Register of applications

Below is a list of all applications for Nationally Significant Infrastructure Projects received by the Planning Inspectorate (or formerly by the Infrastructure Planning Commission). This register is required in accordance with Section 39 of the Planning Act 2008. Click on the links to view further information and the documents associated with each project. All associated documents can be accessed under the ‘Documents’ tab on the relevant project page.

ApplicationLocationDeveloperDate Of application submissionDate of acceptance/non-acceptance for examinationStatusSubmission date
The London ResortSwanscombe Peninsula and land adjacent to Ebbsfleet StationLondon Resort Company Holdings04/01/202128/01/2021Withdrawn. This case has been archived and all records removed from the site. 2021-01-04
Willington C Gas PipelineNear Burton on TrentRWE npower30/07/201322/08/2013DCO granted on 17/12/20142013-07-30
A30 Temple to Higher Carblake ImprovementApproximately 3 miles north east of BodminCornwall Council15/08/201309/09/2013DCO granted on 05/02/20152013-08-15
A160 - A180 Port of Immingham ImprovementBetween Brocklesby Interchange and the Port of Immingham, North and North East LincolnshireHighways Agency08/01/201427/01/2014DCO granted on 04/02/20152014-01-08
A19/A1058 Coast Road Junction ImprovementNorth Tyneside where the A1058 passes over the A19 approximately 1.5 miles north of the Tyne TunnelHighways Agency14/11/201403/12/2014DCO granted on 28/01/20162014-11-14
Galloper Offshore Wind FarmApproximately 27km off the coast of SuffolkGalloper Wind Farm Ltd21/11/201119/12/2011DCO granted on 24/05/20132011-11-21
Kentish Flats ExtensionKentish Flats, KentVattenfall14/10/201110/11/2011DCO granted on 19/02/20132011-10-14
Morpeth Northern BypassNorth of Morpeth, NorthumberlandNorthumberland County Council15/07/201307/08/2013DCO granted on 12/01/20152013-07-15
Burbo Bank Extension offshore wind farmLiverpool Bay NW of Wirral CoastDONG Energy Burbo Extension (UK) Ltd.22/03/201319/04/2013DCO granted on 26/09/20142013-03-22
Brechfa Forest West Wind FarmCarmarthenshire, WalesRWE Npower Renewables04/11/201130/11/2011DCO granted on 12/03/20132011-11-04
A556 Knutsford to Bowdon SchemeKnutsford to Bowdon, CheshireHighways Agency24/04/201317/05/2013DCO granted on 28/08/20142013-04-24
Clocaenog Forest Wind FarmDenbighshire CC and Conwy CBC, North WalesRWE npower renewables28/03/201323/04/2013DCO granted on 12/09/20142013-03-28
M1 Junction 10a Grade Separation - LutonJunction 10a M1 LutonLuton Borough Council29/06/201227/07/2012DCO granted on 30/10/20132012-06-29
Woodside Link Houghton Regis BedfordshireNorth of Houghton Regis Dunstable BedfordshireCentral Bedfordshire Council14/05/201311/06/2013DCO granted on 30/09/20142013-05-14
Heysham to M6 Link RoadNorth of Lancaster M6 J34 to junction of A683 & A589Lancashire County Council06/12/201123/12/2011DCO granted on 19/03/20132011-12-06
Norwich Northern Distributor Road (NDR)North of Norwich from a point 1.6km NW of A1067Norfolk County Council07/01/201404/02/2014DCO granted on 02/06/20152014-01-07
Dogger Bank Creyke BeckYorkshire and HumberForewind29/08/201325/09/2013DCO granted on 17/02/20152013-08-29
East Northants Resource Management Facility2.6km north of Kings Cliffe East NorthamptonshireAugean PLC14/03/201211/04/2012DCO granted on 11/07/20132012-03-14
Abergelli PowerFarmland to the north of Swansea, WalesAbergelli Power Limited25/05/201821/06/2018DCO granted on 19/09/20192018-05-25
Wylfa Newydd Nuclear Power StationAnglesey, WalesHorizon Nuclear Power01/06/201828/06/2018Withdrawn. This case has been archived and all records removed from the site. 2018-06-01
Reinforcement to North Shropshire Electricity Distribution NetworkFrom Oswestry Grid Substation to Wem Primary SubstationSP Manweb12/11/201810/12/2018DCO granted on 20/03/20202018-11-12
Hornsea Project Three Offshore Wind FarmApproximately 120km offshore, to the east of TriminghamOrsted Hornsea Project Three (UK) Ltd14/05/201808/06/2018DCO granted on 31/12/20202018-05-14
Rail Central (Strategic Rail Freight Interchange)Land at Arm Farm, Milton Malsor, NorthamptonAshfield Land Management Limited and Gazeley GLP Northampton s.á.r.l.29/10/201815/11/2018Withdrawn. This case has been archived and all records removed from the site. 2018-10-29
