M42 Junction 6 Improvement

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (6)

Developer's Application (174)

Acceptance (9)

Pre Examination (29)

Examination (416)

Decision (21)

Decided (0)

Date

SourceDescription
Other
Cadent Gas Limited (PDF, 571 KB)
Additional Submission – Side Agreement - Accepted at the discretion of the Examining Authority
Other
Camilla and David Burton (PDF, 140 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
High Speed 2 (HS2) (PDF, 204 KB)
Additional Submission - Protective Provisions - Accepted at the discretion of the Examining Authority
Other
Notification of completion of the Examining Authority’s Examination (PDF, 107 KB)
Other
Philip O’Reilly (PDF, 1 MB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Bickenhill and Marston Green Parish Council (PDF, 128 KB)
Deadline 10 Submission - Comments on any additional information or submissions received by Deadline 9
Other
Camilla and David Burton (PDF, 107 KB)
Deadline 10 Submission - Comments on any additional information or submissions received by previous deadline
Other
Heath Cotterill (PDF, 96 KB)
Deadline 10 Submission - Comments on any additional information or submissions received by previous deadline
Other
Highways England (PDF, 316 KB)
Deadline 10 Submission - 8.100 Applicant's comments on any Additional Information or Submissions Received by Deadline 9
Other
Highways England (PDF, 363 KB)
Deadline 10 Submission- 8.18(a) Statement of Common Ground with Arden Hotel
Other
Highways England (PDF, 448 KB)
Deadline 10 Submission - 8.4(j) Guide to the Application
Other
Highways England (PDF, 128 KB)
Deadline 10 Submission - Cover Letter
Other
Highways England (PDF, 331 KB)
Deadline 10 Submission - 8.101 Position Statement on Cadent Gas Protective Provisions
Other
Highways England (PDF, 45 MB)
Deadline 10 Submission - 2.9(a) Crown Land Plans - Volume 2
Other
National Grid Electricity Transmission Plc (PDF, 1 MB)
Additional Submission - Protective Provisions - Accepted at the discretion of the Examining Authority
Other
Philip O 'Reilly (PDF, 897 KB)
Deadline 10 Submission - Comments on any additional information or submissions received by previous deadline - Response to Solihull Metropolitan Borough Council Deadline 9 Submission - Late Submission accepted at the discretion of the Examining Authority
Other
Philip O 'Reilly (PDF, 821 KB)
Deadline 10 Submission - Comments on any additional information or submissions received by previous deadline - Response to Highways England Deadline 9 Documents 2.6(a), 2.8(a), 3.1(c), 4.1(a), 4.3(a), 8.94 & 8.98 - Late Submission accepted at the discretion of the Examining Authority
Other
Philip O 'Reilly (PDF, 10 MB)
Deadline 10 Submission - Comments on any additional information or submissions received by previous deadline - Response to Highways England Deadline 9 Document 8.93(a) - Late Submission accepted at the discretion of the Examining Authority
Other
Gerald Eve LLP on behalf of The National Exhibition Centre (PDF, 142 KB)
Deadline 10 Submission - Comments on any additional information or submissions received by previous deadline
Other
Barlow Associates Limited (PDF, 103 KB)
Additional Submission - Response to the ExA’s letter of 12 Nov 2019 - accepted at the discretion of the Examining Authority
Other
Highways England (PDF, 36 KB)
Deadline 9 Submission - 8.93(a) Actions Arising out of ISH on Compulsory Acquisition and Temporary Possession on 22 October for Deadline 8 – clean version - Late Submission accepted at the discretion of the Examining Authority
Other
Highways England (PDF, 36 KB)
Deadline 9 Submission - 8.93(a) Actions Arising out of ISH on Compulsory Acquisition and Temporary Possession on 22 October for Deadline 8 – tracked version - Late Submission accepted at the discretion of the Examining Authority
Other
AECOM (PDF, 2 MB)
Deadline 9 Submission - Responses to any Further Information Requested by the Panel
Other
Bickenhill and Marston Green Parish Council (PDF, 226 KB)
Deadline 9 Submission - Comments on the Panel's Preferred dDCO or dDCO Commentary
Other
Cadent Gas Limited (PDF, 7 MB)
Deadline 9 Submission - Comments on the Panel's Preferred dDCO or dDCO Commentary
Other
David and Camilla Burton (PDF, 365 KB)
Deadline 9 Submission - Comments on the Panel's Preferred dDCO or dDCO Commentary
Other
Heath Cotterill (PDF, 157 KB)
Deadline 9 Submission - Comments on the Panel's Preferred dDCO or dDCO Commentary
Other
Highways England (PDF, 2 MB)
Deadline 9 Submission - 8.99 Response to the ExA’s Commentary on the dDCO
Other
Highways England (PDF, 89 KB)
Deadline 9 Submission - Cover Letter
Other
Highways England (PDF, 2 MB)
Deadline 9 Submission - 4.1(a) Statement of Reasons-Tracked
Other
Highways England (PDF, 25 MB)
Deadline 9 Submission - 2.2(a) Land Plans (Sheets 4-7)
Other
Highways England (PDF, 2 MB)
Deadline 9 Submission - 4.1(a) Statement of Reasons-Clean
Other
Highways England (PDF, 618 KB)
Deadline 9 Submission - 3.1(c) Draft Development Consent Order-Tracked
Other
Highways England (PDF, 24 MB)
Deadline 9 Submission - 6.11(a) Outline Environmental Management Plan - Tracked
Other
Highways England (PDF, 260 KB)
Deadline 9 Submission - 8.97 Actions Arising out of ISH on dDCO 4 on 23 October 2019 for Deadline 9 - Clean
Other
Highways England (PDF, 24 MB)
Deadline 9 Submission - 6.11(a) Outline Environmental Management Plan - Clean
Other
Highways England (PDF, 46 MB)
Deadline 9 Submission - 2.5(a) Streets, Rights of Way and Access Plans
Other
Highways England (PDF, 384 KB)
Deadline 9 Submission - 3.2(a) Explanatory Memorandum - Tracked
Other
Highways England (PDF, 36 KB)
Deadline 9 Submission - 4.3(a) Book of Reference-Clean
Other
Highways England (PDF, 48 MB)
Deadline 9 Submission - 2.4(a) General Arrangement Plans
Other
Highways England (PDF, 444 KB)
Deadline 9 Submission - 8.4(i) Guide to the Application
Other
Highways England (PDF, 46 MB)
Deadline 9 Submission - 2.7(a) Classification of Road Plans
Other
Highways England (PDF, 44 MB)
Deadline 9 Submission - 2.6(a) Traffic Regulation Measures Plans Part 2 – Speed Limits
Other
Highways England (PDF, 36 KB)
Deadline 9 Submission - 4.3(a) Book of Reference-Tracked
Other
Highways England (PDF, 46 MB)
Deadline 9 Submission - 2.3(a) Work Plans
Other
Highways England (PDF, 368 KB)
Deadline 9 Submission - 3.2(a) Explanatory Memorandum-Clean
Other
Highways England (PDF, 586 KB)
Deadline 9 Submission - 3.1(c) Draft Development Consent Order-Clean
Other
Highways England (PDF, 44 MB)
Deadline 9 Submission - 2.6(a) Traffic Regulation Measures Plans Part 1 - Clearways and Weight Limits
Other
Highways England (PDF, 266 KB)
Deadline 9 Submission - 8.94 Actions Arising out of ISH on dDCO 4 on 23 October for Deadline 8 - Clean
Other
Highways England (PDF, 962 KB)
Deadline 9 Submission - 8.98 Applicant’s Comments on any Additional Information or Submissions Received by Deadline 8
Other
Highways England (PDF, 49 MB)
Deadline 9 Submission - 2.8(a) Engineering Drawings and Sections
Other
Highways England (PDF, 266 KB)
Deadline 9 Submission - 8.94 Actions Arising out of ISH on dDCO 4 on 23 October for Deadline 8-Tracked
Other
Highways England (PDF, 32 MB)
