Documents Published By Stage

Pre Application (7)

Developer's Application (149)

Acceptance (10)

Pre Examination (14)

Examination (758)

Decision (0)

Decided (0)

Date

SourceDescription
Other
Size: 118 KB
Kent and Essex Inshore Fisheries and Conservation Authority (KEIFCA)
Response to Rule 6 - Additional Submission Accepted at the discretion of the Examining Authority
Other
Size: 797 KB
Examination Library
Other
Size: 65 KB
Note from Unaccompanied Site Inspection – 15 April 2019
Other
Size: 99 KB
Notification of completion of the Examining Authority's Examination
Other
Size: 72 KB
Vattenfall Wind Power Limited
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 50 KB
The Crown Estate
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 137 KB
Declined Request for Procedural Decision or Recommendation on Pilotage Simulation
Other
Size: 177 KB
Trinity House
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 992 KB
Marine Management Organisation
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 268 KB
Natural England
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 923 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Appendix 5 to Deadline 8 Submission: Applicant’s Response to Interested Parties Deadline 7 Submissions – Shipping and Navigation
Other
Size: 962 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Appendix 8 to Deadline 8 Submission: Explanatory Memorandum
Other
Size: 465 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Appendix 2 to Deadline 8: Applicant’s final position on matters outstanding
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 8 Submission - Appendix 10 to Deadline 8 Submission: Offshore Works Plan
Other
Size: 189 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Annex A to Appendix 2 to Deadline 8 Submission: Final position on the Environmental Statement topics and other matters
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 8 Submission - Annex A to Appendix 7 to Deadline 8 Submission: SI Template Validation Report
Other
Size: 885 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Annex A to Appendix 8 to Deadline 8 Submission: Log of Changes to the draft Development Consent Order
Other
Size: 796 KB
Vattenfall Wind Power Limited
Deadline 8 Submission: Annex A to Appendix 12 to Deadline 8 Submission: Norfolk Vanguard MMO Position Paper on Arbitration
Other
Size: 694 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Annex B to Appendix 8 to Deadline 8 Submission: Explanatory Memorandum – Tracked Changes
Other
Size: 3 MB
Vattenfall Wind Power Limited
Deadline 8 Submission - Appendix 11 to Deadline 8 Submission: Statement of Common Ground - RiverOak Strategic Partners Limited (RSP)
Other
Size: 56 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Cover letter. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 565 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Annex B to Appendix 5 to Deadline 7 Submission: Response on policy matters in relation to shipping and navigation
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 8 Submission - Annex A to Appendix 5 to Deadline 8 Submission: Busiest day animation - pilotage
Other
Size: 939 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Annex D to Appendix 8 of Deadline 8 Submission – Offshore Project Description Assessed in the Environmental Statement
Other
Size: 468 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Appendix 7 to Deadline 8 Submission: Response to Deadline 7 submissions on Fish Ecology
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 8 Submission - Annex C to Appendix 8 to Deadline 8 Submission: Revised Draft Development Consent Order - Tracked Changes
Other
Size: 417 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Appendix 12 to Deadline 8 Submission: Applicant's Final position on Arbitration
Other
Size: 275 KB
Maritime and Coastguard Agency
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 6 MB
Vattenfall Wind Power Limited
Deadline 8 Submission - Appendix 9 to Deadline 8 Submission: MCZ Assessment Audit
Other
Size: 475 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Annex B to Appendix 2 to Deadline 8 Submission: Final Position Statement: draft Development Consent Order
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 8 Submission - Appendix 1 to Deadline 8 Submission: Guide to the Application
Other
Size: 296 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Appendix 4 to Deadline 8 Submission: Applicant’s Response to Natural England’s Deadline 7 Submissions
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 8 Submission - Appendix 7 to Deadline 8 Submission: Revised Draft Development Consent Order
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 8 Submission - Annex C to Appendix 5 to Deadline 8 Submission: Accompanying Figure
Other
Size: 845 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Annex E to Appendix 8 to Deadline 8 Submission: Plan of Plans. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 547 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Annex F to Appendix 8 to Deadline 8 Submission: Applicant’s response to ExA’s further requests for information under EPR Rule 17 – 4.1.5
Other
Size: 401 KB
Vattenfall Wind Power Limited
Deadline 8 Submission - Appendix 6 to Deadline 8 Submission: Legal Response to IP Representations
Other
Size: 156 KB
Nemo Link Limited
Withdrawal of representation. Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 44 KB
National Grid
Deadline 6A Submission - Responses to the ExA’s Further requests for information under EPR Rule 17. Withdrawal of representation. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 91 KB
Southern Water
Withdrawal of representation. Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 2 MB
UK Power Networks
Withdrawal of representation. Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 191 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 9 to Deadline 7 Submission: Planning Act 2008 s.135 Crown Land and Consent
Other
Size: 316 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 24 to Deadline 7 Submission: Statement of Common Ground – Chamber of Shipping-
Other
Size: 59 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Cover Letter
Other
Size: 554 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 28 to Deadline 7 Submission: Applicant’s commentary on responses to the ExA’s further requests for information under EPR Rule 17
Other
Size: 282 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 27 to Deadline 7 Submission: Shipping and Navigation: Schedule of Mitigation
Other
Size: 377 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 7 to Deadline 7 Submission: Requests for Statements of Common Ground and Statement of Commonality
Other
Size: 239 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 21 to Deadline 7 Submission: Requests for Statements of Common Ground and Statement of Commonality – Shipping and Navigation
Other
Size: 797 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 6 to Deadline 7 Submission: Explanatory Memorandum
Other
Size: 651 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 8 to Deadline 7 Submission: Schedule of Mitigation
Other
Size: 964 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 1 to Deadline 7 Submission: Guide to the Application
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 7 Submission - Annex C to Appendix 6 to Deadline 7 Submission: Revised Draft Development Consent Order Tracked Changes
Other
Size: 626 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Annex B to Appendix 6 to Deadline 7 Submission: Explanatory Memorandum – Tracked Changes
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 2 to Deadline 7 Submission: Applicant's Response to Deadline 6 Interested Parties Submissions - Shipping and Navigation
Other
Size: 794 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Annex D to Appendix 6 of Deadline 7 Submission – Offshore Project Description Assessed in the Environmental Statement
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 7 Submission - Annex A to Appendix 5 to Deadline 7 Submission: SI Template Validation Report
Other
Size: 736 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 3 to Deadline 7 Submission: Responses to IP Comments on the ExA's DCO Commentary
Other
Size: 413 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 4 to Deadline 7 Submission: Applicant's Response to Deadline 6 Interested Parties Submissions – Other Matters
Other
Size: 510 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Annex B to Appendix 2 to Deadline 7 Submission: Email Correspondence
Other
Size: 410 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Annex A to Appendix 2 to Deadline 7 Submission: Collation of responses to Interested Parties on submissions relating to the navigational simulation
Other
Size: 422 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Annex E to Appendix 6 to Deadline 7 Submission: Applicant’s response to ExA’s further requests for information under EPR Rule 17 – 4.1.5
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 5 to Deadline 7 Submission: Revised Draft Development Consent Order - Revision H
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 7 Submission - Annex A to Appendix 6 to Deadline 7 Submission: Log of Changes to the draft Development Consent Orde
Other
Size: 227 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 20 to Deadline 7 Submission: Statement of Common Ground - Thanet Fishermen’s Association
Other
Size: 181 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 14 to Deadline 7 Submission: ExQ 1.3.8 Statutory Undertakers Apparatus table
Other
Size: 200 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 12 to Deadline 7 Submission: Commercial Agreements Update Table
Other
Size: 202 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 11 to Deadline 7 Submission Landowner Agreements Update Table
Other
Size: 613 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 18 to Deadline 7 Submission: Statement of Common Ground – Port of London Authority
Other
Size: 545 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Annex A to Appendix 8 to Deadline 7 Submission: Schedule of Mitigation (Tracked changes since Deadline 3)
Other
Size: 835 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 17 to Deadline 7 Submission: Statement of Reasons - Revision B
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 16 to Deadline 7 Submission: Applicant’s position on Shipping and Navigation Future Baseline
Other
Size: 202 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 15 to Deadline 7 Submission: Outline Shipping and Navigation Liaison Plan
Other
Size: 184 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 10 to Deadline 7 Submission: List of All Objections to the Grant of Compulsory Acquisition and Temporary Possession Powers (ExQ 1.3.6)
Other
Size: 185 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 13 to Deadline 7 Submission: ExQ 1.3.7 Statutory Undertakers Land Rights table
Other
Size: 259 KB
Maritime and Coastguard Agency
Deadline 7 Submission - Cover letter, Responses to the ExA’s Further requests for information under EPR Rule 17 and Response to comments on the ExA's dDCO Commentary
Other
Size: 235 KB
Natural England
Deadline 7 Submission - Response to the Applicant's comments on RIES
Other
Size: 177 KB
Natural England
Deadline 7 Submission - Deadline 7 Submission - Comments on responses to the Examining Authority's Further Written Questions (ExQ3)
Other
Size: 149 KB
Trinity House
Deadline 7 Submission - Deadline 7 Submission - Cover letter and Comments on the Applicant’s Draft Development Consent Order (dDCO) Revision F
Other
Size: 9 MB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 19 to Deadline 7 Submission: Statement of Common Ground – Estuary Services Limited (Signed). Late Submission accepted at the discretion of the Examining Authority
Other
Size: 151 KB
Trinity House
Deadline 7 Submission - Deadline 7 Submission - Counsel's Opinion (Rebecca Clutten FTB) on the Applicant’s Draft Development Consent Order (dDCO) Revision F (arbitration and saving provision for THLS)
Other
Size: 227 KB
Port of London Authority and Estuary Services Limited
Deadline 7 Submission - Response to the Applicant's Deadline 6 submissions, Comments on responses to the Examining Authority's Further Written Questions (ExQ3), Response to Deadline 5 Submission by Interested Parties, Response to ISH8 Hearing Action Point 20 requested for Deadline 7, Response to comments on the Examining Authority's dDCO Commentary
Other
Size: 613 KB
Port of London Authority
Deadline 7 Submission - Draft Statement of Common Ground
Other
Size: 172 KB
Natural England
Deadline 7 Submission - Comments on Responses to the ExA’s Further requests for information under EPR Rule 17
Other
Size: 353 KB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 19 to Deadline 7 Submission: Statement of Common Ground – Estuary Services Limited
Other
Size: 1 MB
Marine Management Organisation
Deadline 7 Submission - Comments on responses to the Examining Authority's Further Written Questions (ExQ3), Responses to the ExA’s Further requests for information under EPR Rule 17 and Comments on the Applicant’s Draft Development Consent Order (dDCO) Revision F
Other
Size: 353 KB
Estuary Services Limited
Deadline 7 Submission - Draft Statement of Common Ground
Other
Size: 8 MB
Vattenfall Wind Power Limited
Deadline 7 Submission - Appendix 18 to Deadline 7 Submission: Statement of Common Ground – Port of London Authority (Signed). Late Submission accepted at the discretion of the Examining Authority
Other
Size: 437 KB
Port of Tilbury London Limited and London Gateway Port Limited
Deadline 7 Submission - Response to the Applicant's Deadline 6 submissions, Comments on Responses to the ExA’s Further requests for information under EPR Rule 17, Comments on responses to the Examining Authority's DCO commentary and final overall submissions and closing remarks
Other
Size: 440 KB
Natural England
Deadline 7 Submission - Response to comments on the Examining Authority's dDCO Commentary
Other
Size: 223 KB
Natural England
Deadline 7 Submission - Cover letter and comments on documents submitted by the applicant at Deadline 6 and in the period leading up to Deadline 7
Other
Size: 254 KB
Vattenfall Wind Power Limited
Deadline 6A Submission - Appendix 4 to Deadline 6A Submission: Applicant's Responses to Qs 35 to 41 of the Examining Authority's commentary on the draft DCO. This document should be read in conjunction with REP6-034. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 21 KB
Vattenfall Wind Power Limited
Deadline 6A Submission - Late Deadline 6A Cover Letter. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 476 KB
Vattenfall Wind Power Limited
Deadline 6A Submission - Appendix 3 to Deadline 6A Submission: Cefas 2009 strategic study - Rationale for the removal of the Thanet Offshore Wind Farm seasonal restriction. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 55 KB
The Crown Estate
Deadline 6A Submission - Responses to the ExA’s Further requests for information under EPR Rule 17
Other
Size: 298 KB
Vattenfall Wind Power Limited
Deadline 6A Submission - Annex B to Appendix 1 to Deadline 6A Submission: Applicant’s response to ExA’s further requests for information under EPR Rule 17 – 4.1.5
Other
Size: 732 KB
Vattenfall Wind Power Limited
Deadline 6A Submission - Annex A to Appendix 2 to Deadline 6A Submission: Schedule of Mitigation (tracked changes)
Other
Size: 526 KB
Vattenfall Wind Power Limited
Deadline 6A Submission - Appendix 2 to Deadline 6A Submission: Schedule of Mitigation
Other
Size: 50 KB
Vattenfall Wind Power Limited
Deadline 6A Submission - Cover Letter
Other
Size: 174 KB
Vattenfall Wind Power Limited
Deadline 6A Submission - Annex A to Appendix 1 to Deadline 6A Submission: Applicant’s response to ExA’s further requests for information under EPR Rule 17 – 4.12.7
Other
Size: 254 KB
Maritime and Coastguard Agency
