AQUIND Interconnector

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (9)

Developer's Application (507)

Acceptance (19)

Pre Examination (76)

Examination (1305)

Decision (778)

Decided (66)

Date

SourceDescription
Other
AQUIND Limited (PDF, 460 KB)
Deadline 7 Submission - Late Submission - 3.2 Explanatory Memorandum - Clean - D7 - Accepted at the discretion of the Examining Authority
Other
APLEAL Action Group (PDF, 1 MB)
Deadline 7 Submission - Written Submission
Other
AQUIND Limited (PDF, 604 KB)
Deadline 7 Submission - Late Submission - 7.9.9.1 Schedule of documents forming the Environmental Statement - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 4 MB)
Deadline 7 Submission - Late Submission - 7.9.37 Traffic Demand Management Strategy - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 3 MB)
Deadline 7 Submission - Late Submission -4.1 Statement of Reasons - Clean - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 10 MB)
Deadline 7 Submission - Late Submission - 2.2 Land Plans - Rev05 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 374 KB)
Deadline 7 Submission - Late Submission - 7.9.35 Employment and Skills Strategy - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 470 KB)
Deadline 7 Submission - Late Submission - 7.5.8 Statement of Common Ground between AQUIND Limited and Havant Borough Council - Agreed Draft - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 476 KB)
Deadline 7 Submission - Late Submission - 3.2 Explanatory Memorandum - Tracked - D7 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 1 MB)
Deadline 7 Submission - Late Submission - 3.1 Draft DCO - Tracked - D7 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 34 MB)
Deadline 7 Submission - Late Submission - 2.4 Works Plans - Rev06 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 4 MB)
Deadline 7 Submission - Late Submission - 4.3 Book of Reference – Tracked - Rev006 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 43 MB)
Deadline 7 Submission - Late Submission - 7.7.16 Additional Viewpoint Location Plan and Additional Viewpoints Part B - Figures 15.60-15.61 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 267 KB)
Deadline 7 Submission - Late Submission - Letter to Ian Maguire (Portsmouth City Council) - DCO: Framework Recreational Management Strategy dated 27 January 2021 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 1 MB)
Deadline 7 Submission - Late Submission - 1.3 Application Document Tracker - Rev007 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 426 KB)
Deadline 7 Submission - Late Submission - 7.5.20 Statement of Common Ground between AQUIND Limited and Portsmouth Water - Draft Version - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 1,013 KB)
Deadline 7 Submission - Late Submission - 2.6 Converter Station and Telecommunications Buildings Parameter Plans - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 741 KB)
Deadline 7 Submission - Late Submission - 7.5.5 Statement of Common Ground between AQUIND Limited and Hampshire County Council - Agreed Draft - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 2 MB)
Deadline 7 Submission - Late Submission - 2.1 Site Location Plan - Rev04 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 12 MB)
Deadline 7 Submission - Late Submission - 7.5.13 Statement of Common Ground between AQUIND Limited and Historic England - Rev005 - Agreed Draft - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 339 KB)
Deadline 7 Submission - Late Submission - 7.9.9.1 Schedule of documents forming the Environmental Statement - Tracked - Rev004 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 1 MB)
Deadline 7 Submission - Late Submission - 7.9.36 Request for Changes to the Order Limits - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 887 KB)
Deadline 7 Submission - Late Submission - 7.5.4 Statement of Common Ground between AQUIND Limited and Winchester City Council - Agreed Draft - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 8 MB)
Deadline 7 Submission - Late Submission - 2.4 Works Plans - Part 2 - Low Resolution - Rev06 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 10 MB)
