5 Report on Ground Investigation Report No. 762402RLX-5 (PDF, 5 MB)
Other
6.10.1-6.10.4 Archaeology and Cultural Heritage Appendices (PDF, 2 MB)
Other
2.32 Tollingham Block Valve Planning Arrangement (PDF, 499 KB)
Other
6.7.2 Report on Ground Investigation Report No. 762402T2 (PDF, 34 MB)
Other
3.1 Draft Development Consent Order (PDF, 679 KB)
Other
2.68 SKERNE BLOCK VALVE PERMANENT VEHICULAR ACCESS (MAIN STREET SKERNE) VEHICULAR SWEPT PATH ANALYSIS (PDF, 394 KB)
Other
6.10.5 Geophysical Survey Part 22 (PDF, 27 MB)
Other
7.8 Proposed Scheme Report Part 3 (PDF, 42 MB)
Other
2.33 Tollingham Block Valve Elevations (N E) (PDF, 648 KB)
Other
6.9.6 Bat Survey Report (PDF, 9 MB)
Other
7.8 Proposed Scheme Report Part 1 (PDF, 50 MB)
Other
6.13.1-6.13.3 Noise and Vibration Appendices (PDF, 3 MB)
Other
2.3 Works Plans Sheets 0-12 (PDF, 21 MB)
Other
7.3 Design and Access Statement (PDF, 21 MB)
Other
2.1 Land Plans Sheets 0-26 (PDF, 50 MB)
Other
6.8 Land Use and Agriculture (PDF, 44 MB)
Other
2.9 BARMSTON PUMPING STATION Location Plan (PDF, 629 KB)
Other
5.1 Consultation Report Part 1 (PDF, 31 MB)
Other
6.7.6 Report on Ground Investigation Report No. 762402RVX-6 (PDF, 16 MB)
Other
1.5 Newspaper Notices (PDF, 12 MB)
Other
2.37 Tollingham Block Valve Planting Drawing (PDF, 720 KB)
Other
2.4 Access Rights of Way and Stopping Up Plans Sheets 0-12 (PDF, 20 MB)
Other
5.2.1-5.2.6 Flood Risk Assessment Appendices (PDF, 6 MB)
Other
2.20 Drax Pig Trap Elevations (S W) (PDF, 550 KB)
Other
7.4 Need Case (PDF, 1,003 KB)
Other
7.5 Code of Construction Practice (PDF, 9 MB)
Other
6.10 Archaeology and Cultural Heritage (PDF, 8 MB)
Other
6.7 Geology Hydrogeology and Ground Conditions (PDF, 36 MB)
Other
2.47 Skerne Block Valve Elevations (N E) (PDF, 661 KB)
Other
1.3 Application Form (PDF, 139 KB)
Other
2.42 Dalton Block Valve 3D Visualisation (Isometric) (PDF, 1 MB)
Other
7.1 Planning Statement (PDF, 615 KB)
Other
2.4 Access Rights of Way and Stopping Up Plans Sheets 13-25 (PDF, 17 MB)
Other
6.10.5 Geophysical Survey Part 3 (PDF, 29 MB)
Other
2.12 BARMSTON PUMPING STATION ADMINISTRATION WORKSHOP SWITCHOUSE BUILDINGS (PDF, 465 KB)
Other
6.12.1 Dust Assessment Methodology (PDF, 99 KB)
Other
6.17.1 Intra Project Cumulative Effects Screening Assessment (PDF, 396 KB)
Other
6.10.5 Geophysical Survey Part 4 (PDF, 373 KB)
Other
6.15.2-6.15.3 Socio-Economics Appendices (PDF, 4 MB)
Other
2.27 Camblesforth Multi-Junction Elevations (S W) (PDF, 630 KB)
Other
6.10.5 Geophysical Survey Part 13 (PDF, 28 MB)
Other
2.26 Camblesforth Multi-Junction Elevations (N E) (PDF, 662 KB)
Other
7.7 Drainage Report (PDF, 293 KB)
Other
2.74 Regulation 5(2)(l) and 5(2)(m) Assessment Reference Document (PDF, 74 KB)
Other
2.5 Hedgerow Plans Sheet 0-12 (PDF, 21 MB)
Other
6.4.3 Scoping Opinion (PDF, 22 MB)
Other
6.4.9 Stakeholder Meeting Minutes (PDF, 1 MB)
Other
2.60 BARMSTON PUMPING STATION PERMANENT VEHICULAR ACCESS (SANDS ROAD) (PDF, 300 KB)
Other
6.3.1 Crossing Schedule (PDF, 135 KB)
Other
6.7.1 Report on Ground Investigation Report No. 762402 - Part 2 of 3 (PDF, 18 MB)
Other
6.18 Summary of Residual Effects (PDF, 785 KB)
Other
2.44 Dalton Block Valve Planting Drawing (PDF, 700 KB)
Other
6.4.2 Scoping Report (PDF, 44 MB)
Other
