Brechfa Forest Connection

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (5)

Developer's Application (176)

Acceptance (8)

Pre Examination (13)

Examination (456)

Decision (45)

Decided (2)

Date

SourceDescription
Other
Size: 111 KB
The Brechfa Forest Wind Farm Connection (Correction) Order 2017
This Order corrects errors and omissions in the Brechfa Forest Wind Farm Connection Order 2016 under paragraph (1)(5)(a) of Schedule 4 to the Planning Act 2008.
Other
Size: 309 KB
Correction Notice dated 9 March 2017, issued by the Secretary of State for Business, Energy & Industrial Strategy
Details of the corrections made by the Secretary of State to the Brechfa Forest Wind Farm Connection Order 2016
Other
Size: 1 MB
Recommendation Report - Appendices
Other
Size: 463 KB
Other
Size: 2 MB
Carmarthenshire County Council
Response to 21 September Consultation
Other
Size: 2 MB
Brechfa Forest Connection Recommendation Report
Other
Size: 33 KB
Other
Size: 1 MB
Development Consent Order made by the Secretary of State
Other
Size: 14 KB
Robert Jones
Response to 21 September Consultation
Other
Size: 117 KB
Notice of the Decision by the Secretary of State (Reg 23)
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
Response to 21 September Consultation
Other
Size: 13 MB
Post Examination Correspondence Log
Other
Size: 96 KB
Hysbysiad o benderfyniad yr Ysgrifennydd Gwladol (Rheol 23)
Other
Size: 56 KB
Department for Business, Energy and Industrial Strategy
Marsh Fritillary Butterfly Consultation. Request for comments from the Applicant, Natural Resources Wales, Carmarthenshire County Council and any other Interested Party. Requested of 21 September 2016.
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.63 Explanatory Memorandum Option Aa
Other
Size: 90 KB
Crown Estate
Response to BEIS Consultation
Other
Size: 490 KB
Natural Resources Wales
Response to BEIS Consultation
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.62 Development Consent Order Option Ba
Other
Size: 7 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.34A Works Plans Section B Option B
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.62 Development Consent Order Option Ba (track changed)
Other
Size: 1 MB
Western Power Distribution (South Wales) plc
Cover Letter to BEIS
Other
Size: 4 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.61 Development Consent Order Option Aa (track changed)
Other
Size: 5 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.65 Statement of Reasons Option Aa (track change)
Other
Size: 12 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.34B Works Plans Section A Option B
Other
Size: 4 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.66 Statement of Reasons Option Ba (tracked change)
Other
Size: 584 KB
Carmarthenshire County Council
Response to BEIS Consultation
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.61 Development Consent Order Option Aa
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.63 Explanatory Memorandum Option Aa (tracked change)
Other
Size: 7 MB
Western Power Distribution (South Wales) plc
BFC Vol 02.1A Works Plans Section B Option A
Other
Size: 14 MB
Western Power Distribution (South Wales) plc
BFC Vol 02.1A Works Plans Section C
Other
Size: 5 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.65 Statement of Reasons Option Aa
Other
Size: 5 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.66 Statement of Reasons Option Ba
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.64 Explanatory Memorandum Ba (tracked change)
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.64 Explanatory Memorandum Ba
Other
Size: 11 MB
Western Power Distribution (South Wales) plc
BFC Vol 02.1B Works Plans Section A Option A
Other
Size: 142 KB
Department for Business, Energy and Industrial Strategy
Response to Western Power Distribution (South Wales) plc granting an extension to the 2 September 2016 deadline and clarification in respect of the Secretary of State's request for new Works Plans to correct any existing inconsistencies
Other
Size: 98 KB
Osborne Clarke LLP on behalf of Western Power Distribution (South Wales) plc
Request for an extension to the 2 September 2016 deadline and clarification on the Secretary of State's request in relation to the Works Plans
Other
Size: 46 KB
Department for Business, Energy and Industrial Strategy
Request for comments from the Applicant, Natural Resources Wales and the Crown Estate Commissioners on the application for the proposed Brechfa Forest Connection project
Other
Size: 45 KB
BEIS
Letter sent to Western Power Distribution and Carmarthenshire County Council
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.3.4 Statements of Common Ground - Landscape and Visual - Carmarthenshire County Council. Not published at Deadline 2 in error.
Other
Size: 83 KB
Notification to Cyngor Cymuned Cynwyl Gaeo confirming 'Other Person' status
Other
Size: 958 KB
Examination Library
Published Examination Library
Other
Size: 13 KB
Jenny Hare
Submission for Deadline 8- Accepted at the discretion of the Examining Authority before close of examination
Other
Size: 67 KB
Notification of Completion of ExA Examination
Other
Size: 87 KB
Adran 99 Hysbysiad o gwblhau Arholiad y'r Awdurdod Archwilio
Other
Size: 8 MB
I A R Jones
Late Submission for Deadline 8. Accepted at the discretion of the Examining Authority before close of examination
Other
Size: 105 KB
Diana and Kevin Reader
Late Submission for Deadline 8. Accepted at the discretion of the Examining Authority before close of examination
Other
Size: 44 KB
Western Power Distribution (South Wales) PLC
S.127 Submission. Late Submission for Deadline 8 accepted at the discretion of the Examining Authority before close of examination
Other
Size: 1 MB
Yoka and Bryan Kilkelly
Late Submission for Deadline 8. Accepted at the discretion of the Examining Authority before close of examination
Other
Size: 68 KB
Western Power Distribution (South Wales) PLC
National Grid withdrawal of Relevant Representation. Late Submission for Deadline 8 accepted at the discretion of the Examining Authority
Other
Size: 31 KB
Dawn Reed
Late Submission for Deadline 8. Accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.55 Commentary of Changes to DCO and Application Plan References at Deadline 8. Late Submission for Deadline 8 accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.7B List of Documents to be certified by the Secretary of State. Late Submission for Deadline 8 accepted at the discretion of the Examining Authority
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 01.7H Guide to the Application. Late Submission for Deadline 8 accepted at the discretion of the Examining Authority
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.54 Commentary of Changes to DCO (Vol 03.1F and Vol 09.31A)
Other
Size: 8 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.34A Works Plans Section A Option B
Other
Size: 286 KB
Natural Resources Wales
Response to Rule 17 Letter
Other
Size: 3 MB
I A R Jones
Submission for Deadline 8
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1F Development Consent Order Option A
Other
Size: 84 KB
National Grid
Withdrawal of Relevant Representation
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.31A Development Consent Order Option B (Tracked change)
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 04.3E Book of Reference (Tracked change)
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 09.59 Book of Reference Change Commentary 4.3D to 4.3E
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.8A Protective Provisions Table
Other
Size: 9 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.1A Works Plans Section A Option A
Other
Size: 114 KB
Kevin and Diana Reader
Submission for Deadline 8
Other
Size: 75 KB
Western Power Distribution (South Wales) PLC
Covering email for Deadline 8
Other
Size: 14 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.4A Environmental Features Plans Section A
Other
Size: 9 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.8A Trees and Hedges with the Potential to be Affected Plans Section A Option A
Other
Size: 2 MB
Leslie and Pearl Birch
Submission for Deadline 8
Other
Size: 198 KB
Pauline Medland
Late Submission for Deadline 8. Accepted at the discretion of the Examining Authority
Other
Size: 419 KB
Mr and Mrs Rentmore
Submission for Deadline 8
Other
Size: 10 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.3A Access and Public Rights of Way Plans Section A
Other
Size: 9 KB
Peter Morris
Submission for Deadline 8
Other
Size: 7 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.39A Trees and Hedges with the Potential to be Affected Plans Section A Option B
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.2B Explanatory Memorandum Option A
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.31A Development Consent Order Option B
Other
Size: 14 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.5A Heritage Designations Plans Section A
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.57 Applicant's responses to Deadline 6 and 7 Submissions
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.2B Explanatory Memorandum Option A (Tracked change)
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.56 Comparite of DCO Option A (Vol 03.1F against Vol 03.1)
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1F Development Consent Order Option A (Tracked change)
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.32B Explanatory Memorandum Option B (Tracked change)
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.32B Explanatory Memorandum Option B
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.7A List of Documents to be certified by the Secretary of State
Other
Size: 33 KB
Mr and Mrs B Davies and Mr and Mrs K Reader
Correspondence with applicant submitted for Deadline 8
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 04.3E Book of Reference
Other
Size: 336 KB
Carmarthenshire County Council
Late Response to Rule 17 Letter. Accepted at the discretion of the Examining Authority
Other
Size: 13 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.2D Land Affected and Land Plans Section A
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.58 Applicant's response to ExA's procedural decision 30 March 2016
Other
Size: 8 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.33A Statement of Reasons - Option B (Tracked change)
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.3.7A Statements of Common Ground - Carmarthenshire County Council. Late submission for Deadline 7
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 01.7G Guide to the Application
Other
Size: 263 KB
Pauline Medland
Late submission for Deadline 7
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.52 Review of proposals to realign a section of OHL on land at Penwaun and Llwyn Newydd
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 08.3B Draft Section 106 Agreement (unsigned)
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.1C Updated Landowner Engagement Table
Other
Size: 174 KB
Leslie and Pearl Birch
Submission for Deadline 7
Other
Size: 5 MB
Western Power Distribution (South Wales) PLC
BFC Vol 04.1B Statement of Reasons - Option A
Other
Size: 8 MB
