York Potash Harbour Facilities Order

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (15)

Developer's Application (261)

Acceptance (12)

Pre Examination (2)

Examination (253)

Decision (8)

Decided (0)

Date

SourceDescription
Other
Size: 9 KB
Correction slip
To correct an incorrect email address in the York Potash Harbour Facilities Order
Other
Size: 623 KB
Development Consent Order as made by the Secretary of State
The Development Consent Order made by the Secretary of State
Other
Size: 2 MB
Examining Authority’s Recommendation Report
Examining Authority's Recommendation Report including the following Appendices; The Examination, Examination Library, List of Abbreviations, Recommended DCO - submitted to the Secretary of State for Transport 20 April 2016
Other
Size: 109 KB
Notice of the Decision by the SoS (Reg 23)
Other
Size: 215 KB
Secretary of State’s Decision Letter and Statement of Reasons
Secretary of State’s Decision Letter which includes the Statement of Reasons and Habitats Regulations Assessment
Other
Size: 8 MB
Post Examination Correspondence
Other
Size: 120 KB
Other
Size: 141 KB
York Potash Ltd
Document 3.4E - Contractor's Temporary Compound Layout Site D- Rev F
Other
Size: 315 KB
Examination Library
Examination library published following updating the template 06 April 2016
Other
Size: 66 KB
Notification of Completion of ExA Examination
Other
Size: 222 KB
CATS Parties
Submission for Deadline 9 of 20 January 2016
Other
Size: 300 KB
Northumbrian Water
Submission for Deadline 9 of 20 January 2016
Other
Size: 89 KB
Redcar & Cleveland Borough Council
Submission for Deadline 9 of 20 January 2016
Other
Size: 183 KB
SABIC UK Petrochemicals Limited, Huntsman Polyurethanes (UK) Limited and INEOS UK SNS Limited
Submission for Deadline 9 of 20 January 2016
Other
Size: 520 KB
York Potash Ltd
Submission for Deadline 9 of 20 January 2016
Other
Size: 481 KB
York Potash Ltd
Submission for Deadline 9 of 20 January 2016
Other
Size: 400 KB
York Potash Ltd
Letter accepted by the Examining Authority as a late submission to Deadline 9
Other
Size: 2 MB
Environment Agency
Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
Other
Size: 34 KB
GTC group of companies
No comments. Submission for Deadline 8 of 13 January 2016
Other
Size: 95 KB
Marine Management Organisation
Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
Other
Size: 362 KB
Northern Powergrid (Northeast) Limited
Withdrawal of representations. Submission for Deadline 8 of 13 January 2016
Other
Size: 89 KB
Redcar & Cleveland Borough Council
Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016.Submission for Deadline 8 of 13 January 2016
Other
Size: 1 MB
York Potash Ltd
Draft Development Consent Order (Comparite with version 4.1C). Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
Other
Size: 1 MB
York Potash Ltd
Covering email, letter and 1.4H - Document List. Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
Other
Size: 1 MB
York Potash Ltd
Draft Development Consent Order (Tracked). Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
Other
Size: 1 MB
York Potash Ltd
Draft Development Consent Order (Clean). Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
Other
Size: 1 MB
York Potash Ltd
Draft Development Consent Order (Comparite with version 4.1). Response to the Examining Authority?s Rule 8 (3) and 17 Letter dated 6 January 2016. Submission for Deadline 8 of 13 January 2016
Other
Size: 77 KB
Rules 8(3) and 17 Letter
Examining Authority?s Request for further information from specified parties and deadline for comments.
Other
Size: 258 KB
CATS Parties
Statement of Response to the Applicant?s document 8.11 for Deadline 6. Submission for Deadline 7 of 30 December 2015
Other
Size: 76 KB
Huntsman Polyurethanes (UK) Limited
Comments on the Applicant?s Schedule of Changes to the draft Development Consent Order submitted at Deadline 6. Submission for Deadline 7 of 30 December 2015
Other
Size: 76 KB
INEOS UK SNS Limited (INEOS) � formerly DEA UK SNS Limited (DEA)
Comments on the Applicant?s Schedule of Changes to the draft Development Consent Order submitted at Deadline 6. Submission for Deadline 7 of 30 December 2015
Other
Size: 133 KB
Marine Management Organisation
No further comments. Submission for Deadline 7 of 30 December 2015
Other
Size: 85 KB
Redcar & Cleveland Borough Council
No further comments. Submission for Deadline 7 of 30 December 2015
Other
Size: 76 KB
SABIC UK Petrochemicals Limited
Comments on the Applicant?s Schedule of Changes to the draft Development Consent Order submitted at Deadline 6. Submission for Deadline 7 of 30 December 2015
Other
Size: 78 KB
Tata Steel UK and Redcar Bulk Terminal
Confirmation of the Applicant?s submission for Deadline 7 of 30 December 2015
Other
Size: 73 KB
York Potash Ltd
Response to Tata Steel UK and Redcar Bulk Terminal?s submission for Deadline 6. Submission for Deadline 7 of 30 December 2015
Other
Size: 3 MB
York Potash Ltd
8.12 ? Applicant?s Responses to other parties submissions for Deadline 6. Submission for Deadline 7 of 30 December 2015
Other
Size: 635 KB
York Potash Ltd
Covering Letter and attachment. Submission for Deadline 7 of 30 December 2015
Other
Size: 476 KB
York Potash Ltd
1.4G ? Document List. Submission for Deadline 7 of 30 December 2015
Other
Size: 48 KB
Oil and Gas Authority
Comments on CATS Pipelines System?s concerns regarding the possible routes of the conveyor system. Accepted at the discretion of the Examining Authority
Other
Size: 83 KB
Historic England
Comments on the RIES and the Examining Authority?s draft Development Consent Order. Accepted as a late submission for Deadline 6 at the discretion of the Examining Authority.
