You can filter the results to show only the items that match your interest.
Documents Published By Stage
Pre Application (15)
Developer's Application (261)
- All Documents
- Application Form (6)
- Compulsory Acquisition Information (5)
- Draft Development Consent Orders (2)
- Environmental Statement (133)
- Other Documents (21)
- Plans (87)
- Reports (7)
Acceptance (12)
Pre Examination (2)
Examination (253)
- All Documents
- Additional Submissions (4)
- Deadline 1 - 21 August 2015 - 21-08-2015 (52)
- Deadline 2 - 7 September 2015 - 07-09-2015 (20)
- Deadline 3 - 2 October 2015 - 02-10-2015 (12)
- Deadline 4 - 6 November 2015 - 06-11-2015 (62)
- Deadline 5 - 20 November 2015 - 20-11-2015 (9)
- Deadline 6 - 16 December 2015 - 16-12-2015 (32)
- Deadline 7 - 30 December 2016 - 30-12-2016 (11)
- Deadline 8 - 13 January 2016 (10)
- Deadline 9 - 20 January 2016 (7)
- Development Consent Order (1)
- Environmental Impact Assessment (1)
- + Examining Authority questions (2)
- + Hearings (17)
- Other (1)
- Preliminary Meeting (6)
- Procedural Decisions (5)
- Site Inspection (Accompanied) - 23-09-2015 - 1000 - Wilton Centre Redcar (1)
Decision (8)
- All Documents
- Decision (5)
- Examination Library.pdf (1)
- Other Documents (1)
- Procedural Decisions (1)
Decided (13)
Source | Description |
---|---|
Other |
Department for Transport (PDF, 87 KB)
The York Potash Harbour Facilities (Amendment) Order 2022
|
Other |
Department for Transport (PDF, 202 KB)
Secretary of State Decision Letter - 25 August 2022
|
Other |
Natural England (PDF, 94 KB)
Summary of Natural England's Advice - No Objection Letter
|
Other |
Net Zero Teesside Power Limited (PDF, 138 KB)
Representation in relation to the York Potash Harbour DCO Change Notice
|
Other |
Net Zero Teesside Power Limited (PDF, 2 MB)
4.1 Site Location Plan Key Plan
|
Other |
Net Zero Teesside Power Limited (PDF, 6 MB)
4.1 Site Location Plan
|
Other |
Department for Transport (PDF, 119 KB)
Reduced Consultee letter
|
Other |
York Potash Ltd (PDF, 2 MB)
DCO Re-Phasing Plan-Land Interests
|
Other |
York Potash Ltd (PDF, 96 KB)
Letter to DfT - The York Potash Harbour DCO 2016 - Non Material Amendment Application - 9.2.22
|
Other |
York Potash Ltd (PDF, 2 MB)
The York Potash Harbour Facilities Order Amendment Application Statement
|
Other |
York Potash Ltd (PDF, 75 KB)
The York Potash Harbour Facilities Draft Amendment Order
|
Other |
York Potash Ltd (PDF, 919 KB)
The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments
|
Other |
York Potash Ltd (PDF, 64 KB)
Regulation 6 Notice - The York Potash Harbour DCO - NMA Application
|
Other |
Correction slip (PDF, 9 KB)
To correct an incorrect email address in the York Potash Harbour Facilities Order
|
Other |
Development Consent Order as made by the Secretary of State (PDF, 623 KB)
The Development Consent Order made by the Secretary of State
|
Other |
Examining Authority’s Recommendation Report (PDF, 2 MB)
Examining Authority's Recommendation Report including the following Appendices; The Examination, Examination Library, List of Abbreviations, Recommended DCO - submitted to the Secretary of State for Transport 20 April 2016
|
Other |
Notice of the Decision by the SoS (Reg 23) (PDF, 109 KB)
|
Other |
Secretary of State’s Decision Letter and Statement of Reasons (PDF, 215 KB)
Secretary of State’s Decision Letter which includes the Statement of Reasons and Habitats Regulations Assessment
|
Other |
Post Examination Correspondence (PDF, 8 MB)
|
Other | |
Other |
York Potash Ltd (PDF, 141 KB)
Document 3.4E - Contractor's Temporary Compound Layout Site D- Rev F
|
Other |
Examination Library (PDF, 315 KB)
Examination library published following updating the template 06 April 2016
|
Other |
Notification of Completion of ExA Examination (PDF, 66 KB)
|
Other |
CATS Parties (PDF, 222 KB)
Submission for Deadline 9 of 20 January 2016
|
Other |
Northumbrian Water (PDF, 300 KB)
Submission for Deadline 9 of 20 January 2016
|
Other |
Redcar & Cleveland Borough Council (PDF, 89 KB)
Submission for Deadline 9 of 20 January 2016
|
Other |
SABIC UK Petrochemicals Limited, Huntsman Polyurethanes (UK) Limited and INEOS UK SNS Limited (PDF, 183 KB)
Submission for Deadline 9 of 20 January 2016
|
Other |
York Potash Ltd (PDF, 520 KB)
Submission for Deadline 9 of 20 January 2016
|
Other |
York Potash Ltd (PDF, 481 KB)
Submission for Deadline 9 of 20 January 2016
|
Other |
York Potash Ltd (PDF, 400 KB)
Letter accepted by the Examining Authority as a late submission to Deadline 9
|
Other |
Environment Agency (PDF, 2 MB)
Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
GTC group of companies (PDF, 34 KB)
No comments. Submission for Deadline 8 of 13 January 2016
|
Other |
Marine Management Organisation (PDF, 95 KB)
Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
Northern Powergrid (Northeast) Limited (PDF, 362 KB)
Withdrawal of representations. Submission for Deadline 8 of 13 January 2016
|
Other |
Redcar & Cleveland Borough Council (PDF, 89 KB)
Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016.Submission for Deadline 8 of 13 January 2016
|
Other |
York Potash Ltd (PDF, 1 MB)
Draft Development Consent Order (Comparite with version 4.1C). Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
York Potash Ltd (PDF, 1 MB)
Covering email, letter and 1.4H - Document List. Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
York Potash Ltd (PDF, 1 MB)
Draft Development Consent Order (Tracked). Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
York Potash Ltd (PDF, 1 MB)
Draft Development Consent Order (Clean). Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
York Potash Ltd (PDF, 1 MB)
Draft Development Consent Order (Comparite with version 4.1). Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
|
Other |
Rules 8(3) and 17 Letter (PDF, 77 KB)
Examining Authority?s Request for further information from specified parties and deadline for comments.
