You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (9)
Developer's Application (507)
- All Documents
- Application Form (7)
- Compulsory Acquisition Information (3)
- Draft Development Consent Order (3)
- Environmental Statement (391)
- Plans (12)
- Reports (91)
Acceptance (19)
Pre Examination (76)
Examination (1305)
- All Documents
- + Additional Submissions (102)
- Certificates and Notices (2)
- + Deadline 1 (326)
- Deadline 2 (32)
- + Deadline 3 (44)
- Deadline 4 (58)
- Deadline 5 (152)
- Deadline 6 (152)
- Deadline 7 (130)
- Deadline 7c (34)
- Deadline 8 (126)
- Deadline 9 (20)
- Hearing Agenda (11)
- Notification regarding close of examination (s99) (1)
- + Open Floor Hearing 1 (4)
- + Open Floor Hearing 2 (2)
- Preliminary Meeting Note (1)
- Procedural Decision (3)
- Procedural Decisions (20)
- Re-determination (2)
- + Recording of Hearing (78)
- Recording of Preliminary Meeting (2)
- Report on the Implications for European Sites (RIES) (1)
- Unaccompanied Site Inspection (2)
Decision (725)
- All Documents
- Habitats Regulations Assessment (1)
- Notice of the Decision by the SoS (1)
- Notification of Decision to Refuse Application (1)
- Post-Examination Correspondence (1)
- Re-determination (430)
- Recommendation Report (1)
- Redetermination (2)
- Secretary of State Consultation (87)
- Secretary of State Consultation 1 (1)
- Secretary of State Consultation 2 (29)
- Secretary of State Consultation 3 (169)
- Secretary of State ConsultationRe-determination (1)
- Secretary of State Decision Letter (Refused) (1)
Decided (0)
The selection shows documents received from the applicant in relation to the development consent order application.
Source | Description |
---|---|
Other |
Aquind Limited (PDF, 2 MB)
6.1.10 Environmental Statement - Volume 1 - Chapter 10 Marine Mammals and Basking Sharks
|
Other |
Aquind Limited (PDF, 936 KB)
6.1.12 Environmental Statement - Volume 1 - Chapter 12 Commercial Fisheries
|
Other |
Aquind Limited (PDF, 923 KB)
6.1.28 Environmental Statement - Volume 1 - Chapter 28 Carbon and Climate Change
|
Other |
Aquind Limited (PDF, 3 MB)
6.1.2 Environmental Statement - Volume 1 - Chapter 2 Consideration of Alternatives
|
Other |
Aquind Limited (PDF, 962 KB)
6.1.4 Environmental Statement - Volume 1 - Chapter 4 EIA Methodology
|
Other |
Aquind Limited (PDF, 793 KB)
6.1.18 Environmental Statement - Volume 1 - Chapter 18 Ground Conditions
|
Other |
Aquind Limited (PDF, 994 KB)
6.1.20 Environmental Statement - Volume 1 - Chapter 20 Surface Water Resources and Flood Risk
|
Other |
Aquind Limited (PDF, 2 MB)
6.1.6 Environmental Statement - Volume 1 - Chapter 6 Physical Processes
|
Other |
Aquind Limited (PDF, 1 MB)
6.1.8 Environmental Statement - Volume 1 - Chapter 8 Intertidal and Benthic Habitats
|
Other |
Aquind Limited (PDF, 5 MB)
6.1.22 Environmental Statement - Volume 1 - Chapter 22 Traffic and Transport
|
Other |
Aquind Limited (PDF, 1 MB)
6.1.24 Environmental Statement - Volume 1 - Chapter 24 Noise and Vibration
|
Other |
Aquind Limited (PDF, 545 KB)
6.1.14 Environmental Statement - Volume 1 - Chapter 14 Marine Archaeology
|
Other |
Aquind Limited (PDF, 986 KB)
6.1.16 Environmental Statement - Volume 1 - Chapter 16 Onshore Ecology
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.12.10 Environmental Statement - Volume 2 - Figure 12.10 Fishing Grounds - Fisherman Specific Maps
|
Other |
Aquind Limited (PDF, 2 MB)
6.1.11 Environmental Statement - Volume 1 - Chapter 11 Marine Ornithology
|
Other |
Aquind Limited (PDF, 738 KB)
6.1.13 Environmental Statement - Volume 1 - Chapter 13 Shipping, Navigation and Other Marine Users
|
Other |
Aquind Limited (PDF, 4 MB)
6.1.15 Environmental Statement - Volume 1 - Chapter 15 Landscape and Visual Amenity
|
Other |
Aquind Limited (PDF, 1 MB)
6.1.29 Environmental Statement - Volume 1 - Chapter 29 Cumulative Effects
|
Other |
Aquind Limited (PDF, 5 MB)
6.2.10.1 Environmental Statement - Volume 2 - Figure 10.1 Study Area
|
Other |
Aquind Limited (PDF, 3 MB)
6.1.3 Environmental Statement - Volume 1 - Chapter 3 Description of the Proposed Development
|
Other |
Aquind Limited (PDF, 722 KB)
6.1.5 Environmental Statement - Volume 1 - Chapter 5 Consultation
|
Other |
Aquind Limited (PDF, 874 KB)
6.1.21 Environmental Statement - Volume 1 - Chapter 21 Heritage and Archaeology
|
Other |
Aquind Limited (PDF, 1 MB)
6.1.26 Environmental Statement - Volume 1 - Chapter 26 Human Health
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.11.2 Environmental Statement - Volume 2 - Figure 11.2 Marine Ornithology - SSSI Sites
|
Other |
Aquind Limited (PDF, 609 KB)
6.1.17 Environmental Statement - Volume 1 - Chapter 17 Soils and Agricultural Land Use
|
Other |
Aquind Limited (PDF, 780 KB)
6.1.19 Environmental Statement - Volume 1 - Chapter 19 Groundwater
|
Other |
Aquind Limited (PDF, 1 MB)
6.1.7 Environmental Statement - Volume 1 - Chapter 7 Marine Water and Sediment Quality
|
Other |
Aquind Limited (PDF, 3 MB)
6.1.9 Environmental Statement - Volume 1 - Chapter 9 Fish and Shellfish
|
Other |
Aquind Limited (PDF, 458 KB)
6.1.25 Environmental Statement - Volume 1 - Chapter 25 Socio-economics
|
Other |
Aquind Limited (PDF, 884 KB)
6.1.27 Environmental Statement - Volume 1 - Chapter 27 Waste and Material Resources
|
Other |
Aquind Limited (PDF, 11 MB)
6.1.23 Environmental Statement - Volume 1 - Chapter 23 Air Quality
|
Other |
Aquind Limited (PDF, 808 KB)
6.2.12.12 Environmental Statement - Volume 2 - Figure 12.12 Average UK VMS Value (£) Dredge (2013 - 2017; MMO, 2018)
|
Other |
Aquind Limited (PDF, 364 KB)
6.1.30 Environmental Statement - Volume 1 - Chapter 30 Summary and Conclusions
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.11.1 Environmental Statement - Volume 2 - Figure 11.1 Marine Ornithology SPA and Ramsar Sites
|
Other |
Aquind Limited (PDF, 16 MB)
6.10 Outline Landscape and Biodiversity Strategy
|
Other |
Aquind Limited (PDF, 636 KB)
6.1.1 Environmental Statement - Volume 1 - Chapter 1 Introduction
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.12.11 Environmental Statement - Volume 2 - Figure 12.11 Cuttlefish Trapping, Netting and Longlining Grounds, based on Consultation with UK Local Fishermen
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.12.1 Environmental Statement - Volume 2 - Figure 12.1 Study Area
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.12.13 Environmental Statement - Volume 2 - Figure 12.13 Average VMS Value (£) of UK Vessels Operating Dredges at the National Scale (2012 - 2016; MMO, 2018)
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.12.21 Environmental Statement - Volume 2 - Figure 12.21 Fishing Density (Number of Vessels) of French Demersal Trawlers in September to December 2014 (CRPMEM, 2018)
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.12.22 Environmental Statement - Volume 2 - Figure 12.22 Fishing Density (Number of Vessels) of French Pelagic Trawlers in January, February, July and August 2014 (CRPMEM, 2018)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.12.18 Environmental Statement - Volume 2 - Figure 12.18 Fishing Density (Number of Vessels) of French Scallop Dredgers in October to December 2014 (CRPMEM, 2018)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.12.19 Environmental Statement - Volume 2 - Figure 12.19 Fishing Density (Number of Vessels) of French Demersal Trawlers in January to April 2014 (CRPMEM, 2018)
