South Humber Bank Energy Centre

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (5)

Developer's Application (141)

Acceptance (7)

Pre Examination (19)

Examination (133)

Decision (14)

Decided (2)

Transboundary Documents
Date

SourceDescription
Other
Department for Business, Energy and Industrial Strategy (PDF, 33 KB)
The South Humber Bank Energy Centre (Correction) Order 2022
Other
Department for Business, Energy and Industrial Strategy (PDF, 131 KB)
The South Humber Bank Energy Centre Corrections Notice
Other
Development Consent Order as Made by the Secretary of State (PDF, 336 KB)
Other
Habitats Regulations Assessment (PDF, 913 KB)
Other
Notification of Decision to Accept Application (PDF, 114 KB)
Other
Post-examination Submission (PDF, 412 KB)
Other
Recommendation Report (PDF, 3 MB)
Other
Regulation 31 Notice (PDF, 102 KB)
Other
Secretary of State Decision Letter (PDF, 672 KB)
Other
EP Waste Management Limited (PDF, 226 KB)
Response to the Secretary of State’s consultation of 8 October 2021
Other
Department for Business, Energy & Industrial Strategy (BEIS) (PDF, 205 KB)
Request for information from the Applicant
Other
EP Waste Management Limited (PDF, 252 KB)
Response to the Secretary of State’s consultation of 30 September 2021
Other
Network Rail Infrastructure Limited (PDF, 149 KB)
Response to the Secretary of State’s consultation of 30 September 2021
Other
Department for Business, Energy & Industrial Strategy (BEIS) (PDF, 688 KB)
Request for information from the Applicant and Network Rail Infrastructure Limited
Other
EP Waste Management Limited (PDF, 550 KB)
Response to the Secretary of State’s consultation of 27 August 2021
Other
National Grid (PDF, 103 KB)
Response to the Secretary of State’s consultation of 27 August 2021
Other
Department for Business, Energy & Industrial Stratergy (BEIS) (PDF, 157 KB)
Request for Information from the Applicant, National Grid Electricity Transmission plc and National Grid Gas plc dated 27 August 2021
Other
Notification of the completion of the Examining Authority's Examination (PDF, 106 KB)
Other
ESP Utilities Group Ltd (PDF, 146 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
EP Waste Management Limited (PDF, 241 KB)
Deadline 7 Submission - 8.19 Submissions in Response to ExA’s R17 Letter Dated 28 April 2021
Other
EP Waste Management Limited (PDF, 316 KB)
Deadline 7 Submission - 1.2 Application Guide
Other
EP Waste Management Limited (PDF, 397 KB)
Deadline 7 Submission - 8.6 Comparison Draft Development Consent Order – Deadline 7
Other
EP Waste Management Limited (PDF, 222 KB)
Deadline 7 Submission - 7.6 - Statement of Common Ground with National Grid
Other
EP Waste Management Limited (PDF, 420 KB)
Deadline 7 Submission - 2.1 Draft Development Consent Order – Deadline 7
Other
EP Waste Management Limited (PDF, 177 KB)
Deadline 7 Submission - Cover Letter
Other
EP Waste Management Limited (PDF, 432 KB)
Deadline 7 Submission - 7.6 - Statement of Common Ground with National Grid – Comparison Between Deadline 4 Version and Signed (Deadline 7) Version
Other
National Grid (PDF, 108 KB)
Deadline 7 Submission - Response to the Rule 17 letter dated 28 April 2021
Other
Natural England (PDF, 291 KB)
Deadline 7 Submission - Response to the Rule 17 letter dated 28 April 2021
Other
North East Lincolnshire Council (PDF, 178 KB)
Deadline 7 Submission - Response to the Rule 17 letter dated 28 April 2021
Other
Variation to Timetable – Rule 8(3) and Request for Further Information – Rule 17 (PDF, 203 KB)
Other
EP Waste Management Limited (PDF, 215 KB)
Deadline 6 Submission - Cover Letter
Other
EP Waste Management Limited (PDF, 1 MB)
Deadline 6 Submission - 8.6 Comparison Draft Development Consent Order
Other
EP Waste Management Limited (PDF, 507 KB)
Deadline 6 Submission - 1.2 Application Guide
Other
EP Waste Management Limited (PDF, 473 KB)
Deadline 6 Submission - 8.7 Schedule of Changes to the Draft DCO
Other
EP Waste Management Limited (PDF, 384 KB)
Deadline 6 Submission - 8.17 Applicant's response to Deadline 5 submissions and comments on the Report on the Implications for European Sites (RIES)
Other
EP Waste Management Limited (PDF, 776 KB)
Deadline 6 Submission - 2.1 Draft Development Consent Order
Other
EP Waste Management Limited (PDF, 654 KB)
Deadline 6 Submission - 5.11 Biodiversity Strategy
Other
EP Waste Management Limited (PDF, 127 KB)
Deadline 6 Submission - 8.18 - Signed Position Statement between the Applicant and North East Lincolnshire Council
Other
EP Waste Management Limited (PDF, 3 MB)
