Drax Re-power

You can filter the results to show only the items that match your interest.

Date

SourceDescription
Other
Size: 316 KB
National Grid
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Size: 886 KB
Biofuelwatch
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Size: 75 KB
Notification of Completion of the Examining Authority's Examination
Other
Size: 1 MB
Drax Power Limited
Additional Submission - 1.2 Application Guide (Final Submission) (Revision 014) - Accepted at the discretion of the Examining Authority
Other
Size: 3 MB
Drax Power Limited
Additional Submission - 8.5.26 Statement signed by Applicant and landowner with respect to planting on the Bingley Land - Accepted at the discretion of the Examining Authority
Other
Size: 976 KB
Drax Power Limited
Additional Submission - 8.2.10 Schedule of Changes (Final Submission) (Revision 001) - Accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Drax Power Limited
Additional Submission - 8.5.4 Schedule of Negotiations (Final Submission) (Revision 003) - Accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Drax Power Limited
Additional Submission - 8.1.4 Statement of Common Ground with North Yorkshire County Council and Selby District Council (Revision 004) - Accepted at the discretion of the Examining Authority
Other
Size: 3 MB
Drax Power Limited
Additional Submission - Legal agreement pursuant to section 106 of the Town and Country Planning Act 1990 between the Applicant, Selby District Council and North Yorkshire County Council (Final Submission) (Revision 001) - Accepted at the discretion of the Examining Authority
Other
Size: 582 KB
Client Earth
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Size: 116 KB
Drax Power Limited
Additional Submission - End of Examination Cover Letter - Accepted at the discretion of the Examining Authority
Other
Size: 549 KB
Examination Library
Other
Size: 79 KB
National Grid
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Size: 15 MB
I.D Watson Farmers
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Size: 170 KB
Julian May
Deadline 9 Submission
Other
N/A
Drax Power Limited
Deadline 9 Submission - 9.6 Draft Development Consent Order – Proposed Scheme compared with Unit X (Revision 1)
Other
N/A
Drax Power Limited
Deadline 9 Submission - 9.5 Land Plans for the Rule 17 Letter (Revision 01)
Other
Size: 661 KB
Drax Power Limited
Deadline 9 Submission - DCO Validation - Drax Development Consent Order PINS submission version - Deadline 9 March 2019
Other
Size: 830 KB
Client Earth
Deadline 9 Submission - Response to further information requested by the Examining Authority
Other
Size: 638 KB
Drax Power Limited
Deadline 9 Submission - DCO Validation - Drax Development Consent Order PINS submission version relating to UNIT X ONLY - Deadline 9 March 2019
Other
Size: 77 KB
Natural England
Deadline 9 Submission
Other
N/A
Drax Power Limited
Deadline 9 Submission - 8.5.23 Note to Confirm Compliance with the Revised National Planning Policy Framework (2018 and 2019)
Other
N/A
Drax Power Limited
Deadline 9 Submission - 9.2 Applicant’s Response to Request for Further Information (Rule 17 Letter) (Revision 001)
Other
N/A
Drax Power Limited
Deadline 9 Submission - 8.2.9 Schedule of Changes for Deadline 9 (Revision 001)
Other
Size: 99 KB
Drax Power Limited
Deadline 9 Submission - 9.1 Drax Re-power Rule 17 Cover Letter
Other
N/A
Drax Power Limited
Deadline 9 Submission - 9.3 Development Consent Order relating to Unit X only (Revision 1)
Other
N/A
Drax Power Limited
Deadline 9 Submission - 8.4.12 Applicant’s Response to North Yorkshire County Council’s and Selby District Council’s Position on Landscaping (Revision 002)
Other
N/A
Drax Power Limited
Deadline 9 Submission - 9.4 Book of Reference for the Rule 17 Letter (Revision 001)
Other
N/A
Drax Power Limited
Deadline 9 Submission - 8.5.24 Closing Submissions (Revision 001)
Other
N/A
Drax Power Limited
Deadline 9 Submission - 8.1.6 Statement of Common Ground between Drax Power Limited and Highways England (Final) (Revision 004)
Other
Size: 58 KB