Other
Size: 2 MB
CATS parties
Young Lady Report. Submission for Deadline 6 of 16 December 2015
Other
Size: 2 MB
CATS parties
Statement of difference. Submission for Deadline 6 of 16 December 2015
Other
Size: 569 KB
Tata Steel UK and Redcar Bulk Terminal
Comments on the Examining Authority's draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
Other
Size: 1 MB
Environment Agency
Comments on the Examining Authority?s draft Development Consent Order and RIES. Submission for Deadline 6 of 16 December 2015
Other
Size: 194 KB
GTC group of companies
No comments. Submission for Deadline 6 of 16 December 2015
Other
Size: 6 MB
Huntsman Polyurethanes (UK) Limited
Relating to Schedule 9 ? Protective Provisions. Submission for Deadline 6 of 16 December 2015
Other
Size: 101 KB
Huntsman Polyurethanes (UK) Limited
Comments on the Examining Authority?s draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
Other
Size: 102 KB
INEOS UK SNS Limited (INEOS) � formerly DEA UK SNS Limited (DEA)
Comments on the Examining Authority?s draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
Other
Size: 6 MB
INEOS UK SNS Limited (INEOS) � formerly DEA UK SNS Limited (DEA)
Relating to Schedule 9 ? Protective Provisions. Submission for Deadline 6 of 16 December 2015
Other
Size: 216 KB
Marine Management Organisation
Additional information to Response to Examining authority?s questions. Submission for Deadline 6 of 16 December 2015
Other
Size: 511 KB
Marine Management Organisation
Response to Examining Authority?s Questions. Submission for Deadline 6 of 16 December 2015
Other
Size: 236 KB
Natural England
Response to Examining Authority?s Questions on the RIES issued on 25 November 2015. Submission for Deadline 6 of 16 December 2015
Other
Size: 37 KB
Redcar & Cleveland Borough Council
No comments on the draft Development Consent Order or the RIES. Submission for Deadline 6 of 16 December 2015
Other
Size: 37 KB
Redcar & Cleveland Borough Council
Withdrawal of objection to proposed conveyor bridge. Submission for Deadline 6 of 16 December 2015
Other
Size: 102 KB
SABIC UK Petrochemicals Limited
Comments on the Examining Authority?s draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
Other
Size: 6 MB
SABIC UK Petrochemicals Limited
Relating to Schedule 9 ? Protective Provisions. Submission for Deadline 6 of 16 December 2015
Other
Size: 70 KB
Trinity House
No further comments on the drafy Development Consent Order. Submission for Deadline 6 of 16 December 2015
Other
Size: 1 MB
York Potash Limited
3.16 Access Around the RBT Conveyor. Submission for Deadline 6 of 16 December 2015
Other
Size: 377 KB
York Potash Limited
8.9 Applicant?s Response to Rule 17 Letter of 25 November 2015 and Comment on the RIES. Submission for Deadline 6 of 16 December 2015
Other
Size: 1 MB
York Potash Limited
4.1D draft Development Consent Order (Tracked). Submission for Deadline 6 of 16 December 2015
Other
Size: 1 MB
York Potash Limited
Covering Letter and Document List. Submission for Deadline 6 of 16 December 2015
Other
Size: 1 MB
York Potash Limited
4.1D draft Development Consent Order (clean). Submission for Deadline 6 of 16 December 2015
Other
Size: 45 KB
York Potash Limited
5.3B Book of Reference (Tracked). Submission for Deadline 6 of 16 December 2015
Other
Size: 573 KB
York Potash Limited
6.11B Outline Ecological Management Plan. Submission for Deadline 6 of 16 December 2015
Other
Size: 406 KB
York Potash Limited
8.8 Applicant?s Comments on the Examining Authority?s draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
Other
Size: 45 KB
York Potash Limited
5.3B Book of Reference (Clean). Submission for Deadline 6 of 16 December 2015
Other
Size: 855 KB
York Potash Limited
6.10A Outline Construction Environmental Management Plan. Submission for Deadline 6 of 16 December 2015
Other
Size: 780 KB
York Potash Limited
8.10 Schedule of Changes to the draft Development Consent Order. Submission for Deadline 6 of 16 December 2015
Other
Size: 13 MB
York Potash Ltd
8.11 Applicant?s Response to BP CATS Objection to Southern Conveyor Route. Submission for Deadline 6 of 16 December 2015 (Republished 5 April 2016)
Other
Size: 860 KB
York Potash Ltd
Constructability Notes - BP CATS Pipeline Southern Route. Submission for Deadline 6 of 16 December 2015
Other
Size: 877 KB
York Potash Ltd
Constructability Notes - BP CATS Pipeline Northern Route. Submission for Deadline 6 of 16 December 2015
Other
Size: 33 KB
Recording of CA Hearing
Audio Recording of the Compulsory Acquisition Hearing 24 November 2015
Other
audio recording
Size: 80 MB
Recording of DCO Hearing
Audio Recording of the Development Consent Order Hearing 24 November 2015
Other
Size: 86 KB
Rule 17 Letter
Letter notifying Publication of the Report on the Implications for European Sites, publication of the draft Development Consent Order, and a request for information issued by the Examining Authority on 25 November 2015
Other
Size: 205 KB
CATS Parties
Submission to the Compulsory Acquisiton hearing of 24 November 2015
Other
Size: 1,018 KB
Examining Authority�s Draft Development Consent Order
Examining Authority?s Draft Development Consent Order issued by the Examining Authority on 25 November 2015
Other
Size: 15 KB
Marine Management Organisation
Answers to the Examining Authority?s questions at the Development Consent Order hearing of 24 November 2014
Other
Size: 390 KB
Report on the Implications for European Sites (RIES)
Report on the Implications for European Sites (RIES) issued by the Examining Authority on 25 November 2015
Other
Size: 145 KB
Marine Management Organisation
Comments on responses to the Examining Authority?s second round of written questions. Submission for Deadline 5 of 20 November 2015
Other
Size: 36 KB
Northern Powergrid (Northeast) Limited
Update on discussions with applicant. Submission for Deadline 5 of 20 November 2015
Other
Size: 197 KB
Redcar and Cleveland Borough Council
Update on discussions with the applicant. Submission for Deadline 5 of 20 November 2015
Other
Size: 2 MB
Sahaviriya Steel Industries UK Limited (SSI)
Winding Up Order and update on discussions with applicant. Submission for Deadline 5 of 20 November 2015
Other
Size: 642 KB
Tata Steel UK Limited
Tata/RBT?s Comments on Responses to the Examining Authority?s second round of written questions and two Appendices. Submission for Deadline 5 of 20 November 2015
Other
Size: 218 KB
York Potash Ltd
Hierarchy Document. Submission for Deadline 5 of 20 November 2015
Other
Size: 472 KB
York Potash Ltd
1.4E- Updated document list reflecting appropriate additions. Submission for Deadline 5 of 20 November 2015
Other
Size: 538 KB
York Potash Ltd
Covering Letter to the Planning Inspectorate. Submission for Deadline 5 of 20 November 2015
Other
Size: 981 KB
York Potash Ltd
8.7- Applicant?s Responses to Other Parties Responses to the Examining Authority?s second round of written questions. Submission for Deadline 5 of 20 November 2015
Other
Size: 14 KB
Agenda for the Compulsory Acquisition hearing on 24 November 2015
Other
Size: 21 KB
Agenda for the Development Consent Order hearing on 24 November 2015
Other
Size: 2 MB
CATS Parties
Update on discussions with the applicant dated 20 October 2015. Submission for Deadline 4 of 6 November 2015
Other
Size: 809 KB
CATS Parties
Update on Protective Provisions. Submission for Deadline 4 of 6 November 2015
Other
Size: 5 MB
DEA UK SNS Limited
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
Other
Size: 554 KB
Environment Agency
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
Other
Size: 5 MB
Huntsman Polyurethanes (UK) Limited
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
Other
Size: 511 KB
Marine Management Organisation
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 Nowember 2015
Other
Size: 27 KB
National Grid Electricity Transmission Plc
Withdrawing objection. Submission for Deadline 4 of 6 November 2015