Deadline 6 Submission - Deed of Variation under section 106 and 106A of the Town and Country Planning Act 1990 between the Applicant and North East Lincolnshire Council dated 19 April 2021
Other
Report on the Implications for European Sites (RIES) (PDF, 301 KB)
Issued by the Examining Authority on 31 March 2021
Other
Environment Agency (PDF, 193 KB)
Deadline 5 Submission - Response to the Examining Authority’s Further Written Questions (EXQ2)
Other
EP Waste Management Limited (PDF, 454 KB)
Deadline 5 Submission - 8.7 Schedule of Changes to the draft Development Consent Order
Other
EP Waste Management Limited (PDF, 5 MB)
Deadline 5 Submission - 5.8 Habitats Regulations Assessment Report
Other
EP Waste Management Limited (PDF, 176 KB)
Deadline 5 Submission - Cover Letter
Other
EP Waste Management Limited (PDF, 949 KB)
Deadline 5 Submission - 8.6 Comparison draft Development Consent Order
Other
EP Waste Management Limited (PDF, 946 KB)
Deadline 5 Submission - 2.1 Draft Development Consent Order
Other
EP Waste Management Limited (PDF, 5 MB)
Deadline 5 Submission - 8.16 Applicants Response to the Examining Authority's Further Written Questions (ExQ2)
Other
EP Waste Management Limited (PDF, 507 KB)
Deadline 5 Submission - 1.2 Application Guide
Other
National Grid (PDF, 150 KB)
Deadline 5 Submission - Response to the Examining Authority’s Further Written Questions (EXQ2)
Other
Natural England (PDF, 225 KB)
Deadline 5 Submission - Response to the Examining Authority’s Further Written Questions (EXQ2)
Other
Network Rail Infrastructure Limited (PDF, 386 KB)
Deadline 5 Submission - Response to the Examining Authority's Further Written Questions (ExQ2)
Other
North East Lincolnshire Council (PDF, 220 KB)
Deadline 5 Submission - Response to the Examining Authority's Further Written Questions (ExQ2) Appendices
Other
North East Lincolnshire Council (PDF, 62 KB)
Deadline 5 Submission - Response to Request for further information (Rule 17) letter dated 9 March 2021 in relation to the Unmanned Aerial Vehicle (UAV) footage
Other
North East Lincolnshire Council (PDF, 149 KB)
Deadline 5 Submission - Response to the Examining Authority's Further Written Questions (ExQ2)
Other
EP Waste Management Limited (PDF, 1 MB)
Additional Submission - Accepted at the discretion of the Examining Authority - Unmanned Aerial Vehicle (UAV) Video Technical Information
Other
EP Waste Management Limited (Document 4 KB)
Additional Submission - Accepted at the discretion of the Examining Authority - Unmanned Aerial Vehicle (UAV) Video March 2021
Other
Request for Further Information - Rule 17 (PDF, 107 KB)
Other
Further Written Questions (PDF, 238 KB)
Other
EP Waste Management Limited (PDF, 354 KB)
Deadline 4 Submission - Draft Statement of Common Ground with National Grid
Other
EP Waste Management Limited (PDF, 944 KB)
Deadline 4 Submission - 2.1 Draft Development Consent Order
Other
EP Waste Management Limited (PDF, 244 KB)
Deadline 4 Submission - Position Statement
Other
EP Waste Management Limited (PDF, 412 KB)
Deadline 4 Submission - 5.4 Other Consents and Licenses
Other
EP Waste Management Limited (PDF, 199 KB)
Deadline 4 Submission - Written summary of oral submissions made at Open Floor Hearing 1
Other
EP Waste Management Limited (PDF, 480 KB)
Deadline 4 Submission - 8.7 Schedule of Changes to the draft Development Consent Order
Other
EP Waste Management Limited (PDF, 505 KB)
Deadline 4 Submission - 1.2 Application Guide
Other
EP Waste Management Limited (PDF, 181 KB)
Deadline 4 Submission - Cover Letter
Other
EP Waste Management Limited (PDF, 967 KB)
Deadline 4 Submission - 8.6 Comparison draft Development Consent Order
Other
EP Waste Management Limited (PDF, 780 KB)
Deadline 4 Submission - 8.15 Confidential Health and Safety Executive Zone Information (Redacted)
Other
EP Waste Management Limited (PDF, 612 KB)
Deadline 4 Submission - Statement of Common Ground with North East Lincolnshire Council
Other
EP Waste Management Limited (PDF, 264 KB)
Deadline 4 Submission - 8.3 Statement of Commonality of Statements of Common Ground
Other
EP Waste Management Limited (PDF, 406 KB)
Deadline 4 Submission - Statement of Common Ground with Network Rail
Other
EP Waste Management Limited (PDF, 1 MB)
Deadline 4 Submission - Written summary of oral submissions made at Issue Specific Hearing 1
Other
Network Rail Infrastructure Limited (PDF, 246 KB)
Deadline 4 Submission - Written summary of oral submissions made at Open Floor Hearing 1
Other
Action points from Issue Specific Hearing 1 on the draft Development Consent Order (PDF, 212 KB)
Other
Recording of Open Floor Hearing - 08 February 2021 (PDF, 31 KB)
Other