Manston Airport5km west of Ramsgate, KentRiverOak Strategic Partners Ltd17/07/201814/08/2018DCO granted on 18/08/20222018-07-17
North Wales ConnectionAnglesey/GwyneddNational Grid Electricity Transmission Plc07/09/201804/10/2018Withdrawn. This case has been archived and all records removed from the site. 2018-09-07
M20 Junction 10ASouth of AshfordHighways England19/07/201611/08/2016DCO granted on 01/12/20172016-07-19
The Sizewell C ProjectNear Leiston in SuffolkNNB Generation Company (SZC) Limited27/05/202024/06/2020DCO granted on 20/07/20222020-05-27
Bramford to Twinstead29km linear route between the Bramford Substation,Suffolk and 1.5km south of Twinstead Tee, EssexNational Grid Electricity Transmission27/04/202323/05/2023DCO granted on 12/09/20242023-04-27
A63 Castle Street Improvement-HullA63 to the South of Hull City CentreHighways England20/09/201818/10/2018DCO granted on 28/05/20202018-09-20
Millbrook PowerThe Rookery Pit Near Stewartby, BedfordshireMillbrook Power Limited23/10/201720/11/2017DCO granted on 13/03/20192017-10-23
A38 Derby JunctionsDerbyHighways England23/04/201921/05/2019DCO granted on 17/08/20232019-04-23
Great Yarmouth Third River CrossingA new highway crossing of River Yare, Great Yarmouth, connecting Harfrey’s Roundabout to the west of the River Yare with South Denes Road to the east of the River Yare.Norfolk County Council30/04/201928/05/2019DCO granted on 24/09/20202019-04-30
Able Marine Energy ParkKillingholme, HumbersideAble Humber Ports Ltd19/12/201112/01/2012DCO granted on 18/12/20132011-12-19
Daventry International Rail Freight TerminalFormer Rugby Radio StationRugby Radio Station Ltd Partnership & Prologis UK22/02/201320/03/2013DCO granted on 03/07/20142013-02-22
Dogger Bank Teesside A / Sofia Offshore Wind Farm (formerly Dogger Bank Teesside B) - Project previously known as Dogger Bank Teesside A&BNorth Sea between 125 kilometres (km) and 290km off the UK North East coastForewind Ltd28/03/201423/04/2014DCO granted on 05/08/20152014-03-28
Ferrybridge Multifuel 2 (FM2) Power StationFormer Golf Course, Stranglands Lane, KnottingleyMultifuel Energy Ltd31/07/201420/08/2014DCO granted on 28/10/20152014-07-31
Hinkley Point C New Nuclear Power StationHinkley Point SomersetNNB Generation Company Limited31/10/201124/11/2011DCO granted on 19/03/20132011-10-31
Hinkley Point C ConnectionWest Somerset to BristolNational Grid28/05/201419/06/2014DCO granted on 19/01/20162014-05-28
Hirwaun Power StationHirwaun Industrial Estate. Hirwaun, AberdareHirwaun Power Limited21/03/201415/04/2014DCO granted on 23/07/20152014-03-21
Ipswich Rail Chord1km north of Ipswich goods yardNetwork Rail29/06/201121/07/2011DCO granted on 05/09/20122011-06-29
Kings Lynn B Connection ProjectKings Lynn, NorfolkNational Grid27/07/201221/08/2012DCO granted on 18/12/20132012-07-27
Portishead Branch Line - MetroWest Phase 1Within North Somerset and Bristol City Council administrative boundariesNorth Somerset Council15/11/201912/12/2019DCO granted on 14/11/20222019-11-15
Knottingley Power ProjectFormer Oxiris Chemical Works, KnottingleyKnottingley Power Limited04/10/201331/10/2013DCO granted on 10/03/20152013-10-04
Port Blyth New Biomass PlantPort Blyth in NorthumberlandNorth Blyth Energy Ltd15/03/201211/04/2012DCO granted on 24/07/20132012-03-15
Navitus Bay Wind ParkSouth West of Isle of WightNavitus Bay Development Limited10/04/201408/05/2014DCO refused on 11/09/20152014-04-10
Mynydd y Gwynt Wind FarmNear Y Foel, PowysMynydd y Gwynt Ltd31/07/201420/08/2014DCO refused on 20/11/20152014-07-31
North Doncaster Rail Chord (near Shaftholme)North DoncasterNetwork Rail22/06/201119/07/2011DCO granted on 16/10/20122011-06-22
North Killingholme Power ProjectLand West of Humber Sea TerminalC.GEN Killingholme Ltd25/03/201319/04/2013DCO granted on 11/09/20142013-03-25
North London (Electricity Line) ReinforcementNorth LondonNational Grid30/08/201227/09/2012DCO granted on 16/04/20142012-08-30
Rampion Offshore Wind FarmApproximately 13 - 23km off the Sussex coastE.ON Climate and Renewables01/03/201325/03/2013DCO granted on 16/07/20142013-03-01
Redditch Branch Enhancement SchemeBetween Redditch and AlvechurchNetwork Rail04/09/201201/10/2012DCO granted on 31/10/20132012-09-04