Other
Size: 359 KB
Natural England
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
Other
Size: 396 KB
Northumbrian Water Limited
Update on discussions with the applicant. Submission for Deadline 4 of 6 November 2015
Other
Size: 61 KB
P D Teesport Limited
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
Other
Size: 509 KB
Redcar and Cleveland Borough Council
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
Other
Size: 5 MB
SABIC UK Petrochemicals Limited
Response to the Examining Authority?s Second Round of Written Questions. Submission for Deadline 4 of 6 November 2015
Other
Size: 408 KB
York Potash Ltd
Document 2.1I - YPL Land Plan Inset 6 - Rev v4
Other
Size: 6 MB
York Potash Ltd
Document 6.12A - Mitigation and Monitoring Strategy - Rev 4
Other
Size: 399 KB
York Potash Ltd
Document 2.1E - YPL Land Plan Inset 2 - Rev v4
Other
Size: 2 MB
York Potash Ltd
Document 3.2H - Layout Plans (Ground Level) Southern Route Sheet 1 - Rev D
Other
Size: 417 KB
York Potash Ltd
Document 2.1N(ii) - YPL Land Plan Inset 11(ii) (Southern Route) - Rev v4
Other
Size: 460 KB
York Potash Ltd
Document 2.1K - YPL Land Plan Inset 8 - Rev v4
Other
Size: 2 MB
York Potash Ltd
Document 3.2D - Layout Plans (Ground Level) Northern Route Sheet 3 - Rev G
Other
Size: 45 KB
York Potash Ltd
Doc 5.3A - Book of Reference (Tracked)
Other
Size: 903 KB
York Potash Ltd
Document 3.15B - YPL Pipeline Corridor Plan Sheet 2 - Rev v4
Other
Size: 1 MB
York Potash Ltd
Document 3.3L - Conveyor Route Plans Northern Route Sheet 4 - Rev F
Other
Size: 1 MB
York Potash Ltd
Document 3.3G - Conveyor Route Plans Southern Route Sheet 6 - Rev H
Other
Size: 416 KB
York Potash Ltd
Document 2.1L - YPL Land Plan Inset 9 - Rev v4
Other
Size: 45 KB
York Potash Ltd
Doc 5.3A - Book of Reference (Clean)
Other
Size: 2 MB
York Potash Ltd
Document 3.2C - Layout Plans (Ground Level) Northern Route Sheet 2 - Rev G
Other
Size: 486 KB
York Potash Ltd
Document 2.1J(ii) - YPL Land Plan Inset 7(ii) (Southern Route) - Rev v4
Other
Size: 486 KB
York Potash Ltd
Document 2.1J(i) - YPL Land Plan Inset 7(i) (Northern Route) - Rev v4
Other
Size: 1 MB
York Potash Ltd
Document 3.15C - YPL Pipeline Corridor Plan Sheet 3 - Rev v4
Other
Size: 1 MB
York Potash Ltd
Document 3.16 - Access Around RBT Conveyors
Other
Size: 52 MB
York Potash Ltd
Applicant's Responses to Examining Authority?s Second Questions, including appendices 1 - 5
Other
Size: 1 MB
York Potash Ltd
Document 3.3F - Conveyor Route Plans Southern Route Sheet 5 - Rev H
Other
Size: 1 MB
York Potash Ltd
Document 2.1C - YPL Land Plan Sheet 3 - Rev v4
Other
Size: 394 KB
York Potash Ltd
Document 2.1M - YPL Land Plan Inset 10 - Rev v4
Other
Size: 1 MB
York Potash Ltd
Document 2.1B(ii) - YPL Land Plan Sheet 2(ii) (Southern Route) - Rev v4
Other
Size: 3 MB
York Potash Ltd
Document 3.15 - YPL Pipeline Corridor Plan Key Plan - Rev v4
Other
Size: 2 MB
York Potash Ltd
Document 3.2B - Layout Plans (Ground Level) Northern Route Sheet 1 - Rev G
Other
Size: 418 KB
York Potash Ltd
Document 2.1N(i) - YPL Land Plan Inset 11(i) (Northern Route) - Rev v4
Other
Size: 390 KB
York Potash Ltd
Document 2.1F - YPL Land Plan Inset 3 - Rev v4
Other
Size: 386 KB
York Potash Ltd
Document 2.1H - YPL Land Plan Inset 5 - Rev v4
Other
Size: 2 MB
York Potash Ltd
Document 3.2K - Layout Plans (Ground Level) Southern Route Sheet 4 - Rev D
Other
Size: 2 MB
York Potash Ltd
Document 3.2I - Layout Plans (Ground Level) Southern Route Sheet 2 - Rev D
Other
Size: 942 KB
York Potash Ltd
Document 6.8B - Governance Tracker
Other
Size: 2 MB
York Potash Ltd
Document 3.2J - Layout Plans (Ground Level) Southern Route Sheet 3 - Rev D
Other
Size: 2 MB
York Potash Ltd
Document 3.2E - Layout Plans (Ground Level) Northern Route Sheet 4 - Rev G
Other
Size: 859 KB
York Potash Ltd
Document 2.1A - YPL Land Plan Sheet 1 - Rev v4
Other
Size: 4 MB
York Potash Ltd
Document 7.4B - Development Consent Obligation (signed)
Other
Size: 1 MB
York Potash Ltd
Covering Letter to the Planning Inspectorate and Document List for Deadline 4
Other
Size: 2 MB
York Potash Ltd
Document 3.3K - Conveyor Route Plans Northern Route Sheet 3 - Rev G
Other
Size: 1 MB
York Potash Ltd
Document 4.1C - Draft Development Consent Order (Clean)
Other
Size: 405 KB
York Potash Ltd
Document 2.1D - YPL Land Plan Inset 1 - Rev v4
Other
Size: 573 KB
York Potash Ltd
Document 6.11A - Outline Ecological Management Plan
Other
Size: 629 KB
York Potash Ltd
Document 4.2B - Explanatory Memorandum (Clean)
Other
Size: 1 MB
York Potash Ltd
Document 3.3E - Conveyor Route Plans Southern Route Sheet 4 - Rev H
Other
Size: 669 KB
York Potash Ltd
Document 3.15A - YPL Pipeline Corridor Plan Sheet 1 - Rev v4
Other
Size: 1 MB
York Potash Ltd
Document 2.1B(i) - YPL Land Plan Sheet 2(i) (Northern Route) - Rev v4
Other
Size: 647 KB
York Potash Ltd
Document 4.2B - Explanatory Memorandum (Tracked)
Other
Size: 1 MB
York Potash Ltd
Document 4.1C - Draft Development Consent Order (Tracked)
Other
Size: 2 MB
York Potash Ltd
Document 3.3D - Conveyor Route Plans Southern Route Sheet 3 - Rev H
Other
Size: 3 MB
York Potash Ltd
Document 2.1 - YPL Land Plan Key Plan - Rev v4
Other
Size: 372 KB
York Potash Ltd
Document 2.1G - YPL Land Plan Inset 4 - Rev v4
Other
Size: 1 MB
York Potash Ltd
Applicant?s Newspaper Notices of Hearings on 24 November 2015
Other
Size: 323 KB
ExA Second Round Questions
Examining Authority's second written questions
Other
Size: 100 KB
Timetable Amendment and Notice of Hearings
Other
Size: 6 MB
Tata Steel UK Limited and Others
In lieu of oral submissions at Hearings on 24-25 September 2015. Late submission for Deadline 3 of 2 October 2015 accepted at the discretion of the Examining Authority
Other
audio recording
Size: 95 MB
Recording of DCO hearing
Audo Recording of the Issue Specific Hearing on the Draft Development Consent Order 25 September 2015
Other
audio recording
Size: 31 MB
Recording of Open Floor Hearing
Audio Recording of the Open Floor Hearing on 24 September 2015
Other
Size: 33 KB
Recording of CA Hearing
Audio Recording of the Compulsory Acquisition Hearing 24 September 2015
Other
Size: 3 MB
Marine Management Organisation
Responses to the Examining Authority?s questions
Other
Size: 162 KB
Royal Mail Group Ltd
Written Representation
Other
Size: 1 MB
York Potash Ltd
Draft Development Consent Order (with Tracked Changes)
Other
Size: 240 KB
York Potash Ltd
CIL Note. Appendix 5 of Submissions from Hearings
Other
Size: 81 KB
York Potash Ltd
Network Rail s127. Appendix 1 of Submissions from Hearings
Other
Size: 416 KB
York Potash Ltd
Submissions from Hearings
Other
Size: 1 MB
York Potash Ltd
Draft Development Consent Order (Clean)
Other
Size: 20 MB
York Potash Ltd
Decision Notices and s106 Agreements. Appendix 4 Parts 1 and 2 of Submissions from Hearings
Other
Size: 60 KB
York Potash Ltd
Submission relating to Alternatives. Appendix 2 of Submissions from Hearings
Other
Size: 69 KB
York Potash Ltd
Dredging Note. Appendix 3 of Submissions from Hearings
Other
Size: 1 MB
York Potash Ltd
Covering Letter to the Planning Inspectorate and Document List for Deadline 3
Other
Size: 53 KB
DCO Hearing Agenda 25 September 2015
Other
Size: 1 MB
Amoco (UK) Exploration Company
Submission prior to the Compulsory Acquisition Hearing of 24 September 2015
Other
Size: 65 KB
ICI Chemicals & Polymers Limited
Withdrawal of representation submitted on 21 August 2015. Submission prior to the Compulsory Acquisition Hearing of 24 September 2015
Other
Size: 35 KB
National Grid
Submission prior to the Development Consent Order Hearing of 25 September 2015
Other
Size: 220 KB
P D Teesport Limited
Submission prior to the Development Consent Order Hearing of 25 September 2015
Other
Size: 36 KB
Tata Steel UK Limited
Submission prior to the Compulsory Acquisition Hearing of 24 September 2015
Other
Size: 64 KB
North Yorkshire County Council
Additional response to the Examining Authority?s First Written Questions. Accepted at the discretion of the Examining Authority
