Dogger Bank Teesside A / Sofia Offshore Wind Farm (formerly Dogger Bank Teesside B) – Project previously known as Dogger Bank Teesside A&B

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (24)

Developer's Application (162)

Acceptance (7)

Pre Examination (42)

Examination (562)

Decision (9)

Decided (114)

Date

SourceDescription
Other
Size: 210 KB
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2020
Other
Size: 703 KB
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL)
Explanatory Memorandum for Joint NMC Amendment Order May 2020
Other
Size: 345 KB
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL)
Environmental Report to Support Joint Non-Material Change Application: Dogger Bank Teesside A and Sofia Offshore Wind Farms May 2020
Other
Size: 1 MB
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL)
Appendix 2 Figure 3.2 - Link Sensitivity
Other
Size: 2 MB
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL)
Appendix 2 Figure 1 - Onshore cable route & infrastructure for Dogger Bank Teesside A & B to Lackenby substation
Other
Size: 2 MB
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL)
DCO with Track Changes (Joint NMC) The Dogger Teesside A and B Offshore Wind Farm 2015
Other
Size: 160 KB
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL)
Covering Letter and Supporting Statement
Other
Size: 12 MB
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL)
Appendix 1 - Works Plans
Other
Size: 176 KB
Sofia Offshore Wind Farm Limited
Request to increase hammer energy for Sofia Offshore Wind Farm (SOWF) – 2018
Other
Size: 400 KB
Sofia Offshore Wind Farm Limited
Agreement from Natural England that the 2018 Statement of Common Ground is appropriate
Other
Size: 524 KB
Sofia Offshore Wind Farm Limited
Agreement from the Marine Management Organisation that the 2018 Statement of Common Ground is appropriate
Other
Size: 539 KB
Sofia Offshore Wind Farm Limited (SOWFL)
Environmental Appraisal of Increased Hammer Energy - Appendix B - Auditory Injury Assessment - cumulative exposure to piling noise
Other
Size: 984 KB
Sofia Offshore Wind Farm Limited (SOWFL)
Statement of Common Ground between Sofia Offshore Wind Farm and the Marine Management Organisation – 2018 NMC application
Other
Size: 1 MB
Sofia Offshore Wind Farm Limited (SOWFL)
Response to Non-Material Change Consultation - Environmental Appraisal of Increased Hammer Energy Appendix C: Assessment of fish receptors
Other
Size: 261 KB
Sofia Offshore Wind Farm Limited (SOWFL)
Environmental Appraisal of Increased Hammer Energy Appendix D - Consultation Summary
Other
Size: 671 KB
Sofia Offshore Wind Farm Limited (SOWFL)
Annex E – Sofia response to the BEIS SNS cSAC shadow HRA information – 2018 NMC application
Other
Size: 491 KB
Sofia Offshore Wind Farm Limited (SOWFL)
Annex A – Sofia’s response to Natural England – 2018 NMC application
Other
Size: 498 KB
Sofia Offshore Wind Farm Limited (SOWFL)
Statement of Common Ground between Sofia Offshore Wind Farm and Natural England – 2018 NMC application
Other
Size: 955 KB
Sofia Offshore Wind Farm Limited (SOWFL)
Annex B – Summary of consultation with the MMO – 2018 NMC application
Other
Size: 789 KB
Sofia Offshore Wind Farm Limited (SOWFL)
Environmental Appraisal of Increased Hammer Energy - Main Report
Other
Size: 293 KB
Sofia Offshore Wind Farm Limited (SOWFL)
Non-material change application to the Dogger Bank Teesside A and B Off-shore Wind Farm Order 2015 (as amended) - Cover Letter
Other
Size: 2 MB
Sofia Offshore Wind Farm Limited (SOWFL)
Appendix A - Additional underwater noise modelling at Sofia offshore wind farm, Dogger Bank
Other
Size: 2 MB
Sofia Offshore Wind Farm Limited (SOWFL)
The Dogger Bank Offshore Wind Farm Order 2015 (as amended) NMC amendments requested 2020
Other
Size: 223 KB
Sofia Offshore Wind Farm Limited (SOWFL)
Annex D – Sofia’s response to the Whale and Dolphin Conservation – 2018 NMC application
Other
Size: 501 KB
Sofia Offshore Wind Farm Limited (SOWFL)
Annex C – Sofia’s response the Wildlife Trust – 2018 NMC application
Other
Size: 402 KB
Sofia Offshore Wind Farm Limited (SOWFL)
Appendix E: Information provided by Sofia Offshore Wind Farm Limited (SOWFL) to inform a Habitats Regulation Assessment
Other
Size: 83 KB
Sofia Offshore Wind Farm Limited (SOWFL)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment Order) 2020
Other
Size: 65 KB
Doggerbank Offshore Wind Farm Project 3 Projco Limited
Response to further consultation by the Secretary of State
Other
Size: 130 KB
Department for Business, Energy & Industrial Strategy (BEIS)
Consultation Letter - Request for Further Information
Other
Size: 83 KB
Marine Management Organisation
Response to Non-Material Change Consultation
Other
Size: 135 KB
Natural England
Response to Non-Material Change Consultation
Other
Size: 361 KB
Department for Business, Energy & Industrial Strategy (BEIS)
Habitats Regulations Assessment (HRA)
Other
Size: 193 KB
Department for Business, Energy & Industrial Strategy (BEIS)
Consultation Letter - Request for Information
Other
Size: 3 MB
Doggerbank Offshore Wind Farm Project 3 Projco Limited
Consultation and Publicity Statement Appendix 1-5
Other
Size: 182 KB
Doggerbank Offshore Wind Farm Project 3 Projco Limited
Consultation and Publicity Statement Letter
Other
Size: 106 KB
Historic England
Response to Non-Material Change Consultation
Other
Size: 191 KB
Marine Management Organisation
Response to Non-Material Change Consultation
Other
Size: 168 KB
Maritime and Coastguard Agency
Response to Non-Material Change Consultation
Other
Size: 96 KB
Natural England
Response to Non-Material Change Consultation
Other
Size: 44 KB
The Crown Estate
Response to Non-Material Change Consultation
Other
Size: 77 KB
Doggerbank Offshore Wind Farm Project 3 Projco Limited
NMC Application: Draft Amendment Order
Other
Size: 156 KB
Doggerbank Offshore Wind Farm Project 3 Projco Limited
NMC Application: Regulation 6 Notice
Other
Size: 516 KB
Doggerbank Offshore Wind Farm Project 3 Projco Limited
Dogger Bank Teesside A Non-Material Change Application: Appendix 1 Ornithological Technical Report
Other
Size: 189 KB
Doggerbank Offshore Wind Farm Project 3 Projco Limited
NMC Application: Template Letter to Consultees
Other
Size: 2 MB
Doggerbank Offshore Wind Farm Project 3 Projco Limited
NMC Application: Environmental Report
Other
Size: 140 KB
Doggerbank Offshore Wind Farm Project 3 Projco Limited
NMC Application: BEIS's Response to Regulation 7(3) Letter
Other
Size: 374 KB
Doggerbank Offshore Wind Farm Project 3 Projco Limited
Appendix 1: Proposed list of stakeholders that would be consulted on the non-material change application
Other
Size: 182 KB
Doggerbank Offshore Wind Farm Project 3 Projco Limited
NMC Application: Regulation 7(3) Letter - Request for Approval of the Consultee List
Other
Size: 2 MB
Doggerbank Offshore Wind Farm Project 3 Projco Limited
NMC Application: Development Consent Order - Tracked
Other
Size: 201 KB
Doggerbank Offshore Wind Farm Project 3 Projco Limited
NMC Application: Covering Letter and Supporting Statement
Other
Size: 224 KB
Department for Business, Energy & Industrial Strategy ( BEIS )
Application to make Non-Material Changes to the Dogger Bank Teesside A & B Offshore Wind Farm Order 2015 decision letter dated 25 March 2019
Other
Size: 581 KB
Department for Business, Energy & Industrial Strategy ( BEIS )
Dogger Bank Teesside A and B Offshore Wind Farm - Non Material Change Application Habitats Regulations Assessment
Other
Size: 127 KB
Department for Business, Energy & Industrial Strategy ( BEIS )
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019
Other
Size: 609 KB
Innogy Renewables UK Limited
Response to Non-Material Change Consultation
Other
Size: 179 KB
Marine Management Organisation
Response to Non-Material Change Consultation
Other
Size: 42 KB
Natural England
Response to Non-Material Change Consultation
Other
Size: 136 KB
Department for Business, Energy & Industrial Strategy
Sofia HRA and Requirement consultation letter from Department for Business, Energy & Industrial Strategy to Applicant
Other
Size: 579 KB
Sofia Offshore Wind Farm Limited
Draft Habitats Regulations Assessment
Other
Size: 2 MB
Innogy Renewables UK Limited
DCO NMC Application 8th February 2019 clean application amendment
Other
Size: 2 MB
Innogy Renewables UK Limited
DCO NMC Application 8th February 2019 tracked changes application amendment
Other
Size: 123 KB
Innogy Renewables UK Limited
Option for Sofia Offshore Wind Farm-Non Material Change Application to the Development Consent Order The Dogger Bank Teesside A and B Offshore Wind Farm Order 2017
Other
Size: 98 KB
Innogy Renewables UK Limited
SOWFL Plan B for NMC application - potential removal of increase in hammer energy
Other
Size: 103 KB
Innogy Renewables UK Limited
DCO NMC Application Amendment Order - 8th February 2019 clean application amendment
Other
Size: 111 KB
Innogy Renewables UK Limited
SOEFL DCO NMC Application Amendment Email - Withdrawal Request 8th February 2019
Other
Size: 414 KB
Innogy Renewables UK Limited
DCO NMC Application - Sofia Cover Letter to BEIS for DCO NMC Application 8th February 2019
Other
Size: 34 KB
Innogy Renewables UK Limited
DCO NMC Application Sofia DCO Amendment Order 8th February 2019 tracked changes application amendment
Other
Size: 986 KB
Innogy
Response to further consultation requested by BEIS
Other
Size: 227 KB
Marine Management Organisation
Response to further consultation requested by BEIS
Other
Size: 142 KB
Natural England
Response to further consultation requested by BEIS
Other
Size: 169 KB
Department of Business, Energy and Industrial Strategy
BEIS further consultation letter to the Applicant, Natural England and Marine Management Organisation.