South Hook Combined Heat & Power StationSouth Hook LNG Terminal Site, PembrokeshireQPI Global Ventures Ltd31/05/201326/06/2013DCO granted on 23/10/20142013-05-31
Stafford Area Improvements - Norton Bridge Railway5Km NW of Stafford - centred on Norton BridgeNetwork Rail19/12/201210/01/2013DCO granted on 31/03/20142012-12-19
Tidal Lagoon Swansea BaySwansea Bay, South WalesTidal Lagoon (Swansea Bay) PLC07/02/201406/03/2014DCO granted on 09/06/20152014-02-07
Internal Power Generation Enhancement for Port Talbot SteelworksPort Talbot Steelworks, Port TalbotTata Steel UK limited07/08/201402/09/2014DCO granted on 08/12/20152014-08-07
Thames Tideway TunnelCross London ProjectThames Water28/02/201327/03/2013DCO granted on 12/09/20142013-02-28
Triton Knoll Offshore Wind FarmGreater WashTriton Knoll Offshore Wind Farm Limited31/01/201223/02/2012DCO granted on 11/07/20132012-01-31
Whitemoss Landfill Western ExtensionSkelmersdale, LancashireWhitemoss Landfill Limited20/12/201317/01/2014DCO granted on 21/05/20152013-12-20
Palm Paper 3 CCGT Power station Kings LynnPalm Paper Mill, King's LynnPalm Paper Ltd23/09/201420/10/2014DCO granted on 11/02/20162014-09-23
Preesall Saltfield Underground Gas StoragePreesall Saltfield, Over Wyre, Lancashire.Halite Energy Group Ltd01/12/201123/12/2011DCO refused on 17/07/20152011-12-01
Progress Power StationEye Airfield Industrial Estate, Mid SuffolkProgress Power Limited31/03/201425/04/2014DCO granted on 23/07/20152014-03-31
Silvertown TunnelThe new road tunnel will pass under the River Thames between Silvertown and North GreenwichTransport for London03/05/201631/05/2016DCO granted on 10/05/20182016-05-03
Walney Extension Offshore Wind FarmIrish Sea off Walney IslandDONG Energy Walney Extension (UK) Ltd28/06/201322/07/2013DCO granted on 07/11/20142013-06-28
Hornsea Offshore Wind Farm (Zone 4) - Project Two89km east of East Riding of Yorkshire coastSMart Wind Limited30/01/201519/02/2015DCO granted on 16/08/20162015-01-30
East Midlands Gateway Rail Freight InterchangeNorth of East Midlands AirportRoxhill (Kegworth) Limited29/08/201419/09/2014DCO granted on 12/01/20162014-08-29
East Anglia ONE Offshore Windfarm43 km off Norfolk/Suffolk coastEast Anglia One Ltd21/11/201214/12/2012DCO granted on 17/06/20142012-11-21
White Rose Carbon Capture and Storage ProjectDrax Power Station, Selby, North YorkshireCapture Power Limited24/11/201417/12/20142014-11-24
Meaford Energy CentreFormer Meaford Power Station site, east of Meaford Road, to the north of the town of StoneMeaford Energy Limited31/03/201524/04/2015DCO granted on 19/07/20162015-03-31
York Potash Harbour Facilities OrderBran Sand, TeesportYork Potash Ltd27/03/201521/04/2015DCO granted on 20/07/20162015-03-27
M4 Junctions 3 to 12 Smart MotorwayM4 Motorway from Junction 3 in Borough of Hounslow, London to Junction 12 in West BerkshireHighways Agency (now Highways England)30/03/201527/04/2015DCO granted on 02/09/20162015-03-30
Brechfa Forest ConnectionBrechfa Forest to Llandyfaelog CarmarthenshireWestern Power Distribution (South Wales) plc29/05/201524/06/2015DCO granted on 06/10/20162015-05-29
Triton Knoll Electrical System33km off the Lincolnshire coast to the Triton Knoll Substation in LincolnshireTriton Knoll Offshore Wind Farm Limited24/04/201521/05/2015DCO granted on 03/09/20162015-04-24
Thorpe Marsh Gas Pipeline1.5km west of Camblesforth to Thorpe MarshThorpe Marsh Power Limited20/11/201412/12/2014DCO granted on 03/03/20162014-11-20
River Humber Gas Pipeline Replacement ProjectA crossing of the Humber Estuary (see project description for detail)National Grid15/04/201512/05/2015DCO granted on 25/08/20162015-04-15
A14 Cambridge to Huntingdon Improvement SchemeLinear route between Cambridge and Huntingdon, CambridgeshireHighways England31/12/201427/01/2015DCO granted on 11/05/20162014-12-31
North Wales Wind Farms ConnectionWithin Conwy & Denbighshire Council areasSP MANWEB20/03/201517/04/2015DCO granted on 28/07/20162015-03-20
East Anglia THREE Offshore Wind FarmApproximately 70km east of LowestoftEast Anglia THREE Limited18/11/201515/12/2015DCO granted on 07/08/20172015-11-18