Other
Size: 51 KB
CA Hearing Agenda 24 September 2015
Other
Size: 47 KB
Open Floor Hearing Agenda 24 September 2015
Other
Size: 51 KB
Site Visit Itinerary 23 September 2015
Other
Size: 297 KB
Marine Management Organisation
Comments on responses to the Examining Authority First Written Questions
Other
Size: 568 KB
York Potash Ltd
Document 8.4 Applicant?s Responses to Other Responses to ExA Q1
Other
Size: 413 KB
York Potash Ltd
Document 8.3 Applicant?s Response to Written Representations
Other
Size: 47 KB
Tata Steel UK Limited and others
Comments on responses to Examining Authority's First Written Questions and Response to Comments on Relevant Representations
Other
Size: 179 KB
Environment Agency
Comments on responses to the Examining Authority?s First Written Questions. Submitted for Deadline II of 7 September 2015
Other
Size: 250 KB
Redcar and Cleveland Borough Council
Comments on responses to the Examining Authority's First Written Questions and other comments.
Other
Size: 745 KB
York Potash Ltd
Document 8.3 Appendix 4 - No 2 Tunnel Note
Other
Size: 663 KB
York Potash Ltd
Document 4.2A Draft Explanatory Memorandum (Tracked)
Other
Size: 513 KB
York Potash Ltd
Letter to the Examining Authority dated 07 09 15
Other
Size: 1 MB
York Potash Ltd
Document 4.1A Draft DCO (Tracked)
Other
Size: 261 KB
York Potash Ltd
Document 8.3 Appendix 1 - Notes on INSPIRE and NPL Guidelines
Other
Size: 1 MB
York Potash Ltd
Document 8.3 Appendix 3 - Constructability Notes
Other
Size: 432 KB
York Potash Ltd
Document 8.3 Appendix 5 - Shipping Notes Part 3
Other
Size: 458 KB
York Potash Ltd
Document 1.4B Document List
Other
Size: 1 MB
York Potash Ltd
Document 4.1A Draft DCO (Clean)
Other
Size: 9 MB
York Potash Ltd
Document 8.3 Appendix 5 - Shipping Notes Part 2
Other
Size: 651 KB
York Potash Ltd
Document 4.2A Draft Explanatory Memorandum (Clean)
Other
Size: 57 KB
York Potash Ltd
Document 8.3 Appendix 2 - References
Other
Size: 6 MB
York Potash Ltd
Document 6.12 Mitigation and Monitoring Strategy
Other
Size: 5 MB
York Potash Ltd
Document 8.3 Appendix 5 - Shipping Notes Part 1
Other
Size: 1 MB
York Potash Limited
Applicant?s draft Accompanied Site Visit Itinerary and location maps. Late submission for Deadline 1 of 21 August 2015. Accepted at the discretion of the Examining Authority
Other
Size: 1 MB
ICI Chemicals and Polymers Limited
Land Registry Plan CE148382 of the Bran Sands Site. Referred to in ICI?s submission for Deadline 1of 21 August 2015
Other
Size: 7 MB
CATS Management Limited
Written representation. Submission for Deadline 1 of 21 August 2015
Other
Size: 5 MB
CATS Parties
Written representation. Submission for Deadline 1 of 21 August 2015
Other
Size: 328 KB
DEA UK SNS Limited
Covering Letter to the Planning Inspectorate. Submission for Deadline 1 of 21 August 2015
Other
Size: 18 KB
DEA UK SNS Limited
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 3 MB
DEA UK SNS Limited
Written representation and Summary. Submission for Deadline 1 of 21 August 2015
Other
Size: 767 KB
Environment Agency
Response to the Examining Authority?s First Written Questions and Statement of Common Ground with applicant. Submission for Deadline 1 of 21 August 2015
Other
Size: 393 KB
Health and Safety Executive
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 329 KB
Huntsman Polyurethanes (UK) Limited
Covering Letter to the Planning Inspectorate. Submission for Deadline 1 of 21 August 2015
Other
Size: 18 KB
Huntsman Polyurethanes (UK) Limited
Response to Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 3 MB
Huntsman Polyurethanes (UK) Limited
Written representation. Submission for Deadline 1 of 21 August 2015
Other
Size: 39 KB
Huntsman Polyurethanes (UK) Limited
Summary of Written Representation. Submission for Deadline 1 of 21 August 2015
Other
Size: 19 KB
ICI Chemicals and Polymers Limited
Written representation. Submission for Deadline 1 of 21 August 2015
Other
Size: 482 KB
Marine Management Organisation
Written representation and Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 37 KB
National Grid Electricity Transmission Plc
Written representation. Submission for Deadline 1 of 21 August 2015
Other
Size: 247 KB
Natural England
Written Representation Annex B ? Designated site conservation objectives and citations Submission for Deadline 1 of 21 August 2015
Other
Size: 542 KB
Natural England
Written Representation, Executive Summary, and Annexes A-C. Submission for Deadline 1 of 21 August 2015
Other
Size: 5 MB
Natural England
Written Representation Annex A ? Designated Site Maps. Submission for Deadline 1 of 21 August 2015
Other
Size: 50 KB
Network Rail
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 218 KB
North Yorkshire County Council
Responses to the Examining Authority?s First Round of Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 18 KB
PD Teesport Limited
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 115 KB
PD Teesport Limited
Written Representation and Summary. Submission for Deadline 1 of 21 August 2015
Other
Size: 137 KB
Redcar and Cleveland Borough Council
Local Impact Report. Submission for Deadline 1 of 21 August 2015
Other
Size: 98 KB
Redcar and Cleveland Borough Council
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 18 KB
SABIC UK Petrochemicals Limited
Response to Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 3 MB
SABIC UK Petrochemicals Limited
Written representation and S ummary. Submission for Deadline 1 of 21 August 2015
Other
Size: 331 KB
SABIC UK Petrochemicals Limited
Covering Letter to the Planning Inspectorate. Submission for Deadline 1 of 21 August 2015
Other
Size: 1,000 KB
TATA Steel UK Limited and others
Written representation and Summary, and suggested Site Visit locations. Submission for Deadline 1 of 21 August 2015
Other
Size: 42 KB
Trinity House
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 774 KB
York Potash Limited
Statement of Common Ground with Natural England. Submission for Deadline 1 of 21 August 2015
Other
Size: 9 MB
York Potash Limited
Annual Report and Accounts. Appendix 2 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 2 MB
York Potash Limited
Conveyor Options Study Supplementary Report. Appendix 4 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 216 KB
York Potash Limited
Hierarchy Diagram. Appendix 3 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 942 KB
York Potash Limited
Updated Governance Tracker. Submission for Deadline 1 of 21 August 2015
Other
Size: 1 MB
York Potash Limited
Statement of Common Ground with Redcar and Cleveland Borough Council (Transport). Submission for Deadline 1 of 21 August 2015
Other
Size: 2 MB
York Potash Limited
Permanent Compound Site A plan. Submission for Deadline 1 of 21 August 2015
Other
Size: 334 KB
York Potash Limited
Revised Screening and Integrity Matrices. Appendix 8 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 569 KB
York Potash Limited
Outline Ecological Management Plan. Submission for Deadline 1 of 21 August 2015
Other
Size: 307 KB
York Potash Limited
Biodiversity Offsetting. Appendix 7 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 2 MB
York Potash Limited
Outline Construction Environmental Management Plan. Submission for Deadline 1 of 21 August 2015
Other
Size: 385 KB
York Potash Limited
Update Parameters Table. Submission for Deadline 1 of 21 August 2015
Other
Size: 1 MB
York Potash Limited
Covering Letter and Document list. Submission for Deadline 1 of 21 August 2015
Other
Size: 278 KB
York Potash Limited
Company Structure Diagram. Appendix 1 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 1 MB
York Potash Limited
Statement of Common Ground with Highways England. Submission for Deadline 1 of 21 August 2015
Other
Size: 426 KB
York Potash Limited
Applicant?s Response to Relevant Representations. Submission for Deadline 1 of 21 August 2015.