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.12.20 Environmental Statement - Volume 2 - Figure 12.20 Fishing Density (Number of Vessels) of French Demersal Trawlers in May to August 2014 (CRPMEM, 2018)
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.12.2 Environmental Statement - Volume 2 - Figure 12.2 Historic Fishing Rights (According to the London Convention, 1984) in Relation to the Study Area (UKHO, 2011)
|
Other |
Aquind Limited (PDF, 807 KB)
6.2.12.14 Environmental Statement - Volume 2 - Figure 12.14 Average VMS Value (£) of UK Vessels Operating Scottish Seines (2013 - 2017; MMO, 2018)
|
Other |
Aquind Limited (PDF, 807 KB)
6.2.12.15 Environmental Statement - Volume 2 - Figure 12.15 Average VMS Value (£) of UK Vessels Operating Pelagic Trawl (2013 - 2017; MMO, 2018)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.12.23 Environmental Statement - Volume 2 - Figure 12.23 Fishing Density (Number of Vessels) of French Pelagic Trawlers in September to December 2014 (CRPMEM, 2018)
|
Other |
Aquind Limited (PDF, 806 KB)
6.2.12.16 Environmental Statement - Volume 2 - Figure 12.16 Average VMS Value (£) of UK Vessles Operating Beam Trawl (2013 - 2017; MMO, 2018)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.12.17 Environmental Statement - Volume 2 - Figure 12.17 Fishing Density (Number of Vessels) of French Scallop Dredgers in January to April 2014 (CRPMEM, 2018)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.12.25 Environmental Statement - Volume 2 - Figure 12.25 Average Belgian Landings Values (Euros) by Fishing Method (ILVO, 2010 to 2014; ILVO 2016)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.12.24 Environmental Statement - Volume 2 - Figure 12.24 Average Belgian Landings Values by Vessel Length (2012 to 2014; ILVO, 2016)
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.12.26 Environmental Statement - Volume 2 - Figure 12.26 Average Belgian Landings Values (Euros) by Species (ILVO, 2010 to 2016; ILVO, 2016)
|
Other |
Aquind Limited (PDF, 367 KB)
6.2.12.27 Environmental Statement - Volume 2 - Figure 12.27 Average VMS Value (Euros) by Belgian Vessels Operating Beam Trawls (2010 to 2014; ILVO, 2016)
|
Other |
Aquind Limited (PDF, 368 KB)
6.2.12.28 Environmental Statement - Volume 2 - Figure 12.28 Average VMS Value (Euros) by Belgian Vessels Operating Demersal Trawls (2010 to 2014; ILVO, 2016)
|
Other |
Aquind Limited (PDF, 365 KB)
6.2.12.33 Environmental Statement - Volume 2 - Figure 12.33 Average VMS Values (Euros) by Dutch Vessels Operating Seine Nets (2013-2017; IMARES, 2018)
|
Other |
Aquind Limited (PDF, 6 MB)
6.2.12.4 Environmental Statement - Volume 2 - Figure 12.4 UK Survelliance Sightings by Nationality (2013 - 2017; MMO, 2018)
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.12.8 Environmental Statement - Volume 2 - Figure 12.8 MMO Surveillance Sightings by Method (2013 - 2017; MMO, 2018)
|
Other |
Aquind Limited (PDF, 785 KB)
6.2.13.1 Environmental Statement - Volume 2 - Figure 13.1 Detailed Overview of Ports
|
Other |
Aquind Limited (PDF, 365 KB)
6.2.12.30 Environmental Statement - Volume 2 - Figure 12.30 Average VMS Values (Euros) by Belgian Vessels Operating Dredges (2010 to 2014; IVLO, 2016)
|
Other |
Aquind Limited (PDF, 367 KB)
6.2.12.34 Environmental Statement - Volume 2 - Figure 12.34 Average VMS Value (Euros) by Dutch Vessels Operating Pelagic Trawls (2013- 2017; IMARES, 2018)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.12.6 Environmental Statement - Volume 2 - Figure 12.6 Average UK Landings Values by Method (2013 - 2017; MMO, 2018)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.12.31 Environmental Statement - Volume 2 - Figure 12.31 Average Landings Values (Euros) by Dutch Vessels by Method (2013-2017; IMARES, 2018)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.12.9 Environmental Statement - Volume 2 - Figure 12.9 Fisheries in The Solent based on Consultation with Southern IFCA
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.12.32 Environmental Statement - Volume 2 - Figure 12.32 Average Landings Values (Euros) by Dutch Vessels by Species (2013 - 2017; IMARES, 2018)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.12.3 Environmental Statement - Volume 2 - Figure 12.3 Southern and Sussex IFCA Districts
|
Other |
Aquind Limited (PDF, 365 KB)
6.2.12.29 Environmental Statement - Volume 2 - Figure 12.29 Average VMS Value (Euros) by Belgian Vessels Operating Seine Nets (2010 to 2014; IVLO, 2016)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.12.5 Environmental Statement - Volume 2 - Figure 12.5 Average UK Landings by Vessel Length (2013 - 2017; MMO, 2018)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.12.7 Environmental Statement - Volume 2 - Figure 12.7 Average UK Landings Values by Species (2013 - 2017; MMO, 2018)
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.13.10 Environmental Statement - Volume 2 - Figure 13.10 Dredging Activity
|
Other |
Aquind Limited (PDF, 830 KB)
6.2.13.13 Environmental Statement - Volume 2 - Figure 13.13 RYA Coastal Atlas Data
|
Other |
Aquind Limited (PDF, 943 KB)
6.2.13.3 Environmental Statement - Volume 2 - Figure 13.3 MAIB Data (2005 - 2014)
|
Other |
Aquind Limited (PDF, 1,010 KB)
6.2.13.9 Environmental Statement - Volume 2 - Figure 13.9 Anchored Vessels
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.13.11 Environmental Statement - Volume 2 - Figure 13.11 Fishing Vessel Gear Types
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.13.6 Environmental Statement - Volume 2 - Figure 13.6 Winter Vessel Type
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.13.5 Environmental Statement - Volume 2 - Figure 13.5 Summer Vessel Type
|
Other |
Aquind Limited (PDF, 967 KB)
6.2.13.7 Environmental Statement - Volume 2 - Figure 13.7 Summer Vessel Density
|
Other |
Aquind Limited (PDF, 966 KB)
6.2.13.8 Environmental Statement - Volume 2 - Figure 13.8 Winter Vessel Density
|
Other |
Aquind Limited (PDF, 576 KB)
6.2.14.2 Environmental Statement - Volume 2 - Figure 14.2 Seabed Features of Archaeological Potential
|
Other |
Aquind Limited (PDF, 975 KB)
6.2.13.2 Environmental Statement - Volume 2 - Figure 13.2 General Overview of Navigational Features
|
Other |
Aquind Limited (PDF, 949 KB)
6.2.13.4 Environmental Statement - Volume 2 - Figure 13.4 RNLI Data (2005 - 2014)
|
Other |
Aquind Limited (PDF, 8 MB)
6.2.14.1 Environmental Statement - Volume 2 - Figure 14.1 Location of AQUIND Interconnector Marine Cable Corridor (UK Sector)
|
Other |
Aquind Limited (PDF, 8 MB)
6.2.13.12 Environmental Statement - Volume 2 - Figure 13.12 Recreational AIS
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.13.14 Environmental Statement - Volume 2 - Figure 13.14 Detailed Summer Vessel Type
|
Other |
Aquind Limited (PDF, 683 KB)
6.2.14.5 Environmental Statement - Volume 2 - Figure 14.5 Seabed Features of Archaeological Potential
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.14.6 Environmental Statement - Volume 2 - Figure 14.6 Data Examples of Ferrous Seabed Features