Deadline 9 Submission - 2.2(a) Land Plans (Sheets 1-3)
Other
Open Spaces Society (PDF, 72 KB)
Deadline 9 Submission - Comments on Highways England Deadline 7 submission
Other
Philip O'Riley (PDF, 2 MB)
Deadline 9 Submission - Responses to any Further Information Requested by the Panel
Other
Solihull Metropolitan Borough Council (PDF, 1 MB)
Deadline 9 Submission - Comments on the Panel's Preferred dDCO or dDCO Commentary
Other
Nick Evans on behalf of Highways England (PDF, 101 KB)
Additional Submission - Protective provisions - accepted at the discretion of the Examining Authority
Other
Rule 8(3), Rule 9 and Rule 17 letter - issued 12 Nov 2019 (PDF, 150 KB)
The ExA’s decision on the Applicant’s proposed changes to the original Development Consent Order (DCO) application, change to Examination Timetable, request for further information
Other
Other
Axis on behalf of Applegreen PLC (PDF, 646 KB)
Deadline 8 Submission - Comments on any additional information or submissions received by previous deadline
Other
Cadent Gas Limited (PDF, 84 KB)
Deadline 8 Submission - Comments on any additional information or submissions received by previous deadline
Other
Camilla and David Burton (PDF, 209 KB)
Deadline 8 Submission - Comments on any additional information or submissions received by previous deadline
Other
ESP Utilities Group Ltd (PDF, 202 KB)
Deadline 8 Submission - Comments on any additional information or submissions received by previous deadline
Other
Highways England (PDF, 735 KB)
Deadline 8 Submission - 8.95 Applicant's Comments on any Additional information or Submissions Received by Deadline 7
Other
Highways England (PDF, 413 KB)
Deadline 8 Submission - 8.8 (d) Statement of Common Ground with Solihull Metropolitan Borough Council
Other
Highways England (PDF, 160 KB)
Deadline 8 Submission - Cover Letter
Other
Highways England (PDF, 265 KB)
Deadline 8 Submission - 8.94 Actions Arising out of ISH on dDCO 4 on 23 October for Deadline 8
Other
Highways England (PDF, 13 MB)
Deadline 8 Submission - 8.20 (b) Statement of Common Ground with Birmingham Airport Ltd
Other
Highways England (PDF, 36 KB)
Deadline 8 Submission - 8.93 Actions Arising out of ISH on Compulsory Acquisition and Temporary Possession on 22 October for Deadline 8
Other
Highways England (PDF, 1 MB)
Deadline 8 Submission - 8.16 (a) Statement of Common Ground with National Exhibition Centre Limited
Other
Highways England (PDF, 17 MB)
Deadline 8 Submission - 8.96 Outline Compound Management Plan (Tracked Changes)
Other
Highways England (PDF, 433 KB)
Deadline 8 Submission - 8.4(h) Guide to the Application
Other
Natural England (PDF, 458 KB)
Deadline 8 Submission - Comments on any additional information or submissions received by previous deadline
Other
Philip O'Reilly (PDF, 191 KB)
Deadline 8 Submission - Response to any further information requested by the Panel - Response to Action Points - Issue Specific Hearing 7
Other
Philip O'Reilly (PDF, 4 MB)
Deadline 8 Submission - Comments on submissions received by previous deadline - Response to Highways England Deadline 7 Documents 8.80, 8.83, 8.84, 8.86 and 8.89
Other
ExA letter postponing the decision on Applicant’s proposed change to the dDCO (PDF, 101 KB)
Other
Birmingham Airport (PDF, 171 KB)
Deadline 7 Submission - Post hearing submissions including written submissions of oral cases, arising from Hearings
Other
Camilla and David Burton (PDF, 586 KB)
Deadline 7 Submission - Post hearing submissions including written submissions of oral cases, arising from Hearings
Other
Catherine de Barnes Residents Association and Hampton in Arden Parish Council (PDF, 271 KB)
Deadline 7 Submission - Comments on any additional information or submissions received by previous deadline
Other
Pegasus Group on behalf of Extra MSA Group (PDF, 117 KB)
Deadline 7 Submission - Post hearing submissions including written submissions of oral cases, arising from Hearings
Other
Heath Cotterill (PDF, 159 KB)
Deadline 7 Submission - Post hearing submissions including written submissions of oral cases, arising from Compulsory Acquisition Hearing - 22nd October 2019 and Issue Specific Hearing 8 on 23rd October 2019
Other
Highways England (PDF, 7 MB)
Deadline 7 Submission - 8.91 Outline Bickenhill Meadows SSSI Monitoring and Management Plan
Other
Highways England (PDF, 49 KB)
Deadline 7 Submission - Cover Letter
Other
Highways England (PDF, 2 MB)
Deadline 7 Submission - 8.87 Actions Arising out of ISH on Environmental Matters on 2 October 2019 for Deadline 7
Other
Highways England (PDF, 18 MB)
Deadline 7 Submission - 8.89 Actions Arising out of ISH on dDCO 4 on 23 October
Other
Highways England (PDF, 38 MB)
Deadline 7 Submission - 8.11(c) Statement of Common Ground with Warwickshire Wildlife Trust
Other
Highways England (PDF, 742 KB)
Deadline 7 Submission - 8.80 Applicant's Comments on any Additional Information or Submissions Received by Deadline 6
Other
Highways England (PDF, 12 MB)
Deadline 7 Submission - 8.82 Interim Biodiversity Impact Calculation
Other
Highways England (PDF, 491 KB)
Deadline 7 Submission - 8.74 Outline Biodiversity Management Plan
Other
Highways England (PDF, 293 KB)
Deadline 7 Submission - 8.84 Written Submission of Oral Case for ISH on dDCO on 23 October 2019
Other
Highways England (PDF, 326 KB)
Deadline 7 Submission - 8.18 Statement of Common Ground with Arden Hotel
Other
Highways England (PDF, 101 KB)
Deadline 7 Submission - 8.83 Written Submission of Oral Case for ISH on Compulsory Acquisition and Temporary Possession on 22 October 2019
Other
Highways England (PDF, 9 MB)
Deadline 7 Submission - 8.86 Actions Arising out of ISH on Living Conditions on 1 October 2019 for Deadline 7
Other
Highways England (PDF, 36 KB)
Deadline 7 Submission - 8.88 Actions Arising of ISH on Compulsory Acquisition and Temporary Possession on 22 October
Other
Highways England (PDF, 10 MB)
Deadline 7 Submission - 8.92 Outline Bird Strike Management Plan (Tracked)
Other
Highways England (PDF, 221 KB)
Deadline 7 Submission - 8.85 Applicant's Comments on Responses Received at Deadline 6 to the Panel's Third Written Questions
Other
Highways England (PDF, 108 KB)
Deadline 7 Submission - 8.4(g) Guide to the Application
Other
Barlow Associates Limited on behalf of Mr Geoff Cattell (PDF, 938 KB)
Deadline 7 Submission - Post hearing submissions including written submissions of oral cases, arising from Compulsory Acquisition Hearing - 22nd October 2019
Other
Philip O 'Reilly (PDF, 2 MB)
Deadline 7 submission - Comments on any additional information or submissions received by previous deadline 3
Other
Philip O 'Reilly (PDF, 162 KB)
Deadline 7 Submission - Post hearing submissions including written submissions of oral cases, arising from Compulsory Acquisition Hearing - 22nd October 2019
Other
The Gooch Estate (PDF, 36 KB)
Deadline 7 Submission - Post hearing submissions including written submissions of oral cases, arising from Compulsory Acquisition Hearing - 22nd October 2019
Other
Action Points from Issue Specific Hearing 7 (DCO 4) - 23 Oct 2019 (PDF, 126 KB)
Other
Rule 8 (3) - Notification of a change to the Examination Timetable (PDF, 171 KB)