Other
Size: 4 MB
York Potash Limited
Treatment of Contaminated Silt. Appendix 6 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 990 KB
York Potash Limited
Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 4 MB
York Potash Limited
Draft Development Consent Obligation. Submission for Deadline 1 of 21 August 2015
Other
Size: 2 MB
York Potash Limited
Permanent Compound Site C plan. Submission for Deadline 1 of 21 August 2015
Other
Size: 20 MB
York Potash Limited
Statement of Common Ground with Redcar and Cleveland Borough Council (Planning) and 9 Appendices. Submission for Deadline 1 of 21 August 2015
Other
Size: 739 KB
York Potash Limited
Statement of Common Ground with Environment Agency. Submission for Deadline 1 of 21 August 2015
Other
Size: 797 KB
York Potash Limited
Contaminated Silt Disposal. Appendix 5 of Applicant?s Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 21 August 2015
Other
Size: 49 KB
York Potash Ltd
Applicant?s request for clarification of Examining Authority?s First Written Questions and PINS response
Other
Size: 109 KB
Rule 8 Letter
Other
Size: 367 KB
ExA First Round Questions
Examining Authority's first written questions
Other
Size: 78 KB
Preliminary Meeting Note
Note of the preliminary meeting held on 21 July 2015
Other
audio recording
Size: 44 MB
Preliminary Meeting Audio 21 July 2015
Preliminary Meeting Audio Recording
Other
Size: 51 KB
Anglian Water
Submission dated 25 June 2015. Accepted at the discretion of the Examining Authority at the Preliminary Meeting on 21 July 2015
Other
Size: 56 KB
Network Rail Infrastructure Limited
Submission dated 9 July 2015. Accepted at the discretion of the Examining Authority at the Preliminary Meeting on 21 July 2015
Other
Size: 247 KB
Northumbrian Water Limited
Submission dated 4 June 2015. Accepted at the discretion of the Examining Authority at the Preliminary Meeting on 21 July 2015
Other
Size: 340 KB
Sembcorp Utilities (UK) Limited
Submission dated 16 July 2015. Accepted at the discretion of the Examining Authority at the Preliminary Meeting on 21 July 2015
Other
Size: 33 KB
S56 S59 and R13 Certificates
Certificates of compliance with the obligations to give notice of the acceptance of the application
Other
Size: 113 KB
Rule 6 letter
Other
Size: 114 KB
Notification of Decision to Accept Application
Other
Size: 101 KB
S51 Advice
Advice to the applicant following acceptance of the application
Other
Size: 436 KB
Section 55 Checklist
Other
Size: 44 KB
Darlington Borough Council
Adequacy of Consultation Response
Other
Size: 79 KB
Durham County Council
Adequacy of Consultation Response
Other
Size: 42 KB
Hambleton District Council
Adequacy of Consultation Response
Other
Size: 62 KB
Middlesbrough Council
Adequacy of Consultation Response
Other
Size: 390 KB
North York Moors National Park Authority
Adequacy of Consultation Response
Other
Size: 184 KB
Redcar and Cleveland Borough Council
Adequacy of Consultation Response
Other
Size: 53 KB
Stockton on Tees Borough Council
Adequacy of Consultation Response
Other
Size: 205 KB
Yorkshire County Council
Adequacy of Consultation Response
Other
Size: 192 KB
York Potash ltd
Letter from the applicant withdrawing the application dated 14 January 2015.