Western Power Distribution (South Wales) PLC
BFC Vol 04.1B Statement of Reasons - Option A (Tracked change)
Other
Size: 6 MB
Dawn, Maurice and Audrey Reed
Submission for Deadline 7
Other
Size: 102 KB
Yoka and Bryan Kilkelly
Submission for Deadline 7
Other
Size: 81 KB
Western Power Distribution (South Wales) PLC
Covering email for Deadline 7
Other
Size: 11 KB
Avril and Bryan Davies
Submission for Deadline 7
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.51 Heads of Terms (Tracked change)
Other
Size: 12 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.53 Bruton Knowles correspondence direct with landowners
Other
Size: 5 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.33A Statement of Reasons - Option B
Other
Size: 477 KB
I A R Jones
Submission for Deadline 7
Other
Size: 37 KB
Mr and Mrs Rentmore
Late submission for Deadline 7
Other
Size: 38 KB
Diana and Kevin Reader
Submission for Deadline 7
Other
Size: 104 KB
Rule 17 and 8(3) Letter
Other
Size: 111 KB
Llythyr Rheol 17 a 8(3)
Other
Size: 34 KB
Diana and Kevin Reader
Late Submission for Deadline 6. Accepted at the discretion of the Examining Authority
Other
Size: 13 KB
Avril and Bryan Davies
Late Submission for Deadline 6. Accepted at the discretion of the Examining Authority
Other
Size: 12 KB
P and EJ Morris and Sons
Comments submitted for Deadline 6
Other
Size: 363 KB
HV and E Jones
Comments submitted for Deadline 6
Other
Size: 29 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.43.1 Communication between the Applicant and Affected Persons who have not yet agreed Heads of Terms, Part 1 of 4
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.46 Agreed notes from landowner meeting on Friday, 4 March 2016
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.32A Draft Explanatory Memorandum (Tracked change)
Other
Size: 30 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.43.2 Communication between the Applicant and Affected Persons who have not yet agreed Heads of Terms, Part 2 of 4
Other
Size: 172 KB
Western Power Distribution (South Wales) PLC
Covering email to Deadline 6 submission
Other
Size: 282 KB
Iwan Jones
Comments submitted for Deadline 6
Other
Size: 139 KB
Iwan Jones
Late Submission for Deadline 6. Accepted at the discretion of the Examining Authority
Other
Size: 30 KB
Diana and Kevin Reader
Comments submitted for Deadline 6
Other
Size: 28 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.43.3 Communication between the Applicant and Affected Persons who have not yet agreed Heads of Terms, Part 3 of 4
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.2A Explanatory Memorandum (Tracked change)
Other
Size: 470 KB
Carmarthenshire County Council
Late Submission for Deadline 6. Accepted at the discretion of the Examining Authority
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 04.3D Book of Reference
Other
Size: 5 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.2C Land Affected and Land Plans Section B
Other
Size: 98 KB
Natural Resources Wales
Comments on ExA?s consultation draft DCO and RIES
Other
Size: 105 KB
Natural Resources Wales
Response to Rule 17 Letter of 1 March 2016
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.50 Response to Procedural Decision 27 February, Mr and Mrs Shaw
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.32A Draft Explanatory Memorandum
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 04.3D Book of Reference (Tracked change)
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 09.44 Response to ExA's questions regarding changes to the Book of Reference
Other
Size: 3 MB
Diana and Kevin Reader
Further Comments submitted for Deadline 6
Other
Size: 8 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.2C Land Affected and Land Plans Section A
Other
Size: 544 KB
Dawn Reed
Late Submission for Deadline 6. Accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.49 Response to RIES
Other
Size: 27 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.48.2 Copies of correspondence with Affected Parties regarding unknown plots, Part 2 of 2
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.45 Response to the ExA's procedural decision letter of 1 March 2016
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 01.7F Guide to the Application
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.2A Explanatory Memorandum
Other
Size: 5 MB
Mr and Mrs Rentmore
Comments submitted for Deadline 6
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.1B Updated Land Owner Engagement Table (Tracked change)
Other
Size: 6 MB
IAR Jones
Comments submitted for Deadline 6
Other
Size: 13 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.43.4 Communication between the Applicant and Affected Persons who have not yet agreed Heads of Terms, Part 4 of 4
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 09.47 Book of Reference Change Commentary 4.3C to 4.3D
Other
Size: 44 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.48.1 Copies of correspondence with Affected Parties regarding unknown plots, Part 1 of 2
Other
Size: 112 KB
Bryan and Yoka Kilkelly
Comments submitted for Deadline 6
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.29 Addendum to the Environmental Statement
Other
Size: 5 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.33 Statement of Reasons (Tracked Change)
Other
Size: 9 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.29.2 Addendum to the Environmental Statement Figures Part 2
Other
Size: 29 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.41 Copies of Redacted Correspondence between BJP and Bruton Knowles
Other
Size: 11 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.38 Consultation Statement
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.37 132kV OHL Work No 1 Profiles - Alternative Terminal Option
Other
Size: 5 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.39 Trees and Hedges with the Potential to be Affected Plans Section A
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 9.42 Commentary of changes to DCO Vol 03.1E
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.39 Trees and Hedges with the Potential to be Affected Plans Section B
Other
Size: 283 KB
Western Power Distribution (South Wales) PLC
Proposed Change letter to PINs 24 Feb 2016
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.32 Draft Explanatory Memorandum
Other
Size: 17 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.29.5 Addendum to the Environmental Statement Figures Part 5
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.28 Statement of Applicant - Alternative Undergrounding Option in the Towy Valley
Other
Size: 19 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.29.6 Addendum to the Environmental Statement Figures Part 6
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.30 HRA NSER Screening of Alternative Undergrounding Option in the Towy Valley
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.35 Diagram Illustrating Change OHL to UCG
Other
Size: 414 KB
I A R Jones
Late Submission for Deadline 5. Accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.31 Draft Development Consent Order
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.34 Alternative Undergrounding Option in the Towy Valley Works Plans - Section B
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.40 Master Landowner Communication Table
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.34 Alternative Undergrounding Option in the Towy Valley Works Plans - Section A
Other
Size: 16 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.29.3 Addendum to the Environmental Statement Figures Part 3
Other
Size: 115 KB
Rule 8(3), 17 and s89(3) Letter
Other
Size: 22 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.29.1 Addendum to the Environmental Statement Figures Part 1
Other
Size: 5 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.33 Statement of Reasons
Other
Size: 90 KB
Procedural decision of Option B
Other
Size: 12 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.29.4 Addendum to the Environmental Statement Figures Part 4
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.31 Draft Development Consent Order (Tracked Change)
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.36 Construction Traffic Management Plan Appendix 1
Other
Size: 83 KB
Llythyr Rheol 8(3), 17 ac a89(3)
Other
Size: 1 MB
Dawn Reed
Late Submission for Deadline 5. Accepted at the discretion of the Examining Authority
Other
Size: 140 KB
Report on the Implications for European Sites
Other
Size: 196 KB
Rule 8(3), Rule 17 and s89(3) and s102A Letter
Other
Size: 118 KB
Llythyr Rheol 8(3), Rheol 17 ac a89(3) ac a102A
Other
Size: 34 KB
Diana and Kevin Reader
Late Submission for Deadline 5. Accepted at the discretion of the Examining Authority
Other
Size: 3 MB
Diana Reader
Late Submission for Deadline 5. Accepted at the discretion of the Examining Authority
Other
Size: 29 KB
Mr and Mrs Rentmore
Late Submission for Deadline 5. Accepted at the discretion of the Examining Authority
Other
Size: 14 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.2B Land Affected and Land Plans Section C
Other
Size: 633 KB
Natural Resources Wales
Correspondence with applicant
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.22 Applicant's Written Submissions following the Compulsory Acquisition Hearing held on Wednesday 10 February 2016
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.1A Updated Land Owner Engagement Table
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.22.1 Applicant's Written Submissions following the Compulsory Acquisition Hearing held on Wednesday 10 February 2016 - Appendices
Other
Size: 279 KB
Western Power Distribution (South Wales) PLC
Response to Rule 17 Letter ? Enclosure 4
Other
Size: 1 MB
Leslie & Pearl Birch
Post Hearing Comments
Other
Size: 123 KB
Western Power Distribution (South Wales) PLC
Response to Rule 17 Letter ? Enclosure 2
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.25 HRA NSER Addendum - Location within DCO where Mitigation is Secured
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.2B Land Affected and Land Plans Section B
Other
Size: 496 KB
Pauline Medland
Comments submitted for Deadline 5
Other
Size: 10 MB
Western Power Distribution (South Wales) PLC
BFC Vol 02.2B Land Affected and Land Plans Section A
Other
Size: 11 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.26.5 Outline Tree Inventory Showing Trees Potentially Affected Maps 37-45 (Late Submission for Deadline 5)
Other
Size: 12 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.26.1 Outline Tree Inventory Showing Trees Potentially Affected Maps 1-9 (Late Submission for Deadline 5)
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.24 Commentary of Changes to Draft Development Consent Order 3.1D
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.2.15B DCO03 Appendix 1 Mitigation Table
Other
Size: 26 KB
Diana Reader on behalf of the Land Owners Group
Post hearing comments
Other
Size: 83 KB
HV and KI Miles
Comments submitted for Deadline 5
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 4.3C Book of Reference
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC Vol 1.7E Guide to the Application
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 4.3C Book of Reference (Tracked Change)