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.15.13 Environmental Statement - Volume 2 - Figure 15.13 ZTV - 8 km Baseline 20 Year Option B(i)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.15.12 Environmental Statement - Volume 2 - Figure 15.12 ZTV - 3 km Baseline Option B(ii)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.15.11 Environmental Statement - Volume 2 - Figure 15.11 ZTV - 3 km Baseline Option B(i)
|
Other |
Aquind Limited (PDF, 664 KB)
6.2.14.3 Environmental Statement - Volume 2 - Figure 14.3 Seabed Features of Archaeological Potential
|
Other |
Aquind Limited (PDF, 559 KB)
6.2.14.4 Environmental Statement - Volume 2 - Figure 14.4 Seabed Features of Archaeological Potential
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.14.7 Environmental Statement - Volume 2 - Figure 14.7 Data Examples of Ferrous Seabed Features
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.15.1 Environmental Statement - Volume 2 - Figure 15.1 Landscape and Visual Study Area Converter Station (8 km)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.15.10 Environmental Statement - Volume 2 - Figure 15.10 ZTV - 8 km Bare Earth Option B(ii)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.15.14 Environmental Statement - Volume 2 - Figure 15.14 ZTV - 8 km Baseline 20 Year Option B(ii)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.15.17 Environmental Statement - Volume 2 - Figure 15.17 Viewpoint Location Plan for Converter Station
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.15.15 Environmental Statement - Volume 2 - Figure 15.15 ZTV - 3 km Baseline 20 Year Option B(i)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.15.16 Environmental Statement - Volume 2 - Figure 15.16 ZTV - 3 km Baseline 20 Year Option B(ii)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.18 Environmental Statement - Volume 2 - Figure 15.18 Viewpoint 1: PRoW near Hinton Manor
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.19 Environmental Statement - Volume 2 - Figure 15.19 Viewpoint 2: PRoW leading to Windmill Hill
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.21 Environmental Statement - Volume 2 - Figure 15.21 Viewpoint 4: PRoW off Broadway Lane
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.24 Environmental Statement - Volume 2 - Figure 15.24 Viewpoint 7: PRoW close to Anmore Dell
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.26 Environmental Statement - Volume 2 - Figure 15.26 Viewpoint 9: Fort Widley, Portsdown Hill
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.2 Environmental Statement - Volume 2 - Figure 15.2 Landscape and Visual Detailed Study Area Onshore Cable Corridor (1 of 3)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.20 Environmental Statement - Volume 2 - Figure 15.20 Viewpoint 3: PRoW near Broadway Lane (Monarch's Way)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.22 Environmental Statement - Volume 2 - Figure 15.22 Viewpoint 5: Catherington SSSI
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.29 Environmental Statement - Volume 2 - Figure 15.29 Viewpoint 12: PRoW off unnamed road (Monarch's Way)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.23 Environmental Statement - Volume 2 - Figure 15.23 Viewpoint 6: PRoW near James' Copse
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.28 Environmental Statement - Volume 2 - Figure 15.28 Viewpoint 11: PRoW near Little Denmead Farm (west)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.25 Environmental Statement - Volume 2 - Figure 15.25 Viewpoint 8: PRoW close to Cutlers Farm
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.27 Environmental Statement - Volume 2 - Figure 15.27 Viewpoint 10: PRoW near Little Denmead Farm
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.3 Environmental Statement - Volume 2 - Figure 15.3 Landscape and Visual Detailed Study Area Onshore Cable Corridor (2 of 3)
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.15.40 Environmental Statement - Volume 2 - Figure 15.40 Local, District and Borough Landscape Character Areas - Converter Station (3 km)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.30 Environmental Statement - Volume 2 - Figure 15.30 Viewpoint 13: PRoW off Old Mill Lane (Monarch's Way)
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.15.34 Environmental Statement - Volume 2 - Figure 15.34 Viewpoint 17: Butser Hill
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.15.36 Environmental Statement - Volume 2 - Figure 15.36 Viewpoint B: View from Old Mill Lane (south west)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.4 Environmental Statement - Volume 2 - Figure 15.4 Landscape and Visual Detailed Study Area Onshore Cable Corridor and Landfall (3 of 3)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.31 Environmental Statement - Volume 2 - Figure 15.31 Viewpoint 14: Wayfarer's Walk near Rushmere Lane
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.32 Environmental Statement - Volume 2 - Figure 15.32 Viewpoint 15: Broadpenny Down
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.15.38 Environmental Statement - Volume 2 - Figure 15.38 National Landscape Character Areas
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.15.33 Environmental Statement - Volume 2 - Figure 15.33 Viewpoint 16: Old Winchester Hill
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.35 Environmental Statement - Volume 2 - Figure 15.35 Viewpoint A: View from Broadway Lane (south)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.15.37 Environmental Statement - Volume 2 - Figure 15.37 - Visuals - Viewpoint C: View from Old Mill Lane (north)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.39 Environmental Statement - Volume 2 - Figure 15.39 County, District and City Local Landscape Character Areas – Converter Station (8 km)
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.15.5 Environmental Statement - Volume 2 - Figure 15.5 Landscape Planning Designations Converter Station
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.42 Environmental Statement - Volume 2 - Figure 15.42 National and Local Landscape Character Areas Onshore Cable Corridor (2 of 3)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.43 Environmental Statement - Volume 2 - Figure 15.43 National and Local Landscape Character Areas Onshore Cable Corridor and Landfall (3 of 3)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.15.6 Environmental Statement - Volume 2 - Figure 15.6 Landscape Planning Designations Onshore Cable Corridor (1 of 3)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.7 Environmental Statement - Volume 2 - Figure 15.7 Landscape Planning Designations Onshore Cable Corrdidor (2 of 3)
|
Other |
Aquind Limited (PDF, 5 MB)
6.2.15.8 Environmental Statement - Volume 2 - Figure 15.8 Landscape Planning Designations Onshore Cable Corridor and Landfall (3 of 3)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.48 Environmental Statement - Volume 2 - Figure 15.48 Indicative Landscape Mitigation Plan Option B(i) (north)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.15.9 Environmental Statement - Volume 2 - Figure 15.9 ZTV - 8 km Bare Earth Option B(i)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.15.46 Environmental Statement - Volume 2 - Figure 15.46 Recreational and Transport Routes Converter Station (3 km)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.47 Environmental Statement - Volume 2 - Figure 15.47 Residential Properties and Settlements