2.51 Skerne Block Valve Planting Drawing (PDF, 744 KB)
Other
2.11 BARMSTON PUMPING STATION Pumping Buildings A-H (PDF, 728 KB)
Other
2.49 Skerne Block Valve 3D Visualisation (Isometric) (PDF, 2 MB)
Other
6.9 Ecology and Nature Conservation (PDF, 25 MB)
Other
2.35 Tollingham Block Valve 3D Visualisation (Isometric) (PDF, 2 MB)
Other
6.7.1 Report on Ground Investigation Report No. 762402 - Part 1 of 3 (PDF, 40 MB)
Other
2.34 Tollingham Block Valve Elevations (S W) (PDF, 611 KB)
Other
2.15 BARMSTON PUMPING STATION PROPOSED SITE SECTIONS (PDF, 505 KB)
Other
2.30 Camblesforth Multi-Junction Planting Drawing (PDF, 898 KB)
Other
6.9.9 Ornithological Report (PDF, 23 MB)
Other
6.6 Water Resources and Flood Risk (PDF, 28 MB)
Other
6.9.11 Landfall Intertidal Phase 1 Survey Report (PDF, 6 MB)
Other
6.14 Traffic Transport and Access (PDF, 19 MB)
Other
6.9.8 Reptile Survey Report (PDF, 4 MB)
Other
6.11 Landscape and Visual Assessment (PDF, 44 MB)
Other
6.14.4 Transport Assessment (PDF, 27 MB)
Other
6.9.1 Local Planning Policies - Ecology (PDF, 265 KB)
Other
6.9.7 Otter and Water Vole Report (PDF, 8 MB)
Other
6.10.5 Geophysical Survey Part 8 (PDF, 21 MB)
Other
2.73 PLANS OF STATUTORY NON-STATUTORY SITES AND FEATURES OF THE HISTORIC ENVIRONMENT Maps 0-10 (PDF, 10 MB)
Other
2.28 Camblesforth Multi-Junction 3D Visulisation (isometric) (PDF, 2 MB)
Other
5.1 Consultation Report Part 4 (PDF, 40 MB)
Other
6.10.5 Geophysical Survey Part 10 (PDF, 43 MB)
Other
2.25 Camblesforth Multi-Junction Planning Arrangement (PDF, 742 KB)
Other
2.59 BARMSTON PUMPING STATION PERMANENT VEHICULAR ACCESS (SANDS ROAD) (PDF, 259 KB)
Other
6.10.5 Geophysical Survey Part 1 (PDF, 363 KB)
Other
2.66 TOLLINGHAM BLOCK VALVE PERMANENT VEHICULAR ACCESS (SKIFF LANE) VEHICULAR SWEPT PATH ANALYSIS (PDF, 320 KB)
Other
1.6 Navigation Document (PDF, 160 KB)
Other
2.67 DALTON BLOCK VALVE PERMANENT VEHICULAR ACCESS (LUND WOLD ROAD) VEHICULAR SWEPT PATH ANALYSIS (PDF, 389 KB)
Other
6.9.5 Great Crested Newt Survey Report (PDF, 10 MB)
Other
2.31 Tollingham Block Valve Location Plan (PDF, 526 KB)
Other
6.10.5 Geophysical Survey Part 19 (PDF, 16 MB)
Other
6.10.5 Geophysical Survey Part 12 (PDF, 25 MB)
Other
2.40 Dalton Block Valve Elevations (N E) (PDF, 695 KB)
Other
6.4.4 Schedule of Responses to the Scoping Opinion (PDF, 661 KB)
Other
6.10.5 Geophysical Survey Part 2 (PDF, 39 MB)
Other
6.1 Introduction (PDF, 678 KB)
Other
2.57 DALTON BLOCK VALVE PERMANENT VEHICULAR ACCESS (LUND WOLD ROAD) (PDF, 353 KB)
Other
2.64 DRAX PIG TRAP TEMPORARY CONSTRUCTION VEHICULAR ACCESS (NEW ROAD) VEHICULAR SWEPT PATH ANALYSIS (PDF, 325 KB)
Other
6.10.5 Geophysical Survey Part 21 (PDF, 36 MB)
Other
6.20 Non Technical Summary (PDF, 53 MB)
Other
2.71 DRIFFIELD CONSTRUCTION COMPOUND TEMPORARY VEHICULAR ACCESS (A614) VEHICULAR SWEPT PATH ANALYSIS (PDF, 440 KB)
Other
6.7.3 Report on Ground Investigation Report No. 762402RVX-4 (PDF, 16 MB)
Other
2.48 Skerne Block Valve Elevations (S W) (PDF, 620 KB)
Other
2.56 TOLLINGHAM BLOCK VALVE PERMANENT VEHICULAR ACCESS (SKIFF LANE) (PDF, 312 KB)
Other
6.10.5 Geophysical Survey Part 9 (PDF, 384 KB)
Other
2.21 Drax Pig Trap 3D Visualisation (Isometric) (PDF, 6 MB)
Other
6.9.3 Hedgerow Survey Report (PDF, 6 MB)
Other
