South Humber Bank Energy Centre

You can filter the results to show only the items that match your interest.

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 16 MB
EP Waste Management Limited
5.10 - Indicative Landscape Strategy
Other
Size: 2 MB
EP Waste Management Limited
1.3 - Application Form
Other
Size: 674 KB
EP Waste Management Limited
2.1 - Draft Development Consent Order
Other
Size: 1 MB
EP Waste Management Limited
5.2 - Grid Connection Statement
Other
Size: 385 KB
EP Waste Management Limited
5.4 - Other Consents and Licences
Other
Size: 525 KB
EP Waste Management Limited
4.7 - Indicative Electrical Connection Plan
Other
Size: 555 KB
EP Waste Management Limited
3.1 - Book of Reference
Other
Size: 6 MB
EP Waste Management Limited
5.6 - Combined Heat and Power Assessment
Other
Size: 680 KB
EP Waste Management Limited
5.8 - Habitats Regulations Assessment Signposting Report
Other
Size: 2 MB
EP Waste Management Limited
4.3 - Works Plans
Other
Size: 7 MB
EP Waste Management Limited
4.5 - Indicative Generating Station Plan, Floor Plans, Section and Elevations
Other
Size: 1 MB
EP Waste Management Limited
4.10 - Indicative Landscape Plan
Other
Size: 510 KB
EP Waste Management Limited
4.12 - Proposed Development and Consented Development Boundary Comparison Plan
Other
Size: 293 KB
EP Waste Management Limited
1.2 - Application Guide
Other
Size: 6 MB
EP Waste Management Limited
1.4 - Notices for Statutory Publicity
Other
Size: 2 MB
EP Waste Management Limited
4.11 - Biodiversity Plan
Other
Size: 543 KB
EP Waste Management Limited
4.9 - Indicative Surface Water Drainage Plan
Other
Size: 5 MB
EP Waste Management Limited
5.13 - Development Consent Obligation
Other
Size: 436 KB
EP Waste Management Limited
5.9 - Statutory Nuisance Statement
Other
Size: 2 MB
EP Waste Management Limited
5.11 - Biodiversity Strategy
Other
Size: 17 MB
EP Waste Management Limited
5.1 - Consultation Report
Other
Size: 1 MB
EP Waste Management Limited
5.3 - Gas Connection and Pipeline Statement
Other
Size: 3 MB
EP Waste Management Limited
5.12 - Indicative Lighting Strategy
Other
Size: 615 KB
EP Waste Management Limited
7.1 - Statement of Common Ground with North East Lincolnshire Council
Other
Size: 680 KB
EP Waste Management Limited
2.2 - Explanatory Memorandum
Other
Size: 1 MB
EP Waste Management Limited
4.1 - Site Location Plan
Other
Size: 2 MB
EP Waste Management Limited
5.5 - Planning, Design and Access Statement
Other
Size: 331 KB
EP Waste Management Limited
5.7 - Fuel Availability and Waste Hierarchy Assessment
Other
Size: 167 KB
EP Waste Management Limited
6.2.13 - ES Vol I Chapter 13: Cultural Heritage
Other
Size: 555 KB
EP Waste Management Limited
6.2.15 - ES Vol I Chapter 15: Socio-Economics
Other
Size: 1 MB
EP Waste Management Limited
6.1 - Environmental Statement Non Technical Summary
Other
Size: 260 KB
EP Waste Management Limited
6.2.1 - ES Vol I Chapter 1: Introduction
Other
Size: 322 KB
EP Waste Management Limited