Drax Power Limited
Deadline 9 Submission - Cover Email
Other
N/A
Drax Power Limited
Deadline 9 Submission - 3.2 Explanatory Memorandum (Revision 3)
Other
N/A
Drax Power Limited
Deadline 9 Submission - 6.2.9.10 Environmental Statement – Volume 2 – Appendix 9.10 Biodiversity Net Gain Assessment (Revision 004)
Other
N/A
Drax Power Limited
Deadline 9 Submission - 6.7 Outline Landscape and Biodiversity Strategy (Revision 005)
Other
N/A
Drax Power Limited
Deadline 9 Submission - 3.1 Draft Development Consent Order Red Line Changes Between Deadline 7 Version and Deadline 9 Version (Revision 6)
Other
N/A
Drax Power Limited
Deadline 9 Submission - 3.1 Draft Development Consent Order (Clean) (Revision 6)
Other
N/A
Drax Power Limited
Deadline 9 Submission - 8.1.5 Statement of Common Ground between Drax Power Limited and the Environment Agency (Final) (Revision 004)
Other
Size: 108 KB
Drax Power Limited
Deadline 9 Submission - Cover Letter
Other
N/A
Drax Power Limited
Deadline 9 Submission - 1.2 Application Guide (Revision 013)
Other
Size: 8 MB
North Yorkshire County Council
Deadline 8 Submission - Response to further information requested by the ExA
Other
Size: 1 MB
Drax Power Limited
Deadline 8 Submission - Response to ClientEarth Letter dated 20 February 2019
Other
Size: 54 KB
Selby District Council
Deadline 8 Submission - Response to Further information requested by the ExA
Other
N/A
Drax Power Limited
Deadline 8 Submission - 8.4.12 Applicant’s Response to North Yorkshire County Council’s and Selby District Council’s Position on Landscaping (Revision 001)
Other
N/A
Drax Power Limited
Deadline 8 Submission - 8.5.4 Schedule of Negotiations (Revision 002)
Other
N/A
Drax Power Limited
Deadline 8 Submission - 8.1.5 Statement of Common Ground between Drax Power Limited and the Environment Agency (Updated draft) (Revision 003)
Other
N/A
Drax Power Limited
Deadline 8 Submission - 8.2.8 Schedule of Changes (Revision 001)
Other
N/A
Drax Power Limited
Deadline 8 Submission - 1.2 Application Guide (Revision 012)
Other
N/A
Drax Power Limited
Deadline 8 Submission - 4.4 Compulsory Acquisition Schedule (Revision 006)
Other
N/A
Drax Power Limited
Deadline 8 Submission - 4.3 Book of Reference (Tracked Changes) (Revision 007)
Other
N/A
Drax Power Limited
Deadline 8 Submission - 8.1.6 Statement of Common Ground between Drax Power Limited and Highways England (Updated draft) (Revision 003)
Other
N/A
Drax Power Limited
Deadline 8 Submission - 8.5.22 Applicant's Response to the Examining Authority's Proposed Schedule of Changes to the Draft Development Consent Order (Revision 001)
Other
N/A
Drax Power Limited
Deadline 8 Submission - 6.5 Outline Construction Environmental Management Plan (Revision 005)
Other
N/A
Drax Power Limited
Deadline 8 Submission - 4.3 Book of Reference (Clean) (Revision 007)
Other
N/A
Drax Power Limited
Deadline 8 Submission - 8.1.7 Statement of Common Ground between Drax Power Limited and Yorkshire Wildlife Trust (Final) (Revision 003)
Other
Size: 110 KB
Drax Power Limited
Deadline 8 Submission - Cover Letter
Other
Size: 99 KB
Request for Further Information - Rule 17
Other
N/A
Drax Power Limited
Deadline 7 Submission - Late Submission - Applicant's Response to ClientEarth's Deadline 6 Submission - Accepted at the Discretion of the Examining Authority (Revision 001)
Other
Size: 348 KB
Report on the Implications for European Sites (RIES)
Issued by the Examining Authority - 28 February 2019
Other
Size: 117 KB
Notification of Procedural Decision
The Examining Authority's schedule of changes to the draft Development Consent Order
Other
N/A
Drax Power Limited
Deadline 7 Submission - 8.1.7 Statement of Common Ground between Drax Power Limited and Yorkshire Wildlife Trust (second draft) (Revision 002)
Other
Size: 119 KB
Drax Power Limited
Deadline 7 Submission - Cover Letter
Other
N/A
Drax Power Limited
Deadline 7 Submission - 8.5.20 Written Summary of Drax Power Limited's (The Applicant") Oral Case put at the Issue Specific Hearing - 12 February 2019 (Revision 001)
Other
Size: 745 KB