Richborough Connection ProjectRichborough to CanterburyNational Grid14/01/201611/02/2016DCO granted on 03/08/20172016-01-14
North London Heat and Power ProjectLondon Borough of EnfieldNorth London Waste Authority15/10/201511/11/2015DCO granted on 24/02/20172015-10-15
Keuper Gas Storage ProjectHolford Brinefield, approximately 3km north of Middlewich, Cheshire.Keuper Gas Storage Limited24/11/201522/12/2015DCO granted on 15/03/20172015-11-24
Glyn Rhonwy Pumped StorageCefn-Du Mountain, GwyneddSnowdonia Pumped Hydro Limited21/10/201517/11/2015DCO granted on 08/03/20172015-10-21
Yorkshire and Humber CCS Cross Country PipelineDrax, North Yorkshire to Barmston, East Riding of YorkshireNational Grid Carbon Limited18/06/201416/07/2014DCO refused on 11/01/20172014-06-18
Wrexham Energy CentreWrexhamWrexham Power Limited18/03/201613/04/2016DCO granted on 18/07/20172016-03-18
Rookery South Energy from Waste Generating StationRookery South Pit, Near Stewartby, BedfordshireCovanta Rookery South Limited05/08/201026/08/2010DCO decided on 13/10/20112010-08-05
Hornsea Offshore Wind Farm (Zone 4) - Project OneEast Coast offshore HornseaSMart Wind Ltd30/07/201322/08/20132013-07-30
East Anglia ONE North Offshore WindfarmAn area of approximately 208km2, 36km from Lowestoft and 42km from Southwold at closest pointEast Anglia ONE North Limited25/10/201922/11/2019DCO granted on 31/03/20222019-10-25
East Anglia TWO Offshore WindfarmAn area of 218.4km2 approximately 37km from Lowestoft & 32km from Southwold at closest pointEast Anglia TWO Limited25/10/201922/11/2019DCO granted on 31/03/20222019-10-25
West Midlands InterchangeWest MidlandsFour Ashes Limited03/08/201824/08/2018DCO granted on 04/05/20202018-08-03
Norfolk VanguardThe centre of Norfolk Vanguard West is 67km from the Bacton coast and 63km from the Gorleston coastNorfolk Vanguard Limited26/06/201824/07/2018DCO granted on 11/02/20222018-06-26
Eggborough CCGTNear Eggborough village, Selby District, North YorkshireEggborough Power Limited30/05/201727/06/2017DCO granted on 20/09/20182017-05-30
Electric line connection to Maesgwyn wind farmNear Banwen, NeathElectric line connection to Maesgwyn wind farm03/08/201031/08/2010Withdrawn. This case has been archived and all records removed from the site. 2010-08-03
Brig y Cwm Energy from Waste Generating StationCwmbargoed, Merthyr TydfilCovanta Brig y Cwm Ltd31/12/201026/01/2011Withdrawn. This case has been archived and all records removed from the site. 2010-12-31
Roosecote (Barrow) Biomass Power StationWithin site of existing Roosecote Power StationCentrica Energy03/07/201231/07/2012Withdrawn. This case has been archived and all records removed from the site. 2012-07-03
Fieldes Lock - Rail linked power stationRatty's Lane, Hoddesdon, HertfordshireVeolia Environmental Services (UK) Plc14/08/201207/09/2012Withdrawn. This case has been archived and all records removed from the site. 2012-08-14
Atlantic Array Wind FarmBristol ChannelChannel Energy Limited14/06/201312/07/2013Withdrawn. This case has been archived and all records removed from the site. 2013-06-14
Northampton Gateway Rail Freight InterchangeLand west of the A508, south west of M1 Junction 15 and east of Northampton Loop LineRoxhill Developments Limited21/05/201815/06/2018DCO granted on 09/10/20192018-05-21
Wheelabrator Kemsley Generating Station (K3) and Wheelabrator Kemsley North (WKN) Waste to Energy FacilityAdjacent to and immediately NE of the Kemsley Paper Mill, in Kemsley, Sittingbourne, KentWTI/EFW Holdings Ltd11/09/201908/10/2019DCO granted on 19/02/20212019-09-11
Tees CCPPSite of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JFSembcorp Utilities (UK) Limited22/11/201718/12/2017DCO granted on 05/04/20192017-11-22
VPI Immingham OCGTSite at and adjacent to the existing VPI Immingham Power Station, Rosper Road, Immingham DN40 3DZVPI Immingham B Ltd11/04/201909/05/2019DCO granted on 07/08/20202019-04-11
A19 / A184 Testos Junction ImprovementSunderlandHighways England14/07/201710/08/2017DCO granted on 12/09/20182017-07-14
Thanet Extension Offshore Wind Farmapproximately 8km off the east coast of Kent, in areas surrounding Thanet Offshore Wind FarmVattenfall Wind Power Limited27/06/201823/07/2018DCO refused on 01/06/20202018-06-27