Deadline 6A Submission - Responses to the ExA’s Further requests for information under EPR Rule 17 
Other
Size: 672 KB
Trinity House
Deadline 6A Submission - Responses to the ExA’s Further requests for information under EPR Rule 17 
Other
Size: 253 KB
Marine Management Organisation
Deadline 6A Submission - Responses to the ExA’s Further requests for information under EPR Rule 17 
Other
Size: 439 KB
Vattenfall Wind Power Limited
Deadline 6A Submission - Appendix 1 to Deadline 6A Submission: Applicant’s Responses to the ExA’s further requests for information under EPR Rule 17
Other
Size: 265 KB
Pinsent Masons LLP on behalf of Port of Tilbury London Limited and London Gateway Port Limited
Deadline 6A Submission - Responses to the ExA’s Further requests for information under EPR Rule 17
Other
Size: 435 KB
Winckworth Sherwood LLP on behalf of Port of London Authority and Estuary Services Limited
Deadline 6A Submission - Responses to the Examining Authority's Further requests for information under EPR Rule 17
Other
Size: 86 KB
Natural England
Deadline 6A Submission - Responses to the ExA’s Further requests for information under EPR Rule 17 
Other
Size: 90 KB
Examining Authority
National Federation of Fishermen's Organisations Other Person’s Status
Other
Size: 137 KB
Kent County Council
Deadline 6 Submission - Response to ExA’s Further Written Questions (ExQ3)
Other
Size: 382 KB
Estuary Services Limited
Deadline 6 Submission - Comments on Statement of Common Ground (SoCG)
Other
Size: 804 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 50: Explanatory Memorandum. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 752 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 27: Response to Deadline 5 Submissions by Interested Parties
Other
Size: 316 KB
Natural England
Deadline 6 Submission - Comments on Applicant's submissions received by Deadline 5, Comments on the RIES and Comments on the Examining Authority's dDCO Commentary
Other
Size: 292 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 14: Statement of Common Ground – Natural England Offshore Ornithology
Other
Size: 197 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex C to Appendix 28: SEZ Material Change. List of consultees and consultation tracker
Other
Size: 529 KB
Vattenfall Wind Power Limited
Deadline 6 Submission -Appendix 11: Statement of Common Ground – Marine Management Organisation
Other
Size: 6 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 41: AIS Animations Note. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 119 KB
Port of London Authority and Estuary Services Limited
Deadline 6 Submission - Comments on the Applicant’s responses to ISH8 action points
Other
Size: 294 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex C to Appendix 22: Supplementary Note to ExAQ3.12.34
Other
Size: 380 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex A to Appendix 26: Summary Response to Deadline 5 Shipping and Navigation Submissions
Other
Size: 258 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 4: Statement of Common Ground – Chamber of Shipping
Other
Size: 426 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 32: Commercial Agreements Table
Other
Size: 450 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 12: Statement of Common Ground – Maritime & Coastguard Agency 
Other
Size: 458 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 9: Statement of Common Ground – Kent Wildlife Trust
Other
Size: 280 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 31: Landowner Update Table
Other
Size: 411 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 34: ExQ 1.3.8: PA2008 s138 Statutory Undertakers Apparatus etc
Other
Size: 184 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 19: Statement of Common Ground – RiverOak Strategic Partners Limited (RSP)
Other
Size: 571 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex B to Appendix 50: Explanatory Memorandum (Tracked changes). Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 190 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex A to Appendix 15: Responses to Natural England Residual Goodwin Sands pMCZ comments
Other
Size: 996 KB
Trinity House
Deadline 6 Submission - Response to ExA’s Further Written Questions (ExQ3) and Comments on the Examining Authority's dDCO Commentary
Other
Size: 231 KB
Maritime and Coastguard Agency
Deadline 6 Submission - Response to ExA’s Further Written Questions (ExQ3) and Comments on the Examining Authority's dDCO Commentary
Other
Size: 308 KB
Environment Agency
Deadline 6 Submission - Comments on the Examining Authority's dDCO Commentary
Other
Size: 972 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex B to Appendix 28: Copy of the consultation notification email sent to consultees
Other
Size: 138 KB
Kent Wildlife Trust
Deadline 6 Submission - Comments on D5 submissions on the SEZ Material Change application
Other
Size: 180 KB
Historic England
Deadline 6 Submission - Response to ExA’s Further Written Questions (ExQ3)
Other
Size: 945 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex A to Appendix 11: MMO's tracker of consultation between the parties
Other
Size: 633 KB
Vattenfall Wind Power Limited
Deadline 6 submission - Appendix 26: Response to Deadline 5 Submissions by Interested Parties - Shipping and Navigation. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 305 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 39: CAH2 - Status of National Trust agreement on Compulsory Acquisition. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 850 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 23: Applicant’s Comments on Responses to the Examining Authority’s Second Written Questions – EXQ2
Other
Size: 153 KB
Natural England
Deadline 6 Submission - Response to ExA’s Further Written Questions (ExQ3)
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex B to Annex 41: Busiest day - all vessels. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 76 KB
National Trust
Deadline 6 Submission - Response to CAH2 Hearing Action Point requested for Deadline 6
Other
Size: 843 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 1: Guide to the Application. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 180 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Cover letter. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 287 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 30: List of All Objections to the Grant of Compulsory Acquisition or Temporary Possession Powers (ExQ1 1.3.6)
Other
Size: 303 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 17: Statement of Common Ground – Port of London Authority
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 6 Submission -Appendix 13: Statement of Common Ground – National Trust
Other
Size: 302 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 5: Statement of Common Ground – Estuary Services Limited
Other
Size: 199 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex A to Appendix 28: Copy of the consultation notification letter sent to consultees
Other
Size: 367 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 44: Applicant's response to commentary of dDCO from Interested Parties. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 960 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex A to Appendix 50: DCO changes log. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 92 KB
Marine Management Organisation
Deadline 6 Submission - Original Piling Restrictions in respect of Thanet OFW
Other
Size: 176 KB
Historic England
Deadline 6 Submission - Comments on the Examining Authority's dDCO Commentary
Other
Size: 3 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 42: Thanet Offshore Wind Farm Collision Assessment of Proposed Extension. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 108 KB
Port of London Authority and Estuary Services Limited
Deadline 6 Submission - Comments on Structures Exclusion Zone Consented Works Clarification Note
Other
Size: 407 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex A to Appendix 24: Email correspondence between the Applicant and THE Centre for Effective Dispute Resolution
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 22: Responses to ExA’s Further Written Questions (ExQ3)
Other
Size: 25 KB
NATS
Deadline 6 Submission - Comments on D5 submissions on the SEZ Material Change application
Other
Size: 282 KB
Natural England
Deadline 6 Submission - Comments on responses to the ExA’s Further Written Questions (ExQ2)
Other
Size: 343 KB
Port of London Authority
Deadline 6 Submission - Comments on Statement of Common Ground (SoCG)
Other
Size: 298 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 3: Requests for Statements of Common Ground and Statement of Commonality - Non-Shipping and Navigation
Other
Size: 283 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 2: Requests for Statements of Common Ground and Statement of Commonality - Shipping and Navigation
Other
Size: 877 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 47: Statement of Common Ground – Ramac. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 969 KB
London Gateway Port Limited
Deadline 6 Submission - Signed Statement of Common Ground (SoCG)
Other
Size: 228 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 25: Applicant’s Comments on the Report on the Implications for European Sites (RIES)
Other
Size: 870 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 28: SEZ Material Change Consultation Report
Other
Size: 3 MB
Charles Russell Speechlys on behalf of RAMAC Holding Limited
Deadline 6 Submission - Comments on Applicant's submissions received by Deadline 5
Other
Size: 97 KB
Dover District Council
Deadline 6 Submission - Comments on the Examining Authority's dDCO Commentary
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 51: ISH7 - Action Point 13 - Grid Coordinate audit. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 324 KB
Vattenfall Wind Power Limited
Deadline 6 Submission -Annex B to Appendix 24: Email correspondence between the Applicant and Thanet District Council
Other
Size: 88 KB
Thanet Fishermens Association
Deadline 6 Submission - Response to ExA’s Further Written Questions (ExQ3)
Other
Size: 343 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 21: Statement of Common Ground – Trinity House Lighthouse Service (TH)
Other
Size: 233 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex A to Appendix 27: Response to MMO D5a submission on seasonal restriction
Other
Size: 485 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 38: ISH 8: ExQ Action Point 20: Pilot Transfer Bridge Simulation Study Specification. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 8 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex D to Appendix 28: Copies of responses receive from consultees
Other
Size: 286 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 29: Planning Act 2008 s.135 Crown Land and Consent
Other
Size: 140 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 35: CAH Hearing 1 Action - Evidence of the need for retention of all three route options in relation to work no.16
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 6 Submission -Annex C to Appendix 50: Revised Draft Development Consent Order - Tracked . Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 294 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex A to Appendix 23: The Crown Estate Letter
Other
Size: 326 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 8: Statement of Common Ground – Kent County Council
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex A to Appendix 22: Supporting figures for the Applicant's response to ExA's Further Written Questions (ExQ3)
Other
Size: 776 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex B to Appendix 15: Responses to Natural England on the potential sand wave clearance and displacement of material from Goodwin Sands pMCZ
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 49: Revised Draft Development Consent Order. Late Submission accepted at the discretion of the Examining Authority. The Applicant has advised the Planning Inspectorate some formatting – specifically the number alignment – in this non-tracked changes version of the DCO (Appendix 49) is incorrect. The content within the document is correct. The formatting is correct in the track changes version (Annex C of Appendix 50). Readers wishing to see the content in the correct format are referred to Annex C of Appendix 50. Appendix 49 will be replaced with a correctly formatted version at Deadline 7.
Other
Size: 399 KB
Port of London Authority and Estuary Services Limited
Deadline 6 Submission - Response to ExA’s Further Written Questions (ExQ3)
Other
Size: 101 KB
Port of London Authority and Estuary Services Limited
Deadline 6 Submission - Comments in relation to submissions of the London Pilot’s Council
Other
Size: 797 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex B to Appendix 22: PLA published risk assessment template
Other
Size: 1 MB
Port of Tilbury London Limited
Deadline 6 Submission - Signed Statement of Common Ground (SoCG)
Other
Size: 544 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 52: Schedule of Mitigation. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 314 KB
Port of Tilbury London Limited and London Gateway Port Limited
Deadline 6 Submission - Comments on Applicant's submissions received by Deadline 5, Response to ExA’s Further Written Questions (ExQ3), response to ISH8 action points, Comments on the Examining Authority's dDCO Commentary
Other
Size: 647 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 24: Applicant's comments on the ExA’s preferred dDCO or dDCO commentary. This document should be read in conjunction with REP6A-015
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex E to Appendix 26: Supporting figures for the Applicant's Response to Deadline 5 Shipping and Navigation Submissions
Other
Size: 300 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 43: Applicant's Response to Natural England’s responses to ISH8 Action Points and the Applicant's Deadline 5 Submissions on HRA matters (offshore ornithology and marine mammals). Late Submission accepted at the discretion of the Examining Authority
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 58: Outline Site Integrity Plan (Check Name). Late Submission accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex E to Appendix 22: Supporting figure for the Applicant's response to ExQ3 3.10.4
Other
Size: 814 KB
Port of London Authority and Estuary Services Limited
Deadline 6 Submission - Comments on D5 submissions on the SEZ Material Change application
Other
Size: 720 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 56: Onshore WSI. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 238 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 16: Statement of Common Ground – Natural England - Project Description, Site Selection and Alternatives; and Saltmarsh
Other
Size: 267 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 7: Statement of Common Ground – Kent & Essex Inshore Fisheries Conservation Authority
Other
Size: 341 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 33: ExQ 1.3.7: PA2008 s127 Statutory Undertakers Land/ Rights
Other
Size: 321 KB
Vattenfall Wind Power Limited
Deadline 6 Submission – Annex C to Appendix 26: Shipping commercial assessment (correction from the originally submitted title of Appendix 16 Annex C)
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex C to Appendix 41: Adverse metocean conditions and restricted ESL pilotage operations. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 105 KB
Port of London Authority and Estuary Services Limited
Deadline 6 Submission - Comments on the Examining Authority's dDCO Commentary
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex E to Appendix 28: Applicant’s Response to Port of London Authority and Estuary Services Ltd Consultation Response.