Other
Action Points from Compulsory Acquisition Hearing (CAH2) - 22 Oct 2019 (PDF, 99 KB)
Other
Camilla Burton (PDF, 165 KB)
Proposed Reconfiguration of the Compound and Exits - Submission by Camilla Burton to inform Issue Specific Hearing 7 on draft Development Consent Order - accepted at the discretion of the Examining Authority
Other
Camilla Burton (PDF, 485 KB)
Proposed Reconfiguration of St Peter’s Lane and Catherine-de-Barnes Lane - Submission by Camilla Burton to inform Issue Specific Hearing 7 on draft Development Consent Order - accepted at the discretion of the Examining Authority
Other
High Speed Two (HS2) Limited (PDF, 196 KB)
Additional Submission – High Speed Two (HS2) update on the Planning Performance Agreement with Highways England - accepted at the discretion of the Examining Authority
Other
Highways England (PDF, 699 KB)
Additional Submission – 8.9(b) Statement of Common Ground with Warwickshire County Council - accepted at the discretion of the Examining Authority
Other
Philip O’Reilly (PDF, 872 KB)
Application of the Sport England Guidance - Submission by Philip O’Reilly to inform Issue Specific Hearing 7 on draft Development Consent Order - accepted at the discretion of the Examining Authority
Other
Other
Severn Trent Water Limited (PDF, 110 KB)
Additional Submission – Severn Trent Water Limited’s update on asset protection agreement - accepted at the discretion of the Examining Authority
Other
Gerald Eve LLP on behalf of The National Exhibition Centre (PDF, 476 KB)
Additional Submission – NEC update on the agreement with Highways England - accepted at the discretion of the Examining Authority
Other
Gateley Hamer on behalf of Warwickshire Gaelic Athletic Association (PDF, 956 KB)
Additional Submission – Warwickshire Gaelic Athletic Association (WGAA) updated position statement - accepted at the discretion of the Examining Authority
Other
Recording of Compulsory Acquisition Hearing 2 (CAH2) – 22 October 2019 (PDF, 31 KB)
Other
National Grid Electricity Transmission PLC (PDF, 547 KB)
Additional Submission – Protective Provisions. Accepted at the discretion of the Examining Authority
Other
Gateley Hamer on behalf of Warwickshire Gaelic Athletic Association (PDF, 216 KB)
Deadline 6 Submission – Position Statement. Late Submission accepted at the discretion of the Examining Authority
Other
Agenda for Compulsory Acquisition Hearing 2 (CAH2) (PDF, 187 KB)
Other
Agenda for Issue Specific Hearing 7 (DCO 4) on the draft Development Consent Order (dDCO) (PDF, 190 KB)
Other
Axis on behalf of Applegreen PLC (PDF, 339 KB)
Deadline 6 Submission - Comments on any additional information or submissions received by previous deadline
Other
Bickenhill and Marston Green Parish Council (PDF, 877 KB)
Deadline 6 Submission - Comments on any additional information or submissions received by previous deadline
Other
Birmingham Airport (PDF, 289 KB)
Deadline 6 Submission - Comments on the draft DCO, submitted on D5
Other
Birmingham Airport (PDF, 1 MB)
Deadline 6 Submission - Comments on any additional information or submissions received by previous deadline
Other
Cadent Gas Limited (PDF, 1 MB)
Deadline 6 Submission - Comments on any additional information or submissions received by previous deadline
Other
Camilla and David Burton (PDF, 117 KB)
Deadline 6 Submission - Post hearing submissions including written submissions of oral cases, arising from Hearings on 1-3 October 2019
Other
Catherine de Barnes Residents Association (PDF, 130 KB)
Deadline 6 Submission - Comments on any additional information or submissions received by previous deadline
Other
Catherine de Barnes Residents Association (PDF, 140 KB)
Deadline 6 Submission - Comments on any additional information or submissions received by previous deadline
Other
Catherine de Barnes Residents Association (PDF, 240 KB)
Deadline 6 Submission - Comments on any additional information or submissions received by previous deadline
Other
CPRE Warwickshire (PDF, 19 MB)
Deadline 6 Submission
Other
Pegasus Group on behalf of Extra MSA Group (PDF, 116 KB)
Deadline 6 Submission - Responses to the Panel’s Third Written Questions
Other
Heath Cottherill (PDF, 50 KB)
Deadline 6 Submission - Comments on any additional information or submissions received by previous deadline
Other
Highways England (PDF, 36 MB)
Deadline 6 Submission - 8.10(b) Statement of Common Ground with Natural England
Other
Highways England (PDF, 2 MB)
Deadline 6 Submission - 8.65 Fungi Survey Report 2019
Other
Highways England (PDF, 36 KB)
Deadline 6 Submission - 8.73 Applicant's Responses to actions in respect of ISH on Compulsory Acquisition on 20 August 2019
Other
Highways England (PDF, 321 KB)
Deadline 6 Submission - 8.69 Post Hearing submissions - Written summary of Oral Case for the ISH on Living Conditions on 1 October 2019
Other
Highways England (PDF, 128 KB)
Deadline 6 Submission - Cover Letter
Other
Highways England (PDF, 397 KB)
Deadline 6 Submission - 8.8(c) Statement of Common Ground with Solihull Metropolitan Borough Council
Other
Highways England (PDF, 27 MB)
Deadline 6 Submission - 8.71 Supplementary Environmental Appraisal Report on the proposed non-material changes
Other
Highways England (PDF, 425 KB)
Deadline 6 Submission - 8.68 Applicant's Responses to Examining Authority's Third Round of Written Questions
Other
Highways England (PDF, 8 MB)
Deadline 6 Submission - 8.75 Bat Survey Report 2019 Addendum
Other
Highways England (PDF, 13 MB)
Deadline 6 Submission - 8.72 Applicant's Responses to Actions in respect of ISH on dDCO on 21 August 2019
Other
Highways England (PDF, 299 KB)
Deadline 6 Submission - 8.19(b) Statement of Common Ground with High Speed 2 (HS2) Ltd
Other
Highways England (PDF, 9 MB)
Deadline 6 Submission - 8.66 Outline Bird Strike Management Plan
Other
Highways England (PDF, 374 KB)
Deadline 6 Submission - 8.16 Statement of Common Ground with National Exhibition Centre Limited
Other
Highways England (PDF, 1 MB)
Deadline 6 Submission - 8.77 Applicant's Responses to actions in respect of ISH on Living Conditions on 1 October 2019 -
Other
Highways England (PDF, 259 KB)
Deadline 6 Submission -8.78 Tree Preservation Orders and Trees within a Conservation Area
Other
Highways England (PDF, 3 MB)
Deadline 6 Submission - 8.79 Important Hedgerow Criteria
Other
Highways England (PDF, 271 KB)
Deadline 6 Submission - 8.70 Post Hearing Submissions - Written Summary of Oral Case for the ISH on Environmental Matters on 2 October 2019
Other
Highways England (PDF, 44 MB)
Deadline 6 Submission - 8.67 Consultation Statement for Proposed Non-Material Changes to the DCO
Other
Highways England (PDF, 422 KB)
Deadline 6 Submission - 8.4(f) Guide to the Application
Other
Highways England (PDF, 379 KB)
Deadline 6 Submission - 8.76 Warwickshire Gaelic Athletic Association Position Statement
Other
Highways England (PDF, 37 MB)
Deadline 6 Submission - 8.11(b) Statement of Common Ground with Warwickshire Wildlife Trust
Other
Metropolitan Borough of Solihill Council (PDF, 322 KB)
Deadline 6 Submission - Responses to the Panel’s Third Written Questions and Response to Action Points arising from Hearings on 1-3 October 2019