Recording of Issue Specific Hearing - 09 February 2021 – Part 1 (PDF, 31 KB)
Other
Recording of Issue Specific Hearing - 09 February 2021 – Part 2 (PDF, 31 KB)
Other
Addleshaw Goddard LLP on behalf of Network Rail Infrastructure Limited (PDF, 58 KB)
Additional Submission - Accepted at the discretion of the Examining Authority - Withdrawal of objection and position statement letter
Other
Hearing Agenda for Issue Specific Hearing 1 (PDF, 31 KB)
Draft Development Consent Order (dDCO)
Other
Hearing Agenda for Open Floor Hearing 1 (PDF, 31 KB)
Other
EP Waste Management Limited (PDF, 272 KB)
Deadline 3 Submission - 8.3 Statement of Commonality for Statements of Common Ground
Other
EP Waste Management Limited (PDF, 934 KB)
Deadline 3 Submission - 8.6 Comparison Draft Development Consent Order
Other
EP Waste Management Limited (PDF, 555 KB)
Deadline 3 Submission - 8.9 Applicant's Response to Examining Authority's Written Questions Responses
Other
EP Waste Management Limited (PDF, 704 KB)
Deadline 3 Submission - 8.10 Applicants Comments on Written Representations
Other
EP Waste Management Limited (PDF, 333 KB)
Deadline 3 Submission - 1.2 Application Guide
Other
EP Waste Management Limited (PDF, 452 KB)
Deadline 3 Submission - 8.7 Schedule of Changes to the Draft Development Consent Order
Other
EP Waste Management Limited (PDF, 406 KB)
Deadline 3 Submission - 5.4 Other Consents and Licences
Other
EP Waste Management Limited (PDF, 2 MB)
Deadline 3 Submission - 8.12 Unmanned Aerial Vehicle (UAV) Flight Plan
Other
EP Waste Management Limited (PDF, 854 KB)
Deadline 3 Submission - 7.7 Draft Statement of Common Ground with Network Rail
Other
EP Waste Management Limited (PDF, 927 KB)
Deadline 3 Submission - 2.1 Draft Development Consent Order
Other
EP Waste Management Limited (PDF, 656 KB)
Deadline 3 Submission - 7.1 Draft Statement of Common Ground with North East Lincolnshire Council
Other
EP Waste Management Limited (PDF, 279 KB)
Deadline 3 Submission - Cover Letter
Other
EP Waste Management Limited (PDF, 969 KB)
Deadline 3 Submission - 8.8 Figure 1 Key Watercourses and Flow Direction Diagram
Other
EP Waste Management Limited (PDF, 4 MB)
Deadline 3 Submission - 8.11 Site Entrance Swept Path Analysis and Visibility Splay Drawings
Other
Network Rail Infrastructure Limited (PDF, 66 KB)
Deadline 3 Submission - Position Statement
Other
Notification of Procedural Decision - Rule 9 (PDF, 113 KB)
Other
EP Waste Management Limited (PDF, 2 MB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
EP Waste Management Limited (PDF, 31 KB)
Hearing Notice
Other
Notification of Procedural Decision - Rule 9 (PDF, 127 KB)
Other
Rule 13 - Notification of Hearing (PDF, 182 KB)
Other
Environment Agency (PDF, 78 KB)
Deadline 2 Submission - Written Representation
Other
Environment Agency (PDF, 878 KB)
Deadline 2 Submission - Response to the Examining Authority's Written Questions
Other
Anglian Water Services Limited (PDF, 192 KB)
Deadline 2 Submission - Response to the Examining Authority's Written Questions
Other
Anglian Water Services Limited (PDF, 252 KB)
Deadline 2 Submission - Written Representation
Other
EP Waste Management Limited (PDF, 800 KB)
Deadline 2 Submission - 8.6 Comparison draft Development Consent Order
Other
EP Waste Management Limited (PDF, 767 KB)
Deadline 2 Submission - 2.1 Draft Development Consent Order – Deadline 2
Other
EP Waste Management Limited (PDF, 39 MB)
Deadline 2 Submission - 8.2 Applicant's Response to Examining Authority’s First Written Questions Part 1
Other
EP Waste Management Limited (PDF, 380 KB)
Deadline 2 Submission - 8.3 Statement of Commonality of Statements of Common Ground
Other
EP Waste Management Limited (PDF, 498 KB)
Deadline 2 Submission - 1.2 Application Guide
Other
EP Waste Management Limited (PDF, 5 MB)
Deadline 2 Submission - 8.4 Revised Development Consent Obligation
Other
EP Waste Management Limited (PDF, 39 MB)
Deadline 2 Submission - 8.2 Applicant's Response to Examining Authority’s First Written Questions Part 2
Other
EP Waste Management Limited (PDF, 43 MB)
Deadline 2 Submission - 8.2 Applicant’s Response to Examining Authority’s First Written Questions Part 3
Other
EP Waste Management Limited (PDF, 167 KB)
Deadline 2 Submission - 8.7 Schedule of Changes to the draft Development Consent Order
Other
EP Waste Management Limited (PDF, 36 KB)
Deadline 2 Submission - 3.1 Book of Reference
Other
EP Waste Management Limited (PDF, 4 MB)
Deadline 2 Submission - 7.9 Statement of Common Ground with Royal Mail
Other
EP Waste Management Limited (PDF, 326 KB)
Deadline 2 Submission - Deadline 2 Submission Cover Letter
