You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (6)
Developer's Application (212)
- All Documents
- Application Form (6)
- Compulsory Acquisition Information (3)
- Draft Development Consent Order (3)
- Environmental Statement (99)
- Other Documents (21)
- Plans (45)
- Reports (35)
Acceptance (13)
Pre Examination (70)
- All Documents
- Additional Submissions (46)
- Certificates and Notices (1)
- Hearing Agenda (1)
- Other Documents (2)
- Preliminary Meeting part 1 (1)
- Preliminary Meeting part 2 (1)
- Procedural Deadline A (3)
- Procedural Deadline B (2)
- Procedural Decisions (4)
- Response to Documents requested in Rule 6 letter (6)
- Response to s51 advice (1)
- Unaccompanied Site Inspection (2)
Examination (576)
- All Documents
- Additional Submissions (22)
- Deadline 1 (43)
- Deadline 2 (71)
- Deadline 3 (49)
- Deadline 4 (66)
- Deadline 5 (50)
- Deadline 6 (156)
- Deadline 7 (73)
- Hearing Agenda (7)
- Notification regarding close of examination (s99) (1)
- Other Documents (7)
- Preliminary Meeting Note (1)
- Procedural Decisions (8)
- Recording of hearing (19)
- Report on the Implications for European Sites (RIES) (1)
- Unaccompanied Site Inspection (2)
Decision (113)
- All Documents
- Applicant’s response to the Secretary of State’s minded to approve letter (7)
- Development Consent Order as made (1)
- Draft Development Consent Order which the Secretary of State is minded to make (1)
- Draft Habitats Regulations Assessment (1)
- Examining Authority Recommendation Report (1)
- Habitats Regulation Assessment (1)
- Notification of Decision to Accept Application (2)
- Other Documents (2)
- Secretary of State Consultation (5)
- Secretary of State Consultation 1 (12)
- Secretary of State Consultation 2 (49)
- Secretary of State Consultation 3 (7)
- Secretary of State Consultation 4 (4)
- Secretary of State Consultation 5 (15)
- Secretary of State Consultation 6 (3)
- Secretary of State Decision letter and Statement of Reasons (approved) (1)
- Secretary of State Minded to Approve letter (1)
Decided (0)
The filtered list shows documents relating to the decision for the development consent order.
Source | Description |
---|---|
Other |
Post-examination Submissions (PDF, 726 KB)
|
Other | |
Other |
Habitats Regulation Assessment (PDF, 639 KB)
|
Other |
Notification of Decision Letter (PDF, 178 KB)
|
Other |
Post-examination Submission (PDF, 2 MB)
|
Other |
Regulation 31 Notice – Notification of Decision Letter (PDF, 119 KB)
|
Other |
Secretary of State Decision Letter (PDF, 167 KB)
|
Other |
National Grid Electricity Transmission Plc (PDF, 828 KB)
Response to the Secretary of State’s Consultation of 2 September 2022
|
Other |
Portishead Railway Group (PDF, 3 MB)
Response to the Secretary of State’s Consultation of 2 September 2022
|
Other |
The Bristol Port Company (PDF, 153 KB)
Response to the Secretary of State’s Consultation of 2 September 2022
|
Other |
Department for Transport (PDF, 160 KB)
Request for Comments from Interested Parties
|
Other |
North Somerset Council (PDF, 129 KB)
Applicant’s cover letter response to SoS letter dated 19 April 2022
|
Other |
North Somerset Council (PDF, 3 MB)
Document 4.2 Funding Statement Version 2 (Clean)
|
Other |
North Somerset Council (PDF, 2 MB)
Applicant’s (tracked change) version of the SoS modified version of the draft Development Consent Order
|
Other |
North Somerset Council (PDF, 2 MB)
Comparison version (SoS verses Master) of the draft Development Consent Order
|
Other |
North Somerset Council (PDF, 192 KB)
Applicant’s comments on the changes to the draft Development Consent Order
|
Other |
North Somerset Council (PDF, 3 MB)
Document 4.2 Funding Statement Version 2 (Tracked)
|
Other |
North Somerset Council (PDF, 928 KB)
Clean Master version of the draft Development Consent Order
|
Other |
Department for Transport (PDF, 421 KB)
Minded to Approve Letter
|
Other | |
Other |
Draft Habitats Regulations Assessment (PDF, 733 KB)
|
Other |
Recommendation Report (PDF, 7 MB)
|
Other |
North Somerset Council (PDF, 184 KB)
Applicant’s response to Mr Cash’s representation of 31st January 22, published on 10th February 22.
