You can filter the results to show only the items that match your interest.
Documents Published By Stage
Source | Description |
---|---|
Other |
Marine Management Organisation (MMO) (PDF, 154 KB)
Variation 5 – DML Schedule 10 of the Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
|
Other |
Marine Management Organisation (MMO) (PDF, 31 KB)
Notice of Variation for Schedule 8
|
Other |
Marine Management Organisation (MMO) (PDF, 31 KB)
Notice of Variation for Schedule 10
|
Other |
Marine Management Organisation (MMO) (PDF, 158 KB)
Variation 5 – DML Schedule 8 of the Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
|
Other |
Marine Management Organisation (MMO) (PDF, 927 KB)
Cover Letter
|
Other |
Sofia Offshore Wind Farm Limited (PDF, 149 KB)
Letter to Doggerbank Offshore Windfarm Project 3 Projco Ltd regarding Article 8 – Consent to Transfer Benefit of Order
|
Other |
Marine Management Organisation (MMO) (PDF, 127 KB)
MMO Cover Letter (variation 4)
|
Other |
Marine Management Organisation (MMO) (PDF, 131 KB)
Amended DML Schedule 10 (variation 4)
|
Other |
Marine Management Organisation (MMO) (PDF, 140 KB)
Amended DML Schedule 8 (variation 4)
|
Other |
Marine Management Organisation (MMO) (PDF, 46 KB)
Notice of variation order schedule 10 (variation 4)
|
Other |
Marine Management Organisation (MMO) (PDF, 47 KB)
Notice of variation order schedule 8 (variation 4)
|
Other |
Department for Business, Energy and Industrial Strategy (BEIS) (PDF, 162 KB)
Secretary of State Decision Letter - 22 January 2021
|
Other |
Department for Business, Energy and Industrial Strategy (BEIS) (PDF, 83 KB)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No.2) Order 2021
|
Other |
Department for Business, Energy and Industrial Strategy (BEIS) (PDF, 171 KB)
Secretary of State Decision Letter of 14 January 2021
|
Other |
Department for Business, Energy and Industrial Strategy (BEIS) (PDF, 90 KB)
Amendment Order 2021
|
Other |
Department for Business, Energy and Industrial Strategy (BEIS) (PDF, 160 KB)
Decision Letter of 30 November 2020
|
Other |
Department for Business, Energy and Industrial Strategy (BEIS) (PDF, 112 KB)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) No 2 Order 2020
|
Other |
Marine Management Organisation (PDF, 317 KB)
Cover Email
|
Other |
Marine Management Organisation (PDF, 97 KB)
Cover Letter
|
Other |
Marine Management Organisation (PDF, 185 KB)
Marine Licence Variation Request
|
Other |
Marine Management Organisation (PDF, 59 KB)
Notice of Variation Dogger Bank Teesside AB Offshore Wind Farm Order 2015 Schedule 8, Variation 2
|
Other |
Marine Management Organisation (PDF, 140 KB)
Dogger Bank Teesside A and B Offshore Wind Farm Amended Deemed Marine Licence 3, Schedule 10, Variation 2
|
Other |
Marine Management Organisation (PDF, 142 KB)
Dogger Bank Teesside A and B Offshore Wind Farm Amended Deemed Marine Licence 1, Schedule 8, Variation 2
|
Other |
Marine Management Organisation (PDF, 269 KB)
Habitats Regulations Assessment Adoption Decision, Variation 2
|
Other |
Marine Management Organisation (PDF, 47 KB)
Notice of Variation Dogger Bank Teesside AB Offshore Wind Farm Order 2015 Schedule 10, Variation 2
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 12 MB)
Consultation and Publicity Statement under Regulation 7A
|
Other |
Environment Agency (PDF, 2 MB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Department for Business, Energy and Industrial Strategy (BEIS) (PDF, 360 KB)
Secretary of State’s Habitats Regulations Assessment
|
Other |
Department for Business, Energy and Industrial Strategy (BEIS) (PDF, 79 KB)
Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2020
|
Other |
Department for Business, Energy and Industrial Strategy (BEIS) (PDF, 213 KB)
Decision Letter of 11 August 2020
|
Other |
Marine Management Organisation (PDF, 191 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Maritime and Coastguard Agency (PDF, 444 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Natural England (PDF, 151 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
The Crown Estate (PDF, 198 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
The Wildlife Trust (PDF, 122 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Chrysaor (PDF, 148 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 87 KB)
Appendix 1 - Joint Regulation 6 Notice
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 330 KB)
Appendix 5b - NMC consultee letter
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 327 KB)
Consultation and Publicity Statement
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 432 KB)
Appendix 3 - Joint NMC Consultation List
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 1 MB)
Appendix 2 - Advertisement
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 273 KB)
Appendix 5a - NMC consultee letter
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 41 KB)
Appendix 4 - Additional consultation
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 373 KB)
Appendix 6 - NMC letter for Redcar residents
|
Other |
Historic England (PDF, 108 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Historic England (PDF, 405 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Malcom Morrison (PDF, 109 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Marine Management Organisation (PDF, 378 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Michael Moorhouse (PDF, 200 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Natural England (PDF, 334 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Natural Resources Wales (PDF, 99 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