North Yorkshire County Council & Selby District Council
Deadline 7 Submission - Response to Deadline 6 Submissions
Other
N/A
Drax Power Limited
Deadline 7 Submission - 8.4.6 Outline Public Rights of Way Management Plan (Revision 003)
Other
N/A
Drax Power Limited
Deadline 7 Submission - 8.2.7 Schedule of Changes for Deadline 7 (Revision 001)
Other
N/A
Drax Power Limited
Deadline 7 Submission - 1.2 Application Guide (Revision 011)
Other
N/A
Drax Power Limited
Deadline 7 Submission - 8.5.19 Written Summary of Drax Power Limited's ("The Applicant") Oral Case put at the Compulsory Acquisition Hearing - 12 February 2019 (Revision 001)
Other
N/A
Drax Power Limited
Deadline 7 Submission - 8.1.4 Statement of Common Ground between Drax Power Limited and North Yorkshire County Council and Selby District Council (third draft) (Revision 003)
Other
Size: 502 KB
Client Earth
Deadline 7 Submission - Letter to the Examining Authority regarding the Applicant’s post-hearing submission in respect of Issue Specific Hearing 1
Other
N/A
Drax Power Limited
Deadline 7 Submission - 8.1.5 Statement of Common Ground between Drax Power Limited and the Environment Agency (second draft) (Revision 002)
Other
N/A
Drax Power Limited
Deadline 7 Submission - 6.7 Outline Landscape and Biodiversity Strategy (Revision 004)
Other
N/A
Drax Power Limited
Deadline 7 Submission - 6.4 Environmental Statement Commitments Register (Revision 003)
Other
N/A
Drax Power Limited
Deadline 7 Submission - 3.1 Draft Development Consent Order Red Line of Changes Between D5 Version and D7 Version (Track Changes) (Revision 5)
Other
N/A
Drax Power Limited
Deadline 7 Submission - 5.7 Carbon Capture Readiness Statement (Revision 003)
Other
N/A
Drax Power Limited
Deadline 7 Submission - 3.1 Draft Development Consent Order (Clean) (Revision 5)
Other
N/A
Drax Power Limited
Deadline 7 Submission - 8.1.6 Statement of Common Ground between Drax Power Limited and Highways England (second draft) (Revision 002)
Other
Size: 49 KB
Action Points from Issue Specific Hearing 3 (ISH3)
Other
audio recording
Size: 40 MB
Recording of Issue Specific Hearing 3 (ISH3) - Session 2 - 12 February 2019
Other
audio recording
Size: 266 MB
Recording of Issue Specific Hearing 3 (ISH3) - Session 1 - 12 February 2019
Other
audio recording
Size: 51 MB
Recording of Compulsory Acquisition Hearing 2 (CAH2) - 12 February 2019
Other
audio recording
Size: 21 MB
Recording of Open Floor Hearing 3 (OFH3) - 12 February 2019
Other
Size: 78 KB
Natural England
Deadline 6 Submission - Late Submission - Response to Examining Authority's Further Written Questions - Accepted at the discretion of the Examining Authority
Other
Size: 357 KB
National Grid
Deadline 6 Submission - Late submission accepted at the discretion of the Examining Authority - Updated on 08 February 2019
Other
Size: 222 KB
National Grid
Deadline 6 Submission - Response to Examining Authority's Further Written Question ANC 2.3
Other
Size: 242 KB
Environment Agency
Deadline 6 Submission - Response to the Examining Authority's Further Written Questions
Other
Size: 520 KB
North York County Council and Selby District Council
Deadline 6 Submission - Response to Examining Authority's Further Written Questions
Other
Size: 696 KB
Client Earth
Deadline 6 Submission - Response to Examining Authority's Further Written Question ANC 2.5 and the Applicant's Deadline 5 submission
Other
Size: 212 KB
North Yorkshire Fire and Rescue Service
Deadline 6 Submission - Response to Drax Power Ltd for an Order Granting Development Consent
Other
N/A
Drax Power Limited
Deadline 6 Submission - 8.4.1 Revised Viewpoint Additional Photomontage (Revision 004)
Other
Size: 2 MB
Pinsent Masons on behalf of Drax Power Ltd
Deadline 6 Submission - Response to ClientEarth Letter Dated 9 January 2019
Other
Size: 40 KB
Agenda for Isuue Specific Hearing 2 (ISH2)
Other
N/A
Drax Power Limited
Deadline 6 Submission - 8.5.17 Applicant's Responses to Examining Authority's Further Written Questions (Revision 001)
Other
N/A
Drax Power Limited