Other
National Grid Electricity Transmission PLC (PDF, 227 KB)
Deadline 6 Submission - Comments on the draft DCO, submitted on D5
Other
Natural England (PDF, 720 KB)
Deadline 6 Submission - Responses to the Panel’s Third Written Questions
Other
Philip O 'Reilly (PDF, 5 MB)
Deadline 6 Submission - Unanswered Questions on WGAA from Open Floor Hearing (22nd August 2019)
Other
Philip O 'Reilly (PDF, 15 MB)
Deadline 6 Submission -  Issue Specific Hearing on Living Conditions (1st October 2019)
Other
Severn Trent Water (PDF, 107 KB)
Deadline 6 Submission - Comments on the draft DCO, submitted on D5
Other
The Gooch Estate (PDF, 113 KB)
Deadline 6 Submission - Comments on the draft DCO, submitted on D5
Other
Warwickshire Wildlife Trust (PDF, 169 KB)
Deadline 6 Submission - Responses to the Panel’s Third Written Questions
Other
Woodland Trust (PDF, 242 KB)
Deadline 6 Submission - Responses to the Panel’s Third Written Questions
Other
Action Points from Issue Specific Hearing 5 – Living conditions on 01 Oct 2019 (PDF, 130 KB)
Other
Action Points from Issue Specific Hearing 6 – Environmental matters on 02 Oct 2019 (PDF, 84 KB)
Other
Note of Unaccompanied Site Inspection 2 – 02 Oct 2019 (PDF, 60 KB)
Other
Highways England (PDF, 549 KB)
Additional Submission - 3.1(b) Draft Development Consent Order (Clean) - Accepted at the discretion of the Examining Authority
Other
Natural England (PDF, 161 KB)
Additional Submission – Natural England’s comments on Highways England’s - 8.64 Ancient Woodland Clarifications and Proposed Additional Measures Technical Note - Accepted at the discretion of the Examining Authority
Other
Open Spaces Society (PDF, 2 MB)
Submission by Open Spaces Society to inform Issue Specific Hearing 5 on Living Conditions - accepted at the discretion of the Examining Authority
Other
Recording of Issue Specific Hearing 5 (ISH5) on Living Conditions - 1 October 2019 (PDF, 31 KB)
Other
Recording of Issue Specific Hearing 6 (ISH6) on Environmental Matters - 2 October 2019 (PDF, 31 KB)
Other
Highways England (PDF, 353 KB)
Additional Submission - 8.64 Ancient Woodland Clarifications and Proposed Additional Measures Technical Note - Accepted at the discretion of the Examining Authority
Other
Agenda for Issue Specific Hearing 6 on Environmental Matters (PDF, 163 KB)
Other
Agenda for Issue Specific Hearing 5 on Living Conditions (PDF, 182 KB)
Other
GTC (PDF, 123 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Hampton-in-Arden Parish Council (PDF, 186 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Hampton-in-Arden Parish Council (PDF, 204 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Highways England (PDF, 26 MB)
Additional Submission - 8.62 Bat Survey Report - Accepted at the discretion of the Examining Authority
Other
The Examining Authority’s written questions and requests for information (ExQ3) (PDF, 257 KB)
Other
Gerald Eve LLP on behalf of The National Exhibition Centre (PDF, 182 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Axis on behalf of Applegreen PLC (PDF, 490 KB)
Deadline 5 Submission - Comments on any additional information or submissions received by previous deadline
Other
Camilla and David Burton (PDF, 79 KB)
Deadline 5 Submission - Comments on any additional information or submissions received by previous deadline
Other
Catherine de Barnes Residents Association (PDF, 149 KB)
Deadline 5 Submission - Comments on any additional information or submissions received by previous deadline
Other
Pegasus Group on behalf of Extra MSA Group (PDF, 121 KB)
Deadline 5 Submission - Update to Statement of Common Ground (SoCG)
Other
Highways England (PDF, 389 KB)
Deadline 5 Submission - 8.63 Applicant's Comments on any additional information or submissions received by Deadline 4
Other
Highways England (PDF, 6 MB)
Deadline 5 Submission - 8.17 Statement of Common Ground with Extra MSA Group
Other
Highways England (PDF, 35 MB)
Deadline 5 Submission - 8.11 (a) Statement of Common Ground with Warwickshire Wildlife Trust
Other
Highways England (PDF, 129 KB)
Deadline 5 Submission - Cover Letter
Other
Highways England (PDF, 11 MB)
Deadline 5 Submission - 8.25(a) Outline Bird Strike Management Plan
Other
Highways England (PDF, 424 KB)
Deadline 5 submission - 8.4 (e) Guide to the Application
Other
Highways England (PDF, 42 MB)
Deadline 5 Submission - 8.10 (a) Statement of Common Ground with Natural England
Other
Highways England (PDF, 390 KB)
Deadline 5 Submission - 8.9 (a) Statement of Common Ground with Warwickshire County Council
Other
Highways England (PDF, 554 KB)
Deadline 5 Submission - 3.1 (b) Draft Development Consent Order (track changes)
Other
Highways England (PDF, 488 KB)
Deadline 5 Submission - 8.8 (b) Statement of Common Ground with Solihull Metropolitan Borough Council
Other
Open Spaces Society (PDF, 446 KB)
Deadline 5 Submission - Comments on any additional information or submissions received by previous deadline
Other
Philip O 'Reilly (PDF, 13 MB)
Deadline 5 Submission - Post hearing submission arising from Compulsory Acquisition Hearing on 20 August 2019
Other
The Gooch Estate (PDF, 12 MB)
Deadline 5 Submission - Comments on any additional information or submissions received by previous deadline - Technical Note 2
Other
The Gooch Estate (PDF, 426 KB)
Deadline 5 Submission - Written submission of Oral Case from Issue Specific Hearing on 21 August 2019
Other
The Gooch Estate (PDF, 36 KB)
Deadline 5 Submission - Written submission of Oral Case from Compulsory Acquisition Hearing on 20 August 2019
Other
Gateley Hamer on behalf of Warwickshire Gaelic Athletic Association (PDF, 241 KB)
Deadline 5 Submission - Post hearing submission arising from Compulsory Acquisition Hearing on 20 August 2019
Other
Notification of a change to the Examination Timetable, Notice of procedural decision, notification of hearings and request for further information (PDF, 193 KB)
Rule 8(3), Rule 9, Rule 13 and Rule 17
Other
Axis on behalf of Applegreen PLC (PDF, 441 KB)
Deadline 4 Submission - Updated Response to Examining Authority's First Written Question 1.0.3
Other
Axis on behalf of Applegreen PLC (PDF, 303 KB)
Deadline 4 Submission - Response to the Panel’s Second Written Questions
Other
Axis on behalf of Applegreen PLC (PDF, 1 MB)
Deadline 4 Submission - Response to the Panel’s Second Written Questions
Other
Barbara Tocher (PDF, 95 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Bickenhill and Marston Green Parish Council (PDF, 79 KB)
Deadline 4 Submission - Comments on any additional information or submissions received by previous deadline
Other
Birmingham Airport (PDF, 676 KB)
Deadline 4 submission - Response to Action Points from CAH (20 August) and ISH4 (21 August) - Comments on draft Development Consent Order (dDCO) and update to Statement of Common Ground (SoCG) requested by the Panel
Other
Camilla and David Burton (PDF, 2 MB)
Deadline 4 Submission - Response to the Panel’s Second Written Questions and Post hearing submissions including written submissions of oral cases, arising from Hearings on 20-22 August 2019 (ISH4, CAH and OFH2)
Other
CPRE Warwickshire (PDF, 1 MB)
Deadline 4 Submission - Response to the Panel’s Second Written Questions