Other
Size: 984 KB
Innogy Renewables UK Limited & Marine Management Organisation
Statement of Common Ground
Other
Size: 498 KB
Innogy Renewables UK Limited & Natural Engand
Statement of Common Ground
Other
Size: 184 KB
Natural England
Non-Material Change Consultation Response
Other
Size: 45 KB
Department for Business, Energy & Industrial Strategy
Consultation Extension Letter
Other
Size: 340 KB
Innogy Renewables UK Limited
Request for Extension
Other
Size: 252 KB
Department of Business, Energy and Industrial Strategy
BEIS consultation letter to the Applicant and Natural England
Other
Size: 258 KB
Innogy
Individual consultees confirming receipt of Innogy's responses
Other
Size: 96 KB
Natural England
Addition to letter to the Planning Inspectorate dated 24 July 2018
Other
Size: 46 KB
Department for Business, Energy & Industrial Strategy
Sofia Offshore Wind Farm consultation extension letter
Other
Size: 733 KB
Innogy
Response to Natural England
Other
Size: 367 KB
Innogy
Response to Whale and Dolphin Conservation
Other
Size: 502 KB
Innogy
Response to The Wildlife Trusts
Other
Size: 510 KB
Innogy
Response to Department for Business, Energy & Industrial Strategy
Other
Size: 151 KB
Department for Business, Energy & Industrial Strategy
BEIS consultation request to the Applicant
Other
Size: 375 KB
Marine Management Organisation
Comment on non material change to DCO
Other
Size: 229 KB
Historic England
Comment on non material change to DCO
Other
Size: 420 KB
Innogy Renewables UK Limited
Non Material Change Application July 2018 - Regulation 7A Appendix 3
Other
Size: 339 KB
Innogy Renewables UK Limited
Non Material Change Application July 2018 - Regulation 7A
Other
Size: 2 MB
Innogy Renewables UK Limited
Non Material Change Application July 2018 - Regulation 7A Appendix 2
Other
Size: 416 KB
Innogy Renewables UK Limited
Non Material Change Application July 2018 - Regulation 7A Appendix 5
Other
Size: 40 KB
Innogy Renewables UK Limited
Non Material Change Application July 2018 - Regulation 7A Appendix 1
Other
Size: 25 KB
Innogy Renewables UK Limited
Non Material Change Application July 2018 - Regulation 7A Appendix 4
Other
Size: 219 KB
Marine Management Organisation
Comment on non material change to DCO
Other
Size: 94 KB
Maritime & Coastguard Agency
Comment on non material change to DCO
Other
Size: 141 KB
Ministry of Defence
Comment on non material change to DCO
Other
Size: 106 KB
NATS Safeguarding
NATS Safeguarding - Comment on non material change to DCO
Other
Size: 377 KB
Natural England
Comment on non material change to DCO
Other
Size: 195 KB
Redcar & Cleveland Borough Council
Redcar & Cleveland Borough Council - Comment on non material change to DCO
Other
Size: 714 KB
The Crown Estate
Comment on non material change to DCO
Other
Size: 95 KB
The Wildlife Trust
Comment on non material change to DCO
Other
Size: 81 KB
Trinity House
Comment on non material change to DCO
Other
Size: 490 KB
Whale and Dolphin Conservation
Comment on non material change to DCO
Other
Size: 1 MB
Innogy Renewables UK Limited
NMC Application June 2018 - Appendix B - Environmental appraisal of increased hammer energy
Other
Size: 83 KB
Innogy Renewables UK Limited
NMC Application June 2018 - Regulation 6 Notice
Other
Size: 352 KB
Innogy Renewables UK Limited
NMC Application June 2018 - Appendix B - Auditory Injury Assessment cumulative exposure to piling noise
Other
Size: 5 MB
Innogy Renewables UK Limited
NMC Application June 2018 - Appendix A - Technical report - Additional underwater noise modelling at SOWF Dogger Bank
Other
Size: 399 KB
Innogy Renewables UK Limited
Non-Material Change Application Letter
Other
Size: 297 KB
Innogy Renewables UK Limited
NMC Application June 2018 - Appendix C - Environmental Appraisal of Increased Hammer Energy Addendum Assessment of fish receptors
Other
Size: 365 KB
Innogy Renewables UK Limited
NMC Application June 2018 - Appendix - Supporting Information-Environmental Report
Other
Size: 107 KB
Innogy Renewables UK Limited
NMC Application June 2018- Draft DCO Sofia Offshore Wind Farm Amendment Order 2018
Other
Size: 260 KB
Innogy Renewables UK Limited
NMC Application June 2018 - Appendix - Ornithology technical note in support of NMC
Other
Size: 2 MB
Innogy Renewables UK Limited
NMC Application June 2018 - DCO 2015 - Tracked Changes
Other
Size: 416 KB
Secretary of State
Response from the SoS to Sofia Offshore Wind Farm Limited’s letter of 20 February 2018 in relation to Sofia Offshore Wind Farm (Dogger Bank Teesside B)
Other
Size: 539 KB
Sofia Offshore Wind Farm Limited
Letter sent to SoS giving details of a proposed non-material change application and a request for a reduced scope of consultation (pursuant to Regulation 7(3) of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011, in relation to Sofia Offshore Wind Farm (Dogger Bank Teesside B)
Other
Size: 5 MB
Forewind
Matters of Specific Agreement with the Environment Agency submitted for the deadline of 28 August 2014
Other
Size: 599 KB
Forewind
Appendix 15 - Securing funding for Compulsory Acquisition. Submitted for Deadline V of 23 October 2014
Other
Size: 45 KB
Forewind
Book of Reference (updated) (comparison). Submitted for Deadline V of 23 October 2014
Other
Size: 622 KB
Forewind
Appendix 4 - Offshore In Principle Monitoring Plan. Submitted for Deadline IX of 27 January 2015
Other
Size: 529 KB
Forewind
Appendix 5 - LBBG and GBBG EIA. Submitted for Deadline V of 23 October 2014
Other
Size: 373 KB
Forewind
Local Authorities update final. Submitted for Deadline VI of 20 November 2014
Other
Size: 300 KB
Forewind
Appendix 8 - Action Point 2.7 Overtrawlability Surveys. Submitted for Deadline VI of 20 November 2014
Other
Size: 423 KB
Forewind
Appendix 4 - Blacks Bridge HDD. Submitted for Deadline VI of 20 November 2014
Other
Size: 6 MB
Forewind
Onshore Land Plan (with key plan) - including previously missing sheet 3 submitted in response to Rule 6 letter
Other
Size: 741 KB
Forewind
Appendix 1 - Correspondence with SNH and MSS. Submitted for Deadline V of 23 October 2014
Other
Size: 2 MB
Forewind
Statement of Common Ground with Northumbrian Water Ltd submitted for the deadline of 28 August 2014
Other
Size: 6 MB
Forewind
Appendix 19 - Minor Amendments to Plots Part 1 of 3 submitted for the deadline of 23 September 2014
Other
Size: 310 KB
Forewind
Appendix 3 - Note on west coast gannet colonies. Submitted for Deadline V of 23 October 2014
Other
Size: 314 KB
Forewind
List of all final documentation that accompanies the draft DCO. Submitted for Deadline IX of 27 January 2015
Other
Size: 1 MB
Forewind
SoCG Correspondence Saltburn Marske and New Marske Parish Council. Submitted for Deadline VI of 20 November 2014
Other
Size: 6 MB
Forewind
Appendix 27 - Updated Onshore Order Limits and Grid Co-ordinates submitted for the deadline of 23 September 2014
Other
Size: 367 KB
Forewind
Comments on WDC further response to ExA first written questions. Submitted for Deadline V of 23 October 2014
Other
Size: 6 MB
Forewind
Appendix 20 - Proposed Amendments to Plots Part 1 of 2 submitted for the deadline of 23 September 2014
Other
Size: 443 KB
Forewind
Appendix 17 - DML Structure. Submitted for Deadline V of 23 October 2014
Other
Size: 9 MB
Forewind
Statement of Common Ground with the Marine Management Organisation submitted for the deadline of 28 August 2014
Other
Size: 358 KB
Forewind
Appendix 2 - Grid connection agreement. Submitted for Deadline VI of 20 November 2014
Other
Size: 527 KB
Forewind
Appendix 10 - Effects of EMF on Fisheries. Submitted for Deadline V of 23 October 2014
Other
Size: 9 MB
Forewind
Nature Conservation Plan Key Plan (amended). Submitted for Deadline IX of 27 January 2015
Other
Size: 314 KB
Forewind
Appendix 19 - Update on commercial agreements. Submitted for Deadline V of 23 October 2014
Other
Size: 7 MB
Forewind
Streets and Public Rights Of Way Plan Sheet 04 (amended). Submitted for Deadline IX of 27 January 2015
Other
Size: 404 KB
Forewind
Appendix 9 - Action Point 2.8 Rochdale envelope refinement. Submitted for Deadline VI of 20 November 2014
Other
Size: 435 KB
Forewind
Appendix 8 - EPS Licensing Requirements. Submitted for Deadline V of 23 October 2014
Other
Size: 476 KB
Forewind
Position statement on Royal Mails concerns. Submitted for Deadline V of 23 October 2014
Other
Size: 753 KB
Forewind
Appendix 9 - Summary of Mitigation Measures and Monitoring. Submitted for Deadline V of 23 October 2014
Other
Size: 12 MB
Forewind
Appendix 7 - Outline Offshore Archaeological Written Scheme of Investigation. Submitted for Deadline IX of 27 January 2015
Other
Size: 451 KB
Forewind
Appendix 20 - Outline offshore maintenance plan. Submitted for Deadline V of 23 October 2014
Other
Size: 304 KB
Forewind
Appendix 16 - Audit of Statutory Undertakers. Submitted for Deadline V of 23 October 2014
Other
Size: 8 MB
Forewind
Appendix 19 - Minor Amendments to Plots Part 3 of 3 submitted for the deadline of 23 September 2014
Other
Size: 2 MB
Forewind
Draft DCO version 7 - Tracked Changes. Submitted for Deadline IX of 27 January 2015
Other
Size: 1 MB
Forewind
Appendix 13 - Draft DCO version 4 (clean). Submitted for Deadline V of 23 October 2014
Other
Size: 1 MB
Forewind
Appendix 11 - Civil Aviation Authority SoCG. Submitted for Deadline VI of 20 November 2014
Other
Size: 1 MB
Forewind
Appendix 14 - Draft DCO Version 3 Clean submitted for the deadline of 23 September 2014
Other
Size: 769 KB
Forewind
Appendix 14 Draft DCO Change Log Version 4. Submitted for Deadline V of 23 October 2014
Other
Size: 343 KB
Forewind
Appendix 1 - Disposal Scenario Statement. Submitted for Deadline IX of 27 January 2015
Other
Size: 345 KB
Forewind
Appendix 6 - Atlantic puffin EIA response. Submitted for Deadline V of 23 October 2014
Other
Size: 2 MB
Forewind
Appendix 25 - Update to in-combination tables submitted for the deadline of 23 September 2014
Other
Size: 340 KB
Forewind
Appendix 2 - Defra guidance relevant to the status of fishing. Submitted for Deadline V of 23 October 2014
Other
Size: 683 KB
Forewind
Appendix 7 - Description of Export Cable Protection. Submitted for Deadline VI of 20 November 2014
Other
Size: 327 KB
Forewind
Appendix 18 - Update on discussions relevant to protective provisions. Submitted for Deadline V of 23 October 2014
Other
Size: 394 KB
Forewind
Appendix 5 - Action 1.10 Construction noise mitigation measures. Submitted for Deadline VI of 20 November 2014
Other
Size: 1 MB
Forewind
Statement of Common Ground with Comite Regional des Peches Maritimes et des Elevages Marins (Nord Pas-de-Calais Picardie) submitted for the deadline of 28 August 2014
Other
Size: 1 MB
Forewind
Statement of Common Ground with Northern Powergrid submitted for the deadline of 28 August 2014
Other
Size: 2 MB
Forewind
Statement of Common Ground with Natural England (offshore) submitted for the deadline of 28 August 2014
Other
Size: 441 KB
Forewind
Appendix 10 - Decommissioning of Remedial Cable Protection. Submitted for Deadline VI of 20 November 2014
Other
Size: 7 MB
Forewind
Appendix 19 - Minor Amendments to Plots Part 2 of 3 submitted for the deadline of 23 September 2014
Other
Size: 589 KB
Forewind
Appendix 3 - Outline Decommissioning Statement - version 6. Submitted for Deadline IX of 27 January 2015
Other
Size: 466 KB
Forewind
Appendix 3 - Wilton Requirements. Submitted for Deadline VI of 20 November 2014
Other
Size: 3 MB
Forewind
Draft fisheries liaison plan. Submitted for Deadline V of 23 October 2014
Other
Size: 1 MB
Forewind
Appendix 14- Draft DCO Version 3 Tracked submitted for the deadline of 23 September 2014
Other
Size: 908 KB
Forewind
Statement of Reasons (revised). Submitted for Deadline VI of 20 November 2014
Other
Size: 402 KB
Forewind
Written summary of Issue Specific Hearing relating to natural environment matters. Submitted for Deadline V of 23 October 2014
Other
Size: 568 KB
Forewind
Appendix 7 - Draft offshore In Principle Monitoring Plan. Submitted for Deadline V of 23 October 2014
Other
Size: 9 MB
Forewind
Tree Preservation Order Plan - Key Plan (amended). Submitted for Deadline IX of 27 January 2015
Other
Size: 45 KB
Forewind
Appendix 26 - Book of Reference (updated) Clean submitted for the deadline of 23 September 2014
Other
Size: 2 MB
Forewind