Deadline 7 Submission - Late Submission - 2.5 Access and Rights of Way Plans - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 18 MB)
Deadline 7 Submission - Late Submission - 7.9.34 Applicant's Responses to Deadline 6 and 6a Submissions - Additional Submissions - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 1,008 KB)
Deadline 7 Submission - Late Submission - 3.1 Draft DCO - Clean - D7 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 2 MB)
Deadline 7 Submission - Late Submission - 2.7 Indicative Converter Station Area Layout Plans - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 4 MB)
Deadline 7 Submission - Late Submission - 7.5.16 Statement of Common Ground between AQUIND Limited and the Marine Management Organisation - Rev004(1) - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 10 MB)
Deadline 7 Submission - Late Submission - 2.3 Crown Land Plans - Rev04 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 9 MB)
Deadline 7 Submission - Late Submission - 2.4 Works Plans - Part 1 - Low Resolution - Rev06 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 7 MB)
Deadline 7 Submission - Late Submission - 7.5.14 Statement of Common Ground (Onshore) between AQUIND Limited and Environment Agency - Signed Version - Rev003 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 26 MB)
Deadline 7 Submission - Late Submission - 2.12 Hedgerow and Tree Preservation Order Plans - Rev04 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 8 MB)
Deadline 7 Submission - Late Submission - 2.12 Hedgerow and Tree Preservation Order Plans - Low Resolution - Rev04 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 4 MB)
Deadline 7 Submission - Late Submission - 7.7.8 Indicative Landscape Mitigation Plans - Option B(ii) WQ CA1.3.7 - Rev04 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 465 KB)
Deadline 7 Submission - Late Submission - 7.5.1 Statement of Commonality for Statements of Common Ground - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 46 MB)
Deadline 7 Submission - Late Submission - 7.7.16 Additional Viewpoint Location Plan and Additional Viewpoints Part A - Figures 15.57-15.59 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 4 MB)
Deadline 7 Submission - Late Submission - 4.3 Book of Reference - Clean - Rev006 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 4 MB)
Deadline 7 Submission - Late Submission -4.1 Statement of Reasons - Tracked - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 499 KB)
Deadline 7 Submission - Late Submission - 7.5.10 Statement of Common Ground between AQUIND Limited and Highways England - Agreed Draft - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 410 KB)
Deadline 7 Submission - Late Submission - 7.5.7 Statement of Common Ground between AQUIND Limited and the South Down National Park Authority - Agreed Draft - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 606 KB)
Deadline 7 Submission - Late Submission - 7.2.7 Schedule of Changes - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 1 MB)
Deadline 7 Submission - Late Submission - 7.4.3.1 Second Written Question Response - Appendix 1 - Technical Note providing a review of collision data at Strategic Road Network junctions (MG2.1.1) - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 2 MB)
Deadline 7 Submission - Late Submission - 7.9.33.1 Applicants Responses to Deadline 6 Submissions – Hearing Appendices - - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 1 MB)
Deadline 7 Submission - Late Submission - 7.8.2.2 Environmental Statement Addendum 2 - Appendix 2 - NOAA Tool Inputs and Spreadsheets - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 3 MB)
Deadline 7 Submission - Late Submission - 6.4 ES - Vol 4 - Non-Technical Summary - Clean - Rev 003 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 7 MB)
Deadline 7 Submission - Late Submission - 6.4 ES - Vol 4 - Non-Technical Summary - Tracked - Rev 003 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 2 MB)
Deadline 7 Submission - Late Submission - 6.2.15.49 ES - Vol 2 - Figure 15.49 - Indicative Landscape Mitigation Plan Option B(i) (South) - Rev04 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 1 MB)
