Eggborough CCGT

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (6)

Developer's Application (124)

Acceptance (16)

Pre Examination (6)

Examination (173)

Decision (13)

Decided (0)

Date

SourceDescription
Other
Notifcation of Completion of the Examining Authority's Examination (PDF, 98 KB)
Section 99 Notification of Completion of ExA Examination
Other
Eggborough Power Limited (PDF, 368 KB)
Late Submission for Deadline 9 accepted at the discretion of the Examining Authority - Application Guide - Rev.10.0 (End of Examination Version)
Other
Canal and River Trust (PDF, 511 KB)
Late Submission for Deadline 9 accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 2 MB)
Late Submission for Deadline 9 accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 2 MB)
Late Submission for Deadline 9 accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 803 KB)
Late Submission for Deadline 9 accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 419 KB)
Late Submission for Deadline 9 accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 110 KB)
Covering Letter
Other
Eggborough Power Limited (PDF, 1 MB)
2.1 Draft Development Consent Order (DCO) - Rev. 7.0
Other
Eggborough Power Limited (PDF, 6 MB)
9.8 Section 106 Planning Agreement with Selby District Council and Yorkshire Wildlife Trust - Biodiversity enhancement - Rev. 3.0 (Final Version)
Other
Eggborough Power Limited (PDF, 234 KB)
7.9 Statement of Common Ground (SoCG) with National Grid Gas Plc (NGG) and National Grid Electricity Transmission Plc (NGET) - Rev. 3.0
Other
Eggborough Power Limited (PDF, 791 KB)
2.14 Draft DCO - Comparison to Deadline 8 Version
Other
Eggborough Power Limited (PDF, 404 KB)
Planning Performance Agreement with Selby District Council - Discharge of requirements - Rev. 1.0 (Final Version)
Other
Eggborough Power Limited (PDF, 269 KB)
1.2 Application Guide (Rev. 9.0)
Other
Eggborough Power Limited (PDF, 33 KB)
9.9 Compulsory Acquisition Update
Other
Eggborough Power Limited (PDF, 731 KB)
7.1 Statement of Common Ground (SoCG) with North Yorkshire County Council (NYCC) and Selby District Council (SDC) - Rev. 5.0
Other
Eggborough Power Limited (PDF, 999 KB)
9.13 Section 106 Planning Agreement with Selby District Council - Demolition of coal station - Rev. 2.0 (Final Version)
Other
Shakespeare Martineau on behalf of National Grid Plc (PDF, 823 KB)
Other
Eggborough Power Limited (PDF, 3 MB)
7.11 Statement of Common Ground (SoCG) with the Yorkshire Wildlife Trust
Other
Eggborough Power Limited (PDF, 110 KB)
Covering Letter
Other
Eggborough Power Limited (PDF, 490 KB)
1.2 Application Guide (Rev. 8.0)
Other
Eggborough Power Limited (PDF, 12 MB)
5.10 Indicative Landscape and Biodiversity Strategy (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 538 KB)
2.13 Explanatory Note on Changes to Draft DCO
Other
Eggborough Power Limited (PDF, 836 KB)
2.12 Draft DCO - Comparison against Deadline 6 Version
Other
Eggborough Power Limited (PDF, 1 MB)
2.1 Draft Development Consent Order (DCO) - Rev. 6.0
Other
Eggborough Power Limited (PDF, 1 MB)
7.10 Statement of Common Ground with the Marine Management Organisation (MMO) - Rev. 4.0
Other
Marine Management Organisation (MMO) (PDF, 202 KB)
Submission for Deadline 8
Other
Examining Authority's Draft Development Consent Order (DCO) issued on 19 February 2018 (PDF, 235 KB)
Examining Authority's Draft Development Consent Order (DCO) issued on 19 February 2018
Other
Eggborough Power Limited (PDF, 247 KB)
1.2 Application Guide (Rev. 7.0)
Other
Eggborough Power Limited (PDF, 561 KB)
7.1 Statement of Common Ground with North Yorkshire County Council (NYCC) and Selby District Council (SDC) - Rev. 4
Other
Eggborough Power Limited (PDF, 221 KB)
9.15 Comments on Report on Implications for European Sites (RIES)
Other
Eggborough Power Limited (PDF, 531 KB)
4.14 Indicative Deemed Marine Licence Coordinates Plans (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 1 MB)