Draft DCO version 7 - Clean. Submitted for Deadline IX of 27 January 2015
Other
Size: 45 KB
Forewind
Book of Reference (updated) (clean). Submitted for Deadline V of 23 October 2014
Other
Size: 449 KB
Forewind
Appendix 2 - Outline Offshore Maintenance Plan. Submitted for Deadline IX of 27 January 2015
Other
Size: 1 MB
Forewind
Appendix 13 - Draft DCO version 4 (tracked). Submitted for Deadline V of 23 October 2014
Other
Size: 607 KB
Forewind
Appendix 4 - Razorbill and guillemot EIA. Submitted for Deadline V of 23 October 2014
Other
Size: 749 KB
Forewind
Appendix 5 - Outline Code of Construction Practice - version 4. Submitted for Deadline IX of 27 January 2015
Other
Size: 609 KB
Forewind
Statement of Common Ground correspondence with Scottish Natural Heritage submitted for the deadline of 28 August 2014
Other
Size: 708 KB
Forewind
Landowner notification of proposed change. Submitted for Deadline VI of 20 November 2014
Other
Size: 45 KB
Forewind
Appendix 26 - Book of Reference (updated) Comparison Statement submitted for the deadline of 23 September 2014
Other
Size: 300 KB
Forewind
Written summary of Issue Specific Hearing relating to HRA. Submitted for Deadline V of 23 October 2014
Other
Size: 1 MB
Forewind
Statement of Common Ground between Forewind and Redcar and Teesbay Fishermen's Association submitted for the deadline of 28 August 2014
Other
Size: 1 MB
Forewind
SoCG between EPIC Regeneration Consultants and Hartlepool Fishermen's Society submitted for the deadline of 28 August 2014
Other
Size: 3 MB
Forewind
Statement of Common Ground with VisNed-NFFO submitted for the deadline of 28 August 2014
Other
Size: 5 MB
Secretary of State Decision Letter
Other
Size: 2 MB
Examining Authority Recommendation Report
Other
Size: 73 KB
Notice of the Decision
Other
Size: 2 MB
Habitats Regulations Assessment
Other
Other
Size: 6 MB
Post examination Correspondence Log
Other
Size: 462 KB
Dogger Bank Teesside A&B Document Library - Publication Version
Other
Size: 46 KB
Action Point from Hearing of 2 December 2014
Action Point regarding Visned video clip played during hearing of 2 December 2014
Other
Size: 67 KB
Section 99 Letter
Letter closing the Examination
Other
Size: 429 KB
Forewind
Response to Sembcorp Deadline X Submission. Submitted for Deadline XI of 4 February 2015
Other
Size: 304 KB
Forewind
Summary and Index. Submitted for Deadline XI of 4 February 2015
Other
Size: 479 KB
Forewind
Response to MMO Deadline X Submission. Submitted for Deadline XI of 4 February 2015
Other
Size: 18 KB
Natural England
Submission for Deadline XI of 4 February 2015
Other
Size: 109 KB
SABIC UK Petrochemicals Limited
Submission for Deadline XI of 4 February 2015
Other
Size: 498 KB
Sembcorp Utilities
Submission for Deadline XI of 4 February 2015 (Late Submission)
Other
Size: 307 KB
Forewind
Summary and Index. Submitted for Deadline X of 2 February 2015
Other
Size: 513 KB
Forewind
Master Index version 7. Submitted for Deadline X of 2 February 2015
Other
Size: 385 KB
Forewind
Statement of Reservations- The Wilton Complex. Submitted for Deadline X of 2 February 2015
Other
Size: 443 KB
Forewind
Response to Rule 17 Letter of 21 January 2015. Submitted for Deadline X of 2 February 2015
Other
Size: 458 KB
Forewind
Response to Rule 17 Letter of 29 January 2015. Submitted for Deadline X of 2 February 2015
Other
Size: 819 KB
Marine Management Organisation
Submission for Deadline X of 2 February 2015
Other
Size: 292 KB
National Grid Electricity Transmission
Submission for Deadline X of 2 February 2015
Other
Size: 17 KB
Natural England
Submission for Deadline X of 2 February 2015
Other
Size: 5 MB
SABIC UK Petrochemicals Limited
Submission for Deadline X of 2 February 2015
Other
Size: 993 KB
Sembcorp Utilities
Submission for Deadline X of 2 February 2015
Other
Size: 282 KB
The Crown Estate
Response to Rule 17 Letter of 21 January 2015. Submitted for Deadline X of 2 February 2015
Other
Size: 457 KB
The Wildlife Trusts
Submission for Deadline X of 2 February 2015
Other
Size: 110 KB
Rule 17 and 8(3) Letter
Rule 17 and 8(3) Letter issued by the Examining Authority on 29 January 2015
Other
Size: 45 KB
Forewind
Book of Reference (updated) (comparison). Submitted for Deadline IX of 27 January 2015
Other
Size: 41 KB
Northern Powergrid (North East) Limited
Update on protective provisions agreement. Submitted for deadline IX of 27 January 2015 (Late Submission)
Other
Size: 5 MB
Forewind
Offshore Location Plan (amended). Submitted for Deadline IX of 27 January 2015
Other
Size: 7 MB
Forewind
Onshore Order Limits and Grid Co-ordinates Plan Amendment. Submitted for Deadline IX of 27 January 2015
Other
Size: 2 MB
Forewind
Offshore Sites or Features Of the Historic Environment (amended). Submitted for Deadline IX of 27 January 2015
Other
Size: 545 KB
Forewind
Appendix 6 ? Updated Hierarchy of offshore and onshore management Plans. Submitted for Deadline IX of 27 January 2015
Other
Size: 9 MB
Forewind
Access to Works Plan Sheet 01 (Updated). Submitted for Deadline IX of 27 January 2015
Other
Size: 7 MB
Forewind
Onshore Location Plan (amended). Submitted for Deadline IX of 27 January 2015
Other
Size: 7 MB
Forewind
Onshore Works Sheet Plan 04 (Updated). Submitted for Deadline IX of 27 January 2015
Other
Size: 9 MB
Forewind
Wilton Protective Provisions Supporting Plans. Submitted for Deadline IX of 27 January 2015
Other
Size: 2 MB
Forewind
Offshore Order Limits and Grid Co-ordinates Plan (amended). Submitted for Deadline IX of 27 January 2015
Other
Size: 3 MB
Forewind
Onshore Land Plan Sheet 02 Amendment. Submitted for Deadline IX of 27 January 2015
Other
Size: 724 KB
Forewind
Draft DCO version 7 Change Log. Submitted for Deadline IX of 27 January 2015
Other
Size: 418 KB
Forewind
Comments on Mr Langton?s submission at Deadline VIII. Submitted for Deadline IX of 27 January 2015
Other
Size: 5 MB
Forewind
Streets and Public Rights Of Way Plan Sheet 01 (amended). Submitted for Deadline IX of 27 January 2015
Other
Size: 2 MB
Forewind
Onshore Land Plan Sheet 05 Amendment. Submitted for Deadline IX of 27 January 2015
Other
Size: 7 MB
Forewind
Offshore Works Plan (amended). Submitted for Deadline IX of 27 January 2015
Other
Size: 2 MB
Forewind
Onshore Land Plan Sheet 01 Amendment. Submitted for Deadline IX of 27 January 2015
Other
Size: 1 MB
Forewind
Offshore Land Plan (amended). Submitted for Deadline IX of 27 January 2015
Other
Size: 325 KB
Forewind
Submission Summary and Index. Submitted for Deadline IX of 27 January 2015
Other
Size: 498 KB
Forewind
Response to Rule 17 Request. Submitted for Deadline IX of 27 January 2015
Other
Size: 2 MB
Forewind
Onshore Special Category Land Plan. Submitted for Deadline IX of 27 January 2015
Other
Size: 2 MB
Forewind
Onshore Land Plan Sheet 04 Amendment. Submitted for Deadline IX of 27 January 2015
Other
Size: 2 MB
Forewind
Onshore Land Plan Sheet 06 Amendment. Submitted for Deadline IX of 27 January 2015
Other
Size: 9 MB
Forewind
Sites or Features of the Historic Environment Plan Sheet 01 (amended). Submitted for Deadline IX of 27 January 2015
Other
Size: 2 MB
Forewind
Onshore Nature Conservation Sites Plan. Submitted for Deadline IX of 27 January 2015
Other
Size: 515 KB
Forewind
Comments on MMO Deadline VIII Response. Submitted for Deadline IX of 27 January 2015
Other
Size: 6 MB
Forewind
Onshore Works Sheet Plan 01 (Updated). Submitted for Deadline IX of 27 January 2015
Other
Size: 3 MB
Forewind
Onshore Land Plan Sheet 03 Amendment. Submitted for Deadline IX of 27 January 2015
Other
Size: 45 KB
Forewind
Book of Reference (updated) (clean). Submitted for Deadline IX of 27 January 2015
Other
Size: 3 MB
Forewind
Offshore Nature Conservation Sites (amended). Submitted for Deadline IX of 27 January 2015
Other
Size: 588 KB
Marine Management Organisation
Response to Rule 17 Request. Submitted for Deadline IX of 27 January 2015
Other
Size: 69 KB
National Grid Electricity Transmission
Response to Rule 17 Request. Submitted for deadline IX of 27 January 2015 (Late Submission)
Other
Size: 263 KB
Natural England
Response to Rule 17 Request. Submitted for deadline IX of 27 January 2015
Other
Size: 370 KB
Royal Society for the Protection of Birds (RSPB)
Response to Rule 17 Request. Submitted for Deadline IX of 27 January 2015
Other
Size: 12 MB
SABIC UK Petrochemicals Limited
Response to Deadline IX of 27 January 2015
Other
Size: 132 KB
Rule 17 Letter
Rule 17 Letter published to the website on 21 January 2015
Other
Size: 369 KB
Mark Brooker on behalf of Arthur Clifford Jowsey
Correspondence submitted for Deadline VIII of 19 January 2015
Other
Size: 3 MB
Sembcorp Utilities
Correspondence submitted for Deadline VIII of 19 January 2015 (Late submission)
Other
Size: 398 KB
Charlie Langton
Correspondence submitted for Deadline VIII of 19 January 2015
Other
Size: 2 MB
Forewind
Appendix 1A ? Submission to RCBC?s draft Local Plan Consultation. Submitted for Deadline VIII of 19 January 2015
Other
Size: 1 MB
Forewind
Comments on ExA?s revised draft DCO. Submitted for Deadline VIII of 19 January 2015
Other
Size: 446 KB
Forewind
Comments on Mr Jowsey?s submission. Submitted for Deadline VIII of 19 January 2015
Other
Size: 3 MB
Forewind
Appendix 1B ? Land Interests and Development Option Agreements Plan Final. Submitted for Deadline VIII of 19 January 2015
Other
Size: 466 KB
Forewind
Comments on Mr Scaife?s submission. Submitted for Deadline VIII of 19 January 2015
Other
Size: 340 KB
Forewind
Disposal scenario statement. Submitted for Deadline VIII of 19 January 2015
Other
Size: 344 KB
Forewind
Visibility splays- Action from accompanied site inspection. Submitted for Deadline VIII of 19 January 2015
Other
Size: 863 KB
Forewind
Appendix 1 - Commentry on RCBC Local Plan Final. Submitted for Deadline VIII of 19 January 2015
Other
Size: 588 KB
Forewind
Outline decommissioning statement version 5. Submitted for Deadline VIII of 19 January 2015
Other
Size: 324 KB
Forewind
Summary and Index. Submitted for Deadline VIII of 19 January 2015
Other
Size: 917 KB
Forewind
Response to ExA?s Draft DCO Appendix A. Submitted for Deadline VIII of 19 January 2015
Other
Size: 4 MB
Forewind
Wilton provisions and response to Sembcorp/ Sabic submissions. Submitted for Deadline VIII of 19 January 2015
Other
Size: 631 KB
Forewind
Updated Master Index (version 6). Submitted for Deadline VIII of 19 January 2015
Other
Size: 510 KB
Forewind
Comments on the RIES. Submitted for Deadline VIII of 19 January 2015
Other
Size: 815 KB
Forewind
Appendix 2 ? RCBC Correspondence in relation to Article 9 Final. Submitted for Deadline VIII of 19 January 2015
Other
Size: 469 KB
Forewind
Compulsory Acquisition Hearing summary 13 January 2015. Submitted for Deadline VIII of 19 January 2015
Other
Size: 677 KB
Marine Management Organisation
Submission for Deadline VIII of 19 January 2015
Other
Size: 585 KB
Natural England
Submission for Deadline VIII of 19 January 2015
Other
Size: 322 KB
Royal Society for the Protection of Birds (RSPB)
Submission for Deadline VIII of 19 January 2015
Other
Size: 6 MB
SABIC UK Petrochemicals Limited
Comments regarding protective provisions and on the Draft DCO. Submitted for Deadline VIII of 19 January 2015
Other
Size: 203 KB
The Crown Estate
Submission for Deadline VIII of 19 January 2015 (Late submission)
Other
Size: 583 KB
The Wildlife Trusts
Comments on the RIES. Submitted for Deadline VIII of 19 January 2015
Other
Size: 236 KB
Panel's note of Accompanied Site Visit 5
Site visit on Garden Land at Yearby and Agricultural land at Redcar Road, Marske-by-the-Sea on 14 January 2015
Other
Size: 48 KB
Action points from hearing on 13 January 2015
Compulsory Acquisition hearing of 13 January
Other
Size: 33 KB
Audio recording of the Compulsory Acquisition Hearing held on 13 January 2015 (continued from 4 December 2014) Part 2
Other
Size: 33 KB
Audio recording of the Compulsory Acquisition Hearing held on 13 January 2015 (continued from 4 December 2014) Part 3
Other
Size: 33 KB
Audio recording of the Compulsory Acquisition Hearing held on 13 January 2015 (continued from 4 December 2014) Part 1
Other
Size: 33 KB
Audio recording of the Compulsory Acquisition Hearing held on 13 January 2015 (continued from 4 December 2014) Part 4
Other
Size: 84 KB
National Grid Electricity Transmission