5.4.1-5.4.11 No Significant Effects Report Appendices (PDF, 3 MB)
Other
6.4.8 PEIR Addendum Responses (PDF, 1 MB)
Other
2.46 Skerne Block Valve Planning Arrangement (PDF, 542 KB)
Other
6.6.1-6.6.8 Water Resources and Flood Risk Appendices (PDF, 3 MB)
Other
2.61 WIDENING OF SANDS ROAD BETWEEN A165 JUNCTION AND SITE ACCESS (PDF, 351 KB)
Other
2.7 Deemed Marine Licence Coordinates (PDF, 2 MB)
Other
6.8.2 Planning Applications (PDF, 279 KB)
Other
6.11.1-6.11.6 Landscape and Visual Assessment Appendices (PDF, 7 MB)
Other
5.4 No Significant Effects Report (PDF, 3 MB)
Other
6.9.2 Ecology Desk Study and Consultation Information (PDF, 9 MB)
Other
2.19 Drax Pig Trap Elevations (N E) (PDF, 569 KB)
Other
Notification of Decision to Accept Application (PDF, 75 KB)
Other
6.4.1 Thematic group meeting minutes (PDF, 490 KB)
Other
2.10 BARMSTON PUMPING STATION Illustrative Site Layout (PDF, 825 KB)
Other
2.41 Dalton Block Valve Elevations (S W) (PDF, 658 KB)
Other
1.2 Covering Letter (PDF, 368 KB)
Other
6.10.5 Geophysical Survey Part 11 (PDF, 33 MB)
Other
2.38 Dalton Block Valve Location Plan (PDF, 309 KB)
Other
2.24 Camblesforth Multi-Junction Location Plan (PDF, 354 KB)
Other
2.58 SKERNE BLOCK VALVE PERMANENT VEHICULAR ACCESS (MAIN STREET SKERNE) (PDF, 374 KB)
Other
2.2 Plans showing Special Category Land Sheets 1-2 (PDF, 576 KB)
Other
6.14.1-6.14.3 Traffic Transport and Access Appendices (PDF, 16 MB)
Other
6.10.5 Geophysical Survey Part 6 (PDF, 33 MB)
Other
6.15.1 Beach User Report (PDF, 22 MB)
Other
2.22 Drax Pig Trap Elevations (Operational Site) (PDF, 1 MB)
Other
6.4.6 PEIR Responses (PDF, 2 MB)
Other
2.50 Skerne Block Valve Elevations (Operational Site) (PDF, 901 KB)
Other
2.52 Typical Temporary Access From Highway Flumed Ditch Crossing (PDF, 151 KB)
Other
2.69 BARMSTON PUMPING STATION PERMANENT VEHICULAR ACCESS (SANDS ROAD) VEHICULAR SWEPT PATH ANALYSIS (PDF, 374 KB)
Other
2.6 Crown Land Plans Sheets 1-3 (PDF, 791 KB)
Other
6.7.1 Report on Ground Investigation Report No. 762402 - Part 3 of 3 (PDF, 33 MB)
Other
7.6 Construction Report (PDF, 5 MB)
Other
7.8 Proposed Scheme Report Part 4 (PDF, 38 MB)
Other
6.2 Onshore Scheme Development and Alternatives (PDF, 17 MB)
Other
Bradford Metropolitan District Council (PDF, 38 KB)
Adequacy of Consultation Representation
Other
City of York Council (PDF, 104 KB)
Adequacy of Consultation Representation
Other
Cumbria County Council (PDF, 92 KB)
Adequacy of Consultation Representation
Other
Darlington Borough Council (PDF, 37 KB)
Adequacy of Consultation Representation
Other
Doncaster Metropolitan Borough Council (PDF, 13 KB)
Adequacy of Consultation Representation
Other
Durham County Council (PDF, 69 KB)
Adequacy of Consultation Representation
Other
East Riding of Yorkshire Council (PDF, 744 KB)
Adequacy of Consultation Representation
Other
Harrogate Borough Council (PDF, 31 KB)
Adequacy of Consultation Representation
Other
Hull City Council (PDF, 36 KB)
Adequacy of Consultation Representation
Other
Lancashire County Council (PDF, 15 KB)
Adequacy of Consultation Representation
Other
Leeds City Council (PDF, 35 KB)
Adequacy of Consultation Representation
Other
Middlesbrough Borough Council (PDF, 109 KB)
Adequacy of Consultation Representation
Other