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.54 Environmental Statement - Volume 2 - Figure 15.54 Viewpoint 20
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.15.44 Environmental Statement - Volume 2 - Figure 15.44 Topography
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.15.45 Environmental Statement - Volume 2 - Figure 15.45 Recreational and Transport Routes Converter Station (8 km)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.15.56 Environmental Statement - Volume 2 - Figure 15.56 Viewpoint 22
|
Other |
Aquind Limited (PDF, 10 MB)
6.2.16.1 Environmental Statement - Volume 2 - Figure 16.1 Statutory Designated Sites
|
Other |
Aquind Limited (PDF, 17 MB)
6.2.16.2 Environmental Statement - Volume 2 - Figure 16.2 Non-statutory Designated Sites and Priority Habitats
|
Other |
Aquind Limited (PDF, 25 MB)
6.2.16.4 Environmental Statement - Volume 2 - Figure 16.4 Hedgerows
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.41 Environmental Statement - Volume 2 - Figure 15.41 National and Local Landscape Character Areas Onshore Cable Corridor (1 of 3)
|
Other |
Aquind Limited (PDF, 565 KB)
6.2.15.50 Environmental Statement - Volume 2 - Figure 15.50 Indicative Landscape Mitigation Plan (Landfall)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.15.55 Environmental Statement - Volume 2 - Figure 15.55 Viewpoint 21
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.15.49 Environmental Statement - Volume 2 - Figure 15.49 Indicative Landscape Mitigation Plan Option B(i) (south)
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.15.52 Environmental Statement - Volume 2 - Figure 15.52 Viewpoint 18
|
Other |
Aquind Limited (PDF, 34 MB)
6.2.15.53 Environmental Statement - Volume 2 - Figure 15.53 Viewpoint 19
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.15.51 Environmental Statement - Volume 2 - Figure 15.51 Viewpoint Location Plan (Landfall)
|
Other |
Aquind Limited (PDF, 18 MB)
6.2.16.3 Environmental Statement - Volume 2 - Figure 16.3 Habitats
|
Other |
Aquind Limited (PDF, 17 MB)
6.2.17.1 Environmental Statement - Volume 2 - Figure 17.1 Location of Soil Auger Observations
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.18.5 Environmental Statement - Volume 2 - Figure 18.5 Onshore Cable Corridor Constraints Sheet 5 of 5
|
Other |
Aquind Limited (PDF, 8 MB)
6.2.19.2 Environmental Statement - Volume 2 - Figure 19.2 Superficial Geology
|
Other |
Aquind Limited (PDF, 8 MB)
6.2.21.1 Environmental Statement - Volume 2 - Figure 21.1 Historic Environment Features Map
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.21.2 Environmental Statement - Volume 2 - Figure 21.2 Baseline Zone of Theoretical Visibility showing Listed Buildings considered for Settings Assessment
|
Other |
Aquind Limited (PDF, 9 MB)
6.2.23.11 Environmental Statement - Volume 2 - Figure 23.11 Traffic Diversion DS2 Scenario NO2 Concentration Changes Portsmouth AQMAs
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.22.4 Environmental Statement - Volume 2 - Figure 22.4 Baseline Environment Sheet 1
|
Other |
Aquind Limited (PDF, 9 MB)
6.2.19.4 Environmental Statement - Volume 2 - Figure 19.4 Source Protection Zones
|
Other |
Aquind Limited (PDF, 16 MB)
6.2.20.2 Environmental Statement - Volume 2 - Figure 20.2 LiDAR
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.22.1 Environmental Statement - Volume 2 - Figure 22.1 EIA Traffic and Transport Study Area
|
Other |
Aquind Limited (PDF, 8 MB)
6.2.20.4 Environmental Statement - Volume 2 - Figure 20.4 Flood Zone Map
|
Other |
Aquind Limited (PDF, 7 MB)
6.2.17.2 Environmental Statement - Volume 2 - Figure 17.2 Agricultural Land Classification
|
Other |
Aquind Limited (PDF, 5 MB)
6.2.18.1 Environmental Statement - Volume 2 - Figure 18.1 Onshore Cable Corridor Constraints Sheet 1 of 5
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.18.3 Environmental Statement - Volume 2 - Figure 18.3 Onshore Cable Corridor Constraints Sheet 3 of 5
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.23.5 Environmental Statement - Volume 2 - Figure 23.5 Backup Generator Positions
|
Other |
Aquind Limited (PDF, 5 MB)
6.2.23.7 Environmental Statement - Volume 2 - Figure 23.7 Traffic Diversion DS1 Scenario NO2 Concentration Changes
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.22.2 Environmental Statement - Volume 2 - Figure 22.2 Traffic Survey Locations
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.22.3 Environmental Statement - Volume 2 - Figure 22.3 Construction Traffic Routing
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.22.5 Environmental Statement - Volume 2 - Figure 22.5 Baseline Environment Sheet 2
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.18.4 Environmental Statement - Volume 2 - Figure 18.4 Onshore Cable Corridor Constraints Sheet 4 of 5
|
Other |
Aquind Limited (PDF, 9 MB)
6.2.19.1 Environmental Statement - Volume 2 - Figure 19.1 Bedrock Geology and Karst
|
Other |
Aquind Limited (PDF, 9 MB)
6.2.23.12 Environmental Statement - Volume 2 - Figure 23.12 Verification Zones
|
Other |
Aquind Limited (PDF, 7 MB)
6.2.20.6 Environmental Statement - Volume 2 - Figure 20.6 Flood Risk from Reservoir
|
Other |
Aquind Limited (PDF, 12 MB)
6.2.23.1 Environmental Statement - Volume 2 - Figure 23.1 Air Quality Constraints
|
Other |
Aquind Limited (PDF, 8 MB)
6.2.23.3 ES - Vol 2 - Figure 23.3 Construction Traffic Network and Banded Receptors
|
Other |
Aquind Limited (PDF, 8 MB)
6.2.20.3 Environmental Statement - Volume 2 - Figure 20.3 Watercourses
|
Other |
Aquind Limited (PDF, 7 MB)
6.2.20.7 Environmental Statement - Volume 2 - Figure 20.7 History of Flooding
|
Other |
Aquind Limited (PDF, 5 MB)
6.2.20.8 Environmental Statement - Volume 2 - Figure 20.8 Surface, Transitional and Coastal Water Framework Directive Water Bodies
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.22.6 Environmental Statement - Volume 2 - Figure 22.6 Baseline Environment Sheet 3
|
Other |
Aquind Limited (PDF, 7 MB)
6.2.19.3 Environmental Statement - Volume 2 - Figure 19.3 Groundwater Monitoring Points
|
Other |
Aquind Limited (PDF, 5 MB)
6.2.17.3 Environmental Statement - Volume 2 - Figure 17.3 Farm Holdings
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.18.2 Environmental Statement - Volume 2 - Figure 18.2 Onshore Cable Corridor Constraints Sheet 2 of 5
|
Other |
Aquind Limited (PDF, 8 MB)
6.2.20.5 Environmental Statement - Volume 2 - Figure 20.5 Flood Risk from Surface Water
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.22.7 Environmental Statement - Volume 2 - Figure 22.7 Links Taken Forward For Further Assessment
|
Other |
Aquind Limited (PDF, 21 MB)
6.2.23.2 Environmental Statement - Volume 2 - Figure 23.2 Construction Dust Assessment
|
Other |
Aquind Limited (PDF, 10 MB)
6.2.23.4 Environmental Statement - Volume 2 - Figure 23.4 Diversion and Road Closure Traffic Network and Banded Receptors
|
Other |
Aquind Limited (PDF, 22 MB)
6.2.20.1 Environmental Statement - Volume 2 - Figure 20.1 Flood Risk Constraints
|
Other |
Aquind Limited (PDF, 6 MB)
6.2.23.6 Environmental Statement - Volume 2 - Figure 23.6 Traffic Diversion Do-Minimum Scenario NO2 Concentrations
|
Other |
Aquind Limited (PDF, 5 MB)
6.2.23.8 Environmental Statement - Volume 2 - Figure 23.8 Traffic Diversion DS2 Scenario NO2 Concentration Changes.pdf