|
Other |
Barry Cash (PDF, 66 KB)
Response to the Secretary of State’s consultation of 28 January 2022
|
Other |
North Somerset Council (PDF, 4 MB)
Response to the Secretary of State’s consultation of 28 January 2022
|
Other |
Department for Transport (PDF, 264 KB)
Secretary of State’s further consultation letter addressed to the Applicant dated 28 January 2022
|
Other |
Babcock (PDF, 654 KB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
Cotswolds National Landscape (PDF, 119 KB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
Dave Parkinson (PDF, 96 KB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
Environment Agency (PDF, 97 KB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
Friends of Suburban Bristol Railways (PDF, 79 KB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
Historic England (PDF, 372 KB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
J K Radnedge (PDF, 31 KB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
L. Bonham (PDF, 122 KB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
North Somerset Council (PDF, 5 MB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
North Somerset Council (PDF, 202 KB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
R A & D M Hughes (PDF, 95 KB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
Roger Fox (PDF, 72 KB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
The Coal Authority (PDF, 62 KB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
UK Health Security Agency (PDF, 104 KB)
Response to the Secretary of State’s consultation of 30 November 2021
|
Other |
Department For Transport (PDF, 171 KB)
Request for information from the Applicant by 23 November 2021
|
Other |
Department for Transport (PDF, 171 KB)
Response to the Secretary of State’s consultation of 9 November 2021
|
Other |
North Somerset Council (PDF, 3 MB)
Response to the Secretary of State’s consultation of 9 November 2021
|
Other |
Portishead Busway Campaign (PDF, 873 KB)
Response to the Secretary of State’s consultation of 9 November 2021
|
Other |
Department For Transport (PDF, 133 KB)
Secretary of State's Consultation letter dated 09 November 2021
|
Other |
Environment Agency (PDF, 7 KB)
Response to the Secretary of State’s consultation letter of 21 September 2021 - Letter dated 05 October 2021
|
Other |
Exolum Pipeline System Limited (formerly CLH Pipeline System (CLH-PS) Limited) (PDF, 99 KB)
Response to the Secretary of State’s consultation letter of 21 September 2021 - Letter withdrawing the objection dated 1 October 2021
|
Other |
Luke Bonham (PDF, 121 KB)
Response to the Secretary of State’s consultation letter of 21 September 2021 – Letter to Secretary of State dated 27 September 2021
|
Other |
National Trust (PDF, 27 KB)
Response to the Secretary of State’s consultation letter of 21 September 2021 - Letter withdrawing the objection dated 1 October 2021
|
Other |
UK Health Security Agency (PDF, 36 KB)
Response to the Secretary of State’s consultation letter of 21 September 2021 – Letter to Secretary of State dated 5 October 2021
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 224 KB)
Response to the Secretary of State’s consultation letter of 21 September 2021 – Letter to Secretary of State dated 5 October 2021
|
Other |
Department For Transport (PDF, 186 KB)
Request for information from the Environment Agency and all Interested Parties by 5 October 2021
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 239 KB)
Response to the Secretary of State's letter dated 17 August 2021 - 8.1 Addendum to the Design and Access Statement - Version 1
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 446 KB)
Response to the Secretary of State's letter dated 17 August 2021 - 8.14 - Addendum to the Master Construction Environmental Management Plan - Version 1
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 146 KB)
Response to the Secretary of State's letter dated 17 August 2021 - Cover Letter
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 2 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 4.1 – Statement of Reasons (Clean) - Version 6
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 544 KB)
Response to the Secretary of State's letter dated 17 August 2021 - 9.11 – Compulsory Acquisition Schedule (Clean) - Version 7
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 1 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 3.1 Draft proposed Development Consent Order (Clean) - Version 10
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 12 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 4.3 – Book of Reference (Clean) - Version 5
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 12 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 4.3 - Book of Reference (Tracked Changes) - Version 5
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 257 KB)
Response to the Secretary of State's letter dated 17 August 2021 - 9.1 – Schedule of Changes to the draft Development Consent Order - Version 9