Update on negotiations with Forewind. Submitted for Deadline VIII of 19 January 2015
Other
Size: 62 KB
Forewind
Notification notice for hearing on 14-16 October 2014
Other
Size: 544 KB
Forewind
Notification notice for hearing on 2-4 December 2014
Other
Size: 544 KB
Forewind
Notification notice for hearing on 11-13 November 2014
Other
Size: 73 KB
Northumbrian Water Limited
Response regarding Protective Provisions agreement. Submitted for Deadline VIII of 19 January 2015
Other
Size: 157 KB
Hearing and Site Visit Agenda
Agenda for Further Compulsory Acquisition Hearing on 13 January 2015 and Accompanied Site Inspection Programme
Other
Size: 185 KB
Charlie Langton on behalf of Mr and Mrs Scaife
Correspondence submitted for the Deadline of 29 December 2014 (Late submission)
Other
Size: 6 MB
Forewind
Correspondence with Strutt and Parker. Submitted for the Deadline on 29 December 2014
Other
Size: 146 KB
Kevin Keddie and Arthur Clifford Jowsey
Correspondence submitted for the Deadline of 29 December 2014
Other
Size: 2 MB
ExA version of the Draft DCO
Other
Size: 56 KB
Forewind
Notification notice for hearing on 13 January 2015
Other
Size: 1 MB
Report on the Implications for European Sites (RIES)
Other
Size: 98 KB
Letter informing of publication of the RIES
Other
Size: 347 KB
VisNed and National Federation of Fishermens Organisations
Submission for Deadline VII of 11 December 2014 (Late Submission)
Other
Size: 233 KB
Natural England
Response to Action 1.5. Submission for Deadline VII of 11 December 2014
Other
Size: 431 KB
Natural England
Annex A ? Site integrity Position Statement. Submission for Deadline VII of 11 December 2014
Other
Size: 325 KB
Natural England
Annex B ? Ornithology advice. Submission for Deadline VII of 11 December 2014
Other
Size: 542 KB
Carter Jonas
Submission for Deadline VII of 11 December 2014
Other
Size: 328 KB
English Heritage
Submission for Deadline VII of 11 December 2014
Other
Size: 563 KB
Forewind
Appendix 1 ? Action 1.4 Response to NE BDMPS Comments submitted for Deadline VII of 11 December 2014
Other
Size: 747 KB
Forewind
Appendix 15 ? Outline Code of Construction Practice ? Version 3 submitted for Deadline VII of 11 December 2014
Other
Size: 3 MB
Forewind
Response to Strutt and Parker Deadline VI submission submitted for Deadline VII of 11 December 2014
Other
Size: 396 KB
Forewind
Appendix 18 - Structure of the BoR Parts 1 and 3 submitted for Deadline VII of 11 December 2014
Other
Size: 4 MB
Forewind
Signed Statement of intent with Alcatel - Version 3 submitted for Deadline VII of 11 December 2014
Other
Size: 515 KB
Forewind
Appendix 4 ? Action 1.11 IROPI Written Statement submitted for Deadline VII of 11 December 2014
Other
Size: 624 KB
Forewind
Offshore In Principle Monitoring Plan submitted for Deadline VII of 11 December 2014
Other
Size: 785 KB
Forewind
Draft DCO Version 6 Change Log submitted for Deadline VII of 11 December 2014
Other
Size: 2 MB
Forewind
Appendix 14 ? SoCG RCBC Funding Security submitted for Deadline VII of 11 December 2014
Other
Size: 2 MB
Forewind
Draft DCO Version 6 Tracked submitted for Deadline VII of 11 December 2014
Other
Size: 2 MB
Forewind
Position Statement on Tata Steel UK Ltd submission submitted for Deadline VII of 11 December 2014
Other
Size: 3 MB
Forewind
Appendix 7 ? Location of Lackenby and Tod Point substations submitted for Deadline VII of 11 December 2014
Other
Size: 338 KB
Forewind
Appendix 11 ? Action 2.8 Disposal Scenario Statement submitted for Deadline VII of 11 December 2014
Other
Size: 451 KB
Forewind
Written Summary of Issue Specific Hearing on 2 December 2014 submitted for Deadline VII of 11 December 2014
Other
Size: 430 KB
Forewind
Written Summary of Issue Specific Hearing on 3 December 2014 submitted for Deadline VII of 11 December 2014
Other
Size: 384 KB
Forewind
Written Summary of Compulsory Acquisition Hearing on 4 December 2014 submitted for Deadline VII of 11 December 2014
Other
Size: 294 KB
Forewind
Response to RSPB Deadline VI Comments submitted for Deadline VII of 11 December 2014
Other
Size: 424 KB
Forewind
Comments on RCBC Response to ExQ2 submitted for Deadline VII of 11 December 2014
Other
Size: 231 KB
Forewind
Comments on English Heritage Deadline VI Response submitted for Deadline VII of 11 December 2014
Other
Size: 554 KB
Forewind
Appendix 19 - Position note on onshore EIA matters submitted for Deadline VII of 11 December 2014
Other
Size: 585 KB
Forewind
Draft DCO Point by Point Response to MMO Comments on DMLs submitted for Deadline VII of 11 December 2014
Other
Size: 443 KB
Forewind
Appendix 3 ? Action 1.9 Sweetman Judgment submitted for Deadline VII of 11 December 2014
Other
Size: 866 KB
Forewind
Appendix 5 ? Updated Integrity Matrices submitted for Deadline VII of 11 December 2014
Other
Size: 648 KB
Forewind
Appendix 2 ? SCI Position Statement submitted for Deadline VII of 11 December 2014
Other
Size: 427 KB
Forewind
Outline Offshore Maintenance Plan submitted for Deadline VII of 11 December 2014
Other
Size: 324 KB
Forewind
Appendix 12 ? Action 2.10 HVAC Remedial Cable Protection submitted for Deadline VII of 11 December 2014
Other
Size: 412 KB
Forewind
Comments on Tees Valley RIGs Deadline VI Response submitted for Deadline VII of 11 December 2014
Other
Size: 2 MB
Forewind
Appendix 13 ? Evidence of Crown Consent submitted for Deadline VII of 11 December 2014
Other
Size: 1 MB
Forewind
Draft DCO Version 6 Clean submitted for Deadline VII of 11 December 2014
Other
Size: 295 KB
Forewind
Comments on Natural England DLVI Response (offshore) submitted for Deadline VII of 11 December 2014
Other
Size: 449 KB
Forewind
Appendix 8 ? Wilton DCO Provisions submitted for Deadline VII of 11 December 2014
Other
Size: 557 KB
Forewind
Master Index version 5 submitted for Deadline VII of 11 December 2014
Other
Size: 471 KB
Forewind
Draft DCO Point by Point Response to MMO Comments on DCO submitted for Deadline VII of 11 December 2014
Other
Size: 4 MB
Forewind
Written Scheme of Investigation submitted for Deadline VII of 11 December 2014
Other
Size: 397 KB
Forewind
Update to Forewind?s response to NE?s submission at Deadline V (onshore) submitted for Deadline VII of 11 December 2014
Other
Size: 382 KB
Forewind
Response to the Crown Estate's submission on the draft DCO submitted for Deadline VII of 11 December 2014
Other
Size: 540 KB
Forewind
Appendix 10 ? Draft DCO Hierarchy of Management Plans submitted for Deadline VII of 11 December 2014
Other
Size: 238 KB
Forewind
Appendix 6 ? NGET Written Statement submitted for Deadline VII of 11 December 2014
Other
Size: 3 MB
Forewind
Response to Carter Jonas Deadline VI submission submitted for Deadline VII of 11 December 2014
Other
Size: 411 KB
Forewind
Appendix 16 ? Standard Form Deed of Grant Statement submitted for Deadline VII of 11 December 2014
Other
Size: 338 KB
Forewind
Summary and Index submitted for Deadline VII of 11 December 2014
Other
Size: 630 KB
Forewind
Fisheries Liaison Plan submitted for Deadline VII of 11 December 2014
Other
Size: 511 KB
Forewind
Appendix 17 ? Restrictive Covenants submitted for Deadline VII of 11 December 2014
Other
Size: 1 MB
Marine Management Organisation
Submission for Deadline VII of 11 December 2014
Other
Size: 705 KB
Natural England
Submission for Deadline VII of 11 December 2014
Other
Size: 320 KB
Royal Society for the Protection of Birds (RSPB)
Submission for Deadline VII of 11 December 2014
Other
Size: 225 KB
Panel's note of Accompanied Site Visit 4
Site Visit on Agricultural land between New Marske and Yearby on 4 December 2014
Other
Size: 31 KB
Highways Agency
Further Email submitted for Deadline VII of 11 December 2014
Other
Size: 108 KB
National Grid Electricity Transmission
Response submitted for Deadline VII of 11 December 2014
Other
Size: 206 KB
SABIC UK Petrochemicals Limited
Response submitted for Deadline VII of 11 December 2014
Other
Size: 153 KB
Scottish Natural Heritage and Marine Scotland
Response to ExA additional questions submitted for Deadline VII of 11 December 2014
Other
Size: 145 KB
Sembcorp Utilities
Response submitted for Deadline VII of 11 December 2014
Other
Size: 1 MB
Strutt and Parker
Letter on behalf of K & T Wilson submitted for Deadline VII of 11 December 2014
Other
Size: 1 MB
Strutt and Parker
Letter on behalf of J Pybus submitted for Deadline VII of 11 December 2014
Other
Size: 936 KB
Strutt and Parker
Letter on behalf of Mrs J Bullock submitted for Deadline VII of 11 December 2014
Other
Size: 1 MB
Strutt and Parker
Letter on behalf of William Wardman Ltd submitted for Deadline VII of 11 December 2014
Other
Size: 475 KB
Strutt and Parker
Letter on behalf of G Towers submitted for Deadline VII of 11 December 2014
Other
Size: 305 KB
The Wildlife Trusts
Response submitted for Deadline VII of 11 December 2014
Other
audio recording
Size: 74 MB
Part 4 - Audio recording of the Issue Specific Hearing held on 3 December 2014
Hearing relating to natural environment, offshore social and economic impacts and draft DCO
Other
audio recording
Size: 18 MB
Part 5 - Audio recording of the Issue Specific Hearing held on 3 December 2014
Hearing relating to natural environment, offshore social and economic impacts and draft DCO
Other
audio recording
Size: 60 MB
Part 3 - Audio recording of the Issue Specific Hearing held on 3 December 2014
Hearing relating to natural environment, offshore social and economic impacts and draft DCO
Other
audio recording
Size: 53 MB
Part 1 - Audio recording of the Issue Specific Hearing held on 3 December 2014
Hearing relating to natural environment, offshore social and economic impacts and draft DCO
Other
audio recording
Size: 99 MB
Part 2 - Audio recording of the Issue Specific Hearing held on 3 December 2014
Hearing relating to natural environment, offshore social and economic impacts and draft DCO
Other
Size: 33 KB
Part 1 - Audio recording of the Compulsory Acquisition Hearing held on 4 December 2014
Hearing relating to Compulsory Acquisition matters
Other
Size: 33 KB
Part 2 - Audio recording of the Compulsory Acquisition Hearing held on 4 December 2014
Hearing relating to Compulsory Acquisition matters
Other
audio recording
Size: 74 MB
Part 4 - Audio recording of the Issue Specific Hearing held on 2 December 2014
Hearing relating to natural environment, offshore social and economic impacts and draft DCO
Other
audio recording
Size: 53 MB
Part 1 - Audio recording of the Issue Specific Hearing held on 2 December 2014
Hearing relating to natural environment, offshore social and economic impacts and draft DCO
Other
audio recording
Size: 60 MB
Part 3 - Audio recording of the Issue Specific Hearing held on 2 December 2014
Hearing relating to natural environment, offshore social and economic impacts and draft DCO
Other
audio recording
Size: 99 MB
Part 2 - Audio recording of the Issue Specific Hearing held on 2 December 2014
Hearing relating to natural environment, offshore social and economic impacts and draft DCO
Other
Size: 15 MB
Carter Jonas
Development Option document for the land at Ryehills (Grundales). Submitted for Deadline VII of 11 December 2014
Other
Size: 16 MB
Carter Jonas
Development Option document for the land at Cat Flatt. Submitted for Deadline VII of 11 December 2014
Other
Size: 31 KB
Highways Agency
Response to Rule 17 Letter submitted for Deadline VII of 11 December 2014
Other
Size: 4 MB
Strutt and Parker LLP
Response to Deadline VI
Other
Size: 10 KB
Tees Valley RIGS Group
Written summary of points made orally at hearing on 2 December 2014. Submitted for Deadline VII of 11 December 2014
Other
Size: 78 KB
Rule 8(3) and 9 Letter
Timetable Change for Further Compulsory Acquisition Hearings
Other
Size: 98 KB
Rule 13 Letter
Further Notification of Hearing and Site Inspection Arrangements
Other
Size: 78 KB
Action points from hearings on 2-4 December 2014
ISHs of 2 and 3 December and CA hearing of 4 December
Other
Size: 1 MB
Forewind
Response to NWL?s proposed Protective Provisions. Submitted for Deadline VIII of 19 January 2015
Other
Size: 328 KB
Sahaviriya Steel Industries UK
Submission for Deadline VII of 11 December 2014.
Other
Size: 466 KB
National Grid
Update. Submitted for Deadline VII.
Other
Size: 122 KB
Northumbrian Water Limited
Proposed Protective Provisions. Submitted for Deadline VII.