6.2.17 - ES Vol I Chapter 17: Cumulative and Combined Effects
Other
Size: 354 KB
EP Waste Management Limited
6.2.19 - ES Vol I Chapter 19: Sustainability and Climate Change
Other
Size: 61 KB
EP Waste Management Limited
6.2.3 - ES Vol I Chapter 3: Description of the Proposed Development Site
Other
Size: 209 KB
EP Waste Management Limited
6.2.5 - ES Vol I Chapter 5: Construction Programme and Management
Other
Size: 241 KB
EP Waste Management Limited
6.2.21 - ES Vol I Environmental Statement Glossary
Other
Size: 3 MB
EP Waste Management Limited
6.3.1 - ES Vol II Figure 1.1: Site Location Plan
Other
Size: 174 KB
EP Waste Management Limited
6.2.6 - ES Vol I Chapter 6: Need, Alternatives and Design Evolution
Other
Size: 254 KB
EP Waste Management Limited
6.2.7 - ES Vol I Chapter 7: Air Quality
Other
Size: 199 KB
EP Waste Management Limited
1.1 - Application Cover Letter
Other
Size: 255 KB
EP Waste Management Limited
6.2.11 - ES Vol I Chapter 11: Landscape and Visual Amenity
Other
Size: 981 KB
EP Waste Management Limited
6.3.3 - ES Vol II Figure 3.2: Residential Receptors
Other
Size: 595 KB
EP Waste Management Limited
4.4 - Access and Rights of Way Plan
Other
Size: 878 KB
EP Waste Management Limited
6.2.10 - ES Vol I Chapter 10: Ecology
Other
Size: 579 KB
EP Waste Management Limited
6.2.12 - ES Vol I Chapter 12: Geology, Hydrogeology and Land Contamination
Other
Size: 51 KB
EP Waste Management Limited
6.2.2 - ES Vol I Chapter 2: Assessment Methodology
Other
Size: 465 KB
EP Waste Management Limited
6.2.4 - ES Vol I Chapter 4: The Proposed Development
Other
Size: 124 KB
EP Waste Management Limited
6.2.0 - ES Vol I Cover and Contents
Other
Size: 662 KB
EP Waste Management Limited
6.3.22 - ES Vol II Figure 11.7B: Viewpoint 2 - Brickfield House (Winter)
Other
Size: 935 KB
EP Waste Management Limited
6.3.24 - ES Vol II Figure 11.8B: Viewpoint 3 - Carr Lane Footpath (Winter)
Other
Size: 1 MB
EP Waste Management Limited
6.3.26 - ES Vol II Figure 11.9B: Viewpoint 4 - Cress Cottage (Winter)
Other
Size: 791 KB
EP Waste Management Limited
6.3.2 - ES Vol II Figure 3.1: Parts of the Site (Order Limits and Work Numbers)
Other
Size: 3 MB
EP Waste Management Limited
6.3.18 - ES Vol II Figure 11.5: Final Viewpoint Locations
Other
Size: 707 KB
EP Waste Management Limited
6.3.20 - ES Vol II Figure 11.6B: Viewpoint 1 - Farmshop Hotel A180 (Winter)
Other
Size: 349 KB
EP Waste Management Limited
6.2.18 - ES Vol I Chapter 18: Human Health
Other
Size: 519 KB
EP Waste Management Limited
4.6 - Indicative Gas Connection Plan
Other
Size: 510 KB
EP Waste Management Limited
4.8 - EP Waste Management LimitedIndicative Towns Water Connection Plan
Other
Size: 208 KB
EP Waste Management Limited
6.2.8 - ES Vol I Chapter 8: Noise and Vibration
Other
Size: 518 KB
EP Waste Management Limited
6.2.9 - ES Vol I Chapter 9: Traffic and Transport
Other
Size: 67 KB
EP Waste Management Limited
6.2.20 - ES Vol I Chapter 20: Summary of Significant Effects