7.10 Statement of Common Ground with the Marine Management Organisation (MMO) - Rev. 4.0
Other
Marine Management Organisation (MMO) (PDF, 215 KB)
Submission for Deadline 7
Other
Natural England (PDF, 3 MB)
Submission for Deadline 7
Other
Eggborough Power Limited (PDF, 252 KB)
7.11 Updated Draft Statement of Common Ground (SoCG) with the Yorkshire Wildlife Trust (Rev.3.0)
Other
Eggborough Power Limited (PDF, 488 KB)
1.2 Application Guide (Rev.6.0)
Other
Eggborough Power Limited (PDF, 869 KB)
2.10 Draft Development Consent Order (DCO) - Comparison to Deadline 5 Version
Other
Eggborough Power Limited (PDF, 299 KB)
2.11 Explanatory Note on Changes to Draft Development Consent Order (DCO)
Other
Eggborough Power Limited (PDF, 6 MB)
4.2 Updated Land Plans (Rev.3.0)
Other
Eggborough Power Limited (PDF, 346 KB)
Covering Letter
Other
Eggborough Power Limited (PDF, 1 MB)
2.1 Updated Draft Development Consent Order (DCO) - Rev. 5.0
Other
Wardhadaway on behalf of Canal and River Trust (PDF, 2 MB)
Submission for Deadline 6
Other
Report on the Implications for European Sites (RIES) (PDF, 494 KB)
Issued by the Examining Authority - 25 January 2018
Other
Request for Further Information - Rule 17 (PDF, 77 KB)
Other
Eggborough Power Limited (PDF, 172 KB)
Deadline 5 Submission - 9.14 Correction to Applicant’s Response to Deadline 3 Submissions
Other
Eggborough Power Limited (PDF, 959 KB)
Deadline 5 Submission - 9.13 Draft Section 106 Planning Agreement with Selby District Council – Demolition of the existing coal-fired power station
Other
Eggborough Power Limited (PDF, 7 MB)
Deadline 5 Submission - Cover Email
Other
Eggborough Power Limited (PDF, 1 MB)
Deadline 5 Submission - 2.1 Updated Draft DCO (Rev. 4.0)
Other
Eggborough Power Limited (PDF, 267 KB)
Deadline 5 Submission - 1.2 Application Guide (Rev. 5.0)
Other
Eggborough Power Limited (PDF, 346 KB)
Deadline 5 Submission - 9.11 Applicant’s Responses to the Examining Authority’s (‘ExA’s’) Further Written Questions
Other
Eggborough Power Limited (PDF, 3 MB)
Deadline 5 Submission - 9.12 Response to the ExA’s Request for Further Information on Habitats Regulations Assessment (including Appendix 1)
Other
Eggborough Power Limited (PDF, 864 KB)
Deadline 5 Submission - 2.8 Draft DCO – Comparison to Deadline 3 Version
Other
Eggborough Power Limited (PDF, 326 KB)
Deadline 5 Submission - 2.9 Explanatory Note on Changes to Draft DCO
Other
North Yorkshire County Council (PDF, 107 KB)
Deadline 5 Submission - Letter to PINS
Other
North Yorkshire County Council and Selby District Council (PDF, 295 KB)
Deadline 5 Submission - Response to ExA Written Questions
Other
The Environment Agency (PDF, 39 KB)
Deadline 5 Submission - Response to ExA Written Questions
Other
Eggborough Power Limited (PDF, 321 KB)
Deadline 4 Submission - 9.10 Applicant’s Response to Deadline 3 Submissions (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 5 MB)
Deadline 4 Submission - Covering Email
Other
Eggborough Power Limited (PDF, 33 KB)
Deadline 4 Submission - 9.9 Compulsory Acquisition Update (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 1,009 KB)
Deadline 4 Submission - 7.10 Statement of Common Ground with the Marine Management Organisation (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 3 MB)
Deadline 4 Submission - 9.8 Draft Section 106 Agreement with Selby District Council and the Yorkshire Wildlife Trust (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 262 KB)
Deadline 4 Submission - 1.2 Application Guide (Rev. 4.0)
Other
Eggborough Power Limited (PDF, 351 KB)
Deadline 4 Submission - 7.9 Statement of Common Ground with National Grid Gas Plc & National Grid Electricity Transmission Plc (Rev. 2.0)
Other
Marine Management Organisation (PDF, 217 KB)
Submission for Deadline 4 and 5
Other
North Yorkshire County Council (PDF, 61 KB)
Deadline 4 Submission
Other
Further Written Questions (PDF, 92 KB)
Further Written Questions
Other
Hensall Parish Council (PDF, 15 KB)
Late Deadline 3 Submission - Accepted at the discretion of the Examining Authority