Deadline 6 Submission - 8.5.18 Applicant's Response to Deadline 5 Submission by Julian May (Revision 001)
Other
N/A
Drax Power Limited
Deadline 6 Submission - 8.4.11 Applicant's Response to Off-Site Mitigation Strategy (Revision 001)
Other
Size: 686 KB
Drax Power Limited
Deadline 6 Submission - Cover Letter
Other
Size: 415 KB
North Yorkshire County Council
Deadline 6 Submission - Late Submission - Local Authority Response - Accepted at the discretion of the Examining Authority
Other
Size: 399 KB
Drax Power Limited
Deadline 6 Submission - 6.6 Habitats Regulations Assessment Report Appendix 1
Other
Size: 317 KB
Drax Power Limited
Deadline 6 Submission - 6.6 Habitats Regulations Assessment Report Appendix 2
Other
N/A
Drax Power Limited
Deadline 6 Submission - 6.6 Habitats Regulations Assessment Report (Revision 003)
Other
N/A
Drax Power Limited
Deadline 6 Submission - 6.5 Outline Construction Environmental Management Plan (Revision 004)
Other
N/A
Drax Power Limited
Deadline 6 Submission - 6.1.3 Site and Project Description (Revision 002)
Other
N/A
Drax Power Limited
Deadline 6 Submission - 1.2 Application Guide (Revision 010)
Other
N/A
Drax Power Limited
Deadline 6 Submission - 6.2.9.10 Appendix 9.10 - Biodiversity Net Gain Assessment (Revision 003)
Other
N/A
Drax Power Limited
Deadline 6 Submission - 6.7 Outline Landscape and Biodiversity Strategy (Revision 003)
Other
N/A
Drax Power Limited
Deadline 6 Submission - 8.2.6 Schedule of Changes (Revision 001)
Other
Size: 708 KB
North Yorkshire County Council
Deadline 4 Submission - Cover Email
Other
Size: 91 KB
Other
Size: 115 KB
Further Written Questions
Other
Size: 122 KB
Rule 13 - Notification of Hearings
Other
Size: 767 KB
Client Earth
Deadline 5 Submission - Comments on any additional information received by Deadline 4
Other
Size: 47 KB
Drax Power Limited
Deadline 5 Submission - Cover Email
Other
Size: 204 KB
Client Earth
Deadline 5 Submission - Comments on any additional information received by Deadline 4
Other
Size: 28 KB
Julian May
Deadline 5 Submission - Comments on any additional information received by Deadline 4
Other
N/A
Drax Power Limited
Deadline 5 Submission - 8.5.16 Note on Substantial Weight to be Given to Need and Application of Tests Under S104 (Revision 001)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 4.3 Book of Reference (Clean) (Revision 006)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 8.4.10 Air Quality Technical Note in Relation to Changes in Stack Height (Revision 001)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 8.5.15 Applicant's Response to Other Parties' Submissions at Deadline 4 (Revision 001)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 8.4.6 Outline Public Rights of Way Management Plan (Revision 002)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 8.4.1 Revised Viewpoints and Additional Photomontage (Revision 003)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 3.2 Explanatory Memorandum (Revision 2)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 8.2.5 Schedule of Changes (Revision 001)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 4.4 Compulsory Acquisition Schedule (Revision 005)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 4.3 Book of Reference (Track Changes) (Revision 006)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 2.5B Single Unit Option Indicative Plant Layout (Revision 05)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 2.6A Indicative Plant Elevations (Revision 03)
Other
Size: 611 KB
Drax Power Limited
Deadline 5 Submission - Cover Letter
Other
N/A
Drax Power Limited
Deadline 5 Submission - 2.2 Land Plans (Revision 03)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 3.1 Draft Development Consent Order Red Line of Changes Between Deadline 3 Version and Deadline 5 Version (Track Changes) (Revision 4)
Other
Size: 1 MB
Drax Power Limited
Deadline 5 Submission - 3.1 Development Consent Order - PINS submission version
Other
N/A
Drax Power Limited