Other
Size: 178 KB
Western Power Distribution (South Wales) PLC
Response to Rule 17 Letter of 3 February 2016
Other
Size: 143 KB
Western Power Distribution (South Wales) PLC
Response to Rule 17 Letter ? Enclosure 3
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.2.18.2A DCO34 Appendix 2 Existing Assets Table
Other
Size: 122 KB
Western Power Distribution (South Wales) PLC
Response to Rule 17 Letter ? Enclosure 1
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.10A Plan Showing Location of Temporary Bridge
Other
Size: 35 KB
Yoka and Bryan Kilkelly
Post Hearing Comments
Other
Size: 2 MB
Avril and Bryan Davies
Comments submitted for Deadline 5
Other
Size: 108 KB
Diana Reader
Post Hearing Comments
Other
Size: 986 KB
Pauline Medland
Further comments submitted for Deadline 5
Other
Size: 11 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.23.1 Applicant's Written Submissions following the Issue Specific Hearing on the DCO held on Thursday 11 February 2016 - Appendices
Other
Size: 93 MB
Diana and Kevin Reader
Post Hearing Comments
Other
Size: 251 KB
Pembrokeshire County Council
Response to Section 89 Letter
Other
Size: 810 KB
I A R Jones
Comments submitted for Deadline 5
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.23 Applicant's Written Submissions following the Issue Specific Hearing on the DCO held on Thursday 11 February 2016
Other
Size: 307 KB
Brecon Beacons National Park Authority
Response to Section 89 Letter
Other
Size: 11 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.26.3 Outline Tree Inventory Showing Trees Potentially Affected Maps 19-27 (Late Submission for Deadline 5)
Other
Size: 11 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.26.4 Outline Tree Inventory Showing Trees Potentially Affected Maps 28-36 (Late Submission for Deadline 5)
Other
Size: 72 KB
Maurice Reed, Audrey Reed and Dawn Reed
Comments submitted for Deadline 5
Other
Size: 438 KB
Avril and Bryan Davies
Post Hearing Comments
Other
Size: 12 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.26.2 Outline Tree Inventory Showing Trees Potentially Affected Maps 10-18 (Late Submission for Deadline 5)
Other
Size: 329 KB
Western Power Distribution (South Wales) PLC
Post Hearing Comments regarding Affected Persons
Other
Size: 17 KB
Diana Reader
Comments regarding corrections to the Updated Land Owner Engagement Table
Other
Size: 2 MB
Yoka and Bryan Kilkelly
Comments submitted for Deadline 5
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1E Draft Development Consent Order
Other
Size: 190 KB
Powys County Council
Response to Section 89 Letter
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 9.27 Book of Reference Change Commentary 4.3B to 4.3C (Late Submission for Deadline 5)
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1E Draft Development Consent Order (Tracked Change)
Other
Size: 12 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.26.6 Outline Tree Inventory Showing Trees Potentially Affected Maps 46-55 (Late Submission for Deadline 5)
Other
audio recording
Size: 60 MB
Audio Recording of the Compulsory Acquisition Hearing Session 1
Compulsory Acquisition Hearing on 10 February 2015
Other
audio recording
Size: 27 MB
Audio Recording of the Compulsory Acquisition Hearing Session 3
Compulsory Acquisition Hearing on 10 February 2015
Other
audio recording
Size: 55 MB
Audio Recording of the Issue Specific Hearing Session 1
Issue Specific Hearing relating to the draft Development Consent Order on 11 February 2015
Other
audio recording
Size: 47 MB
Audio Recording of the Issue Specific Hearing Session 2
Issue Specific Hearing relating to the draft Development Consent Order on 11 February 2015
Other
audio recording
Size: 35 MB
Audio Recording of the Compulsory Acquisition Hearing Session 2
Compulsory Acquisition Hearing on 10 February 2015
Other
Size: 89 KB
Llythyr Rheol 13(6)
Llythyr o'r Awdurdod Archwilio ynghlyn a hysbysiad gwrandawiadau mis Chwefror.
Other
Size: 902 KB
Avril and Bryan Davies
Further Correspondence submitted late for Deadline 4. Accepted at the discretion of the Examining Authority
Other
Size: 9 MB
Pauline Medland
Late response to ExA?s Second Written Questions. Accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Avril and Bryan Davies
Further Comments submitted late for Deadline 4. Accepted at the discretion of the Examining Authority
Other
Size: 214 KB
Avril and Bryan Davies
Further Comments submitted for Deadline 4
Other
Size: 333 KB
Jillie Gardiner
Correspondence submitted late for Deadline 4. Accepted at the discretion of the Examining Authority
Other
Size: 641 KB
Natural Resources Wales
Correspondence with applicant submitted late for Deadline 4. Accepted at the discretion of the Examining Authority
Other
Size: 712 KB
Jillie Gardiner
Further correspondence submitted late for Deadline 4. Accepted at the discretion of the Examining Authority
Other
Size: 116 KB
Rule 8(3) and Rule 17 Letter to Applicant regarding s102
Other
Size: 108 KB
Rule 13(6) letter
Letter from the Examining Authority regarding notifcation of February hearings
Other
Size: 109 KB
Rule 8(3) and Rule 17 Letter to Mr and Mrs Shaw regarding Other Person status
Other
Size: 35 KB
Hearing Agenda 10 February 2016
Agenda for Compulsory Acquisition Hearing on 10 February 2016
Other
Size: 109 KB
Hearing Agenda 11 February 2016
Agenda for Issue Specific Hearing relating to the Draft Development Consent Order (DCO) on 11 February 2016
Other
Size: 709 KB
HV and E Jones
Comments submitted for Deadline 4
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.6 Copy of Section 37 Recommendation and Secretary of State Decision for Legacy Substation to Oswestry Substation 132kV Connection
Other
Size: 726 KB
Natural Resources Wales
Response to ExA?s Second Written Questions
Other
Size: 4 MB
Yoka Kilkelly on behalf of the Landowners group
Comments submitted for Deadline 4
Other
Size: 4 MB
Pauline Medland
Comments submitted for Deadline 4
Other
Size: 7 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.5 Copy of Secretary of State's Decision and Examining Authority's Recommendation in Hinkley Point C Connection
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.11 WPD Adaptation to Climate Change Reports (from June 2011 and May 2015)
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1D Draft Development Consent Order (Tracked Change)
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.17 Responses to Examining Authority's Second Round of Written Questions
Other
Size: 987 KB
Diana and Kevin Reader
Response to ExA?s Second Written Questions
Other
Size: 55 KB
Dr M Woods and N Woods
Comments submitted for Deadline 4
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.14 Consultation Responses from the Civil Aviation Authority
Other
Size: 6 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.16 Special Report -The State of Environmental Impact Assessment Practice in the UK - IEMA (2011)
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.9 Letter from Mainline Pipelines agreeing to Protective Provisions
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.3 Copy of Metropolitan Board of Works v McCarthy (1874)
Other
Size: 5 MB
Susanna Rentmore
Comments submitted for Deadline 4
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.20 Applicants Comments on Submission Made By Interested Parties At Deadline 3
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.21 Commentary of Changes to Draft Development Consent Order 3.1C
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.13 Consultation Responses from the Ministry of Defence
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.15 WPD Company Directive on Pollution Prevention
Other
Size: 135 KB
Avril and Bryan Davies
Comments submitted for Deadline 4
Other
Size: 14 KB
RWE Innogy
Response to ExA?s Second Written Questions
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.17 The Energy Networks Association Engineering Technical Report 136 (June 2007)
Other
Size: 479 KB
Carmarthenshire County Council
Response to ExA?s Second Written Questions
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.1 Updated Land Owner Engagement Table
Other
Size: 109 KB
Blaengwen Group
Comments submitted for Deadline 4
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.7 List of Documents to be Certified by the Secretary of State
Other
Size: 121 KB
Wales & West Utilities
Comments submitted for Deadline 4
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.2 Table of Plots with Unknown Ownership
Other
Size: 54 KB
Christopher Ogwyn Evans
Comments submitted for Deadline 4
Other
Size: 9 MB
Western Power Distribution (South Wales) PLC
BFC Vol 08.6A Construction Environmental Management Plan
Other
Size: 8 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.2.18.3A DCO34 Appendix 3 Proposed Works to Existing Assets Plans
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.8 Protective Provisions Table
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.2.15A DCO03 Appendix 1 Mitigation Table
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.12 Due Diligence Letter
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1D Draft Development Consent Order
Other
Size: 3 MB
Leslie & Pearl Birch
Comments submitted for Deadline 4
Other
Size: 6 KB
Gareth Thomas
Comments submitted for Deadline 4
Other
Size: 162 KB
Bryan and Yoka Kilkelly
Comments submitted for Deadline 4
Other
Size: 129 KB
Dawn Reed
Comments submitted for Deadline 4
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC Vol 01.7D Guide to the Application
Other
Size: 93 KB
Jillina Gardiner
Response to ExA?s Second Written Questions. Late submission for Deadline 4, accepted at the discretion of the Examining Authority
Other
Size: 140 KB
Western Power Distribution (South Wales) PLC
BFC Vol 09.19 Table of Proposed Amendments to Book of Reference
Other
Size: 174 KB
Howard and Karen Miles
Comments submitted for Deadline 4
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.10 Plan Showing Location of Temporary Bridge
Other
Size: 2 MB
IAR Jones
Comments submitted for Deadline 4
Other
Size: 18 KB
Diana & Kevin Reader
Comments submitted for Deadline 4
Other
Size: 12 KB
Peter Morris and family
Comments submitted for Deadline 4
Other
Size: 99 KB
R and PB Eagle
Comments submitted for Deadline 4
Other
Size: 3 MB
Western Power Distribution (South Wales) PLC
BFC Vol 09.18.4 Copy of Wildtree Hotels Limited v Harrow London Borough Council (2000)
Other
Size: 106 KB
Rule 8(3) and Rule 17 Letter
Letter to the applicant regarding Mr and Mrs Shaw dated 27 January 2016
Other
Size: 169 KB
Section 89 Letter to Neath Port Talbot
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to Police and Crime Commissioner
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to Brecons Beacons NPA
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to Pembrokeshire County Council
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to Powys County Council
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to Ceredigion County Council
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to Pembrokeshire Coast NPA
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 169 KB
Section 89 Letter to City and County of Swansea
English and Welsh language versions. Fersiynau Cymraeg a Saesneg.