Deadline 7 Submission - Late Submission - 7.8.2.3 Environmental Statement Addendum 2 - Appendix 3 - Ash Dieback Survey Results - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 953 KB)
Deadline 7 Submission - Late Submission - 7.5.24 Explanatory Memorandum supporting S106 Agreement with Portsmouth City Council - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 687 KB)
Deadline 7 Submission - Late Submission - 7.4.3.6 Applicant's Response to the Examining Authority's Further Written Questions (ExQ2) - Appendix 6 - Fort Cumberland Road Car Park Drawings (SE2.15.1) - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 513 KB)
Deadline 7 Submission - Late Submission - 6.10 Outline Landscape and Biodiversity Strategy - Tracked - Rev005 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 4 MB)
Deadline 7 Submission - Late Submission - 6.8.1 HRA - Vol 1 - Habitats Regulations Assessment Report - Clean - Rev005 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 67 MB)
Deadline 7 Submission - Late Submission - 7.4.1.10 First Written Question Responses - Appendix 10 - Tree Survey Schedule and Constraint Plans - Rev003 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 31 KB)
Deadline 7 Submission - Late Submission - 7.1.9 Covering Letter - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 6 MB)
Deadline 7 Submission - Late Submission - 6.10 Outline Landscape and Biodiversity Strategy - Clean - Rev005 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 508 KB)
Deadline 7 Submission - Late Submission - 7.3.1 Schedule of Changes to the Draft DCO - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 2 MB)
Deadline 7 Submission - Late Submission - 7.4.3.5 Applicant's Response to the Examining Authority's Further Written Questions (ExQ2) - Appendix 5 - Material Datasheets for HDD Drilling Fluid (MG2.1.4) - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 859 KB)
Deadline 7 Submission - Late Submission - 7.8.2.5 Environmental Statement Addendum 2 - Appendix 5 - Clean Air Zone Sensitivity Testing - Air Quality - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 16 MB)
Deadline 7 Submission - Late Submission - 7.9.33 Applicant's Responses to Deadline 6 Submissions - Hearings - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 236 KB)
Deadline 7 Submission - Late Submission - 7.8.2.1 Environmental Statement Addendum 2 - Appendix 1 - Environmental Statement Errata Sheet 2 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 2 MB)
Deadline 7 Submission - Late Submission - 6.2.15.48 ES - Vol 2 - Figure 15.48 - Indicative Landscape Mitigation Plan Option B(i) (North) - Rev04 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 1,018 KB)
Deadline 7 Submission - Late Submission - 7.4.3.8 Applicant's Response to the Examining Authority's Further Written Questions (ExQ2) - Appendix 8 - AQUIND Energy 2019 Accounts (CA2.3.10) - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 556 KB)
Deadline 7 Submission - Late Submission - 7.7.19 Needs and Benefits Second Addendum - Rev001 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 32 MB)
Deadline 7 Submission - Late Submission - 6.9 Onshore Outline Construction Environmental Management Plan - Clean - Rev006 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 3 MB)
Deadline 7 Submission - Late Submission - 7.8.2.4 Environmental Statement Addendum 2 - Appendix 4 - Figure 1 - Denmead Meadows: SINCs, NVC Survey Results and Compounds - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 4 MB)
Deadline 7 Submission - Late Submission - 7.9.26 UK Joint Bay Feasibility Report - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 8 MB)
Deadline 7 Submission - Late Submission - 6.8.1 HRA - Vol 1 - Habitats Regulations Assessment Report - Tracked - Rev005 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 6 MB)
Deadline 7 Submission - Late Submission - 7.4.3 Applicant's Response to the Examining Authority's Further Written Questions (ExQ2) - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 1 MB)
