North Wales Wind Farms Connection

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (3)

Developer's Application (193)

Acceptance (6)

Pre Examination (19)

Examination (446)

Decision (43)

Decided (2)

Date

SourceDescription
Other
Size: 26 KB
North Wales Wind Farms Connection Notice
Other
Size: 27 KB
North Wales Wind Farms Connection (Correction) Order 2017
Other
Size: 140 KB
SP Manweb
Email of 30 June 2016 from SP Manweb to BEIS with the following documents appended: Addendum to the Book of Reference for Option A Version 5 (Document Reference 4.3 Option A v5) and Addendum to the Book of Reference Option B Version 3 (Document Reference 4.3 Option B v3).
Other
Size: 514 KB
Development Consent Order as made by the Secretary of State
Other
Size: 117 KB
Hysbysiad o benderfyniad yr Ysgrifennydd Gwladol (Rheol 23)
Other
Size: 116 KB
Notice of the Decision by the Secretary of State (Reg 23)
Other
Size: 87 KB
Examining Authority Recommendation Report - Appendix A
List of Abbreviations
Other
Size: 1 MB
Examining Authority Recommendation Report - Appendix C
Examination Library
Other
Other
Size: 122 KB
Examining Authority Recommendation Report - Appendix B
Events in the Examination
Other
Size: 7 MB
Post Examination Correspondence Log
Other
Size: 1 MB
Examining Authority Recommendation Report - Appendix E
Examining Authority's Recommended Development Consent Order
Other
Size: 141 KB
Examining Authority Recommendation Report - Appendix D
List of Objections to Compulsory Acquisition of Rights and Restrictions
Other
Size: 2 MB
Examining Authority Recommendation Report
Main Report
Other
Size: 10 KB
Sheila Harman
Response to the Department of Energy and Climate Change's consultation letter of 23 May 2016.
Other
Size: 1 MB
SP Manweb
Response to the Department of Energy and Climate Change's consultation letter of 23 May 2016.
Other
Size: 93 KB
Conwy County Borough Council
Response to the Department of Energy and Climate Change's consultation letter of 23 May 2016.
Other
Size: 73 KB
Natural Resources Wales
Response to the Department of Energy and Climate Change's consultation letter of 23 May 2016.
Other
Size: 51 KB
DECC Consultation letter of 23 May 2016
Other
Size: 506 KB
Examination Library
Other
Size: 58 KB
Robin Barlow
Responses to deadline 10 comments and responses- submitted for deadline 11
Other
Size: 586 KB
SP Manweb
Comparison draft Development Consent Order (option A) showing the tracked changes between the DCO submitted in the application and deadline 11 ? submitted for deadline 11
Other
Size: 58 KB
Cefn Meiriadog and Glascoed Road Residents and Users Group
Responses to deadline 10 comments and responses- submitted for deadline 11
Other
Size: 66 KB
Notification of Completion of ExA Examination
Other
Size: 159 KB
SP Manweb
Responses to Submissions made by Interested Parties and Statutory Consultees at deadline 10 - submitted for deadline 11
Other
Size: 133 KB
SP Manweb
Excel spreadsheet summarising negotiations to Date version 2 - submitted for deadline 11
Other
Size: 23 MB
John Mars Jones
Responses to deadline 10 comments and responses- submitted for deadline 11
Other
Size: 550 KB
SP Manweb
Comparison draft Development Consent Order (option B) showing the tracked changes between the DCO submitted in the application for Option B and deadline 11 ? submitted for deadline 11
Other
Size: 227 KB
Welsh Government
Comments on the ExA?s Report on the Implications for European Sites- submitted for deadline 11
Other
Size: 1 MB
SP Manweb
Draft Development Consent Order for Option A v6 Document showing the tracked changes between the Development Consent Order for Option A v5 (submitted December 2015) and Development Consent Order for Option A v6 (submitted January 2016) (Document Reference 3.1 v6 Tracked); - submitted for deadline 11
Other
Size: 31 KB
SP Manweb
Covering letter- for deadline 11 submission
Other
Size: 148 KB
Iwan Jones
Responses to deadline 10 comments and responses- submitted for deadline 11
Other
Size: 4 MB
SP Manweb
Statement of Common Ground between SP Manweb and the Welsh Government - submitted for deadline 11
Other
Size: 201 KB
SP Manweb
Correspondence from Wardell Armstrong in relation to negotiation updates from the Crown - submitted for deadline 11
Other
Size: 140 KB
SP Manweb
Addendum to the Book of Reference Option A Version 4 (Document Reference 4.3 Option A V.4 (addendum)); - submitted for deadline 11
Other
Size: 85 KB
Hysbyseb o gwblhau Arholiad y'r Awdurdod Archwilio
Other
Size: 195 KB
Durand Hotham
Letter concerning Plas Newydd, Cefn Meiriadog. - submitted for deadline 11
Other
Size: 146 KB
SP Manweb
SP Manweb?s Response to CADW?s submission deadline at 10 - submitted for deadline 11
Other
Size: 40 KB
SP Manweb
Summary of Landowner and Part 3 Interest Negotiations - submitted for deadline 11
Other
Size: 39 KB
Dewi Parry
Responses to deadline 10 comments and responses- submitted for deadline 11
Other
Size: 321 KB
SP Manweb
Signed Statement of Common Ground between SP Manweb and NRW - submitted for deadline 11
Other
Size: 2 MB
SP Manweb
Draft Development Consent Order for Option B v3 (Document Reference 3.1 Option B v3). - submitted for deadline 11
Other
Size: 2 MB
SP Manweb
Draft Development Consent Order for Option A v6 (Document Reference 3.1 v6); - submitted for deadline 11
Other
Size: 1 MB
SP Manweb
Draft Development Consent Order for Option B v3 Document showing the tracked changes between the Development Consent Order for Option B v2 (submitted December 2015) and Development Consent Order for Option B v3 (submitted January 2016) (Document Reference 3.1 Option B v3 Tracked); - submitted for deadline 11
Other
Size: 140 KB
SP Manweb
Addendum to the Book of Reference Option B Version 2 (Document Reference 4.3 Option B V.2 (addendum)); - submitted for deadline 11
Other
Size: 46 KB
Dr James Davies MP
Late submission from a Non-interested party for deadline 10. Accepted at the discretion of the Examining Authority
Other
Size: 224 KB
SP Manweb
Comments on the ExA's Consultation Draft of the Development Consent Order (DCO) - Submitted for deadline 10
Other
Size: 320 KB
Robin Barlow
Submission regarding the Clocaenog substation-Submitted for Deadline 10
Other
Size: 336 KB
Welsh Government�s Historic Environment Service (Cadw)
Response to the request for further information issued by the ExA on 14 December 2015 - Submitted for deadline 10
Other
Size: 152 KB
SP Manweb
Email between SP Manweb PLC and NRW relating to the Statement of Common Ground - Submitted for deadline 10
Other
Size: 120 KB
SP Manweb
Email between SP Manweb PLC and the MOD relating to a Statement of Common Ground- Submitted for deadline 10
Other
Size: 2 MB
SP Manweb
Statement of Common Ground between SP Manweb and RWE Innogy UK Ltd and Brenig Wind Ltd - Submitted for deadline 10
Other
Size: 10 MB
SP Manweb
Responses to Submissions made by Interested Parties and Statutory Consultees during and after the Oral Hearings that took place in December 2015, with associated Appendices 1 and 2- Submitted for deadline 10
Other
Size: 1 MB
SP Manweb
Statement of Common Ground between SP Manweb and the Ramblers Association - Submitted for deadline 10
Other
Size: 280 KB
SP Manweb
Comments on the ExA?s Report on the Implications for European Sites (RIES) - Submitted for deadline 10
Other
Size: 319 KB
SP Manweb
Index to accompany the Responses to Submissions made by Interested Parties and Statutory Consultees during and after the Oral Hearings that took place in December 2015- Submitted for deadline 10
Other
Size: 140 KB
SP Manweb
Updated Book of Reference (BOR) for Option B Version 2 (Document Reference 4.3 v2) Track changed version- Submitted for deadline 10
Other
Size: 140 KB
SP Manweb
Updated Book of Reference (BOR) for Option A Version 4 (Document Reference 4.3 v4) Clean version- Submitted for deadline 10
Other
Size: 47 KB
SP Manweb
Covering letter- Submitted for deadline 10
Other
Size: 377 KB
Natural Resources Wales
Letter concerning Section 135 of the Planning Act 2008- Submitted for Deadline 10
Other
Size: 413 KB
Dewi Parry
Comments on post hearing documents- Submitted for Deadline 10
Other
Size: 66 KB
Eifion Bibby
Comments on The ExA?s Consultation Draft DCO- Submitted for Deadline 10
Other
Size: 140 KB
SP Manweb
Updated Book of Reference (BOR) for Option B Version 2 (Document Reference 4.3 v2) Clean version - Submitted for deadline 10
Other
Size: 75 KB
Sheila Harman
Comments on the ExA?s Consultation Draft DCO- Submitted for Deadline 10
Other
Size: 59 KB
Pylon the Pressure Group
Comments on further post hearing documents- Submitted for Deadline 10
Other
Size: 140 KB
SP Manweb
Updated Book of Reference (BOR) for Option A Version 4 (Document Reference 4.3 4) Track changed version- Submitted for deadline 10
Other
Size: 1 MB
SP Manweb
Statement of Common Ground between SP Manweb and Cefn Group - Submitted for deadline 10
Other
Size: 105 KB
Iwan Jones
Comments on the ExA?s Consultation Draft DCO- Submitted for Deadline 10
Other
Size: 487 KB
SP Manweb
Heritage Assessment: Effects on Berain, Llanefydd, Conwy
Other
Size: 101 KB
ExA's consultation draft Development Consent Order
Other
Size: 117 KB
Iwan Jones
Notes provided at the hearings on the definitiion of 'Serious Concern' and 'Agricultural Land Matrix' in relation to the examination of the application for the Brechfa Forest Connection project. Not published in error - submitted for Deadline 9.
Other
Size: 7 KB
John Fleet
Request for undergrounding-Late submission for Deadline 9 accepted at the discretion of the Examining Authority
Other
Size: 185 KB
Robin Barlow
Written submission of oral representation made at the Open Floor hearing 9 December 2015 submission. Includes an Addendum accepted late at the discretion of the Examining Authority
Other
Size: 34 KB
Lois Williams
Objection to the connection as a permanent infrastructure -Late submission for Deadline 9 accepted at the discretion of the Examining Authority
Other
Size: 73 KB
Martin Barlow
Responses to further documents and submissions made at hearings - Late submission for Deadline 9 accepted at the discretion of the Examining Authority
Other
Size: 163 KB
Report on the Implications for European Sites Proposed North Wales Wind Farms Connection
Other
Size: 649 KB
SP Manweb
Outline Hedgerow Management Plan Version 4 ? Tracked Change Version (Document reference 6.18C v4 - Tracked)
Other
Size: 365 KB
Eifion Bibby
Response to Action Points 1 and 11 from the Compulsory Acquisition Hearingof 9 December 2015 - Submitted for Deadline 9
Other
Size: 159 KB
SP Manweb
CEMP, HMP and EcMP Tracker (Document reference SPM NWWFC DL9 EMT)
Other
Size: 6 MB
SP Manweb
Statement of Common Ground between SP Manweb PLC and Denbighshire County Council (Document reference NWWFC DL9 SOCG DCC)
Other
Size: 287 KB
SP Manweb
Written Summary of the Oral Case in relation to Berain (Document reference SPM NWWFC DL9 AI 5.2 Berain).