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 774 KB)
Response to the Secretary of State's letter dated 17 August 2021 - 9.11 – Compulsory Acquisition Schedule - Version 7 (Comparison to Version 6)
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 43 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.7 - Disused railway engineering plans / GRIP 4 Minor Civils - Part 2 of 2 - Version 3
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 659 KB)
Response to the Secretary of State's letter dated 17 August 2021 - 6.31 - Schedule of Mitigation (Clean) - Version 5
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 18 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.2 - Land Plans - Version 5
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 2 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 3.2 Explanatory Memorandum (Comparison Version 6 to Version 5) - Version 6
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 2 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.31 - Permanent Traffic Regulation Order Plans - Version 2
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 6 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.38 - Portishead Station Car Park Layout, Landscaping and New Boulevard and Access Plan - Version 3
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 19 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.3 - Works Plan - Version 7
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 8 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.36 - Cross Section Plans - Version 3
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 4 MB)
Response to the Secretary of State's letter dated 17 August 2021 - Portishead Station plans Building Design: Proposed Station Buildings; Station Co-ordination Plan; 3D views; Platform Lighting and Lighting Control Layout - Version 2
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 18 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.29 - Compound, Haul Road and Access to Works Plan - Version 5
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 33 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.34 Diversion Routes for Pedestrians and Cyclists (Part 1 of 2) - Version 2
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 681 KB)
Response to the Secretary of State's letter dated 17 August 2021 - 6.31 - Schedule of Mitigation (Tracked Changes) - Version 5
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 465 KB)
Response to the Secretary of State's letter dated 17 August 2021 - 1.4 - Guide to the Application - Version 14
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 44 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.5 - Special Category Land Plans - Version 2
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 11 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.32 - Crossings to be Extinguished Plans - Version 3
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 1 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 9.78 – Update on Utility Providers and Comments on Proposed Protective Provisions (Schedule 16 of the DCO) - Version 1
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 20 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.4 - General Arrangement Plans - Version 5
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 687 KB)
Response to the Secretary of State's letter dated 17 August 2021 - 6.25 - Environmental Statement, Volume 4, Appendix 4.3, Schedule of Mitigation (Tracked Changes) - Version 5
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 494 KB)
Response to the Secretary of State's letter dated 17 August 2021 - 8.11 - Addendum to the Planning Statement - Version 1
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 12 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.9 Longitudinal Profile of Railway Alignment (Section Plans) - Version 2
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 2 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 4.1 - Statement of Reasons Comparison - Version 6 (Comparison to Version 5)
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 419 KB)
Response to the Secretary of State's letter dated 17 August 2021 - 5.5 - Addendum to the Report to Inform Habitats Regulations Assessment - Version 1
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 11 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.35 - New Highways Plans - Version 3
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 2 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 6.25 - Complete Addendum to the Environmental Statement - Versions 2a and 2b
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 8 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.15 to 2.17 - Trinity Footbridge plans: Proposed General Arrangement Plan; Proposed Landscaping General Arrangement Plan; Electrical Layout General Arrangement - Version 2