Lake Lothing Third CrossingLake Lothing, Lowestoft, SuffolkSuffolk County Council13/07/201809/08/2018DCO granted on 30/04/20202018-07-13
Drax Re-powerDrax Power Station, Drax YO8 8PH, North YorkshireDrax Power Limited29/05/201826/06/2018DCO granted on 04/10/20192018-05-29
West Burton C power stationWithin the wider West Burton Power station site, approximately 3.5km to the south of GainsboroughEDF Energy (Thermal Generation) Limited30/04/201923/05/2019DCO granted on 21/10/20202019-04-30
Norfolk BoreasThe centre of Norfolk Boreas is approximately 94km north east of Great YarmouthNorfolk Boreas Limited11/06/201904/07/2019DCO granted on 10/12/20212019-06-11
Tilbury2Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of TilburyPort of Tilbury London Limited31/10/201721/11/2017DCO granted on 20/02/20192017-10-31
A30 Chiverton to Carland Cross SchemeA30 trunk road between Chiverton and Carland Cross junctions.Highways England30/08/201827/09/2018DCO granted on 06/02/20202018-08-30
A19 Downhill Lane Junction ImprovementSunderland/South TynesideHighways England25/01/201922/02/2019DCO granted on 16/07/20202019-01-25
Kemsley Paper Mill (K4) CHP PlantLand within the south-eastern part of the Kemsley Paper Mill, Kemsley, Sittingbourne.DS Smith Paper Ltd06/04/201826/04/2018DCO granted on 05/07/20192018-04-06
A303 StonehengeLinear route between Amesbury and Berwick Down, WiltshireHighways England19/10/201816/11/2018DCO granted on 14/07/20232018-10-19
M42 Junction 6 ImprovementJunction 6 of the M42 motorway, close to the National Exhibition Centre (NEC)Highways England02/01/201930/01/2019DCO granted on 21/05/20202019-01-02
M25 junction 10/A3 Wisley interchange improvementM25 Junction 10, near Wisley, Surrey and A3 between Cobham/Byfleet and Ripley/Ockham.Highways England19/06/201917/07/2019DCO granted on 12/05/20222019-06-19
M25 junction 28 improvementsTo the west of Brentwood in Essex, at the intersection of the M25, the A12 and the A1023Highways England27/05/202024/06/2020DCO granted on 16/05/20222020-05-27
A1 Birtley to Coal House Improvement SchemeThe scheme is located on the A1 Newcastle Gateshead Western Bypass, between junctions 65 and 67.Highways England14/08/201910/09/2019DCO granted on 19/01/20212019-08-14
Lower Thames CrossingEast of Gravesend and TilburyNational Highways31/10/202228/11/2022Decision2022-10-31
A57 Link Roads (previously known as Trans Pennine Upgrade Programme)Within Tameside MBC and Derbyshire CC, 9miles east of Manchester, 2miles west of the Peak DistrictHighways England28/06/202126/07/2021DCO granted on 16/11/20222021-06-28
A585 Windy Harbour to Skippool Improvement SchemeFylde Peninsula - A585 between the Windy Harbour junction and Skippool junctionHighways England29/10/201826/11/2018DCO granted on 09/04/20202018-10-29
Cleve Hill Solar ParkLand approximately 2 km northeast of Faversham and 5 km west of Whitstable on the North Kent Coast.Cleve Hill Solar Park Ltd16/11/201814/12/2018DCO granted on 28/05/20202018-11-16
Riverside Energy ParkImmediately to the west of the existing Riverside Resource Recovery Facility,Bexley, LondonCory Riverside Energy16/11/201814/12/2018DCO granted on 09/04/20202018-11-16
A303 Sparkford to Ilchester DuallingBetween the Podimore Bypass and Sparkford BypassHighways England27/07/201823/08/2018DCO granted on 29/01/20212018-07-27
Hinckley National Rail Freight InterchangeThe site lies 5 km to the north-east of Hinckley town centre, north-west of the M69 junction 2.Tritax Symmetry (Hinckley) Limited17/03/202313/04/2023Decision2023-03-17
A47 - A11 Thickthorn JunctionA47 and A11 Thickthorn Interchange approximately 5.5km south west of Norwich City CentreHighways England31/03/202128/04/2021DCO granted on 14/10/20222021-03-31
A47 North Tuddenham to EastonThe scheme commences east of North Tuddenham and continues to the Easton roundabout.Highways England15/03/202112/04/2021DCO granted on 12/08/20222021-03-15
A47 Blofield to North BurlinghamLocation of the scheme is to the east of Norwich and to the west of Great Yarmouth.Highways England30/12/202027/01/2021DCO granted on 22/06/20222020-12-30
A47 Wansford to SuttonLocation is west of the A1 Peterborough near Wansford and close to the village of Sutton.Highways England05/07/202102/08/2021DCO granted on 17/02/20232021-07-05
