You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (5)
Developer's Application (141)
- All Documents
- Application Form (4)
- Compulsory Acquisition Information (1)
- Draft Development Consent Order (2)
- Environmental Statement (107)
- Other Documents (2)
- Plans (12)
- Reports (13)
Acceptance (7)
Pre Examination (19)
- All Documents
- Additional Submissions (5)
- Appointment of Examining Authority (1)
- Certificates and Notices (3)
- Examination Library (1)
- Other Documents (1)
- Procedural Deadline A (2)
- Procedural Deadline B (1)
- Procedural Decisions (2)
- Recording of preliminary meeting (2)
- Unaccompanied Site Inspection (1)
Examination (133)
- All Documents
- Additional Submissions (7)
- Deadline 1 (19)
- Deadline 2 (26)
- Deadline 3 (15)
- Deadline 4 (15)
- Deadline 5 (14)
- Deadline 6 (9)
- Deadline 7 (10)
- Hearing Agenda (2)
- Hearing Notice (1)
- Other Documents (1)
- Preliminary meeting note (1)
- Procedural Decisions (9)
- Recording of hearing (3)
- Report on the Implications for European Sites (RIES) (1)
Decision (14)
- All Documents
- Development Consent Order as made (1)
- Habitats Regulation Assessment (1)
- Notification of Decision to Accept Application (2)
- Other Documents (1)
- Recommendation Report (1)
- Secretary of State Consultation (2)
- Secretary of State Consultation 1 (1)
- Secretary of State Consultation 2 (4)
- Secretary of State Decision letter and Statement of Reasons approved (1)
Decided (2)
The selection shows documents received from the applicant in relation to the development consent order application.
Source | Description |
---|---|
Other |
EP Waste Management Limited (PDF, 16 MB)
5.10 - Indicative Landscape Strategy
|
Other |
EP Waste Management Limited (PDF, 2 MB)
1.3 - Application Form
|
Other |
EP Waste Management Limited (PDF, 674 KB)
2.1 - Draft Development Consent Order
|
Other |
EP Waste Management Limited (PDF, 1 MB)
5.2 - Grid Connection Statement
|
Other |
EP Waste Management Limited (PDF, 385 KB)
5.4 - Other Consents and Licences
|
Other |
EP Waste Management Limited (PDF, 525 KB)
4.7 - Indicative Electrical Connection Plan
|
Other |
EP Waste Management Limited (PDF, 36 KB)
3.1 - Book of Reference
|
Other |
EP Waste Management Limited (PDF, 6 MB)
5.6 - Combined Heat and Power Assessment
|
Other |
EP Waste Management Limited (PDF, 680 KB)
5.8 - Habitats Regulations Assessment Signposting Report
|
Other |
EP Waste Management Limited (PDF, 2 MB)
4.3 - Works Plans
|
Other |
EP Waste Management Limited (PDF, 7 MB)
4.5 - Indicative Generating Station Plan, Floor Plans, Section and Elevations
|
Other |
EP Waste Management Limited (PDF, 1 MB)
4.10 - Indicative Landscape Plan
|
Other |
EP Waste Management Limited (PDF, 510 KB)
4.12 - Proposed Development and Consented Development Boundary Comparison Plan
|
Other |
EP Waste Management Limited (PDF, 293 KB)
1.2 - Application Guide
|
Other |
EP Waste Management Limited (PDF, 6 MB)
1.4 - Notices for Statutory Publicity
|
Other |
EP Waste Management Limited (PDF, 2 MB)
4.11 - Biodiversity Plan
|
Other |
EP Waste Management Limited (PDF, 543 KB)
4.9 - Indicative Surface Water Drainage Plan
|
Other |
EP Waste Management Limited (PDF, 5 MB)
5.13 - Development Consent Obligation
|
Other |
EP Waste Management Limited (PDF, 436 KB)
5.9 - Statutory Nuisance Statement
|
Other |
EP Waste Management Limited (PDF, 2 MB)
5.11 - Biodiversity Strategy
|
Other |
EP Waste Management Limited (PDF, 17 MB)