|
Other |
CATS Parties (PDF, 258 KB)
Statement of Response to the Applicant?s document 8.11 for Deadline 6. Submission for Deadline 7 of 30 December 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 76 KB)
Comments on the Applicant?s Schedule of Changes to the draft Development Consent Order submitted at Deadline 6. Submission for Deadline 7 of 30 December 2015
|
Other |
INEOS UK SNS Limited (INEOS) � formerly DEA UK SNS Limited (DEA) (PDF, 76 KB)
Comments on the Applicant?s Schedule of Changes to the draft Development Consent Order submitted at Deadline 6. Submission for Deadline 7 of 30 December 2015
|
Other |
Marine Management Organisation (PDF, 133 KB)
No further comments. Submission for Deadline 7 of 30 December 2015
|
Other |
Redcar & Cleveland Borough Council (PDF, 85 KB)
No further comments. Submission for Deadline 7 of 30 December 2015
|
Other |
SABIC UK Petrochemicals Limited (PDF, 76 KB)
Comments on the Applicant?s Schedule of Changes to the draft Development Consent Order submitted at Deadline 6. Submission for Deadline 7 of 30 December 2015
|
Other |
Tata Steel UK and Redcar Bulk Terminal (PDF, 78 KB)
Confirmation of the Applicant?s submission for Deadline 7 of 30 December 2015
|
Other |
York Potash Ltd (PDF, 73 KB)
Response to Tata Steel UK and Redcar Bulk Terminal?s submission for Deadline 6. Submission for Deadline 7 of 30 December 2015
|
Other |
York Potash Ltd (PDF, 3 MB)
8.12 ? Applicant?s Responses to other parties submissions for Deadline 6. Submission for Deadline 7 of 30 December 2015
|
Other |
York Potash Ltd (PDF, 635 KB)
Covering Letter and attachment. Submission for Deadline 7 of 30 December 2015
|
Other |
York Potash Ltd (PDF, 476 KB)
1.4G ? Document List. Submission for Deadline 7 of 30 December 2015
|
Other |
Oil and Gas Authority (PDF, 48 KB)
Comments on CATS Pipelines System?s concerns regarding the possible routes of the conveyor system. Accepted at the discretion of the Examining Authority
|
Other |
Historic England (PDF, 83 KB)
Comments on the RIES and the Examining Authority?s draft Development Consent Order. Accepted as a late submission for Deadline 6 at the discretion of the Examining Authority.
|
Other |
CATS parties (PDF, 2 MB)
Young Lady Report. Submission for Deadline 6 of 16 December 2015
|
Other |
CATS parties (PDF, 2 MB)
Statement of difference. Submission for Deadline 6 of 16 December 2015
|
Other |
Tata Steel UK and Redcar Bulk Terminal (PDF, 569 KB)
Comments on the Examining Authority's draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
Environment Agency (PDF, 1 MB)
Comments on the Examining Authority?s draft Development Consent Order and RIES. Submission for Deadline 6 of 16 December 2015
|
Other |
GTC group of companies (PDF, 194 KB)
No comments. Submission for Deadline 6 of 16 December 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 6 MB)
Relating to Schedule 9 ? Protective Provisions. Submission for Deadline 6 of 16 December 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 101 KB)
Comments on the Examining Authority?s draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
INEOS UK SNS Limited (INEOS) � formerly DEA UK SNS Limited (DEA) (PDF, 102 KB)
Comments on the Examining Authority?s draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
INEOS UK SNS Limited (INEOS) � formerly DEA UK SNS Limited (DEA) (PDF, 6 MB)
Relating to Schedule 9 ? Protective Provisions. Submission for Deadline 6 of 16 December 2015
|
Other |
Marine Management Organisation (PDF, 216 KB)
Additional information to Response to Examining authority?s questions. Submission for Deadline 6 of 16 December 2015
|
Other |
Marine Management Organisation (PDF, 511 KB)
Response to Examining Authority?s Questions. Submission for Deadline 6 of 16 December 2015
|
Other |
Natural England (PDF, 236 KB)
Response to Examining Authority?s Questions on the RIES issued on 25 November 2015. Submission for Deadline 6 of 16 December 2015
|
Other |
Redcar & Cleveland Borough Council (PDF, 37 KB)
No comments on the draft Development Consent Order or the RIES. Submission for Deadline 6 of 16 December 2015
|
Other |
Redcar & Cleveland Borough Council (PDF, 37 KB)
Withdrawal of objection to proposed conveyor bridge. Submission for Deadline 6 of 16 December 2015
|
Other |
SABIC UK Petrochemicals Limited (PDF, 102 KB)
Comments on the Examining Authority?s draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
SABIC UK Petrochemicals Limited (PDF, 6 MB)
Relating to Schedule 9 ? Protective Provisions. Submission for Deadline 6 of 16 December 2015
|
Other |
Trinity House (PDF, 70 KB)
No further comments on the drafy Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 1 MB)
3.16 Access Around the RBT Conveyor. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 377 KB)
8.9 Applicant?s Response to Rule 17 Letter of 25 November 2015 and Comment on the RIES. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 1 MB)
4.1D draft Development Consent Order (Tracked). Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 1 MB)
Covering Letter and Document List. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 1 MB)
4.1D draft Development Consent Order (clean). Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 45 KB)
5.3B Book of Reference (Tracked). Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 573 KB)
6.11B Outline Ecological Management Plan. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 406 KB)
8.8 Applicant?s Comments on the Examining Authority?s draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 45 KB)
5.3B Book of Reference (Clean). Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 855 KB)
6.10A Outline Construction Environmental Management Plan. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Limited (PDF, 780 KB)
8.10 Schedule of Changes to the draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Ltd (PDF, 13 MB)
8.11 Applicant?s Response to BP CATS Objection to Southern Conveyor Route. Submission for Deadline 6 of 16 December 2015 (Republished 5 April 2016)
|
Other |
York Potash Ltd (PDF, 860 KB)
Constructability Notes - BP CATS Pipeline Southern Route. Submission for Deadline 6 of 16 December 2015
|
Other |
York Potash Ltd (PDF, 877 KB)
Constructability Notes - BP CATS Pipeline Northern Route. Submission for Deadline 6 of 16 December 2015
|
Other |