Other
Size: 130 KB
Llythyr Rheol 13 a 16 - Hysbysiad o Wrandawiad a Hysbysiad o Ail Cwestiynau
Other
Size: 104 KB
Rule 13 and 16 Letter - Notification of hearings and issue of second questions
Other
Size: 274 KB
ExA's Second round of questions
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1C Draft Development Consent Order (Tracked Change), validated in SI Template. Accepted as a late submission to Deadline 3 at the discretion of the Examining Authority
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 08.1A Planning Statement Appendix 1 RevA
Other
Size: 153 KB
Mr and Mrs Eagle
Written Representation. Late submission for Deadline 3, accepted at the discretion of the Examining Authority
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC Vol 03.1C Draft Development Consent Order, validated in SI Template. Accepted as a late submission to Deadline 3 at the discretion of the Examining Authority
Other
Size: 62 KB
RH and BL Howells
Summary of oral case put at the Compulsory Acquisition Hearing of 2 and 2 December 2015. Representation not previously published due to administration error.
Other
Size: 169 KB
Western Power Distribution (South Wales) PLC
Email from Mr David Kenyon to provide clarification on the Applicant?s response to Mrs Reader?s representation at the Open Floor Hearing on Monday 30th November 2015. Late submission for Deadline 3
Other
Size: 486 KB
Mr and Mrs Hewer
Written Representations
Other
Size: 822 KB
Carol Evans
Written Representation
Other
Size: 5 MB
Natural Resources Wales
Response in relation to the Updated Habitats Regulations Assessment No Significant Effects Report (HRA NSER)
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_08.6.1_CEMP - Habitat Management Plan
Other
Size: 4 MB
Les Birch
Written Representation, Carmarthenshire County Council Website report, and Copy of the Report into Cable Costs by Western Power Distribution South Wales plc dated June 2013
Other
Size: 2 MB
Rhodri Glyn Thomas AC/AM
Written Representation on behalf of Mr and Mrs Reader
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.12_Applicants Response to Compulsory Acquisition Hearings
Other
Size: 63 KB
Colin Jones
Written Representation
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_01.7C_Guide to the Application
Other
Size: 3 MB
BJP Land Agents
Correspondence from D.A and W G Jones and Summary Table of Negotiations
Other
Size: 187 KB
BJP Land Agents
Correspondence from Messrs James
Other
Size: 14 MB
BJP Land Agents
Covering Letter and Correspondence from clients and solicitors with the Applicant, and Appendix 1 ? Change Requests
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.14_Applicants Response to Issue Specific Hearing on the Draft DCO
Other
Size: 517 KB
Grwp Blaengwen
Written Representation including Summary of oral case put at the Issue Specific Hearing of 8 December 2015
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_3.1B_Draft Development Consent Order
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.3.7_Statements of Common Ground - Development Consent Order - Carmarthenshire County Council
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.11_Applicants Response to Open Floor Hearings
Other
Size: 416 KB
Karen Miles
Summary of oral case put at Compulsory Acquisition Hearing of 2 December 2015 with supporting information
Other
Size: 2 MB
Bryan and Avril Davies
Written Representation. Accepted at the 30 November - 3 December 2015 Hearings.
Other
Size: 5 MB
Grwp Blaengwen
Press cuttings. Accepted at the 30 November - 3 December 2015 Hearings.
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_3.1B_Draft Development Consent Order (Tracked Change)
Other
Size: 226 KB
Avril and Bryan Davies
Comments following hearings and site inspection in week commencing 30 November 2015
Other
Size: 27 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.16_Existing and Wire Line View Transparencies
Other
Size: 173 KB
S87 &102A Letter sent to Yvonne Shaw dated 18 December 2015
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.10_Commentary of Changes to Draft DCO 3.1A
Other
Size: 533 KB
Mr and Mrs Evans
Written Representation
Other
Size: 466 KB
Leslie and Pearl Birch
Summaries of oral cases put at the Open Floor Hearings of 30 November and 1 December and the Compulsory Acquisition Hearing of 3 December 2015. Accepted as a late submission to Deadline 3 at the discretion of the Examining Authority.
Other
Size: 152 KB
Dr Michael Woods and Nicola Woods
Written Representation
Other
Size: 39 KB
Susanna Rentmore
Post Hearing Written Representation
Other
Size: 109 KB
Bryan and Yoka Kilkelly
Written Representation
Other
Size: 23 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.15_Responses to Examining Authority Questions asked at Hearings
Other
Size: 3 MB
Avril and Bryan Davies
Comments following Accompanied Site Inspection on 1 December 2015
Other
Size: 4 MB
Diana Reader
Summaries of oral cases put at the Open Floor Hearing of 30 November 2015 and the Compulsory Acquisition Hearing of 2 December 2015. Plus Appendices 4-28
Other
Size: 48 KB
Howard and Karen Miles
Submission in lieu of representation at the Compulsory Acquisition Hearing of 2 December 2015
Other
Size: 61 KB
Mr and Mrs Reed and Dawn Reed
Written Representation
Other
Size: 2 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_09.13_Applicants Response to Issue Specific Hearing on Environmental Matters
Other
Size: 5 MB
Brechfa Forest and Llanllwni Mountain Tourism Cluster Group
Written Representation
Other
Size: 4 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_02.9_Deviation Plans
Other
Size: 143 KB
Alan Dufty
Written Representation. Accepted as a late submission to Deadline 3 at the discretion of the Examining Authority.
Other
Size: 40 MB
Carmarthenshire County Council
Summary of oral case put at the Issue Specific Hearing of 8 December 2015 and Appendices. Accepted as a late submission to Deadline 3 at the discretion of the Examining Authority.
Other
Size: 4 MB
Karen Miles
Written Representation from 30 landowners represented by BJP Land Agents
Other
Size: 44 KB
Pauline Medland
Written Representation
Other
Size: 46 KB
Carmarthenshire Local Access Forum
Written Statement in lieu of oral case at the Environmental Matters Hearing of 8 December 2015
Other
Size: 16 KB
P & E J Morris and Sons
Written Representation
Other
Size: 1 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_08.3A_Draft Section 106 Agreement
Other
Size: 51 KB
Jennifer Harrison
Summary of oral case put at the Open Floor Hearing of 1 December 2015.