5.1 - Consultation Report
|
Other |
EP Waste Management Limited (PDF, 1 MB)
5.3 - Gas Connection and Pipeline Statement
|
Other |
EP Waste Management Limited (PDF, 3 MB)
5.12 - Indicative Lighting Strategy
|
Other |
EP Waste Management Limited (PDF, 615 KB)
7.1 - Statement of Common Ground with North East Lincolnshire Council
|
Other |
EP Waste Management Limited (PDF, 680 KB)
2.2 - Explanatory Memorandum
|
Other |
EP Waste Management Limited (PDF, 1 MB)
4.1 - Site Location Plan
|
Other |
EP Waste Management Limited (PDF, 2 MB)
5.5 - Planning, Design and Access Statement
|
Other |
EP Waste Management Limited (PDF, 331 KB)
5.7 - Fuel Availability and Waste Hierarchy Assessment
|
Other |
EP Waste Management Limited (PDF, 167 KB)
6.2.13 - ES Vol I Chapter 13: Cultural Heritage
|
Other |
EP Waste Management Limited (PDF, 555 KB)
6.2.15 - ES Vol I Chapter 15: Socio-Economics
|
Other |
EP Waste Management Limited (PDF, 1 MB)
6.1 - Environmental Statement Non Technical Summary
|
Other |
EP Waste Management Limited (PDF, 260 KB)
6.2.1 - ES Vol I Chapter 1: Introduction
|
Other |
EP Waste Management Limited (PDF, 322 KB)
6.2.17 - ES Vol I Chapter 17: Cumulative and Combined Effects
|
Other |
EP Waste Management Limited (PDF, 354 KB)
6.2.19 - ES Vol I Chapter 19: Sustainability and Climate Change
|
Other |
EP Waste Management Limited (PDF, 61 KB)
6.2.3 - ES Vol I Chapter 3: Description of the Proposed Development Site
|
Other |
EP Waste Management Limited (PDF, 209 KB)
6.2.5 - ES Vol I Chapter 5: Construction Programme and Management
|
Other |
EP Waste Management Limited (PDF, 241 KB)
6.2.21 - ES Vol I Environmental Statement Glossary
|
Other |
EP Waste Management Limited (PDF, 3 MB)
6.3.1 - ES Vol II Figure 1.1: Site Location Plan
|
Other |
EP Waste Management Limited (PDF, 174 KB)
6.2.6 - ES Vol I Chapter 6: Need, Alternatives and Design Evolution
|
Other |
EP Waste Management Limited (PDF, 254 KB)
6.2.7 - ES Vol I Chapter 7: Air Quality
|
Other |
EP Waste Management Limited (PDF, 199 KB)
1.1 - Application Cover Letter
|
Other |
EP Waste Management Limited (PDF, 255 KB)
6.2.11 - ES Vol I Chapter 11: Landscape and Visual Amenity
|
Other |
EP Waste Management Limited (PDF, 981 KB)
6.3.3 - ES Vol II Figure 3.2: Residential Receptors
|
Other |
EP Waste Management Limited (PDF, 595 KB)
4.4 - Access and Rights of Way Plan
|
Other |
EP Waste Management Limited (PDF, 878 KB)
6.2.10 - ES Vol I Chapter 10: Ecology
|
Other |
EP Waste Management Limited (PDF, 579 KB)
6.2.12 - ES Vol I Chapter 12: Geology, Hydrogeology and Land Contamination
|
Other |
EP Waste Management Limited (PDF, 51 KB)
6.2.2 - ES Vol I Chapter 2: Assessment Methodology
|
Other |
EP Waste Management Limited (PDF, 465 KB)
6.2.4 - ES Vol I Chapter 4: The Proposed Development
|
Other |
EP Waste Management Limited (PDF, 124 KB)
6.2.0 - ES Vol I Cover and Contents
|
Other |
EP Waste Management Limited (PDF, 662 KB)
6.3.22 - ES Vol II Figure 11.7B: Viewpoint 2 - Brickfield House (Winter)
|
Other |
EP Waste Management Limited (PDF, 935 KB)
6.3.24 - ES Vol II Figure 11.8B: Viewpoint 3 - Carr Lane Footpath (Winter)
|
Other |
EP Waste Management Limited (PDF, 1 MB)
6.3.26 - ES Vol II Figure 11.9B: Viewpoint 4 - Cress Cottage (Winter)
|
Other |
EP Waste Management Limited (PDF, 791 KB)
6.3.2 - ES Vol II Figure 3.1: Parts of the Site (Order Limits and Work Numbers)
|
Other |
EP Waste Management Limited (PDF, 3 MB)
6.3.18 - ES Vol II Figure 11.5: Final Viewpoint Locations