Other
Rule 8(3) and Rule 17 Letter (PDF, 143 KB)
Other
Canal and River Trust (PDF, 640 KB)
Deadline 3 Submission - Code of Practice Part 1
Other
Canal and River Trust (PDF, 819 KB)
Deadline 3 Submission - Code of Practice Part 2
Other
Canal and River Trust (PDF, 913 KB)
Deadline 3 Submission - Covering Letter
Other
Canal and River Trust (PDF, 47 KB)
Deadline 3 Submission - Protective Provisions
Other
Canal and River Trust (PDF, 817 KB)
Deadline 3 Submission - Code of Practice Part 3
Other
Eggborough Power Limited (PDF, 861 KB)
Deadline 3 Submission - 2.6 Draft DCO Comparison to Deadline 2 Version (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 49 KB)
Deadline 3 Submission - 9.6 Appendix 1
Other
Eggborough Power Limited (PDF, 263 KB)
Deadline 3 Submission - 1.2 Application Guide (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 6 MB)
Deadline 3 Submission - 9.7 Demolition of the Existing Coal-Fired Power Station, including Appendices 1 and 2
Other
Eggborough Power Limited (PDF, 314 KB)
Deadline 3 Submission - 9.5 Written Summary of Applicant’s Oral Case put at the Issue Specific Hearing on the Draft DCO held on 23 November 2017
Other
Eggborough Power Limited (PDF, 1 MB)
Deadline 3 Submission - 2.1 Updated Draft DCO (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 331 KB)
Deadline 3 Submission - 9.8 Draft Section 106 Agreement with Selby District Council and the Yorkshire Wildlife Trust
Other
Eggborough Power Limited (PDF, 470 KB)
Deadline 3 Submission - 9.4 Written Summary of Applicant’s Oral Case put at the Issue Specific Hearing on Environmental Matters held on 22 November 2017
Other
Eggborough Power Limited (PDF, 1 MB)
Deadline 3 Submission - 7.3 Statement of Common Ground with the Environment Agency (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 529 KB)
Deadline 3 Submission - 9.3 Applicant’s Comments on the Local Impact report, Written Representations and Responses to the ExA’s First Written Questions
Other
Eggborough Power Limited (PDF, 11 MB)
Deadline 3 Submission - Covering Email
Other
Eggborough Power Limited (PDF, 479 KB)
Deadline 3 Submission - 7.1 Updated Draft Statement of Common Ground with North Yorkshire County Council and Selby District Council (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 245 KB)
Deadline 3 Submission - 9.6 Written Summary of Applicant’s Oral Case put at the Issue Specific Hearing on Compulsory Acquisition on 23 November 2017
Other
Eggborough Power Limited (PDF, 307 KB)
Deadline 3 Submission - 2.7 Explanatory Note on Changes to Draft DCO (Deadline 3) (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 341 KB)
Deadline 3 Submission - 7.11 Updated Draft Statement of Common Ground with the Yorkshire Wildlife Trust (Rev. 2.0)
Other
Marine Management Organisation (PDF, 214 KB)
Deadline 3 Submission - MMO Response to Deadline 3
Other
National Grid (PDF, 1 MB)
Deadline 3 Submission - Letter from National Grid
Other
North Yorkshire County Council and Selby District Council (PDF, 54 KB)
Deadline 3 Submission - Letter to ExA
Other
Yorkshire Wildlife Trust (PDF, 2 MB)
Deadline 3 Submission - Wet Woodland Creation Map Lower Aire
Other
Yorkshire Wildlife Trust (PDF, 2 MB)
Deadline 3 Submission - Working with Natural Processes- Using the Evidence Base
Other
Yorkshire Wildlife Trust (PDF, 371 KB)
Deadline 3 Submission - Project Summary - Working with Natural Processes
Other
Yorkshire Wildlife Trust (PDF, 4 MB)
Deadline 3 Submission - Response to ExA's Written Questions
Other
Action Points from Issue Specific Hearing on Environmental Matters (PDF, 52 KB)
22 November 2017
Other
Recording of Compulsory Acquisition Hearing (PDF, 31 KB)
23 November 2017
Other
Recording of Issue Specific Hearing on Environmental Matters - Part 1 (PDF, 31 KB)
22 November 2017
Other
Recording of Issue Specific Hearing on Environmental Matters - Part 2 (PDF, 31 KB)
22 November 2017
Other