Other
EP Waste Management Limited (PDF, 405 KB)
Deadline 2 Submission - 7.4 Statement of Common Ground with Natural England
Other
EP Waste Management Limited (PDF, 937 KB)
Deadline 2 Submission - 8.5 Response to Examiners Question 7.0.1 (Figure 1 and Figure 2)
Other
EP Waste Management Limited (PDF, 4 MB)
Deadline 2 Submission - 5.8 Habitats Regulations Assessment Signposting
Other
Ministry of Defence (PDF, 200 KB)
Deadline 2 Submission - Written Representation
Other
National Grid (PDF, 61 KB)
Deadline 2 Submission - Written Representation
Other
Natural England (PDF, 105 KB)
Deadline 2 Submission - Response to the Examining Authority's Written Questions
Other
Network Rail Infrastructure Limited (PDF, 6 MB)
Deadline 2 Submission - Written Representation
Other
North East Lincolnshire Council (PDF, 312 KB)
Deadline 2 Submission - Response to the Examining Authority's Written Questions
Other
North East Lincolnshire Council (ZIP, 9 MB)
Deadline 2 Submission - Response to the Examining Authority's Written Questions - Appendix A to L
Other
North East Lindsey Drainage Board (PDF, 127 KB)
Deadline 2 Submission - Written Representation
Other
EP Waste Management Limited (PDF, 464 KB)
Deadline 1 Submission - 7.3 Statement of Common Ground with the Environment Agency
Other
EP Waste Management Limited (PDF, 1 MB)
Deadline 1 Submission - Statement of Common Ground with Highways England
Other
EP Waste Management Limited (PDF, 351 KB)
Deadline 1 Submission - 7.6 Statement of Common Ground with National Grid
Other
EP Waste Management Limited (PDF, 457 KB)
Deadline 1 Submission - 7.11 Statement of Common Ground with Cadent Gas
Other
EP Waste Management Limited (PDF, 476 KB)
Deadline 1 Submission - 7.8 Statement of Common Ground with Anglian Water
Other
EP Waste Management Limited (PDF, 169 KB)
Deadline 1 Submission - 7.10 Statement of Common Ground with Historic England
Other
EP Waste Management Limited (PDF, 2 MB)
Deadline 1 Submission - 7.7 Draft Statement of Common Ground with Network Rail
Other
EP Waste Management Limited (PDF, 5 MB)
Deadline 1 Submission - 8.1 Applicant’s Comments on Relevant Representations
Other
EP Waste Management Limited (PDF, 633 KB)
Deadline 1 Submission - 6.4.12 Transport Assessment Annex 28 - Framework CTMP
Other
EP Waste Management Limited (PDF, 494 KB)
Deadline 1 Submission - 7.4 Draft Statement of Common Ground with Natural England
Other
EP Waste Management Limited (PDF, 631 KB)
Deadline 1 Submission - Draft Statement of Common Ground with North East Lincolnshire Council
Other
EP Waste Management Limited (PDF, 360 KB)
Deadline 1 Submission - 7.2 Statement of Common Ground with North Lincolnshire Council
Other
EP Waste Management Limited (PDF, 406 KB)
Deadline 1 Submission - 7.9 Draft Statement of Common Ground with Royal Mail
Other
EP Waste Management Limited (PDF, 491 KB)
Deadline 1 Submission - 1.2 Application Guide
Other
EP Waste Management Limited (PDF, 195 KB)
Deadline 1 Submission - Submission Cover Letter
Other
Network Rail Infrastructure Limited (PDF, 210 KB)
Deadline 1 Submission – Notification of wish to speak at an Open Floor Hearing (OFH)
Other
Network Rail Infrastructure Limited (PDF, 1 MB)
Deadline 1 Submission – Suggested locations for the Examining Authority to include in any Accompanied Site Inspection (ASI)
Other
North East Lincolnshire Council (PDF, 487 KB)
Deadline 1 Submission – Local Impact Report
Other
North East Lincolnshire Council (PDF, 201 KB)
Deadline 1 Submission – Suggested locations for the Examining Authority to include in any Accompanied Site Inspection (ASI)
Other
Preliminary Meeting Note (PDF, 31 KB)
Other
Rule 8 letter - notification of timetable for the examination (PDF, 365 KB)
Other
Written Questions (PDF, 817 KB)
Other
Energy Asset Networks Limited (PDF, 85 KB)
Additional Submission accepted at the discretion of the Examining Authority
Other
Recording of Preliminary Meeting Part 2 - 10 November 2020 (PDF, 31 KB)
Other
Addleshaw Goddard LLP on behalf of Network Rail Infrastructure Limited (PDF, 113 KB)
Procedural Deadline B - Written submission on Examination procedure responding to matters raised orally in the Preliminary Meeting Part 1
Other
Recording of preliminary meeting part 1 - 21 October 2020 (PDF, 31 KB)
Other
EP Waste Management Limited (PDF, 259 KB)
Procedural Deadline A - Late submission accepted at the discretion of the Examining Authority
Other
Addleshaw Goddard LLP on behalf of Network Rail Infrastructure Limited (PDF, 1 MB)
Procedural Deadline A - Issue Specific Hearings
Other
Frequently Asked Questions (FAQs) (PDF, 161 KB)
Other
Rule 6 Letter (PDF, 604 KB)