Other
Size: 9 KB
Iwan Jones
Response to Action Points from day 1- Submitted for Deadline 9
Other
Size: 236 KB
SP Manweb
Outline Construction Environmental Management Plan Version 4 (Document Reference 6.18 v4)
Other
Size: 529 KB
John Mars Jones
Post Hearing Submission; request for the ExA to undertake an unaccompanied site inspection. Submitted for Deadline 9
Other
Size: 187 KB
SP Manweb
Covering letter - Submitted for deadline 9
Other
Size: 2 MB
SP Manweb
Signed Statement of Common Ground between SP Manweb and Conwy County Borough Council
Other
Size: 1 MB
SP Manweb
Draft Development Consent Order for Option A v5 (Document reference 3.1 v5)
Other
Size: 1 MB
SP Manweb
Draft Development Consent Order for Option A v5 - Document showing the tracked changes between the Development Consent Order for Option A v4 (submitted November 2015) and Development Consent Order for Option A v5 (submitted December 2015) (Document reference 3.1 v5 ? Tracked)
Other
Size: 442 KB
Mr S P White
Written submission following the Compulsory Acquisition Hearing of 9 December 2015-Submitted for Deadline 9
Other
Size: 84 KB
John Hopkinson
Written submission of oral representation made at the Open Floor Hearing of 9 December 2015 submission - Submitted for Deadline 9
Other
Size: 3 MB
SP Manweb
Written Summaries of Oral Evidence (IS Hearing 8th December 2015) Including Action Notes (Document reference SPM NWWFC SISH01)
Other
Size: 31 KB
Iwan Jones
Note on single post design/earthing substation and; ?serious concern? at Eriviat/A543 and suggested cable options. Post hearing submission - Submitted for Deadline 9
Other
Size: 356 KB
SP Manweb
Outline Ecological Management Plan Version 3 (Document reference 6.18D v3)
Other
Size: 2 MB
Pylon the Pressure Group
Elaboration of evidence presented at the Open Floor hearing of 9 December 2015 - Submitted for Deadline 9
Other
Size: 517 KB
SP Manweb
Written Summaries of Oral Evidence (CA Hearing 9th December 2015) Including Action Notes (Document Reference SPM NWWFC SCAH02)
Other
Size: 1 MB
SP Manweb
Draft Development Consent Order for Option B v2 - Document showing the tracked changes between the Development Consent Order for Option B v1 (submitted November 2015) and Development Consent Order for Option B v2 (submitted December 2015) (Document reference 3.1 option B v2 ? Tracked)
Other
Size: 9 MB
John Mars Jones
Response to the Applicant?s letter of 2 December 2015, the Strategic Options Report (Addendum 2) and Addendum to the Explanation from SP Manweb (dated 30 September 2015) (JMJ3)- Submitted for Deadline 9
Other
Size: 5 MB
John Mars Jones
Visualisation of the location of wood poles numbers 159 to 174 at Berain (JMJ5)- Submitted for Deadline 9
Other
Size: 140 KB
SP Manweb
Appendix 6 to Action Point 6: Summary Landowner and Part 3 of the Book of Reference Interest Negotiations SPM NWWFC DL9 Day 2 AP6;
Other
Size: 636 KB
SP Manweb
Outline Hedgerow Management Plan Version 4 (Document reference 6.18C v4)
Other
Size: 276 KB
SP Manweb
Outline Construction Environmental Management Plan Version 4 ? Tracked Change Version (Document Reference 6.18 v4 ? Tracked)
Other
Size: 1 MB
John Mars Jones
Comments on the draft Development Consent Order v4 (JMJ4). - Submitted for Deadline 9
Other
Size: 237 KB
SP Manweb
Written Summaries of Oral Evidence (DCO Hearing 10th December 2015) Including Action Notes (Document Reference SPM NWWFC SDCOH03)
Other
Size: 66 KB
Eifion Bibby
Action Points from the Compulsory Acquisition Hearing of 9 December 2015- Submitted for Deadline 9
Other
Size: 360 KB
SP Manweb
Outline Ecological Management Plan Version 3 ? Tracked Change Version (Document reference 6.18D v3 - Tracked)
Other
Size: 1 MB
SP Manweb
Draft Development Consent Order for Option B v2 (Document reference 3.1 Option B v2)
Other
audio recording
Size: 17 MB
Option B Compulsory Acquisition Hearing 09-12-2015
Audio recording of the Compulsory Acquisition Hearing in relation to the proposed provision for the compulsory acquisition of rights and the imposition of restrictions over additional land in relation to Option B. Held on Wednesday 9 December 2015 at Denbigh Town Hall.
Other
audio recording
Size: 67 MB
Option B Issue Specific Hearing 10-12-2015
Audio recording of the Issue Specific Hearing on the draft Development Consent Order for Option B. Held on Thursday 10 December 2015 at Denbigh Town Hall.
Other
audio recording
Size: 59 MB
Option A Open Floor Hearing 09-12-2015
Audio recording of the Open Floor Hearing in relation to Option A (the original application). Held on Wednesday 9 December 2015 at Denbigh Town Hall.
Other
Size: 114 KB
Rule 17 Letter
Request by the ExA for further information from Cadw. Letter dated 14 December 2015.
Other
audio recording
Size: 33 MB
Option A Compulsory Acquisition Hearing 09-12-2015 Session 2 of 2
Audio recording of the Compulsory Acquisition Hearing in relation to the compulsory acquisition of rights and the imposition of restrictions over land in relation to Option A (the original application). Held on Wednesday 9 December 2015 at Denbigh Town Hall. Session 2 of 2
Other
audio recording
Size: 79 MB
Option A Compulsory Acquisition Hearing 09-12-2015 Session 1 of 2
Audio recording of the Compulsory Acquisition Hearing in relation to the compulsory acquisition of rights and the imposition of restrictions over land in relation to Option A (the original application). Held on Wednesday 9 December 2015 at Denbigh Town Hall. Session 1 of 2
Other
audio recording
Size: 63 MB
Issue Specific Hearing 08-12-2015 Session 4
Audio recording of the Issue Specific Hearing on the principles of development and environmental issues. Held on Tuesday 8 December 2015 at Denbigh Town Hall. Session 4 of 4
Other
audio recording
Size: 30 MB
Option A Issue Specific Hearing 10-12-2015
Audio recording of the Issue Specific Hearing on the draft Development Consent Order for Option A (the original application). Held on Thursday 10 December 2015 at Denbigh Town Hall.
Other
audio recording
Size: 6 MB
Option B Open Floor Hearing 09-12-2015
Audio recording of the Open Floor Hearing on the proposed provision for the compulsory acquisition of rights and the imposition of restrictions over additional land in relation to Option B. Held on Wednesday 9 December 2015 at Denbigh Town Hall.
Other
Size: 88 KB
Action points from Day 3 ISH
Action points from the Issue Specific Hearing on the draft Development Consent Order held on 10 December 2015.
Other
Size: 88 KB
Action points from Day 2 CA
Action points from the Compulsory Acqusition Hearing held on 9 December 2015
Other
Size: 103 KB
Action points from Day 1 ISH
Action points from the Issue Specific Hearing on the Principles of Development and Environmental Issues held on 8 December 2015
Other
Size: 61 KB
Unaccompanied Site Inspection Note 10 December 2015
The ExA's note of their unaccompanied site inspection undertaken on 10 December 2015.
Other
audio recording
Size: 19 KB
Issue Specific Hearing 08-12-2015 Session 3
Audio recording of the Issue Specific Hearing on the principles of development and environmental issues. Held on Tuesday 8 December 2015 at Denbigh Town Hall. Session 3 of 4
Other
Size: 105 KB
Unaccompanied Site Inspection Note 7th December
The ExA's note of their unaccompanied site inspection undertaken on 7 December 2015.
Other
audio recording
Size: 88 MB
Issue Specific Hearing 08-12-2015 Session 3
Audio recording of the Issue Specific Hearing on the principles of development and environmental issues. Held on Tuesday 8 December 2015 at Denbigh Town Hall. Session 3 of 4
Other
audio recording
Size: 83 MB
Issue Specific Hearing 08-12-2015 Session 2
Audio recording of the Issue Specific Hearing on the principles of development and environmental issues. Held on Tuesday 8 December 2015 at Denbigh Town Hall. Session 2 of 4
Other
audio recording
Size: 93 MB
Issue Specific Hearing 08-12-2015 Session 1
Audio recording of the Issue Specific Hearing on the principles of development and environmental issues. Held on Tuesday 8 December 2015 at Denbigh Town Hall. Session 1 of 4
Other
Size: 65 KB
Dewi Parry
Post hearing submission- Submitted for Deadline 9
Other
Size: 45 KB
Mr Conrad Proudlock
Hearing submission- Submitted for Deadline 9
Other
Size: 164 KB
Welsh Water
Confirming withdrawal of objection in respect of the Application- Submitted for Deadline 9
Other
Size: 1 MB
SP Manweb
Correspondence from the Crown Estate, which provides consent pursuant to S.135(1) and (2) Planning Act 2008- Submitted for Deadline 9
Other
Size: 211 KB
SP Manweb
Agreed Statement of Common Ground between SP Manweb and Natural Resources Wales- Submitted for Deadline 9
Other
Size: 11 KB
Sheila Harman
Post hearing submission- Submitted for Deadline 9
Other
Size: 73 KB
Natural Resources Wales
Note on Article Crown Land section 135 - Written submission in lieu of attendance at the Compulsory Acquisition hearing 9 December 2015 and DCO hearing 10 December 2015.
Other
Size: 287 KB
Natural Resources Wales
Submission concerning Article 33 of the DCO- Written submission in lieu of attendance at the Compulsory Acquisition hearing 9 December 2015 and DCO hearing 10 December 2015
Other
Size: 173 KB
Natural Resources Wales
Further note Covering letter - Written submission in lieu of attendance at the Compulsory Acquisition hearing 9 December 2015 and DCO hearing 10 December 2015.
Other
Size: 97 KB
Natural Resources Wales
Covering letter- Written submission in lieu of attendance at the Compulsory Acquisition hearing 9 December 2015 and DCO hearing 10 December 2015
Other
Size: 77 KB
Natural Resources Wales
Submission concerning Crown Land- Written submission in lieu of attendance at the Compulsory Acquisition hearing 9 December 2015 and DCO hearing 10 December 2015
Other
Size: 527 KB
Eifion Bibby
Comments on the applicants response to second round of written questions.- Late submission for Deadline 7 accepted at the discretion of the Examining Authority
Other
Size: 14 MB
John Mars Jones
Updated version of Deadline 3 submission on Planting of Trees and Ecological Mitigation Measures (REP3-019). Submitted on 3 December 2015 and accepted by the ExA
Other
Size: 14 MB
John Mars Jones
Updated version of Deadline 3 submission on Underground Cabling (REP3-021). Submitted on 3 December 2015 and accepted by the ExA
Other
Size: 135 KB
SP Manweb
Statement on option B in relation to question 0.4
Other
Size: 447 KB
SP Manweb
Response to Submissions from Interested Parties submitted at Deadline 5
Other
Size: 90 KB
SP Manweb
Letter to the ExA
Other
Size: 232 KB
SP Manweb
Responses to Second Written Questions Submissions
Other
Size: 138 KB
SP Manweb
Index to accompany Response to Submissions from Interested Parties submitted at Deadline 5
Other
Size: 131 KB
SP Manweb
Index to accompany Responses to Second Written Questions Submissions
Other
Size: 337 KB
SP Manweb
Strategic Options Report Addendum 2
Other
Size: 138 KB
SP Manweb
Covering letter for Deadline 7
Other
Size: 2 MB
SP Manweb
Funding Statement Addendum (with appendices)
Other
Size: 98 KB
Natural Resources Wales
Submission for Deadline 7
Other
Size: 121 KB
Wales and West Utilities
Submission for Deadline 7
Other
Size: 48 KB
Network Rail
Comments on Option B. Submitted for Deadline 5 of 13 November 2015
Other
Size: 510 KB
SP Manweb
Correspondence with BT regarding protective provisions. Late submission for Deadline 6 accepted at the discretion of the Examining Authority
Other
Size: 76 KB
Amber Real Estate Investments Limited
Response to ExA?s second written questions. Late submission for Deadline 6 accepted at the discretion of the Examining Authority
Other
Size: 310 KB
Conwy County Borough Council
Local Impact Report Appendices. Submitted for Deadline 1, 1 September 2015 (This document was not published at Deadline 1 in error)
Other
Size: 147 KB
Agendas for the Issue Specific and Compulsory Acquisition hearings
Agendas for the Issue Specific and Compulsory Acquisition hearings taking place on Tuesday 8 December to Thursday 10 December 2015.