Other
Size: 289 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 6: Statement of Common Ground – Historic England
Other
Size: 741 KB
Marine Management Organisation
Deadline 6 Submission - Response to ExA’s Further Written Questions (ExQ3), Comments on the Examining Authority's dDCO Commentary, Comments on the Applicant’s Draft Development Consent Order (dDCO) Revision E and Comments on D5 submissions on the SEZ Material Change application
Other
Size: 223 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 20: Statement of Common Ground - Thanet Fishermen’s Association
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex A to Appendix 41: Busiest day animation - vessels over 90 m
Other
Size: 290 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 18: Statement of Common Ground – Port of Tilbury and London Gateway
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 15: Statement of Common Ground – Natural England Technical Topics (excluding Offshore Ornithology, Saltmarsh, and Site Selection)
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Appendix 36: Fisheries Liaison Co-existence Plan. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 365 KB
Port of Sheerness Ltd
Deadline 6 Submission - Response to ExA’s Further Written Questions (ExQ3)
Other
Size: 459 KB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex D to Appendix 22: ESL Service Restrictions
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 6 Submission - Annex B to Appendix 26: Applicant’s Response to HR Wallingford’s Final Report
Other
Size: 607 KB
Vattenfall Wind Power Limited
Deadline 6 Submission -Annex D to Appendix 50: Offshore Project Description Assessed in the Environmental Statement. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 88 KB
Port of London Authority and Estuary Services Limited
Deadline 6 Submission - Response to action point 20 from ISH8 requested for Deadline 6
Other
Size: 252 KB
Natural England
Deadline 6 Submission - Comments on the Examining Authority's dDCO Commentary
Other
Size: 208 KB
Request for Further Information - Rule 17
Other
Size: 87 KB
National Federation of Fishermen's Organisations
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 768 KB
National Grid Electricity Transmission Plc
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 84 KB
The Crown Estate
Response to Examining Authority's Further Written Questions (ExQ2) Question ExQ2.3.4 - Late Submission accepted at the discretion of the Examining Authority
Other
Size: 602 KB
Examining Authority’s Further Written Questions 3
Other
Size: 78 KB
Steve Willey - SWE on behalf of Mario Campion
Additional Submission - Request to become an Interested Party: received on the 1 May 2019
Other
Size: 681 KB
Report on the Implications for European Sites (RIES)
Issued by the Examining Authority on 14 May 2019
Other
Size: 308 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 39 - Statement of Common Ground - Natural England - Offshore Ornithology - Late Submission accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 38 - Statement of Common Ground - Natural England Technical Topics (excluding Offshore Ornithology, Saltmarsh, and Site Selection) - Late Submission accepted at the discretion of the Examining Authority
Other
Size: 262 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Updated Appendix 37 - Statement of Common Ground - Natural England Project Description, Site Selection and Alternatives; and Saltmarsh - Late Submission accepted at the discretion of the Examining Authority
Other
Size: 364 KB
Examining Authority
Commentary on the draft Development Consent Order (dDCO)
Other
Size: 188 KB
Natural England
Deadline 5A Submission - Comments on any revised dDCO submitted by the Applicant at Deadline 5
Other
Size: 328 KB
Marine Management Organisation
Deadline 5A Submission - Comments on any revised dDCO submitted by the Applicant at Deadline 5
Other
Size: 120 KB
Port of Tilbury London Limited and London Gateway Port Limited
Deadline 5A Submission - Comments on any revised dDCO submitted by the Applicant at Deadline 5
Other
Size: 313 KB
Maritime and Coastguard Agency
Deadline 5A Submission - Comments on any revised dDCO submitted by the Applicant at Deadline 5
Other
Size: 179 KB
Trinity House
Deadline 5A Submission - Comments on any revised dDCO submitted by the Applicant at Deadline 5
Other
Size: 188 KB
Port of London Authority and Estuary Services Limited
Deadline 5A Submission - Comments on any revised dDCO submitted by the Applicant at Deadline 5
Other
Size: 379 KB
Southern Water
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 367 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 36 to Deadline 5 Submission: Statement of Common Ground - Kent County Council
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 16 to Deadline 5 Submission :Response to LPC Deadline 4C Submission
Other
Size: 51 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - The Applicant's response to Deadline 5 Cover Letter
Other
Size: 739 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 29 to Deadline 5 Submission: Guide to the Application
Other
Size: 531 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 34 to Deadline 5 Submission: Statement of Common Ground - Marine Management Organisation
Other
Size: 5 MB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 32 to Deadline 5 Submission: SAC and MCZ Clarification Note and Annexes
Other
Size: 412 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 24 to Deadline 5 Submission: Commercial Agreements Update Table
Other
Size: 645 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 18 to Deadline 5 submission: Requests for Statements of Common Ground and Statement of Commonality
Other
Size: 455 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Annex D to Appendix 31 to Deadline 5 Submission - Offshore Project Description Assessed in the Environmental Statement
Other
Size: 426 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 25 to Deadline 5 Submission: ExQ 1.3.7: PA2008 s127 Statutory Undertakers Land/Rights
Other
Size: 557 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Annex F appendix 28 to Deadline 5 Submission: Revised NRA Addendum Hazard Logs
Other
Size: 184 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 20 to Deadline 5 Submission: Written Summary of Vattenfall's Oral Case put at the Issue Specific Hearing 8 for commercial Fishing and Fisheries
Other
Size: 10 MB
Vattenfall Wind Power Limited
Deadline 5 Submission- Appendix 28 to Deadline 5 Submission: Addendum to Navigation Risk Assessment
Other
Size: 875 KB
Vattenfall Wind Power Limited
Deadline 5 Submission- Annex C to Appendix 31 to Deadline 5 Submission: Revised Draft Development Consent Order -Tracked Changes
Other
Size: 380 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 14 to Deadline 5 Submission: Written Summary of Vattenfall's Oral Case put at the Compulsory Acquisition Hearing 2
Other
Size: 402 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 21 to Deadline 5 Submission: ExQ 1.3.5: Planning Act 2008 s.135 Crown Land and Consent
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 5 Submission - Annex B to Appendix 7 to Deadline 5 Submission: Marine Spatial Planning document
Other
Size: 420 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 22 to Deadline 5 Submission: List of All Objections to the Grant of Compulsory Acquisition or Temporary Possession Powers (ExQ1 1.3.6)
Other
Size: 837 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 13 to Deadline 5 Submission: Revised Draft Development Consent Order
Other
Size: 379 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 23 to Deadline 5 Submission: Landowner Update Table
Other
Size: 250 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 19 to Deadline 5 Submission: Written Summary of Vattenfall's Oral Case put at the Issue Specific Hearing 8 - Biodiversity, Ecology and Natural Environment Considerations
Other
Size: 3 MB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 7 to Deadline 5 Submission: Response to ExA Action points arising from Issue Specific Hearing 8 - Shipping and Navigation
Other
Size: 193 KB
Maritime and Coastguard Agency
Deadline 5 Submission - Response to action points requested by the Examining Authority for ISH 8
Other
Size: 520 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 1 to Deadline 5 Submission: Applicant’s Responses to the Examining Authority’s Second Written Questions – EXQ2
Other
Size: 143 KB
Port of London Authority and Estuary Services Limited
Deadline 5 Submission - Post hearing submissions including written submissions of oral case for ISH 8
Other
Size: 473 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Annex A to Appendix 3 to Deadline 5 Submission: Applicant's response to Natural England's Representation
Other
Size: 526 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Annex A to Appendix 31 to Deadline 5 Submission: Log of Changes to the draft Development Consent Order
Other
Size: 228 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 33 to Deadline 5 Submission : Statement of Common Ground - Kent & Essex Inshore Fisheries Conservation Authority
Other
Size: 392 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 26 to Deadline 5 Submission: ExQ 1.3.8: PA2008 s138 Statutory Undertakers Apparatus etc.
Other
Size: 10 MB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 17 to Deadline 5 Submission: SEZ Material Change Consultation Pack - Part 3
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 17 to Deadline 5 Submission: SEZ Material Change Consultation Pack - Part 4
Other
Size: 465 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 12 to deadline 5 Submission: Written Summary of Vattenfall's Oral Case put at the ISH8 - Shipping and Navigation
Other
Size: 10 MB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 17 to Deadline 5 Submission: SEZ Material Change Consultation Pack - Part 2
Other
Size: 903 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Annex A to Appendix 8 to Deadline 5 Submission: Applicants Response to ISH8 Action Points 1 (b), 3 (d) and 9 (b)
Other
Size: 406 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 35 to Deadline 5 Submission : Statement of Common Ground - Historic England
Other
Size: 385 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Annex B to Appendix 31 to Deadline 5 Submission: Explanatory Memorandum - Tracked Changes
Other
Size: 374 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 31 to Deadline 5 Submission: Explanatory Memorandum
Other
Size: 262 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 37 to Deadline 5 Submission: Statement of Common Ground - Natural England Project Description , Site Selection and Alternatives; and Saltmarsh
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 5 to Deadline 5 Submission : Design and Access Statement
Other
Size: 458 KB
Trinity House
Deadline 5 Submission - Post hearing submissions including written submissions of oral case for ISH 9. Response to action points requested by the Examining Authority for ISH 9 and comments on revised draft Development Consent Order Revision E (tracked) submitted for Deadline 4b
Other
Size: 223 KB
Natural England
Deadline 5 Submission - Response to ExA’s Further Written Questions (ExQ2)
Other
Size: 107 KB
The Crown Estate
Deadline 5 Submission - Response to ExA’s Further Written Questions (ExQ2)
Other
Size: 228 KB
Environment Agency
Deadline 5 Submission - Response to ExA’s Further Written Questions (ExQ2)
Other
Size: 8 MB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 27 to Deadline 5 Submission: Sand Wave Clearance, Dredging and Drill Arising: Disposal Site Characterisation
Other
Size: 10 MB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 17 to Deadline 5 Submission: SEZ Material Change Consultation Pack - Part 1
Other
Size: 496 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Annex A to Appendix 15 to Deadline 5 Submission: Submissions made in the examination proceedings of Norfolk Vanguard and Hornsea Project Three, in relation to arbitration
Other
Size: 489 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Annex B to Appendix 15 to Deadline 5 Submission: Counsel's written opinion, in relation to arbitration
Other
Size: 3 MB
Vattenfall Wind Power Limited
Deadline 5 Submission - Annex B to Appendix 1 to Deadline 5 Submission: Applicant's response to ExQ2 2.3.3
Other
Size: 333 KB
Natural England
Deadline 5 Submission - Response to action points requested by the Examining Authority for ISH 8
Other
Size: 681 KB
Thanet Fishermens Association
Deadline 5 Submission - Response to action points requested by the Examining Authority for ISH 8
Other
Size: 197 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 6 to Deadline 5 Submission : Schedule of Monitoring
Other
Size: 290 KB
Natural England
Deadline 5 Submission - Response to submissions received at deadline 4, 4b and 4c and comments on revised draft Development Consent Order Revision E submitted for Deadline 4
Other
Size: 278 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 15 to Deadline 5 Submission: Written Summary of Vattenfall's Oral Case put at the Issue Specific Hearing 9
Other
Size: 196 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 10 to Deadline 5 submission: Response to ExA Action Points arising from Compulsory Acquisition Hearing No2
Other
Size: 555 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 3 to Deadline 5 Submission: Schedule of Mitigation
Other
Size: 451 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Annex A to Appendix 7 to Deadline 5 Submission: Response to ISH8 Action Point 16: Thanet Extension Structures Exclusion Zone Consented Works Clarification Note
Other
Size: 367 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 8 to Deadline 5 Submission: Response to ExA Action points arising from Issue Specific Hearing 8 - Natural Environment and Commercial Fishing
Other
Size: 504 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Annex C to Appendix 1 to Deadline 5 Submission: Plan as requested in ExQ 2.3.6
Other