Other
Environment Agency (PDF, 201 KB)
Deadline 4 Submission - Response to the Panel’s Second Written Questions
Other
Pegasus Group on behalf of Extra MSA Group (PDF, 180 KB)
Deadline 4 Submission - Response to the DCO Panel's Questions and Update to Statement of Common Ground
Other
Genting Solihull Limited (PDF, 28 KB)
Deadline 4 Submission - Response to the Panel’s Second Written Questions
Other
Heath Cotterill (PDF, 108 KB)
Deadline 4 Submission - Comments on any additional information or submissions received by previous deadline
Other
Highways England (PDF, 292 KB)
Deadline 4 submission - 8.54 Position Statement on SSSI Mitigation
Other
Highways England (PDF, 36 KB)
Deadline 4 Submission - 8.59 Written Summary of Applicant's Case at the Compulsory Acquisition and Temporary Possession hearing on 20 August 2019
Other
Highways England (PDF, 2 MB)
Deadline 4 Submission - 8.58 Applicant's Response to the Panel’s Second Written Questions
Other
Highways England (PDF, 873 KB)
Deadline 4 Submission - 8.56 Applicant's Comments on any Additional Information or Submissions Received at Deadline 3
Other
Highways England (PDF, 14 MB)
Deadline 4 submission - 8.52 Great Crested Newt Survey Report 2019
Other
Highways England (PDF, 272 KB)
Deadline 4 Submission - 8.60 Written Summary of Applicant's Case at the Fourth ISH (DCO 3) on 21 August 2019
Other
Highways England (PDF, 449 KB)
Deadline 4 Submission - 8.4 (d) Updated Guide to the Application
Other
Highways England (PDF, 5 MB)
Deadline 4 Submission - 8.55 Soil Survey Report
Other
Highways England (PDF, 3 MB)
Deadline 4 Submission - 8.57 Details of Compensation Documents
Other
Highways England (PDF, 6 MB)
Deadline 4 Submission - 8.51 Archaeological Investigation Report
Other
Highways England (PDF, 273 KB)
Deadline 4 Submission - 8.12(a) Statement of Common Ground with The Woodland Trust
Other
Highways England (PDF, 42 KB)
Deadline 4 Submission - Cover Letter
Other
Highways England (PDF, 6 MB)
Deadline 4 Submission - 8.48 Lichen Survey Report 2019
Other
Highways England (PDF, 249 KB)
Deadline 4 Submission - 8.61 Written Summary of Applicant's Case at the Second Open Floor Hearing on 22 August 2019
Other
Barlow Associates Limited on behalf of Mrs J Melborn, G Cattell, Messrs Ali and Choudhry, William Freeman and Sons (PDF, 1,019 KB)
Deadline 4 Submission - Update provided at CAH (20 August)
Other
National Exhibition Centre Limited (PDF, 317 KB)
Deadline 4 Submission - Response to the Panel’s Second Written Questions and update following Compulsory Acquisition Hearing in relation to Statement of Common Ground
Other
Natural England (PDF, 515 KB)
Deadline 4 Submission - Response to the Panel’s Second Written Questions and Update to Statement of Common Ground (SoCG)
Other
Network Rail Infrastructure Limited (PDF, 288 KB)
Additional Submission - Withdrawal of Relevant Representation. Accepted at the discretion of the Examining Authority
Other
Open Spaces Society (PDF, 103 KB)
Deadline 4 Submission - Response to the Panel’s Second Written Questions
Other
Philip O'Reilly (PDF, 10 MB)
Deadline 4 Submission - Post hearing submission including written submission of oral case, arising from OFH (22 August) and Questions. Response to Action Points from CAH (20 August) - Specifications
Other
Solihull Metropolitan Borough Council (PDF, 250 KB)
Deadline 4 Submission - Comments on submission from CPRE Warwickshire received at previous deadline
Other
Solihull Metropolitan Borough Council (PDF, 339 KB)
Deadline 4 Submission - Responses to the Panel’s Second Written Questions
Other
Solihull Metropolitan Borough Council (PDF, 711 KB)
Deadline 4 Submission - Update to Statement of Common Ground (SoCG) requested by the Panel (Tracked)
Other
Solihull Metropolitan Borough Council (PDF, 739 KB)
Deadline 4 Submission - Update to Statement of Common Ground (SoCG) requested by the Panel (Clean)
Other
Warwickshire County Council (PDF, 43 KB)
Deadline 4 submission - Update to Statement of Common Ground (SoCG) requested by the Panel
Other
Warwickshire County Council (PDF, 101 KB)
Deadline 4 Submission - Response to the Panel’s Second Written Questions
Other
Warwickshire Wildlife Trust (PDF, 148 KB)
Deadline 4 Submission - Response to the Panel’s Second Written Questions
Other
CPRE Warwickshire (PDF, 2 MB)
Deadline 4 Submission - Published early to facilitate Examination
Other
Rule 13 Notification of Hearings (PDF, 139 KB)
Other
Action Points from Compulsory Acquisition Hearing (PDF, 36 KB)
Other
Action Points from Issue Specific Hearing 4 (DCO 3) (PDF, 120 KB)
Other
Recording of Compulsory Acquisition Hearing (CAH) - Part 1 - 20 August 2019 (PDF, 31 KB)
Other
Recording of Compulsory Acquisition Hearing (CAH) - Part 2 - 20 August 2019 (PDF, 31 KB)
Other
Recording of Issue Specific Hearing 4 (ISH4) - 21 August 2019 (PDF, 31 KB)
Other
Recording of Open Floor Hearing (OFH) - 22 August 2019 (PDF, 31 KB)
Other
HS2 Ltd (PDF, 177 KB)
Written submission clarifying current position and attendance at Compulsory Acquisition Hearings - Accepted at the discretion of the Examining Authority
Other
National Grid Electricity Transmission PLC (PDF, 2 MB)
Written submission to inform Compulsory Acquisition Hearing 1 (CAH 1) - Accepted at the discretion of the Examining Authority
Other
Severn Trent Water (PDF, 318 KB)
Written submission to inform Issue Specific Hearing 4 on the draft Development Consent Order (DCO 3) - Accepted at the discretion of the Examining Authority
Other
Warwickshire Gaelic Athletic Association (PDF, 195 KB)
Written submission to inform Compulsory Acquisition Hearing 1 (CAH 1) - Accepted at the discretion of the Examining Authority
Other
Highways England (PDF, 2 MB)
Deadline 3A Submission - 8.47 Consideration of Alternative Locations for the M42 Junction 6 Main Site Compound
Other
Highways England (PDF, 4 MB)
Deadline 3A Submission - 8.46 Outline Management Plan for Main Site Compound
Other
Highways England (PDF, 451 KB)
Deadline 3A Submission - 8.4(c)Guide to the Application
Other
Highways England (PDF, 113 KB)
Deadline 3A Submission - Cover Letter
Other
Highways England (PDF, 1 MB)
Deadline 3A Submission - 8.50 Transport Modelling Hierarchy and Growth in Future Year Traffic
Other
Highways England (PDF, 327 KB)
Deadline 3A Submission - 8.49 Response to CPRE Letter dated 15 July 2019
Other
Highways England (PDF, 26 MB)
Additional Submission - Non-material change requests to the Application
Other
Agenda for Compulsory Acquisition Hearing (PDF, 124 KB)
Other
Agenda for Issue Specific Hearing 4 (DCO 3) on the draft Development Consent Order (PDF, 221 KB)
Other
Agenda for Open Floor Hearing 2 (PDF, 80 KB)
Other
Pegasus Group on behalf of Extra MSA Group (PDF, 388 KB)
Deadline 4 Submission - Comments on submissions received by previous deadline - published early to facilitate Examination
Other
The Examining Authority’s written questions and requests for information (ExQ2) (PDF, 306 KB)
Other
Highways England (PDF, 659 KB)
Deadline 3 submission – 8.45 Updated Comparison between Application Draft and Second Draft DCOs. Late Submission accepted at the discretion of the Examining Authority.