Cambridge Waste Water Treatment Plant RelocationLand North of A14 Trunk Road, Milton, CambridgeAnglian Water Services Limited28/04/202324/05/2023Decision2023-04-28
Southampton to London Pipeline ProjectFrom Boorley Green, Hampshire to Hounslow, West London, via Alton.Esso Petroleum Company, Limited14/05/201911/06/2019DCO granted on 07/10/20202019-05-14
Boston Alternative Energy Facility (BAEF)Nursery Road, Boston, LincolnshireAlternative Use Boston Projects Limited23/03/202120/04/2021DCO granted on 06/07/20232021-03-23
Hornsea Project Four Offshore Wind FarmApproximately 90km offshore, to the east of HornseaOrsted Hornsea Project Four Limited29/09/202126/10/2021DCO granted on 12/07/20232021-09-29
AQUIND InterconnectorFrom the UK seaward limit in the English Channel to Lovedean Substation.AQUIND Limited14/11/201912/12/2019Decision2019-11-14
Sheringham and Dudgeon Extension ProjectsSEP is to the north and east of Sheringham Shoal OFW. DEP is north and southeast of Dudgeon OFW.Equinor05/09/202203/10/2022DCO granted on 17/04/20242022-09-05
Little Crow Solar ParkLand located 0.6km to the east of the British Steel site at Scunthorpe, North Lincolnshire, DN16 1XPINRG SOLAR (Little Crow) Ltd04/12/202023/12/2020DCO granted on 05/04/20222020-12-04
A428 Black Cat to Caxton Gibbet Road Improvement schemeThe project starts at A1/A421 Junction, Black Cat roundabout and finishes at A428/A1198 junctionHighways England26/02/202123/03/2021DCO granted on 18/08/20222021-02-26
A12 Chelmsford to A120 Widening SchemeFrom Junction 19 of the A12 to the East of Chelmsford to Junction 25 with the A120 at Marks TeyNational Highways15/08/202212/09/2022DCO granted on 12/01/20242022-08-15
M54 to M6 Link RoadThe scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of FeatherstoneHighways England31/01/202028/02/2020DCO granted on 21/04/20222020-01-31
M3 Junction 9 ImprovementAdjacent to Winnal industrial estate, Winchester, north of Alresford Road B3404National Highways21/11/202215/12/2022DCO granted on 16/05/20242022-11-21
Sunnica Energy FarmSunnica West is located south of Chippenham, and Sunnica East is located south of WorlingtonSunnica Ltd18/11/202116/12/2021DCO granted on 12/07/20242021-11-18
The Net Zero Teesside ProjectLand at and in the vicinity of Teesworks, Redcar, Teesside, TS10 5QWNet Zero Teesside Power Limited “NZT Power” and Net Zero North Sea Storage Limited “NZNS Storage”19/07/202116/08/2021DCO granted on 16/02/20242021-07-19
London Luton Airport ExpansionThe existing site of London Luton AirportLondon Luton Airport Limited27/02/202327/03/2023Decision2023-02-27
A417 Missing LinkLocated between the Brockworth bypass and Cowley roundabout in GloucestershireHighways England01/06/202129/06/2021DCO granted on 16/11/20222021-06-01
South Humber Bank Energy CentreLand at South Humber Bank Power Station, South Marsh Road, Stallingborough, near Grimsby, DN41 8BZEP Waste Management Limited09/04/202004/05/2020DCO granted on 10/11/20212020-04-09
Gatwick Airport Northern RunwayGatwick AirportGatwick Airport Limited06/07/202303/08/2023Recommendation2023-07-06
Medworth Energy from Waste Combined Heat and Power FacilityLand on the Algores Way Industrial Estate to the west of Algores Way in Wisbech, Fenland, CambridgeMedworth CHP Limited07/07/202202/08/2022DCO granted on 20/02/20242022-07-07
Awel y Môr Offshore Wind FarmTo the west of, and immediately adjacent to, the Gwynt y Môr Offshore Wind Farm.Awel y Môr Offshore Wind Farm Limited20/04/202218/05/2022DCO granted on 20/09/20232022-04-20
A1 in Northumberland - Morpeth to EllinghamThe scheme consists of two parts on the A1 in NorthumberlandHighways England07/07/202004/08/2020DCO granted on 24/05/20242020-07-07
Keadby 3 Carbon Capture Power StationLand at the Keadby Power Station Site, Trentside, Keadby, Scunthorpe, Lincolnshire, DN17 3EFKeadby Generation Limited01/06/202128/06/2021DCO granted on 07/12/20222021-06-01
North Lincolnshire Green Energy ParkFlixborough Wharf, Flixborough Industrial Estate, North Lincolnshire.North Lincolnshire Green Energy Park Limited31/05/202227/06/2022Decision2022-05-31
East Northants Resource Management Facility Western Extension1.1km east south east of Duddington and 2km north north west of Kings Cliffe, East NorthamptonshireAugean South Limited08/09/202124/09/2021DCO granted on 23/01/20232021-09-08