Size: 229 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Annex A to Appendix 1 to Deadline 5 Submission: Response to ExAQ2.1.8a
Other
Size: 931 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 2 to Deadline 5 Submission: Onshore Archaeology - Outline Written Scheme of Investigation
Other
Size: 26 MB
Port of Tilbury London Limited and London Gateway Port Limited
Deadline 5 Submission - Post hearing submissions including written submissions of oral case for ISH 8. Response to action points requested by the Examining Authority for ISH 8. Response to submissions received at deadline 4, 4b and 4c
Other
Size: 683 KB
Vattenfall Wind Power Limited
Deadline 5 Submission - Appendix 4 to Deadline 5 Submission: HSE Guidelines (1999)
Other
Size: 114 KB
Port of London Authority and Estuary Services Limited
Deadline 5 Submission - Response to action points requested by the Examining Authority for ISH 8
Other
Size: 699 KB
Marine Management Organisation
Deadline 5 Submission - Response to submissions received at deadline 4, 4b and 4c. Comments on revised draft Development Consent Order Revision E submitted for Deadline 4. Response to action points requested by the Examining Authority for ISH 8 and ISH9 and response to ExA’s Further Written Questions (ExQ2)
Other
Size: 425 KB
Trinity House
Deadline 5 Submission - Response to action points requested by the Examining Authority for ISH 8
Other
Size: 91 KB
Port of London Authority and Estuary Services Limited
Deadline 5 Submission - Response to submissions received at deadline 4, 4b and 4c and comments on SEZ Material Change Consultation
Other
Size: 138 KB
Port of London Authority and Estuary Services Limited
Deadline 5 Submission - Post hearing submissions including written submissions of oral case for ISH 9 and comments on revised draft Development Consent Order Revision E submitted for Deadline 4
Other
Size: 436 KB
Dover District Council
Deadline 5 Submission - Response to ExA’s Further Written Questions (ExQ2)
Other
Size: 429 KB
Dover District Council
Deadline 5 Submission - Response to action points requested by the Examining Authority for ISH 8
Other
Size: 6 MB
London Pilots Council
Deadline 5 Submission - Response to action points requested by the Examining Authority for ISH 8
Other
Size: 71 KB
The Crown Estate
Deadline 5 Submission - Response to action points requested by the Examining Authority for ISH 8
Other
Size: 480 KB
Kent County Council
Deadline 5 Submission - Response to ExA’s Further Written Questions (ExQ2)
Other
Size: 1 MB
Charles Russell Speechlys on behalf of RAMAC Holding Limited
Deadline 5 Submission - Post hearing submissions including written submissions of oral case for CAH2 and response to ExA’s Further Written Questions (ExQ2)
Other
Size: 629 KB
Historic England
Deadline 5 Submission - Response to ExA’s Further Written Questions (ExQ2) and comments on revised draft Development Consent Order Revision C submitted for deadline 2
Other
Size: 80 KB
Vattenfall Wind Power Limited
Additional Submission accepted at the discretion of the Examining Authority - Consultation on a material change to the Thanet Extension Offshore Wind Farm
Other
Size: 108 KB
Action Points requested by the Examining Authority arising from ISH8 2 of 2
Actions relating to Shipping and Navigation matters
Other
audio recording
Size: 85 MB
Recording of Issue Specific Hearing 8 (session 2) - Part 3 of 5 - 17 April 2019
Other
audio recording
Size: 49 MB
Recording of Compulsory Acquisition Hearing 2 (CAH2) - Part 2 of 2 - 18 April 2019
Other
audio recording
Size: 61 MB
Recording of Issue Specific Hearing 8 (session 1) - Part 4 of 5 - 16 April 2019
Other
audio recording
Size: 47 MB
Recording of Issue Specific Hearing 8 (session 1) - Part 5 of 5 - 16 April 2019
Other
audio recording
Size: 75 MB
Recording of Issue Specific Hearing 8 (session 2) - Part 4 of 5 - 17 April 2019
Other
audio recording
Size: 92 MB
Recording of Issue Specific Hearing 8 (session 1) - Part 3 of 5 - 16 April 2019
Other
audio recording
Size: 66 MB
Recording of Issue Specific Hearing 8 (session 2) - Part 2 of 5 - 17 April 2019
Other
audio recording
Size: 110 MB
Recording of Issue Specific Hearing 9 (ISH9) - 18 April 2019
Other
audio recording
Size: 52 MB
Recording of Issue Specific Hearing 8 (session 2) - Part 5 of 5 - 17 April 2019
Other
audio recording
Size: 48 MB
Recording of Issue Specific Hearing 8 (session 1) - Part 1 of 5 - 16 April 2019
Other
audio recording
Size: 49 MB
Recording of Compulsory Acquisition Hearing 2 (CAH2)- Part 1 of 2 - 18 April 2019
Other
audio recording
Size: 49 MB
Recording of Issue Specific Hearing 8 (session 2) - Part 1 of 5 - 17 April 2019
Other
audio recording
Size: 108 MB
Recording of Issue Specific Hearing 8 (session 1) - Part 2 of 5 - 16 April 2019
Other
Size: 95 KB
Action Points requested by the Examining Authority arising from CAH2
Other
Size: 75 KB
Action Points requested by the Examining Authority arising from ISH9
Other
Size: 162 KB
Action Points requested by the Examining Authority arising from ISH8 2 of 2
Actions relating to Shipping and Navigation matters
Other
Size: 146 KB
Action Points requested by the Examining Authority arising from ISH8 1 of 2
Natural Environment and Fishing matters
Other
Size: 431 KB
Examining Authority’s Further Written Questions 2 (Amended)
EXQ2 Amended numbering
Other
Size: 652 KB
Vattenfall Wind Power Limited
Deadline 4C Submission - Appendix 8: Guide to the Application
Other
Size: 374 KB
Vattenfall Wind Power Limited
Deadline 4C Submission - Appendix 5: Response to Deadline 4 Submissions by Interested Parties
Other
Size: 61 KB
Vattenfall Wind Power Limited
Deadline 4C Submission - Cover Letter
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 4C Submission - Appendix 7: Fish Clarification Note
Other
Size: 257 KB
Vattenfall Wind Power Limited
Deadline 4C Submission - Annex A to Appendix 7: Herring and sole spawning potential calculations 
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 4C Submission - Annex A to Appendix 2: Shipping and Navigation – Statement of Evidence Accompanying Figures
Other
Size: 5 MB
Vattenfall Wind Power Limited
Deadline 4C Submission - Appendix 3: Thanet Offshore Wind Farm: A Post-Construction Monitoring Survey of Benthic Resources
Other
Size: 491 KB
Vattenfall Wind Power Limited
Deadline 4C Submission - Appendix 2: Shipping and Navigation - Statement of Evidence
Other
Size: 450 KB
Vattenfall Wind Power Limited
Deadline 4C Submission - Appendix 4:PD Audit - Offshore Project Description Assessed in the Environmental Statement
Other
Size: 347 KB
Vattenfall Wind Power Limited
Deadline 4C Submission - Appendix 6: Statement of Common Ground – Natural England - Offshore ornithology
Other
Size: 163 KB
Vattenfall Wind Power Limited
Deadline 4C Submission - Appendix 1: Interested Parties identified for consultation on the Structure Exclusion Zone
Other
Size: 5 MB
Port of London Authority and Estuary Services Limited
Deadline 4C Submission - Written Representation
Other
Size: 350 KB
Marine Management Organisation
Deadline 4C Submission - Notification of requested attendees at ISH8 and ISH9
Other
Size: 309 KB
Trinity House
Deadline 4C Submission - Written Representation
Other
Size: 133 KB
UK Chamber of Shipping
Deadline 4C Submission - Written Representation
Other
Size: 302 KB
Maritime & Coastal Agency
Deadline 4C Submission - SEZ ExA
Other
Size: 5 MB
London Pilot Council
Deadline 4C Submission - Written Representation
Other
Size: 5 MB
Port of Tilbury London Limited and London Gateway Port Limited
Deadline 4C Submission - Appendix 1 HRW Report
Other
Size: 217 KB
Trinity House
Deadline 4C Submission - Notification of requested attendees at ISH8 and ISH9
Other
N/A
Vattenfall Wind Power Limited
Annex A1 to Appendix 3 - Implications of the SEZ – Seascape, Landscape and Visual Effects - Wirelines. Late Submission accepted at the discretion of the Examining Authority
Other
N/A
Vattenfall Wind Power Limited
Annex A to Appendix 3: Implications of the SEZ – Seascape, Landscape and Visual Effects. Late Submission accepted at the discretion of the Examining Authority.
Other
N/A
Examining Authoritys Further Written Questions 2
Superseded by Examining Authority’s Further Written Questions 2 (Amended)
Other
Size: 130 KB
Hearing Agendas for April 2019
Other
Size: 47 KB
Issue Specific Hearing 9 - Thursday 18 April 2019
Thanet Offshore Wind Farm Extension Agenda for Issue Specific Hearing 9
Other
Size: 49 KB
Compulsory Acquisition Hearing 2 - Thursday 18 April 2019
Thanet Offshore Wind Farm Extension Agenda for the Compulsory Acquisition Hearing 2
Other
Size: 98 KB
Issue Specific Hearing 8 - Tuesday 16 and Wednesday 17 April 2019
Thanet Offshore Wind Farm Extension Agenda for ISH8: Environmental, Maritime, Fishing and other matters
Other
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 4B Submission - Annex A to Appendix 4: The consequences of the SEZ on assessment of the Outer Thames Estuary and Flamborough and Filey Coast SPAs (as submitted in Deadline 4). Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 3 MB
Vattenfall Wind Power Limited
Deadline 4B Submission - Annex B to Appendix 1: PLA NRA narrative and matrix. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 275 KB
Vattenfall Wind Power Limited
Deadline 4B Submission - Annex C to Appendix 1: Hazard workshop minutes as agreed by Trinity/MCA/Simon Moore. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 637 KB
Vattenfall Wind Power Limited
Deadline 4B Submission - Appendix 4:Addendum to the Report to Inform Appropriate Assessment. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 4B Submission - Annex F to Appendix 1: Hazard Logs. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 637 KB
Vattenfall Wind Power Limited
Deadline 4B Submission - Appendix 8: Guide to the Application. Late Submission accepted at the discretion of the Examining Authority.
Other
N/A
Vattenfall Wind Power Limited
Superseded by Annex A to Appendix 3: Implications of the SEZ – Seascape, Landscape and Visual Effects. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 10 MB
Vattenfall Wind Power Limited
Deadline 4B Submission - Annex A to Appendix 1: Addendum to Navigation Risk Assessment. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 4B Submission - Annex A to Appendix 1:IALA MSP guidance. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 589 KB
Vattenfall Wind Power Limited
Deadline 4B Submission - Appendix 3: An addendum to the Environmental Statement (ES) assessing the SEZ proposal. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 259 KB
Vattenfall Wind Power Limited
Deadline 4B Submission - Appendix 2: Review of Application Documents with regards to the Structures Exclusion Zone. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 3 MB
Vattenfall Wind Power Limited
Deadline 4B Submission - Annex D to Appendix 1: Hazard Information Pack. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 4B Submission - Appendix 9: Revised Draft Development Consent Order - Tracked Changes. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 4B Submission - Appendix 5: Crown Land Plan. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 338 KB
Vattenfall Wind Power Limited
Deadline 4B Submission - Annex E to Appendix 1: Pilotage class as provided by LPC. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 446 KB
Vattenfall Wind Power Limited
Deadline 4B Submission - Annex B to Appendix 3: Structure Exclusion Zone, Onshore Heritage. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 4B Submission - Annex C to Appendix 3: Assessment of the implications of the implementation of the Structures Exclusion Zone in relation to commercial fisheries . Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 888 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 7: Radar Line of Sight Coverage Plan. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 34 KB
Vattenfall Wind Power Limited
Deadline 4B Submission - Cover Letter. Late Submission accepted at the discretion of the Examining Authority.
Other
N/A
Vattenfall Wind Power Limited
Superseded by Deadline 4B Submission: Annex A1 to Appendix 1: Implications of the SEZ – Seascape, Landscape and Visual Effects – Wirelines. Late Submission accepted at the discretion of the Examining Authority
Other
Size: 888 KB
Vattenfall Wind Power Limited
Deadline 4B Submission - Appendix 6: Extinguishment of Public Rights of Way Navigation Plan. Late Submission accepted at the discretion of the Examining Authority.
Other
N/A
Other
Size: 5 MB
Vattenfall Wind Power Limited
Deadline 4 Submission – Outline Navigational Risk Assessment Addendum and Hazard Logs. Late Submission accepted at the discretion of the Examining Authority.
Other
Size: 3 MB
Accompanied Site Inspection 2: The Thames Port – Final Itinerary
Final Itinerary for ASI2
Other
Size: 66 KB
Ian Hide
Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 15: Sandwave Clearance, Dredge and Disposal Site Characterisation
Other
Size: 319 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 19: The consequences of the SEZ on assessment of Red-throated Diver interest feature of OTE SPA alone and in-combination
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 20: MCZ Assessment Clarification Note
Other
Size: 320 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 9: ExQ 1.3.6 - List of all Objections to the Grant of Compulsory Acquisition of Temporary Possession Powers
Other
Size: 577 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 3: Response to Deadline 3 Submissions by Interested Parties.
Other
Size: 290 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 5: Responses to comments on Shipping Policy Considerations
Other
Size: 674 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Annex A to Appendix 7: DCO Changes Log
Other
Size: 943 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 18: Draft Site Integrity Plan
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 21: Reef Biogenic Mitigation Plan
Other
Size: 534 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 13: ExQ 1.3.8 - Planning Act 2008 s.138 Statutory Undertakers Apparatus etc.