Other
Note of Unaccompanied Site Inspection 1 – 25 August 2020 (PDF, 111 KB)
Other
Cadent Gas Limited (PDF, 87 KB)
Additional Submission accepted at the discretion of the Examining Authority – Request to withdraw Relevant Representation
Other
Request for Further Information - Rule 17 (PDF, 144 KB)
Other
Examination Library (PDF, 738 KB)
Other
EP Waste Management Limited (PDF, 723 KB)
Additional Submission accepted at the discretion of the Examining Authority – Report on Section 56 and EIA Regulation 16 Activities
Other
EP Waste Management Limited (PDF, 231 KB)
Additional Submission accepted at the discretion of the Examining Authority – Covering letter with response to s51 advice dated 4 May 2020
Other
EP Waste Management Limited (PDF, 530 KB)
Additional Submission accepted at the discretion of the Examining Authority – Updated Land Plan (Document reference 4.3 Rev 2.0) submitted in response to s51 advice dated 4 May 2020
Other
Historic England (PDF, 581 KB)
Additional Submission accepted at the discretion of the Examining Authority – Position statement
Other
EP Waste Management Limited (PDF, 56 KB)
Certificate of compliance with section 56 of the Planning Act 2008
Other
EP Waste Management Limited (PDF, 71 KB)
Regulation 16 Notice
Other
Notice of Appointment of Examining Authority (PDF, 189 KB)
Other
EP Waste Management Limited (PDF, 148 KB)
Applicant's s56 notice of accepted application
Other
Lincolnshire County Council (PDF, 120 KB)
Adequacy of Consultation Representation
Other
North East Lincolnshire Council (PDF, 173 KB)
Adequacy of Consultation Representation
Other
North Lincolnshire Council (PDF, 119 KB)
Adequacy of Consultation Representation
Other
Notification of Decision to Accept Application (PDF, 134 KB)
Other
Section 51 advice to the Applicant (PDF, 141 KB)
Other
Section 55 Checklist (PDF, 321 KB)
Other
West Lindsey District Council (PDF, 51 KB)
Adequacy of Consultation Representation
Other
EP Waste Management Limited (PDF, 16 MB)
5.10 - Indicative Landscape Strategy
Other
EP Waste Management Limited (PDF, 2 MB)
1.3 - Application Form
Other
EP Waste Management Limited (PDF, 674 KB)
2.1 - Draft Development Consent Order
Other
EP Waste Management Limited (PDF, 1 MB)
5.2 - Grid Connection Statement
Other
EP Waste Management Limited (PDF, 385 KB)
5.4 - Other Consents and Licences
Other
EP Waste Management Limited (PDF, 525 KB)
4.7 - Indicative Electrical Connection Plan
Other
EP Waste Management Limited (PDF, 36 KB)
3.1 - Book of Reference
Other
EP Waste Management Limited (PDF, 6 MB)
5.6 - Combined Heat and Power Assessment
Other
EP Waste Management Limited (PDF, 680 KB)
5.8 - Habitats Regulations Assessment Signposting Report
Other
EP Waste Management Limited (PDF, 2 MB)
4.3 - Works Plans
Other
EP Waste Management Limited (PDF, 7 MB)
4.5 - Indicative Generating Station Plan, Floor Plans, Section and Elevations
Other
EP Waste Management Limited (PDF, 1 MB)
4.10 - Indicative Landscape Plan
Other
EP Waste Management Limited (PDF, 510 KB)
4.12 - Proposed Development and Consented Development Boundary Comparison Plan
Other
EP Waste Management Limited (PDF, 293 KB)
1.2 - Application Guide
Other
EP Waste Management Limited (PDF, 6 MB)
1.4 - Notices for Statutory Publicity
Other
EP Waste Management Limited (PDF, 2 MB)
4.11 - Biodiversity Plan
Other
EP Waste Management Limited (PDF, 543 KB)
4.9 - Indicative Surface Water Drainage Plan
Other
EP Waste Management Limited (PDF, 5 MB)
5.13 - Development Consent Obligation
Other
EP Waste Management Limited (PDF, 436 KB)
5.9 - Statutory Nuisance Statement
Other
EP Waste Management Limited (PDF, 2 MB)
5.11 - Biodiversity Strategy
Other
EP Waste Management Limited (PDF, 17 MB)
5.1 - Consultation Report
Other
EP Waste Management Limited (PDF, 1 MB)
5.3 - Gas Connection and Pipeline Statement
Other
EP Waste Management Limited (PDF, 3 MB)
5.12 - Indicative Lighting Strategy
Other
EP Waste Management Limited (PDF, 615 KB)
7.1 - Statement of Common Ground with North East Lincolnshire Council
Other
EP Waste Management Limited (PDF, 680 KB)
2.2 - Explanatory Memorandum
Other
EP Waste Management Limited (PDF, 1 MB)
4.1 - Site Location Plan
Other
EP Waste Management Limited (PDF, 2 MB)
5.5 - Planning, Design and Access Statement
Other
EP Waste Management Limited (PDF, 331 KB)
5.7 - Fuel Availability and Waste Hierarchy Assessment
Other
EP Waste Management Limited (PDF, 167 KB)
6.2.13 - ES Vol I Chapter 13: Cultural Heritage
Other
EP Waste Management Limited (PDF, 555 KB)
6.2.15 - ES Vol I Chapter 15: Socio-Economics
Other
EP Waste Management Limited (PDF, 1 MB)