Other
Barbara Tocher (PDF, 71 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Applegreen plc (PDF, 13 MB)
Deadline 3 Submission - Comments on responses received at D2 to the Panel’s First Written Questions and comments on other submissions received for the previous deadline
Other
Camilla and David Burton (PDF, 959 KB)
Deadline 3 Submission - Comments on any additional information or submissions received for the previous deadline
Other
Catherine de Barnes Residents Association (PDF, 227 KB)
Deadline 3 Submission - Comments on any additional information or submissions received for the previous deadline
Other
CPRE Warwickshire (PDF, 185 KB)
Deadline 3 Submission - Post hearing submission
Other
Heath Cotterill (PDF, 3 MB)
Deadline 3 Submission - Post hearing submissions including written submissions of oral cases, arising from Hearings on 2 July 2019
Other
Heath Cotterill (PDF, 162 KB)
Deadline 3 Submission - Comments on responses received at D2 to the Panel’s First Written Questions and comments on any additional information or submissions received for the previous deadline
Other
Highways England (PDF, 551 KB)
Deadline 3 Submission - 8.34 Applicant's comments on responses received at Deadline 2 to the Panel's First Written questions
Other
Highways England (PDF, 21 MB)
Deadline 3 Submission - 6.3 Environmental Statement Appendix 14.2 (a) Bickenhill Meadows SSSI - Preliminary Hydrological Investigation Technical Note
Other
Highways England (PDF, 704 KB)
Deadline 3 Submission - 8.44 Applicant's Comments on any Additional Information or Submissions Received at deadline 2
Other
Highways England (PDF, 401 KB)
Deadline 3 Submission - 8.4 (b) Guide to the Application
Other
Highways England (PDF, 463 KB)
Deadline 3 Submission - 8.35 Applicant's Response to Local Impact Report: Solihull Metropolitan Borough Council
Other
Highways England (PDF, 667 KB)
Deadline 3 Submission - 8.14 (a) Statement of Common Ground with Western Power Distribution (East Midlands) PLC
Other
Highways England (PDF, 7 MB)
Deadline 3 Submission - 8.41 Assessment of Potential Footpath Connectivity between the A45 and Birmingham International Railway Station
Other
Highways England (PDF, 929 KB)
Deadline 3 Submission - 8.33 The Applicant's comments to written representations which were received at Deadline 1
Other
Highways England (PDF, 394 KB)
Deadline 3 Submission - 8.8 (a) Statement of Common Ground with Solihull Metropolitan Borough Council
Other
Highways England (PDF, 279 KB)
Deadline 3 Submission - 8.32 Cover Letter
Other
Highways England (PDF, 890 KB)
Superseded by Deadline 3 submission – 8.45 Updated Comparison between Application Draft and Second Draft DCOs. Late Submission accepted at the discretion of the Examining Authority
Other
Highways England (PDF, 12 MB)
Deadline 3 Submission - 8.20 (a) Statement of Common Ground with Birmingham Airport Ltd
Other
Highways England (PDF, 14 MB)
Deadline 3 Submission - 8.42 junction 5A Location and Constraints Summary
Other
Highways England (PDF, 494 KB)
Deadline 3 Submission - 8.39 Written Submission of Applicant's Case at the Second ISH on 2 July 2019
Other
Highways England (PDF, 48 MB)
Deadline 3 Submission - 8.38 Bat Survey Report 2018
Other
Highways England (PDF, 571 KB)
Deadline 3 Submission - 6.1 Environmental Statement Chapter 15 (a) - Climate
Other
Highways England (PDF, 614 KB)
Deadline 3 Submission - 3.1 (a) Draft Development Consent Order
Other
Highways England (PDF, 317 KB)
Deadline 3 Submission - 8.36 Applicant's Response to Local Impact Report: Warwickshire County Council
Other
Highways England (PDF, 453 KB)
Deadline 3 Submission - 8.40 Written Submission of Applicant's Case at the Third ISH on 2 July 2019
Other
Highways England (PDF, 7 MB)
Deadline 3 Submission - 8.37 Aquatic Macroinvertebrate Survey Report 2018
Other
Highways England (PDF, 655 KB)
Deadline 3 Submission - 8.43 further Information in Support of the Transport Assessment Report
Other
Jonathan Horton (PDF, 1 MB)
Deadline 3 Submission - Comments on any additional information or submissions received for the previous deadline
Other
Pegasus Group (PDF, 228 KB)
Deadline 3 Submission - Comments on responses received at D2 to the Panel’s First Written Questions
Other
Philip Clover (PDF, 651 KB)
Deadline 3 Submission - Written Representation
Other
Philip O'Reilly (PDF, 793 KB)
Deadline 3 Submission - Response to Highways England Deadline 2 Documents 8.20, 8.23, 8.25 & 8.26
Other
Solihull Metropolitan Borough Council (PDF, 246 KB)
Deadline 3 Submission - Post hearing submission and response to further information requested by the Panel
Other
Warwickshire County Council (PDF, 366 KB)
Deadline 3 Submission - Response to any further information requested by the Panel: Transport Assessment
Other
Rule 13 Notification of Hearings (PDF, 136 KB)
Other
Highways England (PDF, 248 KB)
Additional Submission - Accepted at the discretion of the Examining Authority - Clarification about referencing in Highways England’s response to ExA’s written questions
Other
Highways England (PDF, 14 MB)
Additional Submission - Accepted at the discretion of the Examining Authority following the recent ASI 8.30 Accompanied Site Inspection Pack
Other
Highways England (PDF, 4 MB)
Additional Submission - Accepted at the discretion of the Examining Authority following the recent ASI 8.31 Indicative Proposal for Main Compound and Office for M42 J6 Scheme
Other
Barbara Tocher (PDF, 45 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Highways England (PDF, 131 KB)
Deadline 2 submission - 8.19 Updated Statement of Common Ground between High Speed 2 (HS2) and Highways England. Late Submission accepted at the discretion of the Examining Authority
Other
Recording of Issue Specific Hearing 2 – Part 1 of 2 – 2 July 2019 (PDF, 31 KB)
Other
Recording of Issue Specific Hearing 2 – Part 2 of 2 – 2 July 2019 (PDF, 31 KB)
Other
Recording of Issue Specific Hearing 3 – Part 1 of 2 – 2 July 2019 (PDF, 31 KB)
Other
Recording of Issue Specific Hearing 3 – Part 2 of 2 – 2 July 2019 (PDF, 31 KB)
Other
Applegreen plc (PDF, 316 KB)
Deadline 2 Submission - Response to Comments on Relevant Representation
Other
Applegreen plc (PDF, 1 MB)
Deadline 2 Submission - Applegreen- Response to Examining Authority's First Written Questions - Appendix D
Other
Applegreen plc (PDF, 207 KB)
Deadline 2 Submission - Submissions Overview Document
Other
Applegreen plc (PDF, 2 MB)
Deadline 2 Submission - Response to Examining Authority's First Written Questions - Appendix F
Other
Applegreen plc (PDF, 441 KB)
Deadline 2 Submission - Responses to Examining Authority's Written Questions
Other
Applegreen plc (PDF, 55 MB)
Deadline 2 Submission - Response to Examining Authority's First Written Questions - Appendix C
Other
Applegreen plc (PDF, 2 MB)
Deadline 2 Submission - Response to Examining Authority's First Written Questions - Appendix E
Other