|
Other |
EP Waste Management Limited (PDF, 707 KB)
6.3.20 - ES Vol II Figure 11.6B: Viewpoint 1 - Farmshop Hotel A180 (Winter)
|
Other |
EP Waste Management Limited (PDF, 349 KB)
6.2.18 - ES Vol I Chapter 18: Human Health
|
Other |
EP Waste Management Limited (PDF, 519 KB)
4.6 - Indicative Gas Connection Plan
|
Other |
EP Waste Management Limited (PDF, 510 KB)
4.8 - EP Waste Management LimitedIndicative Towns Water Connection Plan
|
Other |
EP Waste Management Limited (PDF, 208 KB)
6.2.8 - ES Vol I Chapter 8: Noise and Vibration
|
Other |
EP Waste Management Limited (PDF, 518 KB)
6.2.9 - ES Vol I Chapter 9: Traffic and Transport
|
Other |
EP Waste Management Limited (PDF, 67 KB)
6.2.20 - ES Vol I Chapter 20: Summary of Significant Effects
|
Other |
EP Waste Management Limited (PDF, 393 KB)
6.2.14 - ES Vol I Chapter 14: Water Resources, Flood Risk and Drainage
|
Other |
EP Waste Management Limited (PDF, 282 KB)
6.2.16 - ES Vol I Chapter 16: Waste Management
|
Other |
EP Waste Management Limited (PDF, 904 KB)
6.3.23 - ES Vol II Figure 11.8A: Viewpoint 3 - Carr Lane Footpath (Summer)
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.3.25 - ES Vol II Figure 11.9A: Viewpoint 4 - Cress Cottage (Summer)
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.3.10 - ES Vol II Figure 7.3: Annual Mean Maximum NO2 Process Contribution - 2015 Meteorological Year
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.3.12 - ES Vol II Figure 8.1: Noise Sensitive Receptors and Monitoring Locations
|
Other |
EP Waste Management Limited (PDF, 859 KB)
6.3.28 - ES Vol II Figure 11.10B: Viewpoint 5 - Beechwood Farm Carvery (Winter)
|
Other |
EP Waste Management Limited (PDF, 678 KB)
6.3.30 - ES Vol II Figure 11.11B: Viewpoint 6 - Sunk Island Footpath (Winter)
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.3.11 - ES Vol II Figure 7.4: Short Term Maximum NO2 Process Contribution - 2014 Meteorological Year
|
Other |
EP Waste Management Limited (PDF, 1 MB)
6.3.13 - ES Vol II Figure 8.2: Predicted Noise Levels at Ecological Receptors - Worst Case Hour 06:00 - 07:00, Height Above Ground 0.5 m
|
Other |
EP Waste Management Limited (PDF, 1 MB)
6.3.27 - ES Vol II Figure 11.10A: Viewpoint 5 - Beechwood Farm Carvery (Summer)
|
Other |
EP Waste Management Limited (PDF, 942 KB)
6.3.29 - ES Vol II Figure 11.11A: Viewpoint 6 - Sunk Island Footpath (Summer)
|
Other |
EP Waste Management Limited (PDF, 227 KB)
6.3.0 - ES Vol II Cover and Contents
|
Other |
EP Waste Management Limited (PDF, 3 MB)
6.3.14 - ES Vol II Figure 11.1: Potential Viewpoint Locations
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.3.16 - ES Vol II Figure 11.3: Public Rights of Way and Topography
|
Other |
EP Waste Management Limited (PDF, 637 KB)
6.3.32 - ES Vol II Figure 11.12B: Viewpoint 7 - Immingham South Footpath (Winter)
|
Other |
EP Waste Management Limited (PDF, 1 MB)
6.3.19 - ES Vol II Figure 11.6A: Viewpoint 1 - Farmshop Hotel A180 (Summer)
|
Other |
EP Waste Management Limited (PDF, 1 MB)
6.3.21 - ES Vol II Figure 11.7A: Viewpoint 2 - Brickfield House (Summer)
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.3.15 - ES Vol II Figure 11.2: Landscape Types and Designations
|
Other |
EP Waste Management Limited (PDF, 3 MB)
6.3.17 - ES Vol II Figure 11.4: Zone of Theoretical Visibility (ZTV) - Energy Centre and Stack
|
Other |
EP Waste Management Limited (PDF, 1 MB)