Other
Size: 163 KB
Request for further information under Rule 17
Letter to Scottish Natural Heritage and Marine Scotland
Other
Size: 334 KB
Crown Estate
Submitted for Deadline VI of 20 November 2014 (late submission)
Other
Size: 228 KB
Forewind
Question 3.1 Appendix 2. Submitted for Deadline VI of 20 November 2014 (late submission)
Other
Size: 195 KB
Natural England
Response to Second Written Questions. Submitted for Deadline VI of 20 November 2014
Other
Size: 112 KB
Rule 9 letter
Rule 9 letter issued by the Examining Authority on 25 November 2014
Other
Size: 73 KB
Letter to Sahaviriya Steel Industries UK Ltd
Letter from the Examining Authority regarding Requested Changes to Compulsory Acquisition Proposals
Other
Size: 134 KB
141125 Hearing and Site Inspection Agendas
Agenda for Hearings between 2 ? 4 December 2014 and Confirmation of the Accompanied Site Inspection Programme
Other
Size: 2 MB
Carter Jonas LLP
Submission for Deadline VI - Amended version
Other
Size: 73 KB
Letter to Tata Steel
Letter from the Examining Authority regarding requested Changes to Compulsory Acquisition Proposals
Other
Size: 98 KB
Natural England
Application changes response
Other
Size: 134 KB
Tata Steel
Response to Deadline VI of 20 November 2014
Other
Size: 53 KB
Carter Jonas LLP
Correspondence submitted for Deadline VI of 20 November 2014
Other
Size: 38 KB
English Heritage
Response to Deadline VI of 20 November 2014
Other
Size: 36 KB
English Heritage
Response to Second Written Questions. Submitted for Deadline VI of 20 November 2014
Other
Size: 562 KB
Forewind
Question 4.1 Appendix 1. Submitted for Deadline VI of 20 November 2014
Other
Size: 504 KB
Forewind
Question 3.4 Appendix 1. Submitted for Deadline VI of 20 November 2014
Other
Size: 2 MB
Forewind
Question 5.6 Appendix 1. Submitted for Deadline VI of 20 November 2014
Other
Size: 340 KB
Forewind
Question 11.1 Appendix 1. Submitted for Deadline VI of 20 November 2014
Other
Size: 4 MB
Forewind
Comments on Natural England Deadline V response (onshore) final. Submitted for Deadline VI of 20 November 2014
Other
Size: 583 KB
Forewind
Appendix 14 ? Action 3.5 Funding of Dogger Bank Teesside AB projects final. Submitted for Deadline VI of 20 November 2014
Other
Size: 918 KB
Forewind
Response to Second Written Questions. Submitted for Deadline VI of 20 November 2014
Other
Size: 424 KB
Forewind
Summary and Index. Submitted for Deadline VI of 20 November 2014
Other
Size: 1 MB
Forewind
Draft DCO version 5 (tracked). Submitted for Deadline VI of 20 November 2014
Other
Size: 655 KB
Forewind
Question 11.4 Figure 1. Submitted for Deadline VI of 20 November 2014
Other
Size: 2 MB
Forewind
Forewind ? Responses to Order Limit Amendments Consultation Part 4 of 4. Submitted for Deadline VI of 20 November 2014
Other
Size: 1 MB
Forewind
Draft DCO version 5 (clean). Submitted for Deadline VI of 20 November 2014
Other
Size: 389 KB
Forewind
Written summary Compulsory Acquisition Hearing 13 November 2014. Submitted for Deadline VI of 20 November 2014
Other
Size: 601 KB
Forewind
Question 3.3 Appendix 1. Submitted for Deadline VI of 20 November 2014
Other
Size: 902 KB
Forewind
Apportioning of Flamborough and Filey Coast pSPA and Farne Islands guillemot and razorbill population. Submitted for Deadline VI of 20 November 2014
Other
Size: 423 KB
Forewind
Forewind ? Written summary Issue Specific Hearing 11 and 12 November 2014
Other
Size: 2 MB
Forewind
Question 14.1 Appendix 1. Submitted for Deadline VI of 20 November 2014
Other
Size: 733 KB
Forewind
Outline Code of Construction Practice version 2 final. Submitted for Deadline VI of 20 November 2014
Other
Size: 5 MB
Forewind
Updated Integrity Matrices ? Tracked Changes. Submitted for Deadline VI of 20 November 2014
Other
Size: 505 KB
Forewind
Master Index version 4. Submitted for Deadline VI of 20 November 2014
Other
Size: 1 MB
Forewind
Updated SoCG National Grid Electricity Transmission. Submitted for Deadline VI of 20 November 2014
Other
Size: 1 MB
Forewind
Question 3.1 Appendix 1. Submitted for Deadline VI of 20 November 2014
Other
Size: 4 MB
Forewind
Inshore Shipping and Anchoring Review. Submitted for Deadline VI of 20 November 2014
Other
Size: 493 KB
Forewind
Comments on Scottish Fishermen?s Federation Deadline V Final. Submitted for Deadline VI of 20 November 2014
Other
Size: 3 MB
Forewind
Updated Integrity Matrices 4. Submitted for Deadline VI of 20 November 2014
Other
Size: 393 KB
Forewind
Appendix 13 ? Action 3.5 Commercial Clarification part 1 of 2. Submitted for Deadline VI of 20 November 2014
Other
Size: 491 KB
Forewind
Comments on the Wildlife Trusts Deadline V response final. Submitted for Deadline VI of 20 November 2014
Other
Size: 386 KB
Forewind
Responses to Order Limit Amendments Consultation Part 1 of 4. Submitted for Deadline VI of 20 November 2014
Other
Size: 1 MB
Forewind
Apportioning of Flamborough and Filey Coast pSPA gannet population. Submitted for Deadline VI of 20 November 2014
Other
Size: 331 KB
Forewind
Response to Ms Marshall Deadline V submission. Submitted for Deadline VI of 20 November 2014
Other
Size: 45 KB
Forewind
Book of Reference (updated) (comparison) Final. Submitted for Deadline VI of 20 November 2014
Other
Size: 433 KB
Forewind
Draft DCO Change Log version 5. Submitted for Deadline VI of 20 November 2014
Other
Size: 409 KB
Forewind
Point by point response to Natural England Draft DCO version 4 . Submitted for Deadline VI of 20 November 2014
Other
Size: 45 KB
Forewind
Book of Reference (updated) (clean) Final. Submitted for Deadline VI of 20 November 2014
Other
Size: 2 MB
Forewind
Appendix 13 ? Action 3.5 Commercial Clarification part 2 of 2. Submitted for Deadline VI of 20 November 2014
Other
Size: 514 KB
Forewind
Question 12.4 Appendix 1. Submitted for Deadline VI of 20 November 2014
Other
Size: 10 MB
Forewind
Responses to Order Limit Amendments Consultation Part 2 of 4. Submitted for Deadline VI of 20 November 2014
Other
Size: 388 KB
Forewind
Appendix 15 ? Action 3.5 Seven year consent duration final. Submitted for Deadline VI of 20 November 2014
Other
Size: 385 KB
Forewind
Funding Statement (revised). Submitted for Deadline VI of 20 November 2014
Other
Size: 372 KB
Forewind
Comments on Natural England Deadline V response (offshore) final. Submitted for Deadline VI of 20 November 2014
Other
Size: 4 MB
Forewind
Responses to Order Limit Amendments Consultation Part 3 of 4. Submitted for Deadline VI of 20 November 2014
Other
Size: 319 KB
Forewind
Question 2.4 Appendix 1. Submitted for Deadline VI of 20 November 2014
Other
Size: 422 KB
Forewind
Appendix 12 ? Action 3.4 Need for Compulsory Acquisition Final. Submitted for Deadline VI of 20 November 2014
Other
Size: 1 MB
Forewind
Forewind ? Apportioning of Flamborough and Filey Coast pSPA and Farne Islands kittiwake population
Other
Size: 2 MB
Forewind
Final HRA In-combination ornithology tables. Submitted for Deadline VI of 20 November 2014
Other
Size: 461 KB
Forewind
Response to Action Points List 1 ? Action 1.3. Submitted for Deadline VI of 20 November 2014
Other
Size: 289 KB
Forewind
Written summary Open Floor Hearing 11 November 2014. Submitted for Deadline VI of 20 November 2014
Other
Size: 122 KB
Hartlepool Fishermen's Society
Response to Second Written Questions. Submitted for Deadline VI of 20 November 2014
Other
Size: 22 KB
Marine Management Organisation
Proposed DML condition. Submitted for Deadline VI of 20 November 2014
Other
Size: 706 KB
Marine Management Organisation
Response to Deadline VI of 20 November 2014
Other
Size: 1 MB
National Grid Electricity Transmission Plc
Update on position with Forewind. Submitted for Deadline VI of 20 November 2014
Other
Size: 1,015 KB
Natural England
Response to Deadline VI of 20 November 2014
Other
Size: 41 KB
Redcar and Cleveland Borough Council
Response to Second Written Questions. Submitted for Deadline VI of 20 November 2014
Other
Size: 707 KB
Royal Society for the Protection of Birds (RSPB)
Response to Second Written Questions. Submitted for Deadline VI of 20 November 2014
Other
Size: 477 KB
SABIC
Response to Deadline VI of 20 November 2014
Other
Size: 514 KB
Sembcorp
Update on position with Forewind. Submitted for Deadline VI of 20 November 2014
Other
Size: 14 KB
Tees Valley RIGS Group
Update on position with Forewind. Submitted for Deadline VI of 20 November 2014
Other
Size: 614 KB
The Wildlife Trusts
Response to Second Written Questions. Submitted for Deadline VI of 20 November 2014
Other
Size: 134 KB
Whale and Dolphin Conservation
Response to Second Written Questions. Submitted for Deadline VI of 20 November 2014
Other
audio recording
Size: 15 MB
Audio recording of the Open Floor Hearing held on 11 November 2014
Other
audio recording
Size: 42 MB
Part 2 - Audio recording of the Issue Specific Hearing held on 12 November 2014
Hearing relating to community benefits, onshore traffic and transportation, offshore physical impacts, offshore socio-economic impacts
Other
audio recording
Size: 32 MB
Part 3 - Audio recording of the Issue Specific Hearing held on 12 November 2014
Hearing relating to community benefits, onshore traffic and transportation, offshore physical impacts, offshore socio-economic impacts
Other
audio recording
Size: 72 MB
Part 1 - Audio recording of the Issue Specific Hearing held on 12 November 2014
Hearing relating to community benefits, onshore traffic and transportation, offshore physical impacts, offshore socio-economic impacts
Other
audio recording
Size: 40 MB
Part 3 continued - Audio recording of the Issue Specific Hearing held on 12 November 2014
Hearing relating to community benefits, onshore traffic and transportation, offshore physical impacts, offshore socio-economic impacts
Other
audio recording
Size: 62 MB
Part 4 - Audio recording of the Issue Specific Hearing held on 11 November 2014
Hearing relating to natural environment, onshore physical impacts, onshore socio-economic impacts
Other
Size: 59 KB
Panel's note of Accompanied Inspection 2
Site Visit at Red Howles RIG and the Landing Point on 11 November 2014
Other
Size: 63 KB
Panel's note of Accompanied Site Visit 3
Site Visit at Old Hall Farm and Land Surrounding Lackenby Substation on 13 November 2014
Other
Size: 673 KB
Accompanied Site Visit Route of 13 November 2014
Other
audio recording
Size: 91 MB
Part 3 - Audio recording of the Issue Specific Hearing held on 11 November 2014
Hearing relating to natural environment, onshore physical impacts, onshore socio-economic impacts
Other
audio recording
Size: 54 MB
Part 1 - Audio recording of the Issue Specific Hearing held on 11 November 2014
Hearing relating to natural environment, onshore physical impacts, onshore socio-economic impacts
Other
audio recording
Size: 23 MB
Part 2 - Audio recording of the Issue Specific Hearing held on 11 November 2014
Hearing relating to natural environment, onshore physical impacts, onshore socio-economic impacts
Other
Size: 33 KB
Part 2 - Audio recording of the Compulsory Acquisition Hearing held on 13 November 2014
Hearing relating to Compulsory Acquisition matters
Other
Size: 33 KB
Part 1 - Audio recording of the Compulsory Acquisition Hearing held on 13 November 2014
Hearing relating to Compulsory Acquisition matters
Other
Size: 418 KB
Forewind
Figure submitted after site visit of 11 November 2014
Other
Size: 2 MB
Tees Valley RIGS Group
Photos submitted after site visit of 11 November 2014.
Other
Size: 102 KB
Action points from hearings on 11-13 November 2014
ISHs of 11 & 12 November and CA hearing of 13 November
Other
Size: 36 KB
English Heritage
Application changes response
Other
Size: 18 KB
Public Health England
Application changes response
Other
Size: 833 KB
West Midland Metropolitan Authority Pension Fund
Correspondence regarding compulsory acquisition of land
Other
Size: 11 KB
Environment Agency
Application changes response
Other
Size: 15 KB
Network Rail Infrastructure Ltd
Comments regarding protective provisions
Other
Size: 469 KB
SABIC UK Petrochemicals Limited
Written Representation submitted for the deadline of 3 September 2014 (Late Submission)
Other
Size: 218 KB
Hearing and Site Inspection Agendas
Agenda for Hearings between 11 ? 13 November 2014 and Accompanied Site Inspection Programme
Other
Size: 41 KB
UK Trade and Investment (UKTI)
Letter withdrawing representations
Other
Size: 5 MB
Forewind
Appendix 21? ExA Action list 3.11 ? M&G Solid Fuels easement confirmation (version 3- submitted to replace published version 1). Submitted for Deadline V of 23 October 2014 (Late Submission)
Other
Size: 143 KB
ExA Second Written Questions
Second Written Questions issued on 28 October 2014
Other
Size: 787 KB
Royal Society for the Protection of Birds (RSPB)
Response submitted for Deadline V of 23 October 2014
Other
Size: 465 KB
The Wildlife Trusts
Response submitted for Deadline V of 23 October 2014
Other
Size: 49 KB
Carter Jonas LLP
Correspondence submitted for Deadline V of 23 October 2014
Other
Size: 595 KB
Forewind
Point by point response to Natural England comments on the draft DCO (version 2). Submitted for Deadline V of 23 October 2014
Other
Size: 413 KB
Forewind
Written summary of the DCO/DML Hearing oral case. Submitted for Deadline V of 23 October 2014
Other
Size: 303 KB
Forewind
Expert CV - Brown and May Marine Ltd. Submitted for Deadline V of 23 October 2014
Other
Size: 110 KB
Forewind
Expert CV - Beth Mackey. Submitted for Deadline V of 23 October 2014
Other
Size: 1 MB
Forewind
Appendix 12 ? Final SoCG with North York Moors NP. Submitted for Deadline V of 23 October 2014
Other
Size: 110 KB
Forewind
Expert CV - Jonny Lewis. Submitted for Deadline V of 23 October 2014
Other
Size: 1 MB
Forewind
Point by point response to MMO comments on the draft DCO (version 2). Submitted for Deadline V of 23 October 2014
Other
Size: 2 MB
Forewind
Summary and Index. Submitted for Deadline V of 23 October 2014
Other
Size: 2 MB
Forewind
Appendix 11 ? Final SoCG with Natural England Onshore. Submitted for Deadline V of 23 October 2014
Other
Size: 111 KB
Forewind
Expert CV - Richard Cottle. Submitted for Deadline V of 23 October 2014
Other
Size: 6 MB
Forewind
Master Index version 3. Submitted for Deadline V of 23 October 2014
Other
Size: 2 MB
Forewind
SoCG Correspondence Middlesbrough Council. Submitted for Deadline V of 23 October 2014
Other
Size: 1 MB
Forewind
SoCG Nunthorpe Parish Council. Submitted for Deadline V of 23 October 2014
Other
Size: 2 MB
Forewind
SoCG Billingham Town Council. Submitted for Deadline V of 23 October 2014
Other
Size: 2 MB
Forewind
SoCG EPIC Regeneration. Submitted for Deadline V of 23 October 2014
Other
Size: 109 KB
Forewind
Expert CV - Mark Trinder. Submitted for Deadline V of 23 October 2014
Other
Size: 110 KB
Forewind
Expert CV - Bob Furness. Submitted for Deadline V of 23 October 2014
Other
Size: 185 KB