Other
Size: 393 KB
EP Waste Management Limited
6.2.14 - ES Vol I Chapter 14: Water Resources, Flood Risk and Drainage
Other
Size: 282 KB
EP Waste Management Limited
6.2.16 - ES Vol I Chapter 16: Waste Management
Other
Size: 904 KB
EP Waste Management Limited
6.3.23 - ES Vol II Figure 11.8A: Viewpoint 3 - Carr Lane Footpath (Summer)
Other
Size: 2 MB
EP Waste Management Limited
6.3.25 - ES Vol II Figure 11.9A: Viewpoint 4 - Cress Cottage (Summer)
Other
Size: 2 MB
EP Waste Management Limited
6.3.10 - ES Vol II Figure 7.3: Annual Mean Maximum NO2 Process Contribution - 2015 Meteorological Year
Other
Size: 2 MB
EP Waste Management Limited
6.3.12 - ES Vol II Figure 8.1: Noise Sensitive Receptors and Monitoring Locations
Other
Size: 859 KB
EP Waste Management Limited
6.3.28 - ES Vol II Figure 11.10B: Viewpoint 5 - Beechwood Farm Carvery (Winter)
Other
Size: 678 KB
EP Waste Management Limited
6.3.30 - ES Vol II Figure 11.11B: Viewpoint 6 - Sunk Island Footpath (Winter)
Other
Size: 2 MB
EP Waste Management Limited
6.3.11 - ES Vol II Figure 7.4: Short Term Maximum NO2 Process Contribution - 2014 Meteorological Year
Other
Size: 1 MB
EP Waste Management Limited
6.3.13 - ES Vol II Figure 8.2: Predicted Noise Levels at Ecological Receptors - Worst Case Hour 06:00 - 07:00, Height Above Ground 0.5 m
Other
Size: 1 MB
EP Waste Management Limited
6.3.27 - ES Vol II Figure 11.10A: Viewpoint 5 - Beechwood Farm Carvery (Summer)
Other
Size: 942 KB
EP Waste Management Limited
6.3.29 - ES Vol II Figure 11.11A: Viewpoint 6 - Sunk Island Footpath (Summer)
Other
Size: 227 KB
EP Waste Management Limited
6.3.0 - ES Vol II Cover and Contents
Other
Size: 3 MB
EP Waste Management Limited
6.3.14 - ES Vol II Figure 11.1: Potential Viewpoint Locations
Other
Size: 2 MB
EP Waste Management Limited
6.3.16 - ES Vol II Figure 11.3: Public Rights of Way and Topography
Other
Size: 637 KB
EP Waste Management Limited
6.3.32 - ES Vol II Figure 11.12B: Viewpoint 7 - Immingham South Footpath (Winter)
Other
Size: 1 MB
EP Waste Management Limited
6.3.19 - ES Vol II Figure 11.6A: Viewpoint 1 - Farmshop Hotel A180 (Summer)
Other
Size: 1 MB
EP Waste Management Limited
6.3.21 - ES Vol II Figure 11.7A: Viewpoint 2 - Brickfield House (Summer)
Other
Size: 2 MB
EP Waste Management Limited
6.3.15 - ES Vol II Figure 11.2: Landscape Types and Designations
Other
Size: 3 MB
EP Waste Management Limited
6.3.17 - ES Vol II Figure 11.4: Zone of Theoretical Visibility (ZTV) - Energy Centre and Stack
Other
Size: 1 MB
EP Waste Management Limited
6.3.31 - ES Vol II Figure 11.12A: Viewpoint 7 - Immingham South Footpath (Summer)
Other
Size: 467 KB
EP Waste Management Limited
6.3.5 - ES Vol II Figure 4.1: Indicative Proposed Development Layout
Other
Size: 4 MB
EP Waste Management Limited
6.4.2 - ES Vol III Appendix 1B: Scoping Opinion
Other
Size: 11 MB
EP Waste Management Limited
6.4.5 - ES Vol III Appendix 7A: Air Quality Dispersion Modelling Assessment
Other
Size: 142 KB