6.1 - Environmental Statement Non Technical Summary
Other
EP Waste Management Limited (PDF, 260 KB)
6.2.1 - ES Vol I Chapter 1: Introduction
Other
EP Waste Management Limited (PDF, 322 KB)
6.2.17 - ES Vol I Chapter 17: Cumulative and Combined Effects
Other
EP Waste Management Limited (PDF, 354 KB)
6.2.19 - ES Vol I Chapter 19: Sustainability and Climate Change
Other
EP Waste Management Limited (PDF, 61 KB)
6.2.3 - ES Vol I Chapter 3: Description of the Proposed Development Site
Other
EP Waste Management Limited (PDF, 209 KB)
6.2.5 - ES Vol I Chapter 5: Construction Programme and Management
Other
EP Waste Management Limited (PDF, 241 KB)
6.2.21 - ES Vol I Environmental Statement Glossary
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.1 - ES Vol II Figure 1.1: Site Location Plan
Other
EP Waste Management Limited (PDF, 174 KB)
6.2.6 - ES Vol I Chapter 6: Need, Alternatives and Design Evolution
Other
EP Waste Management Limited (PDF, 254 KB)
6.2.7 - ES Vol I Chapter 7: Air Quality
Other
EP Waste Management Limited (PDF, 199 KB)
1.1 - Application Cover Letter
Other
EP Waste Management Limited (PDF, 255 KB)
6.2.11 - ES Vol I Chapter 11: Landscape and Visual Amenity
Other
EP Waste Management Limited (PDF, 981 KB)
6.3.3 - ES Vol II Figure 3.2: Residential Receptors
Other
EP Waste Management Limited (PDF, 595 KB)
4.4 - Access and Rights of Way Plan
Other
EP Waste Management Limited (PDF, 878 KB)
6.2.10 - ES Vol I Chapter 10: Ecology
Other
EP Waste Management Limited (PDF, 579 KB)
6.2.12 - ES Vol I Chapter 12: Geology, Hydrogeology and Land Contamination
Other
EP Waste Management Limited (PDF, 51 KB)
6.2.2 - ES Vol I Chapter 2: Assessment Methodology
Other
EP Waste Management Limited (PDF, 465 KB)
6.2.4 - ES Vol I Chapter 4: The Proposed Development
Other
EP Waste Management Limited (PDF, 124 KB)
6.2.0 - ES Vol I Cover and Contents
Other
EP Waste Management Limited (PDF, 662 KB)
6.3.22 - ES Vol II Figure 11.7B: Viewpoint 2 - Brickfield House (Winter)
Other
EP Waste Management Limited (PDF, 935 KB)
6.3.24 - ES Vol II Figure 11.8B: Viewpoint 3 - Carr Lane Footpath (Winter)
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.26 - ES Vol II Figure 11.9B: Viewpoint 4 - Cress Cottage (Winter)
Other
EP Waste Management Limited (PDF, 791 KB)
6.3.2 - ES Vol II Figure 3.1: Parts of the Site (Order Limits and Work Numbers)
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.18 - ES Vol II Figure 11.5: Final Viewpoint Locations
Other
EP Waste Management Limited (PDF, 707 KB)
6.3.20 - ES Vol II Figure 11.6B: Viewpoint 1 - Farmshop Hotel A180 (Winter)
Other
EP Waste Management Limited (PDF, 349 KB)
6.2.18 - ES Vol I Chapter 18: Human Health
Other
EP Waste Management Limited (PDF, 519 KB)
4.6 - Indicative Gas Connection Plan
Other
EP Waste Management Limited (PDF, 510 KB)
4.8 - EP Waste Management LimitedIndicative Towns Water Connection Plan
Other
EP Waste Management Limited (PDF, 208 KB)
6.2.8 - ES Vol I Chapter 8: Noise and Vibration
Other
EP Waste Management Limited (PDF, 518 KB)
6.2.9 - ES Vol I Chapter 9: Traffic and Transport
Other
EP Waste Management Limited (PDF, 67 KB)
6.2.20 - ES Vol I Chapter 20: Summary of Significant Effects
Other
EP Waste Management Limited (PDF, 393 KB)
6.2.14 - ES Vol I Chapter 14: Water Resources, Flood Risk and Drainage
Other
EP Waste Management Limited (PDF, 282 KB)
6.2.16 - ES Vol I Chapter 16: Waste Management
Other
EP Waste Management Limited (PDF, 904 KB)
6.3.23 - ES Vol II Figure 11.8A: Viewpoint 3 - Carr Lane Footpath (Summer)
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.25 - ES Vol II Figure 11.9A: Viewpoint 4 - Cress Cottage (Summer)
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.10 - ES Vol II Figure 7.3: Annual Mean Maximum NO2 Process Contribution - 2015 Meteorological Year
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.12 - ES Vol II Figure 8.1: Noise Sensitive Receptors and Monitoring Locations
Other
EP Waste Management Limited (PDF, 859 KB)
6.3.28 - ES Vol II Figure 11.10B: Viewpoint 5 - Beechwood Farm Carvery (Winter)
Other
EP Waste Management Limited (PDF, 678 KB)
6.3.30 - ES Vol II Figure 11.11B: Viewpoint 6 - Sunk Island Footpath (Winter)
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.11 - ES Vol II Figure 7.4: Short Term Maximum NO2 Process Contribution - 2014 Meteorological Year
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.13 - ES Vol II Figure 8.2: Predicted Noise Levels at Ecological Receptors - Worst Case Hour 06:00 - 07:00, Height Above Ground 0.5 m
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.27 - ES Vol II Figure 11.10A: Viewpoint 5 - Beechwood Farm Carvery (Summer)