Forewind
Correspondence with Highways Agency submitted for Deadline V of 23 October 2014
Other
Size: 7 MB
Forewind
Appendix 21 ? ExA Action list 3.11 ? M&G Solid Fuels easement confirmation. Submitted for Deadline V of 23 October 2014 (Late Submission)
Other
Size: 499 KB
Forewind
Expert CV - Nick Cooper. Submitted for Deadline V of 23 October 2014
Other
Size: 40 KB
Highways Agency
Correspondence with Forewind submitted for Deadline V of 23 October 2014
Other
Size: 917 KB
Marilyn Marshall
Correspondence submitted for Deadline V of 23 October 2014
Other
Size: 233 KB
Marine Management Organisation
Response submitted for Deadline V of 23 October 2014
Other
Size: 259 KB
National Grid Electricity Transmission
Correspondence submitted for Deadline V of 23 October 2014
Other
Size: 983 KB
Natural England
Response submitted for Deadline V of 23 October 2014
Other
Size: 63 KB
Royal Mail
Correspondence with Forewind submitted for Deadline V of 23 October 2014
Other
Size: 220 KB
Scottish Fishermen�s Federation
Correspondence submitted for Deadline V of 23 October 2014
Other
Size: 3 MB
Tees Valley RIGS Group
Correspondence submitted for Deadline V of 23 October 2014
Other
Size: 56 KB
Panels Note of Accompanied Site Visit
Site Visit at the Wilton Complex on 15 October 2014
Other
audio recording
Size: 90 MB
Part 3 of the audio recording of the Issue Specific Hearing on 16 Ocotober 2014
Day 3 relating to the draft DCO and DML
Other
audio recording
Size: 59 MB
Part 2 of the audio recording of the Issue Specific Hearing on 16 October 2014
Day 3 relating to the draft DCO and DML
Other
audio recording
Size: 48 MB
Part 2 of the audio recording of the Issue Specific Hearing on 15 October 2014
Day 2 relating to fisheries resource sustainability and other natural environment issues
Other
audio recording
Size: 85 MB
Part 1 of the audio recording of the Issue Specific Hearing on 15 October 2014
Day 2 relating to fisheries resource sustainability and other natural environment issues
Other
audio recording
Size: 78 MB
Part 1 of the audio recording of the Issue Specific Hearing on 16 October 2014
Day 3 relating to the draft DCO and DML
Other
audio recording
Size: 82 MB
Part 4 of the audio recording of the Issue Specific Hearing on 14 October 2014
Day 1 relating to Biodiversity, HRA and geological effects
Other
audio recording
Size: 80 MB
Part 2 of the audio recording of the Issue Specific Hearing on 14 October 2014
Day 1 relating to Biodiversity, HRA and geological effects
Other
audio recording
Size: 73 MB
Part 1 of the audio recording of the Issue Specific Hearing on 14 October 2014
Day 1 relating to Biodiversity, HRA and geological effects
Other
audio recording
Size: 61 MB
Part 3 of the audio recording of the Issue Specific Hearing on 14 October 2014
Day 1 relating to Biodiversity, HRA and geological effects
Other
Size: 86 KB
Action points from hearings on 14-16 October 2014
ISH relating to natural environment of 14 & 15 October and DCO hearing of 16 October
Other
Size: 426 KB
Carter Jonas LLP on behalf of Lord Ronaldshay
Correspondence regarding compulsory acquisition
Other
Size: 45 KB
Forewind
Response to Rule 17 Request and update to Book of Reference. Submitted for Deadline of 8 October 2014
Other
Size: 213 KB
Hearing agenda for Issue Specific Hearings
Agenda for Hearings between 14 ? 16 October 2014 and Confirmation of Accompanied Site Inspection Programme
Other
Size: 71 KB
Letter to persons affected by changes in Book of Reference
Letter Issued by ExA on 1 October 2014
Other
Size: 114 KB
Rule 17 Letter
Rule 17 Letter issued by the Examining Authority on 1 October 2014
Other
Size: 8 MB
Sembcorp Utilities
Response submitted for the deadline of 23 September 2014 (Late submission)
Other
Size: 465 KB
Forewind
Appendix 15- Draft DCO Change Log Version 3 submitted for the deadline of 23 September 2014
Other
Size: 424 KB
Forewind
Submission Summary and Index submitted for the deadline of 23 September 2014
Other
Size: 2 MB
Forewind
Appendix 5- Comments on Hartlepool Fishermen?s Society submitted for the deadline of 23 September 2014
Other
Size: 786 KB
Forewind
Appendix 12- Updated Master Index submitted for the deadline of 23 September 2014
Other
Size: 572 KB
Forewind
Appendix 18 ? SCI Site Integrity Position Statement submitted for the deadline of 23 September 2014
Other
Size: 461 KB
Forewind
Appendix 8 ? Comments on SoCG with RSPB submitted for the deadline of 23 September 2014
Other
Size: 3 MB
Forewind
Appendix 20 ?Proposed Amendments to Plots Part 2 of 2 submitted for the deadline of 23 September 2014
Other
Size: 1 MB
Forewind
Appendix 6- Comments on Natural England (Offshore) submitted for the deadline of 23 September 2014
Other
Size: 868 KB
Forewind
Appendix 17- Requirements secured through the DCO submitted for the deadline of 23 September 2014
Other
Size: 519 KB
Forewind
Appendix 11- Comments on Redcar and Cleveland Borough Council submitted for the deadline of 23 September 2014
Other
Size: 642 KB
Forewind
Appendix 3- Comments on Whale and Dolphin Conservation submitted for the deadline of 23 September 2014
Other
Size: 418 KB
Forewind
Appendix 24 ?Response to ExA First Question 13.7 Final submitted for the deadline of 23 September 2014
Other
Size: 439 KB
Forewind
Appendix 10- Comments on English Heritage Part 2 submitted for the deadline of 23 September 2014
Other
Size: 641 KB
Forewind
Appendix 9- Comments on English Heritage Part 1 submitted for the deadline of 23 September 2014
Other
Size: 593 KB
Forewind
Appendix 2- Comments on the Wildlife Trusts submitted for the deadline of 23 September 2014
Other
Size: 463 KB
Forewind
Appendix 7- Comments on Natural England (Onshore) submitted for the deadline of 23 September 2014
Other
Size: 1,024 KB
Forewind
Appendix 21 ? Updated SoCG with Natural England submitted for the deadline of 23 September 2014
Other
Size: 517 KB
Forewind
Appendix 22 ?North York Moors NPA Position Statement submitted for the deadline of 23 September 2014
Other
Size: 2 MB
Forewind
Appendix 1 ? Comments on Sembcorp (part 1 of 2) submitted for the deadline of 23 September 2014
Other
Size: 390 KB
Forewind
Appendix 13- Update on screening and integrity matrices final submitted for the deadline of 23 September 2014
Other
Size: 460 KB
Forewind
Appendix 4- Comments on National Federation of Fishermen?s Organisations submitted for the deadline of 23 September 2014
Other
Size: 1 MB
Forewind
Appendix 23 ?SoCG correspondence with Skelton and Brotton Parish Council submitted for the deadline of 23 September 2014
Other
Size: 10 MB
Forewind Ltd
Appendix 1 ? Comments on Sembcorp (part 2 of 2) submitted for the deadline of 23 September 2014
Other
Size: 610 KB
Marine Management Organisation
Response submitted for the deadline of 23 September 2014
Other
Size: 527 KB
Natural England
Response submitted for the deadline of 23 September 2014
Other
Size: 220 KB
Royal Mail
Representation submitted for the deadline of 23 September 2014
Other
Size: 234 KB
Scottish Natural Heritage
Response to First Written Questions submitted for the deadline of 3 September 2014 (Late submission)
Other
Size: 3 MB
Sembcorp Utilities
Further Written Representation submitted for the deadline of 3 September 2014 (Late submission)
Other
Size: 51 KB
Whale and Dolphin Conservation
Further Response to First Written Questions submitted for the deadline of 3 September 2014 (Late submission)
Other
Size: 184 KB
Hearing and Site Inspections Notification Letter
Letter providing details of the time date and place of hearings and site inspections
Other
Size: 36 KB
Cleveland Potash Limited
Email confirming withdrawal of representations and site visit request
Other
Size: 60 KB
Letter to Whale and Dolphin Conservation
Letter regarding the acceptance of late documents for the deadline of 3 September 2014
Other
Size: 74 KB
Whale and Dolphin Conservation
Response to First Written Questions submitted for the deadline of 3 September 2014 (Late submission)
Other
Size: 62 KB
Energetics
Written Representation submitted for the deadline of 3 September 2014
Other
Size: 63 KB
English Heritage
Response to First Written Questions submitted for the deadline of 3 September 2014
Other
Size: 106 KB
Environment Agency
Response to First Written Questions submitted for the deadline of 3 September 2014
Other
Size: 41 KB
Equality and Human Rights Commission
Written Representation submitted for the deadline of 3 September 2014
Other
Size: 9 MB
Forewind
Response to First Written Questions - Question 6.28 Appendix 1 (Part 2 of 2) - submitted for the deadline of 3 September 2014
Other
Size: 571 KB
Forewind
Response to First Written Questions - Question 6.7 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 663 KB
Forewind
Response to First Written Questions - Question 2.22 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 2 MB
Forewind
Response to First Written Questions - Question 1.22 Appendix 1-4 submitted for the deadline of 3 September 2014 Document type:
Other
Size: 1 MB
Forewind
Response to First Written Questions - Question 1.2 Appendix 1 - submitted for the deadline of 3 September 2014
Other
Size: 7 MB
Forewind
Response to First Written Questions - Question 6.20 Appendix 1 (Part 2 of 2) - submitted for the deadline of 3 September 2014
Other
Size: 626 KB
Forewind
Response to First Written Questions - Question 1.25 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 2 MB
Forewind
Appendix A1 ? Draft DCO Version 2 Clean - submitted for the deadline of 3 September 2014
Other
Size: 367 KB
Forewind
Appendix D3 - Draft DCO Schedule 5 amendments - submitted for the deadline of 3 September 2014
Other
Size: 298 KB
Forewind
Response to First Written Questions - Question 1.26 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 1 MB
Forewind
Response to First Written Questions - Question 2.10 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 2 MB
Forewind
Response to First Written Questions submitted for the deadline of 3 September 2014
Other
Size: 7 MB
Forewind
Response to First Written Questions - Question 3.14 Appendix 1 - submitted for the deadline of 3 September 2014
Other
Size: 2 MB
Forewind
Statement of Common Ground with Redcar and Teesbay Fishermen?s Association submitted for the deadline of 3 September 2014
Other
Size: 355 KB
Forewind
Summary of Written Representation submitted for the deadline of 3 September 2014
Other
Size: 6 MB
Forewind
Response to First Written Questions - Question 6.28 Appendix 1 (Part 1 of 2) - submitted for the deadline of 3 September 2014
Other
Size: 755 KB
Forewind
Appendix G ? Economic Benefits Study Headline Report - submitted for the deadline of 3 September 2014
Other
Size: 463 KB
Forewind
Appendix E ? East Inshore and Offshore Marine Plans Table of Compliance - submitted for the deadline of 3 September 2014
Other
Size: 6 MB
Forewind
Response to First Written Questions - Question 6.20 Appendix 1 (Part 1 of 2) - submitted for the deadline of 3 September 2014
Other
Size: 2 MB
Forewind
Appendix A2 ? Draft DCO Version 2 Tracked - submitted for the deadline of 3 September 2014
Other
Size: 2 MB
Forewind
Appendix B ? Draft DCO Change Log - submitted for the deadline of 3 September 2014
Other
Size: 491 KB
Forewind
Response to First Written Questions - Question 11.3 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 471 KB
Forewind
Appendix C ? Landowner and Statutory Undertaker Negotiations - submitted for the deadline of 3 September 2014
Other
Size: 1 MB
Forewind
Response to First Written Questions - Question 14.3 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 4 MB
Forewind
Appendix H ? Wintering Birds Position Statement - submitted for the deadline of 3 September 2014
Other
Size: 291 KB
Forewind
Response to First Written Questions - Question 5.1 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 3 MB
Forewind
Response to First Written Questions - Question 3.8 Appendix 1 - submitted for the deadline of 3 September 2014
Other
Size: 494 KB
Forewind
Response to First Written Questions - Question 2.23 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 292 KB
Forewind
Response to First Written Questions - Question 6.16 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 2 MB
Forewind
Written Representation submitted for the deadline of 3 September 2014
Other
Size: 4 MB
Forewind
Response to First Written Questions - Question 6.10 Appendix 1-2 - submitted for the deadline of 3 September 2014
Other
Size: 3 MB
Forewind
Response to First Written Questions - Question 5.2 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 45 KB
Forewind
Appendix D1 ? Book of Reference Clean - submitted for the deadline of 3 September 2014
Other
Size: 1 MB
Forewind
Master Index version 1 submitted for the deadline of 3 September 2014
Other
Size: 290 KB
Forewind
Response to First Written Questions - Question 5.3 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 4 MB
Forewind
Response to First Written Questions - Question 6.11 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 448 KB
Forewind
Appendix F ? Updated Other Consents and Licences - submitted for the deadline of 3 September 2014
Other
Size: 530 KB
Forewind
Response to First Written Questions - Question 6.8 Appendix 1 submitted for the deadline of 3 September 2014
Other
Size: 3 MB
Forewind
Appendix D5 ? Onshore Land Plan Sheet 03 Update - submitted for the deadline of 3 September 2014
Other
Size: 45 KB
Forewind
Appendix D2 ? Book of Reference Tracked - submitted for the deadline of 3 September 2014
Other
Size: 1 MB
Forewind
Proposed amendment to application plots 58B and 58F - submitted for the deadline of 3 September 2014
Other
Size: 2 MB
Forewind
Appendix D4 ? Onshore Land Plan Sheet 01 Update - submitted for the deadline of 3 September 2014
Other
Size: 71 KB
Fulcrum Pipelines Limited
Written Representation submitted for the deadline of 3 September 2014
Other
Size: 40 KB
GTC
Written Representation submitted for the deadline of 3 September 2014
Other
Size: 3 MB
Hartlepool Fishermen's Society
Written Representation submitted for the deadline of 3 September 2014 (Late submission)
Other
Size: 103 KB
Hartlepool Fishermen's Society Ltd
Response to First Written Questions submitted for the deadline of 3 September 2014
Other
Size: 296 KB
Marine Management Organisation
Response to First Written Questions submitted for the deadline of 3 September 2014
Other
Size: 164 KB
National Federation of Fishermen's Organisations (NFFO)
Written Representation submitted for the deadline of 3 September 2014
Other
Size: 180 KB
National Federation of Fishermen's Organisations (NFFO)
Response to First Written Questions submitted for the deadline of 3 September 2014
Other
Size: 7 MB
Natural England
Written Representation and Response to First Written Questions submitted for the deadline of 3 September 2014.
