South Humber Bank Energy Centre

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (5)

Developer's Application (141)

Acceptance (7)

Pre Examination (19)

Examination (133)

Decision (14)

Decided (2)

Transboundary Documents
Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
EP Waste Management Limited (PDF, 16 MB)
5.10 - Indicative Landscape Strategy
Other
EP Waste Management Limited (PDF, 2 MB)
1.3 - Application Form
Other
EP Waste Management Limited (PDF, 674 KB)
2.1 - Draft Development Consent Order
Other
EP Waste Management Limited (PDF, 1 MB)
5.2 - Grid Connection Statement
Other
EP Waste Management Limited (PDF, 385 KB)
5.4 - Other Consents and Licences
Other
EP Waste Management Limited (PDF, 525 KB)
4.7 - Indicative Electrical Connection Plan
Other
EP Waste Management Limited (PDF, 36 KB)
3.1 - Book of Reference
Other
EP Waste Management Limited (PDF, 6 MB)
5.6 - Combined Heat and Power Assessment
Other
EP Waste Management Limited (PDF, 680 KB)
5.8 - Habitats Regulations Assessment Signposting Report
Other
EP Waste Management Limited (PDF, 2 MB)
4.3 - Works Plans
Other
EP Waste Management Limited (PDF, 7 MB)
4.5 - Indicative Generating Station Plan, Floor Plans, Section and Elevations
Other
EP Waste Management Limited (PDF, 1 MB)
4.10 - Indicative Landscape Plan
Other
EP Waste Management Limited (PDF, 510 KB)
4.12 - Proposed Development and Consented Development Boundary Comparison Plan
Other
EP Waste Management Limited (PDF, 293 KB)
1.2 - Application Guide
Other
EP Waste Management Limited (PDF, 6 MB)
1.4 - Notices for Statutory Publicity
Other
EP Waste Management Limited (PDF, 2 MB)
4.11 - Biodiversity Plan
Other
EP Waste Management Limited (PDF, 543 KB)
4.9 - Indicative Surface Water Drainage Plan
Other
EP Waste Management Limited (PDF, 5 MB)
5.13 - Development Consent Obligation
Other
EP Waste Management Limited (PDF, 436 KB)
5.9 - Statutory Nuisance Statement
Other
EP Waste Management Limited (PDF, 2 MB)
5.11 - Biodiversity Strategy
Other
EP Waste Management Limited (PDF, 17 MB)
5.1 - Consultation Report
Other
EP Waste Management Limited (PDF, 1 MB)
5.3 - Gas Connection and Pipeline Statement
Other
EP Waste Management Limited (PDF, 3 MB)
5.12 - Indicative Lighting Strategy
Other
EP Waste Management Limited (PDF, 615 KB)
7.1 - Statement of Common Ground with North East Lincolnshire Council
Other
EP Waste Management Limited (PDF, 680 KB)
2.2 - Explanatory Memorandum
Other
EP Waste Management Limited (PDF, 1 MB)
4.1 - Site Location Plan
Other
EP Waste Management Limited (PDF, 2 MB)
5.5 - Planning, Design and Access Statement
Other
EP Waste Management Limited (PDF, 331 KB)
5.7 - Fuel Availability and Waste Hierarchy Assessment
Other
EP Waste Management Limited (PDF, 167 KB)
6.2.13 - ES Vol I Chapter 13: Cultural Heritage
Other
EP Waste Management Limited (PDF, 555 KB)
6.2.15 - ES Vol I Chapter 15: Socio-Economics
Other
EP Waste Management Limited (PDF, 1 MB)
6.1 - Environmental Statement Non Technical Summary
Other
EP Waste Management Limited (PDF, 260 KB)
6.2.1 - ES Vol I Chapter 1: Introduction
Other
EP Waste Management Limited (PDF, 322 KB)
6.2.17 - ES Vol I Chapter 17: Cumulative and Combined Effects
Other
EP Waste Management Limited (PDF, 354 KB)
6.2.19 - ES Vol I Chapter 19: Sustainability and Climate Change
Other
EP Waste Management Limited (PDF, 61 KB)
6.2.3 - ES Vol I Chapter 3: Description of the Proposed Development Site
Other
EP Waste Management Limited (PDF, 209 KB)
6.2.5 - ES Vol I Chapter 5: Construction Programme and Management
Other
EP Waste Management Limited (PDF, 241 KB)
6.2.21 - ES Vol I Environmental Statement Glossary
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.1 - ES Vol II Figure 1.1: Site Location Plan
Other
EP Waste Management Limited (PDF, 174 KB)
6.2.6 - ES Vol I Chapter 6: Need, Alternatives and Design Evolution
Other
EP Waste Management Limited (PDF, 254 KB)
6.2.7 - ES Vol I Chapter 7: Air Quality
Other
EP Waste Management Limited (PDF, 199 KB)