Other
Size: 130 KB
SP Manweb
Covering letter 25 November 2015- Late submission for Deadline 6 accepted at the discretion of the Examining Authority.
Other
Size: 14 MB
SP Manweb
Landscaping Plans: Landscaping and Reinstatement Planting - Option B (Sheets 1-13) Late submission for Deadline 6 accepted at the discretion of the Examining Authority.
Other
Size: 3 MB
SP Manweb
Appendix to the Response to the ExA's Second Written Question NWWFC SWQ12.7 (The "Berain Paper")- Late submission for Deadline 6 accepted at the discretion of the Examining Authority.
Other
Size: 457 KB
SP Manweb
Response to Post Hearing Submissions from Interested Parties submitted at Deadline 4. Late submission for Deadline 6 accepted at the discretion of the Examining Authority.
Other
Size: 6 MB
SP Manweb
Appendix to SP Manweb?s Response to Post Hearing Submissions from Interested Parties at Deadline 4: Guidance on the Application of Separation Distances from Residential Properties (May 2014) - Full Report. Late submission for Deadline 6 accepted at the discretion of the Examining Authority.
Other
Size: 309 KB
SP Manweb
Index to accompany Response to Post Hearing Submissions from Interested Parties submitted at Deadline 4. Late submission for Deadline 6 accepted at the discretion of the Examining Authority.
Other
Size: 146 KB
SP Manweb
Covering letter - Late submission for Deadline 6 accepted at the discretion of the Examining Authority.
Other
Size: 1 MB
SP Manweb
Landscaping Plans and Important Hedgerows v3 - Sheet 3
Other
Size: 66 KB
John Hopkinson
Response to ExA?s second written questions
Other
Size: 10 MB
SP Manweb
Response to the Examining Authority's Second Written Questions
Other
Size: 274 KB
SP Manweb
Second Round Written Questions. Appendix 12.3 - E-mail Response to DCC
Other
Size: 1 MB
SP Manweb
Second Round Written Questions. Appendix 0.10 - Draft DCO (Doc Ref 3.1) - Option B (Clean)
Other
Size: 140 KB
SP Manweb
4.3 Book of Reference Parts 1-5 Option B - Tracked changes
Other
Size: 52 KB
Iwan Jones
Response to ExA?s second written questions
Other
Size: 144 KB
Natural Resources Wales
Response to ExA?s second written questions
Other
Size: 472 KB
SP Manweb
Second Round Written Questions. Appendix 0.4 - Statement from Gareth Roberts
Other
Size: 140 KB
SP Manweb
4.3 Book of Reference Parts 1-5 Option A v3 - Tracked changes
Other
Size: 96 KB
Denbighshire County Council
Response to ExA?s second written questions
Other
Size: 81 KB
SP Manweb
Second Round Written Questions. Appendix 11.2(c)
Other
Size: 249 KB
SP Manweb
Second Round Written Questions. Appendix 11.2(f)
Other
Size: 322 KB
SP Manweb
Second Round Written Questions. Appendix 11.2(d)
Other
Size: 38 MB
SP Manweb
Land plans - Option A v2 - Key Plan & Sheets 1-13
Other
Size: 1 MB
SP Manweb
3.1 DCO Option A v4 - Clean Version
Other
Size: 40 MB
SP Manweb
Land plans - Option B v1 - Key Plan & Sheets 1-13
Other
Size: 376 KB
Dewi Parry
Response to ExA?s second written questions
Other
Size: 140 KB
SP Manweb
4.3 Book of Reference Parts 1-5 Option B - Clean version
Other
Size: 50 KB
Robin Barlow
Comment on original deadline 5 submission
Other
Size: 12 KB
Sheila Harman
Response to ExA?s second written questions
Other
Size: 266 KB
SP Manweb
Response to the Examining Authority's Second Written Questions - Index
Other
Size: 118 KB
SP Manweb
Second Round Written Questions. Appendix 11.2(b)
Other
Size: 1 MB
SP Manweb
3.1 DCO Option B - Clean Version
Other
Size: 177 KB
SP Manweb
Second Round Written Questions. Appendix 11.2(e)
Other
Size: 60 KB
Martin Barlow
Response to ExA?s second written questions
Other
Size: 851 KB
SP Manweb
Second Round Written Questions. Appendix 11.2(a)
Other
Size: 140 KB
SP Manweb
4.3 Book of Reference Parts 1-5 Option A v3 - Clean Version
Other
Size: 121 KB
Robin Barlow
Response to the Applicant's deadline 4 submission- Late submission for Deadline 6 accepted at the discretion of the Examining Authority.
Other
Size: 1 MB
Eifion Bibby
Response to ExA?s second written questions
Other
Size: 1 MB
SP Manweb
3.1 DCO Option B - Tracked Version
Other
Size: 118 KB
SP Manweb
Summary Tracker for the Book of Reference and Land Plans - Submitted for Deadline 6
Other
Size: 807 KB
SP Manweb
Second Round Written Questions. Appendix 0.10 - Draft DCO (Doc Ref 3.1) - Option B (Tracked)
Other
Size: 657 KB
SP Manweb
Second Round Written Questions. Appendix 0.2 - Table of Landowner Suggestions
Other
Size: 1 MB
SP Manweb
3.1 DCO Option A v4 - tracked Version
Other
Size: 113 KB
SP Manweb
Second Round Written Questions. Appendix 4.10 - The Latest Correspondence Received from NATS
Other
Size: 206 KB
SP Manweb
Covering letter - submitted for Deadline 6 of 18 November 2015
Other
Size: 880 KB
Martin Barlow
Late Submission to Deadline 5. Accepted at the discretion of the Examining Authority.
Other
Size: 139 KB
Amserlen ar gyfer archwilio Opsiwn B
Welsh language version of the Timetable for the examination of Option B letter.
Other
Size: 124 KB
SP Manweb
Applicant's Hearing (Rule 13) Newspaper Notice for hearings in December
Other
Size: 134 KB
Carter Jonas LLP on behalf of Mrs J W Smith
Written representation. Submitted for Deadline 5 of 13 November 2015
Other
Size: 62 KB
Robin Barlow
Response to the new submission by SP Manweb on Lifetime Costs of Undergrounding / Overgrounding. Submitted for Deadline 5 of 13 November 2015
Other
Size: 154 KB
SP Manweb
Regulation 9 b certificate
Other
Size: 125 KB
Timetable for examination of Option B
Other
Size: 159 KB
SP Manweb
Regulation 9 a certificate
Other
Size: 86 KB
Canal & River Trust
Comments on the notice of Provision for Powers of Compulsory Application in Respect of additional land.
Other
Size: 487 KB
Rostons Limited on behalf of Mrs M Jones
Update relating to compulsory acquisition. Submitted for Deadline 5 of 13 November 2015
Other
Size: 393 KB
Welsh Government
Comments on the change in timetable
Other
Size: 12 KB
Iwan Jones
Comments on applicant?s answer to AP31 ? Timing of surveys. Late submission for Deadline 5 of 13 November 2015 accepted at the discretion of the Examining Authority.
Other
Size: 81 KB
Peris G Jones
Comments on the Lifetime Cost Report submitted by SP Manweb for Deadline 4. Submitted for Deadline 5 of 13 November 2015
Other
Size: 17 KB
Iwan Jones
Comments on the Life Time Cost Analysis. Submitted for Deadline 5 of 13 November 2015
Other
Size: 69 KB
Natural Resources Wales
Comments on post hearing documents. Submitted for Deadline 5 of 13 November 2015
Other
Size: 1 MB
Dewi Parry
Comments on further post hearing documents and Option B. Submitted for Deadline 5 of 13 November 2015
Other
Size: 31 KB
Iwan Jones
Comments on the applicants photomontages
Other
Size: 1 MB
Mr Eifion Bibby
Comments on Option B on behalf of clients. Submitted for Deadline 5 of 13 November 2015
Other
Size: 68 KB
Natural Resources Wales
Comments on Option B. Submitted for Deadline 5 of 13 November 2015
Other
Size: 12 KB
Iwan Jones
Comments on further post hearing documents. Submitted for Deadline 5 of 13 November 2015
Other
Size: 94 KB
Pylon the Pressure Group
Further post hearing documents
Other
Size: 38 KB
Dafydd I Jones
Comments on Option B
Other
Size: 85 KB
Daffyd I Jones
Comments on post hearing documents. Submitted for Deadline 5 of 13 November 2015
Other
Size: 372 KB
SP Manweb
Response to Post Hearing Submission from Interested Parties submitted at Deadline 3 (Meilir Jones, Meirick Lloyd Davies, Peris G Jones, Pylon the Pressure Group, Robin Barlow, Simon P White)- late submission to Deadline 4 accepted at the discretion of the Examining Authority
Other
Size: 159 KB
SP Manweb
Covering letter - late submission to Deadline 4 accepted at the discretion of the Examining Authority
Other
Size: 251 KB
SP Manweb
Response to Post Hearing Submission from Conwy County Borough Council submitted at Deadline 3- late submission to Deadline 4 accepted at the discretion of the Examining Authority
Other
Size: 3 MB
SP Manweb
Response to Post Hearing Submission from Interested Parties submitted at Deadline 3 (Civil Aviation Authority, Dafydd Jones, Eifion Bibby, Iwan Jones, John Hopkinson, John Mars Jones, JP Hughes) - late submission to Deadline 4 accepted at the discretion of the Examining Authority
Other
Size: 988 KB
SP Manweb
Response to Post Hearing Submission from Denbighshire County Council submitted at Deadline 3 - late submission to Deadline 4 accepted at the discretion of the Examining Authority
Other
Size: 286 KB
SP Manweb
Response to Late Deadline 1 and Deadline 3 Representation on Option B from Eifion Bibby - late submission to Deadline 4 accepted at the discretion of the Examining Authority
Other
Size: 329 KB
SP Manweb
Response to Post Hearing Submissions at Deadline 3 Index - late submission to Deadline 4 accepted at the discretion of the Examining Authority
Other
Size: 2 MB
SP Manweb
Updated photomontages in response to Action point 1- Issue specific hearing day 2
Other
Size: 6 MB
Iwan Jones
Post-hearing documents. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 3 MB
SP Manweb
Appendices to the written summary of oral representations made at the Issue Specific Hearing (day 1) dated 29 September 2015
Other
Size: 13 MB
David Roberts.