North York Moors National Park Authority (PDF, 168 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
North Yorkshire County Council (PDF, 530 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Shell UK Limited (PDF, 44 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
The Coal Authority (PDF, 64 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
The Crown Estate (PDF, 124 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
The Office of Rail and Road (PDF, 84 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Trinity House (PDF, 77 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Historic England (PDF, 679 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Marine Management Organisation (PDF, 688 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Maritime & Coastguard Agency (PDF, 273 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Michael Moorhouse (PDF, 200 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Natural England (PDF, 279 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
North Yorkshire County Council (PDF, 538 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
The Crown Estate (PDF, 236 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
The Wildlife Trusts (PDF, 311 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Trinity House (PDF, 462 KB)
Response to the consultation by the Secretary of State for Business, Energy and Industrial Strategy
|
Other |
Sofia Offshore Wind Farm Limited (PDF, 169 KB)
Consultation and Publicity Statement under Regulation 7A
|
Other |
Sofia Offshore Wind Farm Limited (PDF, 3 MB)
Appendices 1-4
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 1 MB)
Environmental Report - Annex 1 - Underwater Noise Modelling at the Teesside A offshore wind farm, Dogger Bank
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 108 KB)
Regulation 6 Notice
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 829 KB)
Regulation 7(3) BEIS Response
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 79 KB)
The Dogger Bank Teesside A and B Offshore Wind Farm Draft Amendment Order
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 367 KB)
Regulation 7(3) Appendix 1 - Consultee List
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 1 MB)
Development Consent Order - Tracked Version
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 116 KB)
Regulation 7(3) Request for Approval of the Consultee List
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 91 KB)
Cover Letter
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 607 KB)
Environmental Report
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 1,000 KB)
Appendix 1 - Marine Mammal Technical Report
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 134 KB)
Template Letter to Consultees
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 210 KB)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2020
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 703 KB)
Explanatory Memorandum for Joint NMC Amendment Order May 2020
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 345 KB)
Environmental Report to Support Joint Non-Material Change Application: Dogger Bank Teesside A and Sofia Offshore Wind Farms May 2020
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 1 MB)
Appendix 2 Figure 3.2 - Link Sensitivity
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 2 MB)
Appendix 2 Figure 1 - Onshore cable route & infrastructure for Dogger Bank Teesside A & B to Lackenby substation
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 2 MB)
DCO with Track Changes (Joint NMC) The Dogger Teesside A and B Offshore Wind Farm 2015
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 160 KB)
Covering Letter and Supporting Statement
|
Other |
Doggerbank Offshore Windfarm Project 3 Projco Limited and Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 12 MB)
Appendix 1 - Works Plans
|
Other |
Sofia Offshore Wind Farm Limited (PDF, 176 KB)
Request to increase hammer energy for Sofia Offshore Wind Farm (SOWF) – 2018
|
Other |
Sofia Offshore Wind Farm Limited (PDF, 400 KB)
Agreement from Natural England that the 2018 Statement of Common Ground is appropriate
|
Other |
Sofia Offshore Wind Farm Limited (PDF, 524 KB)
Agreement from the Marine Management Organisation that the 2018 Statement of Common Ground is appropriate
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 539 KB)
Environmental Appraisal of Increased Hammer Energy - Appendix B - Auditory Injury Assessment - cumulative exposure to piling noise
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 984 KB)
Statement of Common Ground between Sofia Offshore Wind Farm and the Marine Management Organisation – 2018 NMC application
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 1 MB)
Response to Non-Material Change Consultation - Environmental Appraisal of Increased Hammer Energy Appendix C: Assessment of fish receptors
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 261 KB)
Environmental Appraisal of Increased Hammer Energy Appendix D - Consultation Summary
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 671 KB)
Annex E – Sofia response to the BEIS SNS cSAC shadow HRA information – 2018 NMC application
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 491 KB)
Annex A – Sofia’s response to Natural England – 2018 NMC application