Deadline 7 Submission - Late Submission - 7.4.3.4 Applicant's Response to the Examining Authority's Further Written Questions (ExQ2) - Appendix 4 - Bentonite Breakout Note (MG2.1.3) - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 1 MB)
Deadline 7 Submission - Late Submission - 7.6.1 Compulsory Acquisition Schedule - Tracked - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 13 MB)
Deadline 7 Submission - Late Submission - 5.5 Design and Access Statement - Tracked - Rev004 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 2 MB)
Deadline 7 Submission - Late Submission - 6.9 Onshore Outline Construction Environmental Management Plan - Tracked - Rev006 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 547 KB)
Deadline 7 Submission - Late Submission - 7.7.21 ES Appendix 16.3 - Arboriculture Report - Appendix F - Generic Aborticultural Method Statement - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 4 MB)
Deadline 7 Submission - Late Submission - 6.8.2.8.1 HRA - Vol 2 - Figure 8.1 - Location of In Combination Marine Projects - Rev02 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 20 MB)
Deadline 7 Submission - Late Submission - 7.4.3.3 Applicant's Response to the Examining Authority's Further Written Questions (ExQ2) - Appendix 3 - A27 HDD Crossing Farlington, UK - CD622 Documentation for Highways England (MG2.1.1) - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 2 MB)
Deadline 7 Submission - Late Submission - 7.8.2 Environmental Statement Addendum 2 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 760 KB)
Deadline 7 Submission - Late Submission - 7.6.1 Compulsory Acquisition Schedule - Clean - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 25 MB)
Deadline 7 Submission - Late Submission - 7.7.20 Supplementary Transport Assessment Addendum - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 49 MB)
Deadline 7 Submission - Late Submission - 7.4.3.2 Applicant's Response to the Examining Authority's Further Written Questions (ExQ2) - Appendix 2 - Infiltration Testing Results (MG2.1.1) - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 412 KB)
Deadline 7 Submission - Late Submission - 7.4.3.7 Applicant's Response to the Examining Authority's Further Written Questions (ExQ2) - Appendix 7 - Copies of the extent of Highway land maintained at public expense at Day Lane, Lovedean (TT2.16.8) - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 28 MB)
Deadline 7 Submission - Late Submission - 5.5 Design and Access Statement - Rev004 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 995 KB)
Deadline 7 Submission - Late Submission - 7.5.3 Statement of Common Ground between AQUIND Limited and Portsmouth City Council Rev 003 - Accepted at the discretion of the Examining Authority
Other
AQUIND Limited (PDF, 2 MB)
Deadline 7 Submission - Late Submission - 7.9.29 Day Lane Technical Note - Accepted at the discretion of the Examining Authority
Other
East Hampshire District Council (PDF, 118 KB)
Deadline 7 Submission - Responses to ExQ2
Other
Environment Agency (PDF, 742 KB)
Deadline 7 Submission - Responses to ExQ2
Other
Hampshire County Council (PDF, 783 KB)
Deadline 7 Submission - Responses to ExQ2
Other
Hampshire County Council (PDF, 2 MB)
Deadline 7 Submission - update and response to Deadline 7
Other
Hampshire County Council (PDF, 2 MB)
Deadline 7 Submission - Cover Email
Other
Havant Borough Council (PDF, 194 KB)
Deadline 7 Submission
Other
Highways England (PDF, 544 KB)
Deadline 7 Submission - Written Statement
Other
Historic England (PDF, 137 KB)
Deadline 7 Submission - Responses to ExQ2
Other
Ian Cleugh (PDF, 79 KB)
Deadline 7 Submission - Objection to electric cable
Other
James Bunbury (PDF, 292 KB)
Deadline 7 Submission - Responses to ExQ2
Other
Kevin Flynn (PDF, 56 KB)
Deadline 7 Submission
Other
Kimberley Barrett (PDF, 94 KB)
Deadline 7 Submission - Requested additional evidence
Other
Marine Management Organisation (MMO) (PDF, 163 KB)
Deadline 7 Submission - Responses to ExQ2
Other
Blake Morgan LLP on behalf of Mr Geoffery Carpenter and Mr Peter Carpenter (PDF, 10 MB)
Deadline 7 Submission - Comments on the ExA's further written questions (ExQ2) [PD-031] (question references LV2.9.1 and LV2.9.2) and related appendices