Recording of CA Hearing (PDF, 31 KB)
Audio Recording of the Compulsory Acquisition Hearing 24 November 2015
|
Other |
Recording of DCO Hearing (PDF, 31 KB)
Audio Recording of the Development Consent Order Hearing 24 November 2015
|
Other |
Rule 17 Letter (PDF, 86 KB)
Letter notifying Publication of the Report on the Implications for European Sites, publication of the draft Development Consent Order, and a request for information issued by the Examining Authority on 25 November 2015
|
Other |
CATS Parties (PDF, 205 KB)
Submission to the Compulsory Acquisiton hearing of 24 November 2015
|
Other |
Examining Authority�s Draft Development Consent Order (PDF, 1,018 KB)
Examining Authority?s Draft Development Consent Order issued by the Examining Authority on 25 November 2015
|
Other |
Marine Management Organisation (PDF, 15 KB)
Answers to the Examining Authority?s questions at the Development Consent Order hearing of 24 November 2014
|
Other |
Report on the Implications for European Sites (RIES) (PDF, 390 KB)
Report on the Implications for European Sites (RIES) issued by the Examining Authority on 25 November 2015
|
Other |
Marine Management Organisation (PDF, 145 KB)
Comments on responses to the Examining Authority?s second round of written questions. Submission for Deadline 5 of 20 November 2015
|
Other |
Northern Powergrid (Northeast) Limited (PDF, 36 KB)
Update on discussions with applicant. Submission for Deadline 5 of 20 November 2015
|
Other |
Redcar and Cleveland Borough Council (PDF, 197 KB)
Update on discussions with the applicant. Submission for Deadline 5 of 20 November 2015
|
Other |
Sahaviriya Steel Industries UK Limited (SSI) (PDF, 2 MB)
Winding Up Order and update on discussions with applicant. Submission for Deadline 5 of 20 November 2015
|
Other |
Tata Steel UK Limited (PDF, 642 KB)
Tata/RBT?s Comments on Responses to the Examining Authority?s second round of written questions and two Appendices. Submission for Deadline 5 of 20 November 2015
|
Other |
York Potash Ltd (PDF, 218 KB)
Hierarchy Document. Submission for Deadline 5 of 20 November 2015
|
Other |
York Potash Ltd (PDF, 472 KB)
1.4E- Updated document list reflecting appropriate additions. Submission for Deadline 5 of 20 November 2015
|
Other |
York Potash Ltd (PDF, 538 KB)
Covering Letter to the Planning Inspectorate. Submission for Deadline 5 of 20 November 2015
|
Other |
York Potash Ltd (PDF, 981 KB)
8.7- Applicant?s Responses to Other Parties Responses to the Examining Authority?s second round of written questions. Submission for Deadline 5 of 20 November 2015
|
Other | |
Other | |
Other |
CATS Parties (PDF, 2 MB)
Update on discussions with the applicant dated 20 October 2015. Submission for Deadline 4 of 6 November 2015
|
Other |
CATS Parties (PDF, 809 KB)
Update on Protective Provisions. Submission for Deadline 4 of 6 November 2015
|
Other |
DEA UK SNS Limited (PDF, 5 MB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
Environment Agency (PDF, 554 KB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 5 MB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
Marine Management Organisation (PDF, 511 KB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 Nowember 2015
|
Other |
National Grid Electricity Transmission Plc (PDF, 27 KB)
Withdrawing objection. Submission for Deadline 4 of 6 November 2015
|
Other |
Natural England (PDF, 359 KB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
Northumbrian Water Limited (PDF, 396 KB)
Update on discussions with the applicant. Submission for Deadline 4 of 6 November 2015
|
Other |
P D Teesport Limited (PDF, 61 KB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
Redcar and Cleveland Borough Council (PDF, 509 KB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
SABIC UK Petrochemicals Limited (PDF, 5 MB)
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
|
Other |
York Potash Ltd (PDF, 408 KB)
Document 2.1I - YPL Land Plan Inset 6 - Rev v4
|
Other |
York Potash Ltd (PDF, 6 MB)
Document 6.12A - Mitigation and Monitoring Strategy - Rev 4
|
Other |
York Potash Ltd (PDF, 399 KB)
Document 2.1E - YPL Land Plan Inset 2 - Rev v4
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2H - Layout Plans (Ground Level) Southern Route Sheet 1 - Rev D
|
Other |
York Potash Ltd (PDF, 417 KB)
Document 2.1N(ii) - YPL Land Plan Inset 11(ii) (Southern Route) - Rev v4
|
Other |
York Potash Ltd (PDF, 460 KB)
Document 2.1K - YPL Land Plan Inset 8 - Rev v4
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2D - Layout Plans (Ground Level) Northern Route Sheet 3 - Rev G
|
Other |
York Potash Ltd (PDF, 45 KB)
Doc 5.3A - Book of Reference (Tracked)
|
Other |
York Potash Ltd (PDF, 903 KB)
Document 3.15B - YPL Pipeline Corridor Plan Sheet 2 - Rev v4
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 3.3L - Conveyor Route Plans Northern Route Sheet 4 - Rev F
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 3.3G - Conveyor Route Plans Southern Route Sheet 6 - Rev H
|
Other |
York Potash Ltd (PDF, 416 KB)
Document 2.1L - YPL Land Plan Inset 9 - Rev v4
|
Other |
York Potash Ltd (PDF, 45 KB)
Doc 5.3A - Book of Reference (Clean)
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2C - Layout Plans (Ground Level) Northern Route Sheet 2 - Rev G
|
Other |
York Potash Ltd (PDF, 486 KB)
Document 2.1J(ii) - YPL Land Plan Inset 7(ii) (Southern Route) - Rev v4
|
Other |
York Potash Ltd (PDF, 486 KB)
Document 2.1J(i) - YPL Land Plan Inset 7(i) (Northern Route) - Rev v4
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 3.15C - YPL Pipeline Corridor Plan Sheet 3 - Rev v4
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 3.16 - Access Around RBT Conveyors
|
Other |
York Potash Ltd (PDF, 52 MB)
Applicant's Responses to Examining Authority?s Second Questions, including appendices 1 - 5
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 3.3F - Conveyor Route Plans Southern Route Sheet 5 - Rev H
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 2.1C - YPL Land Plan Sheet 3 - Rev v4
|
Other |
York Potash Ltd (PDF, 394 KB)
Document 2.1M - YPL Land Plan Inset 10 - Rev v4
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 2.1B(ii) - YPL Land Plan Sheet 2(ii) (Southern Route) - Rev v4
|
Other |
York Potash Ltd (PDF, 3 MB)
Document 3.15 - YPL Pipeline Corridor Plan Key Plan - Rev v4