Recording of Issue Specific Hearing on Environmental Matters - Part 3 (PDF, 31 KB)
22 November 2017
Other
Recording of Issue Specific Hearing on the draft DCO (PDF, 31 KB)
23 November 2017
Other
Response to Mr R Tams to a request to be an interested party (PDF, 126 KB)
3 October 2017
Other
Accompanied Site Inspection Itinerary (PDF, 51 KB)
21 November 2017
Other
Agenda for Issue Specific Hearings and Compulsory Acquisition Hearing (PDF, 50 KB)
Hearings on 22 and 23 November 2017
Other
Eggborough Power Limited (PDF, 5 MB)
Accompanied Site Inspection Route
Other
Hensall Parish Council (PDF, 17 KB)
Deadline 2 Submission
Other
Canal and River Trust (PDF, 667 KB)
Deadline 2 Submission - Written Representation and Response to ExA's Written Questions
Other
Eggborough Power Limited (PDF, 1 MB)
Deadline 2 Submission - 9.2 Comments on Relevant Representations, including Appendix 1
Other
Eggborough Power Limited (PDF, 9 MB)
Deadline 2 Submission - 9.1 Appendix 14 Part 2 of 2
Other
Eggborough Power Limited (PDF, 136 KB)
Deadline 2 Submission - 9.1 Appendix 9
Other
Eggborough Power Limited (PDF, 874 KB)
Deadline 2 Submission - 2.4 – Draft DCO – Comparison to Submission Version (May 2017) (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 217 KB)
Deadline 2 Submission - 2.5 Explanatory Note on Changes to Draft DCO (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 272 KB)
Deadline 2 Submission - 9.1 Appendix 10
Other
Eggborough Power Limited (PDF, 5 MB)
Deadline 2 Submission - 9.1 Appendix 2
Other
Eggborough Power Limited (PDF, 643 KB)
Deadline 2 Submission - 9.1 Appendix 7
Other
Eggborough Power Limited (PDF, 202 KB)
Deadline 2 Submission - 9.1 Appendix 5
Other
Eggborough Power Limited (PDF, 1 MB)
Deadline 2 Submission - 9.1 Applicant’s Responses to the Examining Authority’s First Written Questions
Other
Eggborough Power Limited (PDF, 179 KB)
Deadline 2 Submission - 9.1 Appendix 6
Other
Eggborough Power Limited (PDF, 2 MB)
Deadline 2 Submission - 9.1 Appendix 11
Other
Eggborough Power Limited (PDF, 2 MB)
Deadline 2 Submission - 2.1 Updated Draft DCO (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 433 KB)
Deadline 2 Submission - 7.5 Statement of Common Ground with The Coal Authority (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 253 KB)
Deadline 2 Submission - 1.2 Application Guide (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 33 KB)
Deadline 2 Submission - 3.1 Book of Reference (Parts 1-5) (Track Change Version) (Rev. 3.0)
Other
Eggborough Power Limited (PDF, 912 KB)
Deadline 2 Submission - 9.1 Appendix 12
Other
Eggborough Power Limited (PDF, 2 MB)
Deadline 2 Submission - 4.3 Crown Land Plan (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 84 KB)
Deadline 2 Submission - Covering Email
Other
Eggborough Power Limited (PDF, 193 KB)
Deadline 2 Submission - 9.1 Appendix 1
Other
Eggborough Power Limited (PDF, 358 KB)
Deadline 2 Submission - 4.14 Deemed Marine Licence Coordinates Plan (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 86 KB)
Deadline 2 Submission - 9.1 Appendix 8
Other
Eggborough Power Limited (PDF, 256 KB)
Deadline 2 Submission - 5.4 Other Consents and Licences (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 505 KB)
Deadline 2 Submission - 7.1 Draft Statement of Common Ground with North Yorkshire County Council and Selby District Council (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 263 KB)
Deadline 2 Submission - 7.11 Draft Statement of Common Ground with the Yorkshire Wildlife Trust (Rev. 1.0)
Other
Eggborough Power Limited (PDF, 9 MB)
Deadline 2 Submission - 9.1 Appendix 14 Part 1 of 2
Other
Eggborough Power Limited (PDF, 768 KB)
Deadline 2 Submission - 9.1 Appendix 3
Other
Eggborough Power Limited (PDF, 11 MB)
Deadline 2 Submission - 4.2 Land Plans (Key Plan and Sheets 1-4) (Rev. 2.0)
Other
Eggborough Power Limited (PDF, 250 KB)
Deadline 2 Submission - 9.1 Appendix 13
Other
Eggborough Power Limited (PDF, 206 KB)
Deadline 2 Submission - 9.1 Appendix 4
Other
Environment Agency (PDF, 302 KB)