EP Waste Management Limited
6.4.7 - ES Vol III Appendix 8A: Noise Perception and Terminology
Other
Size: 1 MB
EP Waste Management Limited
6.3.45 - ES Vol II Figure 17.2: Electrical Connection Route Options
Other
Size: 113 KB
EP Waste Management Limited
6.4.0 - ES Vol III Cover and Contents
Other
Size: 16 MB
EP Waste Management Limited
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 6 - Annexes 16 to 28
Other
Size: 175 KB
EP Waste Management Limited
6.4.14 - ES Vol III Appendix 10B: Ecological Impact Assessment Methodology
Other
Size: 232 KB
EP Waste Management Limited
6.4.9 - ES Vol III Appendix 8C: Noise Monitoring
Other
Size: 78 KB
EP Waste Management Limited
6.4.11 - ES Vol III Appendix 8E: Noise Modelling
Other
Size: 110 KB
EP Waste Management Limited
6.4.20 - ES Vol III Appendix 11B: Potential Viewpoints for Landscape and Visual Impact Assessment
Other
Size: 11 MB
EP Waste Management Limited
6.4.21 - ES Vol III Appendix 12A: Phase 1 Geo-environmental and Geotechnical Desk Study Report
Other
Size: 2 MB
EP Waste Management Limited
6.3.41 - ES Vol II Figure 13.1: Heritage Assets within the 5 km Study Area
Other
Size: 478 KB
EP Waste Management Limited
6.3.43 - ES Vol II Figure 14.1: Key Watercourses and Flow Direction
Other
Size: 9 MB
EP Waste Management Limited
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 2 - Annexes 1 to 4
Other
Size: 18 MB
EP Waste Management Limited
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 4 - Annexes 6 to 14
Other
Size: 16 MB
EP Waste Management Limited
6.4.26 - ES Vol III Appendix 14A: Flood Risk Assessment File 2 - Annexes
Other
Size: 194 KB
EP Waste Management Limited
6.4.28 - ES Vol III Appendix 19A: Greenhouse Gas Emissions Assessment
Other
Size: 48 KB
EP Waste Management Limited
6.4.10 - ES Vol III Appendix 8D: Noise Assessment Construction Activities
Other
Size: 2 MB
EP Waste Management Limited
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 1 - Main Document
Other
Size: 6 MB
EP Waste Management Limited
6.3.4 - ES Vol II Figure 3.3: Environmental Receptors within 5 km
Other
Size: 849 KB
EP Waste Management Limited
6.3.36 - ES Vol II Figure 11.14B: Viewpoint 9 - Middle Drain Public Right of Way (Winter)
Other
Size: 385 KB
EP Waste Management Limited
6.4.4 - ES Vol III Appendix 5A: Outline Construction Environmental Management Plan
Other
Size: 362 KB
EP Waste Management Limited
6.4.13 - ES Vol III Appendix 10A: Ecology Legislation and Planning Policy
Other
Size: 2 MB
EP Waste Management Limited
6.4.23 - ES Vol III Appendix 12C: Ground Investigation Interpretive Report
Other
Size: 544 KB
EP Waste Management Limited
6.4.25 - ES Vol III Appendix 13B: Historical Maps and Aerial Photographs
Other
Size: 1 MB
EP Waste Management Limited
6.3.6 - ES Vol II Figure 4.2: Ecological Mitigation and Enhancements (Indicative)
Other
Size: 2 MB
EP Waste Management Limited
6.3.8 - ES Vol II Figure 7.1: Air Quality Receptors and Diffusion Tube Monitoring Locations.