6.3.31 - ES Vol II Figure 11.12A: Viewpoint 7 - Immingham South Footpath (Summer)
|
Other |
EP Waste Management Limited (PDF, 467 KB)
6.3.5 - ES Vol II Figure 4.1: Indicative Proposed Development Layout
|
Other |
EP Waste Management Limited (PDF, 4 MB)
6.4.2 - ES Vol III Appendix 1B: Scoping Opinion
|
Other |
EP Waste Management Limited (PDF, 11 MB)
6.4.5 - ES Vol III Appendix 7A: Air Quality Dispersion Modelling Assessment
|
Other |
EP Waste Management Limited (PDF, 142 KB)
6.4.7 - ES Vol III Appendix 8A: Noise Perception and Terminology
|
Other |
EP Waste Management Limited (PDF, 1 MB)
6.3.45 - ES Vol II Figure 17.2: Electrical Connection Route Options
|
Other |
EP Waste Management Limited (PDF, 113 KB)
6.4.0 - ES Vol III Cover and Contents
|
Other |
EP Waste Management Limited (PDF, 16 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 6 - Annexes 16 to 28
|
Other |
EP Waste Management Limited (PDF, 175 KB)
6.4.14 - ES Vol III Appendix 10B: Ecological Impact Assessment Methodology
|
Other |
EP Waste Management Limited (PDF, 232 KB)
6.4.9 - ES Vol III Appendix 8C: Noise Monitoring
|
Other |
EP Waste Management Limited (PDF, 78 KB)
6.4.11 - ES Vol III Appendix 8E: Noise Modelling
|
Other |
EP Waste Management Limited (PDF, 110 KB)
6.4.20 - ES Vol III Appendix 11B: Potential Viewpoints for Landscape and Visual Impact Assessment
|
Other |
EP Waste Management Limited (PDF, 11 MB)
6.4.21 - ES Vol III Appendix 12A: Phase 1 Geo-environmental and Geotechnical Desk Study Report
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.3.41 - ES Vol II Figure 13.1: Heritage Assets within the 5 km Study Area
|
Other |
EP Waste Management Limited (PDF, 478 KB)
6.3.43 - ES Vol II Figure 14.1: Key Watercourses and Flow Direction
|
Other |
EP Waste Management Limited (PDF, 9 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 2 - Annexes 1 to 4
|
Other |
EP Waste Management Limited (PDF, 18 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 4 - Annexes 6 to 14
|
Other |
EP Waste Management Limited (PDF, 16 MB)
6.4.26 - ES Vol III Appendix 14A: Flood Risk Assessment File 2 - Annexes
|
Other |
EP Waste Management Limited (PDF, 194 KB)
6.4.28 - ES Vol III Appendix 19A: Greenhouse Gas Emissions Assessment
|
Other |
EP Waste Management Limited (PDF, 48 KB)
6.4.10 - ES Vol III Appendix 8D: Noise Assessment Construction Activities
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 1 - Main Document
|
Other |
EP Waste Management Limited (PDF, 6 MB)
6.3.4 - ES Vol II Figure 3.3: Environmental Receptors within 5 km
|
Other |
EP Waste Management Limited (PDF, 849 KB)
6.3.36 - ES Vol II Figure 11.14B: Viewpoint 9 - Middle Drain Public Right of Way (Winter)
|
Other |
EP Waste Management Limited (PDF, 385 KB)
6.4.4 - ES Vol III Appendix 5A: Outline Construction Environmental Management Plan
|
Other |
EP Waste Management Limited (PDF, 362 KB)
6.4.13 - ES Vol III Appendix 10A: Ecology Legislation and Planning Policy
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.4.23 - ES Vol III Appendix 12C: Ground Investigation Interpretive Report
|
Other |
EP Waste Management Limited (PDF, 544 KB)
6.4.25 - ES Vol III Appendix 13B: Historical Maps and Aerial Photographs
|
Other |
EP Waste Management Limited (PDF, 1 MB)
6.3.6 - ES Vol II Figure 4.2: Ecological Mitigation and Enhancements (Indicative)
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.3.8 - ES Vol II Figure 7.1: Air Quality Receptors and Diffusion Tube Monitoring Locations.