Other
Size: 124 KB
Public Health England
Response to First Written Questions submitted for the deadline of 3 September 2014
Other
Size: 375 KB
Redcar and Cleveland Borough Council
Response to First Written Questions submitted for the deadline of 3 September 2014
Other
Size: 302 KB
Royal Society for the Protection of Birds (RSPB)
Letter submitted for the deadline of 3 September 2014
Other
Size: 525 KB
Royal Society for the Protection of Birds (RSPB)
Response to First Written Questions submitted for the deadline of 3 September 2014
Other
Size: 987 KB
Royal Yachting Association
Response to First Written Questions submitted for the deadline of 3 September 2014
Other
Size: 347 KB
Sembcorp Utilities
Written Representation submitted for the deadline of 3 September 2014. (Late submission)
Other
Size: 12 KB
Tees Valley RIGS Group
Response to First Written Questions submitted for the deadline of 3 September 2014
Other
Size: 421 KB
The Wildlife Trusts
Written Representation submitted for the deadline of 3 September 2014
Other
Size: 545 KB
The Wildlife Trusts
Response to First Written Questions submitted for the deadline of 3 September 2014
Other
Size: 39 KB
UK Chamber of Shipping
Response to First Written Questions submitted for the deadline of 3 September 2014
Other
Size: 51 KB
UK Trade and Investment (UKTI)
This representation is now WITHDRAWN (see letter of 31 October)
Other
Size: 7 MB
Whale and Dolphin Conservation
Written Representation submitted for the deadline of 3 September 2014
Other
Size: 408 KB
Tees Valley Unlimited
Other representations
Other
Size: 68 KB
Letter to Forewind
Letter regarding the acceptance of late documents for the deadline of 28 August 2014
Other
Size: 68 KB
Letter to NRW
Letter regarding the acceptance of late documents for the deadline of 28 August 2014
Other
Size: 838 KB
Forewind
Health Impact Review (updated) submitted for the deadline of 28 August 2014
Other
Size: 467 KB
Forewind
Status of Statement of Common Ground document submitted for the deadline of 28 August 2014
Other
Size: 2 MB
Forewind
Statement of Common Ground between Forewind and The Royal Yachting Association submitted for the deadline of 28 August 2014
Other
Size: 2 MB
Forewind
Statement of Common Ground between Forewind and Tata Communications submitted for the deadline of 28 August 2014
Other
Size: 2 MB
Forewind
Statement of Common Ground between Forewind and The Wildlife Trusts submitted for the deadline of 28 August 2014
Other
Size: 2 MB
Forewind
Statement of Common Ground between Forewind and The UK Chamber of Shipping submitted for the deadline of 28 August 2014
Other
Size: 958 KB
Forewind
Statement of Common Ground between Forewind and National Grid plc submitted for the deadline of 28 August 2014
Other
Size: 3 MB
Forewind
Statement of Common Ground between Forewind and the Trinity House submitted for the deadline of 28 August 2014
Other
Size: 2 MB
Forewind
Statement of Common Ground correspondence with The Civil Aviation Authority submitted for the deadline of 28 August 2014
Other
Size: 8 MB
Forewind
Statement of Common Ground between Forewind and Rederscentrale submitted for the deadline of 28 August 2014
Other
Size: 2 MB
Forewind
Statement of Common Ground between Forewind and The National Trust (offshore and onshore aspects) submitted for the deadline of 28 August 2014
Other
Size: 8 MB
Forewind
Statement of Common Ground between Forewind and the Swedish Fishermen?s Federation submitted for the deadline of 28 August 2014
Other
Size: 1 MB
Forewind
Statement of Common Ground with North Eastern Inshore Fisheries and Conservation Authority submitted for the deadline of 28 August 2014
Other
Size: 10 MB
Forewind
Statement of Common Ground with Sembcorp Utilities (UK) Ltd submitted for the deadline of 28 August 2014
Other
Size: 6 MB
Forewind
Statement of Common Ground between Forewind and Shell submitted for the deadline of 28 August 2014
Other
Size: 3 MB
Forewind
Statement of Common Ground with the Norwegian Fishermen?s Association and Fiskebat submitted for the deadline of 28 August 2014
Other
Size: 636 KB
Forewind
Statement of Common Ground between Forewind and Natural England (onshore aspects) submitted for the deadline of 28 August 2014
Other
Size: 9 MB
Forewind
NE SoCG Appendix 1 ?Point by point response to NE/JNCC?s s42 consultation response document submitted for the deadline of 28 August 2014
Other
Size: 4 MB
Forewind
Statement of Common Ground between Forewind and Whale and Dolphin Conservation submitted for the deadline of 28 August 2014
Other
Size: 2 MB
Forewind
Statement of Common Ground with Public Health England submitted for the deadline of 28 August 2014
Other
Size: 3 MB
Forewind
Statement of Common Ground between Forewind and Tees Valley RIGS submitted for the deadline of 28 August 2014
Other
Size: 2 MB
Forewind
Statement of Common Ground between Forewind and the Maritime and Coastguard Agency document submitted for the deadline of 28 August 2014
Other
Size: 6 MB
Forewind
Statement of Common Ground with Rederscentrale submitted for the deadline of 28 August 2014
Other
Size: 829 KB
Forewind
Statement of Common Ground with Redcar and Cleveland Borough Council submitted for the deadline of 28 August 2014
Other
Size: 838 KB
Forewind
Statement of Common Ground between Forewind and York Potash Ltd submitted for the deadline of 28 August 2014
Other
Size: 8 MB
Forewind
Statement of Common Ground with the Environment Agency (onshore and offshore) submitted for the deadline of 28 August 2014
Other
Size: 3 MB
Forewind
Statement of Common Ground between Forewind and RWE Dea submitted for the deadline of 28 August 2014
Other
Size: 1 MB
Forewind
Statement of Common Ground between Forewind and The Ministry of Defence (Defence Infrastructure Organisation Safeguarding) submitted for the deadline of 28 August 2014
Other
Size: 1 MB
Forewind
Figure showing Civil Parishes for Teesside A B project submitted for the deadline of 28 August 2014
Other
Size: 28 MB
Forewind
Statement of Common Ground with the Royal Society for the Protection of Birds submitted for the deadline of 28 August 2014
Other
Size: 6 MB
Forewind
Statement of Uncommon Ground between Forewind and Natural England (onshore aspects)submitted for the deadline of 28 August 2014
Other
Size: 3 MB
Forewind
NE SoCG Appendix 5 - 8 submitted for the deadline of 28 August 2014
Other
Size: 1 MB
Forewind
Statement of Common Ground with North York Moors National Park Authority submitted for the deadline of 28 August 2014
Other
Size: 2 MB
Forewind
NE SoCG Appendix 9 - 12 submitted for the deadline of 28 August 2014
Other
Size: 2 MB
Forewind Ltd
Statement of Common Ground between Forewind and Guisborough Town Council submitted for the deadline of 28 August 2014
Other
Size: 6 MB
Forewind Ltd
Statement of Common Ground between Forewind and Danmarks Fiskeriforening (Danish Fishermen's Association) submitted for the deadline of 28 August 2014
Other
Size: 1 MB
Forewind Ltd
Statement of Common Ground between Forewind and Hartlepool Borough Council submitted for the deadline of 28 August 2014
Other
Size: 3 MB
Forewind Ltd
Statement of Common Ground between Forewind and English Heritage (Offshore) submitted for the deadline of 28 August 2014
Other
Size: 1 MB
Forewind Ltd
Statement of Common Ground correspondence with German Fishermen?s Association submitted for the deadline of 28 August 2014
Other
Size: 1 MB
Forewind Ltd
Statement of Common Ground between Forewind and Gassco submitted for the deadline of 28 August 2014
Other
Size: 2 MB
Forewind Ltd
Statement of Common Ground between Forewind and English Heritage (onshore) document submitted for the deadline of 28 August 2014
Other
Size: 2 MB
Forewind Ltd
Statement of Common Ground between Forewind and Highways Agency submitted for the deadline of 28 August 2014
Other
Size: 162 KB
Natural Resources Wales
Clarification note submitted for the deadline of 28 August 2014
Other
Size: 1 MB
Redcar and Cleveland Borough Council
Local Impact Report submitted by Redcar and Cleveland Borough Council for the deadline of 28 August 2014
Other
Size: 184 KB
Sembcorp Utilities
Information about the site visit
Other
Size: 749 KB
Sembcorp Utilities
Other Representations
Other
Size: 2 MB
Tees Valley RIGS Group
Information about the site visit
Other
Size: 69 KB
Email to Royal Mail
Confirmation of interested party status
Other
Size: 73 KB
Preliminary meeting note
Note of the Preliminary meeting held on 5 August 2014
Other
Size: 5 MB
Savills on behalf of Airvolution Energy Ltd
Correspondence received after preliminary meeting
Other
Size: 295 KB
Maritime and Coastguard Agency
Representation submitted in response to Rule 8 Letter
Other
Size: 217 KB
Rule 8 Letter
Rule 8 Letter issued by the Examining Authority on 11 August 2014
Other
Size: 554 KB
ExA first written questions
First written questions issued on 11 August 2014.
Other
audio recording
Size: 126 MB
Preliminary Meeting Audio Recording
Preliminary meeting audio recording
Other
Size: 28 KB
Marine Management Organisation
Response to Rule 6 Letter
Other
Size: 108 KB
Letter to Scottish Executive
Invitation to Preliminary Meeting
Other
Size: 107 KB
Letter to Highways Agency Historical Railways Estate
Invitation to Preliminary Meeting
Other
Size: 108 KB
Letter to Welsh Government
Invitation to Preliminary Meeting
Other
Size: 107 KB
Letter to Natural Resources Wales
Invitation to Preliminary Meeting
Other
Size: 107 KB
Letter to Ministry of Defence
Invitation to Preliminary Meeting
Other
Size: 2 MB
Cleveland Potash Ltd
Response to Rule 6 Letter
Other
Size: 707 KB
Forewind
Explanatory Memorandum- with duplicated text removed submitted in response to Rule 6 Letter
Other
Size: 851 KB
Forewind
Navigational Risk Assessment Appendix B submitted in response to Rule 6 Letter
Other
Size: 130 KB
Forewind
SoCG Update submitted in response to Rule 6 Letter
Other
Size: 695 KB
Forewind
Navigational Risk Assessment Appendix D submitted in response to Rule 6 Letter
Other
Size: 377 KB
Forewind
Response to Rule 6 Letter
Other
Size: 380 KB
Forewind
Navigational Risk Assessment Appendix C submitted in response to Rule 6 Letter
Other
Size: 155 KB
Forewind
Navigational Risk Assessment Appendix A submitted in response to Rule 6 Letter
Other
Size: 14 KB
Tees Valley RIGS Group
Response to Rule 6 Letter
Other
Size: 111 KB
Natural England
Response to Rule 6 Letter
Other
Size: 88 KB
Panel's note of unaccompanied inspection of sites undertaken on 2 July 2014
Other
Size: 72 KB
Invitation letter to the Preliminary Meeting to France - Fritsch
Other
Size: 72 KB
Invitation letter to the Preliminary Meeting to France - Manthe
Other
Size: 72 KB
Invitation letter to the Preliminary Meeting to Denmark
Other
Size: 72 KB
Invitation letter to the Preliminary Meeting to Sweden
Other
Size: 72 KB
Invitation letter to the Preliminary Meeting to Norway
Other
Size: 72 KB
Invitation letter to the Preliminary Meeting to Belgium - Foubert
Other
Size: 72 KB
Invitation letter to the Preliminary Meeting to Belgium - Vandenborre
Other
Size: 72 KB
Invitation letter to the Preliminary Meeting to France - Facon
Other
Size: 72 KB
Invitation letter to the Preliminary Meeting to the Netherlands
Other
Size: 72 KB