Other
Size: 490 KB
Doc 4.2 Explanatory Memorandum
Other
Size: 10 MB
ES Contents index
Other
Size: 2 MB
Section 3 App 3.1 Waste management
Other
Size: 399 KB
Doc 3.5B - Permanent Compound Site C
Other
Size: 2 MB
Section 15 App 15.3 Stage 1 geoarchaeological assessment
Other
Size: 256 KB
Doc 6.6 App 6.9 Employee distribution
Other
Size: 16 MB
Doc 6.6 App 22.1 Potential significant impacts ZTV national park
Other
Size: 48 MB
Doc 5.2 Funding Statement Appendix 1 - Annual Report 2014
Other
Size: 9 MB
Doc 3.13 Ease of Reference A3 Plans Bundle part 3
Other
Size: 47 MB
Doc 6.1 Consultation Statement Appendices - 10 to 21
Other
Size: 167 KB
Doc 3.5A - Permanent Compound Site A
Other
Size: 15 MB
Doc 7.2 - Summary of Proposals Document
Other
Size: 15 MB
Doc 6.6 App 22.1 Landscape designations construction traffic flow
Other
Size: 527 KB
Doc 5.1 Statement of Reasons
Other
Size: 7 MB
Section 20 App 20.5 LVIA figures 2 of 2
Other
Size: 13 MB
Doc 6.6 App 22.1 Panoramic photographs 03
Other
Size: 1 MB
ES Section 12 Traffic and transport
Other
Size: 48 MB
Doc 6.6 App 22.1 Sequential access land panoramic viewpoints
Other
Size: 28 MB
Section 6 App 6.2 Land Quality Generic Risk Assessment
Other
Size: 163 KB
EIA Appendices Index
Other
Size: 818 KB
ES Section 20 Landscape and visual environment
Other
Size: 3 MB
Doc 3.2I - Layout Plans (Ground Level) Southern Route Sheet 2
Other
Size: 49 MB
ES Section 3 Project description 2 of 2
Other
Size: 18 MB
Doc 6.6 App 22.1 6km winding towers ZTV national park
Other
Size: 4 MB
Doc 3.2L - Layout Plans (Ground Level) Southern Route Sheet 5
Other
Size: 3 MB
Doc 1.3 Newspaper Notices Report
Other
Size: 5 MB
Doc 3.4B - Location of Temporary Compounds (Sheet 2 of 2)
Other
Size: 13 MB
Doc 6.6 App 22.3 A171 sequential assessment
Other
Size: 14 MB
Doc 6.6 App 22.1 Panoramic photographs 04
Other
Size: 116 KB
Doc 3.9D - Indicative Elevation Open Quay Construction
Other
Size: 16 MB
Doc 6.6 App 22.3 Cleveland Way sequential assessment
Other
Size: 45 KB
Doc 5.3 Book of Reference
Other
Size: 441 KB
Doc 1.6 Issues and Document Tracker
Other
Size: 550 KB
Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement
Other
Size: 2 MB
Doc 3.3J - Conveyor Route Plans Northern Route - Sheet 2
Other
Size: 2 MB
Doc 3.3L - Conveyor Route Plans Northern Route - Sheet 4
Other
Size: 5 MB
ES Section 11 Fisheries and fishing activity
Other
Size: 292 KB
Doc 3.8A - Indicative Layout - Solid Quay Construction - Northern Route
Other
Size: 4 MB
Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 5
Other
Size: 3 MB
Doc 3.2B - Layout Plans (Ground Level) Northern Route Sheet 1
Other
Size: 270 KB
Section 6 App 6.1 Land quality investigation meeting note
Other
Size: 340 KB
Section 14 App 14.1 Construction vibration calculations
Other
Size: 1 MB
ES Section 22 Offshore disposal of dredged material
Other
Size: 10 MB
ES Section 5 Hydrodynamic and sedimentary regime
Other
Size: 531 KB
Other
Size: 43 KB
Doc 6.6 App 6.11 Operational shift details
Other
Size: 430 KB
Doc 2.1K - YPL Land Plan Inset 8 Rev v1
Other
Size: 9 MB
Doc 3.1 - Location Plan
Other
Size: 116 KB
Doc 3.4F - Temporary Compound Site E
Other
Size: 3 MB
Doc 3.2J - Layout Plans (Ground Level) Southern Route Sheet 3
Other
Size: 3 MB
Doc 3.3H - Conveyor Route Plans Northern Route - Key Plan
Other
Size: 254 KB
Section 12 App 12.10 Peak construction employee numbers
Other
Size: 19 KB
Doc 6.6 App 6.6 Peak construction employees
Other
Size: 25 MB
Doc 6.6 App 22.1 Landscape character with woods
Other
Size: 12 MB
Doc 7.3 Appendix 2b - MDT Planning Statement Appendices
Other
Size: 359 KB
Doc 2.1F - YPL Land Plan Inset 3 Rev v1
Other
Size: 13 MB
Section 12 App 12.2 Transport Assessment 2 of 2
Other
Size: 45 MB
Section 12 App 12.2 Transport Assessment 1 of 2
Other
Size: 833 KB
Doc 4.1 Draft DCO (including requirements)
Other
Size: 3 MB
ES Section 18 Infrastructure
Other
Size: 456 KB
Doc 2.1J - YPL Land Plan Inset 7 Rev v1
Other
Size: 2 MB
Doc 3.3O - Conveyor Route Plans Northern Route - Sheet 7
Other
Size: 777 KB
ES Section 24 References
Other
Size: 299 KB
Doc 3.9A - Indicative Layout - Open Quay Northern Route
Other
Size: 565 KB
Section 12 App 12.8 Activity HGV summary
Other
Size: 3 MB
Doc 3.3A - Conveyor Route Southern Route - Key Plan
Other
Size: 949 KB
Doc 7.5 - Letter from Secretary of State for BIS
Other
Size: 5 MB
ES Section 15 Archaeology and heritage
Other
Size: 47 KB
Doc 6.6 App 6.14 MHF operation employees
Other
Size: 110 KB
Doc 6.6 CIA Appendices Index
Other
Size: 28 MB
Doc 6.3 Habitats Regulations Assessment 2 of 2
Other
Size: 19 MB
Section 10 App 10.2 Terrestrial ecology survey reports
Other
Size: 13 MB
Section 4 App 4.2 Scoping Opinion
Other
Size: 268 KB
Section 12 App 12.9 Traffic demand summary
Other
Size: 3 MB
Doc 3.2C - Layout Plans (Ground Level) Northern Route Sheet 2
Other
Size: 3 MB
ES Section 21 Recreation and access
Other
Size: 451 KB
Section 20 App 20.3 Visual assessment
Other
Size: 976 KB
Doc 1.2 Covering Letter
Other
Size: 47 MB
Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 2
Other
Size: 609 KB
Doc 2.2E - YPL Works Plan Sheet 5 Rev v1
Other
Size: 658 KB
Doc 5.2 Funding Statement
Other
Size: 596 KB
Doc 2.3A YPL Access and RoW Plan Sheet 1 Rev v1
Other
Size: 5 MB
Section 19 App 19.1 Socio economic legislation policy guidance
Other
Size: 1 MB
Doc 6.1 Consultation Statement - Main Text
Other
Size: 68 KB
Doc 6.6 App 6.15 Operation link distribution
Other
Size: 158 KB
Doc 3.4E - Temporary Compound Site D
Other
Size: 204 KB
Doc 3.4G - Temporary Compound Site F
Other
Size: 1 MB
Doc 3.7 - MHF Overall Site Layout
Other
Size: 15 MB
Doc 6.6 App 22.1 Landscape character operational traffic flow
Other
Size: 1 MB
Section 8 App 8.1 Underwater noise calibration certificate
Other
Size: 2 MB
Doc 7.3 Appendix 7 - Alternative Sites Assessment
Other
Size: 371 KB
Doc 2.1E - YPL Land Plan Inset 2 Rev v1
Other
Size: 4 MB
Doc 3.2K - Layout Plans (Ground Level) Southern Route Sheet 4
Other
Size: 245 KB
Section 12 App 12.6 Collision data
Other
Size: 213 KB
Doc 3.12E - Conveyor Cross Sections Southern Route Sheet 1
Other
Size: 376 KB
Doc 2.1H - YPL Land Plan Inset 5 Rev v1
Other
Size: 8 MB