Other
Blake Morgan LLP  on behalf of Mr Geoffery Carpenter and Mr Peter Carpenter (PDF, 3 MB)
Deadline 7 Submission - Response by the Affected Party to Examination Authority's Further Written Questions (ExQ2) - Question ExADCO2.5.1
Other
Blake Morgan LLP  on behalf of Mr Geoffery Carpenter and Mr Peter Carpenter (PDF, 129 KB)
Deadline 7 Submission - Cover Letter
Other
Blake Morgan LLP  on behalf of Mr Geoffery Carpenter and Mr Peter Carpenter (PDF, 27 MB)
Deadline 7 Submission - Statement on Funding
Other
Blake Morgan LLP  on behalf of Mr Geoffery Carpenter and Mr Peter Carpenter (PDF, 1,007 KB)
Deadline 7 Submission - Statement in relation to the Carpenters' Proposal for Alternative Accesses and Protective Provisions in relation to Little Denmead Farm
Other
National Grid Electricity Systems Operator limited (NGESO) (PDF, 153 KB)
Deadline 7 Submission - Responses to ExQ2
Other
National Grid Electricity Transmission Plc (PDF, 4 MB)
Deadline 7 Submission - Responses to ExQ2
Other
Natural England (PDF, 202 KB)
Deadline 7 Submission - Responses to ExQ2
Other
Paula Ann Savage (PDF, 653 KB)
Deadline 7 Submission - Non-Interested Party Submission accepted at the discretion of the Examining Authority
Other
Portsmouth City Council (PDF, 5 MB)
Deadline 7 Submission - Responses to ExQ2 and comments on the following documents provided by the applicant at Deadline 6
Other
Portsmouth City Council (PDF, 110 KB)
Deadline 7 Submission
Other
Portsmouth Water (PDF, 258 KB)
Deadline 7 Submission - Responses to ExQ2
Other
Newsteer Real Estate Advisers  on behalf of Sainsbury's Supermarkets Limited (PDF, 242 KB)
Deadline 7 Submission - Responses to ExQ2
Other
South Downs National Park Authority (PDF, 143 KB)
Deadline 7 Submission - Responses to ExQ2 and comments on the following documents provided by the applicant at Deadline 6
Other
Southern Gas Networks PLC (PDF, 209 KB)
Deadline 7 Submission - Withdrawal of Objection
Other
Freeths LLP on behalf of University of Portsmouth (PDF, 360 KB)
Deadline 7 Submission - Responses to ExQ2
Other
Viola Langley (PDF, 625 KB)
Deadline 7 Submission
Other
Viola Langley (PDF, 218 KB)
Deadline 7 Submission - Responses to ExQ2
Other
Viola Langley (PDF, 170 KB)
Deadline 7 Submission - Late Submission - Accepted at the discretion of the Examining Authority
Other
Winchester City Council (PDF, 109 KB)
Deadline 7 Submission - Applicants response to Deadline 5 submissions edited to show WCC section only with further comment by WCC
Other
Winchester City Council (PDF, 8 MB)
Deadline 7 Submission - Cover Email
Other
Winchester City Council (PDF, 154 KB)
Deadline 7 Submission - WCC Paper No. 7 Matters to be Considered within a 106 Agreement
Other
Winchester City Council (PDF, 156 KB)
Deadline 7 Submission - WCC Paper No.5 Comments on Design & Access Statement Rev003
Other
Winchester City Council (PDF, 160 KB)
Deadline 7 Submission - WCC Paper No. 1 General comments on dDCO rev005
Other
Winchester City Council (PDF, 159 KB)
Deadline 7 Submission - WCC Paper No. 4 Comments on ExA Position to Further Site Inspections
Other
Winchester City Council (PDF, 160 KB)
Deadline 7 Submission - WCC Paper No. 3 Comments on Joint Bays Technical Note
Other
Winchester City Council (PDF, 158 KB)
Deadline 7 Submission - WCC Paper No.6 Comments on Denmead Meadows Position Paper
Other
Winchester City Council (PDF, 928 KB)
Deadline 7 Submission - Copy dDCO rev005 edited to include WCC comments
Other
Winchester City Council (PDF, 3 MB)
Deadline 7 Submission - Kings Pond Meadow Habitat Survey
Other
Winchester City Council (PDF, 164 KB)
Deadline 7 Submission - WCC Paper No. 2 Comments on Ash Dieback Situation
Other
Winchester City Council (PDF, 242 KB)
Deadline 7 Submission - Examining Authority Further Written Questions No.2
Other
Winchester City Council (PDF, 4 MB)
Deadline 7 Submission - Applicants response to Deadline 4 submissions edited to show WCC section only with further comment by WCC
Other
Blake Morgan LLP  on behalf of  Mr Geoffery Carpenter and Mr Peter Carpenter (PDF, 423 KB)
Deadline 7 Submission - Statement in relation to the Applicant's use of Compulsory Acquisition Powers as a Last Resort