Other
Size: 4 MB
EP Waste Management Limited
6.4.21 - ES Vol III Appendix 12A: Phase 1 Geo-environmental and Geotechnical Desk Study Report
Other
Size: 25 MB
EP Waste Management Limited
6.4.22 - ES Vol III Appendix 12B: Ground Investigation Factual Report
Other
Size: 992 KB
EP Waste Management Limited
6.3.35 - ES Vol II Figure 11.14A: Viewpoint 9 - Middle Drain Public Right of Way (Summer)
Other
Size: 9 MB
EP Waste Management Limited
6.4.15 - ES Vol III Appendix 10C: Preliminary Ecological Appraisal Report
Other
Size: 7 MB
EP Waste Management Limited
6.4.27 - ES Vol III Appendix 14B: Outline Drainage Strategy
Other
Size: 4 MB
EP Waste Management Limited
6.3.40 - ES Vol II Figure 11.18: Viewpoint 9 Photomontage and Wireframe for Indicative Concept Layout
Other
Size: 2 MB
EP Waste Management Limited
6.3.42 - ES Vol II Figure 13.2: Archaeological Events within the 5 km Study Area
Other
Size: 2 MB
EP Waste Management Limited
6.3.37 - ES Vol II Figure 11.15: Viewpoint 1 Farmshop Hotel, A180 - Photomontage and Wireframe for Indicative Concept Layout
Other
Size: 155 KB
EP Waste Management Limited
6.4.3 - ES Vol III Appendix 1C: Statement of Competence
Other
Size: 13 MB
EP Waste Management Limited
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 3 - Annex 5
Other
Size: 19 MB
EP Waste Management Limited
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 5 - Annex 15
Other
Size: 115 KB
EP Waste Management Limited
6.4.24 - ES Vol III Appendix 13A: Gazetteer of Cultural Heritage Assets
Other
Size: 2 MB
EP Waste Management Limited
6.4.26 - ES Vol III Appendix 14A: Flood Risk Assessment File 1 - Main Document
Other
Size: 3 MB
EP Waste Management Limited
6.3.44 - ES Vol II Figure 17.1: Cumulative Developments (Short List)
Other
Size: 441 KB
EP Waste Management Limited
6.3.7 - ES Vol II Figure 4.3: Comparison of Consented and Proposed Developments
Other
Size: 2 MB
EP Waste Management Limited
6.3.9 - ES Vol II Figure 7.2: Ecological Air Quality Receptor Locations
Other
Size: 3 MB
EP Waste Management Limited
6.3.38 - ES Vol II Figure 11.16: Viewpoint 5 Beechwood Farm Carvery - Photomontage and Wireframe for Indicative Concept Layout
Other
Size: 3 MB
EP Waste Management Limited
6.3.39 - ES Vol II Figure 11.17: Viewpoint 7 Photomontage and Wireframe for Indicative Concept Layout
Other
Size: 877 KB
EP Waste Management Limited
6.4.16 - ES Vol III Appendix 10D: Aquatic Macroinvertebrate and Macrophyte Survey
Other
Size: 444 KB
EP Waste Management Limited
6.4.18 - ES Vol III Appendix 10F: Reptile Survey
Other
Size: 337 KB
EP Waste Management Limited
6.4.29 - ES Vol III Appendix 20A: Commitments Register
Other
Size: 616 KB
EP Waste Management Limited
6.3.34 - ES Vol II Figure 11.13B: Viewpoint 8 - Mauxhall Farm Footpath (Winter)
Other
Size: 11 MB
EP Waste Management Limited
6.4.6 - ES Vol III Appendix 7B: Human Health Risk Assessment
Other
Size: 895 KB
EP Waste Management Limited
6.4.8 - ES Vol III Appendix 8B: Consultation with NELC Environmental Health Officer
Other
Size: 1 MB
EP Waste Management Limited
6.4.17 - ES Vol III Appendix 10E: Otter and Water Vole Survey
Other
Size: 259 KB
EP Waste Management Limited
6.4.19 - ES Vol III Appendix 11A: Landscape and Visual Impact Assessment Methodology
Other
Size: 901 KB
EP Waste Management Limited
6.3.33 - ES Vol II Figure 11.13A: Viewpoint 8 - Mauxhall Farm Footpath (Summer)
Other
Size: 1 MB
EP Waste Management Limited
6.3.46 - ES Vol II Figure 17.3: Gas Connection Route Options
Other
Size: 11 MB
EP Waste Management Limited
6.4.1 - ES Vol III Appendix 1A: Environmental Impact Assessment Scoping Report
Other
Size: 141 KB
EP Waste Management Limited
AECOM and EA Letter to PINS on SHBEC approach to FRA
Other
Size: 523 KB
EP Waste Management Limited
4.2 - Land Plan
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.