White Rose Carbon Capture and Storage Project

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (4)

Developer's Application (83)

Acceptance (16)

Pre Examination (5)

Examination (184)

Decision (8)

Decided (0)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
3.2 - Statement of Reasons - Revision 2 - Changes from Submission - Track Change Version (PDF, 788 KB)
Post-submission changes to '3.2 Statement of Reasons' (supersedes the application document received on 24 November 2014).
Other
Site Notice Order Plan (PDF, 7 MB)
Post-submission changes. Additional submission of Order Plan (the FDO) that was used to accompany the site notices.
Other
Drax Power Station Diversion Order 2014 (Confirmed) (PDF, 1 MB)
Post-submission changes. Additional Submission received of the Long Drax, Diversion Order (the FDO), dated 13 February 2015.
Other
2.2 - Explanatory Memorandum - Revision 2 - Changes from Submission - Track Change Version (PDF, 582 KB)
Post-submission changes to ?2.2 Explanatory Memorandum' (supersedes the application document received on 24 November 2014).
Other
1.3 - Application Index - Revision 2 (PDF, 502 KB)
Post-submission changes to 'Application Index 1.3' (supercedes the application document received on 24 November 2014).
Other
4.1 - Capture Power Limited - Site Location Plan - Revision v4 (PDF, 5 MB)
Post-submission changes to ?4.1 Site Location Plan' (supersedes the application document received on 24 November 2014).
Other
4.4 - Capture Power Limited - Access and Rights of Way Plans (Key Plan and Sheets 1 - 4) - Revision v4 (PDF, 3 MB)
Post-submission changes to '4.4 Access and Rights of Way Plans (Key Plan and Sheets 1 - 4)? (supersedes the application document received on 24 November 2014).
Other
4.2 - Capture Power Limited - Land Plan (Key Plan and sheets 1 - 4) - Revision v4 (PDF, 3 MB)
Post-submission changes to '4.2 Land Plan (Key Plan and Sheets 1 - 4)? (supersedes the application document received on 24 November 2014).
Other
2.1 - Draft Development Consent Order - Revision 2 - Changes from Submission - Track Change Version (PDF, 490 KB)
Post-submission changes to ?2.1 Draft Development Consent Order' (supersedes the application document received on 24 November 2014).
Other
6.3.7i - ES - Traffic Sensitivity Test (PDF, 841 KB)
Post-submission changes. New document (13 April 2015 - Revision 1).
Other
5.2 - Grid Connection Statement - Revision 2 - Changes from Submission - Track Change Version (PDF, 1 MB)
Post-submission changes to ?5.2 Grid Connection Statement? (supersedes the application document received on 24 November 2014).
Other
3.1 - Book of Reference - Revision 4 (PDF, 45 KB)
Post-submission changes to ?3.1 Book of Reference? (supersedes the application document received on 24 November 2014).
Other
4.8 - Capture Power Limited - Indicative Route of Electrical Connection for 400 kV Plan (PDF, 955 KB)
Post-submission changes to '4.8 Indicative Electrical Connection Routes (Work No. 4)? (one sheet replacing Sheets 1 ? 3 originally submitted) (supersedes the application document received on 24 November 2014).
Other
Capture Power Ltd (PDF, 264 KB)
Post-submission changes. Letter to the Planning Inspectorate regarding amendments to the DCO application and updates to the application documents.
Other
ES Volume 2 Chapter H - LVIA Revision 05.2 (PDF, 167 MB)
Post-submission changes to 6.3.12 ES Volume 2 Chapter H - LVIA Technical Report (addition of Figure H 4.5) (supersedes the application document received on 24 November 2014).
Other
4.3 - Capture Power Limited - Works Plan (Key Plan and sheets 1 - 4) - Revision v4 (PDF, 4 MB)
Post-submission changes to '4.3 Works Plan (Key Plan and Sheets 1 - 4)? (supersedes the application document received on 24 November 2014).
Other
5.2 - Grid Connection Statement - Revision 2 - Changes from Submission - Clean Version (PDF, 1 MB)
Post-submission changes to ?5.2 Grid Connection Statement? (supersedes the application document received on 24 November 2014).
Other
6.3.15 ES Volume 2 Confidential Badger Method Statement [Not to be published] (PDF, 7 KB)
Other
6.3.2 ES Volume 2 Chapter B - Noise and Vibration Technical Report (PDF, 3 MB)
Other