Deadline 5 Submission - 2.5A Two Unit Option Indicative Plant Layout (Revision 05)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 2.6B Indicative Gas Receiving Facility and Gas Compressor Elevations (Revision 02)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 3.1 Development Consent Order (Clean) (Revision 4)
Other
N/A
Drax Power Limited
Deadline 5 Submission - 1.2 Application Guide (Revision 009)
Other
Size: 64 KB
North Yorkshire County Council
Deadline 4 Submission - Cover Email - Pre hearing information
Other
Size: 85 KB
Request for Further Information - Rule 17
Request for Further Information on the Proposed Changes to the Application
Other
Size: 29 KB
Cath Kibbler
Deadline 4 Submission - Accepted at the discretion of the Examining Authority
Other
Size: 44 KB
James Hewitt
Deadline 4 Submission - Accepted at the discretion of the Examining Authority
Other
N/A
Drax Power Limited
Deadline 4 Submission - 8.1.7 Statement of Common Ground with Yorkshire Wildlife Trust (Revision 001)
Other
Size: 23 KB
Friends of the Earth Selby
Deadline 4 Submission - Oral representation and comments on Drax's response
Other
Size: 1,007 KB
North Yorkshire County Council
Deadline 4 Submission - Local Authorities Draft DCO - The Authorities amendments
Other
N/A
Drax Power Limited
Deadline 4 Submission - 8.2.4 Schedule of Changes (Revision 001)
Other
Size: 275 KB
North Yorkshire County Council
Deadline 4 Submission - Letter from NYCC to Drax officers referred to in point 25, Appendix 1, Statement of Common Ground
Other
N/A
Drax Power Limited
Deadline 4 Submission - 8.5.13 Written Summary of Applicants Oral Case at Issue Specific Hearing (DCO) (Revision 001)
Other
N/A
Drax Power Limited
Deadline 4 Submission - 8.5.14 Written Summary of Applicants Oral Case at Compulsory Acquisition Hearing (Revision 001)
Other
N/A
Drax Power Limited
Deadline 4 Submission - 6.5 Outline Construction Environmental Management Plan (Revision 002)
Other
N/A
Drax Power Limited
Deadline 4 Submission - 2.4 Access and Rights of Way Plans (Revision 01)
Other
Size: 737 KB
Client Earth
Deadline 4 Submission - Post-Hearing Submission and Response to Deadline 3 Submissions
Other
Size: 263 KB
North Yorkshire County Council
Deadline 4 Submission - Letter from NYCC to Drax officers referred to in point 9, Appendix 1, Statement of Common Ground
Other
Size: 513 KB
Drax Power Limited
Deadline 4 Submission - Cover Letter
Other
N/A
Drax Power Limited
Deadline 4 Submission - 8.5.12 Written Summary of Applicants Oral Case at Issue Specific Hearing (Environmental Matters) (Revision 001)
Other
N/A
Drax Power Limited
Deadline 4 Submission - 2.3A Works Plans (Revision 04)
Other
N/A
Drax Power Limited
Deadline 4 Submission - 8.1.4 Statement of Common Ground with North Yorkshire County Council and Selby County Council (Revision 002)
Other
N/A
Drax Power Limited
Deadline 4 Submission - 6.2.5.1 Appendix 5.1 - Outline Construction Worker Travel Plan (Revision 003)
Other
N/A
Martin Woolley Landscape Architects on behalf of North Yorkshire County Council and Selby District Council
Deadline 4 Submission - Draft mitigation strategy
Other
N/A
Drax Power Limited
Deadline 4 Submission - 1.2 Application guide (Revision 008)
Other
N/A
Drax Power Limited
Deadline 4 Submission - 8.1.5 Statement of Common Ground with Environment Agency (Revision 001)
Other
N/A
Drax Power Limited
Deadline 4 Submission - 6.2.5.2 Appendix 5.2 - Outline Construction Traffic Management Plan (Revision 003)
Other
Size: 48 KB
WSP on behalf of Drax Power Limited
Deadline 4 Submission - Covering Email
Other
Other
audio recording
Size: 143 MB
Recording of Issue Specific Hearing 1 (ISH1) AM Session Part 1 - 05 December 2018
Other
audio recording
Size: 71 MB
Recording of Compulsory Acquisition Hearing 1 (CAH1) - 06 December 2018
Other
audio recording
Size: 149 MB
Recording of Issue Specific Hearing 1 (ISH1) PM Session Part 2 - 05 December 2018
Other
audio recording
Size: 47 MB
Recording of Open Floor Hearing 2 (OFH2) - 04 December 2018
Other
audio recording
Size: 74 MB
Recording of Issue Specific Hearing 1 (ISH1) PM Session Part 1 - 05 December 2018
Other
audio recording
Size: 89 MB