Doc 6.6 App 22.3 A169 sequential assessment
Other
Size: 175 KB
Section 12 App 12.7 Collision cluster data
Other
Size: 31 KB
Doc 6.6 App 6.3 Earthworks HGV profile
Other
Size: 8 MB
Doc 6.6 App 22.3 Coast to coast sequential assessment
Other
Size: 710 KB
Doc 2.2D - YPL Works Plan Sheet 4 Rev v1
Other
Size: 26 KB
Doc 6.6 App 6.12 Operational shift times
Other
Size: 7 MB
ES Section 7 Marine sediment and water quality
Other
Size: 8 MB
ES Section 6 Hydrology hydrogeology land quality
Other
Size: 163 KB
Doc 3.8C - Indicative Section Solid Quay Construction
Other
Size: 38 MB
Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014
Other
Size: 20 MB
ES Section 3 Project description 1 of 2
Other
Size: 18 MB
Doc 6.6 App 22.2 Panoramic photographs 03
Other
Size: 4 MB
Doc 7.3 Appendix 2a - MDT Planning Statement
Other
Size: 4 MB
Doc 3.2G - Layout Plans (Ground Level) Southern Route - Key Plan
Other
Size: 4 MB
Doc 3.2F - Layout Plans (Ground Level) Northern Route Sheet 5
Other
Size: 31 MB
Section 22 App 22.1 Offshore minipod deployment
Other
Size: 12 MB
Section 12 App 12.1 Figures to support Traffic and Transport section
Other
Size: 17 MB
Doc 3.13 Ease of Reference A3 Plans Bundle part 1
Other
Size: 18 MB
Doc 1.1 Application Form
Other
Size: 60 KB
Doc 3.6B - Substation Elevations Sites A and C
Other
Size: 53 MB
Section 8 App 8.3 Benthic ecology survey report
Other
Size: 205 KB
Doc 6.6 App 6.8 Rented accommodation mine MTS
Other
Size: 1 MB
Section 13 App 13.1 Air quality assessment methodology
Other
Size: 17 MB
Doc 7.1 Planning Statement
Other
Size: 531 KB
ES Section 23 Impact interrelationships
Other
Size: 82 KB
Doc 6.6 App 22.3 Sequential receptor assessment
Other
Size: 19 MB
Doc 6.6 App 22.2 Panoramic photographs 04
Other
Size: 13 MB
ES Section 13 Air quality
Other
Size: 110 KB
Doc 6.6 App 6.7 Construction shift patterns
Other
Size: 2 MB
Doc 3.3K - Conveyor Route Plans Northern Route - Sheet 3
Other
Size: 7 MB
Section 15 App 15.2 Northern Gateway Archaeological Appraisal
Other
Size: 2 MB
Doc 3.3I - Conveyor Route Plans Northern Route - Sheet 1
Other
Size: 837 KB
Section 12 App 12.4 Baseline traffic flows
Other
Size: 24 MB
Doc 6.6 App 22.1 Landscape designations with woods
Other
Size: 7 MB
Doc 6.6 App 22.3 National cycle route 1 sequential assessment
Other
Size: 2 MB
Section 4 App 4.3 WFD compliance assessment
Other
Size: 647 KB
Section 6 App 6.4 CEMP
Other
Size: 2 MB
Doc 3.3F - Conveyor Route Plans Southern Route - Sheet 5
Other
Size: 795 KB
ES Section 2 Legislation regulation policy
Other
Size: 3 MB
Doc 2.1 - YPL Land Plan Key Plan Rev v1
Other
Size: 64 MB
Section 5 App 5.1 Hydraulic studies to support EIA
Other
Size: 33 MB
Doc 6.3 Habitats Regulations Assessment 1 of 2
Other
Size: 31 MB
Doc 6.6 App 22.1 Study area photograph photomontage locations
Other
Size: 4 MB
Doc 3.12D - Conveyor Cross Sections Location Plan - Southern Route
Other
Size: 65 MB
Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1
Other
Size: 2 MB
Doc 3.3C - Conveyor Route Plans Southern Route - Sheet 2
Other
Size: 381 KB
Section 20 App 20.2 Landscape assessment
Other
Size: 5 MB
Doc 7.3 Appendix 5 - MHF Planning Statement
Other
Size: 10 MB
ES Section 9 Marine and coastal ornithology
Other
Size: 276 KB
Section 20 App 20.1 LVIA methodology
Other
Size: 33 MB
Doc 6.1 Consultation Statement Appendices - 1 to 9
Other
Size: 238 KB
Section 10 App 10.1 Terrestrial ecology legislation
Other
Size: 374 KB
Doc 2.1D - YPL Land Plan Inset 1 Rev v1
Other
Size: 36 KB
Doc 6.6 App 6.13 Mine operation employees
Other
Size: 909 KB
Doc 7.6 The Crown Estate Consent Letter
Other
Size: 4 MB
Doc 3.2E - Layout Plans (Ground Level) Northern Route Sheet 4
Other
Size: 3 MB
Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015
Other
Size: 26 MB
Section 5 App 5.2 Model calibration and validation
Other
Size: 26 MB
Doc 6.6 App 22.1 Sequential access land panoramic with woods
Other
Size: 275 KB
Doc 3.10 - Conveyor Typologies
Other
Size: 3 MB
Section 17 App 17.1 Flood Risk Assessment
Other
Size: 19 MB
Doc 6.6 App 22.2 Panoramic photographs 02
Other
Size: 49 MB
Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3
Other
Size: 1 MB
Section 15 App 15.4 Additional settings assessment report
Other
Size: 2 MB
Doc 3.3M - Conveyor Route Plans Northern Route - Sheet 5
Other
Size: 2 MB
Doc 3.3N - Conveyor Route Plans Northern Route - Sheet 6
Other
Size: 29 MB
ES Section 1 Introduction
Other
Size: 452 KB
Doc 7.4 Draft Development Consent Obligations - Heads of Terms
Other
Size: 2 MB
Doc 2.2B - YPL Works Plan Sheet 2 Rev v1
Other
Size: 16 MB
Doc 6.6 App 22.2 Panoramic photographs 01
Other
Size: 22 MB
ES Section 8 Marine ecology
Other
Size: 15 MB
ES Section 14 Noise and vibration
Other
Size: 670 KB
Other
Size: 397 KB
Doc 2.1I - YPL Land Plan Inset 6 Rev v1
Other
Size: 3 MB
Doc 7.3 Appendix 1 - Mine and MTS Planning Statement
Other
Size: 4 MB
Doc 3.2A - Layout Plans (Ground Level) Northern Route - Key Plan
Other
Size: 398 KB
Doc 2.1M - YPL Land Plan Inset 10 Rev v1
Other
Size: 27 MB
Doc 6.6 App 22.1 Sequential access land panoramic no woods
Other
Size: 71 KB
Doc 3.6A - Permanent Building Elevations Site C
Other
Size: 292 KB
Doc 3.9B - Indicative Layout - Open Quay Construction - Southern Route
Other
Size: 2 MB
Doc 3.3E - Conveyor Route Plans Southern Route - Sheet 4
Other
Size: 3 MB
Doc 6.7 Environmental Statement Non Technical Summary 2 of 2
Other
Size: 5 MB
Doc 3.4A - Location of Temporary Compounds (Sheet 1 of 2)
Other
Size: 3 MB
Doc 2.3 YPL Access and RoW Plan Key Plan Rev v1
Other
Size: 32 MB
Doc 6.6 App 22.1 Landscape character
Other
Size: 509 KB
Doc 6.6 App 1.1 Description of the YPP
Other
Size: 3 MB
Section 8 App 8.2 Underwater noise modelling report
Other
Size: 188 KB
Doc 3.4C - Temporary Compound Site A
Other
Size: 137 KB
Doc 6.6 App 6.10 Worker link distribution
Other
Size: 387 KB
Doc 2.1N - YPL Land Plan Inset 11 Rev v1
Other
Size: 26 MB
Doc 6.6 App 22.1 Landscape designations no woods
Other
Size: 20 MB
Doc 6.6 App 22.2 Panoramic photographs 05
Other
Size: 2 MB
Section 9 App 9.1 Waterbird distribution plots
Other
Size: 47 KB
Doc 6.6 App 6.5 YPP HGV distribution
Other
Size: 14 MB
Doc 3.13 Ease of Reference A3 Plans Bundle part 2
