South Humber Bank Energy Centre

You can filter the results to show only the items that match your interest.

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
EP Waste Management Limited (PDF, 525 KB)
4.7 - Indicative Electrical Connection Plan
Other
EP Waste Management Limited (PDF, 2 MB)
4.3 - Works Plans
Other
EP Waste Management Limited (PDF, 7 MB)
4.5 - Indicative Generating Station Plan, Floor Plans, Section and Elevations
Other
EP Waste Management Limited (PDF, 1 MB)
4.10 - Indicative Landscape Plan
Other
EP Waste Management Limited (PDF, 510 KB)
4.12 - Proposed Development and Consented Development Boundary Comparison Plan
Other
EP Waste Management Limited (PDF, 2 MB)
4.11 - Biodiversity Plan
Other
EP Waste Management Limited (PDF, 543 KB)
4.9 - Indicative Surface Water Drainage Plan
Other
EP Waste Management Limited (PDF, 1 MB)
4.1 - Site Location Plan
Other
EP Waste Management Limited (PDF, 595 KB)
4.4 - Access and Rights of Way Plan
Other
EP Waste Management Limited (PDF, 519 KB)
4.6 - Indicative Gas Connection Plan
Other
EP Waste Management Limited (PDF, 510 KB)
4.8 - EP Waste Management LimitedIndicative Towns Water Connection Plan
Other
EP Waste Management Limited (PDF, 523 KB)
4.2 - Land Plan
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.