Post-hearing submission . Late submission to Deadline 3 - This was accepted at the discretion of the Examining Authority
Other
Size: 889 KB
SP Manweb
Comparite showing amendments made to the TMP between Version 1 and Version 2. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 374 KB
SP Manweb
Appendices to the written summary of oral representations made at the Compulsory Acquisition hearings dated 24 and 25 September 2015. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 2 MB
Dewi Parry
Post-hearing documents. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 853 KB
SP Manweb
Revised draft of the Outline Traffic Management Plan (TMP) (Version 2). Submitted for Deadline 4 of 2 November 2015.
Other
Size: 40 KB
SP Manweb
Response to action point 8 from the Compulsory Acquisition Hearings - Landowner and Part 3 Interest Negotiations .Submitted for Deadline 4 of 2 November 2015.
Other
Size: 351 KB
SP Manweb
Note on the operation of Section 135 of the Planning Act 2008. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 79 KB
Robin Barlow
Comments raised at the Issue Specific Hearing held on 30 September 2015. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 19 MB
SP Manweb
Landscaping Plans (Sheet 1-13). Submitted for Deadline 4 of 2 November 2015.
Other
Size: 563 KB
SP Manweb
Response to the written submission provided by Mr Robin Barlow at Deadline 2. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 2 MB
SP Manweb
Response to action point 9b from Day One of the Issue Specific Hearings ? Lifetime Costs Report .Submitted for Deadline 4 of 2 November 2015.
Other
Size: 201 KB
SP Manweb
A document summarising and confirming the versions of the CEMP, TMP, EcMP, HMP and OLMP. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 428 KB
Peris G Jones
Comments on Deadline 3 submissions. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 322 KB
SP Manweb
Revised draft of the Construction Environmental Management Plan (CEMP) (Version 3). Submitted for Deadline 4 of 2 November 2015.
Other
Size: 385 KB
SP Manweb
Comparite showing amendments made to the EcMP between Version 1 and Version 2. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 153 KB
SP Manweb
Guidance document on Working Safely Near Overhead Electric Power Lines (Health and Safety Executive).Submitted for Deadline 4 of 2 November 2015.
Other
Size: 242 KB
SP Manweb
Covering letter. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 32 KB
Dafydd I Jones
Post-hearing representation; late submission to Deadline 4 accepted at the discretion of the Examining Authority
Other
Size: 999 KB
SP Manweb
A revised draft of the Outline Landscape Management Plan (OLMP) (Version 2) This has been submitted to remove references to Ash. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 483 KB
SP Manweb
Comparite showing amendments made to the CEMP between Version 2 and Version 3. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 683 KB
SP Manweb
Appendices to the written summary of oral representations made at the Issue Specific Hearing (day 2) dated 30 September 2015. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 275 KB
SP Manweb
Response to the written submission provided by Mr John Fleet at Deadline 1. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 445 KB
SP Manweb
Revised draft of the Ecological Management Plan (EcMP) (Version 2). Submitted for Deadline 4 of 2 November 2015.
Other
Size: 529 KB
SP Manweb
Appendices to the written summary of oral representations made at the Issue Specific Hearing (day 3) dated 1 October 2015. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 1 MB
SP Manweb
Comparite showing amendments made to the OLMP between Version 1 and Version 2. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 202 KB
SP Manweb
Response to the written submission provided by the Pylon the Pressure Group at Deadline 1. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 206 KB
Natural Resources Wales
Response to Action Point 11 from the Issue Specific Hearing held on 29th September 2015. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 249 KB
SP Manweb
Response to the written submission relating to Option A matters provided by Mr Eifion Bibby at Deadline 1. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 306 KB
SP Manweb
Responses to late Deadline 2 representations, providing a summary of the representations provided and signposting to previous submissions made. Submitted for Deadline 4 of 2 November 2015.
Other
Size: 296 KB
SP Manweb
Schedule of changes to the Outline Hedgerow Management Plan (HMP) .Submitted for Deadline 4 of 2 November 2015.
Other
Size: 157 KB
SP Manweb
Letter of 28 October 2015 in relation to the examination of Option B.
Other
Size: 76 KB
Examining Authority Second Questions - Table 1
Interested Parties who are objecting to the Compulsory Acquisition of Rights
Other
Size: 128 KB
Examining Authority Second Questions
Other
Size: 434 KB
Denbighshire County Council
Post-hearing submission. Representation made at the Issue specific hearing on Landscape and Visual Impact on 30 September 2015. Submitted for Deadline 3 of 16 October 2015 (updated on 20 October 2015).
Other
Size: 311 KB
Conwy County Borough Council
Post-hearing submissions. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 2 MB
John Mars Jones
Post-hearing submission. Works Plan Sheet 10 - modified to show possible areas for undergrounding for Berain. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 8 MB
John Hopkinson
Post-hearing submission. Representation made at the Open floor hearing of 23 September 2015. Submitted for Deadline 3 of 16 October 2015
Other
Size: 199 KB
Pinsent Masons on behalf of SP Manweb
Post-hearing submission. Response to a submission made by John Mars Jones. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 790 KB
Pinsent Masons on behalf of SP Manweb
Doc 3.1 draft Development Consent Order (version 3). Submitted for Deadline 3 of 16 October 2015.
Other
Size: 18 MB
Pinsent Masons on behalf of SP Manweb
Land Plan sheet 7 to 13. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 2 MB
Pinsent Masons on behalf of SP Manweb
Post-hearing submission. Representation made at the Compulsory Acquisition Hearings of 24 & 25 October 2015. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 501 KB
Denbighshire County Council
Post-hearing submission. Representation made at the Issue specific hearing on Socioeconomic Impacts on 1 October 2015. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 231 KB
Pinsent Masons on behalf of SP Manweb
Post-hearing submission. Representation made at the Issue specific hearing on the draft Development Consent Order on 2 October 2015. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 26 KB
Denbighshire County Council
Post-hearing submission; note from County Councillor Alice Jones on land use and agriculture. Submitted for Deadline 3 of 16 October 2015
Other
Size: 17 MB
Peris G Jones
Post-hearing submission. Submitted for Deadline 3 of 16 October 2015 -This was accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Pinsent Masons on behalf of SP Manweb
Post-hearing submission. Representation made at the Issue specific hearing on Landscape and visual impact; heritage impacts and biodiversity of 30 September 2015. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 307 KB
Pinsent Masons on behalf of SP Manweb
Covering letter for submissions for Deadline 3 of 16 October 2015.
Other
Size: 324 KB
John Mars Jones
Post-hearing submission relating to Underground Cabling. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 44 KB
Iwan Jones
Post-hearing submission on costings analysis of overhead and underground lines. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 131 KB
Denbighshire County Council
Post-hearing submission. Representation made at the Issue specific hearing on the draft Development Consent Order on 2 October 2015. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 1,024 KB
Robin Barlow
Post-hearing document. Routeing Consultation Document for the Loch Urr Grid Connection project. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 101 KB
John Fleet
Post-hearing submission- Submitted for Deadline 3 of 16 October 2015
Other
Size: 4 MB
John Mars Jones
Post-hearing submission. Letter from SP Manweb to John Mars Jones. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 288 KB
Mr Iwan Jones
Post-hearing submission. Investigation into the potential impact of wind farms on tourism in Wales - Summary Report. Submitted for Deadline 3 of 16 October 2015
Other
Size: 13 KB
Civil Aviation Authority
Post-hearing submission. Submitted for Deadline 3 of 16 October 2015
Other
Size: 62 KB
John Mars Jones
Post-hearing submission. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 693 KB
Meirick Lloyd Davies
Post-hearing submission; Letter from Ann Jones AM. Submitted for Deadline 3 of 16 October 2015
Other
Size: 1 MB
Pinsent Masons on behalf of SP Manweb
Post-hearing submission. Representation made at the Issue specific hearing on Land use, land take and land management impacts on 1 October 2015. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 561 KB
JP Hughes
Post-hearing submission. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 322 KB
John Mars Jones
Post-hearing submission relating to Planting of Trees and Ecological Mitigation Measures. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 77 KB
Simon P White
Post-hearing submission. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 2 MB
John Mars Jones
Post-hearing submission. Representation made at the Open-floor hearing held on 23 September 2015. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 780 KB
Pinsent Masons on behalf of SP Manweb
Doc 3.1 draft Development Consent Order - Tracked Change (Version 3). Submitted for Deadline 3 of 16 October 2015.
Other
Size: 24 MB
Pinsent Masons on behalf of SP Manweb
Overall Location Plan, Master Key Plan and Land Plan 1 to 6. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 124 KB
Eifion Bibby
Post-hearing submission. Representations made at the Compulsory Acquisition hearings of 24 & 25 September 2015. Submitted for Deadline 3 of 16 October 2015
Other
Size: 2 MB
Pylon the Pressure Group
Post hearing submission. Submitted for Deadline 3 of 16 October 2015
Other
Size: 12 MB
Pinsent Masons on behalf of SP Manweb
Post-hearing submission. Representations made at Issue speciific hearing on Principles of development (including assessment approach, costs and policy), construction impacts and decommissioning. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 14 KB
Iwan Jones
Post-hearing submission. Representations made at hearings. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 6 MB
Pinsent Masons on behalf of SP Manweb
Post-hearing submission; Inspector's Report on the Conjoined Public Inquiry.Submitted for Deadline 3 of 16 October 2015.
Other
Size: 2 MB
Dafydd Jones
Post-hearing submission. Representation made at the Compulsory Acquisition hearing of 25 September 2015. Submitted for Deadline 3 of 16 October 2015
Other
Size: 52 KB
Denbighshire County Council
Post-hearing submission. Representation made at the Issue specific hearing on Land Use, Land Management and Land Take on 1 October 2015. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 185 KB
Meilir Jones
Representation submitted for Deadline 3 of 16 October 2015.
Other
Size: 2 MB
John Mars Jones
Post-hearing submission. Representation made at the Compulsory Acquisition hearing held on 24 & 25 September 2015. Submitted for Deadline 3 of 16 October 2015.
Other
Size: 180 KB
Pinsent Masons on behalf of SP Manweb
Applicant's Regulation 8 Newspaper Notice
Other
Size: 468 KB
Pinsent Masons on behalf of SP Manweb
Submission for Preliminary Meeting on 28 July 2015 regarding proposed changes to the application
Other
Size: 595 KB
Pinsent Masons on behalf of SP Manweb
Letter of 9 October 2015 in relation to the acceptance of the proposed provision for the compulsory acquisition of additional land to facilitate Option B.
Other
audio recording
Size: 19 KB
Issue Specific Hearing 02-10-15 - Part 2 1
Audio recording of the Issue Specific Hearing on the draft Development Consent Order. Held on Friday 2 October 2015 at Denbigh Town Hall.
Other
audio recording
Size: 71 MB
Issue Specific Hearing 01-10-05 - Part 1
Audio recording of the Issue Specific Hearing on land use, land take and land management impacts; other operational impacts (inc. EMFs and noise); socioeconomic impacts and environmental monitoring and mitigation plans. Held on Thursday 1 October 2015 at Denbigh Town Hall.
Other
audio recording
Size: 116 MB
Issue Specific Hearing 01-10-05 - Part 2
Audio recording of the Issue Specific Hearing on land use, land take and land management impacts; other operational impacts (inc. EMFs and noise); socioeconomic impacts and environmental monitoring and mitigation plans. Held on Thursday 1 October 2015 at Denbigh Town Hall.
Other
audio recording
Size: 19 KB
Issue Specific Hearing 01-10-05 - Part 3
Audio recording of the Issue Specific Hearing on land use, land take and land management impacts; other operational impacts (inc. EMFs and noise); socioeconomic impacts and environmental monitoring and mitigation plans. Held on Thursday 1 October 2015 at Denbigh Town Hall.