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 498 KB)
Statement of Common Ground between Sofia Offshore Wind Farm and Natural England – 2018 NMC application
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 955 KB)
Annex B – Summary of consultation with the MMO – 2018 NMC application
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 789 KB)
Environmental Appraisal of Increased Hammer Energy - Main Report
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 293 KB)
Non-material change application to the Dogger Bank Teesside A and B Off-shore Wind Farm Order 2015 (as amended) - Cover Letter
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 2 MB)
Appendix A - Additional underwater noise modelling at Sofia offshore wind farm, Dogger Bank
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 2 MB)
The Dogger Bank Offshore Wind Farm Order 2015 (as amended) NMC amendments requested 2020
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 223 KB)
Annex D – Sofia’s response to the Whale and Dolphin Conservation – 2018 NMC application
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 501 KB)
Annex C – Sofia’s response the Wildlife Trust – 2018 NMC application
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 402 KB)
Appendix E: Information provided by Sofia Offshore Wind Farm Limited (SOWFL) to inform a Habitats Regulation Assessment
|
Other |
Sofia Offshore Wind Farm Limited (SOWFL) (PDF, 83 KB)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment Order) 2020
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 65 KB)
Response to further consultation by the Secretary of State
|
Other |
Department for Business, Energy & Industrial Strategy (BEIS) (PDF, 130 KB)
Consultation Letter - Request for Further Information
|
Other |
Marine Management Organisation (PDF, 83 KB)
Response to Non-Material Change Consultation
|
Other |
Natural England (PDF, 135 KB)
Response to Non-Material Change Consultation
|
Other |
Department for Business, Energy & Industrial Strategy (BEIS) (PDF, 361 KB)
Habitats Regulations Assessment (HRA)
|
Other |
Department for Business, Energy & Industrial Strategy (BEIS) (PDF, 193 KB)
Consultation Letter - Request for Information
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 3 MB)
Consultation and Publicity Statement Appendix 1-5
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 182 KB)
Consultation and Publicity Statement Letter
|
Other |
Historic England (PDF, 106 KB)
Response to Non-Material Change Consultation
|
Other |
Marine Management Organisation (PDF, 191 KB)
Response to Non-Material Change Consultation
|
Other |
Maritime and Coastguard Agency (PDF, 168 KB)
Response to Non-Material Change Consultation
|
Other |
Natural England (PDF, 96 KB)
Response to Non-Material Change Consultation
|
Other |
The Crown Estate (PDF, 44 KB)
Response to Non-Material Change Consultation
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 77 KB)
NMC Application: Draft Amendment Order
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 156 KB)
NMC Application: Regulation 6 Notice
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 516 KB)
Dogger Bank Teesside A Non-Material Change Application: Appendix 1 Ornithological Technical Report
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 189 KB)
NMC Application: Template Letter to Consultees
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 2 MB)
NMC Application: Environmental Report
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 140 KB)
NMC Application: BEIS's Response to Regulation 7(3) Letter
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 374 KB)
Appendix 1: Proposed list of stakeholders that would be consulted on the non-material change application
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 182 KB)
NMC Application: Regulation 7(3) Letter - Request for Approval of the Consultee List
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 2 MB)
NMC Application: Development Consent Order - Tracked
|
Other |
Doggerbank Offshore Wind Farm Project 3 Projco Limited (PDF, 201 KB)
NMC Application: Covering Letter and Supporting Statement
|
Other |
Department for Business, Energy & Industrial Strategy ( BEIS ) (PDF, 224 KB)
Application to make Non-Material Changes to the Dogger Bank Teesside A & B Offshore Wind Farm Order 2015 decision letter dated 25 March 2019
|
Other |
Department for Business, Energy & Industrial Strategy ( BEIS ) (PDF, 127 KB)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019
|
Other |
Department for Business, Energy & Industrial Strategy (PDF, 136 KB)
Sofia HRA and Requirement consultation letter from Department for Business, Energy & Industrial Strategy to Applicant
|
Other |
Sofia Offshore Wind Farm Limited (PDF, 579 KB)
Draft Habitats Regulations Assessment
|
Other |
Department of Business, Energy and Industrial Strategy (PDF, 169 KB)
BEIS further consultation letter to the Applicant, Natural England and Marine Management Organisation.
|
Other |
Department of Business, Energy and Industrial Strategy (PDF, 252 KB)
BEIS consultation letter to the Applicant and Natural England
|
Other |
Department for Business, Energy & Industrial Strategy (PDF, 151 KB)
BEIS consultation request to the Applicant
|
Other |
Secretary of State Decision Letter (PDF, 5 MB)
|
Other |
Habitats Regulations Assessment (PDF, 2 MB)
|
Other | |
Other |
Examining Authority Recommendation Report (PDF, 2 MB)
|
Other |