River Humber Gas Pipeline Replacement Project

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
2.6 Images of the Works (PDF, 4 MB)
Other
6.3.3 Appendix 3.3 Alternatives - Crossing Options Report (PDF, 995 KB)
Other
6.8.4 Appendix 8.4 Paull Holme Strays Investigation Report (PDF, 2 MB)
Other
6.8.1 Appendix 8.1 Environment Agency and Local Authority Responses (PDF, 8 MB)
Other
6.8.7 Appendix 8.7 Information Relating to Stoneledge Field Investigation (PDF, 10 MB)
Other
2.5 Elevations (Tunnel Long Section) (PDF, 3 MB)
Other
6.6.4 Appendix 6.4 Geophysical Surveys Undertaken at Goxhill (PDF, 50 MB)
Other
5.1.1 Consultation Report - Appendices Part 1 (PDF, 45 MB)
Other
7.2.1 Initial Traffic Management Plan (PDF, 42 MB)
Other
2.4 Site Layout Plans (PDF, 10 MB)
Other
6.11.1 Appendix 11.1 Agricultural Land Survey (PDF, 4 MB)
Other
6.13.2 Appendix 13.2 Initial Site Water Management Plan (PDF, 400 KB)
Other
7.8 Schedule of Progress on Voluntary Negotiations (PDF, 410 KB)
Other
6.8.6 Appendix 8.6 Geophysical Survey Report Part 1 (PDF, 13 MB)
Other
5.4 Habitats Regulations Assessment Part 1 (PDF, 26 MB)
Other
1.4 Electronic Application Index (PDF, 288 KB)
Other
3.3 Comparison of DCO Against Model Provisions (PDF, 1 MB)
Other
2.2 Works Plans (PDF, 6 MB)
Other
3.2 Explanatory Memorandum (PDF, 843 KB)
Other
2.7 Crown Land Plans (PDF, 424 KB)
Other
7.4 Need Case (PDF, 6 MB)
Other
6.10.3 Appendix 10.3 Noise Model Outputs (PDF, 35 MB)
Other
5.3 Statement of Statutory Nuisance (PDF, 271 KB)
Other
7.5 Additional Information for Specific Types of Infrastructure (Regulation 6(4)) (PDF, 385 KB)
Other
6.8.8 Appendix 8.8 Responses from Lincolnshire Environmental Records Centre East Yorkshire RIGS Group (PDF, 1 MB)
Other
6.6.2 Appendix 6.2 Aerial Photograph Analysis at Paull (PDF, 6 MB)
Other
5.4 Habitats Regulations Assessment Part 2 (PDF, 21 MB)
Other
6.16 Screening Opinions (PDF, 1 MB)
Other
6.8.6 Appendix 8.6 Geophysical Survey Report Part 3 (PDF, 38 MB)
Other
6.19 Non-Technical Summary (PDF, 30 MB)
Other
6.3.2 Appendix 3.2 Alternatives - Route Corridor Investigation Study (PDF, 9 MB)
Other
6.8.5 Appendix 8.5 Chalk Report (PDF, 6 MB)
Other
6.4 EIA Methodology and Construction Environmental Management (PDF, 378 KB)
Other
6.1 Introduction (PDF, 3 MB)
Other
7.1 Planning Statement (PDF, 623 KB)
Other
6.13.3 Appendix 13.3 Hydrogeological Impact Assessment (PDF, 6 MB)
Other
6.6.5 Appendix 6.5 South End Bypass Geophysical Survey (PDF, 3 MB)
Other
6.3 Design Iterations and Alternatives Considered (PDF, 12 MB)
Other
7.3 Initial Construction Environmental Management Plan (PDF, 7 MB)
Other
7.9 Statement of Common Ground Schedule (PDF, 5 MB)
Other
2.8 Environmental Features and Heritage Designations Plans Part 2 (PDF, 43 MB)