Other
EP Waste Management Limited (PDF, 942 KB)
6.3.29 - ES Vol II Figure 11.11A: Viewpoint 6 - Sunk Island Footpath (Summer)
Other
EP Waste Management Limited (PDF, 227 KB)
6.3.0 - ES Vol II Cover and Contents
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.14 - ES Vol II Figure 11.1: Potential Viewpoint Locations
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.16 - ES Vol II Figure 11.3: Public Rights of Way and Topography
Other
EP Waste Management Limited (PDF, 637 KB)
6.3.32 - ES Vol II Figure 11.12B: Viewpoint 7 - Immingham South Footpath (Winter)
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.19 - ES Vol II Figure 11.6A: Viewpoint 1 - Farmshop Hotel A180 (Summer)
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.21 - ES Vol II Figure 11.7A: Viewpoint 2 - Brickfield House (Summer)
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.15 - ES Vol II Figure 11.2: Landscape Types and Designations
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.17 - ES Vol II Figure 11.4: Zone of Theoretical Visibility (ZTV) - Energy Centre and Stack
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.31 - ES Vol II Figure 11.12A: Viewpoint 7 - Immingham South Footpath (Summer)
Other
EP Waste Management Limited (PDF, 467 KB)
6.3.5 - ES Vol II Figure 4.1: Indicative Proposed Development Layout
Other
EP Waste Management Limited (PDF, 4 MB)
6.4.2 - ES Vol III Appendix 1B: Scoping Opinion
Other
EP Waste Management Limited (PDF, 11 MB)
6.4.5 - ES Vol III Appendix 7A: Air Quality Dispersion Modelling Assessment
Other
EP Waste Management Limited (PDF, 142 KB)
6.4.7 - ES Vol III Appendix 8A: Noise Perception and Terminology
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.45 - ES Vol II Figure 17.2: Electrical Connection Route Options
Other
EP Waste Management Limited (PDF, 113 KB)
6.4.0 - ES Vol III Cover and Contents
Other
EP Waste Management Limited (PDF, 16 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 6 - Annexes 16 to 28
Other
EP Waste Management Limited (PDF, 175 KB)
6.4.14 - ES Vol III Appendix 10B: Ecological Impact Assessment Methodology
Other
EP Waste Management Limited (PDF, 232 KB)
6.4.9 - ES Vol III Appendix 8C: Noise Monitoring
Other
EP Waste Management Limited (PDF, 78 KB)
6.4.11 - ES Vol III Appendix 8E: Noise Modelling
Other
EP Waste Management Limited (PDF, 110 KB)
6.4.20 - ES Vol III Appendix 11B: Potential Viewpoints for Landscape and Visual Impact Assessment
Other
EP Waste Management Limited (PDF, 11 MB)
6.4.21 - ES Vol III Appendix 12A: Phase 1 Geo-environmental and Geotechnical Desk Study Report
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.41 - ES Vol II Figure 13.1: Heritage Assets within the 5 km Study Area
Other
EP Waste Management Limited (PDF, 478 KB)
6.3.43 - ES Vol II Figure 14.1: Key Watercourses and Flow Direction
Other
EP Waste Management Limited (PDF, 9 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 2 - Annexes 1 to 4
Other
EP Waste Management Limited (PDF, 18 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 4 - Annexes 6 to 14
Other
EP Waste Management Limited (PDF, 16 MB)
6.4.26 - ES Vol III Appendix 14A: Flood Risk Assessment File 2 - Annexes
Other
EP Waste Management Limited (PDF, 194 KB)
6.4.28 - ES Vol III Appendix 19A: Greenhouse Gas Emissions Assessment
Other
EP Waste Management Limited (PDF, 48 KB)
6.4.10 - ES Vol III Appendix 8D: Noise Assessment Construction Activities
Other
EP Waste Management Limited (PDF, 2 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 1 - Main Document
Other
EP Waste Management Limited (PDF, 6 MB)
6.3.4 - ES Vol II Figure 3.3: Environmental Receptors within 5 km
Other
EP Waste Management Limited (PDF, 849 KB)
6.3.36 - ES Vol II Figure 11.14B: Viewpoint 9 - Middle Drain Public Right of Way (Winter)
Other
EP Waste Management Limited (PDF, 385 KB)
6.4.4 - ES Vol III Appendix 5A: Outline Construction Environmental Management Plan
Other
EP Waste Management Limited (PDF, 362 KB)
6.4.13 - ES Vol III Appendix 10A: Ecology Legislation and Planning Policy
Other
EP Waste Management Limited (PDF, 2 MB)
6.4.23 - ES Vol III Appendix 12C: Ground Investigation Interpretive Report
Other
EP Waste Management Limited (PDF, 544 KB)
6.4.25 - ES Vol III Appendix 13B: Historical Maps and Aerial Photographs
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.6 - ES Vol II Figure 4.2: Ecological Mitigation and Enhancements (Indicative)
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.8 - ES Vol II Figure 7.1: Air Quality Receptors and Diffusion Tube Monitoring Locations.