|
Other |
Aquind Limited (PDF, 10 MB)
6.2.23.10 Environmental Statement - Volume 2 - Figure 23.10 Traffic Diversion DS1 Scenario NO2 Concentration Changes Portsmouth AQMAs
|
Other |
Aquind Limited (PDF, 144 KB)
6.2.3.10 Environmental Statement - Volume 2 - Figure 3.10 Converter Station Area General Arrangement Plan
|
Other |
Aquind Limited (PDF, 197 KB)
6.2.3.12 Environmental Statement - Volume 2 - Figure 3.12 Construction Corridor Assumptions HVDC Cables
|
Other |
Aquind Limited (PDF, 17 MB)
6.2.3.13 Environmental Statement - Volume 2 - Figure 3.13 Environmental Constraints Map
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.8.1 Environmental Statement - Volume 2 - Figure 8.1 Study Area
|
Other |
Aquind Limited (PDF, 6 MB)
6.2.8.4 Environmental Statement - Volume 2 - Figure 8.4 Sediment Shore Station Locations and Habitats
|
Other |
Aquind Limited (PDF, 439 KB)
6.2.3.7 Environmental Statement - Volume 2 - Figure 3.7 Atlantic Cable Crossing
|
Other |
Aquind Limited (PDF, 530 KB)
6.2.3.1 Environmental Statement - Volume 2 - Figure 3.1 Marine Cable Corridor
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.3.6 Environmental Statement - Volume 2 - Figure 3.6 Mobile Sediment
|
Other |
Aquind Limited (PDF, 346 KB)
6.2.3.8 Environmental Statement - Volume 2 - Figure 3.8 Cable Crossing Details
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.8.3 Environmental Statement - Volume 2 - Figure 8.3 Relevant Protected Areas (SSSI)
|
Other |
Aquind Limited (PDF, 9 MB)
6.2.7.1 Environmental Statement - Volume 2 - Figure 7.1 Study Area
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.8.2 Environmental Statement - Volume 2 - Figure 8.2 Relevant Protected Areas (MCZ, Ramsar, & SAC)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.3.9 Environmental Statement - Volume 2 - Figure 3.9 Order Limits Sections (Onshore)
|
Other |
Aquind Limited (PDF, 7 MB)
6.2.3.4 Environmental Statement - Volume 2 - Figure 3.4 Shallow Geology
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.3.5 Environmental Statement - Volume 2 - Figure 3.5 Indicative Seabed Preparation
|
Other |
Aquind Limited (PDF, 10 MB)
6.2.23.9 Environmental Statement - Volume 2 - Figure 23.9 Traffic Diversion Do-Minimum Scenario NO2 Concentrations Portsmouth AQMAs
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.8.5 Environmental Statement - Volume 2 - Figure 8.5 High Level Benthic Habitats in the Vicinity of the Proposed Development (EMODnet, 2016)
|
Other |
Aquind Limited (PDF, 4 MB)
6.2.3.2 Environmental Statement - Volume 2 - Figure 3.2 Order Limits (Onshore)
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.3.3 Environmental Statement - Volume 2 - Figure 3.3 UK Landfall
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.29.3 Environmental Statement - Volume 2 - Figure 29.3 Aggregate Projects within the UK Marine Area
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.29.4 Environmental Statement - Volume 2 - Figure 29.4 Dredge and Disposal Projects within the UK Marine Area
|
Other |
Aquind Limited (PDF, 540 KB)
6.3.6.1 Environmental Statement - Volume 3 - Appendix 6.1 Physical Processes Consultation Responses
|
Other |
Aquind Limited (PDF, 165 KB)
6.2.3.11 Environmental Statement - Volume 2 - Figure 3.11 Construction Corridor Assumptions HVAC Cables
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.29.5 Environmental Statement - Volume 2 - Figure 29.5 Coastal Projects within the UK Marine Area
|
Other |
Aquind Limited (PDF, 18 MB)
6.2.29.6 Environmental Statement - Volume 2 - Figure 29.6 Onshore Short List of Developments
|
Other |
Aquind Limited (PDF, 7 MB)
6.3.6.5 Environmental Statement - Volume 3 - Appendix 6.5 Disposal Site Characterisation Report
|
Other |
Aquind Limited (PDF, 36 MB)
6.2.24.2 Environmental Statement - Volume 2 - Figure 24.2 Illustrative Cable Route, HDD sites and Joint Bays for noise and vibration assessment
|
Other |
Aquind Limited (PDF, 220 KB)
6.3.7.5 Environmental Statement - Volume 3 - Appendix 7.5 Marine Management Organisation Spreadsheet
|
Other |
Aquind Limited (PDF, 10 MB)
6.3.8.1 Environmental Statement - Volume 3 - Appendix 8.1 Benthic Ecology Survey Report
|
Other |
Aquind Limited (PDF, 399 KB)
6.3.3.8 Environmental Statement - Volume 3 - Appendix 3.8 Onshore and Marine Programme
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.29.1 Environmental Statement - Volume 2 - Figure 29.1 Major Projects within the UK Marine Area
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.29.2 Environmental Statement - Volume 2 - Figure 29.2 Major and Aggregate Projects within the French Marine Area
|
Other |
Aquind Limited (PDF, 438 KB)
6.3.4.1 Environmental Statement - Volume 3 - Appendix 4.1 Screening for Major Accidents and Disasters
|
Other |
Aquind Limited (PDF, 43 MB)
6.3.5.2 Environmental Statement - Volume 3 - Appendix 5.2 EIA Scoping Report
|
Other |
Aquind Limited (PDF, 624 KB)
6.3.6.3 Environmental Statement - Volume 3 - Appendix 6.3 Grain Size Statistics
|
Other |
Aquind Limited (PDF, 17 MB)
6.2.25.2 Environmental Statement - Volume 2 - Figure 25.2 PRoW and Open Green Space witin 500 m of the Proposed Development
|
Other |
Aquind Limited (PDF, 529 KB)
6.3.7.2 Environmental Statement - Volume 3 - Appendix 7.2 Marine Water and Sediment Quality Consultation Responses
|
Other |
Aquind Limited (PDF, 7 MB)
6.3.7.1 Environmental Statement - Volume 3 - Appendix 7.1 Marine Water Framework Directive Assessment
|
Other |
Aquind Limited (PDF, 505 KB)
6.3.9.1 Environmental Statement - Volume 3 - Appendix 9.1 Fish and Shellfish Consultation Responses
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.24.4 Environmental Statement - Volume 2 - Figure 24.4 Section 1 - Predicted Broadband Noise Levels (pre-additional mitigation) from Operational Converter Station (Option B (ii)) and equipment included in Noise Model
|
Other |
Aquind Limited (PDF, 17 MB)
6.2.25.1 Environmental Statement - Volume 2 - Figure 25.1 Socio-economic Receptors within 500 m of the Proposed Development
|
Other |
Aquind Limited (PDF, 4 MB)
6.3.7.3 Environmental Statement - Volume 3 - Appendix 7.3 Contaminated Sediment Survey Report
|
Other |
Aquind Limited (PDF, 32 MB)
6.9 Onshore Outline Construction Environmental Management Plan
|
Other |
Aquind Limited (PDF, 713 KB)
6.3.8.4 Environmental Statement - Volume 3 - Appendix 8.4 Intertidal and Benthic Habitats Cumulative Assessment Matrix
|
Other |
Aquind Limited (PDF, 3 MB)
6.3.8.5 Environmental Statement - Volume 3 - Appendix 8.5 Marine Conservation Zone Assessment
|
Other |
Aquind Limited (PDF, 768 KB)
6.2.24.1 Environmental Statement - Volume 2 - Figure 24.1 Section 1 - Noise Survey Measurement Locations and Sensitive Receptors surrounding Converter Station
|
Other |
Aquind Limited (PDF, 914 KB)
6.2.24.3 Environmental Statement - Volume 2 - Figure 24.3 Section 10 - Noise Survey Measurement Locations and Sensitive Receptors Surrounding Telecommunications Infrastructure at Landfall
|
Other |
Aquind Limited (PDF, 582 KB)
6.3.8.2 Environmental Statement - Volume 3 - Appendix 8.2 Intertidal and Benthic Habitats Consultation Responses
|
Other |
Aquind Limited (PDF, 7 MB)
6.3.8.3 Environmental Statement - Volume 3 - Appendix 8.3 Intertidal Survey Report
|
Other |
Aquind Limited (PDF, 401 KB)