Recording of Issue Specific Hearing 2 (ISH2) - 06 December 2018
Other
audio recording
Size: 130 MB
Recording of Issue Specific Hearing 1 (ISH1) AM Session Part 2 - 05 December 2018
Other
Size: 46 KB
Proposed provisions checklist
Other
Size: 75 KB
Procedural decision regarding Drax Power Limited’s additional land application
Other
Size: 67 KB
North Yorkshire County Council
Email from North Yorkshire County Council – Additional Submission - Accepted at the discretion of the Examining Authority
Other
Size: 115 KB
Notification of Procedural Decision
Other
Size: 140 KB
Application for Additional Land - Rule 17
Other
Size: 118 KB
Agenda for Open Floor Hearing 2
Open Floor Hearing 2 Agenda
Other
Size: 156 KB
Agenda For Issue Specific Hearing and Compulsory Acquisition Hearing
Issue Specific Hearing and Compulsory Acquisition Hearing Agenda
Other
N/A
Drax Power Limited
Deadline 3 Submission - 4.1 Statement of Reasons (Revision 002)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 4.3 Book of Reference - Clean (Revision 005)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 4.3 Book of Reference - Track Changes (Revision 005)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 2.5A Two Unit Option Indicative Plant Layout (Revision 04)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 3.1 Draft Development Consent Order Red Line of Changes Between Rev 2 and Rev 3
Other
N/A
Drax Power Limited
Deadline 3 Submission - 3.1 Draft Development Consent Order Clean (Revision 3)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 3.2 Explanatory Memorandum (Revision 1)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 2.6A Indicative Plant Elevations (Revision 02)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 2.5B Single Unit Option Indicative Plant Layout (Revision 04)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 5.7 Carbon Capture Readiness Statement (Revision 002)
Other
N/A
Julian May
Deadline 3 Submission - Comments on Applicants Response to Examining Authority's Written Questions
Other
N/A
Drax Power Limited
Deadline 3 Submission - 6.6 Habitats Regulations Assessment Report (Revision 002)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 5.8 Other Consents and Licences (Revision 003)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 8.1.10 Statement of Common Ground between Drax Power Limited and Newland Parish Council (Revision 001)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 8.1.9 Statement of Common Ground between Drax Power Limited and Selby Area Internal Drainage Board (Revision 001)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 5.6 Combined Heat and Power Statement (Revision 002)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 4.4 Compulsory Acquisition Schedule (Revision 004)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 8.5.11 Response to the Local Impact Report (Revision 001)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 1.2 Application Guide (Revision 007)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 8.5.9 Responses to Written Representations (Revision 001)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 8.4.1 Revised Viewpoints and Additional Photomontage (Revision 002)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 8.4.8 Assessment of Non-Material Amendments to Proposed Scheme (Revision 001)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 8.4.9 Update to the Cumulative Assessment (Revision 001)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 8.2.3 Schedule of Changes (Revision 001)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 1.6 Glossary (Revision 002)
Other
N/A
Drax Power Limited
Deadline 3 Submission - 8.5.10 Responses to Other Parties’ Responses to the Examining Authority’s Written Questions (Revision 001)
Other
Size: 481 KB
Drax Power Limited
Deadline 3 Submission - Cover Letter
Other
Size: 3 MB
Drax Power Limited
6.2.9.10 Appendix 9.10 - Biodiversity Net Gain Assessment - Appendix 3 - Maps - Additional Submission - Accepted at the discretion of the Examining Authority
Other