Other
EP Waste Management Limited (PDF, 4 MB)
6.4.21 - ES Vol III Appendix 12A: Phase 1 Geo-environmental and Geotechnical Desk Study Report
Other
EP Waste Management Limited (PDF, 25 MB)
6.4.22 - ES Vol III Appendix 12B: Ground Investigation Factual Report
Other
EP Waste Management Limited (PDF, 992 KB)
6.3.35 - ES Vol II Figure 11.14A: Viewpoint 9 - Middle Drain Public Right of Way (Summer)
Other
EP Waste Management Limited (PDF, 9 MB)
6.4.15 - ES Vol III Appendix 10C: Preliminary Ecological Appraisal Report
Other
EP Waste Management Limited (PDF, 7 MB)
6.4.27 - ES Vol III Appendix 14B: Outline Drainage Strategy
Other
EP Waste Management Limited (PDF, 4 MB)
6.3.40 - ES Vol II Figure 11.18: Viewpoint 9 Photomontage and Wireframe for Indicative Concept Layout
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.42 - ES Vol II Figure 13.2: Archaeological Events within the 5 km Study Area
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.37 - ES Vol II Figure 11.15: Viewpoint 1 Farmshop Hotel, A180 - Photomontage and Wireframe for Indicative Concept Layout
Other
EP Waste Management Limited (PDF, 155 KB)
6.4.3 - ES Vol III Appendix 1C: Statement of Competence
Other
EP Waste Management Limited (PDF, 13 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 3 - Annex 5
Other
EP Waste Management Limited (PDF, 19 MB)
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 5 - Annex 15
Other
EP Waste Management Limited (PDF, 115 KB)
6.4.24 - ES Vol III Appendix 13A: Gazetteer of Cultural Heritage Assets
Other
EP Waste Management Limited (PDF, 2 MB)
6.4.26 - ES Vol III Appendix 14A: Flood Risk Assessment File 1 - Main Document
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.44 - ES Vol II Figure 17.1: Cumulative Developments (Short List)
Other
EP Waste Management Limited (PDF, 441 KB)
6.3.7 - ES Vol II Figure 4.3: Comparison of Consented and Proposed Developments
Other
EP Waste Management Limited (PDF, 2 MB)
6.3.9 - ES Vol II Figure 7.2: Ecological Air Quality Receptor Locations
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.38 - ES Vol II Figure 11.16: Viewpoint 5 Beechwood Farm Carvery - Photomontage and Wireframe for Indicative Concept Layout
Other
EP Waste Management Limited (PDF, 3 MB)
6.3.39 - ES Vol II Figure 11.17: Viewpoint 7 Photomontage and Wireframe for Indicative Concept Layout
Other
EP Waste Management Limited (PDF, 877 KB)
6.4.16 - ES Vol III Appendix 10D: Aquatic Macroinvertebrate and Macrophyte Survey
Other
EP Waste Management Limited (PDF, 444 KB)
6.4.18 - ES Vol III Appendix 10F: Reptile Survey
Other
EP Waste Management Limited (PDF, 337 KB)
6.4.29 - ES Vol III Appendix 20A: Commitments Register
Other
EP Waste Management Limited (PDF, 616 KB)
6.3.34 - ES Vol II Figure 11.13B: Viewpoint 8 - Mauxhall Farm Footpath (Winter)
Other
EP Waste Management Limited (PDF, 11 MB)
6.4.6 - ES Vol III Appendix 7B: Human Health Risk Assessment
Other
EP Waste Management Limited (PDF, 895 KB)
6.4.8 - ES Vol III Appendix 8B: Consultation with NELC Environmental Health Officer
Other
EP Waste Management Limited (PDF, 1 MB)
6.4.17 - ES Vol III Appendix 10E: Otter and Water Vole Survey
Other
EP Waste Management Limited (PDF, 259 KB)
6.4.19 - ES Vol III Appendix 11A: Landscape and Visual Impact Assessment Methodology
Other
EP Waste Management Limited (PDF, 901 KB)
6.3.33 - ES Vol II Figure 11.13A: Viewpoint 8 - Mauxhall Farm Footpath (Summer)
Other
EP Waste Management Limited (PDF, 1 MB)
6.3.46 - ES Vol II Figure 17.3: Gas Connection Route Options
Other
EP Waste Management Limited (PDF, 11 MB)
6.4.1 - ES Vol III Appendix 1A: Environmental Impact Assessment Scoping Report
Other
EP Waste Management Limited (PDF, 141 KB)
AECOM and EA Letter to PINS on SHBEC approach to FRA
Other
EP Waste Management Limited (PDF, 523 KB)
4.2 - Land Plan
Other
EP Waste Management Limited (PDF, 120 KB)
EP Waste Management Limited’s response to the Planning Inspectorate’s draft documents s51 advice
Other
Acknowledgement of S46 Notification - 1 November 2019 (PDF, 116 KB)
Other
S46 Notification - 28 October 2019 (PDF, 115 KB)
Other
Scoping Opinion (PDF, 4 MB)
Adopted by the Secretary of State on 2 October 2019
Other
EP UK Investments Limited (PDF, 14 MB)
Scoping Report submitted to the Secretary of State on 21 August 2019