Hornsea Offshore Wind Farm (Zone 4) – Project Two

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (8)

Developer's Application (213)

Acceptance (12)

Pre Examination (15)

Examination (447)

Decision (65)

Decided (35)

Date

SourceDescription
Other
Size: 353 KB
BEIS
Non Material Change 2 Amendment Order
Other
Size: 325 KB
BEIS
Non Material Change 2 Decision Letter
Other
Size: 50 KB
Maritime & Coastguard Agency
Response to Non-Material Change Consultation
Other
Size: 725 KB
The Crown Estate
Response to Non-Material Change Consultation
Other
Size: 389 KB
National Federation of Fishermen Organisation
Response to Non-Material Change Consultation
Other
Size: 37 KB
Trinity House
Response to Non-Material Change Consultation
Other
Size: 38 KB
Natural England
Response to Non-Material Change Consultation
Other
Size: 164 KB
Historic England
Response to Non-Material Change Consultation
Other
Size: 35 KB
Anglian Water
Response to Non-Material Change Consultation
Other
Size: 98 KB
Optimus Wind Limited and Breesea Limited
Appendix E – Letter of consent from Department for Business, Energy & Industrial Strategy
Other
Size: 194 KB
Optimus Wind Limited and Breesea Limited
Appendix A – Notice of Application
Other
Size: 313 KB
Optimus Wind Limited and Breesea Limited
Appendix D – Consultation and Publication Strategy
Other
Size: 19 KB
Optimus Wind Limited and Breesea Limited
Appendix B - Draft of The Hornsea Two Offshore Wind Farm (Amendment) (No. 2) Order 201[X]
Other
Size: 172 KB
Optimus Wind Limited and Breesea Limited
Appendix C – Supporting Information
Other
Size: 53 KB
Optimus Wind Limited and Breesea Limited
Non-Material Change Request - Cover Letter
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.