6.3.5.1 Environmental Statement - Volume 3 - Appendix 5.1 EIA Scoping Opinion General Responses Table
|
Other |
Aquind Limited (PDF, 32 MB)
6.3.5.3 Environmental Statement - Volume 3 - Appendix 5.3 EIA Scoping Opinion
|
Other |
Aquind Limited (PDF, 673 KB)
6.3.7.4 Environmental Statement - Volume 3 - Appendix 7.4 Marine Water and Sediment Quality Cumulative Assessment Matrix
|
Other |
Aquind Limited (PDF, 554 KB)
6.8.3.3 Habitats Regulations Assessment Report - Volume 3 - Appendix 3 In Combination Projects
|
Other |
Aquind Limited (PDF, 1 MB)
6.8.3.2 Habitats Regulations Assessment Report - Volume 3 - Appendix 2 Pre-Screening for Marine Mammals
|
Other |
Aquind Limited (PDF, 623 KB)
6.8.3.4 Habitats Regulations Assessment Report - Volume 3 - Appendix 4 HRA Marine Consultation Responses
|
Other |
Aquind Limited (PDF, 871 KB)
6.2.24.5 Environmental Statement - Volume 2 - Figure 24.5 Section 10 - Predicted Broadband Noise Levels from Operational Telecommunication ORS Infrastructure at Landfall
|
Other |
Aquind Limited (PDF, 14 MB)
6.3.6.2 Environmental Statement - Volume 3 - Appendix 6.2 Modelling Technical Report
|
Other |
Aquind Limited (PDF, 768 KB)
6.3.6.4 Environmental Statement - Volume 3 - Appendix 6.4 Physical Processes Cumulative Assessment Matrix
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.8.6 Environmental Statement - Volume 2 - Figure 8.6 Benthic Sampling Stations in UK Waters
|
Other |
Aquind Limited (PDF, 6 MB)
6.2.8.7 Environmental Statement - Volume 2 - Figure 8.7 Habitats Identified During the Benthic Baseline Survey
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.9.2 Environmental Statement - Volume 2 - Figure 9.2 ICES Rectangles, ICES Division VII.7.d and IFCA Districts which Cover the Marine Cable Corridor
|
Other |
Aquind Limited (PDF, 6 MB)
6.2.9.9 Environmental Statement - Volume 2 - Figure 9.9 Designated Sites
|
Other |
Aquind Limited (PDF, 593 KB)
6.2.9.8 Environmental Statement - Volume 2 - Figure 9.8 Sediment Suitability for Sandeel Spawning (EMODnet, 2019)
|
Other |
Aquind Limited (PDF, 341 KB)
6.3.1.1 Environmental Statement - Volume 3 - Appendix 1.1 Requirements of the EIA Regulations and their location within the ES
|
Other |
Aquind Limited (PDF, 326 KB)
6.3.1.2 Environmental Statement - Volume 3 - Appendix 1.2 EIA Project Team and Competence
|
Other |
Aquind Limited (PDF, 380 KB)
6.3.3.3 Environmental Statement - Volume 3 - Appendix 3.3 Qualitative Description of the Marine Cable Corridor
|
Other |
Aquind Limited (PDF, 5 MB)
6.2.9.4 Environmental Statement - Volume 2 - Figure 9.4 Spawning and Nursery Grounds in the Vicinity of the Marine Cable Corridor
|
Other |
Aquind Limited (PDF, 174 KB)
6.2.9.6 Environmental Statement - Volume 2 - Figure 9.6 South Marine Plan
|
Other |
Aquind Limited (PDF, 484 KB)
6.3.12.2 Environmental Statement - Volume 3 - Appendix 12.2 Commercial Fisheries Consultation Responses
|
Other |
Aquind Limited (PDF, 2 MB)
6.2.9.1 Environmental Statement - Volume 2 - Figure 9.1 Study Area
|
Other |
Aquind Limited (PDF, 3 MB)
6.2.9.3 Environmental Statement - Volume 2 - Figure 9.3 Spawning Grounds in the Vicinity of the Marine Cable Corridor
|
Other |
Aquind Limited (PDF, 1 MB)
6.2.9.5 Environmental Statement - Volume 2 - Figure 9.5 Black Bream Spawning Grounds
|
Other |
Aquind Limited (PDF, 602 KB)
6.2.9.7 Environmental Statement - Volume 2 - Figure 9.7 Sediment Suitability for Herring Spawning (EMODnet, 2019)
|
Other |
Aquind Limited (PDF, 380 KB)
6.3.3.5 Environmental Statement - Volume 3 - Appendix 3.5 Additional Supporting Information for Onshore Works
|
Other |
Aquind Limited (PDF, 629 KB)
6.3.3.7 Environmental Statement - Volume 3 - Appendix 3.7 Onshore Electric and Magnetic Field Report
|
Other |
Aquind Limited (PDF, 413 KB)
6.3.10.1 Environmental Statement - Volume 3 - Appendix 10.1 Marine Mammals and Basking Shark Consultation Responses
|
Other |
Aquind Limited (PDF, 347 KB)
6.3.11.1 Environmental Statement - Volume 3 - Appendix 11.1 - Marine Ornithology Consultation Responses
|
Other |
Aquind Limited (PDF, 3 MB)
6.3.23.3 Environmental Statement - Volume 3 - Appendix 23.3 Air Quality Traffic Modelling
|
Other |
Aquind Limited (PDF, 2 MB)
6.3.23.4 Environmental Statement - Volume 3 - Appendix 23.4 Air Quality Generator Emissions Modelling
|
Other |
Aquind Limited (PDF, 3 MB)
6.3.24.6 Environmental Statement - Volume 3 - Appendix 24.6 Noise Survey Equipment, Meteorological Conditions and Noise Survey Results
|
Other |
Aquind Limited (PDF, 814 KB)
6.3.24.7 Environmental Statement - Volume 3 - Appendix 24.7 Noise Modelling Results - Operational Converter Station and Landfall Telecommunications Infrastructure
|
Other |
Aquind Limited (PDF, 14 MB)
6.3.13.1 Environmental Statement - Volume 3 - Appendix 13.1 Navigation Risk Assessment
|
Other |
Aquind Limited (PDF, 649 KB)
6.3.9.2 Environmental Statement - Volume 3 - Appendix 9.2 Fish and Shellfish Cumulative Assessment Matrix
|
Other |
Aquind Limited (PDF, 674 KB)
6.3.10.2 Environmental Statement - Volume 3 - Appendix 10.2 - Marine Mammals and Basking Shark Cumulative Assessment Matrix
|
Other |
Aquind Limited (PDF, 692 KB)
6.3.3.4 Environmental Statement - Volume 3 - Appendix 3.4 Additional Supporting Information for Marine Works
|
Other |
Aquind Limited (PDF, 2 MB)
6.3.12.1a Environmental Statement - Volume 3 - Appendix 12.1a Commercial Fisheries Baseline Report
|
Other |
Aquind Limited (PDF, 554 KB)
6.3.21.6 Environmental Statement - Volume 3 - Appendix 21.6 Cumulative Effects Assessment Matrix (Stage 1 & 2)
|
Other |
Aquind Limited (PDF, 569 KB)
6.3.14.2 Environmental Statement - Volume 3 - Appendix 14.1 Marine Archaeological Technical Report
|
Other |
Aquind Limited (PDF, 369 KB)
6.3.21.4 Environmental Statement - Volume 3 - Appendix 21.4 Heritage and Archaeology Impact Tables
|
Other |
Aquind Limited (PDF, 458 KB)
6.3.11.2 Environmental Statement - Volume 3 - Appendix 11.2 Marine Ornithology Cumulative Assessment Matrix
|
Other |
Aquind Limited (PDF, 43 MB)
6.3.12.1b Environmental Statement - Volume 3 - Appendix 12.1b Commercial Fisheries Baseline Report Fig 1 - 31
|
Other |
Aquind Limited (PDF, 17 MB)
6.3.12.1c Environmental Statement - Volume 3 - Appendix 12.1c Commercial Fisheries Baseline Report Fig 32 - 62
|
Other |
Aquind Limited (PDF, 685 KB)
6.3.12.3 Environmental Statement - Volume 3 - Appendix 12.3 Commercial Fisheries Cumulative Assessment Matrix
|
Other |
Aquind Limited (PDF, 41 MB)
6.3.22.1A Environmental Statement - Volume 3 - Appendix 22.1A Framework Traffic Management Strategy
|
Other |
Aquind Limited (PDF, 766 KB)
6.3.23.2 Environmental Statement - Volume 3 - Appendix 23.2 IAQM Construction Assessment
|
Other |
Aquind Limited (PDF, 35 MB)
6.3.22.1 Environmental Statement - Volume 3 - Appendix 22.1 Transport Assessment
|
Other |
Aquind Limited (PDF, 1 MB)
6.6 Mitigation Schedule
|
Other |
Aquind Limited (PDF, 329 KB)
6.7 Letter of No Impediment
|
Other |
Aquind Limited (PDF, 3 MB)
6.8.2.4.7 Habitat Regulations Assessment Report - Volume 2 - Figure 4.7 Marine Ornithology: Sites in the UK Marine Area
|
Other |
Aquind Limited (PDF, 3 MB)
6.8.2.4.8 Habitat Regulations Assessment Report - Volume 2 - Figure 4.8 Marine Ornithology: Transboundary Sites
|
Other |
Aquind Limited (PDF, 5 MB)