Rampion 2 Offshore Wind FarmAdjacent to the exisiting Rampion Wind Farm, approximately 13km off the Sussex CoastRampion Extension Development Limited10/08/202307/09/2023Decision2023-08-10
Five Estuaries Offshore Wind FarmLocated off the East coast of England, approximately 37km offshore from SuffolkFive Estuaries Offshore Wind Farm Ltd25/03/202422/04/2024Examination2024-03-25
Longfield Solar FarmLocated on land north east of Chelmsford and north of the A12 between Boreham and Hatfield PeverelLongfield Solar Energy Farm Limited28/02/202228/03/2022DCO granted on 26/06/20232022-02-28
North Falls Offshore Wind FarmThe southern section of the North Sea, approximately 24.5km from its nearest point to land.North Falls Offshore Wind Farm Ltd26/07/202422/08/2024Pre-examination2024-07-26
Drax Bioenergy with Carbon Capture and Storage ProjectAt, and in the vicinity of, Drax Power Station, New Road, Drax, Selby, North Yorkshire YO8 8PHDrax Power Limited23/05/202220/06/2022DCO granted on 16/01/20242022-05-23
Able Marine Energy Park Material Change 2Approximately 3km north-west of the Port of Immingham in North Lincolnshire.Able Humber Ports Ltd25/06/202115/07/2021DCO granted on 16/07/20222021-06-25
Yorkshire GREENApproximately 2km to the north west of York, extending 36km south to Monk Fryston substationNational Grid Electricity Transmission (NGET)15/11/202208/12/2022DCO granted on 14/03/20242022-11-15
HyNet Carbon Dioxide PipelineFrom the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North WalesLiverpool Bay CCS Limited03/10/202231/10/2022DCO granted on 20/03/20242022-10-03
A66 Northern Trans-Pennine ProjectThe A66 connects the M6 at Penrith and the A1(M) at Scotch Corner.National Highways21/06/202219/07/2022DCO granted on 07/03/20242022-06-21
M5 Junction 10 Improvements SchemeIn Gloucestershire, 5 miles to the south of Tewkesbury and 4 miles to the north-west of Cheltenham.Gloucestershire County Council19/12/202316/01/2024Examination2023-12-19
M60/M62/M66 Simister IslandM60 Junction 18, three miles south of Bury.National Highways02/04/202430/04/2024Examination2024-04-02
Oaklands Farm Solar ParkLand at Rosliston Road, south of Drakelow Power StationOaklands Farm Solar Limited08/02/202405/03/2024Examination2024-02-08
Immingham Eastern Ro-Ro TerminalPort of Immingham, Immingham, North LincolnshireAssociated British Ports10/02/202306/03/2023DCO granted on 04/10/20242023-02-10
Rivenhall IWMF and Energy CentreLand at the former Rivenhall Airfield, off Coggeshall Road (A120), Braintree CO5 9DFIndaver Rivenhall Ltd10/11/202308/12/2023Decision2023-11-10
Heckington Fen Solar ParkThe site is located on land to the north of East Heckington and 3.5km south east of South Kyme.Ecotricity (Heck Fen Solar) Limited15/02/202313/03/2023Decision2023-02-15
Slough Multifuel Extension ProjectLand at 342 Edinburgh Avenue, Slough Trading Estate, Slough, Berkshire, SL1 4TU.SSE Slough Multifuel Limited30/09/202226/10/2022DCO granted on 28/11/20232022-09-30
Cottam Solar ProjectCottam 1 land parcel located to the east of Willingham by Stow, Normanby by Stow and Stow.Cottam Solar Project Limited12/01/202309/02/2023DCO granted on 05/09/20242023-01-12
West Burton Solar ProjectWest Burton 1-3 land parcels located to the south of Sturton by Stow and south east of Marton.West Burton Solar Project Limited21/03/202318/04/2023Decision2023-03-21
Mallard Pass Solar ProjectLand either side and in the vicinity of the East Coast Main Line, near the village of Essendine.Mallard Pass Solar Farm Limited24/11/202221/12/2022DCO granted on 12/07/20242022-11-24
Gate Burton Energy ParkThe Site is located approximately 4 kilometres (km) south of Gainsborough.Gate Burton Energy Park Ltd27/01/202322/02/2023DCO granted on 12/07/20242023-01-27
Dogger Bank South Offshore Wind FarmsThe Dogger Bank in the North Sea, approximately 100 kilometres (km) from the UK coastRWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd12/06/202410/07/2024Pre-examination2024-06-12
Viking CCS PipelineFrom land south of VPI Immingham Power Plant to the Theddlethorpe Gas TerminalChrysaor Production (UK) Limited23/10/202317/11/2023Recommendation2023-10-23