1.1 - Application Cover Letter
Other
EP Waste Management Limited (PDF, 255 KB)
6.2.11 - ES Vol I Chapter 11: Landscape and Visual Amenity
Other
EP Waste Management Limited (PDF, 981 KB)
6.3.3 - ES Vol II Figure 3.2: Residential Receptors
Other
EP Waste Management Limited (PDF, 595 KB)
4.4 - Access and Rights of Way Plan
Other
EP Waste Management Limited (PDF, 878 KB)
6.2.10 - ES Vol I Chapter 10: Ecology
Other
EP Waste Management Limited (PDF, 579 KB)
6.2.12 - ES Vol I Chapter 12: Geology, Hydrogeology and Land Contamination
Other
EP Waste Management Limited (PDF, 51 KB)
6.2.2 - ES Vol I Chapter 2: Assessment Methodology
Other
EP Waste Management Limited (PDF, 465 KB)
6.2.4 - ES Vol I Chapter 4: The Proposed Development
Other
EP Waste Management Limited (PDF, 124 KB)
6.2.0 - ES Vol I Cover and Contents
Other
EP Waste Management Limited (PDF, 662 KB)
6.3.22 - ES Vol II Figure 11.7B: Viewpoint 2 - Brickfield House (Winter)
Other
EP Waste Management Limited (PDF, 935 KB)
6.3.24 - ES Vol II Figure 11.8B: Viewpoint 3 - Carr Lane Footpath (Winter)
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.26 - ES Vol II Figure 11.9B: Viewpoint 4 - Cress Cottage (Winter)
Other
EP Waste Management Limited (PDF, 791 KB)
6.3.2 - ES Vol II Figure 3.1: Parts of the Site (Order Limits and Work Numbers)
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.18 - ES Vol II Figure 11.5: Final Viewpoint Locations
Other
EP Waste Management Limited (PDF, 707 KB)
6.3.20 - ES Vol II Figure 11.6B: Viewpoint 1 - Farmshop Hotel A180 (Winter)
Other
EP Waste Management Limited (PDF, 349 KB)
6.2.18 - ES Vol I Chapter 18: Human Health
Other
EP Waste Management Limited (PDF, 519 KB)
4.6 - Indicative Gas Connection Plan
Other
EP Waste Management Limited (PDF, 510 KB)
4.8 - EP Waste Management LimitedIndicative Towns Water Connection Plan
Other
EP Waste Management Limited (PDF, 208 KB)
6.2.8 - ES Vol I Chapter 8: Noise and Vibration
Other
EP Waste Management Limited (PDF, 518 KB)
6.2.9 - ES Vol I Chapter 9: Traffic and Transport
Other
EP Waste Management Limited (PDF, 67 KB)
6.2.20 - ES Vol I Chapter 20: Summary of Significant Effects
Other
EP Waste Management Limited (PDF, 393 KB)
6.2.14 - ES Vol I Chapter 14: Water Resources, Flood Risk and Drainage
Other
EP Waste Management Limited (PDF, 282 KB)
6.2.16 - ES Vol I Chapter 16: Waste Management
Other
EP Waste Management Limited (PDF, 904 KB)
6.3.23 - ES Vol II Figure 11.8A: Viewpoint 3 - Carr Lane Footpath (Summer)
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.25 - ES Vol II Figure 11.9A: Viewpoint 4 - Cress Cottage (Summer)
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.10 - ES Vol II Figure 7.3: Annual Mean Maximum NO2 Process Contribution - 2015 Meteorological Year
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.12 - ES Vol II Figure 8.1: Noise Sensitive Receptors and Monitoring Locations
Other
EP Waste Management Limited (PDF, 859 KB)
6.3.28 - ES Vol II Figure 11.10B: Viewpoint 5 - Beechwood Farm Carvery (Winter)
Other
EP Waste Management Limited (PDF, 678 KB)
6.3.30 - ES Vol II Figure 11.11B: Viewpoint 6 - Sunk Island Footpath (Winter)
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.11 - ES Vol II Figure 7.4: Short Term Maximum NO2 Process Contribution - 2014 Meteorological Year
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.13 - ES Vol II Figure 8.2: Predicted Noise Levels at Ecological Receptors - Worst Case Hour 06:00 - 07:00, Height Above Ground 0.5 m
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.27 - ES Vol II Figure 11.10A: Viewpoint 5 - Beechwood Farm Carvery (Summer)
Other
EP Waste Management Limited (PDF, 942 KB)
6.3.29 - ES Vol II Figure 11.11A: Viewpoint 6 - Sunk Island Footpath (Summer)
Other
EP Waste Management Limited (PDF, 227 KB)
6.3.0 - ES Vol II Cover and Contents
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.14 - ES Vol II Figure 11.1: Potential Viewpoint Locations
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.16 - ES Vol II Figure 11.3: Public Rights of Way and Topography