Other
Size: 5 MB
Western Power Distribution (South Wales) PLC
BFC_Vol_05.4A_Habitat Regulations Assessment - NSER
Other
Size: 307 KB
Natural Resources Wales
Response in relation to the Statement of Common Ground between Western Power Distribution and Carmarthenshire County Council
Other
Size: 66 KB
Carmarthenshire County Council
Response to the Examining Authority?s request for further information at the Issue Specific Hearing of 8 and 9 December 2015
Other
Size: 636 KB
Leslie and Pearl Birch
Written Representation
Other
audio recording
Size: 89 MB
Issue Specific Hearing - 8-12-2015 Session 2
Issue Specific Hearing on Environmental Matters Session 2 of 4
Other
audio recording
Size: 79 MB
Issue Specific Hearing - 8-12-2015 Session 4
Issue Specific Hearing on Environmental Matters Session 4 of 4
Other
audio recording
Size: 74 MB
Issue Specific Hearing - 8-12-2015 Session 3
Issue Specific Hearing on Environmental Matters Session 3 of 4
Other
audio recording
Size: 58 MB
Issue Specific Hearing - 8-12-2015 Session 1
Issue Specific Hearing on Environmental Matters Session 1 of 4
Other
audio recording
Size: 42 MB
Issue Specific Hearing - 10-12-2015 Session 1
Issue Specific Hearing on the draft Development Consent Order Session 1 of 2
Other
audio recording
Size: 31 MB
Issue Specific Hearing - 10-12-2015 Session 2
Issue Specific Hearing on the draft Development Consent Order Session 2 of 2
Other
Size: 108 KB
Procedural Decision Welsh Language Version
Procedural Decision issued by the Examining Authority, dated 7 December 2015, to accept a Note Regarding Proposal for Alternative Southern Extension to Underground Section as Scheme Variation into the examination and request additional information from the Applicant
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
Note regarding proposal for alternative southern extension to underground section as scheme variation. Letter dated 19 November 2015 referred to in procedural decision issued on 7 December 2015.
Other
Size: 98 KB
Procedural Decision
Procedural Decision issued by the Examining Authority, dated 7 December 2015, to accept a Note Regarding Proposal for Alternative Southern Extension to Underground Section as Scheme Variation into the examination and request additional information from the Applicant
Other
audio recording
Size: 5 MB
Open Floor Hearing 2015 12 01 Translation from Welsh
Other
audio recording
Size: 19 KB
Compulsory Acquisition Hearing - 02-12-2015 - Session 1 1
Other
audio recording
Size: 108 MB
Compulsory Acquisition Hearing - 02-12-2015 - Session 1
Other
audio recording
Size: 34 MB
Compulsory Acquisition Hearing - 03-12-2015 - Session 2
Other
audio recording
Size: 19 KB
Open Floor Hearing - 30-11-2015 - Session 1 1
Other
audio recording
Size: 22 MB
Open Floor Hearing - 30-11-2015 - Session 2
Other
audio recording
Size: 96 MB
Open Floor Hearing - 30-11-2015 - Session 1
Other
audio recording
Size: 36 MB
Compulsory Acquisition Hearing - 02-12-2015 - Session 2
Other
audio recording
Size: 63 MB
Open Floor Hearing - 01-12-2015
Other
audio recording
Size: 52 MB
Compulsory Acquisition Hearing - 03-12-2015 - Session 1
Other
Size: 2 MB
Western Power Distribution (South Wales) Plc
BFC_Vol_09.3.5_Statement of Common Ground_Historic Environment_Carmarthenshire County Council
Other
Size: 1 MB
Western Power Distribution (South Wales) Plc
BFC_Vol_09.7A_Comments on Local Impact Reports - Accepted at the discretion of the ExA as a late submission to Deadline 2.
Other
Size: 23 KB
BJP Land Agents
Written Submission - Status of Land Negotiation/ Compulsory Acquisition - Accepted at the discretion of the ExA as a late submission to Deadline 2.
Other
Size: 3 MB
Western Power Distribution (South Wales) Plc
BFC_Vol_09.3.6_Statement of Common Ground_Landscape and Visual_Natural Resources Wales
Other
Size: 20 KB
Diana Reader
Written Submission - Status of Land Negotiation/ Compulsory Acquisition - Accepted at the discretion of the ExA as a late submission to Deadline 2.
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.6.2 Applicant's Comments on Written Representations from Other Parties
Other
Size: 60 KB
Dr M Woods and N Woods
Comments on Responses to Relevant Representations
Other
Size: 140 KB
Western Power Distribution (South Wales) plc
BFC Vol 04.3B Book of Reference
Other
Size: 221 KB
Bryan and Yoka Kilkelly
Written representation
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.9 Commentary of Changes to Draft Development Consent Order 3.1
Other
Size: 36 KB
D.A and W.B. Davies
Written representation and suggested location for an Accompanied Site Inspection
Other
Size: 4 MB
Western Power Distribution (South Wales) plc
BFC - Guide to the Application
Other
Size: 140 KB
Western Power Distribution (South Wales) plc
BFC Vol 04.3B Book of Reference (Tracked Change)
Other
Size: 213 KB
E.L and M. James
Report of meeting with BJP Land Agents on 23 November 2015
Other
Size: 146 KB
R.H and B.L Howells
Written representation
Other
Size: 32 KB
Susanna Rentmore
Written representation
Other
Size: 63 KB
Linda Evans
Written representation
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.8 Applicant's Comments on Responses to Examining Authoritys First Written Questions
Other
Size: 1 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.7 Applicant's Response to Carmarthenshire County Councils Local Impact Report
Other
Size: 18 KB
G James & Sons
Written representation
Other
Size: 781 KB
Avril and Bryan Davies
Report of meeting between D.A. Davies and W. B Davies, BJP Land Agents, and WPD and Freedom on 17 November 2015.
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 03.1A Draft Development Consent Order
Other
Size: 1 MB
BJP Land Agents
Updates on discussions with the Applicant and Extract of summary table of negotiations. Accepted as a late submission for deadline 2 at the discretion of the Examining Authority.
Other
Size: 237 KB
Grwp Blaengwen
Notification of attendance and intention to speak at Hearings
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 03.1A Draft Development Consent Order - Comparison between 3.1 and 3.1A (Tracked Change)
Other
Size: 1 MB
Bruce and Yvonne Shaw
Written representation
Other
Size: 32 KB
BJP Land Agents
Correspondence between BJP Land Agents and applicant?s representative relating to Heads of Terms
Other
Size: 313 KB
G and H Thomas
Written representation and suggested location for an Accompanied Site Inspection
Other
Size: 187 KB
H.V and K.I. Miles
Written representation, notifications of attendance at hearings and suggested location for an Accompanied Site Inspection
Other
Size: 26 KB
BJP Land Agents
Comments on delayed Heads of Terms
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
FC Vol 09.3.3 Statements of Common Ground - Natural Resources Wales
Other
Size: 1 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.6.1 Applicant's Comments on Written Representations from Carmarthenshire County Council
Other
Size: 141 KB
Dawn Reed
Written representation, notifications of attendance at hearings and suggested location for an Accompanied Site Inspection
Other
Size: 315 KB
Natural Resources Wales
Suggestions for an Accompanied Site Inspection Itinerary
Other
Size: 153 KB
Attendance list and Itinerary for Accompanied Site Inspection
Attendance list of all those confirmed attendees for the two day site visit on 1 and 11 December 2015, plus a final Itinerary
Other
Size: 94 KB
Carmarthenshire County Council
Written representation
Other
Size: 130 KB
A.J and M.P. Reed
Written representation, notifications of attendance at hearings and suggested location for an Accompanied Site Inspection
Other
Size: 438 KB
Leslie and Pearl Birch
Written representation and notifications of attendance at Open Floor Hearings
Other
Size: 35 KB
Alan Dufty
Written representation
Other
Size: 973 KB
Diana Reader
Submission prior to Compulsory Acquisition Hearing of 2 and 3 December 2015
Other
Size: 33 KB
Hearing Agendas
Agenda for Issue Specific Hearing on the Draft Development Consent Order (DCO) on 10 December 2015
Other
Size: 42 KB
Hearing Agendas
Agenda for Agenda for Issue Specific Hearing on Environmental Matters on 8 and 9 December 2015
Other
Size: 18 KB
Hearing Agendas
Agendas for Open Floor Hearings on 30 November and 1 December 2015
Other
Size: 39 KB
Hearing Agendas
Agenda for Compulsory Acquisition Hearing on 2 and 3 December 2015
Other
Size: 117 KB
BJP Land Agents
Letters on behalf of clients to the Examining Authority and the applicant. Accepted at the discretion of the Examining Authority.
Other
Size: 97 KB
BJP Land Agents
Email from the Nia Wyn Davies enclosing Heads of Terms and BJP response on behalf of clients. Accepted at the discretion of the Examining Authority
Other
Size: 12 MB
Accompanied Site Inspection Itinerary
This itinerary is provided in outline and is subject to change and refinement
Other
Size: 78 KB
Brechfa Forest and Llanllwni Mountain Tourism Cluster Group.