|
Other |
EP Waste Management Limited (PDF, 4 MB)
6.4.21 - ES Vol III Appendix 12A: Phase 1 Geo-environmental and Geotechnical Desk Study Report
|
Other |
EP Waste Management Limited (PDF, 25 MB)
6.4.22 - ES Vol III Appendix 12B: Ground Investigation Factual Report
|
Other |
EP Waste Management Limited (PDF, 992 KB)
6.3.35 - ES Vol II Figure 11.14A: Viewpoint 9 - Middle Drain Public Right of Way (Summer)
|
Other |
EP Waste Management Limited (PDF, 9 MB)
6.4.15 - ES Vol III Appendix 10C: Preliminary Ecological Appraisal Report
|
Other |
EP Waste Management Limited (PDF, 7 MB)
6.4.27 - ES Vol III Appendix 14B: Outline Drainage Strategy
|
Other |
EP Waste Management Limited (PDF, 4 MB)
6.3.40 - ES Vol II Figure 11.18: Viewpoint 9 Photomontage and Wireframe for Indicative Concept Layout
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.3.42 - ES Vol II Figure 13.2: Archaeological Events within the 5 km Study Area
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.3.37 - ES Vol II Figure 11.15: Viewpoint 1 Farmshop Hotel, A180 - Photomontage and Wireframe for Indicative Concept Layout
|
Other |
EP Waste Management Limited (PDF, 155 KB)
6.4.3 - ES Vol III Appendix 1C: Statement of Competence
|
Other |
EP Waste Management Limited (PDF, 13 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 3 - Annex 5
|
Other |
EP Waste Management Limited (PDF, 19 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 5 - Annex 15
|
Other |
EP Waste Management Limited (PDF, 115 KB)
6.4.24 - ES Vol III Appendix 13A: Gazetteer of Cultural Heritage Assets
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.4.26 - ES Vol III Appendix 14A: Flood Risk Assessment File 1 - Main Document
|
Other |
EP Waste Management Limited (PDF, 3 MB)
6.3.44 - ES Vol II Figure 17.1: Cumulative Developments (Short List)
|
Other |
EP Waste Management Limited (PDF, 441 KB)
6.3.7 - ES Vol II Figure 4.3: Comparison of Consented and Proposed Developments
|
Other |
EP Waste Management Limited (PDF, 2 MB)
6.3.9 - ES Vol II Figure 7.2: Ecological Air Quality Receptor Locations
|
Other |
EP Waste Management Limited (PDF, 3 MB)
6.3.38 - ES Vol II Figure 11.16: Viewpoint 5 Beechwood Farm Carvery - Photomontage and Wireframe for Indicative Concept Layout
|
Other |
EP Waste Management Limited (PDF, 3 MB)
6.3.39 - ES Vol II Figure 11.17: Viewpoint 7 Photomontage and Wireframe for Indicative Concept Layout
|
Other |
EP Waste Management Limited (PDF, 877 KB)
6.4.16 - ES Vol III Appendix 10D: Aquatic Macroinvertebrate and Macrophyte Survey
|
Other |
EP Waste Management Limited (PDF, 444 KB)
6.4.18 - ES Vol III Appendix 10F: Reptile Survey
|
Other |
EP Waste Management Limited (PDF, 337 KB)
6.4.29 - ES Vol III Appendix 20A: Commitments Register
|
Other |
EP Waste Management Limited (PDF, 616 KB)
6.3.34 - ES Vol II Figure 11.13B: Viewpoint 8 - Mauxhall Farm Footpath (Winter)
|
Other |
EP Waste Management Limited (PDF, 11 MB)
6.4.6 - ES Vol III Appendix 7B: Human Health Risk Assessment
|
Other |
EP Waste Management Limited (PDF, 895 KB)
6.4.8 - ES Vol III Appendix 8B: Consultation with NELC Environmental Health Officer
|
Other |
EP Waste Management Limited (PDF, 1 MB)
6.4.17 - ES Vol III Appendix 10E: Otter and Water Vole Survey
|
Other |
EP Waste Management Limited (PDF, 259 KB)
6.4.19 - ES Vol III Appendix 11A: Landscape and Visual Impact Assessment Methodology
|
Other |
EP Waste Management Limited (PDF, 901 KB)
6.3.33 - ES Vol II Figure 11.13A: Viewpoint 8 - Mauxhall Farm Footpath (Summer)
|
Other |
EP Waste Management Limited (PDF, 1 MB)
6.3.46 - ES Vol II Figure 17.3: Gas Connection Route Options
|
Other |
EP Waste Management Limited (PDF, 11 MB)
6.4.1 - ES Vol III Appendix 1A: Environmental Impact Assessment Scoping Report
|
Other |
EP Waste Management Limited (PDF, 141 KB)
AECOM and EA Letter to PINS on SHBEC approach to FRA
|
Other |
EP Waste Management Limited (PDF, 523 KB)
4.2 - Land Plan
|