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 420 KB)
Response to the Secretary of State's letter dated 17 August 2021 - 8.13 - Addendum to the Construction Traffic Management Plan - Version 1
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 34 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.34 Diversion Routes for Pedestrians and Cyclists (Part 2 of 2) - Version 2
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 1 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 3.2 Explanatory Memorandum (Clean) - Version 6
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 666 KB)
Response to the Secretary of State's letter dated 17 August 2021 - 6.25 - Environmental Statement, Volume 4, Appendix 4.3, Schedule of Mitigation (Clean) - Version 5
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 6 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 2.8.1 to 2.8.10 Engineering Sections Portishead Station, Portishead Station Proposed Platforms, Trinity Footbridge, S022 Quarry Underbridge 2, Mount Pleasant Embankment, Hardwick Road Cutting, Avon Road Embankment, Pill Station, Pill Station Proposed Typical Sections, Quarry Underbridge No. 2 - Version 2
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 1 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 3.1 Draft proposed Development Consent Order - Version 10
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 1 MB)
Response to the Secretary of State's letter dated 17 August 2021 - 3.1 Draft proposed Development Consent Order - Version 10 (comparison to Version 9)
|
Other |
Wedlake Bell LLP on behalf of The Bristol Port Company (PDF, 344 KB)
Response to the Secretary of State's letter dated 17 August 2021
|
Other |
Department for Transport (PDF, 171 KB)
Secretary of State's response to the Applicant's correspondence dated 16 August 2021
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 888 KB)
Response to the Secretary of State’s consultation of 13 August 2021 - Correspondence to Secretary of State dated 16 August 2021
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 344 KB)
Response to the Secretary of State’s consultation of 13 August 2021 - Letter to Secretary of State dated 26 August 2021
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council - The Applicant (PDF, 450 KB)
Response to the Secretary of State’s consultation of 13 August 2021 - 6.10 and 6.25 - Addendum to the Environmental Statement
|
Other |
Wedlake Bell LLP on behalf of The Bristol Port Company (PDF, 115 KB)
Response to the Secretary of State’s consultation of 13 August 2021 - Letter to Secretary of State dated 27 August 2021
|
Other |
Department For Transport (PDF, 157 KB)
Request for information from the Applicant and the Bristol Port Company by 27 August 2021
|
Other |
Veale Wasbrough Vizards LLP on behalf of Exolum Pipeline System Limited (formerly CLH Pipeline System (CLH-PS) (PDF, 100 KB)
Response to the Secretary of State’s consultation of 26 July 2021
|
Other |
First Corporate Shipping Limited, trading as The Bristol Port Company (PDF, 623 KB)
Response to the Secretary of State’s consultation of 26 July 2021
|
Other |
BDB Pitmans LLP on behalf of National Grid Electricity Transmission plc (‘NGET’) (PDF, 1 MB)
Response to the Secretary of State’s consultation of 26 July 2021
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant (PDF, 31 MB)
Response to the Secretary of State’s consultation of 26 July 2021 - ANNEX 1 - Letter dated 21 July 2021
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant (PDF, 616 KB)
Response to the Secretary of State’s consultation of 26 July 2021 - ANNEX 2 - Enclosure 6 shown in comparison to that enclosed with the July letter
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant (PDF, 320 KB)
Response to the Secretary of State’s consultation of 26 July 2021 - ANNEX 4 - Revised PPs shown as a comparison to NGET submitted PPs at REP4-046
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant (PDF, 188 KB)
Response to the Secretary of State’s consultation of 26 July 2021 - ANNEX 3 - Revised protective provisions which the Applicant has proposed to NGET
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant (PDF, 412 KB)
Response to the Secretary of State’s consultation of 26 July 2021 - ANNEX 5 - Updated Compulsory Acquisition Schedule
|
Other |
Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant (PDF, 122 KB)
Response to the Secretary of State’s consultation of 26 July 2021 - Letter to Secretary of State dated 9 August 2021
|
Other |
Stuart Tarr on behalf of Ham Green Residents and their Supporters (PDF, 175 KB)
Response to the Secretary of State’s consultation of 26 July 2021
|
Other |
Osborne Clarke LLP on behalf of Western Power Distribution (South West) PLC (WPD) (PDF, 139 KB)
Response to the Secretary of State’s consultation of 26 July 2021
|
Other |
Department for Transport (PDF, 177 KB)
Request for information from the Applicant and the Interested parties by 9 August 2021
|