Size: 938 KB
North Yorkshire County Council and Selby District Council
Late Deadline 2 Submission accepted at the discretion of the Examining Authority - Response to the Examining Authority's Written Questions and Local Impact Report
Other
N/A
Drax Power Limited
Deadline 2 Submission - 4.2 Funding Statement (Revision 002)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 4.3 Book of Reference - Track Changes (Revision 004)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 4.3 Book of Reference - Clean (Revision 004)
Other
Size: 217 KB
Preliminary Meeting Note
Other
N/A
Drax Power Limited
Deadline 2 Submission - 6.2.5.2 Appendix 5.2 - Outline Construction Traffic Management Plan (Revision 002)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 6.2.5.1 Appendix 5.1 - Outline Construction Worker Travel Plan (Revision 002)
Other
Size: 302 KB
Environment Agency
Deadline 2 Submission - Response to the Examining Authority's Written Questions
Other
N/A
Drax Power Limited
Deadline 2 Submission - 2.2 Land Plans (Revision 03)
Other
Size: 2 MB
Natural England
Deadline 2 Submission - Response to the Examining Authority's Written Questions
Other
N/A
Drax Power Limited
Deadline 2 Submission - 2.3B Indicative Works Associated with Unit X (Revision 03)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 2.5B One Unit Option Indicative Plant Layout (Revision 03)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 6.8 Flood Risk Assessment (Revision 003)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 8.5.2 Accompanied Site Inspection - Suggested Locations and Justifications (Revision 002)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 2.3C Indicative Works Associated with Unit Y (Revision 02)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 8.5.5 Removal of Stage 0 Mitigation Review (Revision 001)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 2.5A Two Unit Option Indicative Plant Layout (Revision 03)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 8.4.4 Supplemental Environmental Information - Bat Activity Survey (Revision 001)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 8.5.6 Plans Identifying the Additional Land (Revision 001)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 8.4.7 Landscape and Visual Amenity Effects – Appropriateness of Proposed Mitigation (Revision 001)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 8.1.6 Statement of Common Ground with Highways England (Draft) (Revision 001)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 8.4.6 Outline Public Rights of Way Management Plan (Revision 001)
Other
Size: 665 KB
Yorkshire Wildlife Trust
Deadline 2 Submission - Response to the Examining Authority's Written Questions
Other
N/A
Drax Power Limited
Deadline 2 Submission - 3.1 Draft Development Consent Order Rev 2 - Red Line of Changes Between Revision 1 and Revision 2
Other
Size: 198 KB
Julian M
Deadline 2 Submission - Written Representation
Other
Size: 242 KB
Environment Agency
Deadline 2 Submission - Written Representation
Other
N/A
Drax Power Limited
Deadline 2 Submission - 2.3A Works Plans (Revision 03)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 8.5.7 Additional Land Application (Revision 001)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 8.5.4 Schedule of Negotiations (Revision 001)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 8.5.8 Supplemental Statement of Reasons in Relation to Additional Land Revision 001)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 4.4 Compulsory Acquisition Schedule (Revision 003)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 6.7 Outline Landscape and Biodiversity Strategy (Revision 002)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 2.6C Indicative Above Ground Gas Installation Elevations (Revision 02)
Other
Size: 602 KB
ClientEarth
Deadline 2 Submission - Written Representation and Response to the Examining Authority's Written Questions
Other
N/A
Drax Power Limited