Other
Size: 6 MB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 17: Offshore Archaeology - Draft Written Scheme of Investigation
Other
Size: 356 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 22: Outline Offshore Operation and Maintenance Plan
Other
Size: 323 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 11: Commercial Agreements Update Tables
Other
Size: 177 KB
Port of Tilbury London Limited and London Gateway Port Limited
Deadline 4 Submission Comments on submissions received by Deadline 3 including Action Points from ISH5
Other
Size: 453 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 7: Explanatory Memorandum
Other
Size: 541 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 1: Guide to the Application
Other
Size: 3 MB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 14: Structures Exclusion Zone
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 2: Draft Development Consent Order
Other
Size: 287 KB
Natural England
Deadline 4 Submission - Comments on submissions received by Deadline 3
Other
Size: 878 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 6: Onshore Archaeology: Draft Written Scheme of Investigation
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 16: Saltmarsh Mitigation, Reinstatement and Monitoring Plan
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 27: Data Analysis and Validation Paper
Other
Size: 177 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Cover letter
Other
Size: 5 MB
Port of London Authority and Estuary Services Limited
Deadline 4 Submission - Comments on submissions received by Deadline 3 including Action Points from ISH5 and ISH6
Other
Size: 691 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 23: Review of the Environment Statement and Report to Inform Appropriate Assessment in relation to the Structure Exclusion Zone
Other
Size: 414 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 4: Response to Deadline 3 Submissions by Interested Parties - Shipping and Navigation
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 24: Offshore Works Plan
Other
Size: 386 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 25: Offshore Ornithology In-combination Effects Position Paper on Kittiwake and the FCC SPA
Other
Size: 550 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 8: ExQ 1.3.5 - Planning Act 2008 s.135 Crown Land and Consent
Other
Size: 362 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 10: Landowner Update Table
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 4 Submission - Annex A to Appendix 2: Draft Development Consent Order (Tracked Changes)
Other
Size: 376 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Appendix 12: ExQ 1.3.7 - Planning Act 2008 s.127 Statutory Undertakers Land Rights
Other
Size: 516 KB
Vattenfall Wind Power Limited
Deadline 4 Submission - Annex B to Appendix 7: Explanatory Memorandum - Tracked Changes
Other
Size: 470 KB
Marine Management Organisation
Deadline 4 Submission - Comments on submissions received by Deadline 3 including a summary of issues that remain outstanding and comments on the Applicant’s draft Development Consent Order Revision C
Other
Size: 97 KB
Note from Unaccompanied Site Inspection - 18 March 2019
Other
Size: 207 KB
Notification of Procedural Decision - Rule 9
Other
Size: 133 KB
BritNed Development Ltd
Statement of Submission: received on the 11 March 2019
Other
Size: 144 KB
Natural England
Update following Deadline 3 in Respect of the HRA.. Late submission accepted at the discretion of the Examining Authority
Other
Size: 402 KB
Vattenfall Wind Power Limited
Deadline 3 Submission – Appendix 19: Statement of Common Ground – Dover District Council. Late submission accepted at the discretion of the Examining Authority
Other
Size: 223 KB
The Crown Estate
Post Compulsory Acquisition Hearing 1 (CAH1- 21 February 2019) Submission Of Oral Case. Late submission accepted at the discretion of the Examining Authority
Other
Size: 132 KB
Notification of Accompanied Site Inspection 2: The Thames Ports
Other
Size: 153 KB
Port of London Authority and Estuary Services Limited
Deadline 3 Submission - Response to action points requested by the Examining Authority for ISH 5
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 41 : Fisheries Liaison and Co-Existence Plan
Other
Size: 758 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Annex B to Appendix 2: Kentish Flats Extensions SLVIA Documents
Other
Size: 413 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 8 : Response to Deadline 2 submissions by Shipping Interested Parties
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Annex C to Appendix 2: Offshore Wind Farm Envelope Layout Examples
Other
Size: 641 KB
Trinity House
Deadline 3 Submission - Post hearing submissions including written submissions of oral case for ISH 7 and response to action points requested by the Examining Authority
Other
Size: 31 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 14.6: Figures and Photo Montages – Figures 14.10a to 14.11d
Other
Size: 420 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 13: Written Summary of Oral Case put at the Issue Specific Hearing 7
Other
Size: 328 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 9 : Written Summary of Vattenfall’s Oral Case put at the Issue Specific Hearing 3 and Annexes
Other
Size: 528 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 23 : Statement of Common Ground – Marine Management
Other
Size: 319 KB
Natural England
Deadline 3 Submission - Response to action points requested by the Examining Authority for ISH 3 and clarification of position in relation to SoCG
Other
Size: 30 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 14.6: Figures and Photo Montages - Figures 14.1 to 14.6b
Other
Size: 233 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 38 : In Principle Offshore Ornithology Monitoring Plan
Other
Size: 244 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 2 : Response to ExA Action Points arising from Issue Specific Hearing 4
Other
Size: 570 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 44 : Landowner Update Table
Other
Size: 33 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Cover Letter
Other
Size: 27 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 14.6: Figures and Photo Montages – Figures 14.20b to 14.22d
Other
Size: 318 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 11: Written Summary of Oral Case put at the Issue Specific Hearing 5
Other
Size: 658 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 4 : Response to ExA Action Points arising from Issue Specific Hearing 6
Other
Size: 311 KB
Natural England
Deadline 3 submission - Comments on Clarification Notes Submitted at Deadline 1 and 2
Other
Size: 383 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 31: Ministry of Defence Letter
Other
Size: 262 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 10: Written Summary of Vattenfall’s Oral Case put at the Issue Specific Hearing 4
Other
Size: 471 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 30: Statement of Common Ground – Thanet District Council
Other
Size: 31 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 14.6 : Figures and Photo Montages – Figures 14.6c to 14.7c
Other
Size: 820 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 32 : Schedule of Mitigation
Other
Size: 269 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 24 : Statement of Common Ground – National Trust
Other
Size: 912 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 37 : Onshore Archaeology - Outline Written Scheme of Investigation
Other
Size: 473 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 22 : Statement of Common Ground – Kent Wildlife Trust
Other
Size: 752 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 36:Environmental Statement Addendum, Onshore Heritage
Other
Size: 946 KB
Port of Tilbury London Limited and London Gateway Port Limited
Deadline 3 Submission - Post hearing submissions including written submissions of oral case for ISH 5 and response to action points requested by the Examining Authority, matters outstanding from Deadline 1, comments on Deadline 2 submissions, arrangements for ASI2 and Planning Policy Position Paper
Other
Size: 590 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 46 : ExQ 1.3.7 - PA2008 s127 Statutory Undertakers Land/ Rights
Other
Size: 194 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 40 :Outline Shipping and Navigation Liaison Plan
Other
Size: 221 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 21 : Statement of Common Ground – Kent & Essex Inshore Fisheries Conservation Authority
Other
Size: 216 KB
Historic England
Deadline 3 Submission - Response to action points requested by the Examining Authority for ISH 4 and comments on revised dDCO submitted at Deadline 2
Other
Size: 463 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 18: Statement of Common Ground – Environment Agency
Other
Size: 793 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 33 : Revised Draft Development Consent Order
Other
Size: 1,018 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Annex A to Appendix 2: ZTV and Wireframe Visualisations - Calais Dover Ferry Route
Other
Size: 194 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 48 : ISH3 Action Point 13 - Schedule of Monitoring
Other
Size: 350 KB
Marine Management Organisation
Deadline 3 Submission - Post hearing submissions including written submissions of oral case for ISH 3 and ISH 7, response to action points (ISH 3) requested by the Examining Authority and Comments on the Site Integrity Plan (SIP) submitted by the applicant at Deadline 2
Other
Size: 783 KB
Port of London Authority and Estuary Services Limited
Deadline 3 Submission - Comments on Appendix 4 and 5 to Applicant’s Deadline 2 Submission - Pilotage and Navigation Risk Assessment Methodology and Consultation. Late submission accepted at the discretion of the Examining Authority
Other
Size: 242 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Annex A to Appendix 11: Written summary, Issue Specific Hearing 5, Agenda item 8 Aviation
Other
Size: 606 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 42 : ExQ 1.3.5 - Planning Act 2008 s.135 Crown Land and Consent
Other
Size: 495 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 47 : ExQ 1.3.8 - PA2008 s138 Statutory Undertakers Apparatus etc.
Other
Size: 121 KB
London Pilots Council
Deadline 3 Submission - Response to action points requested by the Examining Authority for ISH 5
Other
Size: 223 KB
Port of London Authority and Estuary Services Limited
Deadline 3 Submissions - Comments on Appendix 3 to Applicant’s Deadline 2 Submission: Applicant’s Response to Written Representations on the theme of Ports/Shipping Routes
Other
Size: 389 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Annex B to Appendix 34 : Explanatory Memorandum – Tracked Changes
Other
Size: 871 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Annex C to Appendix 33 : Revised Draft Development Consent Order- Tracked Changes
Other
Size: 205 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 12: Written Summary of Oral Case put at the Issue Specific Hearing 6
Other
Size: 653 KB
Kent Wildlife Trust
Deadline 3 Submission - Post hearing submissions including written submissions of oral case for ISH 3 and response to action points requested by the Examining Authority
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 14 : Written Summary of the Applicant's Oral Case put at Compulsory Acquisition Hearing 1
Other
Size: 35 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 14.6: Figures and Photo Montages – Figures 14.11e to 14.15a
Other
Size: 93 KB
Natural England
Deadline 3 submission - An email from the Environment Agency supporting Natural England's comments on the latest revision of the Saltmarsh Mitigation, Monitoring and Reinstatement Plan
Other
Size: 360 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 34 : Explanatory Memorandum
Other
Size: 855 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 3 : Response to ExA Action Points arising from Issue Specific Hearing 5
Other
Size: 601 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Annex A to Appendix 1: Revised Project Description Transcription note
Other
Size: 248 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 27 : Statement of Common Ground – Natural England Project Description, Site Selection and Alternatives; and Saltmarsh
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 5 : Funding Statement
Other
Size: 32 KB
National Trust
Deadline 3 Submission - Post hearing submissions including written submissions of oral case for ISH 3 and response to action points requested by the Examining Authority
Other
Size: 5 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 6 : Report Addressing Oral Submissions by Ramac Holdings Ltd. at Compulsory Acquisition Hearing 1 in relation to the Size of the Proposed Substation and the Substation Site Selection Process
Other
Size: 768 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Annex B to Appendix 1: MCZ Chart illustrating Goodwin Sands with relevant projects
Other
Size: 307 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 16 : Requests for Statements of Common Ground and Statement of Commonality
Other
Size: 30 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 14.6: Figures and Photo Montages – Figures 14.15b to 14.17e
Other
Size: 417 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Annex C to Appendix 34: Offshore Project Description Assessed in the Environmental Statement
Other
Size: 274 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 25 : Statement of Common Ground – Natural England Offshore Ornithology
Other
Size: 559 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 43 : ExQ 1.3.6 - List of all objections to the Grant of Compulsory Acquisition or Temporary Possession Powers
Other
Size: 230 KB
Environment Agency
Deadline 3 Submission - Written Response
Other
Size: 32 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 14.6: Figures and Photo Montages – Figures 14.17f to 14.20a
Other
Size: 389 KB
Thanet Fishermen's Association
Deadline 3 Submission - Post hearing submissions including written submissions of oral case for ISH 6 and response to action points requested by the Examining Authority
Other
Size: 33 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 14.6 : Figures and Photo Montages – Figures 14.22e to 14.30
Other
Size: 591 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 26 : Statement of Common Ground – Natural England Technical Topics (excluding Offshore Ornithology, Saltmarsh, and Site Selection)
Other
Size: 553 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 24 : Guide to the Application
Other
Size: 13 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 14.6 : Figures and Photo Montages – Figures 14.38 to 14.41
Other
Size: 16 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 14.6: Figures and Photo Montages – Figures 14.31 to 14.37
Other
Size: 104 KB
Trinity House
Deadline 3 Submission - Request to speak at Issue Specific Hearing 8 and 9.