6.3.3.6 Environmental Statement - Volume 3 - Appendix 3.6 Surface Water Drainage and Aquifer Contamination Mitigation Strategy
|
Other |
Aquind Limited (PDF, 740 KB)
6.3.13.2 Environmental Statement - Volume 3 - Appendix 13.2 Shipping, Navigation and Other Marine Users Cumulative Assessment Matrix
|
Other |
Aquind Limited (PDF, 23 MB)
6.3.14.1 Environmental Statement - Volume 3 - Appendix 14.2 Marine Archaeological Consultation Responses
|
Other |
Aquind Limited (PDF, 419 KB)
6.3.22.3 Environmental Statement - Volume 3 - Appendix 22.3 Baseline and Methodology Tables
|
Other |
Aquind Limited (PDF, 794 KB)
6.3.14.4 Environmental Statement - Volume 3 - Appendix 14.4 Marine Archaeology Cumulative Assessment Matrix
|
Other |
Aquind Limited (PDF, 3 MB)
6.3.14.3 Environmental Statement - Volume 3 - Appendix 14.3 Marine Archaeology Outline Written Scheme of Investigation
|
Other |
Aquind Limited (PDF, 567 KB)
6.3.23.5 Environmental Statement - Volume 3 - Appendix 23.5 Air Quality Cumulative Effects Assessment Matrix (Stage 1 & 2)
|
Other |
Aquind Limited (PDF, 532 KB)
6.3.23.6 Environmental Statement - Volume 3 - Appendix 23.6 Air Quality Cumulative Effects Assessment Matrix (Stage 3 & 4)
|
Other |
Aquind Limited (PDF, 432 KB)
6.3.24.4 Environmental Statement - Volume 3 - Appendix 24.4 Legislation, Policy and Guidance
|
Other |
Aquind Limited (PDF, 218 KB)
6.3.24.5 Environmental Statement - Volume 3 - Appendix 24.5 Noise and Vibration Assessment Assumptions
|
Other |
Aquind Limited (PDF, 5 MB)
6.8.1 Habitats Regulations Assessment Report - Volume 1 - Main Text
|
Other |
Aquind Limited (PDF, 4 MB)
6.8.2.4.1 Habitat Regulations Assessment Report - Volume 2 - Figure 4.1 Annex I Habitats: Sites in the UK Marine Area
|
Other |
Aquind Limited (PDF, 303 KB)
6.3.21.5 Environmental Statement - Volume 3 - Appendix 21.5 Heritage and Archaeology Residual Effects Tables
|
Other |
Aquind Limited (PDF, 334 KB)
6.3.21.7 Environmental Statement - Volume 3 - Appendix 21.7 Cumulative Effects Assessment Matrix (Stage 3 & 4)
|
Other |
Aquind Limited (PDF, 515 KB)
6.3.24.1 Environmental Statement - Volume 3 - Appendix 24.1 Consultation Responses
|
Other |
Aquind Limited (PDF, 470 KB)
6.3.24.2 Environmental Statement - Volume 3 - Appendix 24.2 Best Practicable Measures to be Employed during Construction
|
Other |
Aquind Limited (PDF, 330 KB)
6.3.24.3 Environmental Statement - Volume 3 - Appendix 24.3 Lists of Sensitive Receptors for Noise and Vibration Assessment of Converter Station and Telecommunications Infrastructure
|
Other |
Aquind Limited (PDF, 341 KB)
6.3.25.1 Environmental Statement - Volume 3 - Appendix 25.1 Consultation Responses
|
Other |
Aquind Limited (PDF, 3 MB)
6.8.3.1 Habitats Regulations Assessment Report - Volume 3 - Appendix 1 PINS Screening and Integrity Matrices
|
Other |
Aquind Limited (PDF, 5 MB)
6.3.22.4 Environmental Statement - Volume 3 - Appendix 22.4 Impact Tables
|
Other |
Aquind Limited (PDF, 576 KB)
6.3.24.8 Environmental Statement - Volume 3 - Appendix 24.8 Noise and Vibration Cumulative Effects Assessment Matrix (Stage 1 & 2)
|
Other |
Aquind Limited (PDF, 326 KB)
6.3.24.9 Environmental Statement - Volume 3 - Appendix 24.9 Noise and Vibration Cumulative Effects Assessment Matrix (Stage 3 & 4)
|
Other |
Aquind Limited (PDF, 3 MB)
6.4 Environmental Statement - Volume 4 - Non-Technical Summary
|
Other |
Aquind Limited (PDF, 336 KB)
6.5 Marine Outline Construction Environmental Management Plan
|
Other |
Aquind Limited (PDF, 525 KB)
6.3.25.2 Environmental Statement - Volume 3 - Appendix 25.2 Socio-economic Receptors within 500 m
|
Other |
Aquind Limited (PDF, 4 MB)
6.8.2.8.1 Habitat Regulations Assessment Report - Volume 2 - Figure 8.1 Location of In Combination Projects
|
Other |
Aquind Limited (PDF, 3 MB)
6.8.2.4.2 Habitat Regulations Assessment Report - Volume 2 - Figure 4.2 Annex I Habitats: Transboundary Sites
|
Other |
Aquind Limited (PDF, 5 MB)
6.8.2.4.3 Habitat Regulations Assessment Report - Volume 2 - Figure 4.3 Migratory Fish: Sites in the UK Marine Area
|
Other |
Aquind Limited (PDF, 4 MB)
6.8.2.4.4 Habitat Regulations Assessment Report - Volume 2 - Figure 4.4 Migratory Fish: Transboundary Sites
|
Other |
Aquind Limited (PDF, 2 MB)
6.8.2.4.5 Habitat Regulations Assessment Report - Volume 2 - Figure 4.5 Marine Mammals: Sites in the UK Marine Area
|
Other |
Aquind Limited (PDF, 4 MB)
6.8.2.4.6 Habitat Regulations Assessment Report - Volume 2 - Figure 4.6 Marine Mammals: Transboundary Sites
|
Other |
Aquind Limited (PDF, 47 MB)
6.3.22.2 Environmental Statement - Volume 3 - Appendix 22.2 Framework Construction Traffic Management Plan
|
Other |
Aquind Limited (PDF, 1 MB)
6.3.22.5 Environmental Statement - Volume 3 - Appendix 22.5 Traffic and Transport CEA (Stage 1 & 2)
|
Other |
Aquind Limited (PDF, 424 KB)
6.3.23.1 Environmental Statement - Volume 3 - Appendix 23.1 Consultation Responses
|
Other |
Aquind Limited (PDF, 315 KB)
6.3.3.1 Environmental Statement - Volume 3 - Appendix 3.1 Proposed Development Design Flexibility
|
Other |
Aquind Limited (PDF, 18 MB)
6.3.16.13 Environmental Statement - Volume 3 - Appendix 16.13 Wintering Bird Survey Report
|
Other |
Aquind Limited (PDF, 363 KB)
6.3.3.2 Environmental Statement - Volume 3 - Appendix 3.2 Marine Worst-Case Design Parameters
|
Other |
Aquind Limited (PDF, 966 KB)
6.3.15.4 Environmental Statement - Volume 3 - Appendix 15.4 Landscape Character
|
Other |
Aquind Limited (PDF, 17 MB)
6.3.16.11 Environmental Statement - Volume 3 - Appendix 16.11 Hazel Dormouse Survey Report
|
Other |
Aquind Limited (PDF, 4 MB)
6.3.15.7 Environmental Statement - Volume 3 - Appendix 15.7 Landscape Schedules, Planting Heights and Image Board
|
Other |
Aquind Limited (PDF, 2 MB)
6.3.15.8 Environmental Statement - Volume 3 - Appendix 15.8 Assessment of Landscape and Visual Effects
|
Other |
Aquind Limited (PDF, 4 MB)
6.3.16.10 Environmental Statement - Volume 3 - Appendix 16.10 Reptile Survey Report
|
Other |
Aquind Limited (PDF, 436 KB)
6.3.15.1 Environmental Statement - Volume 3 - Appendix 15.1 Consultation Responses
|
Other |
Aquind Limited (PDF, 528 KB)
6.3.15.9 Environmental Statement - Volume 3 - Appendix 15.9 Landscape and Visual Amenity Cumulative Effects Assessment Matrix (Stage 1 & 2)
|
Other |
Aquind Limited (PDF, 548 KB)
6.3.15.10 Environmental Statement - Volume 3 - Appendix 15.10 Landscape and Visual Amenity Cumulative Effects Assessment Matrix (Stage 3 & 4)
|
Other |
Aquind Limited (PDF, 5 MB)
6.3.16.12 Environmental Statement - Volume 3 - Appendix 16.12 Breeding Bird Survey Report
|
Other |
Aquind Limited (PDF, 677 KB)
6.3.15.5 Environmental Statement - Volume 3 - Appendix 15.5 South Downs National Park
|
Other |
Aquind Limited (PDF, 512 KB)
6.3.15.6 Environmental Statement - Volume 3 - Appendix 15.6 Visual Amenity
|
Other |
Aquind Limited (PDF, 549 KB)
6.3.25.3 Environmental Statement - Volume 3 - Appendix 25.3 Socio-economic Cumulative Effects Assessment Matrix (Stage 1 & 2)
|
Other |
Aquind Limited (PDF, 407 KB)
6.3.25.4 Environmental Statement - Volume 3 - Appendix 25.4 Socio-economic Cumulative Effects Assessment Matrix (Stage 3 & 4)
|
Other |
Aquind Limited (PDF, 661 KB)
6.3.15.2 Environmental Statement - Volume 3 - Appendix 15.2 National and Local Policy Review
|
Other |
Aquind Limited (PDF, 594 KB)