Written Representation
Other
Size: 14 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.23.2_EIA22 Appendix 2 Relevant Watercourses Part2
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.12_DLV20 Appendix 1 Report into Underground Cables
Other
Size: 667 KB
Ms L Morris, Secretary on behalf of Grwp Blaengwen
Written Representation and Notification of attendance at open floor hearings and Issue specific hearings
Other
Size: 5 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.19.3_EIA09 Appendix 3 CCC Scoping Opinion to PINS
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.8.2_DLV06 Appendix 2 Ellie Davies - CV
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
Response to the Examining Authority?s first questions
Other
Size: 65 KB
Dr M Woods
Written Representation
Other
Size: 150 KB
Rhodri Glyn Thomas AM
Written Representation
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 09.2.19.1 EIA09 Appendix 1 Notes of NRW ecology meetings
Other
Size: 4 MB
Carmarthenshire County Council
Local Impact Report and Appendices 1-4
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.19.4_EIA09 Appendix 4 CCC Response on Draft ES
Other
Size: 70 KB
Gilfach Wen Barn
Written Representation
Other
Size: 4 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.14.1_DLV24 Appendix 1 NG Our Approach to Design and Routeing 2012
Other
Size: 4 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.14.2_DLV24 Appendix 2 NG Approach to Options Appraisal 2012
Other
Size: 50 KB
Civil Aviation Authority
Position Statement
Other
Size: 7 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.14.4.2_DLV24 Appendix 4 CIGRE Guidelines Part 2
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.3.2_Statements of Common Ground - Historic Environment - Dyfed Archaeological Trust and Cadw
Other
Size: 8 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.6.4_DLV02 Appendix 4 Figure 1 Appendix 9.8 Other Receptors
Other
Size: 6 MB
Yoka Kilkelly and other Land and Property Owners
Written Representation
Other
Size: 7 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.6.3_DLV02 Appendix 3 Figure 1 Appendix 9.7 Classified Roads
Other
Size: 7 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.18.3_DCO34 Appendix 3 Proposed Works to Existing Assets Plans
Other
Size: 5 MB
Natural Resources Wales
Responses to the Examining Authority?s first questions
Other
Size: 5 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.16_DCO24 Appendix 1 Brechfa Forest West Wind Farm Approved layout
Other
Size: 5 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.20.2_EIA13 Appendix 2 BFWWF Completed Unilateral Undertaking
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.2_CA12 Appendix 1 Justification for Land
Other
Size: 221 KB
Natural Resources Wales
Comment concerning their remit in respect of this application
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.26_EIA30 Appendix 1 Tables 20.1 & 20.2
Other
Size: 4 MB
Western Power Distribution (South Wales) plc
BFC_Vol_01.7A_Guide to the Application
Other
Size: 8 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.20.1_EIA13 Appendix 1 BFWWF Habitat Management Plan
Other
Size: 384 KB
Carmarthenshire County Council
Responses to the Examining Authority?s first questions
Other
Size: 67 KB
Jillina Gardiner
Written Representation
Other
Size: 16 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.23.1_EIA22 Appendix 1 Relevant Watercourses Part1
Other
Size: 9 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.27_HA11 Appendix 1 HRA Figure 2 Otter Figures
Other
Size: 93 KB
Yoka Kilkelly
Notification of attendance at hearings and accompanied site inspection, making oral representations at hearings and suggested locations for site inspection
Other
Size: 6 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.18.2_DCO34 Appendix 2 Existing Assets Table
Other
Size: 2 MB
Robert F Jones on behalf of Grwp Blaengwen
Written Representation and notification of a wish to be heard at an open floor hearing.
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.9_DLV13 Appendix 1 Modified Table 9.1
Other
Size: 31 KB
Mrs J Harrison
Written Representation
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.17_DCO33 Appendix 1 Email from Openreach
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.11_DLV19 Appendix 1 Strategic Options Comparison
Other
Size: 319 KB
Western Power Distribution (South Wales) plc
Notification from the applicant that WPD intend to provide an alternative option for poles 84 to 86 south of the River Towy, which has been accepted by the ExA as a Deadline 1 submission
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.5_CA18 Appendix 1 Land Owner Engagements
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.5_Position with regard to Statements of Common Ground
Other
Size: 4 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.3.1_Statements of Common Ground - Carmarthenshire County Council
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.14.3_DLV24 Appendix 3 NG UG Policy New Connections
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.7_DLV03 Appendix 1 Viewpoints
Other
Size: 104 KB
Jonathan Edwards MP
Written Representation
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.1_DLV22 Appendix 1 Route Alignment Selection Report
Other
Size: 2 MB
Clients of BJP Residential Ltd
Written Representation and Appendices
Other
Size: 294 KB
Clients of BJP Residential Ltd
Written Representation Summary
Other
Size: 142 KB
Western Power Distribution (South Wales) plc
Covering letter and document list
Other
Size: 9 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.22_EIA20 Appendix 1 Conceptual Site Model
Other
Size: 10 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.14.4.1_DLV24 Appendix 4 CIGRE Guidelines Part 1
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.4_Applicant's Responses to Relevant Representations
Other
Size: 8 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.6.1_DLV02 Appendix 1 Figure 1 Appendix 9.5 Residential Receptors
Other
Size: 60 KB
Carmarthenshire County Council
Notifications of attendance and suggested locations at accompanied site inspection, attendance open floor hearings, and oral representations at hearings
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.18.1_DCO34 Appendix 1 S37 Consent Burry Port
Other
Size: 9 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.5_DLV22 Appendix 5 Route Alignment Selection Report Appendix 2.1
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.10_DLV15 Appendix 1 Table of Receptors
Other
Size: 10 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.4.4_DLV22 Appendix 4 Route Alignment Selection Report Appendix 1.2 Part 4
Other
Size: 12 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.4.3_DLV22 Appendix 4 Route Alignment Selection Report Appendix 1.2 Part 3
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.3_DLV22 Appendix 3 Route Alignment Selection Report Appendix 1.1
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.15_DCO03 Appendix 1 Mitigation Table
Other
Size: 10 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.2_DLV22 Appendix 2 Route Alignment Selection Report Figures
Other
Size: 5 MB
J P Hewer
Written Representation and Appendices
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.8.3_DLV06 Appendix 3 John Meehan - CV
Other
Size: 232 KB
Carmarthenshire County Council
Written Representation
Other
Size: 9 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.28_OM02 Guide to the Application
Other
Size: 58 KB
RWE Innogy UK
Response to Examining Authority?s written question EIA13
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.1_CA01 Appendix 1 Change Requests
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.25_EIA29 Appendix 1 SIA Guidelines
Other
Size: 8 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.6.2_DLV02 Appendix 2 Figure 1 Appendix 9.6 Footpaths
Other
Size: 6 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.3_CA13 Appendix 1 Organogram
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.21_EIA17 Appendix 1 Stage 3 Consultation - NRW
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.24_EIA26 Appendix 1 Outline Frac-out Contingency Plan
Other
Size: 3 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.4_CA14 Appendix 1 Annual Report and Financial Statements
Other
Size: 37 KB
Cadw
Confirmation of Statement of Common Ground for the historic environment
Other
Size: 9 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.4.1_DLV22 Appendix 4 Route Alignment Selection Report Appendix 1.2 Part 1
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.8.1_DLV06 Appendix 1 Phillip Black - CV
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.19.2_EIA09 Appendix 2 Follow up Email with NRW
Other
Size: 13 MB
Western Power Distribution (South Wales) plc
BFC_Vol_09.2.13.4.2_DLV22 Appendix 4 Route Alignment Selection Report Appendix 1.2 Part 2
Other
Size: 144 KB
Bryan and Yoka Kilkelly
Written Representation
Other
Size: 62 KB
Mrs N Woods
Written Representation.
Other
Size: 101 KB
Notification of Hearings and Accompanied Site Visit
Other
Size: 114 KB
Hysbysiad o Wrandawiadau ac Arolygiad y Safle
Other
Size: 152 KB
Examining Authority's note of an Unaccompanied Site Inspection undertaken on 05 October 2015
Other
Size: 336 KB
ExA First round of questions
First Round of Written Questions Issued by the Examining Authority (ExA)
Other
Size: 158 KB
Brechfa Connection Preliminary Meeting Note
Note of the Preliminary Meeting held on 6 October 2015
Other
Size: 117 KB
Rule 8 Letter
Other
Size: 122 KB
Llythyr Rheol 8
Other
Size: 429 KB
Western Power Distribution (South Wales) plc
BFC Vol 6.4 - Appendix 14.1 Noise Supporting Information Errata as submitted on 25 September 2015 and accepted at the discretion of the Examining Authority.
Other
audio recording
Size: 66 MB
Brechfa Connection Preliminary Meeting Audio recording
Other
Size: 112 KB
Other
Size: 184 KB
Rule 6 Letter
Other
Size: 205 KB
Llythyr Rheol 6
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 06.4 - ES Appendix 17.1 Review of Socio economic, Recreation and Tourism Assessments.
Other
Size: 2 MB
Wales & West Utilities
Correspondence submitted during the Relevant Representation stage and accepted by the Examining Authority.
Other
Size: 5 MB
Western Power Distribution (South Wales) plc
BFC Vol 04.1A - Revised Statement of Reasons (Clean).
Other
Size: 15 MB
Western Power Distribution (South Wales) plc
BFC Vol 02.2A - Revised Land Affected and Land Plans Section A.