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2B - Layout Plans (Ground Level) Northern Route Sheet 1 - Rev G
|
Other |
York Potash Ltd (PDF, 418 KB)
Document 2.1N(i) - YPL Land Plan Inset 11(i) (Northern Route) - Rev v4
|
Other |
York Potash Ltd (PDF, 390 KB)
Document 2.1F - YPL Land Plan Inset 3 - Rev v4
|
Other |
York Potash Ltd (PDF, 386 KB)
Document 2.1H - YPL Land Plan Inset 5 - Rev v4
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2K - Layout Plans (Ground Level) Southern Route Sheet 4 - Rev D
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2I - Layout Plans (Ground Level) Southern Route Sheet 2 - Rev D
|
Other |
York Potash Ltd (PDF, 942 KB)
Document 6.8B - Governance Tracker
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2J - Layout Plans (Ground Level) Southern Route Sheet 3 - Rev D
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.2E - Layout Plans (Ground Level) Northern Route Sheet 4 - Rev G
|
Other |
York Potash Ltd (PDF, 859 KB)
Document 2.1A - YPL Land Plan Sheet 1 - Rev v4
|
Other |
York Potash Ltd (PDF, 4 MB)
Document 7.4B - Development Consent Obligation (signed)
|
Other |
York Potash Ltd (PDF, 1 MB)
Covering Letter to the Planning Inspectorate and Document List for Deadline 4
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.3K - Conveyor Route Plans Northern Route Sheet 3 - Rev G
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 4.1C - Draft Development Consent Order (Clean)
|
Other |
York Potash Ltd (PDF, 405 KB)
Document 2.1D - YPL Land Plan Inset 1 - Rev v4
|
Other |
York Potash Ltd (PDF, 573 KB)
Document 6.11A - Outline Ecological Management Plan
|
Other |
York Potash Ltd (PDF, 629 KB)
Document 4.2B - Explanatory Memorandum (Clean)
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 3.3E - Conveyor Route Plans Southern Route Sheet 4 - Rev H
|
Other |
York Potash Ltd (PDF, 669 KB)
Document 3.15A - YPL Pipeline Corridor Plan Sheet 1 - Rev v4
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 2.1B(i) - YPL Land Plan Sheet 2(i) (Northern Route) - Rev v4
|
Other |
York Potash Ltd (PDF, 647 KB)
Document 4.2B - Explanatory Memorandum (Tracked)
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 4.1C - Draft Development Consent Order (Tracked)
|
Other |
York Potash Ltd (PDF, 2 MB)
Document 3.3D - Conveyor Route Plans Southern Route Sheet 3 - Rev H
|
Other |
York Potash Ltd (PDF, 3 MB)
Document 2.1 - YPL Land Plan Key Plan - Rev v4
|
Other |
York Potash Ltd (PDF, 372 KB)
Document 2.1G - YPL Land Plan Inset 4 - Rev v4
|
Other |
York Potash Ltd (PDF, 1 MB)
Applicant?s Newspaper Notices of Hearings on 24 November 2015
|
Other |
ExA Second Round Questions (PDF, 323 KB)
Examining Authority's second written questions
|
Other |
Timetable Amendment and Notice of Hearings (PDF, 100 KB)
|
Other |
Tata Steel UK Limited and Others (PDF, 6 MB)
In lieu of oral submissions at Hearings on 24-25 September 2015. Late submission for Deadline 3 of 2 October 2015 accepted at the discretion of the Examining Authority
|
Other |
Recording of DCO hearing (PDF, 31 KB)
Audo Recording of the Issue Specific Hearing on the Draft Development Consent Order 25 September 2015
|
Other |
Recording of Open Floor Hearing (PDF, 31 KB)
Audio Recording of the Open Floor Hearing on 24 September 2015
|
Other |
Recording of CA Hearing (PDF, 31 KB)
Audio Recording of the Compulsory Acquisition Hearing 24 September 2015
|
Other |
Marine Management Organisation (PDF, 3 MB)
Responses to the Examining Authority?s questions
|
Other |
Royal Mail Group Ltd (PDF, 162 KB)
Written Representation
|
Other |
York Potash Ltd (PDF, 1 MB)
Draft Development Consent Order (with Tracked Changes)
|
Other |
York Potash Ltd (PDF, 240 KB)
CIL Note. Appendix 5 of Submissions from Hearings
|
Other |
York Potash Ltd (PDF, 81 KB)
Network Rail s127. Appendix 1 of Submissions from Hearings
|
Other |
York Potash Ltd (PDF, 416 KB)
Submissions from Hearings
|
Other |
York Potash Ltd (PDF, 1 MB)
Draft Development Consent Order (Clean)
|
Other |
York Potash Ltd (PDF, 20 MB)
Decision Notices and s106 Agreements. Appendix 4 Parts 1 and 2 of Submissions from Hearings
|
Other |
York Potash Ltd (PDF, 60 KB)
Submission relating to Alternatives. Appendix 2 of Submissions from Hearings
|
Other |
York Potash Ltd (PDF, 69 KB)
Dredging Note. Appendix 3 of Submissions from Hearings
|
Other |
York Potash Ltd (PDF, 1 MB)
Covering Letter to the Planning Inspectorate and Document List for Deadline 3
|
Other |
DCO Hearing Agenda 25 September 2015 (PDF, 53 KB)
|
Other |
Amoco (UK) Exploration Company (PDF, 1 MB)
Submission prior to the Compulsory Acquisition Hearing of 24 September 2015
|
Other |
ICI Chemicals & Polymers Limited (PDF, 65 KB)
Withdrawal of representation submitted on 21 August 2015. Submission prior to the Compulsory Acquisition Hearing of 24 September 2015
|
Other |
National Grid (PDF, 35 KB)
Submission prior to the Development Consent Order Hearing of 25 September 2015
|
Other |
P D Teesport Limited (PDF, 220 KB)
Submission prior to the Development Consent Order Hearing of 25 September 2015
|
Other |
Tata Steel UK Limited (PDF, 36 KB)
Submission prior to the Compulsory Acquisition Hearing of 24 September 2015
|
Other |
North Yorkshire County Council (PDF, 64 KB)
Additional response to the Examining Authority?s First Written Questions. Accepted at the discretion of the Examining Authority
|
Other |
CA Hearing Agenda 24 September 2015 (PDF, 51 KB)
|
Other |
Open Floor Hearing Agenda 24 September 2015 (PDF, 47 KB)
|
Other |
Site Visit Itinerary 23 September 2015 (PDF, 51 KB)
|
Other |
Marine Management Organisation (PDF, 297 KB)
Comments on responses to the Examining Authority First Written Questions
|
Other |
York Potash Ltd (PDF, 568 KB)
Document 8.4 Applicant?s Responses to Other Responses to ExA Q1
|
Other |
York Potash Ltd (PDF, 413 KB)
Document 8.3 Applicant?s Response to Written Representations
|
Other |
Tata Steel UK Limited and others (PDF, 47 KB)
Comments on responses to Examining Authority's First Written Questions and Response to Comments on Relevant Representations
|
Other |
Environment Agency (PDF, 179 KB)
Comments on responses to the Examining Authority?s First Written Questions. Submitted for Deadline II of 7 September 2015
|
Other |
Redcar and Cleveland Borough Council (PDF, 250 KB)
Comments on responses to the Examining Authority's First Written Questions and other comments.