6.3.15.3 Environmental Statement - Volume 3 - Appendix 15.3 Landscape and Visual Assessment Methodology
|
Other |
Aquind Limited (PDF, 371 KB)
6.3.16.1 Environmental Statement - Volume 3 - Appendix 16.1 Consultation Responses
|
Other |
Aquind Limited (PDF, 2 MB)
6.3.25.5 Environmental Statement - Volume 3 - Appendix 25.5 Illustrative Phasing of Works at Example Public Open Spaces
|
Other |
Aquind Limited (PDF, 1 MB)
6.3.26.2 Environmental Statement - Volume 3 - Appendix 26.2 Human Health Cumulative Effects Assessment Matrix (Stage 1 & 2)
|
Other |
Aquind Limited (PDF, 351 KB)
6.3.27.2 Environmental Statement - Volume 3 - Appendix 27.2 Waste and Material Resources Assumptions and Limitations
|
Other |
Aquind Limited (PDF, 338 KB)
6.3.27.4 Environmental Statement - Volume 3 - Appendix 27.4 Waste and Material Resources Cumulative Effects Assessment Matrix (Stage 3 & 4)
|
Other |
Aquind Limited (PDF, 18 MB)
6.3.16.14 Environmental Statement - Volume 3 - Appendix 16.14 Winter Working Restriction for Features of Chichester & Langstone Harbours SPA
|
Other |
Aquind Limited (PDF, 310 KB)
6.3.27.1 Environmental Statement - Volume 3 - Appendix 27.1 Consultation Responses
|
Other |
Aquind Limited (PDF, 688 KB)
6.3.27.3 Environmental Statement - Volume 3 - Appendix 27.3 Waste and Material Resources Cumulative Effects Assessment Matrix (Stage 1 & 2)
|
Other |
Aquind Limited (PDF, 1 MB)
6.3.28.3 Environmental Statement - Volume 3 - Appendix 28.3 Climate Resilience Baseline
|
Other |
Aquind Limited (PDF, 827 KB)
6.3.28.2 Environmental Statement - Volume 3 - Appendix 28.2 Climate Vulnerability Assessment
|
Other |
Aquind Limited (PDF, 767 KB)
6.3.29.1 Environmental Statement - Volume 3 - Appendix 29.1 Cumulative Effects Assessment Consultation Responses
|
Other |
Aquind Limited (PDF, 624 KB)
6.3.28.1 Environmental Statement - Volume 3 - Appendix 28.1 Consultation Responses
|
Other |
Aquind Limited (PDF, 971 KB)
6.3.29.2 Environmental Statement - Volume 3 - Appendix 29.2 Collated Onshore Long and Short List of Developments
|
Other |
Aquind Limited (PDF, 984 KB)
6.3.29.3 Environmental Statement - Volume 3 - Appendix 29.3 Marine Intra-Project Effects
|
Other |
Aquind Limited (PDF, 549 KB)
6.3.26.1 Environmental Statement - Volume 3 - Appendix 26.1 Consultation Responses
|
Other |
Aquind Limited (PDF, 643 KB)
6.3.26.3 Environmental Statement - Volume 3 - Appendix 26.3 Human Health Cumulative Effects Assessment Matrix (Stage 3 & 4)
|
Other |
Aquind Limited (PDF, 475 KB)
6.3.2.5 Environmental Statement - Volume 3 - Appendix 2.5 Assessment and Comparison of Environmental Impacts Associated with Converter Station Options A and B
|
Other |
Aquind Limited (PDF, 595 KB)
6.3.16.15 Environmental Statement - Volume 3 - Appendix 16.15 Onshore Ecology Cumulative Effects Assessment Matrix (Stage 1 & 2)
|
Other |
Aquind Limited (PDF, 607 KB)
6.3.20.1 Environmental Statement - Volume 3 - Appendix 20.1 Consultation Responses
|
Other |
Aquind Limited (PDF, 31 MB)
6.3.16.4 Environmental Statement - Volume 3 - Appendix 16.4 Non-Statutory Designated Sites Report
|
Other |
Aquind Limited (PDF, 548 KB)
6.3.2.3 Environmental Statement - Volume 3 - Appendix 2.3 Landfall Constraints Matrix
|
Other |
Aquind Limited (PDF, 488 KB)
6.3.2.4 Environmental Statement - Volume 3 - Appendix 2.4 Summary of Onshore Cable Route Alternatives
|
Other |
Aquind Limited (PDF, 27 MB)
6.3.16.9 Environmental Statement - Volume 3 - Appendix 16.9 Great Crested Newt Survey Report
|
Other |
Aquind Limited (PDF, 8 MB)
6.3.16.8 Environmental Statement - Volume 3 - Appendix 16.8 Bat Survey Report
|
Other |
Aquind Limited (PDF, 8 MB)
6.3.16.5 Environmental Statement - Volume 3 - Appendix 16.5 Aquatic Ecology Scoping Assessment
|
Other |
Aquind Limited (PDF, 42 KB)
6.3.16.7 Environmental Statement - Volume 3 - Appendix 16.7 Badger Survey and Badger Bait Marking Survey Report (Confidential)
|
Other |
Aquind Limited (PDF, 13 MB)
6.3.17.2 Environmental Statement - Volume 3 - Appendix 17.2 Agricultural Land Classification and Soil Resources
|
Other |
Aquind Limited (PDF, 751 KB)
6.3.21.2 Environmental Statement - Volume 3 - Appendix 21.2 Historic Environment Desk Based Assessment
|
Other |
Aquind Limited (PDF, 16 MB)
6.3.16.3 Environmental Statement - Volume 3 - Appendix 16.3 Arboriculture Report
|
Other |
Aquind Limited (PDF, 308 KB)
6.3.17.1 Environmental Statement - Volume 3 - Appendix 17.1 Consultation Responses
|
Other |
Aquind Limited (PDF, 39 MB)
6.3.16.2 Environmental Statement - Volume 3 - Appendix 16.2 PEA / Phase 1 Habitat Survey Report
|
Other |
Aquind Limited (PDF, 321 KB)
6.3.16.16 Environmental Statement - Volume 3 - Appendix 16.16 Onshore Ecology Cumulative Effects Assessment Matrix (Stage 3 & 4)
|
Other |
Aquind Limited (PDF, 11 MB)
6.3.20.2 Environmental Statement - Volume 3 - Appendix 20.2 Onshore Water Framework Directive Assessment
|
Other |
Aquind Limited (PDF, 29 MB)
6.3.21.3 Environmental Statement - Volume 3 - Appendix 21.3 Geophysical Survey Report
|
Other |
Aquind Limited (PDF, 576 KB)
6.3.20.5 Environmental Statement - Volume 3 - Appendix 20.5 Surface Water Resources and Flood Risk Cumulative Effects Assessment Matrix (Stage 1 & 2)
|
Other |
Aquind Limited (PDF, 444 KB)
6.3.21.1 Environmental Statement - Volume 3 - Appendix 21.1 Consultation Responses
|
Other |
Aquind Limited (PDF, 2 MB)
6.3.16.6 Environmental Statement - Volume 3 - Appendix 16.6 Aquatic Ecology Assessment – Tributaries of the North Purbrook Stream, Denmead
|
Other |
Aquind Limited (PDF, 6 MB)
6.3.20.3 Environmental Statement - Volume 3 - Appendix 20.3 Watercourses Summary
|
Other |
Aquind Limited (PDF, 3 MB)
6.3.20.4 Environmental Statement - Volume 3 - Appendix 20.4 Flood Risk Assessment
|
Other |
Aquind Limited (PDF, 564 KB)
6.3.19.4 Environmental Statement - Volume 3 - Appendix 19.4 Groundwater Cumulative Effect Assessment Matrix (Stage 1 & 2)
|
Other |
Aquind Limited (PDF, 540 KB)
6.3.17.3 Environmental Statement - Volume 3 - Appendix 17.3 Soils and Agricultural Land Use Cumulative Effects Assessment Matrix (Stage 1 & 2)
|
Other |
Aquind Limited (PDF, 6 MB)
6.3.18.1 Environmental Statement - Volume 3 - Appendix 18.1 Preliminary Risk Assessment and Generic Quantitative Risk Assessment
|
Other |
Aquind Limited (PDF, 495 KB)
6.3.18.2 Environmental Statement - Volume 3 - Appendix 18.2 Consultation Responses
|
Other |
Aquind Limited (PDF, 705 KB)
6.3.18.3 Environmental Statement - Volume 3 - Appendix 18.3 Ground Conditions Cumulative Effects Assessment Matrix (Stage 1 & 2)
|
Other |
Aquind Limited (PDF, 350 KB)
6.3.17.4 Environmental Statement - Volume 3 - Appendix 17.4 Soils and Agricultural Land Use Cumulative Effect Assessment Matrix (Stage 3 & 4)
|
Other |
Aquind Limited (PDF, 447 KB)
6.3.2.1 Environmental Statement - Volume 3 - Appendix 2.1 NGET Cost Benefit Analysis Methodology
|
Other |
Aquind Limited (PDF, 556 KB)
6.3.2.2 Environmental Statement - Volume 3 - Appendix 2.2 Landfall Weighting
|
Other |
Aquind Limited (PDF, 445 KB)
6.3.19.1 Environmental Statement - Volume 3 - Appendix 19.1 Consultation Responses
|
Other |
Aquind Limited (PDF, 376 KB)
6.3.19.2 Environmental Statement - Volume 3 - Appendix 19.2 Groundwater Resources Baseline
|
Other |
Aquind Limited (PDF, 566 KB)
6.3.19.3 Environmental Statement - Volume 3 - Appendix 19.3 The Hydrogeology of Kings Pond and Denmead Meadows
|