Other
Size: 6 MB
Western Power Distribution (South Wales) plc
BFC Vol 04.1A - Revised Statement of Reasons (Tracked Change).
Other
Size: 140 KB
Western Power Distribution (South Wales) plc
BFC Vol 04.3A - Revised Book of Reference (clean).
Other
Size: 1 MB
Western Power Distribution (South Wales) plc
BFC Vol 08.10 - DCO Documents Errata.
Other
Size: 1 MB
Western Power Distribution (South Wales) plc
BFC Vol 05.1 - Consultation Report Addendum.
Other
Size: 11 MB
Western Power Distribution (South Wales) plc
BFC Vol 08.9 - Outline Archaeological Written Scheme of Investigation Figure 1.1.
Other
Size: 18 MB
Western Power Distribution (South Wales) plc
BFC Vol 02.2A - Revised Land Affected and Land Plans Section C.
Other
Size: 4 MB
Western Power Distribution (South Wales) plc
BFC Vol 01.7 - Guide to the Application.
Other
Size: 38 KB
Western Power Distribution (South Wales) plc
BFC Vol 08.11 - Certificates of Compliance with Section 56, 59 of the Act, with Regulation 13 of the EIA Regulations and Notice of Discrepancies between S56 and BoR.
Other
Size: 1 MB
Western Power Distribution (South Wales) plc
BFC Vol 08.1 - Planning Statement Appendix 1 Other Consents and Licenses.
Other
Size: 232 KB
Western Power Distribution (South Wales) plc
Cover letter accompanying the documents sumitted in response to the Post-Acceptance procedural decision.
Other
Size: 140 KB
Western Power Distribution (South Wales) plc
BFC Vol 04.3A - Revised Book of Reference (Tracked Change).
Other
Size: 3 MB
Health & Safety Executive
Correspondence submitted during the Relevant Representation stage and accepted by the Examining Authority.
Other
Size: 165 KB
Cyngor Cymuned Cynwyl Gaeo
Correspondence submitted during the Relevant Representation stage and accepted by the Examining Authority.
Other
Size: 1 MB
BJP Residential Ltd on behalf of 21 Landowners
Additional Representations submitted during the Relevant Representation stage and accepted by the Examining Authority.
Other
Size: 68 KB
The Canal and River Trust
Correspondence submitted during the Relevant Representation stage and accepted by the Examining Authority.
Other
Size: 62 KB
City & County of Swansea
Correspondence submitted during the Relevant Representation stage and accepted by the Examining Authority.
Other
Size: 2 MB
Western Power Distribution (South Wales) plc
BFC Vol 08.12 - Response to Examining Authority's Procedural Decision dated 6 July 2015 and PINS Section 55 Application Checklist.
Other
Size: 9 MB
Western Power Distribution (South Wales) plc
BFC Vol 02.2A - Revised Land Affected and Land Plans Section B.
Other
Size: 156 KB
Western Power Distribution (South Wales) plc
Acknowledgement of the Examining Authority?s Procedural decision following the issue of acceptance decision.
Other
Size: 114 KB
Procedural decision following issue of acceptance decision
Other
Size: 51 KB
Appointment of an Examining Authority
Other
Size: 94 KB
Notification of Decision to Accept Application
Other
Size: 183 KB
Section 55 Acceptance of Applications Checklist
Other
Size: 38 KB
Pembrokeshire County Council
Response to Adequacy of Consultation request
Other
Size: 2 MB
Carmarthenshire County Council
Response to Adequacy of Consultation request
Other
Size: 38 KB
Pembrokeshire Coast National Park Authority
Response to Adequacy of Consultation request
Other
Size: 65 KB
Brecon Beacons National Park Authority
Response to Adequacy of Consultation request
Other
Size: 36 KB
Powys County Council
Response to Adequacy of Consultation request
Other
Size: 42 KB
Osborne Clarke on behalf of Western Power Distribution
Clarification points regarding the application documents.
Other
Size: 1 MB
BFC Vol 06.4 ES Appendix 16.1 Clarification of Traffic and Transport Scope
Other
Size: 1 MB
BFC Vol 06.4 ES Appendix 16.2 Brechfa Forest Construction Programme
Other
Size: 15 MB
BFC Vol 06.4 ES Appendix 9.2 Effects on Landscape Character
Other
Other
Size: 35 MB
BFC Vol 05.1 Consultation Report Appendix 6.3-8.24
Other
Size: 1 MB
BFC Vol 06.2 Environmental Statement Chapter 13 Hydrology Drainage Flood Risk
Other
Size: 16 MB
Other
Size: 12 MB
BFC Vol 06.6 Scoping Opinion
Other
Size: 15 MB
BFC Vol 06.4 ES Appendix 9.4 Effects on Representative Viewpoints
Other
Size: 43 MB
BFC Vol 06.3 Figures 12.1 to 17.1
Other
Size: 2 MB
BFC Vol 06.2 Environmental Statement Chapter 10 Ecology
Other
Size: 2 MB
BFC Vol 06.2 Environmental Statement Chapter 2 Project Description
Other
Size: 3 MB
BFC Vol 08.2 Strategic Optioneering Report
Other
Size: 1 MB
BFC Vol 06.2 Environmental Statement Chapter 11 Historic Environment
Other
Size: 22 MB
BFC Vol 02.2 Land Affected and Land Plans Section C
Other
Size: 2 MB
BFC Vol 06.2 Environmental Statement Chapter 8 Land Use Agriculture and Forestry
Other
Size: 1 MB
BFC Vol 06.4 ES Appendix 9.7 Visual Effects upon Road Users
Other
Size: 4 MB
BFC Vol 06.4 ES Appendix 11.1 Historic Environment Technical Report
Other
Size: 18 MB
BFC Vol 02.4 Environmental Features Plans Section C
Other
Size: 19 MB
BFC Vol 02.2 Land Affected and Land Plans Section A
Other
Size: 11 MB
BFC Vol 02.1 Works Plans Section B
Other
Size: 17 MB
Other
Size: 7 MB
BFC Vol 06.4 ES Appendix 10.1 Bat Technical Report
Other
Size: 3 MB
BFC Vol 06.4 ES Appendix 9.3 Effects on Landscape Designations
Other
Size: 8 MB
BFC Vol 02.7 132kV Overhead Line Work no.1 Profiles
Other
Size: 9 MB
BFC Vol 06.4 ES Appendix 10.2 Botany Technical Report
Other
Size: 2 MB
BFC Vol 06.4 ES Appendix 15.1 Air Quality Assessment
Other
Size: 2 MB
BFC Vol 06.4 ES Appendix 7.2 Compliance with NPS EN1 and NPS EN5
Other
Size: 16 MB
BFC Vol 05.1 Consultation Report Appendix 9.1-14.7
Other
Size: 4 MB
BFC Vol 02.7 Design Drawings Brechfa Forest Satellite Construction Compound
Other
Size: 36 MB
BFC Vol 08.5 Construction Management Strategy Part 1 of 2
Other
Size: 2 MB
BFC Vol 05.1.1 Consultation Report Summary Welsh
Other
Size: 2 MB
BFC Vol 08.9 Outline Archaeological Written Scheme of Investigation
Other
Size: 2 MB
BFC Vol 08.7 Construction Traffic Management Plan
Other
Size: 2 MB
BFC Vol 05.1 Consultation Report
Other
Size: 2 MB
BFC Vol 06.7 Publicity under Reg 11 of Infrastructure Planning (EIA) Regs 2009
Other
Size: 36 MB
BFC Vol 07.1 3D Model Guide
Other
Size: 11 MB
BFC Vol 02.8 Trees and Hedges with the Potential to be Affected Section B
Other
Size: 5 MB
BFC Vol 06.1 Environmental Statement Non Technical Summary Welsh
Other
Size: 140 KB
BFC Vol 04.3 Book of Reference
Other
Size: 5 MB
BFC Vol 06.1 Environmental Statement Non Technical Summary
Other
Size: 1 MB
BFC Vol 06.2 Environmental Statement Chapter 6 EIA Process
Other
Size: 4 MB
BFC Vol 04.1 Statement of Reasons
Other
Size: 12 MB
BFC Vol 02.4 Environmental Features Plans Section B
Other
Size: 5 MB
BFC Vol 05.4 HRA NSER
Other
Size: 17 MB
BFC Vol 02.7 132kV Overhead Line Wood Pole Outline
Other
Size: 20 MB
BFC Vol 08.7 Construction Traffic Management Plan Figures 1.1-4.2