|
Other |
York Potash Ltd (PDF, 745 KB)
Document 8.3 Appendix 4 - No 2 Tunnel Note
|
Other |
York Potash Ltd (PDF, 663 KB)
Document 4.2A Draft Explanatory Memorandum (Tracked)
|
Other |
York Potash Ltd (PDF, 513 KB)
Letter to the Examining Authority dated 07 09 15
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 4.1A Draft DCO (Tracked)
|
Other |
York Potash Ltd (PDF, 261 KB)
Document 8.3 Appendix 1 - Notes on INSPIRE and NPL Guidelines
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 8.3 Appendix 3 - Constructability Notes
|
Other |
York Potash Ltd (PDF, 432 KB)
Document 8.3 Appendix 5 - Shipping Notes Part 3
|
Other |
York Potash Ltd (PDF, 458 KB)
Document 1.4B Document List
|
Other |
York Potash Ltd (PDF, 1 MB)
Document 4.1A Draft DCO (Clean)
|
Other |
York Potash Ltd (PDF, 9 MB)
Document 8.3 Appendix 5 - Shipping Notes Part 2
|
Other |
York Potash Ltd (PDF, 651 KB)
Document 4.2A Draft Explanatory Memorandum (Clean)
|
Other |
York Potash Ltd (PDF, 57 KB)
Document 8.3 Appendix 2 - References
|
Other |
York Potash Ltd (PDF, 6 MB)
Document 6.12 Mitigation and Monitoring Strategy
|
Other |
York Potash Ltd (PDF, 5 MB)
Document 8.3 Appendix 5 - Shipping Notes Part 1
|
Other |
York Potash Limited (PDF, 1 MB)
Applicant?s draft Accompanied Site Visit Itinerary and location maps. Late submission for Deadline 1 of 21 August 2015. Accepted at the discretion of the Examining Authority
|
Other |
ICI Chemicals and Polymers Limited (PDF, 1 MB)
Land Registry Plan CE148382 of the Bran Sands Site. Referred to in ICI?s submission for Deadline 1of 21 August 2015
|
Other |
CATS Management Limited (PDF, 7 MB)
Written representation. Submission for Deadline 1 of 21 August 2015
|
Other |
CATS Parties (PDF, 5 MB)
Written representation. Submission for Deadline 1 of 21 August 2015
|
Other |
DEA UK SNS Limited (PDF, 328 KB)
Covering Letter to the Planning Inspectorate. Submission for Deadline 1 of 21 August 2015
|
Other |
DEA UK SNS Limited (PDF, 18 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
DEA UK SNS Limited (PDF, 3 MB)
Written representation and Summary. Submission for Deadline 1 of 21 August 2015
|
Other |
Environment Agency (PDF, 767 KB)
Response to the Examining Authority?s First Written Questions and Statement of Common Ground with applicant. Submission for Deadline 1 of 21 August 2015
|
Other |
Health and Safety Executive (PDF, 393 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 329 KB)
Covering Letter to the Planning Inspectorate. Submission for Deadline 1 of 21 August 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 18 KB)
Response to Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 3 MB)
Written representation. Submission for Deadline 1 of 21 August 2015
|
Other |
Huntsman Polyurethanes (UK) Limited (PDF, 39 KB)
Summary of Written Representation. Submission for Deadline 1 of 21 August 2015
|
Other |
ICI Chemicals and Polymers Limited (PDF, 19 KB)
Written representation. Submission for Deadline 1 of 21 August 2015
|
Other |
Marine Management Organisation (PDF, 482 KB)
Written representation and Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
National Grid Electricity Transmission Plc (PDF, 37 KB)
Written representation. Submission for Deadline 1 of 21 August 2015
|
Other |
Natural England (PDF, 247 KB)
Written Representation Annex B ? Designated site conservation objectives and citations
Submission for Deadline 1 of 21 August 2015
|
Other |
Natural England (PDF, 542 KB)
Written Representation, Executive Summary, and Annexes A-C. Submission for Deadline 1 of 21 August 2015
|
Other |
Natural England (PDF, 5 MB)
Written Representation Annex A ? Designated Site Maps. Submission for Deadline 1 of 21 August 2015
|
Other |
Network Rail (PDF, 50 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
North Yorkshire County Council (PDF, 218 KB)
Responses to the Examining Authority?s First Round of Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
PD Teesport Limited (PDF, 18 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
PD Teesport Limited (PDF, 115 KB)
Written Representation and Summary. Submission for Deadline 1 of 21 August 2015
|
Other |
Redcar and Cleveland Borough Council (PDF, 137 KB)
Local Impact Report. Submission for Deadline 1 of 21 August 2015
|
Other |
Redcar and Cleveland Borough Council (PDF, 98 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
SABIC UK Petrochemicals Limited (PDF, 18 KB)
Response to Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
SABIC UK Petrochemicals Limited (PDF, 3 MB)
Written representation and S ummary. Submission for Deadline 1 of 21 August 2015
|
Other |
SABIC UK Petrochemicals Limited (PDF, 331 KB)
Covering Letter to the Planning Inspectorate. Submission for Deadline 1 of 21 August 2015
|
Other |
TATA Steel UK Limited and others (PDF, 1,000 KB)
Written representation and Summary, and suggested Site Visit locations. Submission for Deadline 1 of 21 August 2015
|
Other |
Trinity House (PDF, 42 KB)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 774 KB)
Statement of Common Ground with Natural England. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 9 MB)
Annual Report and Accounts. Appendix 2 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 2 MB)
Conveyor Options Study Supplementary Report. Appendix 4 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 216 KB)
Hierarchy Diagram. Appendix 3 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 942 KB)
Updated Governance Tracker. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 1 MB)
Statement of Common Ground with Redcar and Cleveland Borough Council (Transport). Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 2 MB)
Permanent Compound Site A plan. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 334 KB)
Revised Screening and Integrity Matrices. Appendix 8 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 569 KB)
Outline Ecological Management Plan. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 307 KB)
Biodiversity Offsetting. Appendix 7 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 2 MB)
Outline Construction Environmental Management Plan. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 385 KB)
Update Parameters Table. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 1 MB)
Covering Letter and Document list. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 278 KB)
Company Structure Diagram. Appendix 1 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 1 MB)
Statement of Common Ground with Highways England. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 426 KB)
Applicant?s Response to Relevant Representations. Submission for Deadline 1 of 21 August 2015.
|
Other |
York Potash Limited (PDF, 4 MB)
Treatment of Contaminated Silt. Appendix 6 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 990 KB)
Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 4 MB)
Draft Development Consent Obligation. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 2 MB)
Permanent Compound Site C plan. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 20 MB)
Statement of Common Ground with Redcar and Cleveland Borough Council (Planning) and 9 Appendices. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 739 KB)
Statement of Common Ground with Environment Agency. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Limited (PDF, 797 KB)
Contaminated Silt Disposal. Appendix 5 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
|
Other |
York Potash Ltd (PDF, 49 KB)
Applicant?s request for clarification of Examining Authority?s First Written Questions and PINS response
|
Other |
Rule 8 Letter (PDF, 109 KB)
|
Other |
ExA First Round Questions (PDF, 367 KB)
Examining Authority's first written questions
|
Other |
Preliminary Meeting Note (PDF, 78 KB)
Note of the preliminary meeting held on 21 July 2015
|
Other |
Preliminary Meeting Audio 21 July 2015 (PDF, 31 KB)
Preliminary Meeting Audio Recording
|
Other |
Anglian Water (PDF, 51 KB)
Submission dated 25 June 2015. Accepted at the discretion of the Examining Authority at the Preliminary Meeting on 21 July 2015
|
Other |
Network Rail Infrastructure Limited (PDF, 56 KB)
Submission dated 9 July 2015. Accepted at the discretion of the Examining Authority at the Preliminary Meeting on 21 July 2015
|
Other |
Northumbrian Water Limited (PDF, 247 KB)
Submission dated 4 June 2015. Accepted at the discretion of the Examining Authority at the Preliminary Meeting on 21 July 2015
|
Other |
Sembcorp Utilities (UK) Limited (PDF, 340 KB)
Submission dated 16 July 2015. Accepted at the discretion of the Examining Authority at the Preliminary Meeting on 21 July 2015
|
Other |
S56 S59 and R13 Certificates (PDF, 33 KB)
Certificates of compliance with the obligations to give notice of the acceptance of the application
|
Other |
Rule 6 letter (PDF, 113 KB)
|
Other |
Notification of Decision to Accept Application (PDF, 114 KB)
|
Other |
S51 Advice (PDF, 101 KB)
Advice to the applicant following acceptance of the application
|
Other |
Section 55 Checklist (PDF, 436 KB)
|
Other |
Darlington Borough Council (PDF, 44 KB)
Adequacy of Consultation Response
|
Other |
Durham County Council (PDF, 79 KB)
Adequacy of Consultation Response
|
Other |
Hambleton District Council (PDF, 42 KB)
Adequacy of Consultation Response
|
Other |
Middlesbrough Council (PDF, 62 KB)
Adequacy of Consultation Response
|
Other |
North York Moors National Park Authority (PDF, 390 KB)
Adequacy of Consultation Response
|
Other |
Redcar and Cleveland Borough Council (PDF, 184 KB)
Adequacy of Consultation Response
|
Other |
Stockton on Tees Borough Council (PDF, 53 KB)
Adequacy of Consultation Response
|
Other |
Yorkshire County Council (PDF, 205 KB)
Adequacy of Consultation Response
|
Other |
York Potash ltd (PDF, 192 KB)
Letter from the applicant withdrawing the application dated 14 January 2015.