Invitation letter to the Preliminary Meeting to Belgium - de Cock
Other
Size: 72 KB
Invitation letter to the Preliminary Meeting to Belgium - Renard
Other
Size: 186 KB
Rule 6 Letter
Rule 6 Letter issued by the Examining Authority on 11 July 2014
Other
Size: 69 KB
Bat Conservation Trust
Representation submitted as a result of the s56 notification
Other
Size: 7 KB
Cruising Association
Representation submitted as a result of the s56 notification
Other
Size: 63 KB
Energetics UK
Representation submitted as a result of the s56 notification
Other
Size: 39 KB
GTC UK
Representation submitted as a result of the s56 notification
Other
Size: 37 KB
Hartlepool Borough Council
Representation submitted as a result of the s56 notification
Other
Size: 1 MB
Northumbrian Water
Representation submitted as a result of the s56 notification
Other
Size: 62 KB
York Potash Limited
Representation submitted as a result of the s56 notification
Other
Size: 108 KB
Letter from ExA to applicant regarding Book of Reference part 3 persons
Other
Size: 45 KB
Forewind
Response to ExA regarding Book of Reference
Other
Size: 536 KB
Forewind
s56 Notice
Other
Size: 33 KB
Forewind
Certificates of Compliances with Reg 13, s56 and s59
Other
Size: 115 KB
140530 Transboundary Re-Screening Matrix
Other
Size: 11 MB
6.20 ES Chapter 20 Seascape and Visual Character
Other
Size: 5 MB
6.13.2 ES Chapter 13 Appendix B
Other
Size: 2 MB
6.19 ES Chapter 19 Military Activity and Civil Aviation
Other
Size: 29 MB
6.13.1 ES Chapter 13 Appendix A
Other
Size: 19 MB
6.24.3 ES Chapter 24 Appendix C
Other
Size: 46 MB
6.9 ES Chapter 9 Marine Physical Processes
Other
Size: 614 KB
6.4.1 ES Chapter 4 Appendix A
Other
Size: 35 MB
6.15.1 ES Chapter 15 Appendix A
Other
Size: 8 MB
6.6.4 ES Chapter 6 Appendix D
Other
Size: 5 MB
6.12.6 ES Chapter 12 Appendix F
Other
Size: 2 MB
6.24.5 ES Chapter 24 Appendix E
Other
Size: 7 MB
6.11 ES Chapter 11 Marine and Coastal Ornithology
Other
Size: 946 KB
6.5.2 ES Chapter 5 Appendix B
Other
Size: 3 MB
6.14.1 ES Chapter 14 Appendix A
Other
Size: 13 MB
6.29 ES Chapter 29 Noise and Vibration
Other
Size: 620 KB
6.0.2 ES Glossary
Other
Size: 598 KB
6.30.2 ES Chapter 30 Appendix B
Other
Size: 14 MB
6.26 ES Chapter 26 Land Use and Agriculture
Other
Size: 44 MB
6.9.1 ES Chapter 9 Appendix A3
Other
Size: 30 MB
6.28.1 ES Chapter 28 Appendix A
Other
Size: 518 KB
6.5.3 ES Chapter 5 Appendix C
Other
Size: 7 MB
6.18.2 ES Chapter 18 Appendix B
Other
Size: 23 MB
6.6.6 ES Chapter 6 Appendix F
Other
Size: 959 KB
6.12.5 ES Chapter 12 Appendix E
Other
Size: 4 MB
6.24.4 ES Chapter 24 Appendix D
Other
Size: 4 MB
6.10 ES Chapter 10 Marine Water and Sediment Quality
Other
Size: 737 KB
6.35 ES Chapter 35 Summary of Monitoring and Mitigation
Other
Size: 39 MB
6.16.1 ES Chapter 16 Appendix A
Other
Size: 17 MB
6.13 ES Chapter 13 Fish and Shellfish Ecology
Other
Size: 25 MB
6.15 ES Chapter 15 Commercial Fisheries
Other
Size: 2 MB
6.5.1 ES Chapter 5 Appendix A
Other
Size: 11 MB
6.23 ES Chapter 23 Tourism and Recreation
Other
Size: 14 MB
6.12 ES Chapter 12 Marine and Intertidal Ecology
Other
Size: 38 MB
6.27.1 ES Chapter 27 Appendix A3
Other
Size: 8 MB
6.6.5 ES Chapter 6 Appendix E
Other
Size: 15 MB
6.21 ES Chapter 21 Landscape and Visual Impact
Other
Size: 5 MB
6.6.7 ES Chapter 6 Appendix G
Other
Size: 22 MB
6.6 ES Chapter 6 Assessment of Alternatives
Other
Size: 1 MB
6.34 ES Chapter 34 Conclusions
Other
Size: 195 KB
6.30.1 ES Chapter 30 Appendix A
Other
Size: 40 MB
6.25 ES Chapter 25 Terrestrial Ecology
Other
Size: 137 KB
6.6.1 ES Chapter 6 Appendix A
Other
Size: 8 MB
6.28 ES Chapter 28 Traffic and Access
Other
Size: 39 MB
6.27.1 ES Chapter 27 Appendix A2
Other
Size: 2 MB
6.31 ES Chapter 31 Inter-relationsips
Other
Size: 27 MB
6.11.1 ES Chapter 11 Appendix A
Other
Size: 3 MB
6.30 ES Chapter 30 Air Quality
Other
Size: 5 MB
6.6.3 ES Chapter 6 Appendix C
Other
Size: 23 MB
6.24.1 ES Chapter 24 Appendix A
Other
Size: 10 MB
6.16 ES Chapter 16 Shipping and Navigation
Other
Size: 24 MB
6.25.1 ES Chapter 25 appendix A2
Other
Size: 4 MB
6.36 ES Non-Technical Summary
Other
Size: 1 MB
6.8.1 ES Chapter 8 Appendix A
Other
Size: 10 MB
6.5 ES Chapter 5 Project Description
Other
Size: 660 KB
6.4 ES Chapter 4 Environmental Impact Assessment Process
Other
Size: 999 KB
6.11.2 ES Chapter 11 Appendix B
Other
Size: 2 MB
6.1 ES Chapter 1 Introduction
Other
Size: 19 MB
6.14 ES Chapter 14 Marine Mammals
Other
Size: 9 MB
6.24 ES Chapter 24 Geology Water Resources and Land Quality
Other
Size: 41 MB
6.9.1 ES Chapter 9 Appendix A1
Other
Size: 47 MB
6.12.2 ES Chapter 12 Appendix B1
Other
Size: 11 MB
6.20.1 ES Chapter 20 Appendix A
Other
Size: 400 KB
6.8.2 ES Chapter 8 Appendix B
Other
Size: 2 MB
6.12.4 ES Chapter 12 Appendix D
Other
Size: 22 MB
6.21.1 ES Chapter 21 Appendix A
Other
Size: 3 MB
6.13.6 ES Chapter 13 Appendix F
Other
Size: 45 MB
6.12.1 ES Chapter 12 Appendix A
Other
Size: 2 MB
6.14.3 ES Chapter 14 Appendix C
Other
Size: 7 MB
6.18 ES Chapter 18 Marine and Coastal Archaeology
Other
Size: 4 MB
6.12.3 ES Chapter 12 Appendix C
Other
Size: 14 MB
6.24.2 ES Chapter 24 Appendix B
Other
Size: 11 MB
1.4 Dogger Bank Teesside Scoping Report
Other
Size: 40 MB
6.9.1 ES Chapter 9 Appendix A2
Other
Size: 10 MB
1.5 Dogger Bank Teesside Scoping Opinion
Other
Size: 281 KB
6.3 ES Chapter 3 Legislation and Policy
Other
Size: 29 MB
6.27.1 ES Chapter 27 Appendix A5
Other
Size: 505 KB
6.2 ES Chapter 2 Project Need
Other
Size: 504 KB
6.11.3 ES Chapter 11 Appendix C
Other
Size: 622 KB
6.29.1 ES Chapter 29 Noise Appendix A
Other
Size: 6 MB
6.13.4 ES Chapter 13 Appendix D
Other
Size: 26 MB
6.25.1 ES Chapter 25 Appendix A1
Other
Size: 7 MB
6.17 ES Chapter 17 Other Marine Users
Other
Size: 36 MB
6.12.2 ES Chapter 12 Appendix B3
Other
Size: 1 MB
6.6.2 ES Chapter 6 Appendix B
Other
Size: 46 MB
6.12.2 ES Chapter 12 Appendix B2
Other
Size: 27 MB
6.18.1 ES Chapter 18 Appendix A
Other
Size: 3 MB
6.13.5 ES Chapter 13 Appendix E
Other
Size: 6 MB
6.8 ES Chapter 8 Designated Sites
Other
Size: 2 MB
6.7 ES Chapter 7 Consultation
Other
Size: 2 MB
6.32 ES Chapter 32 Transboundary Effects
Other
Size: 5 MB
6.13.3 ES Chapter 13 Appendix C
Other
Size: 452 KB
6.22 ES Chapter 22 Socio-Economics
Other
Size: 1 MB
6.13.7 ES Chapter 13 Appendix G
Other
Size: 6 MB
6.33 ES Chapter 33 Cumulative Impact Assessment
Other
Size: 756 KB
6.14.4 ES Chapter 14 Appendix D
Other
Size: 4 MB
6.14.2 ES Chapter 14 Appendix B
Other
Size: 30 MB
6.27.1 ES Chapter 27 Appendix A1
Other
Size: 13 MB
6.27 ES Chapter 27 Terrestrial Archaeology
Other
Size: 18 MB
6.9.1 ES Chapter 9 Appendix A4
Other
Size: 37 MB
6.27.1 ES Chapter 27 Appendix A4
Other
Size: 45 KB
4.3 Book of Reference
Other
Size: 18 MB
2.9.2 Onshore sites or features of the historic environment (with key plan)
Other
Size: 5 MB
1.2 Application Form
Other
Size: 2 MB
2.9.1 Offshore Sites or Features of the Historic Environment
Other
Size: 1 MB
5.2.5 Habitats Regulations Assessment Appendix E
Other
Size: 3 MB
5.1.2 Consultation Report Appendix B
Other
Size: 9 MB
5.1 Consultation Report
Other
Size: 880 KB
2.5.2 Indicative Extent of Marine Licences - Cross Section
Other
Size: 11 MB
2.12 Tree Preservation Order Plan (with key plan)
Other
Size: 1 MB
5.1.9 Consultation Report Appendix I
Other
Size: 1 MB
2.5.1 Indicative extent of marine licences - spatial
Other
Size: 603 KB
8.2 Outline Code of Construction Practice
Other
Size: 8 MB
2.2.2 Order Limits and Grid Co-ordinates Plan Onshore
Other
Size: 473 KB
5.2 Habitats Regulations Assessment Report
Other
Size: 8 MB
2.4.1 Offshore Works Plan (with key plan)
Other
Size: 6 MB
5.2.8 Habitats Regulations Assessment Appendix H
Other
Size: 71 KB
6.0.1 Dogger Bank Teesside A and B Contents Page
Other
Size: 10 MB
5.1.6 Consultation Report Appendix F
Other
Size: 1,002 KB
5.2.3 Habitats Regulations Assessment Appendix C
Other
Size: 476 KB
5.3 Consents and licences under other legislation
Other
Size: 1 MB
2.3.1 Offshore Land Plan
Other
Size: 16 MB
5.2.1 Habitats Regulations Assessment Appendix A
Other
Size: 505 KB
7.3 Statutory Nuisance Statement
Other
Size: 2 MB
5.2.7 Habitats Regulations Assessment Appendix G
Other
Size: 4 MB
1.1 Covering Letter
Other
Size: 37 MB
5.2.2 Habitats Regulations Assessment Appendix B
Other
Size: 11 MB
5.1.3 Consultation report Appendix C
Other
Size: 5 MB
5.2.6 Habitats Regulations Assessment Appendix F
Other
Size: 967 KB
3.2 Explanatory Memorandum
Other
Size: 43 MB
5.1.7 Consultation Report Appendix G
Other
Size: 5 MB
7.2 Cable Details and Grid Connection Statement
Other
Size: 12 MB
2.8.2 Onshore Nature Conservation Sites Plan (with key plan)
Other
Size: 1 MB
3.1 Draft Development Consent Order
Other
Size: 22 MB
2.7 Streets and Public Rights of Way Plan (with key plan)
Other
Size: 403 KB
2.4.6 Work No 1B Grid Coordinates Plan
Other
Size: 614 KB
4.2 Statement of Reasons
Other
Size: 41 MB
5.1.4 Consultation Report Appendix D2
Other
Size: 3 MB
2.8.1 Offshore Nature Conservation Sites
Other
Size: 5 MB
5.2.4 Habitats Regulations Assessment Appendix D
Other
Size: 6 MB
2.3.2 Onshore Land Plan (with key plan)
Other
Size: 18 MB
2.6 Access to Works Plan (with key plan)
Other
Size: 12 MB
1.3 Newspaper Notices
Other
Size: 1 MB
5.1.8 Consultation Report Appendix H
Other
Size: 23 MB
2.4.2 Onshore Works Plan (with key plan)
Other
Size: 906 KB
8.4 Health and Safety Statement
Other
Size: 754 KB
5.1.1 Consultation Report Appendix A
Other
Size: 632 KB
8.3 Outline Decommissioning Statement
Other
Size: 6 MB
2.1.1 Location Plan Offshore
Other
Size: 2 MB
5.1.10 Consultation Report Appendix J
Other
Size: 10 MB
2.1.2 Location Plan Onshore
Other
Size: 814 KB
5.1.11 Consultation Report Appendix K
Other
Size: 1 MB
8.1 Planning and Design Statement
Other
Size: 204 KB
4.1 Funding Statement
Other
Size: 2 MB
2.11 Special Category Land Plan
Other
Size: 424 KB
2.4.5 Work No 1A Grid Coordinates Plan
Other
Size: 4 MB
5.2.9 Habitats Regulations Assessment Appendix I
Other
Size: 1 MB
2.4.4 Creyke Beck and Teesside A and B Extent of Works Plan
Other
Size: 36 MB
5.1.4 Consultation Report Appendix D1
Other
Size: 2 MB
2.2.1 Order Limits and Grid Co-ordinates Plan Offshore
Other
Size: 2 MB
5.1.12 Consultation Report Appendix L
Other
Size: 36 MB
5.1.5 Consultation Report Appendix E
Other
Size: 541 KB
7.1 Safety Zone Statement
Other
Size: 120 KB
s51 Advice
Advice issued by the Planning Inspectorate to the applicant regarding the Book of Reference
Other
Size: 128 KB
Acceptance Decision Letter
Letter notifying of the Planning Inspectorate?s acceptance decision under s55
Other
Size: 490 KB
s55 Checklist
Acceptance Checklist
Other
Size: 9 KB
Middlesbrough Council
Representation on the adequacy of the Applicant's pre-application consultation from Middlesbrough Council.
Other
Size: 29 KB
North York Moors National Park Authority
Representation on the adequacy of the Applicant's pre-application consultation from North York Moors National Park Authority.
Other
Size: 44 KB
North Yorkshire County Council
Representation on the adequacy of the Applicant's pre-application consultation from North Yorkshire County Council.
Other
Size: 78 KB
Redcar and Cleveland Borough Council
Representation on the adequacy of the Applicant's pre-application consultation from Redcar and Cleveland Borough Council.
Other
Size: 150 KB