6.3.3 ES Volume 2 Chapter C - Surface Water and Flood Risk Technical Report (PDF, 4 MB)
Other
6.1 Environmental Statement - Non Technical Summary (PDF, 5 MB)
Other
6.4.7 ES Volume 3 Section N - Climate Change Risk Assessment (PDF, 301 KB)
Other
7.1 Master Glossary (PDF, 472 KB)
Other
6.4.3 ES Volume 3 Section K.2 - Habitats Plan (PDF, 5 MB)
Other
6.3.6 ES Volume 2 Chapter D.1 - Geology Annexes (PDF, 36 MB)
Other
5.1.1 Consultation Report Appendices 3.1 - 7.7 (PDF, 48 MB)
Other
6.3.5 ES Volume 2 Chapter D - Geology Technical Report (PDF, 4 MB)
Other
5.1.2 Consultation Report Appendices 7.8 - 7.17 (PDF, 34 MB)
Other
6.4.5 ES Volume 3 Section L - Habitats Regulations Assessment Report (PDF, 3 MB)
Other
1.4 Application Form (PDF, 546 KB)
Other
5.7 Carbon Capture Storage (CCS) and Carbon Capture and Readiness (CCR) Statement (PDF, 740 KB)
Other
6.4.10 ES Volume 3 Section Q - Scoping Opinion (PDF, 12 MB)
Other
3.3 Funding Statement (PDF, 458 KB)
Other
6.4.4 ES Volume 3 Section K.3 - Historic Environment Plan (PDF, 5 MB)
Other
4.2 Land Plan (Key Plan and Sheets 1 - 4) (PDF, 2 MB)
Other
6.4.11 ES Volume 3 Section R - Framework Site Waste Management Plan (PDF, 1 MB)
Other
5.1.5 Consultation Report Appendices 8.3 - 12.2 (PDF, 29 MB)
Other
4.3 Works Plan (Key Plan and Sheets 1 - 4) (PDF, 2 MB)
Other
6.2 Environmental Statement - Volume 1 (Main Report) (PDF, 21 MB)
Other
6.4.9 ES Volume 3 Section P - EIA Scoping Report (PDF, 2 MB)
Other
5.2 Grid Connection Statement (PDF, 4 MB)
Other
5.5 Design and Access Statement (PDF, 4 MB)
Other
6.3.9 ES Volume 2 Chapter G - Archaeology Technical Report (PDF, 8 MB)
Other
5.1.3 Consultation Report Appendices 7.18 - 8.1 (PDF, 15 MB)
Other
4.8 Indicative Electrical Connection Routes (Work No. 4) (PDF, 3 MB)
Other
4.4 Access and Rights of Way Plans (Key Plan and Sheets 1 - 4) (PDF, 2 MB)
Other
6.4.2 ES Volume 3 Section K.1 - Location Plan (PDF, 4 MB)
Other
6.3.16 ES Volume 2 Confidential Badger Report [Not to be published] (PDF, 7 KB)
Other
6.3.13 ES Volume 2 Chapter I - Ecology Technical Report (PDF, 1 MB)
Other
4.9 Indicative Drainage Plan (PDF, 2 MB)
Other
5.6 Combined Heat and Power Assessment (PDF, 2 MB)
Other
2.3 Draft DCO - Comparison with Model Provisions (PDF, 964 KB)
Other
6.3.4 ES Volume 2 Chapter C.1 - Flood Risk Assessment (PDF, 15 MB)
Other
1.1 Application Cover Letter (PDF, 74 KB)
Other
6.4.1 ES Volume 3 Section J - Construction Environmental Management Plan (PDF, 540 KB)
Other
4.0 Overall Cover Sheet (PDF, 133 KB)
Other
5.4 Planning Statement (PDF, 4 MB)
Other
4.5 Indicative Generating Station Drawings (Work No. 1A) (PDF, 7 MB)
Other
6.3.7 ES Volume 2 Chapter E - Transport Assessment (PDF, 22 MB)
Other
3.1 Book of Reference (PDF, 45 KB)
Other
6.3.14 ES Volume 2 Chapter I - Ecology Technical Report Annexes 1-11 (PDF, 16 MB)
Other
1.5 Notices for Statutory Publicity (PDF, 27 MB)
Other
6.3.10b ES Volume 2 Chapter G.1 - Geophysical Survey Results (PDF, 43 MB)
Other
6.3.1 ES Volume 2 Chapter A - Emissions to Atmosphere Technical Report (PDF, 1 MB)
Other
Other
6.3.11 ES Volume 2 Chapter G.2 - Written Scheme of Investigation (PDF, 2 MB)
Other
4.1 Site Location Plan (PDF, 3 MB)
Other
4.6 Indicative Site Raising Drawing (Work Nos. 1A and 1B) (PDF, 1 MB)
Other
5.1 Consultation Report (PDF, 1 MB)
Other
6.3.12 ES Volume 2 Chapter H - LVIA Technical Report (PDF, 30 MB)
Other
6.3.0 ES Volume 2 (Technical Reports) Cover Sheet and Contents (PDF, 281 KB)
Other
6.3.10a ES Volume 2 Chapter G.1 - Geophysical Survey Results (PDF, 14 MB)
Other
4.10 Indicative Landscaping and Biodiveristy Framework Plan (PDF, 3 MB)
Other
2.2 Explanatory Memorandum (PDF, 564 KB)
Other
5.3 Other Consents and Licences (PDF, 456 KB)
Other
3.2 Statement of Reasons (PDF, 771 KB)
Other
6.3.8 ES Volume 2 Chapter F - Socio-economic Characteristics (PDF, 11 MB)
Other
6.4.8 ES Volume 3 Section O - Statement under S79 (1) of the EPA 1990 (PDF, 265 KB)
Other
2.1 Draft Development Consent Order (PDF, 754 KB)
Other
6.4.6 ES Volume 3 Section M - Green House Gas Assessment (PDF, 429 KB)
Other
5.1.4 Consultation Report Appendices 8.2 (PDF, 37 MB)
Other
6.4.0 ES Volume 3 (Other Reports and Plans) Cover Sheet and Contents (PDF, 268 KB)
Other
1.3 Application Index (PDF, 469 KB)