|
Other |
Doc 4.2 Explanatory Memorandum (PDF, 490 KB)
|
Other |
ES Contents index (PDF, 10 MB)
|
Other |
Section 3 App 3.1 Waste management (PDF, 2 MB)
|
Other |
Doc 3.5B - Permanent Compound Site C (PDF, 399 KB)
|
Other | |
Other |
Doc 6.6 App 6.9 Employee distribution (PDF, 256 KB)
|
Other | |
Other | |
Other | |
Other |
Doc 6.1 Consultation Statement Appendices - 10 to 21 (PDF, 47 MB)
|
Other |
Doc 3.5A - Permanent Compound Site A (PDF, 167 KB)
|
Other |
Doc 7.2 - Summary of Proposals Document (PDF, 15 MB)
|
Other | |
Other |
Doc 5.1 Statement of Reasons (PDF, 527 KB)
|
Other |
Section 20 App 20.5 LVIA figures 2 of 2 (PDF, 7 MB)
|
Other |
Doc 6.6 App 22.1 Panoramic photographs 03 (PDF, 13 MB)
|
Other |
ES Section 12 Traffic and transport (PDF, 1 MB)
|
Other | |
Other | |
Other |
EIA Appendices Index (PDF, 163 KB)
|
Other |
ES Section 20 Landscape and visual environment (PDF, 818 KB)
|
Other | |
Other |
ES Section 3 Project description 2 of 2 (PDF, 49 MB)
|
Other | |
Other | |
Other |
Doc 1.3 Newspaper Notices Report (PDF, 3 MB)
|
Other | |
Other |
Doc 6.6 App 22.3 A171 sequential assessment (PDF, 13 MB)
|
Other |
Doc 6.6 App 22.1 Panoramic photographs 04 (PDF, 14 MB)
|
Other |
Doc 3.9D - Indicative Elevation Open Quay Construction (PDF, 116 KB)
|
Other |
Doc 6.6 App 22.3 Cleveland Way sequential assessment (PDF, 16 MB)
|
Other |
Doc 5.3 Book of Reference (PDF, 45 KB)
|
Other |
Doc 1.6 Issues and Document Tracker (PDF, 441 KB)
|
Other | |
Other | |
Other | |
Other |
ES Section 11 Fisheries and fishing activity (PDF, 5 MB)
|
Other | |
Other | |
Other | |
Other | |
Other |
Section 14 App 14.1 Construction vibration calculations (PDF, 340 KB)
|
Other | |
Other |
ES Section 5 Hydrodynamic and sedimentary regime (PDF, 10 MB)
|
Other | |
Other |
Doc 6.6 App 6.11 Operational shift details (PDF, 43 KB)
|
Other |
Doc 2.1K - YPL Land Plan Inset 8 Rev v1 (PDF, 430 KB)
|
Other |
Doc 3.1 - Location Plan (PDF, 9 MB)
|
Other |
Doc 3.4F - Temporary Compound Site E (PDF, 116 KB)
|
Other | |
Other | |
Other |
Section 12 App 12.10 Peak construction employee numbers (PDF, 254 KB)
|
Other |
Doc 6.6 App 6.6 Peak construction employees (PDF, 19 KB)
|
Other |
Doc 6.6 App 22.1 Landscape character with woods (PDF, 25 MB)
|
Other | |
Other |
Doc 2.1F - YPL Land Plan Inset 3 Rev v1 (PDF, 359 KB)
|
Other |
Section 12 App 12.2 Transport Assessment 2 of 2 (PDF, 13 MB)
|
Other |
Section 12 App 12.2 Transport Assessment 1 of 2 (PDF, 45 MB)
|
Other |
Doc 4.1 Draft DCO (including requirements) (PDF, 833 KB)
|
Other |
ES Section 18 Infrastructure (PDF, 3 MB)
|
Other |
Doc 2.1J - YPL Land Plan Inset 7 Rev v1 (PDF, 456 KB)
|
Other | |
Other |
ES Section 24 References (PDF, 777 KB)
|
Other |
Doc 3.9A - Indicative Layout - Open Quay Northern Route (PDF, 299 KB)
|
Other |
Section 12 App 12.8 Activity HGV summary (PDF, 565 KB)
|
Other | |
Other |
Doc 7.5 - Letter from Secretary of State for BIS (PDF, 949 KB)
|
Other |
ES Section 15 Archaeology and heritage (PDF, 5 MB)
|
Other |
Doc 6.6 App 6.14 MHF operation employees (PDF, 47 KB)
|
Other |
Doc 6.6 CIA Appendices Index (PDF, 110 KB)
|
Other |
Doc 6.3 Habitats Regulations Assessment 2 of 2 (PDF, 28 MB)
|
Other | |
Other |
Section 4 App 4.2 Scoping Opinion (PDF, 13 MB)
|
Other |
Section 12 App 12.9 Traffic demand summary (PDF, 268 KB)
|
Other | |
Other |
ES Section 21 Recreation and access (PDF, 3 MB)
|
Other |
Section 20 App 20.3 Visual assessment (PDF, 451 KB)
|
Other |
Doc 1.2 Covering Letter (PDF, 976 KB)
|
Other | |
Other |
Doc 2.2E - YPL Works Plan Sheet 5 Rev v1 (PDF, 609 KB)
|
Other |
Doc 5.2 Funding Statement (PDF, 658 KB)
|
Other |
Doc 2.3A YPL Access and RoW Plan Sheet 1 Rev v1 (PDF, 596 KB)
|
Other | |
Other |
Doc 6.1 Consultation Statement - Main Text (PDF, 1 MB)
|
Other |
Doc 6.6 App 6.15 Operation link distribution (PDF, 68 KB)
|
Other |
Doc 3.4E - Temporary Compound Site D (PDF, 158 KB)
|
Other |
Doc 3.4G - Temporary Compound Site F (PDF, 204 KB)
|
Other |
Doc 3.7 - MHF Overall Site Layout (PDF, 1 MB)
|
Other | |
Other | |
Other | |
Other |
Doc 2.1E - YPL Land Plan Inset 2 Rev v1 (PDF, 371 KB)
|
Other | |
Other |
Section 12 App 12.6 Collision data (PDF, 245 KB)
|
Other | |
Other |
Doc 2.1H - YPL Land Plan Inset 5 Rev v1 (PDF, 376 KB)
|
Other |
Doc 6.6 App 22.3 A169 sequential assessment (PDF, 8 MB)
|
Other |
Section 12 App 12.7 Collision cluster data (PDF, 175 KB)
|
Other |
Doc 6.6 App 6.3 Earthworks HGV profile (PDF, 31 KB)
|