Other
audio recording
Size: 19 KB
Issue Specific Hearing 01-10-05 - Part 2 1
Audio recording of the Issue Specific Hearing on land use, land take and land management impacts; other operational impacts (inc. EMFs and noise); socioeconomic impacts and environmental monitoring and mitigation plans. Held on Thursday 1 October 2015 at Denbigh Town Hall.
Other
audio recording
Size: 123 MB
Issue Specific Hearing 02-10-15 - Part 1
Audio recording of the Issue Specific Hearing on the draft Development Consent Order. Held on Friday 2 October 2015 at Denbigh Town Hall.
Other
audio recording
Size: 168 MB
Issue Specific Hearing 02-10-15 - Part 2
Audio recording of the Issue Specific Hearing on the draft Development Consent Order. Held on Friday 2 October 2015 at Denbigh Town Hall.
Other
audio recording
Size: 19 KB
Issue Specific Hearing 02-10-15 - Part 1 1
Audio recording of the Issue Specific Hearing on the draft Development Consent Order. Held on Friday 2 October 2015 at Denbigh Town Hall.
Other
Size: 44 KB
Proposed provision checklist
Acceptance Checklist relating to the proposed provision for the compulsory acquisition of additional land
Other
audio recording
Size: 164 MB
Issue Specific Hearing 29-09-15-Part 3
Audio recording of the Issue Specific Hearing on Principles of development (including assessment approach, costs and policy), construction impacts and decommissioning. Held on Tuesday 29 September 2015 at Denbigh Town Hall.
Other
Size: 142 KB
SP Manweb
Option B Submission Covering letter
Other
audio recording
Size: 19 KB
Issue Specific Hearing 30-09-2015- Part 1 1
Audio recording of the Issue Specific Hearing on Landscape and visual impact; heritage impacts and biodiversity. Held on Wednesday 30 September 2015 at Denbigh Town Hall.
Other
Size: 140 KB
SP Manweb
Book Of Reference Parts 1-5 Option B (Clean Version)
Other
Size: 11 MB
SP Manweb
Access and rights of Way Plan- Sheet 6 to Sheet 13 (Option B)
Other
audio recording
Size: 137 MB
Issue Specific Hearing 30-09-2015 - Part 4
Audio recording of the Issue Specific Hearing on Landscape and visual impact; heritage impacts and biodiversity. Held on Wednesday 30 September 2015 at Denbigh Town Hall.
Other
Size: 31 MB
SP Manweb
Works Plan - Key Plan to Sheet 5 (Option B)
Other
Size: 7 MB
SP Manweb
Section Drawing Sheet 15 to Sheet 29 (Option B)
Other
Size: 34 MB
SP Manweb
Access and rights of Way Plan to Key Plan- Sheet 5 (Option B)
Other
Size: 6 MB
SP Manweb
Section Drawing Sheet 1 to Sheet 14 (Option B)
Other
Size: 69 KB
Action points from Day 1 ISH
Other
Size: 83 KB
Action points from Day 3 ISH
Other
Size: 5 MB
SP Manweb
Statement of reasons (4.1 v2) ?Option B
Other
audio recording
Size: 70 MB
Issue Specific Hearing 30-09-2015- Part 3
Audio recording of the Issue Specific Hearing on Landscape and visual impact; heritage impacts and biodiversity. Held on Wednesday 30 September 2015 at Denbigh Town Hall.
Other
audio recording
Size: 46 MB
Compulsory Acquisition Hearing-25-9-15
Audio recording of the Compulsory Acquisition Hearing. Held on Friday 25 September 2015 at Denbigh Town Hall.
Other
Size: 554 KB
SP Manweb
Compulsory Acquisition document- Option B
Other
Size: 99 KB
Hysbysiad o benderfyniadau trefniadol ar Opsiwn B
Welsh Language version of the notification of procedural decision on Option B.
Other
audio recording
Size: 60 MB
Issue Specific Hearing 30-09-2015- Part 2
Audio recording of the Issue Specific Hearing on Landscape and visual impact; heritage impacts and biodiversity. Held on Wednesday 30 September 2015 at Denbigh Town Hall.
Other
audio recording
Size: 98 MB
Issue Specific Hearing 30-09-2015- Part 1
Audio recording of the Issue Specific Hearing on Landscape and visual impact; heritage impacts and biodiversity. Held on Wednesday 30 September 2015 at Denbigh Town Hall.
Other
Size: 140 KB
SP Manweb
Book Of Reference Option B Schedule of Changes
Other
audio recording
Size: 113 MB
Compulsory Acquisition Hearing 24-09-15 - Part 1
Audio recording of the Compulsory Acquisition Hearing. Held on Thursday 24 September 2015 at Denbigh Town Hall.
Other
Size: 8 MB
SP Manweb
Works Plan - Sheet 6 to Sheet 13 (Option B)
Other
Size: 32 MB
SP Manweb
Land Plan- Key Plan to Sheet 5 (Option B)
Other
audio recording
Size: 19 KB
Issue Specific Hearing 30-09-2015 - Part 4 1
Audio recording of the Issue Specific Hearing on Landscape and visual impact; heritage impacts and biodiversity. Held on Wednesday 30 September 2015 at Denbigh Town Hall.
Other
audio recording
Size: 19 KB
Compulsory Acquisition Hearing 24-09-15 - Part 2 1
Audio recording of the Compulsory Acquisition Hearing. Held on Thursday 24 September 2015 at Denbigh Town Hall.
Other
Size: 7 MB
SP Manweb
Crown Land Plan - Key Plan to Sheet 3 (Option B)
Other
Size: 57 KB
Action points from Day 4 ISH
Other
Size: 18 MB
SP Manweb
Comparison Plan between Option A and Option B - Sheet 1 - Sheet 5
Other
audio recording
Size: 123 MB
Issue Specific Hearing 29-09-15-Part 2
Audio recording of the Issue Specific Hearing on Principles of development (including assessment approach, costs and policy), construction impacts and decommissioning. Held on Tuesday 29 September 2015 at Denbigh Town Hall.
Other
audio recording
Size: 138 MB
Compulsory Acquisition Hearing 24-09-15 - Part 2
Audio recording of the Compulsory Acquisition Hearing. Held on Thursday 24 September 2015 at Denbigh Town Hall.
Other
Size: 140 KB
SP Manweb
Book Of Reference Parts 1-5 Option B Tracked Changes
Other
Size: 65 KB
Action points from CA hearing
Other
Size: 8 MB
SP Manweb
Land Plan- Sheet 6 to Sheet 13 (Option B)
Other
Size: 74 KB
Action points from Day 2 ISH
Other
Size: 97 KB
Notification of procedural decision on Option B
Other
Size: 9 MB
SP Manweb
Landscaping Plans ? Option B
Other
Size: 760 KB
SP Manweb
Environmental Report- Option B
Other
Size: 32 MB
SP Manweb
Comparison Plan between Option A and Option B - Sheet 6 - Sheet 13
Other
audio recording
Size: 111 MB
Issue Specific Hearing 29-09-15-Part 1
Audio recording of the Issue Specific Hearing on Principles of development (including assessment approach, costs and policy), construction impacts and decommissioning. Held on Tuesday 29 September 2015 at Denbigh Town Hall.
Other
audio recording
Size: 86 MB
Open Floor Hearing 23-09-15
Audio recording of the Open Floor Hearing. Held on Wednesday 23 September 2015 at Denbigh Town Hall.
Other
Size: 104 KB
Notification of decision to accept proposed compulsory acquisition of additional land as part of the application
Letter from the ExA to the applicant notifying of the acceptance of the proposed provision for the compulsory acquisition of additional land
Other
Size: 87 KB
Procedural Decision on Option B
Procedural Decision taken by the ExA to accept the applicant?s proposed scheme changes.
Other
audio recording
Size: 19 KB
Compulsory Acquisition Hearing 24-09-15 - Part 3
Audio recording of the Compulsory Acquisition Hearing. Held on Thursday 24 September 2015 at Denbigh Town Hall.
Other
Size: 1 MB
Pylon the Pressure Group
Letter submitted in advance of the Issue specific hearing on 1 October 2015
Other
Size: 147 KB
Detailed Site Visit Itinerary
Other
Size: 107 KB
Durand Hotham
Late submission to Deadline 2- This was accepted at the discretion of the Examining Authority
Other
Size: 72 KB
Natural Resources Wales
Late submission to Deadline 2- This was accepted at the discretion of the Examining Authority
Other
Size: 243 KB
Pylon the Pressure Group
Comments on responses to the ExA?s first written questions- Submitted for Deadline 2 of 17 September 2015
Other
Size: 38 KB
SP Manweb
Covering letter - Submitted for the Deadline 2 of 17 September 2015
Other
Size: 1 MB
SP Manweb
Comments on responses to ExA's first written questions. Submitted for Deadline 2 of 17 September 2015
Other
Size: 6 MB
SP Manweb
Further photomontages submitted in accordance with the commitment contained in respect of the ExA?s First Written question 8.15
Other
Size: 140 KB
SP Manweb
Addendum to the Book of reference (version 2) August 2015- Submitted for the Deadline 2 of 17 September 2015
Other
Size: 1,018 KB
Dewi Parry
Response to Applicant?s ?Response to Relevant Representations? Document- Submitted for Deadline 2 of 17 September 2015
Other
Size: 18 KB
Iwan W Jones
Comments on responses to written representations- Submitted for Deadline 2 of 17 September 2015
Other
Size: 70 KB
JP Hughes
Comments on responses to the ExA's first written questions- Submitted for Deadline 2 of 17 September 2015
Other
Size: 20 MB
SP Manweb
Key Plans for Viewpoints in Technical Appendix 7.3 Part A, response to the Examining Authority First Written Question 8.15
Other
Size: 1 MB
SP Manweb
Responses to written representations and Local Impact Report received from Conwy County Borough Council-Submitted for Deadline 2 of 17 September 2015
Other
Size: 1 MB
SP Manweb
Tracked change version of the DCO showing amendments made between version 1 and version 2 of the draft DCO-Submitted for Deadline 2 of 17 September 2015
Other
Size: 28 MB
SP Manweb
Key Plans for Viewpoints in Technical Appendix 7.3 Part C, in response to the Examining Authority First Written Question 8.15
Other
Size: 7 MB
John Mars Jones
Response to Deadline 1 - Submitted for Deadline 2 of 17 September 2015
Other
Size: 63 KB
Jill Tyrer
Written representation - Submitted for Deadline 2 of 17 September 2015
Other
Size: 101 KB
Eifion Bibby
Response to Applicant?s ?Response to Relevant Representations? Document- Submitted for Deadline 2 of 17 September 2015
Other
Size: 613 KB
SP Manweb
Schedule of mitigation. Submitted for Deadline 2 of 17 September 2015
Other
Size: 170 KB
Cefn Meiriadog and Glascoed Road Residents and Users Group
Comments on responses to the ExA's first written questions- Submitted for Deadline 2 of 17 September 2015
Other
Size: 986 KB
SP Manweb
Responses to written representations received- Submitted for Deadline 2 of 17 September 2015
Other
Size: 77 KB
Dafydd I Jones
Comments on responses to the ExA's first written questions- Submitted for Deadline 2 of 17 September 2015
Other
Size: 2 MB
SP Manweb
Revised draft of the DCO (Version 2) (Document reference 3.1 (v.2))-Submitted for Deadline 2 of 17 September 2015
Other
Size: 153 KB
SP Manweb
Statement of Common Ground between SP Manweb and the Local Health Board of North Wales. Submitted for Deadline 2 of 17 September 2015
Other
Size: 31 MB
SP Manweb
Key Plans for Viewpoints in Technical Appendix 7.3 Parts B in response to the Examining Authority First Written Question 8.15
Other
Size: 57 KB
Robin Barlow
Response to Applicant?s ?Response to Relevant Representations? Document- Submitted for Deadline 2 of 17 September 2015
Other
Size: 97 KB
Simon White
Comments on responses to the ExA's first written questions- Submitted for Deadline 2 of 17 September 2015
Other
Size: 71 KB
D E Tyrer
Response to Deadline 1 - Submitted for Deadline 2 of 17 September 2015
Other
Size: 1 MB
SP Manweb
Responses to written representations and Local Impact Report received from Denbighshire County Council-Submitted for Deadline 2 of 17 September 2015
Other
Size: 161 KB
Agendas for the Issue Specific hearings
Agendas for the Issue Specific hearings taking place on Tuesday 29 September to Friday 2 October 2015
Other
Size: 543 KB
Itinerary for the Accompanied Site Visit
This itinerary is provided in outline and is subject to change and refinement over the coming days
Other
Size: 121 KB
Agendas for the Open Floor and Compulsory Acqusition Hearings
Agendas for the Open Floor and Compulsory Acqusition Hearings taking place on Wednesday 23 to Friday 25 September 2015.