Other
EP Waste Management Limited (PDF, 637 KB)
6.3.32 - ES Vol II Figure 11.12B: Viewpoint 7 - Immingham South Footpath (Winter)
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.19 - ES Vol II Figure 11.6A: Viewpoint 1 - Farmshop Hotel A180 (Summer)
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.21 - ES Vol II Figure 11.7A: Viewpoint 2 - Brickfield House (Summer)
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.15 - ES Vol II Figure 11.2: Landscape Types and Designations
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.17 - ES Vol II Figure 11.4: Zone of Theoretical Visibility (ZTV) - Energy Centre and Stack
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.31 - ES Vol II Figure 11.12A: Viewpoint 7 - Immingham South Footpath (Summer)
Other
EP Waste Management Limited (PDF, 467 KB)
6.3.5 - ES Vol II Figure 4.1: Indicative Proposed Development Layout
Other
EP Waste Management Limited (PDF, 4 MB)
6.4.2 - ES Vol III Appendix 1B: Scoping Opinion
Other
EP Waste Management Limited (PDF, 11 MB)
6.4.5 - ES Vol III Appendix 7A: Air Quality Dispersion Modelling Assessment
Other
EP Waste Management Limited (PDF, 142 KB)
6.4.7 - ES Vol III Appendix 8A: Noise Perception and Terminology
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.45 - ES Vol II Figure 17.2: Electrical Connection Route Options
Other
EP Waste Management Limited (PDF, 113 KB)
6.4.0 - ES Vol III Cover and Contents
Other
EP Waste Management Limited (PDF, 16 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 6 - Annexes 16 to 28
Other
EP Waste Management Limited (PDF, 175 KB)
6.4.14 - ES Vol III Appendix 10B: Ecological Impact Assessment Methodology
Other
EP Waste Management Limited (PDF, 232 KB)
6.4.9 - ES Vol III Appendix 8C: Noise Monitoring
Other
EP Waste Management Limited (PDF, 78 KB)
6.4.11 - ES Vol III Appendix 8E: Noise Modelling
Other
EP Waste Management Limited (PDF, 110 KB)
6.4.20 - ES Vol III Appendix 11B: Potential Viewpoints for Landscape and Visual Impact Assessment
Other
EP Waste Management Limited (PDF, 11 MB)
6.4.21 - ES Vol III Appendix 12A: Phase 1 Geo-environmental and Geotechnical Desk Study Report
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.41 - ES Vol II Figure 13.1: Heritage Assets within the 5 km Study Area
Other
EP Waste Management Limited (PDF, 478 KB)
6.3.43 - ES Vol II Figure 14.1: Key Watercourses and Flow Direction
Other
EP Waste Management Limited (PDF, 9 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 2 - Annexes 1 to 4
Other
EP Waste Management Limited (PDF, 18 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 4 - Annexes 6 to 14
Other
EP Waste Management Limited (PDF, 16 MB)
6.4.26 - ES Vol III Appendix 14A: Flood Risk Assessment File 2 - Annexes
Other
EP Waste Management Limited (PDF, 194 KB)
6.4.28 - ES Vol III Appendix 19A: Greenhouse Gas Emissions Assessment
Other
EP Waste Management Limited (PDF, 48 KB)
6.4.10 - ES Vol III Appendix 8D: Noise Assessment Construction Activities
Other
EP Waste Management Limited (PDF, 2 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 1 - Main Document
Other
EP Waste Management Limited (PDF, 6 MB)
6.3.4 - ES Vol II Figure 3.3: Environmental Receptors within 5 km
Other
EP Waste Management Limited (PDF, 849 KB)
6.3.36 - ES Vol II Figure 11.14B: Viewpoint 9 - Middle Drain Public Right of Way (Winter)
Other
EP Waste Management Limited (PDF, 385 KB)
6.4.4 - ES Vol III Appendix 5A: Outline Construction Environmental Management Plan
Other
EP Waste Management Limited (PDF, 362 KB)
6.4.13 - ES Vol III Appendix 10A: Ecology Legislation and Planning Policy
Other
EP Waste Management Limited (PDF, 2 MB)
6.4.23 - ES Vol III Appendix 12C: Ground Investigation Interpretive Report
Other
EP Waste Management Limited (PDF, 544 KB)
6.4.25 - ES Vol III Appendix 13B: Historical Maps and Aerial Photographs
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.6 - ES Vol II Figure 4.2: Ecological Mitigation and Enhancements (Indicative)