Other
7.2 Transport Assessment (PDF, 49 MB)
Other
6.13 Water Resources (PDF, 10 MB)
Other
6.2 Scheme Description (PDF, 22 MB)
Other
6.4.2 Appendix 4.2 Section 42 Consultation Comments (PDF, 374 KB)
Other
2.1 Land Plans (PDF, 6 MB)
Other
6.5.1 Appendix 5.1 Dust Risk Assessment (PDF, 306 KB)
Other
6.8.6 Appendix 8.6 Geophysical Survey Report Part 2 (PDF, 38 MB)
Other
6.3.1 Appendix 3.1 Strategic Options Report (PDF, 13 MB)
Other
6.18 EIA Regulations Publicity Requirements (PDF, 473 KB)
Other
2.8 Environmental Features and Heritage Designations Plans Part 3 (PDF, 32 MB)
Other
7.6 Drainage Report (PDF, 2 MB)
Other
7.7 Environmental Mitigation Commitments Document (PDF, 344 KB)
Other
6.14 Cumulative Effects (PDF, 5 MB)
Other
6.7.1 Appendix 7.1 Technical Appendix (PDF, 47 MB)
Other
5.2 Flood Risk Assessment (PDF, 17 MB)
Other
5.1 Consultation Report (PDF, 2 MB)
Other
2.8 Environmental Features and Heritage Designations Plans Part 1 (PDF, 268 KB)
Other
2.3 Access and Rights of Way Plans (PDF, 3 MB)
Other
6.5 Air Quality (PDF, 8 MB)
Other
1.3 Copies of Newspaper Notices (PDF, 7 MB)
Other
6.6.3 Appendix 6.3 Geophysical Surveys Undertaken at Paull (PDF, 5 MB)
Other
6.6 Cultural Heritage (PDF, 14 MB)
Other
6.8 Geology and Soils (PDF, 4 MB)
Other
6.13.1 Appendix 13.1 Water Framework Directive Assessment (PDF, 1 MB)
Other
6.8.2 Appendix 8.2 Desk Study Report Part 3 (PDF, 37 MB)
Other
5.1.2 Consultation Report - Appendices Part 2 (PDF, 37 MB)
Other
6.15 Glossary (PDF, 311 KB)
Other
6.8.9 Appendix 8.9 Unexploded Ordnance Report (PDF, 19 MB)
Other
6.8.3 Appendix 8.3 Ground Investigation Report (PDF, 8 MB)
Other
3.1 Draft Development Consent Order (PDF, 1 MB)
Other
6.8.2 Appendix 8.2 Desk Study Report Part 2 (PDF, 45 MB)
Other
6.17 Scoping Opinion (PDF, 3 MB)
Other
5.5 Details of Other Consents and Licences (PDF, 455 KB)
Other
6.8.2 Appendix 8.2 Desk Study Report Part 1 (PDF, 50 MB)
Other
6.10.1 Appendix 10.1 Noise Monitoring Installation Sheets and Time History (PDF, 2 MB)
Other
6.7 Ecology and Nature Conservation (PDF, 46 MB)
Other
6.11 Socio-Economics and Land Use (PDF, 7 MB)
Other
6.4.1 Appendix 4.1 PINS Scoping Opinion Comments (PDF, 503 KB)
Other
4.1 Statement of Reasons (PDF, 763 KB)
Other
1.5 Navigation Document (PDF, 468 KB)
Other
1.2 Application Form (PDF, 2 MB)
Other
6.10.2 Appendix 10.2 Noise Model Inputs (PDF, 407 KB)
Other
1.1 Covering Letter (PDF, 7 MB)
Other
6.10 Noise and Vibration (PDF, 15 MB)
Other
6.9 Landscape and Visual Amenity (PDF, 15 MB)
Other
6.12 Traffic and Transport (PDF, 10 MB)
Other
4.2 Funding Statement (PDF, 303 KB)
Other
6.6.1 Appendix 6.1 Desk-Based Assessment (PDF, 20 MB)
Other
4.3 Book of Reference (Parts 1 - 5) (PDF, 45 KB)