Other
Size: 508 KB
Pylon the Pressure Group
Late submission to Deadline 1- This was accepted at the discretion of the Examining Authority
Other
Size: 64 KB
Eifion Bibby on behalf of Mr AA & Mrs CA Owen
Late submission to Deadline 1- This was accepted at the discretion of the Examining Authority
Other
Size: 63 KB
Eifion Bibby on behalf of Mr DR & Mrs EM Owen
Late submission to Deadline 1- This was accepted at the discretion of the Examining Authority
Other
Size: 63 KB
Eifion Bibby on behalf of Mr AA Owen
Late submission to Deadline 1- This was accepted at the discretion of the Examining Authority
Other
Size: 575 KB
Eifion Bibby on behalf of Mr AEM Owen
Late submission to Deadline 1- This was accepted at the discretion of the Examining Authority
Other
Size: 4 MB
Eifion Bibby on behalf of Mr M Jones
Late submission to Deadline 1- This was accepted at the discretion of the Examining Authority
Other
Size: 7 KB
John Fleet
Late submission to Deadline 1- This was accepted at the discretion of the Examining Authority
Other
Size: 820 KB
Eifion Bibby on behalf of Mr HM Parry
Late submission to Deadline 1- This was accepted at the discretion of the Examining Authority
Other
Size: 509 KB
Eifion Bibby on behalf of Messrs HW,EA& GW Hughes
Late submission to Deadline 1- This was accepted at the discretion of the Examining Authority
Other
Size: 441 KB
Eifion Bibby on behalf of Mr JE Davies
Late submission to Deadline 1- This was accepted at the discretion of the Examining Authority
Other
Size: 494 KB
Eifion Bibby on behalf of Messrs EW,PA&EW Hughes
Late submission to Deadline 1- This was accepted at the discretion of the Examining Authority
Other
Size: 32 KB
Iona Edwards-Jones
Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 19 MB
SP Manweb
Responses to ExA?s First Written Questions. Appendix 13 ? Section Drawings Sheets 21 -29 & Construction Compound Layout . Submitted for Deadline 1of 1 September 2015
Other
Size: 10 KB
Sheila Harman
Notification of wish to make oral representations at the issue specific and open floor hearings. Submitted for Deadline 1 of 1 September 2015
Other
Size: 94 KB
Eifion Bibby
Preliminary Written Representation on behalf of clients. Submitted for Deadline 1 of 1 September 2015
Other
Size: 10 KB
Simon P White
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 128 KB
SP Manweb
Responses to ExA?s First Written Questions. Appendix 11.22 Glossary. Submitted for Deadline 1of 1 September 2015
Other
Size: 5 MB
SP Manweb
Responses to ExA?s First Written Questions. Appendix 6.3 SAC, SPA and RAMSAR Sites assessed. Submitted for Deadline 1of 1 September 2015
Other
Size: 26 MB
SP Manweb
Responses to ExA?s First Written Questions. Appendix 13 ? Section Drawings Sheets 1-12. Submitted for Deadline 1 of 1 September 2015
Other
Size: 56 KB
Pylon the Pressure Group
Notification of wish to make oral representations at the hearings and attend the accompanied site inspection. Submitted for Deadline 1 of 1 September 2015
Other
Size: 16 MB
SP Manweb
Responses to ExA?s First Written Questions. Appendix 13 ? Section Drawings Sheets 13 -20. Submitted for Deadline 1 of 1 September 2015
Other
Size: 28 KB
SP MANWEB
Covering Letter. Submitted for Deadline 1of 1 September 2015
Other
Size: 318 KB
SP MANWEB
Responses to ExA?s First Written Questions Appendix 3.13a Clocaenog Forest Wind Farm ES Ch 12, Appendix 3.13b Clocaenog Forest Wind Farm Construction Programme, Submissions for Deadline 1 of 1 September 2015
Other
Size: 7 MB
SP MANWEB
Responses to ExA?s First Written Questions and Index to Appendices. Submitted for Deadline 1of 1 September 2015
Other
Size: 2 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 2.12 Tir Mostyn Wind Farm 33kV Underground Cable Route Plan. Submitted for Deadline 1 of 1 September 2015
Other
Size: 140 KB
SP MANWEB
Updated Book of Reference Parts 1-5. Submitted for Deadline 1of 1 September 2015
Other
Size: 140 KB
SP MANWEB
Schedule of Changes to BoR v2. Submitted for Deadline 1of 1 September 2015
Other
Size: 13 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 2.9a Legacy Oswestry 132kV Overhead Line Inspector?s Report and Appendix 2.9b Legacy Oswestry 132kV Overhead Line SoS Decision Letter. Submitted for Deadline 1of 1 September 2015
Other
Size: 1 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 2.10 SP Manweb Llandinam Closing Statement. Submitted for Deadline 1of 1 September 2015
Other
Size: 2 MB
SP MANWEB
Statement of Common Ground with Snowdonia National Park Authority. Submitted for Deadline 1of 1 September 2015
Other
Size: 5 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 0.1 & Appendix 0.2 - Suggested viewpoints for Site visit. Submitted for Deadline 1of 1 September 2015
Other
Size: 2 MB
SP MANWEB
Statement of Common Ground Position Statement. Submitted for Deadline 1of 1 September 2015
Other
Size: 32 KB
SP MANWEB
Statement of Common Ground with Civil Aviation Authority . Submitted for Deadline 1of 1 September 2015
Other
Size: 277 KB
SP MANWEB
Responses to ExA?s First Written Questions Appendix. 3.12 Construction Programme. Submitted for Deadline 1of 1 September 2015
Other
Size: 1 MB
SP MANWEB
6.18C Updated Hedgerow Management Plan Submitted for Deadline 1 of 1 September 2015
Other
Size: 140 KB
SP MANWEB
BoR Parts 1-5 ? tracked changes between v1 and v2. Submitted for Deadline 1of 1 September 2015
Other
Size: 15 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 1.1 Location Plan ? Wider Scheme. Submitted for Deadline 1of 1 September 2015
Other
Size: 2 MB
SP MANWEB
Responses to Relevant Representations and Appendices 1 -2. Submitted for Deadline 1 of 1 September 2015
Other
Size: 1 MB
SP MANWEB
Strategic Options Report ? Addendum August 2015. Submitted for Deadline 1 of 1 September 2015
Other
Size: 17 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 4.13a, Appendix 4.13b, Appendix 4.13c ? Extracts from Welsh Government website. Submitted for Deadline 1of 1 September 2015
Other
Size: 217 KB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 11.1 s135 Consent. Submitted for Deadline 1of 1 September 2015
Other
Size: 2 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 5.1 Wind Farms Planning Permissions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 272 KB
SP MANWEB
Statement of Common Ground with Civil Aviation Authority (Responses to ExA?s First Written Questions. Appendix 4.15). Submitted for Deadline 1of 1 September 2015
Other
Size: 2 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 4.17 Electro-Magnetic Field Study. Submitted for Deadline 1of 1 September 2015
Other
Size: 9 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 11.13a Consolidated Report and Accounts Scottish Power UK plc 2014 and Appendix 11.13b SP Manweb Regulatory Accounts 2015. Submitted for Deadline 1of 1 September 2015
Other
Size: 3 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 4.7 Agricultural Land Classification Grade 3 Land Plan. Submitted for Deadline 1of 1 September 2015
Other
Size: 1 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 8.16 Location of Proposed Crematorium. Submitted for Deadline 1of 1 September 2015
Other
Size: 392 KB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 11.7 Table Showing Unknown Land Interests.