Birmingham Airport (PDF, 251 KB)
Deadline 2 Submission - Written submissions of oral case, arising from Issue Specific hearing held on 22 May
Other
Canal and River Trust (PDF, 393 KB)
Deadline 2 Submission - Response to Examining Authority's Written Questions
Other
CPRE Warwickshire (PDF, 87 KB)
Deadline 2 Submission - Response to Examining Authority's First Written Questions
Other
Extra MSA Group (Extra) (PDF, 133 KB)
Deadline 2 Submission - Response to the DCO Panel’s Questions for Deadline 2
Other
Extra MSA Group (Extra) (PDF, 123 KB)
Deadline 2 Submission - Correspondence to the DCO Panel on Extra’s Behalf dated 24th June 2019 to address the DCO Panel’s Questions and the Accompanied Site Visit
Other
Genting Solihull Limited (PDF, 139 KB)
Deadline 2 Submission - Response to Examining Authority's Written Questions
Other
Health and Safety Executive (PDF, 73 KB)
Deadline 2 Submission - Statements of Common Ground (SoCGs) requested by the Panel
Other
Highways England (PDF, 698 KB)
Deadline 2 submission - 8.14 Statement of Common Ground between Western Power and Highways England
Other
Highways England (PDF, 14 MB)
Deadline 2 submission - 8.11 Statement of Common Ground between Warwickshire Wildlife Trust and Highways England
Other
Highways England (PDF, 4 MB)
Deadline 2 submission - 8.6 Responses to Examining Authority's First Written Questions
Other
Highways England (PDF, 319 KB)
Deadline 2 submission - 8.13 Statement of Common Ground between National Grid and Highways England
Other
Highways England (PDF, 5 MB)
Deadline 2 submission - FIGURE 9.1B (a) Non-Statutory Nature Conservation Designations Within The Study Area
Other
Highways England (PDF, 35 MB)
Deadline 2 submission - 8.10 Statement of Common Ground between Natural England and Highways England
Other
Highways England (PDF, 200 KB)
Deadline 2 submission - 8.26 Written Submission of the Applicant’s case put orally at the OFH on 21 May 2019 and the first ISH on the dDCO on 22 May 2019
Other
Highways England (PDF, 33 MB)
Deadline 2 submission - Figure 8.2a Viewpoint Location Plan (Sheet 10 of 31)
Other
Highways England (PDF, 2 MB)
Deadline 2 submission - 8.24 Junction 5A Operational Assessment
Other
Highways England (PDF, 37 MB)
Deadline 2 submission - 8.28 Environmental Statement Figures 4.4
Other
Highways England (PDF, 34 KB)
Deadline 2 Submission - Cover Letter
Other
Highways England (PDF, 1 MB)
Deadline 2 submission - 8.7 Responses to examining Authority's Questions on the Development Consent Order (DCO)
Other
Highways England (PDF, 792 KB)
Deadline 2 submission - 8.3a Comments on the Relevant Representations (Clean)
Other
Highways England (PDF, 304 KB)
Deadline 2 submission - 8.9 Statement of Common Ground between Warwickshire County Council and Highways England
Other
Highways England (PDF, 349 KB)
Deadline 2 submission - 8.8 Statement of Common Ground between Solihull Metropolitan Borough Council and Highways England
Other
Highways England (PDF, 12 MB)
Deadline 2 submission - 8.20 Statement of Common Ground between Birmingham Airport Ltd and Highways England
Other
Highways England (PDF, 91 KB)
Deadline 2 submission - 8.4a Guide to the Application
Other
Highways England (PDF, 9 MB)
Deadline 2 submission - 8.25 Outline Bird Strike Management Plan
Other
Highways England (PDF, 260 KB)
Deadline 2 submission - 8.12 Statement of Common Ground between Woodland Trust and Highways England
Other
Highways England (PDF, 157 KB)
Superseded by Deadline 2 submission - 8.19 Updated Statement of Common Ground between High Speed 2 (HS2) and Highways England. Late Submission accepted at the discretion of the Examining Authority.
Other
Highways England (PDF, 31 MB)
Deadline 2 submission - Accompanied Site Inspection
Other
Highways England (PDF, 140 KB)
Deadline 2 submission - 8.29 Embedded Mitigation Table
Other
Highways England (PDF, 827 KB)
Deadline 2 submission - 8.3a Comments on Relevant Representations (Tracked Changes)
Other
Highways England (PDF, 4 MB)
Deadline 2 submission - Figure 9.1A(a) Statutory Nature Conservation Designations Within The Study Area
Other
Highways England (PDF, 2 MB)
Deadline 2 Submission - 8.21 Proposed Proportionate Reconfiguration of the Warwickshire Gaelic Athletic Association Facility
Other
Highways England (PDF, 622 KB)
Deadline 2 submission - 8.15 Statement of Common Ground between Cadent Gas and Highways England
Other
Highways England (PDF, 31 MB)
Deadline 2 submission - 8.27 Environmental Statement Figures 4.1
Other
Highways England (PDF, 5 MB)
Deadline 2 submission - 8.22 Museum of London Archaeology Interim Archaeological Investigation Report
Other
Highways England (PDF, 15 MB)
Deadline 2 submission - 8.23 Lighting Technical Note
Other
Natural England (PDF, 273 KB)
Deadline 2 Submission - Response to Examining Authority's First Written Questions
Other
Philip O'Reilly (PDF, 41 KB)
Deadline 2 Submission - Request for further Open Floor Hearing
Other
Philip O'Reilly (PDF, 4 MB)
Deadline 2 Submission - Critique of Highways England Document - 6.3 Environmental Statement - Appendix 12.4 - Reconfiguration of Warwickshire Gaelic Athletic Association
Other
Philip O'Reilly (PDF, 4 MB)
Deadline 2 Submission - Response to HE document 8.3 Comments on the Relevant Representations
Other
Philip O'Reilly (PDF, 2 MB)
Deadline 2 Submission - Record of engagement with HE and AECOM (12th December 2017 - 6th June 2019)
Other
Solihull Metrolpolitan Borough Council (PDF, 561 KB)
Deadline 2 Submission - Draft Statement of Common Ground between Solihull Metropolitan Borough Council and Highways England
Other
Solihull Metropolitan Borough Council (PDF, 397 KB)
Deadline 2 Submission - Response to Rule 6 and Rule 8 Questions
Other
Solihull Metropolitan Borough Council (PDF, 431 KB)
Deadline 2 Submission - Response to Examining Authority's Written Questions - Conservation
Other
Solihull Metropolitan Borough Council (PDF, 573 KB)
Deadline 2 Submission - Local Impact Report
Other
Solihull Metropolitan Borough Council (PDF, 45 KB)
Deadline 2 Submission - Response to Examining Authority's Written Questions - Archaeology
Other
The Gooch Estate (PDF, 180 KB)
Deadline 2 Submission - Written Summary of Oral Submissions
Other
Warwickshire County Council (PDF, 48 KB)
Deadline 2 Submission - Position Statement
Other
Warwickshire County Council (PDF, 74 KB)
Deadline 2 Submission - Local Impact Report Executive Summary
Other
Warwickshire County Council (PDF, 689 KB)
Deadline 2 Submission - Local Impact Report
Other
Woodland Trust (PDF, 248 KB)
Deadline 2 Submission - Response to Examining Authority's Written Questions
Other
Applegreen plc (PDF, 66 MB)
Deadline 2 Submission - Response to Examining Authority's First Written Questions - Appendix A
Other
Applegreen plc (PDF, 206 KB)
Deadline 2 Submission - Response to Examining Authority's First Written Questions - Appendix B
Other
National Exhibition Centre Limited (PDF, 197 KB)