Other
Size: 1 MB
BFC Vol 01.3 Electronic Application Index
Other
Size: 11 MB
BFC Vol 05.1 Consultation Report Appendix 3.1-4.3
Other
Size: 16 MB
BFC Vol 02.8 Trees and Hedges with the Potential to be Affected Section C
Other
Size: 1 MB
BFC Vol 06.2 Environmental Statement Chapter 16 Traffic and Transport
Other
Size: 12 MB
BFC Vol 02.2 Land Affected and Land Plans Section B
Other
Size: 2 MB
BFC Vol 06.2 Environmental Statement Chapter 4 Consultation
Other
Size: 26 MB
BFC Vol 08.8 Transport Assessment
Other
Size: 35 MB
BFC Vol 06.5 Scoping Report
Other
Size: 2 MB
BFC Vol 03.2 Explanatory Memorandum
Other
Size: 12 MB
BFC Vol 02.6 Crown Land Plans Section C
Other
Size: 39 MB
BFC Vol 06.4 ES Appendix 12.1 Geo-Environmental Information Part 2 of 6
Other
Size: 40 MB
BFC Vol 06.4 ES Appendix 9.1 Effects on Landscape Elements Part 2 of 2
Other
Size: 1 MB
BFC Vol 01.2 Application Form
Other
Size: 1 MB
BFC Vol 06.2 Environmental Statement Chapter 5 Environmental Setting
Other
Size: 16 MB
BFC Vol 02.5 Heritage Designations Plans Section A
Other
Size: 2 MB
BFC Vol 06.4 ES Appendix 14.1 Noise Supporting Information
Other
Size: 5 MB
BFC Vol 01.4 Newspaper Notices
Other
Size: 15 MB
BFC Vol 02.3 Access and Rights of Way Plans Section A
Other
Size: 14 MB
Other
Size: 14 MB
BFC Vol 02.1 Works Plans Overall Location Plan and Master Key to Sections Plan
Other
Size: 21 MB
BFC Vol 06.4 ES Appendix 12.1 Geo-Environmental Information Part 4 of 6
Other
Size: 2 MB
BFC Vol 08.1 Planning Statement
Other
Size: 1 MB
BFC Vol 06.2 Environmental Statement Chapter 20 Environmental Management
Other
Size: 1 MB
BFC Vol 06.4 ES Appendix 11.2 Historic Environment Planning Compliance
Other
Size: 1 MB
BFC Vol 06.4 ES Appendix 3.2 Change Request Log
Other
Size: 9 MB
BFC Vol 02.7 132kV Underground Cable Work no.2 Design Drawings
Other
Size: 25 MB
BFC Vol 06.3 Figures 19.1 to 19.3
Other
Size: 17 MB
BFC Vol 02.5 Heritage Designations Plans Section C
Other
Size: 40 MB
BFC Vol 06.4 ES Appendix 10.5 Marsh Fritillary Technical Report
Other
Size: 1 MB
BFC Vol 06.4 ES Appendix 9.8 Visual Effects upon other Recreational and Tourist Locations
Other
Size: 10 MB
BFC Vol 02.6 Crown Land Plans Section B
Other
Size: 46 MB
BFC Vol 06.3 Figures 09.6 to 11.5 WEB SAFE VERSION
Other
Size: 38 MB
BFC Vol 08.5 Construction Management Strategy Part 2 of 2
Other
Size: 13 MB
BFC Vol 02.3 Access and Rights of Way Plans Section B
Other
Size: 1 MB
BFC Vol 06.4 ES Appendix 13.1 Hydrology Flood Risk and Drainage Data Table
Other
Size: 1 MB
BFC Vol 06.2 Environmental Statement Chapter 7 Planning Policy
Other
Size: 2 MB
BFC Vol 06.4 ES Appendix 9.5 Visual Effects upon Residents
Other
Size: 8 MB
BFC Vol 06.4 ES Appendix 10.3 Bird Technical Report
Other
Size: 2 MB
BFC Vol 06.4 ES Appendix 9.6 Visual Effects upon Footpath Users
Other
Size: 2 MB
BFC Vol 03.1 Draft Development Consent Order
Other
Size: 16 MB
BFC Vol 02.1 Works Plans Section C
Other
Size: 2 MB
BFC Vol 06.2 Environmental Statement Chapter 18 Electric and Magnetic Fields
Other
Size: 16 MB
BFC Vol 02.4 Environmental Features Plans Section A
Other
Size: 1 MB
BFC Vol 06.4 ES Appendix 18.1 EMF Calculations
Other
Size: 14 MB
BFC Vol 05.1 Consultation Report Appendix 5.1-6.2
Other
Size: 15 MB
BFC Vol 02.1 Works Plans Section A
Other
Size: 2 MB
BFC Vol 06.4 ES Appendix 7.3 Climate Change Resilience Report
Other
Size: 2 MB
BFC Vol 05.1.1 Consultation Report Summary
Other
Other
Size: 4 MB
BFC Vol 06.4 ES Appendix 10.6 Otter and Water Vole Technical Report
Other
Size: 10 MB
BFC Vol 02.7 Key Plan for Detailed Design Drawings
Other
Size: 1 MB
BFC Vol 04.2 Funding Statement
Other
Size: 2 MB
BFC Vol 06.2 Environmental Statement Chapter 19 Cumulative Effects and Inter-relationships
Other
Size: 20 MB
BFC Vol 06.4 ES Appendix 12.1 Geo-Environmental Information Part 3 of 6
Other
Size: 2 MB
BFC Vol 06.2 Environmental Statement Chapter 17 Socio economics Recreation and Tourism
Other
Size: 14 MB
Other
Size: 31 MB
BFC Vol 06.4 ES Appendix 12.1 Geo-Environmental Information Part 6 of 6
Other
Size: 21 MB
BFC Vol 06.4 ES Appendix 12.1 Geo-Environmental Information Part 5 of 6
Other
Size: 1 MB
BFC Vol 06.4 ES Appendix 7.1 Summary of LDP Policies
Other
Size: 15 MB
BFC Vol 02.3 Access and Rights of Way Plans Section C
Other
Size: 9 MB
BFC Vol 02.7 132kV Overhead Line Work no.3 Profiles
Other
Size: 2 MB
BFC Vol 01.6 Glossary and Abbreviations
Other
Size: 1 MB
BFC Vol 08.1 Summary Planning Statement English
Other
Size: 2 MB
BFC Vol 01.1 Cover Letter
Other
Size: 1 MB
BFC Vol 06.2 Environmental Statement Chapter 1 Introduction
Other
Size: 8 MB
BFC Vol 08.6 Construction Environmental Management Plan
Other
Size: 41 MB
BFC Vol 06.4 ES Appendix 9.1 Effects on Landscape Elements Part 1 of 2
Other
Size: 1 MB
BFC Vol 06.2 Environmental Statement Chapter 14 Noise and Vibration
Other
Size: 29 MB
BFC Vol 06.3 Figures 01.1 to 09.4
Other
Size: 14 MB
BFC Vol 08.7 CTMP Appendix 1 PROW Management Strategy
Other
Size: 14 MB
BFC Vol 02.8 Trees and Hedges with the Potential to be Affected Section A
Other
Size: 1 MB
BFC Vol 06.2 Environmental Statement Chapter 12 Geology Hydrogeology Ground Conditions
Other
Size: 12 MB
BFC Vol 02.5 Heritage Designations Plans Section B
Other
Size: 1 MB
BFC Vol 05.3 Statement of Statutory Nuisance
Other
Size: 1 MB
BFC Vol 06.4 ES Appendix 3.1 WPD Schedule 9 Statement
Other
Size: 2 MB
BFC Vol 08.4 Lifetime Costs Report
Other
Size: 32 MB
BFC Vol 06.4 ES Appendix 12.1 Geo-Environmental Information Part 1 of 6
Other
Size: 1 MB
BFC Vol 08.1 Summary Planning Statement Welsh
Other
Size: 13 MB
BFC Vol 05.2 Flood Consequence Assessment
Other
Size: 3 MB
BFC Vol 06.2 Environmental Statement Chapter 9 Landscape and Visual Assessment
Other
Size: 1 MB
BFC Vol 08.3 Draft Section 106 Agreement
Other
Size: 29 MB
BFC Vol 06.3 Figures 09.5
Other
Size: 2 MB
BFC Vol 06.2 Environmental Statement Chapter 3 Project Alternatives
Other
Size: 5 MB
BFC Vol 06.4 ES Appendix 10.4 Dormouse Technical Report
Other
Size: 19 MB
BFC Vol 08.7 CTMP Appendix 2 Access Proformas
Other
Size: 1 MB
BFC Vol 06.2 Environmental Statement Chapter 15 Air Quality
Other
Size: 7 MB
EN020016 Late Response to Scoping Consultation
Other
Size: 11 MB
140821 EN020016 Brechfa Connection Scoping Opinion
Secretary of State's Scoping Opinion for the Brechfa Forest Connection project.
Other
Size: 1 MB
BFC 140717 - EIA Scoping Report - Welsh Summary document REVISED
Originally published on 11/7/14. Revised on 17/7/14 in response to Applicant?s notification that redline boundary on Figure 1 in the NTS was drawn too widely. Revision corrects this error. No other changes.
Other
Size: 1 MB
BFC 140711 - EIA Scoping Report - Summary document English
Summary of the Applicant's Scoping Report
Other
Size: 34 MB
BFC 140711 - EIA Scoping Report 01 - July2014
Applicant's Scoping Report
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.