Other
Size: 2 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 9.1a Natural Resources Wales Response to Statutory Consultation and Appendix 9.1b Welsh Government Response to Statutory Consultation. Submitted for Deadline 1of 1 September 2015
Other
Size: 64 KB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 11.5 Book of Reference and Land Plans Tracker. Submitted for Deadline 1of 1 September 2015
Other
Size: 9 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 8.9 Cumulative Scenario 2 Developments. Submitted for Deadline 1of 1 September 2015
Other
Size: 947 KB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 6.19 Local Wildlife Sites Intersecting the Route. Submission for Deadline 1 of 1 September 2015
Other
Size: 554 KB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 6.20 Dormouse European Protection of Species Licence and Method Statement. Submitted for Deadline 1of 1 September 2015
Other
Size: 386 KB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 3.33 Updated Construction Environmental Management Plan. Submitted for Deadline 1of 1 September 2015
Other
Size: 2 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 3.14 Brenig wind Farm Planning Permission. Submitted for Deadline 1of 1 September 2015
Other
Size: 10 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 6.16a Updated Hedgerow Management Plan and 6.16b. Hedgerow Impacts Map. Submitted for Deadline 1 of 1 September 2015
Other
Size: 1 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 8.3 Appendix 7.3 D Viewpoint Assessment Operational Effects. Submitted for Deadline 1of 1 September 2015
Other
Size: 9 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 7.15 COSHH Sheets. Submitted for Deadline 1 of 1 September 2015
Other
Size: 3 MB
SP MANWEB
Appendix 4.5 Annex 7.3 Clocaenog Forest Wind Farm Environmental Statement. Submitted for Deadline 1 of 1 September 2015
Other
Size: 5 MB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 11.9 Hirwaun Power Station SoS Decision Letter and Statement of Reasons. Submitted for Deadline 1of 1 September 2015
Other
Size: 140 KB
SP MANWEB
Responses to ExA?s First Written Questions. Appendix 11.12 Landowner and Part 3 of the Book of Reference Interest Negotiations Submitted for Deadline 1of 1 September 2015
Other
Size: 1 MB
Durand Hotham
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 401 KB
Conwy County Borough Council
Notification of wish to attend the accompanied site inspection, suggested locations and justifications & decision notice for the Mwchwl Eithin (Nant Bach) windfarm. Submitted for Deadline 1 of 1 September 2015
Other
Size: 77 KB
Dewi Parry
Representation regarding position of Pylons. Submitted for Deadline 1 of 1 September 2015
Other
Size: 72 KB
Iwan Wynne Jones
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 653 KB
Dewi Parry
Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 195 KB
D E Tyrer
Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 24 KB
Lois Williams
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 2 MB
Denbighshire County Council
Local Impact Report and Appendices . Submitted for Deadline 1 of 1 September 2015
Other
Size: 2 MB
Denbighshire County Council
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 91 KB
David Roberts
Notification of wish to make oral representations at the issue specific hearings. Submitted for Deadline 1of 1 September 2015
Other
Size: 618 KB
Dewi Parry
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 81 KB
David Roberts
Notification of wish to speak at an open floor hearing. Submitted for Deadline 1of 1 September 2015
Other
Size: 29 KB
Sheila Harman
Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 177 KB
David Roberts
Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 10 KB
Iwan Wynne Jones
Notification of wish to attend the accompanied site inspection, suggested locations and justifications. Submitted for Deadline 1 of 1 September 2015
Other
Size: 139 KB
David Roberts
Notification of wish to attend the accompanied site inspection, suggested locations and justifications. Submitted for Deadline 1of 1 September 2015
Other
Size: 73 KB
Dafydd I Jones
Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 16 KB
Guthrie Jones & Jones on behalf of Richard Glynne Jones
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 43 KB
Meirick Ll. Davies
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 236 KB
John Mars Jones
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 441 KB
J. Bradburne Price & Co on behalf of J LL Evans
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 111 KB
Mari Roberts
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 287 KB
Durand Hotham
Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 212 KB
Conwy County Borough Council
Covering letter. Submitted for Deadline 1, 1 September 2015
Other
Size: 267 KB
Natural Resources Wales
Written Representation and Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 111 KB
David Roberts
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 30 KB
Sheila Harman
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 308 KB
Nerys Jones
Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 1 MB
Pylon the Pressure Group
Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 415 KB
Denbighshire County Council
Covering Letter. Submitted for Deadline 1 of 1 September 2015
Other
Size: 956 KB
Denbighshire County Council
Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 833 KB
Conwy County Borough Council
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 99 KB
Natural Resources Wales
Representation relating to the submission of a Statement of Common Ground. Submitted for Deadline 1 of 1 September 2015
Other
Size: 447 KB
J. Bradburne Price & Co on behalf of H LL Evans
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 988 KB
Tir Mostyn Wind and Foel Goch Limited
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 1 MB
Cefn Meiriadog and Glascoed Road Residents and Users Group
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 267 KB
Conwy County Borough Council
Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 65 KB
Cefn Meiriadog and Glascoed Road Residents and Users Group
Notification of wish to attend the accompanied site inspection, suggested locations and justifications. Submitted for Deadline 1of 1 September 2015
Other
Size: 356 KB
Campaign for the Protection of Rural Wales Clwyd Branch
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 96 KB
Llanrhaeadr -yng-Nghinmeirch Community Council
Response to ExA's written questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 37 KB
John Hopkinson
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 271 KB
Conwy County Borough Council
Local Impact Report. Submitted for Deadline 1 of 1 September 2015
Other
Size: 2 MB
Welsh Government
Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 66 KB
Robin Barlow
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 56 KB
Cefn Meiriadog and Glascoed Road Residents and Users Group
Response to ExA?s First Written Questions. Submitted for Deadline 1 of 1 September 2015
Other
Size: 490 KB
Abergele Town Council
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 54 KB
Gas Transportation Company and Others
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 19 KB
Dr Jannine Poletti Hughes
Response to ExA's written questions. Submitted for Deadline 1, 1 September 2015
Other
Size: 62 KB
Cefn Meiriadog and Glascoed Road Residents and Users Group
Representation relating to the submission of a Statement of Common Ground. Submitted for Deadline 1of 1 September 2015
Other
Size: 58 KB
Rhyl & St Asaph Angling Association
Written Representation. Submitted for Deadline 1 of 1 September 2015
Other
Size: 489 KB
SP Manweb
Letter of 26 August 2015 notifying that the connection agreement for the Nant Bach wind farm is likely to be terminated, and that submission of the proposed scheme 'Option B' will be delayed.
Other
Size: 12 MB
SP Manweb
Document 6.19.11 Envrionmental Statement Chapter 6 - Ecology and Biodiversity Technical Appendix 6.11. Submitted on 11 August 2015 by the Applicant to replace an application document not previously published with the location of badger setts omitted.
Other
Size: 89 KB
Preliminary Meeting Note
Other
Size: 46 KB
Unaccompanied site inspection note 27th July
The ExA's note of their unaccompanied site inspection undertaken on 27 July 2015
Other
Size: 179 KB
Llythyr Rheol 8
Other
Size: 150 KB
Rule 8 Letter
Other
Size: 349 KB
Examining Authority Questions
Other
audio recording
Size: 67 MB
Preliminary Meeting Audio
Recording of the Preliminary Meeting held on 28 June 2015 at Denbigh Town Hall. Edited to include recordings of the Welsh to English translation service provided.
Other
Size: 57 KB
Davis Meade Property Consultants
Submission for Preliminary Meeting on 28 July 2015
Other
Size: 409 KB
S P Manweb PLC
Natural Resources Wales Letter confirming s135 consent. Submission for Preliminary Meeting on 28 July 2015
Other
Size: 68 KB
Rhyl and St Asaph Angling Association
Submission for Preliminary Meeting on 28 July 2015
Other
Size: 1 MB
S P Manweb PLC
Submission for Preliminary Meeting on 28 July 2015
Other
Size: 201 KB
Natural Resources Wales
Submission for Preliminary Meeting on 28 July 2015
Other
Size: 104 KB
Ministry of Defence
Letter issued on behalf of the Examining Authority advising the Ministry of Defence of 'other party' status.
Other
Size: 71 KB
Michael Williams
Letter issued on behalf of the Examining Authority advising Mr Williams of 'other party' status.
Other
Size: 268 KB
Llythyr Rheol 4 a 6
Welsh language version of the Rule 4 & 6 Letter
Other
Size: 1 MB
SP Manweb
Document 2.5.1 Crown Land Plan Sheet 1- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 5 MB
SP Manweb
Appendix 4 Document 6.19.9 Aboricultural Survey Figures (Updated)-Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 406 KB
SP Manweb
Appendix 1 Planning Inspectorate Section 55 Application Acceptance Checklist- Submitted by the Applicant on 3 July 2015 in response to s55 checklist.
Other
Size: 35 MB
SP Manweb
Photomontages A1 - VP47 (Wireframe)- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 120 KB
SP Manweb
Covering letter- Submitted on 3 July 2015 by the Applicant in response to the s55 checklist.
Other
Size: 32 MB
SP Manweb
Photomontages A1 - VP34- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 37 MB
SP Manweb
Photomontages A1 - VP47- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 6 MB
SP Manweb
Document 2.5.0 Overall Location Plan and Master Key Plan for Crown Land Plan-Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 244 KB
SP Manweb
S55 Checklist SP Manweb Responses Document- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 19 MB
SP Manweb
Photomontages A1 - VP34 (Wireframe)- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 3 MB
SP Manweb
Appendix 3 Document 2.2.11 Land Plans Sheet 11 (Updated)- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 1 MB
SP Manweb
Document 2.5.3 Crown Land Plan Sheet 3- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 8 MB
SP Manweb
Appendix 2 Document 1.4a Newspaper Notices (Updated)- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 1 MB
SP Manweb
Document 2.5.2 Crown Land Plan Sheet 2- Submitted on 3 July 2015 by the Applicant in response to s55 checklist.
Other
Size: 163 KB
Rule 4 and 6 letter
Other
Size: 56 KB
Appointment of an Examining Authority
Other
Size: 38 KB
SP MANWEB