Other | |
Other |
Doc 2.2D - YPL Works Plan Sheet 4 Rev v1 (PDF, 710 KB)
|
Other |
Doc 6.6 App 6.12 Operational shift times (PDF, 26 KB)
|
Other |
ES Section 7 Marine sediment and water quality (PDF, 7 MB)
|
Other |
ES Section 6 Hydrology hydrogeology land quality (PDF, 8 MB)
|
Other |
Doc 3.8C - Indicative Section Solid Quay Construction (PDF, 163 KB)
|
Other | |
Other |
ES Section 3 Project description 1 of 2 (PDF, 20 MB)
|
Other |
Doc 6.6 App 22.2 Panoramic photographs 03 (PDF, 18 MB)
|
Other |
Doc 7.3 Appendix 2a - MDT Planning Statement (PDF, 4 MB)
|
Other | |
Other | |
Other |
Section 22 App 22.1 Offshore minipod deployment (PDF, 31 MB)
|
Other | |
Other |
Doc 3.13 Ease of Reference A3 Plans Bundle part 1 (PDF, 17 MB)
|
Other |
Doc 1.1 Application Form (PDF, 18 MB)
|
Other |
Doc 3.6B - Substation Elevations Sites A and C (PDF, 60 KB)
|
Other |
Section 8 App 8.3 Benthic ecology survey report (PDF, 53 MB)
|
Other |
Doc 6.6 App 6.8 Rented accommodation mine MTS (PDF, 205 KB)
|
Other | |
Other |
Doc 7.1 Planning Statement (PDF, 17 MB)
|
Other |
ES Section 23 Impact interrelationships (PDF, 531 KB)
|
Other |
Doc 6.6 App 22.3 Sequential receptor assessment (PDF, 82 KB)
|
Other |
Doc 6.6 App 22.2 Panoramic photographs 04 (PDF, 19 MB)
|
Other |
ES Section 13 Air quality (PDF, 13 MB)
|
Other |
Doc 6.6 App 6.7 Construction shift patterns (PDF, 110 KB)
|
Other | |
Other | |
Other | |
Other |
Section 12 App 12.4 Baseline traffic flows (PDF, 837 KB)
|
Other |
Doc 6.6 App 22.1 Landscape designations with woods (PDF, 24 MB)
|
Other | |
Other |
Section 4 App 4.3 WFD compliance assessment (PDF, 2 MB)
|
Other |
Section 6 App 6.4 CEMP (PDF, 647 KB)
|
Other | |
Other |
ES Section 2 Legislation regulation policy (PDF, 795 KB)
|
Other |
Doc 2.1 - YPL Land Plan Key Plan Rev v1 (PDF, 3 MB)
|
Other |
Section 5 App 5.1 Hydraulic studies to support EIA (PDF, 64 MB)
|
Other |
Doc 6.3 Habitats Regulations Assessment 1 of 2 (PDF, 33 MB)
|
Other | |
Other | |
Other | |
Other | |
Other |
Section 20 App 20.2 Landscape assessment (PDF, 381 KB)
|
Other |
Doc 7.3 Appendix 5 - MHF Planning Statement (PDF, 5 MB)
|
Other |
ES Section 9 Marine and coastal ornithology (PDF, 10 MB)
|
Other |
Section 20 App 20.1 LVIA methodology (PDF, 276 KB)
|
Other |
Doc 6.1 Consultation Statement Appendices - 1 to 9 (PDF, 33 MB)
|
Other |
Section 10 App 10.1 Terrestrial ecology legislation (PDF, 238 KB)
|
Other |
Doc 2.1D - YPL Land Plan Inset 1 Rev v1 (PDF, 374 KB)
|
Other |
Doc 6.6 App 6.13 Mine operation employees (PDF, 36 KB)
|
Other |
Doc 7.6 The Crown Estate Consent Letter (PDF, 909 KB)
|
Other | |
Other | |
Other |
Section 5 App 5.2 Model calibration and validation (PDF, 26 MB)
|
Other | |
Other |
Doc 3.10 - Conveyor Typologies (PDF, 275 KB)
|
Other |
Section 17 App 17.1 Flood Risk Assessment (PDF, 3 MB)
|
Other |
Doc 6.6 App 22.2 Panoramic photographs 02 (PDF, 19 MB)
|
Other | |
Other | |
Other | |
Other | |
Other |
ES Section 1 Introduction (PDF, 29 MB)
|
Other | |
Other |
Doc 2.2B - YPL Works Plan Sheet 2 Rev v1 (PDF, 2 MB)
|
Other |
Doc 6.6 App 22.2 Panoramic photographs 01 (PDF, 16 MB)
|
Other |
ES Section 8 Marine ecology (PDF, 22 MB)
|
Other |
ES Section 14 Noise and vibration (PDF, 15 MB)
|
Other | |
Other |
Doc 2.1I - YPL Land Plan Inset 6 Rev v1 (PDF, 397 KB)
|
Other | |
Other | |
Other |
Doc 2.1M - YPL Land Plan Inset 10 Rev v1 (PDF, 398 KB)
|
Other | |
Other |
Doc 3.6A - Permanent Building Elevations Site C (PDF, 71 KB)
|
Other | |
Other | |
Other | |
Other | |
Other |
Doc 2.3 YPL Access and RoW Plan Key Plan Rev v1 (PDF, 3 MB)
|
Other |
Doc 6.6 App 22.1 Landscape character (PDF, 32 MB)
|
Other |
Doc 6.6 App 1.1 Description of the YPP (PDF, 509 KB)
|
Other | |
Other |
Doc 3.4C - Temporary Compound Site A (PDF, 188 KB)
|
Other |
Doc 6.6 App 6.10 Worker link distribution (PDF, 137 KB)
|
Other |
Doc 2.1N - YPL Land Plan Inset 11 Rev v1 (PDF, 387 KB)
|
Other |
Doc 6.6 App 22.1 Landscape designations no woods (PDF, 26 MB)
|
Other |
Doc 6.6 App 22.2 Panoramic photographs 05 (PDF, 20 MB)
|
Other |
Section 9 App 9.1 Waterbird distribution plots (PDF, 2 MB)
|
Other |
Doc 6.6 App 6.5 YPP HGV distribution (PDF, 47 KB)
|
Other |
Doc 3.13 Ease of Reference A3 Plans Bundle part 2 (PDF, 14 MB)
|
Other |
Doc 6.6 App 22.1 Landscape designations (PDF, 30 MB)
|
Other |
Section 20 App 20.4 Technical lighting assessment (PDF, 38 MB)
|
Other |
Doc 2.2A - YPL Works Plan Sheet 1 Rev v1 (PDF, 2 MB)
|
Other |