Deadline 2 Submission - Response to Examining Authority's First Written Questions - Late Submission Accepted at the Discretion of the Examining Authority
Other
Accompanied Site Inspection Itinerary (PDF, 204 KB)
Other
Agenda for Issue Specific Hearings 2 and 3 (PDF, 100 KB)
Other
Andy Bennett (PDF, 18 KB)
Deadline 1 Submission - Written Representation and Summary, notification of wish to speak at a Compulsory Acquisition Hearing, notification of attendance, suggested locations, and their justifications for the Accompanied Site Inspection
Other
Axis on behalf of Applegreen PLC (PDF, 78 KB)
Deadline 1 Submission - Written Representation, notification of wish to speak at a Issue Specific Hearing
Other
Bickenhall and Marston Green Parish Council (PDF, 182 KB)
Deadline 1 Submission - Written Representation, Notification of attendance at Hearings and Accompanied Site Inspection
Other
Cadent Gas Limited (PDF, 4 MB)
Deadline 1 Submission - Written Representation, notification of wish to speak at a Issue Specific Hearing and Compulsory Acquisition Hearing - Late submission accepted at the discretion of the ExA
Other
Camilla and David Burton (PDF, 611 KB)
Deadline 1 Submission - Written Representation, notification of wish to speak at a Issue Specific Hearings, notification of attendance, suggested locations, and their justifications for the Accompanied Site Inspection
Other
Canal & River Trust (PDF, 669 KB)
Deadline 1 Submission - Written Representation, notification of wish to speak at Issue Specific Hearing, notification of attendance, suggested locations, and their justifications for the Accompanied Site Inspection
Other
Catherine de Barnes Residents Association (PDF, 159 KB)
Deadline 1 Submission - Written Representation
Other
Cotswolds Conservation Board (PDF, 92 KB)
Deadline 1 Submission - Written Representation
Other
DTA Transportation Limited (PDF, 42 KB)
Deadline 1 Submission - Written Representation
Other
Eleanor O'Brien (PDF, 14 KB)
Deadline 1 Submission - Written Representation
Other
Environment Agency (PDF, 211 KB)
Deadline 1 Submission - Written Representation
Other
Birketts LLP on behalf of Gooch Estate (PDF, 39 KB)
Deadline 1 Submission - Notification of attendance at Issue Specific Hearing and Accompanied Site Inspection
Other
Heath Cotterill (PDF, 18 KB)
Deadline 1 Submission - Written Representation, notification of attendance at Hearings and notification of attendance, suggested locations and their justifications for the Accompanied Site Inspection
Other
Highways England (PDF, 107 KB)
Deadline 1 Submission - Cover Letter
Other
Highways England (PDF, 716 KB)
Deadline 1 Submission - Comments on the Relevant Representations
Other
Highways England (PDF, 419 KB)
Deadline 1 Submission - Updated Guide to the Application
Other
Highways England (PDF, 28 MB)
Deadline 1 Submission - Record of Engagement with Mr Philip O'Reilly
Other
Metropolitan Borough of Solihull Council (PDF, 525 KB)
Deadline 1 Submission - Notification of wish to attend an Accompanied Site Inspection, suggested locations and their justifications. Notification by statutory party of wish to be considered as an Interested Party
Other
Mike Robinson (PDF, 14 KB)
Deadline 1 Submission - Written Representation
Other
National Exhibition Centre Limited (PDF, 2 MB)
Deadline 1 Submission - Written Representation and Summary, notification of wish to speak at a Compulsory Acquisition Hearing, notification of attendance, suggested locations, and their justifications for the Accompanied Site Inspection
Other
National Grid plc (PDF, 2 MB)
Deadline 1 Submission - Written Representation, notification of wish to speak at a Issue Specific Hearing and Compulsory Acquisition Hearing
Other
Natural England (PDF, 4 MB)
Deadline 1 Submission - Written Representation
Other
Natural England (PDF, 300 KB)
Deadline 1 Submission - Written representation summary
Other
Open Spaces Society (PDF, 264 KB)
Deadline 1 Submission - Notification of wish to speak at a Issue Specific Hearing. Notification of attendance, suggested locations and their justifications for the Accompanied Site Inspection
Other
Open Spaces Society (PDF, 22 MB)
Deadline 1 Submission - Written Representation and Summary. Notification of suggested locations and their justifications for the Accompanied Site Inspection
Other
Pegasus Group (PDF, 4 MB)
Deadline 1 Submission - Comments on Relevant Representations, notification of wish to speak at a Issue Specific Hearing, notification of attendance at Accompanied Site Inspection
Other
Philip O 'Reilly (PDF, 14 KB)
Deadline 1 Submission - Deadline 2, Post hearing submissions arising from hearings held on 21 or 22 May, accepted at the discretion of the ExA at Deadline 1
Other
Philip O 'Reilly (PDF, 14 KB)
Deadline 1 Submission - Notification of suggested locations, and their justifications for the Accompanied Site Inspection
Other
Philip O 'Reilly (PDF, 40 KB)
Deadline 1 Submission - Comments on Relevant Representations
Other
Rehan Mian (PDF, 82 KB)
Deadline 1 Submission - Written Representation
Other
Sian Manton (PDF, 16 KB)
Deadline 1 Submission - Written Representation
Other
Stephen Thompson (PDF, 44 KB)
Deadline 1 Submission - Written Representation
Other
The Gooch Estate (PDF, 2 MB)
Deadline 1 Submission - Written Representation
Other
Tom and Barbara Tocher (PDF, 15 KB)
Deadline 1 Submission - Written Representation
Other
Warwickshire Campaign to Protect Rural England (PDF, 2 MB)
Deadline 1 Submission - Comments on Relevant Representations, notification of attendance at Hearings and notification of attendance, suggested locations, and their justifications, for the Accompanied Site Inspection
Other
Warwickshire County Council (PDF, 174 KB)
Deadline 1 Submission - Written Representation and notification of wish to attend an Issue Specific Hearing
Other
Warwickshire Gaelic Athletic Association (PDF, 195 KB)
Deadline 1 Submission - Comments on Relevant Representations, notification of attendance at Compulsory Acquisition Hearing and notification of attendance, suggested locations, and their justifications, for the Accompanied Site Inspection
Other
Warwickshire Gaelic Athletic Association (PDF, 136 KB)
Deadline 1 Submission - Written Representation - Late submission accepted at the discretion of the ExA
Other
Woodland Trust (PDF, 343 KB)
Deadline 1 Submission - Written Representation
Other
Note of Unaccompanied Site Inspection - 22 May 2019 (PDF, 23 KB)
Other
Preliminary Meeting Note (PDF, 120 KB)
Other
Other
Mr David Cuthbert (PDF, 4 MB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Recording of Issue Specific Hearing 1 – Part 1 of 2 - 22 May 2019 (PDF, 31 KB)
Other
Recording of Issue Specific Hearing 1 – Part 2 of 2 - 22 May 2019 (PDF, 31 KB)
Other
Recording of Open Floor Hearing – 21 May 2019 (PDF, 31 KB)
Other
Recording of Preliminary Meeting – 21 May 2019 (PDF, 31 KB)