4.3 Book of Reference Parts 1-5 submitted with s59 certificates
Other
Size: 87 KB
SP MANWEB
Certificate of Compliance Section 56
Other
Size: 140 KB
SP MANWEB
Book of Reference Parts 1-5 tracked changes
Other
Size: 65 KB
SP MANWEB
Certificate of Compliance Regulation 13
Other
Size: 140 KB
SP MANWEB
Schedule of Changes relating to the Updated Book of Reference
Other
Size: 40 KB
SP MANWEB
Applicants cover letter to certificates of compliance
Other
Size: 40 KB
SP MANWEB
Certificate of Compliance Section 59
Other
Size: 40 KB
SP MANWEB
Submission to accompany Certificates
Other
Size: 129 KB
150501 EN020014 NWWFC 2nd Transboundary Screening Matrix
North Wales Wind Farms Connection - Second Transboundary Screening
Other
Size: 433 KB
Section 55 Checklist
Other
Size: 121 KB
Notification of Decision to Accept Application
Other
Size: 16 MB
Denbighshire County Council
Adequacy of Consultation representation
Other
Size: 146 KB
Conwy County Borough Council
Adequacy of Consultation representation
Other
Size: 38 KB
Powys County Council
Adequacy of Consultation representation
Other
Size: 32 KB
Snowdonia National Park Authority
Adequacy of Consultation representation
Other
Size: 2 MB
2.4.4 Access and Rights of Way Plan Sheet 4
Other
Size: 627 KB
6.4 ES Chapter 4 - EIA Methodology
Other
Size: 2 MB
2.6.7 Landscaping Plan Sheet 7
Other
Size: 33 MB
5.3 Flood Consequences Assessment
Other
Size: 290 KB
6.5 ES Chapter 5 - Planning Considerations
Other
Size: 447 KB
1.1 Application Letter including s55 Checklist
Other
Size: 8 MB
5.2.3 Consultation Report Appendices 9 to 14
Other
Size: 295 KB
6.15 ES Chapter 15 - Summary of Environmental Effects
Other
Size: 20 MB
2.7.1 Section Drawings Sheet 1 to 9
Other
Size: 875 KB
5.7 HRA No Significant Effects Report
Other
Size: 2 MB
2.4.6 Access and Rights of Way Plan Sheet 6
Other
Size: 283 KB
6.10 ES Chapter 10 - Land Use and Agriculture
Other
Size: 17 MB
6.19.9 ES Chapter 6 - Ecology and Biodiversity Technical Appendix 6.9
Other
Size: 560 KB
6.3 ES Chapter 3 - Alternatives and Design Evolution
Other
Size: 2 MB
2.4.1 Access and Rights of Way Plan Sheet 1
Other
Size: 1 MB
2.2.1 Land Plans Sheet 1
Other
Size: 358 KB
6.18 ES Chapter 2 - Description of Proposed Development Technical Appendices 2.1
Other
Size: 5 MB
7.5 Planning Statement Technical Appendices
Other
Size: 8 MB
6.20.4 ES Chapter 7 - Landscape and Visual Technical Appendix 7.4
Other
Size: 2 MB
2.3.11 Works Plan Sheet 11
Other
Size: 2 MB
2.2.6 Land Plans Sheet 6
Other
Size: 334 KB
4.2 Funding Statement
Other
Size: 2 MB
2.6.3 Landscaping Plan Sheet 3
Other
Size: 213 KB
6.20.5 ES Chapter 7 - Landscape and Visual Technical Appendix 7.5
Other
Size: 37 MB
6.16 ES Figures Document
Other
Size: 192 KB
6.27 ES Glossary
Other
Size: 428 KB
6.17.3C ES Chapter 1 - Introduction Technical Appendix 1.3 Part C
Other
Size: 2 MB
2.2.12 Land Plans Sheet 12
Other
Size: 2 MB
2.3.3 Works Plan Sheet 3
Other
Size: 14 MB
2.9.3 Historic Sites Plans Sheet 3
Other
Size: 9 MB
6.19.4 ES Chapter 6 - Ecology and Biodiversity Technical Appendices 6.4
Other
Size: 1 MB
2.3.1 Works Plan Sheet 1
Other
Size: 34 MB
2.3.0 Overall Location Plan and Master Key Plan for Works Plan
Other
Size: 5 MB
5.1 Consultation Report
Other
Size: 259 KB
1.3 Planning Inspectorate Application Index
Other
Size: 613 KB
6.2 ES Chapter 2 - Description of Proposed Development
Other
Size: 1 MB
2.3.2 Works Plan Sheet 2
Other
Size: 2 MB
2.3.9 Works Plan Sheet 9
Other
Size: 2 MB
2.6.6 Landscaping Plan Sheet 6
Other
Size: 17 MB
2.8.1 Nature Conservation Sites Plans Sheet 1
Other
Size: 3 MB
6.23 ES Chapter 11 - Socio-Economic and Tourism Technical Appendices 11.1
Other
Size: 37 MB
5.2.2 Consultation Report Appendix 8
Other
Size: 2 MB
2.3.5 Works Plan Sheet 5
Other
Size: 9 MB
6.19.3 ES Chapter 6 - Ecology and Biodiversity Technical Appendices 6.3
Other
Size: 243 KB
6.25.3 ES Chapter 13 - Emissions Technical Appendix 13.3
Other
Size: 15 MB
2.9.2 Historic Sites Plans Sheet 2
Other
Size: 1 MB
2.5.2 Crown Land Plan
Other
Size: 2 MB
2.4.3 Access and Rights of Way Plan Sheet 3
Other
Size: 35 MB
6.17.2 ES Chapter 1 - Introduction Technical Appendix 1.2
Other
Size: 7 MB
1.4 Copies of Newspaper Notices
Other
Size: 39 MB
6.21.1 ES Chapter 8 - Historic Environment Technical Appendix 8.1
Other
Size: 1 MB
2.3.4 Works Plan Sheet 4
Other
Size: 22 MB
2.7.2 Section Drawings Sheet 10 to 19
Other
Size: 1 MB
2.5.1 Crown Land Plan
Other
Size: 33 MB
6.20.3C ES Chapter 7 - Landscape and Visual Technical Appendix 7.3 Part C
Other
Size: 4 MB
6.17.3A ES Chapter 1 - Introduction Technical Appendix 1.3 Part A
Other
Size: 1 MB
2.2.2 Land Plans Sheet 2
Other
Size: 16 MB
2.8.2 Nature Conservation Sites Plans Sheet 2
Other
Size: 4 MB
6.17.3D ES Chapter 1 - Introduction Technical Appendix 1.3 Part D
Other
Size: 27 MB
5.2.1 Consultation Report Appendices 1 to 7
Other
Size: 3 MB
2.4.10 Access and Rights of Way Plan Sheet 10
Other
Size: 19 MB
6.19.1 ES Chapter 6 - Ecology and Biodiversity Technical Appendices 6.1
Other
Size: 15 MB
2.9.1 Historic Sites Plans Sheet 1
Other
Size: 1 MB
2.2.4 Land Plans Sheet 4
Other
Size: 28 MB
5.8 HRA No Significant Effects Report Appendix 1
Other
Size: 46 MB
6.20.3B ES Chapter 7 - Landscape and Visual Technical Appendix 7.3 Part B
Other
Size: 36 MB
6.20.3A ES Chapter 7 - Landscape and Visual Technical Appendix 7.3 Part A
Other
Size: 2 MB
2.4.2 Access and Rights of Way Plan Sheet 2
Other
Size: 2 MB
2.3.6 Works Plan Sheet 6
Other
Size: 446 KB
6.25.2 ES Chapter 13 - Emissions Technical Appendix 13.2
Other
Size: 20 MB
6.30 ES Scoping Report
Other
Size: 2 MB
2.4.7 Access and Rights of Way Plan Sheet 7
Other
Size: 5 MB
7.3 Strategic Options Report
Other
Size: 2 MB
2.2.8 Land Plans Sheet 8
Other
Size: 10 MB
6.19.5 ES Chapter 6 - Ecology and Biodiversity Technical Appendix 6.5
Other
Size: 6 MB
6.19.6 ES Chapter 6 - Ecology and Biodiversity Technical Appendix 6.6
Other
Size: 2 MB
2.4.13 Access and Rights of Way Plan Sheet 13
Other
Size: 2 MB
2.3.10 Works Plan Sheet 10
Other
Size: 5 MB
6.29 ES Scoping Opinion
Other
Size: 2 MB
2.6.4 Landscaping Plan Sheet 4
Other
Size: 2 MB
2.4.5 Access and Rights of Way Plan Sheet 5
Other
Size: 439 KB
6.13 ES Chapter 13 - Emissions
Other
Size: 356 KB
6.17.1 ES Chapter 1 - Introduction Technical Appendix 1.1
Other
Size: 2 MB
2.6.13 Landscaping Plan Sheet 13
Other
Size: 2 MB
2.4.8 Access and Rights of Way Plan Sheet 8
Other
Size: 1 MB
4.1 Statement of Reasons
Other
Size: 2 MB
2.3.8 Works Plan Sheet 8
Other
Size: 2 MB
2.6.2 Landscaping Plan Sheet 2
Other
Size: 2 MB
5.1.1 Consultation Report Summary Welsh Translation
Other
Size: 7 MB
2.1 Location Plan
Other
Size: 304 KB
2.7.4 Construction Compound Layout
Other
Size: 15 MB
2.8.3 Nature Conservation Sites Plans Sheet 3
Other
Size: 2 MB
7.1 Design and Construction Report
Other
Size: 549 KB
6.1 ES Chapter 1 - Introduction
Other
Size: 217 KB
6.25.1 ES Chapter 13 - Emissions Technical Appendix 13.1
Other
Size: 3 MB
2.4.11 Access and Rights of Way Plan Sheet 11
Other
Size: 2 MB
2.6.11 Landscaping Plan Sheet 11
Other
Size: 8 MB
7.2 Design and Construction Report Technical Appendices
Other
Size: 2 MB
2.2.9 Land Plans Sheet 9
Other
Size: 28 MB
6.21.2 ES Chapter 8 - Historic Environment Technical Appendix 8 2
Other
Size: 1 MB
6.18C ES Chapter 2 - Description of Proposed Development Technical Appendices 2.1 Part C
Other
Size: 2 MB
2.4.12 Access and Rights of Way Plan Sheet 12
Other
Size: 517 KB
6.8 ES Chapter 8 - Historic Environment
Other
Size: 2 MB
2.6.9 Landscaping Plan Sheet 9
Other
Size: 30 MB
7.4 Planning Statement
Other
Size: 2 MB
2.4.9 Access and Rights of Way Plan Sheet 9
Other
Size: 3 MB
3.2 Explanatory Memorandum
Other
Size: 1 MB
2.3.7 Works Plan Sheet 7
Other
Size: 358 KB
6.20.1 ES Chapter 7 - Landscape and Visual Technical Appendix 7.1
Other
Size: 178 KB
7.4.1 Planning Statement Summary Welsh Translation
Other
Size: 707 KB
6.20.6 ES Chapter 7 - Landscape and Visual Technical Appendix 7.6
Other
Size: 1 MB
6.6 ES Chapter 6 - Ecology and Biodiversity
Other
Size: 35 MB
2.4.0 Overall Location Plan and Master Key Plan for ARoW Plans
Other
Size: 778 KB
6.7 ES Chapter 7 - Landscape and Visual
Other
Size: 4 MB
1.2 Application Form
Other
Size: 140 KB
4.3 Book of Reference
Other
Size: 705 KB
6.11 ES Chapter 11 - Socio-Economic and Tourism
Other
Size: 263 KB
5.9 Other Consents and Licences Report
Other
Size: 18 MB
6.19.10 ES Chapter 6 - Ecology and Biodiversity Technical Appendix 6.10
Other
Size: 34 MB
2.2.0 Overall Location Plan and Master Key Plan for Land Plans
Other
Size: 2 MB
2.6.10 Landscaping Plan Sheet 10
Other
Size: 2 MB
6.26 ES Chapter 14 - Electric and Magnetic Fields Technical Appendices 14.1
Other
Size: 2 MB
2.2.13 Land Plans Sheet 13
Other
Size: 12 MB
2.7.0 Section Drawings Key Plan
Other
Size: 15 MB
2.9.4 Historic Sites Plans Sheet 4
Other
Size: 1 MB
2.2.7 Land Plans Sheet 7
Other
Size: 2 MB
2.6.1 Landscaping Plan Sheet 1
Other
Size: 2 MB
6.24 ES Chapter 12 - Traffic and Transport Technical Appendices 12.1
Other
Size: 3 MB
6.19.7 ES Chapter 6 - Ecology and Biodiversity Technical Appendices 6.7
Other
Size: 2 MB
2.6.12 Landscaping Plan Sheet 12
Other
Size: 429 KB
6.9 ES Chapter 9 - Flood Risk and Water Quality
Other
Size: 216 KB
6.17.4 ES Chapter 1 - Introduction Technical Appendix 1.4
Other
Size: 22 MB
2.7.3 Section Drawings Sheet 20 to 29
Other
Size: 2 MB
2.2.11 Land Plans Sheet 11
Other
Size: 502 KB
6.14 ES Chapter 14 - Electric and Magnetic Fields
Other
Size: 2 MB
2.6.5 Landscaping Plan Sheet 5
Other
Size: 2 MB
6.28.1 ES Non Technical Summary Welsh Translation
Other
Size: 775 KB
6.12 ES Chapter 12 - Traffic and Transport
Other
Size: 2 MB
2.2.10 Land Plans Sheet 10
Other
Size: 16 MB
6.19.2 ES Chapter 6 - Ecology and Biodiversity Technical Appendices 6.2
Other
Size: 295 KB
5.5 Statement of Statutory Nuisance
Other
Size: 17 MB
2.8.4 Nature Conservation Sites Plans Sheet 4
Other
Size: 1 MB
5.6 Statement of Statutory Nuisance Appendix 1
Other
Size: 2 MB
6.22 ES Chapter 10 - Land Use and Agriculture Technical Appendices 10.1
Other
Size: 1 MB
2.2.3 Land Plans Sheet 3
Other
Size: 2 MB
2.6.8 Landscaping Plan Sheet 8
Other
Size: 2 MB
2.2.5 Land Plans Sheet 5
Other
Size: 2 MB
2.3.12 Works Plan Sheet 12
Other
Size: 217 KB
6.18D ES Chapter 2 - Description of Proposed Development Technical Appendices 2.1 Part D
Other
Size: 2 MB
2.3.13 Works Plan Sheet 13
Other
Size: 455 KB
6.18A ES Chapter 2 - Description of Proposed Development Technical Appendices 2.1 Part A
Other
Size: 217 KB
6.20.2 ES Chapter 7 - Landscape and Visual Technical Appendix 7.2
Other
Size: 681 KB
6.18E ES Chapter 2 - Description of Proposed Development Technical Appendices 2.1 Part E
Other
Size: 1 MB
3.1 Draft Development Consent Order
Other
Size: 3 MB
6.17.5 ES Chapter 1 - Introduction Technical Appendix 1.5
Other
Size: 2 MB
6.18B ES Chapter 2 - Description of Proposed Development Technical Appendices 2.1 Part B
Other
Size: 2 MB
6.17.3B ES Chapter 1 - Introduction Technical Appendix 1.3 Part B
Other
Size: 616 KB
6.28 ES Non Technical Summary
Other
Size: 1 MB
6.17.3 ES Chapter 1 - Introduction Technical Appendix 1.3
Other
Size: 113 KB
140323 EN020014 NWWFC Transboundary Screening Matrix
North Wales Wind Farms Connection - Transboundary Screening Matrix
Other
Size: 5 MB
1402220 EN020014 NWWFC Scoping Opinion
Secretary of State's Scoping Opinion for the North Wales Wind Farms Connection project
Other
Size: 20 MB
140113 EN020014 N Wales Wind Farms Connection Scoping Report
North Wales Wind Farms Connection Scoping Report
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.