Other
Size: 30 MB
Doc 6.6 App 22.1 Landscape designations
Other
Size: 38 MB
Section 20 App 20.4 Technical lighting assessment
Other
Size: 2 MB
Doc 2.2A - YPL Works Plan Sheet 1 Rev v1
Other
Size: 414 KB
Doc 7.3 Project Position Statement
Other
Size: 2 MB
Doc 3.3B - Conveyor Route Plans Southern Route - Sheet 1
Other
Size: 4 MB
ES Section 16 Commercial navigation
Other
Size: 15 MB
Doc 6.6 App 22.1 Panoramic photographs 05
Other
Size: 4 MB
Doc 7.3 Appendix 6 - Marine Licence (offshore)
Other
Size: 60 MB
Section 12 App 12.3 Construction Traffic Management Plan
Other
Size: 4 MB
Section 15 App 15.1 Archaeology desk based appraisal
Other
Size: 155 KB
Doc 3.9C - Indicative Section Open Quay Construction
Other
Size: 42 MB
Section 20 App 20.5 LVIA figures 1 of 2
Other
Size: 111 KB
Doc 6.6 App 22.2 Representative viewpoint assessment
Other
Size: 12 MB
Doc 6.6 App 22.1 Panoramic photographs 01
Other
Size: 25 MB
Doc 6.6 Environmental Statement CIA
Other
Size: 27 MB
Doc 6.6 App 22.1 Landscape character no woods
Other
Size: 22 MB
Doc 6.6 App 22.1 winding towers ZTV national park
Other
Size: 599 KB
Doc 1.5 s55 Checklist
Other
Size: 425 KB
Doc 1.4 Document List
Other
Size: 739 KB
Doc 2.1A - YPL Land Plan Sheet 1 Rev v1
Other
Size: 807 KB
Doc 6.8 Governance Tracker
Other
Size: 654 KB
ES Section 4 Approach to EIA
Other
Size: 5 MB
Doc 3.12A - Conveyor Cross Sections Location Plan - Northern Route
Other
Size: 43 KB
Doc 6.6 App 6.4 In combination traffic demand
Other
Size: 10 MB
Section 4 App 4.1 Environmental Scoping Report
Other
Size: 91 MB
Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 4
Other
Size: 288 KB
Doc 3.8B - Indicative Layout - Solid Quay Construction - Southern Route
Other
Size: 3 MB
Section 7 App 7.2 Sediment quality data
Other
Size: 19 MB
Section 3 App 3.2 Option study report
Other
Size: 8 MB
Doc 6.6 App 22.3 Regional cycle route 165 sequential assessment
Other
Size: 339 KB
Doc 6.9 Parameters Table
Other
Size: 217 KB
Doc 3.12C - Conveyor Cross Sections Northern Route Sheet 2
Other
Size: 41 MB
Section 6 App 6.3 Land Quality Preliminary Risk Assessment
Other
Size: 209 KB
Doc 3.12B - Conveyor Cross Sections Northern Route Sheet 1
Other
Size: 2 MB
Doc 3.3D - Conveyor Route Plans Southern Route - Sheet 3
Other
Size: 3 MB
Doc 3.2D - Layout Plans (Ground Level) Northern Route Sheet 3
Other
Size: 2 MB
Doc 3.3G - Conveyor Route Plans Southern Route - Sheet 6
Other
Size: 1 MB
ES Section 17 Coastal protection and flood defence
Other
Size: 270 KB
Section 12 App 12.11 Distribution of construction employees
Other
Size: 14 MB
Doc 6.6 App 22.1 Panoramic photographs 02
Other
Size: 47 MB
Doc 6.7 Environmental Statement Non Technical Summary 1 of 2
Other
Size: 5 MB
Doc 7.3 Appendix 4 - Economic Impact Report
Other
Size: 15 MB
Doc 6.6 App 22.1 Landscape character construction traffic flow
Other
Size: 6 MB
Doc 2.2 - YPL Works Plan Key Plan Rev v1
Other
Size: 3 MB
Doc 3.2H - Layout Plans (Ground Level) Southern Route Sheet 1
Other
Size: 43 MB
Doc 6.6 App 6.1 Cumulative traffic figures
Other
Size: 15 MB
Doc 6.6 App 22.1 Landscape designations operational traffic flow
Other
Size: 8 MB
Section 12 App 12.5 Collision plans
Other
Size: 157 KB
Doc 3.8D - Indicative Elevation Solid Quay Construction
Other
Size: 1,017 KB
Doc 2.2F - YPL Works Plan Sheet 6 Rev v1
Other
Size: 2 MB
ES Section 19 Socioeconomics
Other
Size: 21 MB
ES Section 10 Terrestrial ecology
Other
Size: 128 KB
Doc 3.14 Harbour Construction Route Access
Other
Size: 1 MB
Section 7 App 7.1 Benthic and sediment sampling strategy
Other
Size: 688 KB
Doc 6.6 App 6.2 In combination HGV
Other
Size: 40 MB
Doc 6.6 App 22.1 Photomontages 1 2 4 5 7 11
Other
Size: 23 MB
Doc 6.6 App 22.1 Photomontages 13 15 17 18
Other
Size: 8 MB
Doc 6.1 Consultation Statement Appendices - 22 to 31
Other
Size: 203 KB
Doc 3.4D - Temporary Compound Site B
Other
Size: 202 KB
Doc 3.12F - Conveyor Cross Sections Southern Route Sheet 2
Other
Size: 756 KB
Doc 2.3B YPL Access and RoW Plan Sheet 2 Rev v1
Other
Size: 685 KB
Doc 6.6 App 5.1 TN2 Workforce
Other
Size: 362 KB
Doc 2.1G - YPL Land Plan Inset 4 Rev v1
Other
Size: 19 MB
Section 16 App 16.1 Marine navigation risk assessment
Other
Size: 344 KB
Section 9 App 9.2 Waterbird data
Other
Size: 1 MB
Doc 2.1B - YPL Land Plan Sheet 2 Rev v1
Other
Size: 2 MB
Doc 2.2C - YPL Works Plan Sheet 3 Rev v1
Other
Size: 416 KB
Doc 2.1L - YPL Land Plan Inset 9 Rev v1
Other
Size: 997 KB
Doc 2.3C YPL Access and RoW Plan Sheet 3 Rev v1
Other
Size: 1 MB
Doc 2.1C - YPL Land Plan Sheet 3 Rev v1
Other
Size: 72 KB
Adequacy of Consultation Request
Other
Size: 131 KB
150121 TR030002 York Potash Harbour Meeting Note
A note of a meeting between the Planning Inspectorate and York Potash Limited on 21 January 2015
Other
Size: 97 KB
Withdrawal of the application dated 14th January 2015
Other
Size: 42 KB
141128 TR030002 Teleconference meeting note PINS and Applicant
Note of a teleconference on 28 November 2014 between PINS and the applicant
Other
Size: 82 KB
Other
Size: 39 KB
Harbour Facility Order initial meeting
Other
Size: 54 KB
140325 TR030002 Meeting Note - Teleconference with applicant
Other
Other
Size: 33 KB
141120 TR030002 Teleconference meeting note PINS and MMO
Note of a teleconference on 20 November 2014 to update PINS on MMO?s pre-application engagement with the applicant
Other
Size: 35 KB
141121 TR030002 Teleconference meeting note PINS and EA
Note of a teleconference on 21 November 2014 to update PINS on the EA?s pre-application engagement with the applicant
Other
Size: 317 KB
141105 TR030002 Comments s51 Advice
S51 advice given to York Potash Ltd on 6 November 2014
Other
Size: 50 KB
141104 TR030002 Meeting Note
Note of a meeting between the Planning Inspectorate and York Potash Ltd on 4 November 2014
Other
Size: 10 MB
140113 TR030002 late scoping responses
Late scoping consultation responses
Other
Size: 3 MB
140113 TR030002 York Potash Harbour Facilities Scoping Opinion Report
The Secretary of State's Scoping Opinion
Other
Size: 10 MB
131202 TR030002 York Potash Harbour Facilities Scoping Report
The Applicants Scoping Report
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.