Other
Size: 105 KB
Trinity House
Deadline 3 Submission - Post hearing submissions including written submissions of oral case for ISH 5 and response to action points requested by the Examining Authority
Other
Size: 12 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 14.6: Figures and Photo Montages – Figures 14.42 to 14.45
Other
Size: 449 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 28 : Statement of Common Ground – Royal Yachting Association
Other
Size: 226 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 15: Response to Deadline 2 submissions by Interested Parties
Other
Size: 613 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 45: Commercial Agreements Update Table
Other
Size: 195 KB
Ministry of Defence
Deadline 3 Submission - Response to action points requested by the Examining Authority
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 7: Submission of International Maritime Organisation (IMO) Formal Safety Assessment (FSA) guidance
Other
Size: 283 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 39 : Clarification Note on Collision Risk Modelling Parameters and Thanet Extension’s Contribution to Cumulative and In-Combination Totals
Other
Size: 316 KB
Vattenfall Wind Power Limited
Deadline3 Submission - Appendix 1: Response to ExA Action Points arising from Issue Specific Hearing 3
Other
Size: 278 KB
Vattenfall Wind Power Limited
Deadline 3 Submission - Annex A to Appendix 34 : Log of Changes to the Draft Development Consent Order
Other
Size: 2 MB
Maritime & Coastguard Agency
Deadline 3 Submission - Response to action points requested by the Examining Authority for ISH 5
Other
Size: 32 MB
Vattenfall Wind Power Limited
Deadline 3 Submission - Appendix 14.6: Figures and Photo Montages – Figures 14.7d to 14.9e
Other
Size: 280 KB
Rule 8(3) Variation to timetable and Rule 13 Notification of Hearings
Notification of Issue Specific and Compulsory Acquisition Hearings in April 2019
Other
Size: 1 MB
Vattenfall Wind Power Limited
Applicant’s Response to S51 advice – Doc.2.12 Crown Land Plan. Revised Application Document. Accepted at the discretion of the Examining Authority
Other
Size: 133 KB
Vattenfall Wind Power Limited
Applicant's Response to S51 advice - Cover letter
Other
Size: 3 MB
Vattenfall Wind Power Limited
Applicant's Response to S51 advice - Doc.2.3 Land Plan (Offshore). Revised Application Document. . Accepted at the discretion of the Examining Authority
Other
Size: 118 KB
Preliminary Meeting Note
Other
audio recording
Size: 98 MB
Recording of Issue Specific Hearing 7 (ISH7) – Part 2 – 21 February 2019
Other
N/A
Note from Unaccompanied Site Inspection - 18 Feb 2019
Other
audio recording
Size: 131 MB
Recording of Compulsory Acquisition Hearing (CAH1) 22 February 2019
Other
audio recording
Size: 83 MB
Recording of Issue Specific Hearing 7 (ISH7) – Part 1 – 21 February 2019
Other
audio recording
Size: 81 MB
Recording of Issue Specific Hearing 5 (ISH5) – Part 3 – 20 February 2019
Other
audio recording
Size: 67 MB
Recording of Issue Specific Hearing 5 (ISH5) – Part 4 – 20 February 2019
Other
Size: 122 KB
Action Points requested by the Examining Authority arising from ISH7
Other
audio recording
Size: 52 MB
Recording of Issue Specific Hearing 6 (ISH6) – Part 2 – 20 February 2019
Other
audio recording
Size: 73 MB
Recording of Issue Specific Hearing 6 (ISH6) – Part 1 – 20 February 2019
Other
Size: 73 KB
Action Points requested by the Examining Authority arising from ISH6
Other
Size: 82 KB
Action Points requested by the Examining Authority arising from ISH4
Other
Size: 107 KB
Action Points requested by the Examining Authority arising from ISH3
Other
Size: 90 KB
Action Points requested by the Examining Authority arising from ISH5
Other
Size: 80 KB
Action Points requested by the Examining Authority arising from CAH1
Other
audio recording
Size: 25 MB
Recording of Issue Specific Hearing 4 (ISH4) – Part 2 – 19 February 2019
Other
audio recording
Size: 63 MB
Recording of Issue Specific Hearing 4 (ISH4) – Part 1 – 19 February 2019
Other
audio recording
Size: 66 MB
Recording of Issue Specific Hearing 5 (ISH5) – Part 2 - 20 February 2019
Other
audio recording
Size: 75 MB
Recording of Issue Specific Hearing 3 (ISH3) – Part 2 – 19 February 2019
Recording of Issue Specific Hearing 3 (ISH3) – Part 2 – 19 February 2019
Other
audio recording
Size: 74 MB
Recording of Issue Specific Hearing 3 (ISH3) – Part 1 – 19 February 2019
Other
audio recording
Size: 29 MB
Recording of Issue Specific Hearing 3 (ISH3) – Part 3 – 19 February 2019
Other
audio recording
Size: 10 MB
Recording of Open Floor Hearing (OFH1) – 19 February 2019
Other
audio recording
Size: 98 MB
Recording of Issue Specific Hearing 5 (ISH5) – Part 1 - 20 February 2019
Other
Size: 106 KB
Royal Society for the Protection of Birds (RSPB)
Deadline 1 Submission - Late submission accepted at the discretion of the Examination Authority discretion
Other
Size: 120 KB
Kent County Council
Update on Works in Pegwell Bay Country Park – Additional submission. Accepted at the discretion of the Examining Authority
Other
Size: 83 KB
Environment Agency
Additional Submission – Accepted at the discretion of the Examining Authority
Other
Size: 170 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Requirements Needing Approval by Authorities
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 2 Submission - HRA Matrices
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 2 Submission - Applicant's Comments on Responses to the Examining Authority's First Written Questions - EXQ1
Other
Size: 408 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - MCZ Assessment Clarification Note
Other
Size: 44 KB
Sunk User Group
Deadline 2 Submission - Comments on responses to Relevant Representations
Other
Size: 231 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Commercial Agreements Update Table
Other
Size: 120 KB
Port of London Authority and Estuary Services Limited
Deadline 2 Submission - Comments on responses to the ExQ1
Other
Size: 74 KB
National Trust
Deadline 2 Submission - Comments on additional submission received at Deadline 1
Other
Size: 213 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - ExQ 1.3.8 - PA 2008 S138 Statutory Undertakers Apparatus etc
Other
Size: 246 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Landowner Update Table
Other
Size: 260 KB
Marine Management Organisation
Deadline 2 Submission - Comments on additional submission received at Deadline 1
Other
Size: 6 MB
Vattenfall Wind Power Limited
Deadline 2 Submission - Revised Application Document. Doc 2.3 Land Plans (Onshore) – Revision D
Other
Size: 3 MB
Vattenfall Wind Power Limited
Deadline 2 Submission - Applicant's Response to Written Representation - Pilotage
Other
Size: 155 KB
Maritime and Coastguard Agency
Deadline 2 Submission - Comments on responses to Relevant Representations, Comments on responses to ExQ1, Comments on responses to action points requested by the ExA arising from ISH2, Comments on additional submission received at Deadline 1 and late response to Deadline 1 ExQ1 1.12.10
Other
Size: 9 MB
Vattenfall Wind Power Limited
Deadline 2 Submission - Offshore Archaeology Draft Written Scheme of Investigation
Other
Size: 216 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Applicant's Response to Written Representation - Navigation Risk Assessment Methodology and Consultation
Other
Size: 454 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Log of Changes to the Draft Development Consent Order
Other
Size: 4 MB
Vattenfall Wind Power Limited
Deadline 2 Submission - Report to Inform Appropriate Assessment - Part 2 of 2
Other
Size: 316 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Comments on Interested Party Responses to ExA Action Points arising from Issue Specific Hearing 2 - Shipping and Navigation
Other
Size: 205 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Applicant's Response to Kent County Council Local Impact Report
Other
Size: 371 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Applicant's Response to Thanet District Council's Local Impact Report
Other
Size: 230 KB
Port of London Authority
Deadline 2 Submission - Comments on Statement of Common Ground submitted at Deadline 1
Other
Size: 228 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - ExQ 1.3.6 - List of all Objections to the Grant of Compulsory Acquisition or Temporary Possession Powers
Other
Size: 504 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Applicant's Response to ISH2 Action Point 8 - Amendments to the Red Line Boundary proposed by Interested Parties
Other
Size: 453 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Tabular Responses to Shipping and Navigation Written Representation
Other
Size: 836 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Book of Reference (Parts 1-5)
Other
Size: 1 MB
Natural England
Deadline 2 Submission - Comments on responses to the ExQ1
Other
Size: 228 KB
Estuary Services Limited
Deadline 2 Submission - Comments on Statement of Common Ground submitted at Deadline 1
Other
Size: 148 KB
Trinity House
Deadline 2 Submission - Comments on responses to the ExQ1
Other
Size: 245 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - ExQ 1.3.7 - PA2008 s127 Statutory Undertakers Land/Rights
Other
Size: 709 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Statement of Reasons
Other
Size: 381 KB
Kent Wildlife Trust
Deadline 2 Submission - Comments on responses to the ExQ1
Other
Size: 7 MB
Vattenfall Wind Power Limited
Deadline 2 Submission - Report to Inform Appropriate Assessment - Part 1 of 2
Other
Size: 433 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Guide to the Application
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 2 Submission - Applicant's Responses to Written Representations
Other
Size: 116 KB
Thanet Fishermens Association
Deadline 2 Submission - Comments on Statement of Submission and Comments on responses to Relevant Representations
Other
Size: 363 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - MGN 543 Check List
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 2 Submission - Applicant's Response to Written Representations on the theme of Ports/Shipping Routes
Other
Size: 146 KB
Port of London Authority and Estuary Services Limited
Deadline 2 Submission - Comments on responses to action points requested by the ExA arising from ISH2
Other
Size: 482 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Explanatory Memorandum
Other
Size: 919 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Draft Site Integrity Plan
Other
Size: 300 KB
Port of Tilbury London Limited and London Gateway Port Limited
Deadline 2 Submission - Comments on Written Representations, Comments on responses to action points requested by the ExA arising from ISH2, Comments on responses to the ExQ1 and Comments on Statement of Common Ground submitted at Deadline 1
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 2 Submission - Saltmarsh Mitigation , Reinstatement and Monitoring Plan
Other
Size: 225 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - ExQ 1.3.5 - Planning Act 2008 s.135 Crown Land and Consent
Other
Size: 838 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Book of Reference (Parts 1-5) Tracked changes since Deadline 1
Other
Size: 999 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Revised Draft Development Consent Order - Tracked Changes
Other
Size: 297 KB
Natural England
Deadline 2 Submission - Comments on Written Representations
Other
Size: 931 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Revised Draft Development Consent Order
Other
Size: 334 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Review of the Environment Statement following the removal of the Option 2 landfall design
Other
Size: 281 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Applicant's Response to Dover District Council's Local Impact Report
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 2 Submission - Special Category Land Plans
Other
Size: 36 KB
Vattenfall Wind Power Limited
Deadline 2 Submission - Submission Letter - The Applicant's Response to Deadline 2, Submissions requested by the ExA and additional documents
Other
Size: 177 KB
Hearing Agendas and Accompanied Site Inspection Itinerary for February 2019
Other
Size: 39 KB
Issue Specific Hearing 4 - Tuesday 19 February 2019
Hearing Agenda for ISH4 on Landscape and Visual, Seascape and Historic Environment Issues
Other
Size: 45 KB
Issue Specific Hearing 3 - Tuesday 19 February 2019
Hearing Agenda for ISH3 on Environmental matters, Ecology, HRA, physical, construction and other matters
Other
Size: 49 KB
Issue Specific Hearing 6 - Wednesday 20 February 2019
Hearing Agenda for ISH6 on Fishing and Fisheries
Other
Size: 32 KB
Open Floor Hearing 1 - Tuesday 19 February 2019
Hearing Agenda for Open Floor Hearing 1
Other
Size: 68 KB
Issue Specific Hearing 5 - Wednesday 20 February 2019
Hearing Agenda for ISH5 on Maritime, Shipping, Navigation, Safety and Recreational Sea Use
Other
Size: 40 KB
Compulsory Acquisition Hearing - Thursday 21 February 2019
Compulsory Acquisition Hearing 1 - Agenda
Other
Size: 42 KB
Issue Specific Hearing 7 - Thursday 21 February 2019
Hearing Agenda for ISH7 on the draft Development Consent Order (dDCO)
Other
Size: 35 KB
Accompanied Site Inspection Itinerary
Accompanied Site Inspection (ASI 1) Itinerary
Other
Size: 308 KB
Natural England
Deadline 1 Submission - Summary of Written Representation
Other
Other
Size: 260 KB
Nemo Link Limited
Deadline 1 Submission - Response to the Examining Authority's Written Questions
Other
Size: 223 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground – Royal Yachting Association - Revision B. Late submission accepted at the Examining Authority’s discretion
Other
Size: 424 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Response to Examining Authority's Written Questions - Supplementary Note – Navigation Risk Assessment Scoring
Other
Size: 317 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Response to the Examining Authority's Action Points arising from Issue Specific Hearing 2
Other
Size: 223 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Appendix 45 Removal of Landfall Option 2
Other
Size: 32 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Report 3 of 3: Geophysical Investigation Report
Other
Size: 9 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Revised Application Document. Doc 8.6 Offshore Archaeology Draft Written Scheme of Investigation - Revision B
Other
Size: 3 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Response to Relevant Representations
Other
Size: 271 KB
Vattenfall Windpower Limited
Deadline 1 Submission - Statement of Common Ground – Dover District Council (DDC)
Other
Size: 196 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Cover Letter
Other
Size: 49 KB
Port of London Authority and Estuary Services Limited
Deadline 1 Submission - Post hearing submissions for Issue Specific Hearing 2 including written submissions of oral case
Other
Size: 491 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Re-presented Hazard Log
Other
Size: 985 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Minutes with MCA from October 2018
Other
Size: 220 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Response to Examining Authority's Written Questions - 1.3.7 PA2008 s127 Statutory Undertakers Land Rights 
Other
Size: 3 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Responses to Relevant Representations (Annexes A to G)
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Response to Examining Authority's Written Questions
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Nautical Chart
Other
Size: 265 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Shipping and Navigation: Schedule of Mitigation
Other
Size: 344 KB
Vattenfall Windpower Limited
Deadline 1 Submission - Statement of Common Ground – Environment Agency
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - NE Spit Searoom
Other
Size: 3 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Pilot Transfer Track Plots
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - A Pilot Transfer Bridge Simulation – Inception Report
Other
Size: 691 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Revised Application Document. Doc 4.1 Statement of Reasons - Revision B
Other
Size: 771 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Onshore Written Scheme of Investigation, Site Investigation Works-Watching Brief
Other
Size: 348 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Natural England Letter
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Safety Zone Figures
Other
Size: 276 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Response to Examining Authority's Written Questions - Supplementary ExQ1 1.12.4 
