Hornsea Offshore Wind Farm (Zone 4) – Project Two

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (8)

Developer's Application (213)

Acceptance (12)

Pre Examination (15)

Examination (447)

Decision (65)

Decided (35)

Date

SourceDescription
Other
Size: 747 KB
SMart Wind limited
Appendix R- Clarification Note - Apportioning of predicted razorbill mortality to the Flamborough and Filey Coast pSPA population
Other
Size: 439 KB
SMart Wind limited
Appendix L - Indicative Construction Schedule Scenarios
Other
Size: 694 KB
SMart Wind limited
Appendix O -Clarification Note - Apportioning of predicted guillemot mortality to the Flamborough and Filey Coast pSPA population
Other
Size: 500 KB
SMart Wind limited
Applicant Response to Deadline 2a
Other
Size: 1 MB
SMart Wind limited
Appendix T_Letter from the Applicant to Natural England dated 26 July 2013.pdf
Other
Size: 664 KB
SMart Wind limited
Appendix Q- Clarification Note - Apportioning of predicted puffin mortality to the Flamborough and Filey Coast pSPA population
Other
Size: 680 KB
SMart Wind limited
Appendix D- Schedule of Changes to Version 4 of the draft Development Consent Order
Other
Size: 714 KB
SMart Wind limited
Appendix E- Plan of the indicative cable corridors at the National Grid substation for the Project, Hornsea Project 1 and C.GEN
Other
Size: 642 KB
SMart Wind limited
Appendix N-Clarification Note - Apportioning of predicted gannet mortality to the Flamborough and Filey Coast pSPA population
Other
Size: 3 MB
SMart Wind limited
Appendix M - MacArthur Green Seabird PVA Report - August 2015
Other
Size: 11 MB
SMart Wind limited
Appendix H_Approved Plans accompanying the Able Logistics Park Planning
Other
Size: 15 MB
SMart Wind limited
Appendix I_Photomontages in relation to Q4 of the Rule 17 Letter
Other
Size: 511 KB
SMart Wind limited
Appendix J - Section 135 Consent from Highways England Historical Railways Estate
Other
Size: 3 MB
SMart Wind limited
Appendix F- Plan showing extant permissions and applications in the immediate environs of the converter/substation site
Other
Size: 1 MB
SMart Wind limited
Appendix B_Comparison of Version 4 of the draft Development Consent Order.pdf
Other
Size: 489 KB
SMart Wind limited
Appendix S_Clarification Note - Unidentified Birds.pdf
Other
Size: 396 KB
SMart Wind limited
Appendix W - Draft Protective Provisions for the benefit of Hornsea Project One (as referred to in the answer to Question 3 of the Rule 17 Letter)
Other
Size: 1 MB
SMart Wind limited
Appendix C- Comparison of Version 4 of the draft Development Consent Order against Version 1
Other
Size: 1 MB
SMart Wind limited
Appendix A_Draft Development Consent Order - Version 4
Other
Size: 397 KB
SMart Wind limited
Appendix V- Draft Protective Provisions proposed by the Applicant for the benefit of C.GEN (as referred to in the answer to Question 3 of the Rule 17 Letter)
Other
Size: 422 KB
SMart Wind limited
Appendix K - Update on Status of Discussions with Certain Stakeholders
Other
Size: 668 KB
SMart Wind limited
Appendix U- Letter from SMart Wind on behalf of DONG Energy to the Planning Inspectorate noting change of ownership
Other
Size: 334 KB
C.Gen Killingholme Limited
Update in regard to Protective Provisions
Other
Size: 613 KB
SMart Wind limited
Appendix P -Clarification Note - Apportioning of predicted kittiwake mortality to the Flamborough and Filey Coast pSPA population
Other
Size: 14 MB
SMart Wind limited
Appendix G_Able Logistics Park Planning Permission
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.