North Lincolnshire Council (PDF, 14 KB)
Adequacy of Consultation Representation
Other
North Yorkshire County Council (PDF, 109 KB)
Adequacy of Consultation Representation
Other
North Yorkshire Moors National Park Authority (PDF, 14 KB)
Adequacy of Consultation Representation
Other
Redcar and Cleveland Borough Council (PDF, 65 KB)
Adequacy of Consultation Representation
Other
Ryesdale District Council (PDF, 61 KB)
Adequacy of Consultation Representation
Other
Scarborough Borough Council (PDF, 67 KB)
Adequacy of Consultation Representation
Other
Selby District Council (PDF, 388 KB)
Adequacy of Consultation Representation
Other
Stockton on Tees Borough Council (PDF, 41 KB)
Adequacy of Consultation Representation
Other
Wakefield Council (PDF, 99 KB)
Adequacy of Consultation Representation
Other
Yorkshire Dales National Park Authority (PDF, 35 KB)
Adequacy of Consultation Representation
Other
280304 EN070001 PINS comments on draft Approach to EIA ES Chapter (PDF, 134 KB)
Other
130911 EN070001 late responses REDACTED (PDF, 2 MB)
Other
EN070001 s53 Authorisation Request 4 Authorisation Documents REDACTED (ZIP, 1 MB)
Authorisation notice, decision letter to applicant, recommendation report and schedule of correspondence for Authorisation Request 4 issued by the Planning Inspectorate on 22 April 2013
Other
EN070001 s53 Authorisation Request 3 Documents 3.2 - 3.4 and 3.6 (ZIP, 5 MB)
Documents 3.2 - 3.4 and 3.6 (as referred to on the schedule of correspondence) for authorisation request 3.
Other
EN070001 s53 Authorisation Request 3 DOC 3.5 Applicants response to further info request REDACTED (ZIP, 18 MB)
Document 3.5 (as referred to on the schedule of correspondence) for authorisation request 3.
Other
EN070001 s53 Authorisation Request 4 Documents 4.2 - 4.4 and 4.6 (ZIP, 5 MB)
Documents 4.2 - 4.4 and 4.6 (as referred to on the schedule of correspondence) for authorisation request 4.
Other
EN070001 s53 Authorisation Request 4 DOC 4.5 Applicants response to further info request REDACTED (ZIP, 11 MB)
Document 4.5 (as referred to on the schedule of correspondence) for authorisation request 4.
Other
EN070001 s53 Authorisation Request 3 Authorisation Documents REDACTED (ZIP, 15 MB)
Authorisation notice, decision letter to applicant, recommendation report and schedule of correspondence for Authorisation Request 3 issued by the Planning Inspectorate on 27 March 2013.
Other
EN070001 S53 Authorisation Request 4 DOC 4.1 Request documents REDACTED 1 (ZIP, 19 KB)
Authorisation request documents submitted to the Planning Inspectorate by the applicant on 19 December 2012 for authorisation request 4
Other
EN070001 s53 Authorisation Request 3 DOC 3.1 Request documents REDACTED (ZIP, 166 MB)
Authorisation request documents submitted to the Planning Inspectorate by the applicant on 19 December 2012 for authorisation request 3
Other
EN070001 S53 Authorisation Request 4 DOC 4.1 Request documents REDACTED (ZIP, 180 MB)
Authorisation request documents submitted to the Planning Inspectorate by the applicant on 19 December 2012 for authorisation request 4
Other
130327 EN070001 Scoping Opinion NEW (PDF, 22 MB)
Other
130218 EN070001 Scoping Report Low Res (PDF, 44 MB)
Scoping Report submitted to PINS by the Applicant