Deadline 2 Submission - 2.1 Site Location Plan (Revision 02)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 5.8 Other Consents and Licences (Revision 002)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 8.1.8 Statement of Common Ground with the Health and Safety Executive (Revision 001)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 6.5 Outline Construction Environmental Management Plan (Revision 002)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 2.4 Access and Rights of Way Plans (Revision 01)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 8.2.2 Schedule of Changes (Revision 001)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 3.1 Draft Development Consent Order (Clean) (Revision 2)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 1.2 Application Guide (Revision 006)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 6.4 Environmental Statement Commitments Register (Revision 002)
Other
Size: 266 KB
National Grid Electricity Transmission plc & National Grid Gas plc
Deadline 2 Submission - Written Representation and Response to the Examining Authority's Written Questions
Other
Size: 166 KB
Biofuelwatch
Deadline 2 Submission - Written Representation
Other
Size: 718 KB
Drax Power Limited
Deadline 2 Submission - Deadline 2 Cover Letter
Other
N/A
Drax Power Limited
Deadline 2 Submission - 6.2.9.10 Appendix 9.10 - Biodiversity Net Gain Assessment (Revision 002)
Other
N/A
Drax Power Limited
Deadline 2 Submission - 8.5.3 Applicant's Response to Written Questions (Revision 001)
Other
Size: 160 KB
Rule 13 - Notification of Hearings and Accompanied Site Inspection
Other
N/A
Drax Power Limited
Hearing Notice for Open Floor Hearing 2 (OFH2), Issue Specific Hearing 1 (ISH1), Issue Specific Hearing 2 (ISH2) and Compulsory Acquisition Hearing 1 (CAH1) on 04 December 2018 to 06 December 2018
Other
Size: 3 MB
Friends of the Earth
Deadline 1 Submission
Other
N/A
Drax Power Limited
Deadline 1 Submission - 8.1.1 Statement of Common Ground with Historic England (Revision 001)
Other
N/A
Drax Power Limited
Deadline 1 Submission - 8.1.3 Statement of Common Ground with East Riding of Yorkshire Council (Revision 001)
Other
N/A
Drax Power Limited
Deadline 1 Submission - 8.2.1 Schedule of Changes (Revision 001)
Other
N/A
Drax Power Limited
Deadline 1 Submission - 8.4.1 Revised Viewpoints and Additional Photomontage (Revision 001)
Other
N/A
Drax Power Limited
Deadline 1 Submission - 8.3.1 Errata Environmental Statement (Chapters 7, 8 and 11) (Revision 001)
Other
N/A
Drax Power Limited
Deadline 1 Submission - 8.1.4 Statement of Common Ground with North Yorkshire County Council and Selby District Council (Draft) (Revision 001)
Other
N/A
Drax Power Limited
Deadline 1 Submission - 8.1.2 Statement of Common Ground with Natural England (Revision 001)
Other
N/A
Drax Power Limited
Deadline 1 Submission - 8.4.2 Supplemental Environmental Information - Breeding Bird Survey (Revision 001)
Other
N/A
Drax Power Limited
Deadline 1 Submission - 1.2 Application Guide (Revision 005)
Other
N/A
Drax Power Limited
Deadline 1 Submission - 8.5.2 Accompanied Site Inspection Suggested Locations and Justifications (Revision 001)
Other
N/A
Drax Power Limited
Deadline 1 Submission - Deadline 1 Cover Letter
Other
N/A
Drax Power Limited
Deadline 1 Submission - 8.5.1 Applicant's Responses to Relevant Representations (Revision 001)
Other
N/A
Drax Power Limited
Deadline 1 Submission - 8.4.5 Electric and Magnetic Fields (EMF) Assessment Report (Revision 001)
Other
Size: 47 KB
Historic England
Deadline 1 Submission
Other
N/A
Drax Power Limited
Deadline 1 Submission - 8.4.3 Supplemental Environmental Information - Reptile Survey (Revision 001)
Other
Size: 174 KB
Rule 8 Letter - Notification of Timetable for the Examination
Other
Size: 194 KB
Written Questions
Other
Size: 88 KB
Note of Unaccompanied Site Inspection - 03 October 2018
Other
audio recording
Size: 164 MB
Recording of Preliminary Meeting Part 1
Other
audio recording
Size: 117 MB
Recording of Open Floor Hearing
Other
audio recording
Size: 83 MB
Recording of Preliminary Meeting Part 2
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.