Stonestreet Green SolarLand at Aldington, southeast of Ashford in KentEPL 001 Limited11/06/202409/07/2024Examination2024-06-11
Thurrock Flexible Generation PlantNorth of the existing Tilbury National Grid substation, off Station Road, Thurrock, RM18 8ULThurrock Power Ltd27/05/202024/06/2020DCO granted on 16/02/20222020-05-27
Morecambe Offshore Windfarm Generation AssetsIrish Sea, approximately 30km from the Lancashire coast.Morecambe Offshore Windfarm Ltd.31/05/202427/06/2024Examination2024-05-31
Morgan Offshore Wind Project Generation AssetsIrish Sea - 22.22km from the Isle of Man and 37.13km from the North West Coast of EnglandMorgan Offshore Wind Limited24/04/202417/05/2024Examination2024-04-24
Mona Offshore Wind FarmIrish SeaMona Offshore Wind Limited22/02/202421/03/2024Examination2024-02-22
Cory Decarbonisation ProjectRiverside Resource Recovery Facility, Norman Road North, Belvedere, DA17 6JYCory Environmental Holdings Limited (CEHL)21/03/202418/04/2024Examination2024-03-21
Immingham Green Energy TerminalEastern side of Port Immingham, North LincolnshireAssociated British Ports21/09/202319/10/2023Decision2023-09-21
Helios Renewable Energy ProjectLand to the south west of the village of Camblesforth and to the north of the village of Hirst CourtEnso Green Holdings D Limited02/07/202430/07/2024Pre-examination2024-07-02
Outer Dowsing Offshore Wind (Generating Station)The project is in the Southern North Sea, approximately 54km from the Lincolnshire coast.GT R4 Limited (trading as Outer Dowsing Offshore Wind)19/03/202416/04/2024Examination2024-03-19
East Yorkshire Solar FarmEast Yorkshire Solar Farm located approximately 1.4 kilometres (km) north-west of Howden.East Yorkshire Solar Farm Limited21/11/202319/12/2023Examination2023-11-21
A46 Newark BypassFrom Farndon roundabout to Winthorpe roundabout near Newark-on-TrentNational Highways26/04/202423/05/2024Examination2024-04-26
Tillbridge Solar ProjectLand east and south-east of Gainsborough, south of A631 and west of B1398.Tillbridge Solar Limited10/04/202408/05/2024Examination2024-04-10
Byers Gill SolarNorth of DarlingtonRWE Renewables UK Solar and Storage Limited09/02/202408/03/2024Examination2024-02-09
Morgan and Morecambe Offshore Wind Farms Transmission AssetsOffshore assets in East Irish Sea; onshore assets in North West EnglandMorgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited21/10/202418/11/2024Pre-examination2024-10-21
Springwell Solar FarmThe Site is located within the administrative boundary of North Kesteven District Council, in the CoSpringwell Energy Farm Limited20/11/2024Due by 18/12/2024Acceptance2024-11-20
H2TeessideLand within the boroughs of Redcar and Cleveland and Stockton-on-Tees and HartlepoolH2 Teesside Limited25/03/202422/04/2024Examination2024-03-25
Botley West Solar FarmLand in West Oxfordshire, Cherwell and Vale of White Horse Districts, across approx 1400 hectaresPhotovolt Development Partners (PVDP) on behalf of SolarFive Ltd15/11/2024Due by 13/12/2024Acceptance2024-11-15
A46 Coventry Junctions (Walsgrave)Walsgrave A46 junction to the east of CoventryNational Highways14/11/2024Due by 12/12/2024Acceptance2024-11-14
Xlinks Morocco-UK Power ProjectFields to the Northwest of the Alverdiscott National SubstationXlinks 1 Limited21/11/2024Due by 19/12/2024Acceptance2024-11-21

Application documents

The application documents are publicly available and easily accessible. Application documents for the above projects can be viewed on the relevant project page and hard copies of the application documents are also available to view free of charge at various locations in the vicinity of the proposed development site. To find out where you can view the application documents, contact the Planning Inspectorate case team (contact details can be found on the relevant project page).

The Planning Inspectorate does not itself have the facilities to produce large quantities of printed material. The most appropriate means, and we expect the quickest means of obtaining copies of application documents will be to contact the developer who will be able to process these requests at a cost. If you ask the Planning Inspectorate for paper copies of application documents this will be subject to the charging policy.