Doc 7.3 Project Position Statement (PDF, 414 KB)
|
Other | |
Other |
ES Section 16 Commercial navigation (PDF, 4 MB)
|
Other |
Doc 6.6 App 22.1 Panoramic photographs 05 (PDF, 15 MB)
|
Other |
Doc 7.3 Appendix 6 - Marine Licence (offshore) (PDF, 4 MB)
|
Other | |
Other | |
Other |
Doc 3.9C - Indicative Section Open Quay Construction (PDF, 155 KB)
|
Other |
Section 20 App 20.5 LVIA figures 1 of 2 (PDF, 42 MB)
|
Other |
Doc 6.6 App 22.2 Representative viewpoint assessment (PDF, 111 KB)
|
Other |
Doc 6.6 App 22.1 Panoramic photographs 01 (PDF, 12 MB)
|
Other |
Doc 6.6 Environmental Statement CIA (PDF, 25 MB)
|
Other |
Doc 6.6 App 22.1 Landscape character no woods (PDF, 27 MB)
|
Other |
Doc 6.6 App 22.1 winding towers ZTV national park (PDF, 22 MB)
|
Other |
Doc 1.5 s55 Checklist (PDF, 599 KB)
|
Other |
Doc 1.4 Document List (PDF, 425 KB)
|
Other |
Doc 2.1A - YPL Land Plan Sheet 1 Rev v1 (PDF, 739 KB)
|
Other |
Doc 6.8 Governance Tracker (PDF, 807 KB)
|
Other |
ES Section 4 Approach to EIA (PDF, 654 KB)
|
Other | |
Other |
Doc 6.6 App 6.4 In combination traffic demand (PDF, 43 KB)
|
Other |
Section 4 App 4.1 Environmental Scoping Report (PDF, 10 MB)
|
Other | |
Other | |
Other |
Section 7 App 7.2 Sediment quality data (PDF, 3 MB)
|
Other |
Section 3 App 3.2 Option study report (PDF, 19 MB)
|
Other | |
Other |
Doc 6.9 Parameters Table (PDF, 339 KB)
|
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other |
Doc 6.6 App 22.1 Panoramic photographs 02 (PDF, 14 MB)
|
Other | |
Other |
Doc 7.3 Appendix 4 - Economic Impact Report (PDF, 5 MB)
|
Other | |
Other |
Doc 2.2 - YPL Works Plan Key Plan Rev v1 (PDF, 6 MB)
|
Other | |
Other |
Doc 6.6 App 6.1 Cumulative traffic figures (PDF, 43 MB)
|
Other | |
Other |
Section 12 App 12.5 Collision plans (PDF, 8 MB)
|
Other |
Doc 3.8D - Indicative Elevation Solid Quay Construction (PDF, 157 KB)
|
Other |
Doc 2.2F - YPL Works Plan Sheet 6 Rev v1 (PDF, 1,017 KB)
|
Other |
ES Section 19 Socioeconomics (PDF, 2 MB)
|
Other |
ES Section 10 Terrestrial ecology (PDF, 21 MB)
|
Other |
Doc 3.14 Harbour Construction Route Access (PDF, 128 KB)
|
Other | |
Other |
Doc 6.6 App 6.2 In combination HGV (PDF, 688 KB)
|
Other |
Doc 6.6 App 22.1 Photomontages 1 2 4 5 7 11 (PDF, 40 MB)
|
Other |
Doc 6.6 App 22.1 Photomontages 13 15 17 18 (PDF, 23 MB)
|
Other | |
Other |
Doc 3.4D - Temporary Compound Site B (PDF, 203 KB)
|
Other | |
Other |
Doc 2.3B YPL Access and RoW Plan Sheet 2 Rev v1 (PDF, 756 KB)
|
Other |
Doc 6.6 App 5.1 TN2 Workforce (PDF, 685 KB)
|
Other |
Doc 2.1G - YPL Land Plan Inset 4 Rev v1 (PDF, 362 KB)
|
Other | |
Other |
Section 9 App 9.2 Waterbird data (PDF, 344 KB)
|
Other |
Doc 2.1B - YPL Land Plan Sheet 2 Rev v1 (PDF, 1 MB)
|
Other |
Doc 2.2C - YPL Works Plan Sheet 3 Rev v1 (PDF, 2 MB)
|
Other |
Doc 2.1L - YPL Land Plan Inset 9 Rev v1 (PDF, 416 KB)
|
Other |
Doc 2.3C YPL Access and RoW Plan Sheet 3 Rev v1 (PDF, 997 KB)
|
Other |
Doc 2.1C - YPL Land Plan Sheet 3 Rev v1 (PDF, 1 MB)
|
Other |
Adequacy of Consultation Request (PDF, 72 KB)
|
Other |
150121 TR030002 York Potash Harbour Meeting Note (PDF, 131 KB)
A note of a meeting between the Planning Inspectorate and York Potash Limited on 21 January 2015
|
Other | |
Other |
141128 TR030002 Teleconference meeting note PINS and Applicant (PDF, 42 KB)
Note of a teleconference on 28 November 2014 between PINS and the applicant
|
Other | |
Other |
Harbour Facility Order initial meeting (PDF, 39 KB)
|
Other | |
Other | |
Other |
141120 TR030002 Teleconference meeting note PINS and MMO (PDF, 33 KB)
Note of a teleconference on 20 November 2014 to update PINS on MMO?s pre-application engagement with the applicant
|
Other |
141121 TR030002 Teleconference meeting note PINS and EA (PDF, 35 KB)
Note of a teleconference on 21 November 2014 to update PINS on the EA?s pre-application engagement with the applicant
|
Other |
141105 TR030002 Comments s51 Advice (PDF, 317 KB)
S51 advice given to York Potash Ltd on 6 November 2014
|
Other |
141104 TR030002 Meeting Note (PDF, 50 KB)
Note of a meeting between the Planning Inspectorate and York Potash Ltd on 4 November 2014
|
Other |
140113 TR030002 late scoping responses (PDF, 10 MB)
Late scoping consultation responses
|
Other |
140113 TR030002 York Potash Harbour Facilities Scoping Opinion Report (PDF, 3 MB)
The Secretary of State's Scoping Opinion
|
Other |
131202 TR030002 York Potash Harbour Facilities Scoping Report (PDF, 10 MB)
The Applicants Scoping Report
|