Deadline 2 Submission - Written Representation and Response to ExA's Written Questions
Other
National Grid Plc (PDF, 26 KB)
Deadline 2 Submission - Response to ExA's Written Questions
Other
National Grid Plc (PDF, 1,023 KB)
Deadline 2 Submission - Written Representation
Other
North Yorkshire County Council and Selby District Council (PDF, 521 KB)
Deadline 2 Submission - Joint Local Impact Report
Other
North Yorkshire County Council and Selby District Council (PDF, 376 KB)
Deadline 2 Submission - Joint Response to ExA's Written Questions
Other
North Yorkshire County Council and Selby District Council (PDF, 44 KB)
Deadline 2 Submission - Cover letter
Other
North Yorkshire County Council and Selby District Council (PDF, 205 KB)
Deadline 2 Submission - Joint Written Representation
Other
The Marine Management Organisation (MMO) (PDF, 344 KB)
Deadline 2 Submission
Other
Yorkshire Wildlife Trust (PDF, 537 KB)
Deadline 2 Submission - Response to ExA's Written Questions
Other
Notification of Hearing and Accompanied Site Inspection for November 2017 (PDF, 162 KB)
Other
North Yorkshire County Council and Selby District Council (PDF, 186 KB)
Response to letter of 11 October received from the Applicant. Late Submission for Deadline 1 accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 1 MB)
7.10 Statement of Common Ground between Eggborough Power Limited and the Marine Management Organisation (MMO) (Revision 2.0)
Other
Eggborough Power Limited (PDF, 310 KB)
7.7 Statement of Common Ground between Eggborough Power Limited and Natural England (Revision 1.0)
Other
Eggborough Power Limited (PDF, 337 KB)
7.6 Statement of Common Ground between Eggborough Power Limited and Canal and River Trust (Revision 2.0)
Other
Eggborough Power Limited (PDF, 583 KB)
7.8 Statement of Common Ground between Eggborough Power Limited and The Civil Aviation Authority (Revision 2.0)
Other
Eggborough Power Limited (PDF, 418 KB)
7.5 Statement of Common Ground between Eggborough Power Limited and The Coal Authority (Revision 3.0)
Other
Eggborough Power Limited (PDF, 442 KB)
7.3 Statement of Common Ground between Eggborough Power Limited and Environment Agency (Revision 2.0)
Other
Eggborough Power Limited (PDF, 112 KB)
Covering Letter for Deadline 1 Submissions
Other
Eggborough Power Limited (PDF, 483 KB)
7.4 Statement of Common Ground between Eggborough Power Limited and Historic England (Revision 4.0)
Other
Eggborough Power Limited (PDF, 252 KB)
7.9 Statement of Common Ground between Eggborough Power Limited and National Grid Gas PLC (NGG) and National Grid Electricity Transmission Plc (NGET) (Revision 2.0)
Other
Eggborough Power Limited (PDF, 3 MB)
7.2 Statement of Common Ground between Eggborough Power Limited and Highways England (Revision 3.0 )
Other
Hensall Parish Council (PDF, 224 KB)
Notification of wish to be considered as an Interested Party
Other
Martineau on behalf of National Grid Plc (PDF, 1 MB)
Response to Rule 8 letter
Other
Response to Mr R Tams to a request to be an interested party (PDF, 86 KB)
9 October 2017
Other
The Marine Management Organisation (MMO) (PDF, 196 KB)
Submission for Deadline 1
Other
Note of Unaccompanied Site Inspection - 26 September 2017 (PDF, 60 KB)
Other
Preliminary Meeting Note (PDF, 61 KB)
Other
Recording of Preliminary Meeting (PDF, 31 KB)
Other
Rule 8 Letter (PDF, 166 KB)
Other
Written Questions (PDF, 267 KB)
Other
Examination Library (PDF, 469 KB)
Other
Eggborough Power Limited (PDF, 335 KB)
Additional Submission - Comments on draft Examination Timetable accepted at the discretion of the Examining Authority
Other
Eggborough Power Limited (PDF, 33 KB)
Additional Submission - 3.1 Updated Book of Reference version 2. Accepted at the discretion of the Examining Authority
Other
Joint Nature Conservation Committee (PDF, 356 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Northern Gas Networks (PDF, 2 MB)
Additional Submission - Accepted at the discretion of the Examining Authority