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.8 - ES Vol II Figure 7.1: Air Quality Receptors and Diffusion Tube Monitoring Locations.
Other
EP Waste Management Limited (PDF, 4 MB)
6.4.21 - ES Vol III Appendix 12A: Phase 1 Geo-environmental and Geotechnical Desk Study Report
Other
EP Waste Management Limited (PDF, 25 MB)
6.4.22 - ES Vol III Appendix 12B: Ground Investigation Factual Report
Other
EP Waste Management Limited (PDF, 992 KB)
6.3.35 - ES Vol II Figure 11.14A: Viewpoint 9 - Middle Drain Public Right of Way (Summer)
Other
EP Waste Management Limited (PDF, 9 MB)
6.4.15 - ES Vol III Appendix 10C: Preliminary Ecological Appraisal Report
Other
EP Waste Management Limited (PDF, 7 MB)
6.4.27 - ES Vol III Appendix 14B: Outline Drainage Strategy
Other
EP Waste Management Limited (PDF, 4 MB)
6.3.40 - ES Vol II Figure 11.18: Viewpoint 9 Photomontage and Wireframe for Indicative Concept Layout
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.42 - ES Vol II Figure 13.2: Archaeological Events within the 5 km Study Area
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.37 - ES Vol II Figure 11.15: Viewpoint 1 Farmshop Hotel, A180 - Photomontage and Wireframe for Indicative Concept Layout
Other
EP Waste Management Limited (PDF, 155 KB)
6.4.3 - ES Vol III Appendix 1C: Statement of Competence
Other
EP Waste Management Limited (PDF, 13 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 3 - Annex 5
Other
EP Waste Management Limited (PDF, 19 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 5 - Annex 15
Other
EP Waste Management Limited (PDF, 115 KB)
6.4.24 - ES Vol III Appendix 13A: Gazetteer of Cultural Heritage Assets
Other
EP Waste Management Limited (PDF, 2 MB)
6.4.26 - ES Vol III Appendix 14A: Flood Risk Assessment File 1 - Main Document
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.44 - ES Vol II Figure 17.1: Cumulative Developments (Short List)
Other
EP Waste Management Limited (PDF, 441 KB)
6.3.7 - ES Vol II Figure 4.3: Comparison of Consented and Proposed Developments
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.9 - ES Vol II Figure 7.2: Ecological Air Quality Receptor Locations
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.38 - ES Vol II Figure 11.16: Viewpoint 5 Beechwood Farm Carvery - Photomontage and Wireframe for Indicative Concept Layout
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.39 - ES Vol II Figure 11.17: Viewpoint 7 Photomontage and Wireframe for Indicative Concept Layout
Other
EP Waste Management Limited (PDF, 877 KB)
6.4.16 - ES Vol III Appendix 10D: Aquatic Macroinvertebrate and Macrophyte Survey
Other
EP Waste Management Limited (PDF, 444 KB)
6.4.18 - ES Vol III Appendix 10F: Reptile Survey
Other
EP Waste Management Limited (PDF, 337 KB)
6.4.29 - ES Vol III Appendix 20A: Commitments Register
Other
EP Waste Management Limited (PDF, 616 KB)
6.3.34 - ES Vol II Figure 11.13B: Viewpoint 8 - Mauxhall Farm Footpath (Winter)
Other
EP Waste Management Limited (PDF, 11 MB)
6.4.6 - ES Vol III Appendix 7B: Human Health Risk Assessment
Other
EP Waste Management Limited (PDF, 895 KB)
6.4.8 - ES Vol III Appendix 8B: Consultation with NELC Environmental Health Officer
Other
EP Waste Management Limited (PDF, 1 MB)
6.4.17 - ES Vol III Appendix 10E: Otter and Water Vole Survey
Other
EP Waste Management Limited (PDF, 259 KB)
6.4.19 - ES Vol III Appendix 11A: Landscape and Visual Impact Assessment Methodology
Other
EP Waste Management Limited (PDF, 901 KB)
6.3.33 - ES Vol II Figure 11.13A: Viewpoint 8 - Mauxhall Farm Footpath (Summer)
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.46 - ES Vol II Figure 17.3: Gas Connection Route Options
Other
EP Waste Management Limited (PDF, 11 MB)
6.4.1 - ES Vol III Appendix 1A: Environmental Impact Assessment Scoping Report
Other
EP Waste Management Limited (PDF, 141 KB)
AECOM and EA Letter to PINS on SHBEC approach to FRA
Other
EP Waste Management Limited (PDF, 523 KB)
4.2 - Land Plan