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Revised Application Document. Doc 2.2 Land Plan (Offshore) - Revision C
Other
Size: 223 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Response to Examining Authority's Written Questi9ons - Supplementary ExQ1 - 1.12.3
Other
Size: 201 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Response to Examining Authority's Written Questions - 1.3.6 Schedule of CA and TP Objections
Other
Size: 837 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Revised Application Document. Doc 4.3 Book of Reference Revision B
Other
Size: 239 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Consultation Matrix 
Other
Size: 656 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Figures related to designated sites for ease of reference
Other
Size: 195 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Response to ExQ1 - 1.3.5 Crown Land and Consent
Other
Size: 281 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Summary of key issues raised in Relevant Representations exceeding 1500 words
Other
Size: 552 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Response to Examining Authority's Written Questions - Supplementary ExQ1 1.12.1
Other
Size: 191 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Response to ExQ1 - 1.3.8 PA2008 s138 Statutory Undertakers Apparatus
Other
Size: 568 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Post hearing submissions for Issue Specific Hearing 2 including written submissions of oral case
Other
Size: 937 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Revised Application Document. Doc 3.1 Draft Development Consent Order (Tracked Changes) - Revision A
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Revised Application Document. Doc 8.15 Biogenic Reef Mitigation Plan - Revision B
Other
Size: 3 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Revised Application Document. Doc 8.7 Outline Landscape and Ecological Management Plan - Revision B
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Works Plan (Offshore) RLB Comparison
Other
Size: 6 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Revised Application Document. Doc 2.6 Works Plan (Onshore) - Revision B
Other
Size: 873 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Revised Application Document. Doc 3.1 Draft Development Consent Order (Clean) - Revision A
Other
Size: 52 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Objection Letter Vattenfall Extension
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Revised Application Document. Doc 2.3 Land Plan (Onshore) - Revision C
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 1 submission - Post hearing submissions for the Preliminary Meeting including written submissions of oral case
Other
Size: 5 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Post hearing submissions for Issue Specific Hearing 1 including written submissions of oral case
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Revised Application Document. Doc 2.4 Special Category Land Plans - Revision C
Other
Size: 6 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Draft Itinerary for Accompanied Site Inspections (ASI)
Other
Size: 6 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Works Plan (Onshore) - Key Plan (Comparison)
Other
Size: 14 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Gate Analysis Foxtrot 
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Revised Application Document. Doc 2.12 Crown Land Plans - Revision C
Other
Size: 10 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Log of Changes to the Draft Development Consent
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Revised Application Document. Doc 2.5 Works Plan (Offshore) - Revision B
Other
Size: 4 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Vessel Traffic Analysis Plots -Dipping, anchoring and inshore route by draught, length and type
Other
Size: 3 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Response to Examining Authority's Action Points arising from Issue Specific Hearing 1
Other
Size: 285 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground – Port of Tilbury and London Gateway
Other
Size: 12 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Appendix 25 - Annex J Consultation Minutes and Correspondence
Other
Size: 8 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Request for Statements of Common Ground and Statement of Commonality
Other
Size: 18 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Appendix 39 Offshore Archaeology Draft Written Scheme of Investigation
Other
Size: 298 KB
Vattenfall Windpower Limited
Deadline 1 Submission - Statement of Common Ground – Estuary Services Limited
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Appendix 25 - Annex Q Re-presented Hazard Log
Other
Size: 1 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Appendix 25 - Annex P Applicant’s Responses to the Examining Authority’s First Written Questions – EXQ1 –Supplementary Note – Navigation Risk Assessment Scoring
Other
Size: 202 KB
Vattenfall Windpower Limited
Deadline 1 Submission - Statement of Common Ground – Highways England (HE)
Other
Size: 11 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Guide to Application
Other
Size: 267 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Response to Examining Authoriy's Action Points arising from Preliminary Meeting (Annexes A & B)
Other
Size: 2 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Consultation Minutes and Correspondence 
Other
Size: 208 KB
Vattenfall Windpower Limited
Deadline 1 Submission - Statement of Common Ground – Kent & Essex Inshore Fisheries Conservation Authority
Other
Size: 289 KB
Vattenfall Windpower Limited
Deadline 1 Submission - Statement of Common Ground – Kent County Council
Other
Size: 340 KB
Vattenfall Windpower Limited
Deadline 1 Submission - Statement of Common Ground – Historic England
Other
Size: 515 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground – Marine Management Organisation
Other
Size: 263 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground - Thanet Fishermen’s Association
Other
Size: 223 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground – Royal Yachting Association
Other
Size: 685 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground – Kent Wildlife Trust
Other
Size: 331 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground – Royal Society for the Protection of Birds (RSPB)
Other
Size: 342 KB
Trinity House
Deadline 1 Submission - Post Hearing Submission for Issue Specific Hearing 2 including written submission of oral case
Other
Size: 311 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground – National Trust
Other
Size: 308 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground – Maritime & Coastguard Agency (MCA)
Other
Size: 314 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground – Trinity House Lighthouse Service (THLS)
Other
Size: 179 KB
UK Chamber of Shipping
Deadline 1 Submission - Response to the Examining Authority's Written Questions
Other
Size: 606 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground – Natural England Technical Topics (excluding Offshore Ornithology, Saltmarsh, and Site Selection)
Other
Size: 332 KB
Vattenfall Wind Power Limited
Deadline 1 Submission -Statement of Common Ground – Natural England Offshore Ornithology
Other
Size: 277 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground – Chamber of Shipping
Other
Size: 259 KB
Trinity House
Deadline 1 Submission - Response to Draft Development Consent Order
Other
Size: 295 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground – Port of London Authority
Other
Size: 8 MB
Vattenfall Windpower Limited
Deadline 1 Submission - Statement of Common Ground – Riveroak Strategic Partners Limited (RSP)
Other
Size: 95 KB
Trinity House
Deadline 1 Submission - Response to the Examining Authority's Written Questions
Other
Size: 287 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Statement of Common Ground – Thanet District Council (TDC)
Other
Size: 88 KB
Thanet District Council
Deadline 1 Submission - Written Representation
Other
Size: 239 KB
Thanet Fishermen's Association
Deadline 1 Submission - Written Representation
Other
Size: 211 KB
Port of Tilbury London Limited
Deadline 1 Submission - Response to the Examining Authority's Written Questions
Other
Size: 296 KB
Kent Fire and Rescue Service
Deadline 1 Submission - Notification by Statutory Parties of wish to be considered an Interested Party
Other
Size: 3 MB
Charles Russell Speechlys on behalf of RAMAC Holding Limited
Deadline 1 Submission - Written Representation and Summary of Written Representation
Other
Size: 3 MB
Government of France
Deadline 1 Submission - Written Representation
Other
Size: 144 KB
Thanet District Council
Deadline 1 Submission - Response to the Examining Authority's Written Questions
Other
Size: 269 KB
Thanet District Council
Deadline 1 Submission - Local Impact Report
Other
Size: 103 KB
The Crown Estate
Deadline 1 Submission - Written Representation
Other
Size: 5 MB
Port of Tilbury London Limited and London Gateway Port Limited
Deadline 1 Submission - Written Representations
Other
Size: 187 KB
Port of Tilbury London Limited and London Gateway Port Limited
Deadline 1 Submission - Summary of Written Representation
Other
Size: 17 KB
Port of Tilbury London Limited
Deadline 1 Submission - Nomination of suggested locations and justifications for site inspections for consideration by the Examining Authority
Other
Size: 116 KB
Thanet Fishermen's Association
Deadline 1 Submission - Summary of Written Representation
Other
Size: 316 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Submitted at the Examining Authority's request. Publicly available Nemo Link Interconnector planning documents.
Other
Size: 13 MB
Natural England
Deadline 1 Submission - Written Representation
Other
Size: 158 KB
Natural England
Deadline 1 Submission - Summary of Relevant Representation
Other
Size: 284 KB
Port of Tilbury London Limited and London Gateway Port Limited
Deadline 1 Submission - Post Hearing Submission for Issue Specific Hearing 2 of oral case
Other
Size: 49 KB
Winckworth Sherwood LLP on behalf of Port of London Authority and Estuary Services Limited
Deadline 1 Submission - Post Hearing Submission for Issue Specific Hearing 2 including written submissions of oral case
Other
Size: 85 KB
Winckworth Sherwood LLP on behalf of Port of London Authority
Deadline 1 Submission - Summary of Written Representation
Other
Size: 6 MB
Winckworth Sherwood on behalf of Estuary Services Limited
Deadline 1 Submission - Written Representation
Other
Size: 308 KB
Winckworth Sherwood on behalf of Port of London Authority and Estuary Services Limited
Deadline 1 Submission - Response to the Examining Authority's Written Questions
Other
Size: 40 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Submitted at the Examining Authority's request. Publicly available Nemolink Interconnector planning documents.
Other
Size: 86 KB
Winckworth Sherwood on behalf of Estuary Services Limited
Deadline 1 Submission - Summary of Written Representations
Other
Size: 260 KB
Natural England
Deadline 1 Submission - Comments on Relevant Representations
Other
Size: 161 KB
Winckworth Sherwood LLP on behalf of Port of London Authority and Estuary Service
Deadline 1 Submission - Comments on Relevant Representations
Other
Size: 145 MB
Vattenfall Wind Power Limited
Deadline 1 Submission - Submitted at the Examining Authority's request. Publicly available Nemolink Interconnector planning documents.
Other
Size: 84 KB
Natural England
Deadline 1 Submission - List of documents received from the Applicant since Relevant Representations
Other
Size: 6 MB
Winckworth Sherwood on behalf of Port of London Authority
Deadline 1 Submission - Written Representation
Other
Size: 11 MB
Winckworth Sherwood on behalf of Port of London Authority and Estuary Services Limited
Deadline 1 Submission - Response to further information requested by the Examining Authority
Other
Size: 10 MB
Nemo Link Limited
Deadline 1 Submission - Written Representation
Other
Size: 412 KB
Natural England
Deadline 1 Submission - Response to Examining Authority Written Questions
Other
Size: 66 KB
Shakespear Martineau on behalf of National Grid Electricity Transmission Plc (NGET)
Deadline 1 Submission - Written Representation
Other
Size: 691 KB
Marine Management Organisation
Deadline 1 Submission - Response to the Examining Authority's Questions
Other
Size: 189 KB
The National Trust
Deadline 1 Submission - Response to the Examining Authority's Written Questions
Other
Size: 1 MB
Shakespear Martineau on behalf of National Grid Electricity Transmission Plc
Deadline 1 Submission - Letter to the Planning Inspectorate
Other
Size: 201 KB
NATS
Deadline 1 Submission - Response to Rule 8 Letter
Other
Size: 173 KB
The National Trust
Deadline 1 Submission - Written Representation
Other
Size: 148 KB
The National Trust
Deadline 1 Submission - Summary of Written Representation
Other
Size: 28 KB
Shakespear Martineau on behalf of National Grid Electricity Transmission Plc (NGET)
Deadline 1 Submission - Response to the Examining Authority's Written Questions
Other
Size: 15 KB
Mr G Pulman
Deadline 1 Submission - Written Representation
Other
Size: 11 MB
Magda Crostline Ltd on behalf of RAMAC Holding Limited
Deadline 1 Submission - Written Representation
Other
Size: 38 KB
The National Trust
Deadline 1 Submission - Response to Examining Authority's Written Questions
Other
Size: 258 KB
Marine Management Organisation
Deadline 1 Submission - Written Representation
Other
Size: 668 KB
London Pilots Council
Deadline 1 Submission - Post Hearing Submission for Issue Specific Hearing 2 including written submission of oral case
Other
Size: 229 KB
Marine Management Organisation
Deadline 1 Submission - Summary of Relevant Representations
Other
Size: 688 KB
Maritime & Coastal Agency
Deadline 1 Submission - Post hearing submissions for Issue Specific Hearing 1 and Issue Specific Hearing 2 including written submissions of oral case and Response to ExQ1
Other
Size: 746 KB
Kent Wildlife Trust
Deadline 1 Submission - Written Representation
Other
Size: 95 KB
Dover District Council
Deadline 1 Submission - Response to the Examining Authority's Written Questions
Other
Size: 280 KB
Kent Wildlife Trust
Deadline 1 Submission - Summary of Written Representation
Other
Size: 906 KB
Historic England
Deadline 1 Submission - Written Representation
Other
Size: 36 KB
John Lowe
Deadline 1 Submission - Written Representation
Other
Size: 184 KB
Kent County Council
Deadline 1 Submission - Written Representation
Other
Size: 560 KB
Kent Wildlife Trust
Deadline 1 Submission - Response to the Examining Authority's Written Questions
Other
Size: 343 KB
Environment Agency
Deadline 1 Submission - Written Representation, Response to the Examining Authority's Written Questions and Statement of Common Ground comments
Other
Size: 124 KB
Kent and Essex Inshore Fisheries and Conservation Authority (KEIFCA)
Deadline 1 Submission - Statement of Submissions from Other Person
Other
Size: 985 KB
Vattenfall Wind Power Limited
Deadline 1 Submission - Minutes with MCA from October 2018
Other
Size: 180 KB
Dover District Council
Deadline 1 Submission - Local Impact Report
Other
Size: 215 KB
Kent County Council
Deadline 1 Submission - Response to the Examining Authority's Written Questions
Other
Size: 119 KB
Kent County Council
Deadline 1 Submission - Local Impact Report
Other
Size: 96 KB
Note from Unaccompanied Site Inspection 2 (USI2) - 10 and 13 December 2018
Other
Size: 414 KB
Rule 8 Letter
Other
Size: 586 KB
Examining Authority Questions
Other
audio recording
Size: 124 MB
Recording of Preliminary Meeting - 11 December 2018
Other
audio recording
Size: 118 MB
Recording of Issue Specific Hearing 1 (ISH1) - 11 December 2018
Other
audio recording
Size: 122 MB
Recording of Issue Specific Hearing 2 (ISH2) - Part 1 (AM) - 12 December 2018
Other
audio recording
Size: 224 MB
Recording of Issue Specific Hearing 2 (ISH2) - Part 2 (PM) - 12 December 2018
Other
Size: 181 KB
Action Points requested by the Examining Authority arising from ISH2
Other
Size: 92 KB
Action Points requested by the Examining Authority arising from ISH1
Other
Size: 813 KB
Vattenfall Wind Power Limited
Marine Guidance Note (MGN) 543, requested by the Examining Authority to inform the examination
Other
Size: 3 MB
Government of France
Response to Rule 6 - Accepted at the discretion of the Examining Authority
Other
Size: 42 KB
Port of Tilbury London Limited (PoTLL)
Letter to the Examining Authority - Additional Submission accepted at the discretion of the Examining Authority and Other Person Status given accordingly.
Other
Size: 236 KB
Note from Unaccompanied Site Inspection - 30 October 2018
Other
Size: 61 KB
Historic England
Response to Rule 6 - Accepted at the discretion of the Examining Authority
Other
Size: 215 KB
Marine Management Organisation
Response to Rule 6 - Accepted at the discretion of the Examining Authority
Other
Size: 275 KB
Natural England
Response to Rule 6 - Accepted at the discretion of the Examining Authority
Other
Size: 145 KB
Vattenfall Wind Power Limited
Response to Rule 6 - Accepted at the discretion of the Examining Authority
Other
Size: 523 KB
Vattenfall Wind Power Limited
Letter to the Planning Inspectorate in response to s51 advice. Additional Submission accepted at the discretion of the Examining Authority
Other
Size: 3 MB
Vattenfall Wind Power Limited
Hearing Notice
Other
Size: 199 KB
Other Person letter to non-UK parties
Other
Size: 543 KB
Rule 6 Letter
Other
Size: 10 MB
Sea Zones Plan
Sea Zones Plan for use in Issue Specific Hearing 2
Other
Size: 218 KB
Notice of Appointment of Examining Authority
Other
Size: 33 KB
Vattenfall Wind Power Limited
Certificates of compliance with s56, s59 of the Planning Act 2008 and Regulation 17 of the Infrastructure Planning (EIA) Regulation 2017
Other
Size: 1 MB
Vattenfall Wind Power Limited
Section 56 Notice
Other
Size: 515 KB
Vattenfall Wind Power Limited
8.1 Code of Construction Practice
Other
Size: 16 MB
Vattenfall Wind Power Limited
6.6.12.1 Seascape Landscape Visual Impact Assessment - Offshore Technical Report
Other
Size: 12 MB
Vattenfall Wind Power Limited
2.14 Radar Line of Sight Coverage Plan
Other
Size: 12 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 3 Chapter 12 - 6.3.12 Public Health
Other
Size: 8 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 3 Chapter 11 - 6.3.11 Aviation and Radar
Other
Size: 14 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 3 Chapter 7 - 6.3.7 Onshore Historic Environment
Other
Size: 8 MB
Vattenfall Wind Power Limited
8.5 Environmental Impact Assessment Evidence Plan Report
Other
Size: 764 KB
Vattenfall Wind Power Limited
7.1 Cable Statement
Other
Size: 10 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 3 Chapter 9 - 6.3.9 Air QualityAir Quality
Other
Size: 1 MB
Vattenfall Wind Power Limited
6.5.5.15 Scientific Names
Other
Size: 8 MB
Vattenfall Wind Power Limited
6.4.13.1 Annex 13-1: Marine Archaeological Desk-based Assessment Technical Report
Other
Size: 358 KB
Vattenfall Wind Power Limited
1.4 Navigation Document
Other
Size: 3 MB
Vattenfall Wind Power Limited
1.5 Copies of Newspaper Notices
Other
Size: 79 KB
Vattenfall Wind Power Limited
Consultation Report Appendix B: Consultation Under Section 42 of the Planning Act 2008 Appendix B9: Statutory Declaration - CONFIDENTIAL NOTE
Other
Size: 36 MB
Vattenfall Wind Power Limited
5.1.1 Consultation Report Appendices
Other
Size: 8 KB
Vattenfall Wind Power Limited
6.5.5.1 Annex 5-1: Appendix D Confidential Badger Records
Other
Size: 7 MB
Vattenfall Wind Power Limited
6.2.14 Inter-relationships - Environmental Statement Volume 2 Chapter 14
Other
Size: 13 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 2 Chapter 7 - 6.2.7 Marine Mammals
Other
Size: 9 MB
Vattenfall Wind Power Limited
6.7.1 Non Technical Summary
Other
Size: 5 MB
Vattenfall Wind Power Limited
6.5.6.1 Annex 6-1 - Phase 1 Geo-environmental Desk Study
Other
Size: 23 MB
Vattenfall Wind Power Limited
6.4.5.2 Annex 5-2 - Benthic Characterisation Report
Other
Size: 137 KB
Vattenfall Wind Power Limited
1.1 Covering Letter
Other
Size: 2 MB
Vattenfall Wind Power Limited
8.2 Planning Statement
Other
Size: 976 KB
Vattenfall Wind Power Limited
7.2 Safety Zone Statement
Other
Size: 8 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 1 Chapter 1 - 6.1.1 Introduction
Other
Size: 6 MB
Vattenfall Wind Power Limited
2.4 Special Category Land Plan
Other
Size: 13 MB
Vattenfall Wind Power Limited
6.1.4 Site Selection and Alternatives - Environmental Statement Volume 1 Chapter 4
Other
Size: 35 MB
Vattenfall Wind Power Limited
6.4.13.2 Offshore Archaeology Geophysical Baseline
Other
Size: 17 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 3 Chapter 8 - 6.3.8 Traffic and Access
Other
Size: 36 MB
Vattenfall Wind Power Limited
6.4.2.3 Annex 2-3 - Geophysical Investigation Report 2 of 3 - Geophysical Site Survey
Other
Size: 202 KB
Vattenfall Wind Power Limited
5.3 Statement of Engagement with Section 79(1) of the Environmental Protection Act 1990
Other
Size: 3 MB
Vattenfall Wind Power Limited
8.13 Saltmarsh Mitigation, Reinstatement and Monitoring Plan
Other
Size: 23 MB
Vattenfall Wind Power Limited
2.10 Statutory / Non-statutory Nature Conservation Sites Plan
Other
Size: 8 MB
Vattenfall Wind Power Limited
2.6 Works Plan (Onshore)
Other
Size: 26 MB
Vattenfall Wind Power Limited
6.5.5.4 Baseline Onshore and Intertidal Ornithology Report
Other
Size: 8 MB
Vattenfall Wind Power Limited
8.7 Outline Landscape and Ecological Management Plan
Other
Size: 7 MB
Vattenfall Wind Power Limited
6.4.2.4 Annex 2-4 - Geophysical Investigation Report 3 of 3 - Geophysical Site Survey
Other
Size: 1 MB
Vattenfall Wind Power Limited
8.5.3 Environmental Impact Assessment Evidence Plan (Appendices Part 3 of 3)
Other
Size: 11 MB
Vattenfall Wind Power Limited
6.6.2.1 Annex 2-1: Landscape Visual Impact Assessment - Onshore Technical Report
Other
Size: 11 MB
Vattenfall Wind Power Limited
2.2 Land Plan (Offshore)
Other
Size: 23 MB
Vattenfall Wind Power Limited
5.2.1 Report to Inform Appropriate Assessment Appendix 1 - Habitats Regulations Assessment Screening
Other
Size: 5 MB
Vattenfall Wind Power Limited
6.4.4.2 Annex 4-2 - Assessment of Historical Data from Thanet OWF in comparison to more recent Thanet Extension Data
Other
Size: 9 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 3 Chapter 4 - 6.3.4 Tourism and Recreation
Other
Size: 1 MB
Vattenfall Wind Power Limited
6.5.7.3 Annex 7-3 - Scope of assessment of effects arising through change to setting of onshore heritage assets
Other
Size: 2 MB
Vattenfall Wind Power Limited
6.5.7.1 Annex 7-1- Onshore Archaeology Desk Assessment
Other
Size: 497 KB
Vattenfall Wind Power Limited
1.1.1 Section 55 Checklist
Other
Size: 10 MB
Vattenfall Wind Power Limited
6.5.8.1 Annex 8-1 - Abnormal Indivisible Load Access Study
Other
Size: 10 MB
Vattenfall Wind Power Limited
6.4.6.2 Annex 6-2 - Site Characterisation Fish Survey Report - Autumn 2016
Other
Size: 2 MB
Vattenfall Wind Power Limited
8.11 Draft Marine Mammal Mitigation Protocol for Piling Activities
Other
Size: 9 MB
Vattenfall Wind Power Limited
8.6 Outline Offshore Archaeological Written Scheme of Investigation
Other
Size: 8 MB
Vattenfall Wind Power Limited
5.2.2 Report to Inform Appropriate Assessment Appendix 2 - HRA Matrices
Other
Size: 8 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 3 Chapter 3 - 6.3.3 Socio-Economics
Other
Size: 1 MB
Vattenfall Wind Power Limited
4.1 Statement of Reasons
Other
Size: 2 MB
Vattenfall Wind Power Limited
6.5.7.2 Heritage Assets Screening Methodology
Other
Size: 16 MB
Vattenfall Wind Power Limited
6.5.5.2 Water Vole and Otter Technical Baseline
Other
Size: 1 MB
Vattenfall Wind Power Limited
8.16 Design and Access Statement
Other
Size: 10 MB
Vattenfall Wind Power Limited
5.1 Consultation Report
Other
Size: 9 MB
Vattenfall Wind Power Limited
6.5.5.13 Inter-tidal Waterfowl Data Analysis
Other
Size: 3 MB
Vattenfall Wind Power Limited
6.5.5.11 Additional Great Crested Newt Survey Technical Baseline
Other
Size: 2 MB
Vattenfall Wind Power Limited
6.4.4.4 Annex 4-4 - Collision Risk Modelling ReportOrnithology (Offshore)
Other
Size: 1 MB
Vattenfall Wind Power Limited
8.8 Fishing Liaison and Co-existence Plan
Other
Size: 23 MB
Vattenfall Wind Power Limited
2.11 Statutory / Non-statutory Sites of Features of the Historic Environment Plan
Other
Size: 9 MB
6.2.8 TEOW DesignatedSites
Environmental Statement Volume 2 Chapter 8 - 6.2.8 Offshore Designated Sites
Other
Size: 24 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 2 Chapter 2 - 6.2.2 Marine Geology, Oceanography and Physical Processes
Other
Size: 1 MB
Vattenfall Wind Power Limited
6.4.4.3 Annex 4-3 - Range of Displacement Matrices for Seabird Species Recorded in Thanet Extension
Other
Size: 27 MB
Vattenfall Wind Power Limited
6.4.2.2 Annex 2-2 - Geophysical Investigation Report 1 of 3 - Operations and Calibration
Other
Size: 734 KB
Vattenfall Wind Power Limited
3.1 Draft Development Consent Order
Other
Size: 10 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 2 Chapter 1 - 6.2.1 Project Description (Offshore)
Other
Size: 8 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 1Chapter 2 - 6.1.2 Policy and Legislation
Other
Size: 11 MB
Vattenfall Wind Power Limited
6.8.1 Scoping Opinion
Other
Size: 12 MB
Vattenfall Wind Power Limited
2.13 Extinguishment of Public Rights of Way Navigation Plan
Other
Size: 2 MB
Vattenfall Wind Power Limited
6.5.5.12 Additional Bat Survey Technical Baseline
Other
Size: 3 MB
Vattenfall Wind Power Limited
6.5.5.8 Badger Technical Baseline
Other
Size: 19 MB
Vattenfall Wind Power Limited
5.2 Report to Inform Appropriate Assessment
Other
Size: 706 KB
Vattenfall Wind Power Limited
4.3 Book of Reference (Parts 1-5)
Other
Size: 11 MB
Vattenfall Wind Power Limited
6.4.5.3 Marine Conservation Zone Assessment - Environmental Statement Volume 4 Annex 5-3
Other
Size: 2 MB
Vattenfall Wind Power Limited
6.5.3.1 Socio-ecomonic Baseline
Other
Size: 2 MB
Vattenfall Wind Power Limited
6.4.6.3 Annex 6-3 - Underwater Noise Assessment
Other
Size: 30 MB
Vattenfall Wind Power Limited
6.5.6.1.3 Land Use Baseline Report Appendices B to H
Other
Size: 36 MB
Vattenfall Wind Power Limited
8.5.2 Environmental Impact Assessment Evidence Plan (Appendices Part 2 of 3)
Other
Size: 11 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 2 Chapter 5 - 6.2.5 Benthic Subtidal and Intertidal Ecology
Other
Size: 13 MB
Vattenfall Wind Power Limited
2.15 Water Bodies in a River Basin Management Plan
Other
Size: 11 MB
Vattenfall Wind Power Limited
2.12 Crown Land Plan
Other
Size: 619 KB
Vattenfall Wind Power Limited
8.3 Schedule of Mitigation
Other
Size: 21 MB
Vattenfall Wind Power Limited
6.6.2.2 Annex 2-2: Onshore Landscape Visual Impact Assessment - Photomontages
Other
Size: 15 MB
Vattenfall Wind Power Limited
6.6.12.2.2 Seascape Landscape Visual Impact Assessment - Photomontages (Part 2 of 2)
Other
Size: 5 MB
Vattenfall Wind Power Limited
6.5.5.7 Reptiles Technical Baseline
Other
Size: 12 MB
Vattenfall Wind Power Limited
6.5.5.1 Ecology Baseline Surveys - Extended Phase 1 Habitat Survey Report
Other
Size: 45 MB
Vattenfall Wind Power Limited
6.5.6.1.1 Land Use Baseline Report Appendix A (Part 1 of 2)
Other
Size: 45 MB
Vattenfall Wind Power Limited
6.4.2.3.2 Annex 2-3 - Geophysical Investigation Report 2 of 3 - Geophysical Site Survey
Other
Size: 12 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 2 Chapter 13 - 6.2.13 Offshore Archaeology and Cultural Heritage
Other
Size: 8 KB
Vattenfall Wind Power Limited
6.5.5.1 Annex 5-4: Ornithology Baseline Report -Appendix F (Confidential)
Other
Size: 10 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 3 Chapter 6 - 6.3.6 Ground Conditions, Flood Risk and Land Use
Other
Size: 8 MB
Vattenfall Wind Power Limited
Environmental Statement Volume 3 Chapter 2 - 6.3.2 Onshore Landscape and Visual Impact Assessment
Other
Size: 13 MB
Vattenfall Wind Power Limited
6.4.9.1 Annex 9-1 - Commercial Fisheries Technical Report
Other
Size: