Documents Published By Stage

Pre Application (12)

Developer's Application (348)

Acceptance (8)

Pre Examination (214)

Examination (876)

Decision (96)

Decided (0)

Date

SourceDescription
Other
Secretary of State Consultation (PDF, 152 KB)
Secretary of State Consultation - 22 September 2023
Other
Hartlepool Borough Council (PDF, 495 KB)
Response Secretary of State Consultation 5 - letter dated 7 August 2023 - late response
Other
Climate Emergency Policy and Planning on behalf of Dr Andrew Boswell (PDF, 5 MB)
Response Secretary of State Consultation 5 - letter dated 7 August 2023 - Amended documentation
Other
Northern Gas Networks (PDF, 6 MB)
Response Secretary of State Consultation 5 - letter dated 7 August 2023 - Late Response
Other
Anglo American (PDF, 240 KB)
Response Secretary of State Consultation 5 - letter dated 7 August 2023
Other
Dr Andrew Boswell on behalf of Climate Emergency Policy and Planning (PDF, 5 MB)
Response Secretary of State Consultation 5 - letter dated 7 August 2023
Other
Hartlepool Borough Council (PDF, 84 KB)
Response Secretary of State Consultation 5 - letter dated 7 August 2023
Other
Historic England (PDF, 54 KB)
Response Secretary of State Consultation 5 - letter dated 7 August 2023
Other
Norsea (PDF, 128 KB)
Response Secretary of State Consultation 5 - letter dated 7 August 2023
Other
NPL Waste Management Limited (PDF, 183 KB)
Response Secretary of State Consultation 5 - letter dated 7 August 2023
Other
CATS North Sea Limited (PDF, 90 KB)
Response to Secretary of State Consultation 4
Other
Department for Energy Security and Net Zero (PDF, 113 KB)
Secretary of State Consultation 4
Other
Huntsman Polyurethanes (UK) (PDF, 518 KB)
Response to Secretary of State Consultation 4
Other
NATIONAL GAS TRANSMISSION PLC (PDF, 208 KB)
Response to Secretary of State Consultation 4
Other
National Grid (PDF, 211 KB)
Response to Secretary of State Consultation 4
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage (PDF, 506 KB)
Response to Secretary of State Consultation 4
Other
SABIC UK Petrochemicals (PDF, 510 KB)
Response to Secretary of State Consultation 4
Other
STDC (PDF, 83 KB)
Response to Secretary of State Consultation 4
Other
Teesside Gas Processing Plant Limited and Teesside Gas & Liquids Processing (PDF, 666 KB)
Response to Secretary of State Consultation 4
Other
Secretary of State Consultation (PDF, 113 KB)
Letter from the Secretary of State – 23 August 2023
Other
Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd (PDF, 276 KB)
Response to the Secretary of States Request for further information dated 16 May 2023 - 6.6 - Appendix 6 Contexualisation against CBDP and Draft Revised NPS response
Other
Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd (PDF, 185 KB)
Response to the Secretary of States Request for further information dated 16 May 2023 - 6.6 - Appendix 5B Detailed Cumulative Assessments
Other
Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd (PDF, 309 KB)
Response to the Secretary of States Request for further information dated 16 May 2023 - 6.6 - Appendix 5A Cumulative Impact Assessment Updated Long List
Other
Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd (PDF, 262 KB)
Response to the Secretary of States Request for further information dated 16 May 2023 - 6.6 - Appendix 3 Statements of Competence
Other
Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd (PDF, 28 MB)
Response to the Secretary of States Request for further information dated 16 May 2023 - 6.6 - Appendix 2 Offshore ES Part 1
Other
Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd (PDF, 186 KB)
Response to the Secretary of States Request for further information dated 16 May 2023 - 6.6 - Appendix 4 Changes to environmental impacts related to the passage of time
Other
Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd (PDF, 2 MB)
Response to the Secretary of States Request for further information dated 16 May 2023 - 6.6 - Wider Project ES-HRA Addendum incl. Appendix 1 SoS RFI 4 Aug 23
Other
Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd (PDF, 797 KB)
Response to the Secretary of States Request for further information dated 16 May 2023 - 1.2 - Application Guide - Rev. 19.0 - 4 Aug 2023
Other
Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd (PDF, 276 KB)
Response to the Secretary of States Request for further information dated 16 May 2023 - DCO - Letter in response to SoS RFI 4 August 2023
Other
Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd (PDF, 41 MB)
Response to the Secretary of States Request for further information dated 16 May 2023 - 6.6 - Appendix 2 Offshore ES Part 2
Other
Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd (PDF, 393 KB)
Response to the Secretary of States Request for further information dated 16 May 2023 - 9.53 - Applicants Response to CEPP Letter Dated 30 May 2023 - SoS RFI 4 Aug 2023
Other
Secretary of State Consultation (PDF, 158 KB)
Secretary of State Consultation - 07 August 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 480 KB)
Response to the Secretary of State's consultation letter of 14 July 2023
Other
Secretary of State Consultation (PDF, 128 KB)
Letter from the Secretary of State - dated 14 July 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 618 KB)
Response to the Secretary of State's consultation letter of 14 June 2023
Other
Orsted Hornsea Project Four Limited (PDF, 211 KB)
Orsted Hornsea Project Four Limited - withdrawal of representations
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 396 MB)
Response to the Secretary of State's consultation letter of 16 May 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 146 MB)
Response to the Secretary of State's consultation letter of 16 May 2023
Other
Secretary of State Consultation (PDF, 161 KB)
Letter from the Secretary of State - dated 14 June 2023
Other
BDB Pitmans LLP on behalf of South Tees Development Corporation (PDF, 282 KB)
Response to the Secretary of State's consultation letter of 16 May 2023
Other
Climate Emergency Policy and Planning - Dr Andrew Boswell (PDF, 7 MB)
Response to the Secretary of State's consultation letter of 16 May 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 16 MB)
Response to the Secretary of State's consultation letter of 16 May 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 1 MB)
Response to the Secretary of State's consultation letter of 16 May 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 1 MB)
Response to the Secretary of State's consultation letter of 16 May 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 26 MB)
Response to the Secretary of State's consultation letter of 16 May 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 5 MB)
Response to the Secretary of State's consultation letter of 16 May 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 1 MB)
Response to the Secretary of State's consultation letter of 16 May 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 1 MB)
Response to the Secretary of State's consultation letter of 16 May 2023
Other
Stockton Borough Council (PDF, 133 KB)
Response to the Secretary of State's consultation letter of 16 May 2023
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 520 KB)
Non-Material Change request - 3.4 - Guide to Land Plan Plots (Rev. 4.0) - April 2023
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 5 MB)
Non-Material Change request - 4.5 ARoW Plans v6 TDR Change
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 4 MB)
Non-Material Change request - 4.3 Crown Land Plans v6 TDR Change
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 5 MB)
Non-Material Change request - 4.1 Site Location Plan v5 TDR Change
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Non-Material Change request - 7.13c - TDR Change Request Letter - 27.04.23 (Final)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Non-Material Change request - 4.1 Site Location Plan Key Plan v5 TDR Change
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 21 MB)
Non-Material Change request - 3.1 - Book of Reference (Rev. 8.0) - (Clean) - April 2023
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 54 MB)
Non-Material Change request - 4.4 Works Plans v6 TDR Change
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Non-Material Change request - 4.5 ARoW Plan Key Plan v6 TDR Change
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Non-Material Change request - 1.2 - Application Guide (Rev. 17.0) - April 2023
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 4 MB)
Non-Material Change request - 4.2 Land Plans v6 TDR Change
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 8 MB)
Non-Material Change request - 4.4 Works Plan Key Plan v6 TDR Change
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Non-Material Change request - 3.1 - Book of Reference (Rev. 8.0) - (Tracked) - April 2023
Other
Secretary of State Consultation (PDF, 153 KB)
Letter from the Secretary of State - dated 16 May 2023
Other
Northern Powergrid (Northeast) PLC (PDF, 56 KB)
Letter of Withdrawal dated 30 April 2023
Other
The Crown Estate (PDF, 406 KB)
Response to the Secretary of State's consultation letter of 3 April 2023
Other
WBD (UK) LLP on behalf of Huntsman Polyurethanes (UK) Limited (PDF, 553 KB)
Response to the Secretary of State's consultation letter of 3 April 2023
Other
WBD (UK) LLP on behalf of SABIC UK Petrochemicals Limited (PDF, 515 KB)
Response to the Secretary of State's consultation letter of 3 April 2023
Other
BCLP Law on behalf of National Gas Transmission PLC (PDF, 751 KB)
Response to the Secretary of State's consultation letter of 3 April 2023
Other
Charles Russell Speechlys LLP on behalf of Air Products (Chemicals) Teesside Limited (PDF, 243 KB)
Response to the Secretary of State's consultation letter of 3 April 2023
Other
Eversheds Sutherland on behalf of Ineos Nitriles UK Limited (PDF, 109 KB)
Response to the Secretary of State's consultation letter of 3 April 2023
Other
Morag Thomson on behalf of Anglo American (PDF, 415 KB)
Response to the Secretary of State's consultation letter of 3 April 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 1 MB)
Response to the Secretary of State's consultation letter of 3 April 2023
Other
Shepherd and Wedderburn LLP on behalf of North Sea Midstream Partners (PDF, 106 KB)
Response to the Secretary of State's consultation letter of 3 April 2023
Other
VWV on behalf of Exolum Seal Sands Ltd and Exolum Riverside Ltd (PDF, 594 KB)
Response to the Secretary of State's consultation letter of 3 April 2023
Other
Secretary of State Consultation (PDF, 230 KB)
Letter from the Secretary of State - dated 3 April 2023
Other
BCLP Law on behalf of National Gas Transmission PLC (PDF, 336 KB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
BCLP Law on behalf of National Grid Electricity Transmission PLC (PDF, 324 KB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
BDB Pitmans on behalf of South Tees Development Corporation (PDF, 173 KB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
Burges Salmon LLP on behalf of CATS North Sea Limited (PDF, 48 KB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
Dentons on behalf of Network Rail Infrastructure Limited (PDF, 287 KB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Ltd (PDF, 271 KB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
DWF Law LLP on behalf of Redcar Bulk Terminal Limited (PDF, 2 MB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
FGP Limited on behalf of NPL Waste Management Limited (PDF, 274 KB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
INEOS Energy (PDF, 120 KB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 1 MB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 10 MB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 1 MB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 10 MB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 1 MB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 840 KB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 22 MB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
Shepherd and Wedderburn LLP on behalf of North Sea Midstream Partners (PDF, 122 KB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
The Crown Estate (PDF, 139 KB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
The Environment Agency (PDF, 18 KB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
VWV on behalf of Exolum Seal Sands Ltd and Exolum Riverside Ltd (PDF, 115 KB)
Response to the Secretary of State's consultation letter of 10 March 2023
Other
Secretary of State Consultation (PDF, 269 KB)
Letter from the Secretary of State - dated 10 March 2023
Other
South Tees Development Corporation (PDF, 250 KB)
Additional submission – additional submission accepted at the discretion of the Examining Authority – End of Examination letter to PINS
Other
South Tees Development Corporation (PDF, 211 KB)
Additional submission – additional submission accepted at the discretion of the Examining Authority – Preferred Protective provisions – Tracked
Other
South Tees Development Corporation (PDF, 168 KB)
Additional submission – additional submission accepted at the discretion of the Examining Authority – Preferred Protective provisions - Clean
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 440 KB)
Deadline 13 Submission - 3.3 - Funding Statement - Appendix 1 (Clean) - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 13 Submission - 3.3 - Funding Statement - Appendix 1 (Tracked) - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 441 KB)
Deadline 13 Submission - 3.3 - Funding Statement - Appendix 1 (Tracked) - Nov 2022
Other
Northumbrian Water Limited (PDF, 172 KB)
Additional Submission – Accepted at the discretion of the Examining Authority - Withdrawal of Northumbrian Water Limited’s representations in respect of the DCO application
Other
Notification of completion of the Examining Authority’s Examination (PDF, 131 KB)
Other
Huntsman Polyurethanes (UK) Limited (PDF, 354 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 25 MB)
Deadline 13 Submission - 3.3 - Funding Statement - Appendix 3 - Shell - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 25 MB)
Deadline 13 Submission - 3.3 - Funding Statement - Appendix 2 - bp - Nov 2022
Other
SABIC UK Petrochemicals Limited (PDF, 341 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Climate Emergency Policy and Planning (CEPP) (PDF, 95 KB)
Deadline 13 Submission - Other: Final submission
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 94 KB)
Deadline 13 Submission - Late submission accepted at the discretion of the Examining Authority – Comments of any other submission received at Deadline 12
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 78 KB)
Deadline 13 Submission - Late submission accepted at the discretion of the Examining Authority - preferred Protective Provisions – Track changes
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 78 KB)
Deadline 13 Submission - Late submission accepted at the discretion of the Examining Authority - Protective Provisions – Clean
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 79 KB)
Deadline 13 Submission - Late submission accepted at the discretion of the Examining Authority - Protective Provisions
Other
Marine Management Organisation (PDF, 200 KB)
Deadline 13 Submission - Comments on any other information submitted at Deadline 12
Other
Natural England (PDF, 129 KB)
Deadline 13 Submission - Any further information requested by the ExA under Rule 17 of the Examination Rules
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 435 KB)
Deadline 13 Submission - 8.36 - Statement of Commonality - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 13 Submission - 8.6 - Natural England SoCG - Final (signed) - Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 13 Submission - 9.50 - Applicants' Comments on D12 Submissions - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 13 Submission - 1.2 - Application Guide - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1,011 KB)
Deadline 13 Submission - 8.18 - CATS SoCG - Final (signed) - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 149 KB)
Deadline 13 Submission - Applicant - Cover email
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 13 Submission - 8.4 - MMO SoCG - Final (signed) - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 266 KB)
Deadline 13 Submission - 8.12 - NWL SoCG - Final - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 22 MB)
Deadline 13 Submission - 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 333 KB)
Deadline 13 Submission - 3 - 9.52 - End of Examination Negotiation Status - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 951 KB)
Deadline 13 Submission - 9.51 - Applicants' Response to ExA's RFI dated 2 Nov 2022 - Nov 22
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 340 KB)
Deadline 13 Submission - 8.37 - SoCG - North Sea Midstream Partners - Final - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 28 MB)
Deadline 13 Submission - 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 13 Submission - 8.5 - EA SoCG - Final (signed) - Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 9 MB)
Deadline 13 Submission - 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022
Other
North Tees Limited (PDF, 639 KB)
Deadline 13 Submission - Letter to Planning Inspectorate Deadline 13 Various matters
Other
Redcar Bulk Terminal Limited (PDF, 133 KB)
Deadline 13 Submission - Comments on any other information submitted at Deadline 12
Other
Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited (PDF, 505 KB)
Deadline 13 Submission - Other: Affected Persons - CPO Land
Other
South Tees Development Corporation (PDF, 220 KB)
Deadline 13 Submission - Other: STDC’s preferred form of Protective Provisions for inclusion in the made Order (Tracked changes)
Other
South Tees Development Corporation (PDF, 174 KB)
Deadline 13 Submission - Other: STDC’s preferred form of Protective Provisions for inclusion in the made Order (clean copy)
Other
South Tees Development Corporation (PDF, 83 KB)
Deadline 13 Submission - Other: D13 - Cover letter
Other
Examining Authority's response to the Applicants' request for proposed changes (PDF, 100 KB)
Other
Anglo American (PDF, 178 KB)
Deadline 12 Submission - Joint Statement between Anglo American and Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 4 MB)
Deadline 12 Submission - 2.1 - Final draft DCO (Clean) - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 5 MB)
Deadline 12 Submission - 4.5- ARoW Plans Sheets 1 to 7 - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 4 MB)
Deadline 12 Submission - 6.3.12 - ES Vol II Figure 7-1 Local Plan Areas Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.123 - ES Vol II Figure 18-3 Historic Landscape Character Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.67 ES Vol II Figure 17-1 Landscape Context
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 536 KB)
Deadline 12 Submission - 6.5 ES Navigation Guide
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.64 ES Vol II Figure 16-1 Traffic Study Area
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 729 KB)
Deadline 12 Submission - 7.13b Letter Requesting Further Proposed Change
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 12 Submission - 6.3.22 - ES Vol II Figure 9-1 Surface Water Features and Attributes
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 6.3.53 ES Vol II Figure 11-2 PCC Site Piling Construction Phase
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.55 ES Vol II Figure 11-4a CO2 Export Pipeline Construction
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.41 - ES Vol II Figure 10-15 Discharge
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 783 KB)
Deadline 12 Submission - 8.3 Statement of Common Ground with South Tees Development Corporation, Tees Valley Combined Authority and Teesworks Limited (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.71 ES Vol II Figure 17-5 Topography
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 332 KB)
Deadline 12 Submission - 6.3.6 ES Vol II Figure 4-1 Indicative PCC Site Layout Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 6.3.10 - ES Vol II Figure 5-3 Indicative Electrical Connection Routings Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 9.5 Compulsory Acquisition Schedule (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.38 - ES Vol II Figure 10-12 Contaminated Land – Polygon
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 4.13 - Surface Water Drainage Plan - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 12 Submission - 2.1 - Final draft DCO (Tracked) - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 814 KB)
Deadline 12 Submission - 3.2 - Statement of Reasons Tracked Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 226 KB)
Deadline 12 Submission - 8.38 Joint Statement between the Applicants and Anglo American Crop Nutrients Limited
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.66 ES Vol II Figure 16-3 Traffic Count Locations
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 12 Submission - 7.16 Habitat Regulations Assessment Report (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 6.3.60 ES Vol II Figure 15-1 Study Areas
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.127 - ES Vol II Figure 24-2 Long List of Other Developments Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 930 KB)
Deadline 12 Submission - 9.5 Compulsory Acquisition Schedule (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 12 Submission - 5.13 - HRA Report (Tracked) - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 10 MB)
Deadline 12 Submission - 6.3.3 - ES Vol II Figure 3-2 Development Areas Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 696 KB)
Deadline 12 Submission - 2.1f - Schedule of Changes to DCO - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 12 Submission - 6.3.49 - ES Vol II Figure 10-23 Historical Features (Sheets 1 to 3)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 6.3.51 ES Vol II Figure 10-25 BGS Buried Valleys
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.8 ES Vol II Figure 5-1 Access and Laydown
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.61 ES Vol II Figure 15-2 Survey Areas
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.36 - ES Vol II Figure 10-10 Contaminated Land
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.46 - ES Vol II Figure 10-20 Risk of Flooding from Rivers and Seas
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.122 - ES Vol II Figure 18-2 Non - designated heritage assets in 1 km Study Area Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 317 KB)
Deadline 12 Submission - 8.19 Statement of Common Ground with CF Fertilisers UK Limited (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 20 MB)
Deadline 12 Submission - 4.19 - Sembcorp Pipeline Corridor PP Plan - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.32 - ES Vol II Figure 10-6 Waste Management
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.129 - ES Vol II Figure 6-2 Proposed Development Changes Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.11 - ES Vol II Figure 6-1 Scheme and Boundary Changes since the PEI Report Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 12 Submission - 6.3.15 - ES Vol II Figure 8-3 Air Quality Study Area – Construction Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.30 - ES Vol II Figure 10-4 BGS Boreholes
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 6.3.19 - ES Vol II Figure 8-7 Annual Mean NOx Process Contribution
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 655 KB)
Deadline 12 Submission - 2.2 - Explanatory Memorandum (Tracked) - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 522 KB)
Deadline 12 Submission - 3.4 - Guide to Land Plan Plots - Outfall Change - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 12 Submission - 6.3.14 - ES Vol II Figure 8-2 Air Quality Study Area - Ecological Receptors Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 6 MB)
Deadline 12 Submission - 4.2 - Land Plans Sheets 1-13 Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 262 KB)
Deadline 12 Submission - 7.15.2 Third ES Addendum Volume II – Figures
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 372 KB)
Deadline 12 Submission - 8.19 Statement of Common Ground with CF Fertilisers UK Limited (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.1 - ES Vol II Figure 1-1 Site Location Plan Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.26 - ES Vol II Figure 9-5 Flood Risk from Surface Water
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 808 KB)
Deadline 12 Submission - 9.48 Applicants’ Comments on Deadline 11 Submissions
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.62 ES Vol II Figure 15-3 Designated Sites
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.69 ES Vol II Figure 17-3 Landscape Character Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.33 - ES Vol II Figure 10-7 Infilled Land – Non-Water
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.31 - ES Vol II Figure 10-5 Quarrying and Landfill
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.45 - ES Vol II Figure 10-19 BGS Flood Susceptibility
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 12 Submission - 5.13 - HRA Report (Clean) - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.28 - ES Vol II Figure 10-2 Superficial Geology
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 4.5- ARoW Plans Key Plan - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.35 - ES Vol II Figure 10-9 Hazardous Nov
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.44 - ES Vol II Figure 10-18 Superficial Aquifer
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.56 ES Vol II Figure 11-4b CO2 Export Pipeline Construction (with screening)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 653 KB)
Deadline 12 Submission - 2.2 - Explanatory Memorandum (Clean) - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 4.14- DML Coordinates Plan Key Plan - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 154 KB)
Deadline 12 Submission - Applicant - Cover email
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 12 Submission - 6.3.50 ES Vol II Figure 10-24 Agricultural Land Classification (Sheets 1 & 2)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 4.1 Site Location Plan - Key Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 5 MB)
Deadline 12 Submission - 4.1 Site Location Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 6.3.18 - ES Vol II Figure 8-6 1 hour Mean NO2 Process Contribution
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 12 Submission - 6.3.25 - ES Vol II Figure 9-4 Environment Agency Fluvial Flood Zones
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.68 ES Vol II Figure 17-2 Public Rights of Way within 2km
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.125 - ES Vol II Figure 22-1 HSE Consultation Zones Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 470 KB)
Deadline 12 Submission - 6.3.16 - ES Vol II Figure 8-4 Air Quality - Model Visualisation Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.40 - ES Vol II Figure 10-14 Sensitive Land Use
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 793 KB)
Deadline 12 Submission - 3.2 - Statement of Reasons Clean Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 4.6.2 PCC Plant Layout Plan Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 54 MB)
Deadline 12 Submission - 4.4 - Works Plan Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 4.15 - Landscape & Biodiversity Plan - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 12 Submission - 6.3.48 - ES Vol II Figure 10-22 Redcar and Cleveland Local Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 12 Submission - 3.1 - Book of Reference (Tracked) Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 4.6.1 PCC Site Layout and Elevation Plan Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.47 - ES Vol II Figure 10-21 Stockton-on-Tees Local Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.2 - ES Vol II Figure 3-1 Site Boundary Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 12 Submission - 6.3.5 ES Vol II Figure 3-4 Environmental Receptors within 2km
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.65 ES Vol II Figure 16-2 HGV Routes to and from the Site
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 12 Submission - 6.3.121 - ES Vol II Figure 18-1 Designated heritage assets in the 5 km Study Area Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - DCO 6.3.21 - ES Vol II Figure 8-9 Nutrient Nitrogen Deposition
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.23 - ES Vol II Figure 9-2 Groundwater Features and Attributes
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.54 ES Vol II Figure 11-3 CO2 Gathering Network Construction
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 6 MB)
Deadline 12 Submission - 4.3 - Crown Land Plans Sheets 1-13 Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 894 KB)
Deadline 12 Submission - 4.14 - DML Coordinates Plan Sheets 1 to 2 - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 631 KB)
Deadline 12 Submission - 4.16.2 - Parking Plan - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 12 Submission - 6.3.52 ES Vol II Figure 11-1 Noise Sensitive Receptors
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.58 ES Vol II Figure 13-1 Surface Waterbodies within 200m
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 18 MB)
Deadline 12 Submission - 5.4 - DAS (Tracked) - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 297 KB)
Deadline 12 Submission - 6.3.7 ES Vol II Figure 4-2 Indicative Landscape and Biodiversity Strategy
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.63 ES Vol II Figure 15-4 Non-Statutory Designated Sites
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.4 - ES Vol II Figure 3-3 Residential Receptors within 2km Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 12 Submission - 6.3.24 - ES Vol II Figure 9-3 Ecological Designations
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 6.3.57 ES Vol II Figure 11-5 PCC Site Operational Noise Levels
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.43 - ES Vol II Figure 10-17 Bedrock Aquifer
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 18 MB)
Deadline 12 Submission - 5.4 - DAS (Clean) - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.70 ES Vol II Figure 17-4 Zone of Theoretical Visibility and Potential Viewpoint Location
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.72 ES Vol II Figure 17-6 Zone of Theoretical Visibility and Representative Viewpoint Locations
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 8 MB)
Deadline 12 Submission - 4.4 - Works Plan Key Plan Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.59 ES Vol II Figure 14-1 Benthic Survey Study Area and Sampling Locations
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.128 - ES Vol II Figure 24-3 Short List of Other Developments Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.9 ES Vol II Figure 5-2 Indicative Pipeline Routings
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 6.3.17 - ES Vol II Figure 8-5 Annual Mean NO2 Process Contribution Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 6.3.124 - ES Vol II Figure 19-1 Marine Heritage Assets in 1 km Study Area Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 12 Submission - 7.16 Habitat Regulations Assessment Report (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 1.2 - Application Guide - Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.27 - ES Vol II Figure 10-1 Artificial Geology
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 8.30 Statement of Common Ground with North Tees Limited, North Tees Land Limited and North Tees Rail Limited (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 569 KB)
Deadline 12 Submission - 7.15.1 Third Change ES Addendum Volume I – Main Text
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 726 KB)
Deadline 12 Submission - 8.3 Statement of Common Ground with South Tees Development Corporation, Tees Valley Combined Authority and Teesworks Limited (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 6.3.29 - ES Vol II Figure 10-3 Bedrock Geology
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.39 - ES Vol II Figure 10-13 Historic Tanks
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 8.30 Statement of Common Ground with North Tees Limited, North Tees Land Limited and North Tees Rail Limited (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 785 KB)
Deadline 12 Submission - 8.36 Statement of Commonality
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 5 MB)
Deadline 12 Submission - 6.3.126 - ES Vol II Figure 24-1 Zones of Influence for Cumulative Effects Assessment Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.42 - ES Vol II Figure 10-16 Flood Risk
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.13 - ES Vol II Figure 8-1 Air Quality Study Area - Human Health Receptors and Monitoring Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.34 - ES Vol II Figure 10-8 Infilled Land – Water
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 305 KB)
Deadline 12 Submission - 9.49 Response to Issue Specific Hearing 6 Actions
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 12 Submission - 6.3.37 - ES Vol II Figure 10-11 Contaminated Land
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 12 Submission - 6.3.20 - ES Vol II Figure 8-8 Maximum 24 hour Mean NOx Process Contribution
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 9 MB)
Deadline 12 Submission - 3.1 - Book of Reference (Clean) Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 12 Submission - 4.9 - Water Connection Plan Nov 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 546 KB)
Deadline 12 Submission - 8.6 Statement of Common Ground with Natural England
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 392 KB)
Deadline 12 Submission - 7.14 Third Change ES Addendum - Non-Technical Summary
Other
North Tees Limited (PDF, 422 KB)
Deadline 12 Submission
Other
Northumbrian Water Limited (PDF, 106 KB)
Deadline 12 Submission - Response to Deadline 5 Submission Submission Withdrawn by email dated 10 November 2022 [AS-210]
Other
Orsted Hornsea Project Four Limited (PDF, 748 KB)
Deadline 12 Submission - Comments on the Applicant’s Submissions at Deadline 8 and 11
Other
Russell Cooke on behalf of Redcar Bulk Terminal Limited (PDF, 193 KB)
Deadline 12 Submission
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 643 KB)
Deadline 12 Submission - Sheets 1 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 716 KB)
Deadline 12 Submission - Sheet 13 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 176 KB)
Deadline 12 Submission - Protective provisions position statement requested by ExA
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 605 KB)
Deadline 12 Submission - Sheet 4 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 671 KB)
Deadline 12 Submission - Annex C – Dogger Bank Teesside Examining Authority Report
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 686 KB)
Deadline 12 Submission - Sheet 11 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 216 KB)
Deadline 12 Submission - Annex E1 – Sembcorp’s preferred Protective Provisions Part 16 – Clean
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 2 MB)
Deadline 12 Submission - Protective Provisions Supporting Plans WILTON COMPLEX Ref : GIS-00-L-03036
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 711 KB)
Deadline 12 Submission - Sheet 9 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 717 KB)
Deadline 12 Submission - Sheet 12 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 130 KB)
Deadline 12 Submission - Annex D – Dogger Bank Teesside draft Development Consent Order
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 115 KB)
Deadline 12 Submission - Annex F – Explanatory Memorandum
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 598 KB)
Deadline 12 Submission - Sheet 7 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 598 KB)
Deadline 12 Submission - Sheet 5 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 217 KB)
Deadline 12 Submission - Annex E2 – Sembcorp’s preferred Protective Provisions Part 16 – Tracked
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 576 KB)
Deadline 12 Submission - Sheet 10 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 594 KB)
Deadline 12 Submission - Sheet 14 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 690 KB)
Deadline 12 Submission - Sheet 8 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 486 KB)
Deadline 12 Submission - Sheet 15 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 527 KB)
Deadline 12 Submission - Sheet 6 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 16 MB)
Deadline 12 Submission - Key Plan - Annex A – Protection provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 551 KB)
Deadline 12 Submission - Sheet 3 out of 15 – Protective provisions supporting plans
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 9 MB)
Deadline 12 Submission - Annex B – Pipeline Seal Sands to Wilton land ownership plan and Wilton Complex Plan
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Limited (PDF, 557 KB)
Deadline 12 Submission - Sheet 2 out of 15 – Protective provisions supporting plans
Other
South Tees Development Corporation (PDF, 203 KB)
Deadline 12 Submission - Preferred form of Protective Provisions for inclusion in the made Order
Other
South Tees Development Corporation (PDF, 188 KB)
Deadline 12 Submission - Final Summary of Outstanding Objections and Closing Submissions
Other
South Tees Development Corporation (PDF, 79 KB)
Deadline 12 Submission - Cover Letter
Other
Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited (PDF, 291 KB)
Deadline 12 Submission
Other
Request for further information - Rule 17 (PDF, 251 KB)
Request for further information - Rule 17 from the Applicants, The Environment Agency and Natural England.
Other
Anglo American (PDF, 178 KB)
Deadline 11 Submission - Responses to the ExA’s ExQ3
Other
BCLP on behalf of National Grid Electricity Transmission (PDF, 82 KB)
Deadline 11 Submission - Responses to the ExA’s ExQ3
Other
BCLP on behalf of National Grid Gas (PDF, 82 KB)
Deadline 11 Submission - Responses to the ExA’s ExQ3
Other
CF Fertilisers UK Limited (PDF, 71 KB)
Deadline 11 Submission - Other: Response to Hearing Action Points arising from Issue Specific Hearing 5
Other
ClientEarth (PDF, 82 KB)
Deadline 11 Submission - Post hearing submissions, including written submission of oral case and any post-hearing notes requested at the hearings
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities UK Ltd (PDF, 1 KB)
Deadline 11 Submission - Post hearing submissions, including written submission of oral case and any post-hearing notes requested at the hearings
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities UK Ltd (PDF, 144 KB)
Deadline 11 Submission - Responses to the ExA’s ExQ3
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities UK Ltd (PDF, 62 KB)
Deadline 11 Submission - Post hearing submissions, including written submission of oral case and any post-hearing notes requested at the hearings
Other
Environment Agency (PDF, 432 KB)
Deadline 11 Submission - Comments on any other information submitted at Deadline 10
Other
Environment Agency (PDF, 148 KB)
Deadline 11 Submission - Comments on any other information submitted at Deadline 10
Other
INEOS Nitriles (UK) Limited (PDF, 91 KB)
Deadline 11 Submission - Other: Response to Hearing Action Points arising from Issue Specific Hearing 5
Other
Marine Management Organistation (PDF, 209 KB)
Deadline 11 Submission - Comments on any other information submitted at Deadline 10
Other
Natural England (PDF, 244 KB)
Deadline 11 Submission - Responses to the ExA’s ExQ3
Other
Natural England (PDF, 136 KB)
Deadline 11 Submission - Other: An update to the Examining Authority regarding topics to be discussed at Issue Specific Hearing 6
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 777 KB)
Deadline 11 Submission - 4.18 - Endurance Store Protective Provisions Plan - Oct 2022 (D11)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 5 MB)
Deadline 11 Submission - 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 11 Submission - 9.5 - Compulsory Acquisition Schedule Clean - Oct 2022 (D11)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 11 Submission - 9.34 Updated List of Developments - Oct 2022 (D11) (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 5 MB)
Deadline 11 Submission - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 11 Submission - 9.34 Updated List of Developments - Oct 2022 (D11) (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 941 KB)
Deadline 11 Submission - 9.46 Applicants’ Response to the ExA's Third Written Questions - Oct 2022 (D11)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 11 Submission - 6.3.128 - ES Vol II Figure 24-3 Short List of Other Developments - Oct 2022 (D11)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 11 Submission - 7.13a - Notification of Further Proposed Changes - Oct 2022 (D11)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 5 MB)
Deadline 11 Submission - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 537 KB)
Deadline 11 Submission - 9.47 - Sensitivity Assessment of Construction Programme - Oct 2022 (D11)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 11 Submission - 1.2 - Application Guide - Oct 2022 (D11)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 11 Submission - 9.44 Written Summary of Oral Submissions for CAH3 - Oct 2022 (D11)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 481 KB)
Deadline 11 Submission - 5.10 - Other Consents and Licences - Oct 2022 D11 (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 453 KB)
Deadline 11 Submission - 5.10 - Other Consents and Licences - Oct 2022 D11 (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 182 KB)
Deadline 11 Submission - Cover email
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 716 KB)
Deadline 11 Submission - 9.43 Written Summary of Oral Submissions at ISH5 - Oct 2022 (D11)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 11 Submission - 6.3.111 - Figure 17-21 - Viewpoint 2 The Cliff Seaton Carew - Photomontage - Oct 2022 (D11)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 11 Submission - 6.3.127 - ES Vol II Figure 24-2 Long List of Other Developments - Oct 2022 (D11)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 11 Submission - 9.5 - Compulsory Acquisition Schedule Tracked - Oct 2022 (D11)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 435 KB)
Deadline 11 Submission - 9.45 Written Summary of Oral Submission for ISH6 - Oct 2022 (D11)
Other
Orsted Hornsea Project Four Limited (PDF, 601 KB)
Deadline 11 Submission - Post hearing submissions, including written submission of oral case and any post-hearing notes requested at the hearings
Other
PD Teesport Limited (PDF, 84 KB)
Deadline 11 Submission - Other: Response to Hearing Action Points arising from Issue Specific Hearing 5
Other
Redcar and Cleveland Borough Council (PDF, 117 KB)
Deadline 11 Submission - Responses to the ExA’s ExQ3
Other
Redcar Bulk Terminal Limited (PDF, 111 KB)
Deadline 11 Submission - Post hearing submissions, including written submission of oral case and any post-hearing notes requested at the hearings
Other
Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited (PDF, 204 KB)
Deadline 11 Submission - Other: Affected Persons - CPO Land
Other
South Tees Development Corporation (PDF, 134 KB)
Deadline 11 Submission - Post hearing submissions, including written submission of oral case and any post-hearing notes requested at the hearings
Other
Teesside Wind Farm Limited (PDF, 88 KB)
Deadline 11 Submission - Other: Response to Hearing Action Points arising from Issue Specific Hearing 5
Other
The North Tees Group (PDF, 3 MB)
Deadline 11 Submission - Responses to the ExA’s ExQ3
Other
CAH3 Action Points (PDF, 82 KB)
Action Points arising from Compulsory Acquisition Hearing 3 on environmental matters - 19 October 2022
Other
Compulsory Acquisition Hearing 3 - Session 1 - Transcript - 19 October 2022 (PDF, 126 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Compulsory Acquisition Hearing 3 - Session 2 - Transcript - 19 October 2022 (PDF, 110 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
ISH5 Action Points (PDF, 92 KB)
Action Points arising from Issue Specific Hearing 5 on environmental matters - 18 October 2022
Other
ISH6 Action Points (PDF, 83 KB)
Action Points arising from Issue Specific Hearing 6 on environmental matters - 19 October 2022
Other
Issue Specific Hearing 5 - Session 1 - Transcript - 18 October 2022 (PDF, 128 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Issue Specific Hearing 5 - Session 2 - Transcript - 18 October 2022 (PDF, 108 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Issue Specific Hearing 5 - Session 3 - Transcript - 18 October 2022 (PDF, 105 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Issue Specific Hearing 6 - Session 1 - Transcript - 19 October 2022 (PDF, 163 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Issue Specific Hearing 6 - Session 2 - Transcript - 19 October 2022 (PDF, 66 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Recording of Compulsory Acquisition Hearing 3 - Session 1 - 19 October 2022 (Document 4 KB)
Other
Recording of Compulsory Acquisition Hearing 3 - Session 2 - 19 October 2022 (Document 4 KB)
Other
Recording of Issue Specific Hearing 5 - Session 1 - 18 October 2022 (Document 4 KB)
Other
Recording of Issue Specific Hearing 5 - Session 2 - 18 October 2022 (Document 4 KB)
Other
Recording of Issue Specific Hearing 5 - Session 3 - 18 October 2022 (Document 4 KB)
Other
Recording of Issue Specific Hearing 6 - Session 1 - 19 October 2022 (Document 4 KB)
Other
Recording of Issue Specific Hearing 6 - Session 2 - 19 October 2022 (Document 4 KB)
Other
Natural England (PDF, 137 KB)
Additional Submission - Accepted at the discretion of the Examining Authority - an update on Nutrient Neutrality for the forthcoming Issue Specific Hearing 6
Other
North Tees Group (PDF, 219 KB)
Additional Submission - Accepted at the discretion of the Examining Authority - Position statement for Compulsory Acquisition Hearing 3
Other
North Tees Group (PDF, 217 KB)
Additional Submission - Accepted at the discretion of the Examining Authority - Position Statement for Issue Specific Hearing 5 on the draft Development Consent Order
Other
North Tees Limited (PDF, 113 KB)
Deadline 2 Submission - Response to Written Questions
Other
Examining Authority's Third Written Questions - ExQ3 (PDF, 256 KB)
Examining Authority's Third Written Questions - ExQ3
Other
Examining Authority's Third Written Questions - ExQ3 (Document 210 KB)
Editable Word version of the Examining Authority's Second Written Questions - ExQ3
Other
Agenda for Issue Specific Hearing 5 and 6, Agenda for Compulsory Acquisition Hearing 3 and Accompanied Site Inspection 2 Itinerary (PDF, 1,010 KB)
Other
Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (PDF, 445 KB)
Draft Itinerary for Accompanied Site Inspection 2
Other
Anglo American (PDF, 136 KB)
Deadline 9 Submission - Other: Update and Comments on documents submitted at D8
Other
ClientEarth (PDF, 112 KB)
Deadline 9 Submission - Any further information requested by the ExA under Rule 17 of the Examination Rules
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities UK Ltd (PDF, 2 KB)
Deadline 9 Submission - Notification of wish to speak at hearings to be held on 18 and 19 October 2022
Other
Environment Agency (PDF, 412 KB)
Deadline 9 Submission - Comments on any other information submitted at Deadline 8 - Late submission accepted at the discretion of the Examining Authority
Other
Historic England (PDF, 547 KB)
Deadline 9 Submission - Comments on any other information submitted at Deadline 8
Other
Marine Management Organisation (PDF, 196 KB)
Deadline 9 Submission - Comments on any other information submitted at Deadline 8
Other
Natural England (PDF, 160 KB)
Deadline 9 Submission - Comments on any other information submitted at Deadline 8
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 9 Submission - 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 636 KB)
Deadline 9 Submission - 8.13 - PD Teesport SoCG (Tracked) Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 26 MB)
Deadline 9 Submission - 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 9 Submission - 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 9 Submission - 9.34 - Updated List of Developments (Tracked) Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 658 KB)
Deadline 9 Submission - 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 424 KB)
Deadline 9 Submission - 8.1 - RCBC SoCG Sept 2022 (D9) - final signed
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 674 KB)
Deadline 9 Submission - 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 438 KB)
Deadline 9 Submission - 8.36 - Statement of Commonality - October 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 314 KB)
Deadline 9 Submission - 9.40 - Applicants' Response to SWQ CA.2.19 Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 628 KB)
Deadline 9 Submission - 8.13 - PD Teesport SoCG (Clean) Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 659 KB)
Deadline 9 Submission - 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 9 Submission - 9.34 - Updated List of Developments (Clean) Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 329 KB)
Deadline 9 Submission - 9.38 - Applicants' Comments on Deadline 8 Submissions Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1,020 KB)
Deadline 9 Submission - 9.5 - Compulsory Acquisition Schedule Clean Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 25 MB)
Deadline 9 Submission - 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 424 KB)
Deadline 9 Submission - 9.39 - Applicants' Response to ExA's RFI Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 671 KB)
Deadline 9 Submission - 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 9 Submission - 1.2 - Application Guide Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 181 KB)
Deadline 9 Submission - Cover email
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 881 KB)
Deadline 9 Submission - 9.5 - Compulsory Acquisition Schedule Tracked Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 742 KB)
Deadline 9 Submission - 9.41- Applicants' Response to ExA's RIES - Oct 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 9 Submission - 9.36 - Nutrient Nitrogen Briefing Paper Tracked Oct 2022
Other
North Tees (PDF, 238 KB)
Deadline 9 Submission - Comments on any other information submitted at Deadline 8
Other
Orsted Hornsea Project Four Limited (PDF, 216 KB)
Deadline 9 Submission - Other: Response to the Applicant's Legal Opinion
Other
Orsted Hornsea Project Four Limited (PDF, 709 KB)
Deadline 9 Submission - Comments on any other information submitted at Deadline 8
Other
Redcar Bulk Terminal Limited (PDF, 156 KB)
Deadline 9 Submission - Other: Further submission to RBT's Deadline 5 Submission and notification to speak at ISH5 and CAH3
Other
Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited (PDF, 214 KB)
Deadline 9 Submission - Other: Affected Persons - CPO Land
Other
Environment Agency (PDF, 330 KB)
Deadline 8 Submission - Comments on any other information submitted at Deadline 7
Other
Marine Management Organisation (PDF, 188 KB)
Deadline 8 Submission - Comments on any other information submitted at Deadline 7
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 722 KB)
Deadline 8 Submission - 9.35 – Applicants’ Comments on Deadline 7 Submissions
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.34 - ES Vol II Figure 10-8 Infilled Land – Water
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 401 KB)
Deadline 8 Submission - 8.5 – Statement of Common Ground with Environment Agency (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 992 KB)
Deadline 8 Submission - 9.5 Compulsory Acquisition Schedule (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.42 - ES Vol II Figure 10-16 Flood Risk
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 8 Submission - 2.1 - Draft Development Consent Order (Tracked Changes)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 8 Submission - 6.3.51 - ES Vol II Figure 10-25 BGS Buried Valleys
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 9.34 – Updated List of Developments in Response to Second Written Question GEN.2.2(i) (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.46 - ES Vol II Figure 10-20 Risk of Flooding from Rivers and Seas
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.38 - ES Vol II Figure 10-12 Contaminated Land – Polygon
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.43 - ES Vol II Figure 10-17 Bedrock Aquifer
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 660 KB)
Deadline 8 Submission - 2.2 Explanatory Memorandum (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 418 KB)
Deadline 8 Submission - 8.2 – Statement of Common Ground with Stockton-on-Tees Borough Council
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 9.34 – Updated List of Developments in Response to Second Written Question GEN.2.2(i) (Tracked Changes)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 420 KB)
Deadline 8 Submission - 8.5 – Statement of Common Ground with Environment Agency (Tracked Changes)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.37 - ES Vol II Figure 10-11 Contaminated Land – Line
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.31 - ES Vol II Figure 10-5 Quarrying and Landfill
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 17 MB)
Deadline 8 Submission - 5.13 Habitat Regulations Assessment Report (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 8 Submission - 8.4 – Statement of Common Ground with the Marine Management Organisation (Tracked Changes)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 8 Submission - 6.3.49 - ES Vol II Figure 10-23 Historical Features (Sheets 1 to 3)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 8 Submission - 6.3.48 - ES Vol II Figure 10-22 Redcar and Cleveland Local Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.41 - ES Vol II Figure 10-15 Discharge
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 207 KB)
Deadline 8 Submission - Cover Email
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 514 KB)
Deadline 8 Submission - 8.6 – Statement of Common Ground with Natural England (Tracked Changes)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.32 - ES Vol II Figure 10-6 Waste Management
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.28 - ES Vol II Figure 10-2 Superficial Geology
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 647 KB)
Deadline 8 Submission - 8.3 – Statement of Common Ground with South Tees Development Corporation, Tees Valley Combined Authority and Teesworks Limited (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 8 Submission - 8.3 – Statement of Common Ground with South Tees Development Corporation, Tees Valley Combined Authority and Teesworks Limited (Tracked Changes)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.35 - ES Vol II Figure 10-9 Hazardous
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 655 KB)
Deadline 8 Submission - 2.2 Explanatory Memorandum (Tracked Changes)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 438 KB)
Deadline 8 Submission - 8.36 - Statement of Commonality
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.33 - ES Vol II Figure 10-7 Infilled Land – Non-Water
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 8 Submission - 8.4 – Statement of Common Ground with the Marine Management Organisation (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 316 KB)
Deadline 8 Submission - 2.1e - Schedule of Changes to the draft Development Consent Order
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.40 - ES Vol II Figure 10-14 Sensitive Land Use
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 503 KB)
Deadline 8 Submission - 8.6 – Statement of Common Ground with Natural England (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.36 - ES Vol II Figure 10-10 Contaminated Land – Point
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 8 Submission - 9.5 Compulsory Acquisition Schedule (Tracked Changes)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 22 MB)
Deadline 8 Submission - 9.36 - Nutrient Nitrogen Briefing Paper
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.39 - ES Vol II Figure 10-13 Historic Tanks
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.47 - ES Vol II Figure 10-21 Stockton-on-Tees Local Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.44 - ES Vol II Figure 10-18 Superficial Aquifer
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 17 MB)
Deadline 8 Submission - 5.13 Habitat Regulations Assessment Report (Tracked Changes)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 8 Submission - 1.2 - Application Guide
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.30 - ES Vol II Figure 10-4 BGS Boreholes
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 8 Submission - 6.3.29 - ES Vol II Figure 10-3 Bedrock Geology
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 8 Submission - 6.3.50 - ES Vol II Figure 10-24 Agricultural Land Classification (Sheets 1 & 2)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 9.37 - Justification of Corridor Widths
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.27 - ES Vol II Figure 10-1 Artificial Geology
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 8 Submission - 8.7 – Statement of Common Ground with Historic England
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 14 MB)
Deadline 8 Submission - 4.17 Net Zero and Anglo-American Shared Areas Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 8 Submission - 2.1 - Draft Development Consent Order (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 8 Submission - 6.3.45 - ES Vol II Figure 10-19 BGS Flood Susceptibility
Other
Orsted Hornsea Project Four Limited (PDF, 782 KB)
Deadline 8 Submission - Comments on any other information submitted at Deadline 7
Other
South Tees Development Corporation (PDF, 78 KB)
Deadline 8 Submission - Comments on any other information submitted at Deadline 7
Other
Note of Unaccompanied Site Inspection - 13 September 2022 (USI2) (PDF, 106 KB)
Other
Other
Report on the Implications for European Sites (RIES) (PDF, 391 KB)
Issued by the Examining Authority - 16 September 2022
Other
Procedural Decision and Rule 17 (PDF, 193 KB)
Procedural Decision made by the Examining Authority and Rule 17 inviting comments
Other
Environment Agency (PDF, 153 KB)
Deadline 7 Submission - Comments on Deadline 6 Submissions
Other
Marine Management Organisation (PDF, 239 KB)
Deadline 7 Submission - Comments on any other information submitted at Deadline 6
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 7 Submission - 9.34 Updated List of Developments in Response to Second Written Question GEN.2.2(i)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 985 KB)
Deadline 7 Submission - 9.32 Applicants’ Comments on Deadline 6 Submissions
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 838 KB)
Deadline 7 Submission - 6.4.49 Environmental Statement: Volume III Appendix 25A: Commitments Register (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 438 KB)
Deadline 7 Submission - 8.36 Statement of Commonality
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 707 KB)
Deadline 7 Submission - 9.5 Compulsory Acquisition Schedule (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 338 KB)
Deadline 7 Submission - 8.30 Statement of Common Ground with North Tees Limited, North Tees Land Limited and North Tees Rail Limited (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 850 KB)
Deadline 7 Submission - 6.4.49 Environmental Statement: Volume III Appendix 25A: Commitments Register (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 357 KB)
Deadline 7 Submission - 8.30 Statement of Common Ground with North Tees Limited, North Tees Land Limited and North Tees Rail Limited (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 726 KB)
Deadline 7 Submission - 9.33 Response to Examining Authority’s Written Question HE.2.6
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 713 KB)
Deadline 7 Submission - 9.5 Compulsory Acquisition Schedule (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 7 Submission - 1.2 Application Guide
Other
North Tees Limited (PDF, 3 MB)
Deadline 7 Submission - Response to the Examining Authority's Second Written Questions
Other
Fisher German Priestner Limited on behalf of NPL Waste Management Limited (PDF, 372 KB)
Deadline 7 Submission - Response to the Deadline 6 Submission - Compulsory Acquisition Schedule
Other
Orsted Hornsea Project Four Limited (PDF, 579 KB)
Deadline 7 Submission - Comments on the Applicant’s Submissions at Deadline 6
Other
BDB Pitmans LLP on behalf of South Tees Development Corporation (PDF, 83 KB)
Deadline 7 Submission - Comments on responses to the Examining Authority's Second Written Questions
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 690 KB)
Deadline 6 Submission - 4.16.4 - Water Connection Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1,018 KB)
Deadline 6 Submission - 4.11.5 - CO2 Gathering Network Plans Sheet 5 August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 4.8.1 - Electrical Connection plans Sheet 1 Key Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 711 KB)
Deadline 6 Submission - 4.11.6 - CO2 Gathering Network Plans Sheet 6 August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 632 KB)
Deadline 6 Submission - 4.16.2 - Parking Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 4.6.1 - PCC Site Layout and Elevation Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 4.14 Deemed Marine Licence Coordinates Plan Key Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 4.1 Site Location Plan Key Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 6 Submission - 4.4 Works Plan Key Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 6 Submission - 4.11.1 - CO2 Gathering Network Plans Sheet 1 Key Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 4.11.8 - CO2 Gathering Network Plans Sheet 8 August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 679 KB)
Deadline 6 Submission - 4.11.2 - CO2 Gathering Network Plans Sheet 2 August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 4.15 Landscape and Biodiversity Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 6 Submission - 4.3 - Crown Land Plans August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 548 KB)
Deadline 6 Submission - 4.11.7 - CO2 Gathering Network Plans Sheet 7 August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 4.5 Access and Rights of Way Plan Key Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 910 KB)
Deadline 6 Submission - 4.6.2 - PCC Plant Layout Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 722 KB)
Deadline 6 Submission - 4.16.3 - PCC Site Access Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 5 MB)
Deadline 6 Submission - 4.5 Access and Rights of Way Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 6 MB)
Deadline 6 Submission - 4.2 - Land Plans August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1,010 KB)
Deadline 6 Submission - 4.14 Deemed Marine Licence Coordinates Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 601 KB)
Deadline 6 Submission - 4.11.4 - CO2 Gathering Network Plans Sheet 4 August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 4.8.2 - Electrical Connection Plans Sheet 2 August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 49 MB)
Deadline 6 Submission - 4.4 Works Plans August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 6 MB)
Deadline 6 Submission - 4.1 Site Location Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 683 KB)
Deadline 6 Submission - 4.11.3 - CO2 Gathering Network Plans Sheet 3 August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1,009 KB)
Deadline 6 Submission - 4.8.4 - Electrical Connection Plans Sheet 4 August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1,005 KB)
Deadline 6 Submission - 4.11.9 - CO2 Gathering Network Plans Sheet 9 August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 4.8.3 - Electrical Connection Plans Sheet 3 August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.8 - ES Vol II Figure 5-1 Access and Laydown August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.72 - ES Vol II Figure 17-6 Zone of Theoretical Visibility and Representative Viewpoint Locations August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.70 - ES Vol II Figure 17-4 Zone of Theoretical Visibility and Potential Viewpoint Location August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 305 KB)
Deadline 6 Submission - 6.3.7 - ES Vol II Figure 4-2 Indicative Landscape and Biodiversity Strategy August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 6 Submission - 6.3.77 - ES Vol II Figure 17-8A Viewpoint 2 The Cliff Seaton Carew - Summer
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.9 - ES Vol II Figure 5-2 Indicative Pipeline Routings August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.71 - ES Vol II Figure 17-5 Topography August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.69 - ES Vol II Figure 17-3 Landscape Character Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.68 - ES Vol II Figure 17-2 Public Rights of Way within 2km August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 6.3.10 - ES Vol II Figure 5-3 Indicative Electrical Connection Routings August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 6.3.19 - ES Vol II Figure 8-7 Annual Mean NOx Process Contribution August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 6 Submission - 6.3.22 - ES Vol II Figure 9-1 Surface Water Features and Attributes August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 6.3.124 - ES Vol II Figure 19-1 Marine Heritage Assets in 1 km Study Area August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.11 - ES Vol II Figure 6-1 Scheme and Boundary Changes since the PEI Report August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.4 - ES Vol II Figure 3-3 Residential Receptors within 2km August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 6.3.57 - ES Vol II Figure 11-5 PCC Site Operational Noise Levels August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 470 KB)
Deadline 6 Submission - 6.3.16 - ES Vol II Figure 8-4 Air Quality - Model Visualisation August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 6.3.17 - ES Vol II Figure 8-5 Annual Mean NO2 Process Contribution August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 6 Submission - 6.3.14 - ES Vol II Figure 8-2 Air Quality Study Area - Ecological Receptors August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.59 - ES Vol II Figure 14-1 Benthic Survey Study Area and Sampling Locations August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 339 KB)
Deadline 6 Submission - 6.3.6 - ES Vol II Figure 4-1 Indicative PCC Site Layout Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.66 - ES Vol II Figure 16-3 Traffic Count Locations August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.67 - ES Vol II Figure 17-1 Landscape Context August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 6 Submission - 6.3.25 - ES Vol II Figure 9-4 Environment Agency Fluvial Flood Zones August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 29 MB)
Deadline 6 Submission - 6.3.110 - Figure 17-20 - Viewpoint 2 The Cliff Seaton Carew - Massing
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.122 - ES Vol II Figure 18-2 Non - designated heritage assets in 1 km Study Area August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 4 MB)
Deadline 6 Submission - 6.3.12 - ES Vol II Figure 7-1 Local Plan Areas August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.13 - ES Vol II Figure 8-1 Air Quality Study Area - Human Health Receptors and Monitoring August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 10 MB)
Deadline 6 Submission - 6.3.3 - ES Vol II Figure 3-2 Development Areas Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.123 - ES Vol II Figure 18-3 Historic Landscape Character August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.127 - ES Vol II Figure 24-2 Long List of Other Developments August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 6.3.129 - ES Vol II Figure 6-2 Proposed Development Changes August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.1 - ES Vol II Figure 1-1 Site Location Plan August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.55 - ES Vol II Figure 11-4a CO2 Export Pipeline Construction August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.62 - ES Vol II Figure 15-3 Designated Sites August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.23 - ES Vol II Figure 9-2 Groundwater Features and Attributes August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.60 - ES Vol II Figure 15-1 Study Areas August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.128 - ES Vol II Figure 24-3 Short List of Other Developments August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.61 - ES Vol II Figure 15-2 Survey Areas August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 6 Submission - 6.3.24 - ES Vol II Figure 9-3 Ecological Designations August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 6.3.20 - ES Vol II Figure 8-8 Maximum 24 hour Mean NOx Process Contribution August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.58 - ES Vol II Figure 13-1 Surface Waterbodies within 200m August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 6 Submission - 6.3.5 - ES Vol II Figure 3-4 Environmental Receptors within 2km August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.26 - ES Vol II Figure 9-5 Flood Risk from Surface Water August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 6 Submission - 6.3.52 - ES Vol II Figure 11-1 Noise Sensitive Receptors August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 6.3.53 - ES Vol II Figure 11-2 PCC Site Piling Construction Phase August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.64 - ES Vol II Figure 16-1 Traffic Study Area August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 6.3.18 - ES Vol II Figure 8-6 1 hour Mean NO2 Process Contribution August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 6.3.21 - ES Vol II Figure 8-9 Nutrient Nitrogen Deposition August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 6 Submission - 6.3.15 - ES Vol II Figure 8-3 Air Quality Study Area – Construction August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 29 MB)
Deadline 6 Submission - 6.3.111 - Figure 17-21 - Viewpoint 2 The Cliff Seaton Carew - Photomontage
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 6 MB)
Deadline 6 Submission - 6.3.126 - ES Vol II Figure 24-1 Zones of Influence for Cumulative Effects Assessment August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.54 - ES Vol II Figure 11-3 CO2 Gathering Network Construction August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.63 - ES Vol II Figure 15-4 Non-Statutory Designated Sites August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.65 - ES Vol II Figure 16-2 HGV Routes to and from the Site August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.125 - ES Vol II Figure 22-1 HSE Consultation Zones August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 6 Submission - 6.3.121 - ES Vol II Figure 18-1 Designated heritage assets in the 5 km Study Area August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.56 - ES Vol II Figure 11-4b CO2 Export Pipeline Construction (with screening) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 6.3.2 - ES Vol II Figure 3-1 Site Boundary Plan August 2022
Other
Anglo American (PDF, 294 KB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
British Telecommunications Plc (PDF, 2 MB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
CATS North Sea Limited (PDF, 63 KB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
ClientEarth (PDF, 120 KB)
Deadline 6 Submission - Comments on any other information submitted at Deadline 5
Other
EDF Energy Renewables Limited and Teesside Wind Farm Limited (PDF, 101 KB)
Deadline 6 Submission - Other: Written Representation following further discussion with the Applicant
Other
Lucy Mo on behalf of Environment Agency (PDF, 318 KB)
Deadline 6 Submission - Comments on any other information submitted at Deadline 5
Other
Environment Agency (PDF, 354 KB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
INEOS Nitriles (UK) Limited (PDF, 106 KB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
INEOS Nitriles (UK) Limited (PDF, 80 KB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
Marine Management Organistation (PDF, 190 KB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
Nick Lightfoot on behalf of Natural England (PDF, 191 KB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 456 KB)
Deadline 6 Submission - 2.2 - Explanatory Memorandum (Tracked) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 489 KB)
Deadline 6 Submission - 7.11.1 Second Environmental Statement Addendum - Volume I August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 17 MB)
Deadline 6 Submission - 5.4 - Design and Access Statement - Clean - August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 6 Submission - 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 305 KB)
Deadline 6 Submission - 2.1d - Schedule of Changes to the DCO August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 380 KB)
Deadline 6 Submission - 9.30 - ISH 4 Action 9 Contaminated Land Timeline August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 29 MB)
Deadline 6 Submission - 5.5 Electricity Grid Connection Statement (Tracked) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 29 MB)
Deadline 6 Submission - 5.5 Electricity Grid Connection Statement (Clean) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 6 Submission - 5.13 - Habitats Regulations Assessment Report (Clean) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1,022 KB)
Deadline 6 Submission - 9.5 - Compulsory Acquisition Schedule (Tracked) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 21 MB)
Deadline 6 Submission - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 352 KB)
Deadline 6 Submission - 9.31 - Response to Examining Authority's Written Questions DLV1.7 ii August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 264 KB)
Deadline 6 Submission - 7.11.2 Second ES Addendum Vol II Cover and Contents August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 15 MB)
Deadline 6 Submission - 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 371 KB)
Deadline 6 Submission - 8.37 - SoCG - North Sea Midstream Partners Deadline 6 Submission
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 6 Submission - 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 325 KB)
Deadline 6 Submission - 7.10 Second Environmental Statement Addendum - Non-Technical Statement August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 434 KB)
Deadline 6 Submission - 8.36 - Statement of Commonality - August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 651 KB)
Deadline 6 Submission - 2.2 - Explanatory Memorandum (Clean) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 958 KB)
Deadline 6 Submission - 9.5 - Compulsory Acquisition Schedule (Clean) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 18 MB)
Deadline 6 Submission - 5.4 - Design and Access Statement - Tracked - August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 6 Submission - 1.2 - Application Guide - August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 6 Submission - 8.4 - Marine Management Organisation SoCG (Clean) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 6 Submission - 3.1 - Book of Reference (Clean) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 6 Submission - 8.4 - Marine Management Organisation SoCG (Tracked) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 861 KB)
Deadline 6 Submission - 8.5 - Environment Agency SoCG (Tracked) August 2-22
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 6 Submission - 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 218 KB)
Deadline 6 Submission - 7.9 - Letter Requesting Further Proposed Changes - August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 6 Submission - 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 805 KB)
Deadline 6 Submission - 3.2 - Statement of Reasons (Tracked) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 464 KB)
Deadline 6 Submission - 9.29 - Cumulative GHG Onshore and Offshore Assessment August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 6 Submission - 3.1 - Book of Reference (Tracked) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 6 Submission - 2.1 - Draft DCO August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 466 KB)
Deadline 6 Submission - 8.1 - RCBC SoCG - August 2022(D6) - Final - Tracked
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 825 KB)
Deadline 6 Submission - 8.5 - Environment Agency SoCG (Clean) August 2-22
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 793 KB)
Deadline 6 Submission - 3.2 - Statement of Reasons (Clean) August 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 423 KB)
Deadline 6 Submission - 8.1 - RCBC SoCG - August 2022(D6) - Final - Clean
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 533 KB)
Deadline 6 Submission - 3.4 - Guide to Land Plan Plots
Other
North Tees Limited (PDF, 227 KB)
Deadline 6 Submission - Responses to the ExA’s ExQ2 and other matters
Other
Orsted Hornsea Project Four Limited (PDF, 21 MB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
PD Teesport Limited (PDF, 105 KB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
PD Teesport Limited (PDF, 83 KB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities UK Ltd (PDF, 190 KB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited (PDF, 223 KB)
Deadline 6 Submission - Other: Affected Persons - CPO Land
Other
South Tees Development Corporation (PDF, 77 KB)
Deadline 6 Submission - Comments on any other information submitted at Deadline 5
Other
South Tees Development Corporation (PDF, 17 MB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
The Crown Estate (PDF, 146 KB)
Deadline 6 Submission - Responses to the ExA’s ExQ2
Other
UK Health Security Agency (PDF, 196 KB)
Deadline 6 Submission - Responses to the ExA's ExQ2
Other
Examining Authority's Second Written Questions - ExQ2 (Document 258 KB)
Editable Word version of the Examining Authority's Second Written Questions
Other
Examining Authority's Second Written Questions - ExQ2 (PDF, 496 KB)
Examining Authority's Second Written Questions - ExQ2
Other
ClientEarth (PDF, 546 KB)
Deadline 5 Submission - Post hearing submissions, including written submission of oral case and any post-hearing notes requested at the hearings held during w/c 16 May 2022
Other
Environment Agency (PDF, 446 KB)
Deadline 5 Submission - Comments on any other information submitted at Deadline 4
Other
Exolum Seal Sands (PDF, 195 KB)
Deadline 5 Submission - Comments on any other information submitted at Deadline 4
Other
Marine Management Organisation (PDF, 190 KB)
Deadline 5 Submission - Comments on any other information submitted at Deadline 4
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 5 Submission - 4.16.3 - PCC Site Access Plan August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 5 Submission - 4.16.2 - Parking Plan August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 947 KB)
Deadline 5 Submission - 9.5 - Compulsory Acquisition Schedule August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 5 Submission - 8.3 - STDC SoCG - August 2022(D5) - Tracked
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 5 Submission - 2.1 - Draft DCO - August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 447 KB)
Deadline 5 Submission - 8.36 - Statement of Commonality - August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 689 KB)
Deadline 5 Submission - 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 442 KB)
Deadline 5 Submission - 8.2 - STBC SoCG - August 2022(D5) - Tracked
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 264 KB)
Deadline 5 Submission - 8.34 - Position Statement Orsted Hornsea Project 4 August 2022 (D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 661 KB)
Deadline 5 Submission - 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 5 Submission - 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Clean
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 524 KB)
Deadline 5 Submission - 9.25 - Applicants' Comments on Deadline 4 Submissions - August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 4 MB)
Deadline 5 Submission - 9.26 - Riparian Mammal Report - August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 5 Submission - 4.16.4 - Water Connection Plan August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 6 MB)
Deadline 5 Submission - 9.22 - Written Summary of ISH3 - August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 650 KB)
Deadline 5 Submission - 2.2 - Explanatory Memorandum - August 2022(D5) - Clean
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 270 KB)
Deadline 5 Submission - 8.12 - Northumbrian Water Ltd SoCG - August 2022(D5) - Tracked
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 5 Submission - 9.23 - Written Summary of CAH2 - August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 5 Submission - 1.2 - Application Guide - August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1,003 KB)
Deadline 5 Submission - 9.24 - Written Summary of ISH4 August 2022 (D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 434 KB)
Deadline 5 Submission - 8.2 - STBC SoCG - August 2022(D5) - Clean
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 5 Submission - 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 5 Submission - 4.16.1 - AIL Access Route Plan August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 625 KB)
Deadline 5 Submission - 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 268 KB)
Deadline 5 Submission - 8.12 - Northumbrian Water Ltd SoCG - August 2022(D5) - Clean
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 326 KB)
Deadline 5 Submission - 8.20 - Exolum Seal Sands & Exolum Riverside SoCG - August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 5 Submission - 8.3 - STDC SoCG - August 2022(D5) - Clean
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 311 KB)
Deadline 5 Submission - 2.1c - Schedule of Changes to the DCO - August 2022(D5)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 5 Submission - 5.12 - Landscape and Biodiversity Strategy - August 2022(D5) - Tracked
Other
North Tees (PDF, 232 KB)
Deadline 5 Submission - Various matters
Other
North Tees (PDF, 167 KB)
Deadline 5 Submission - Various Matter regarding Compulsory Acquisition Hearing 2
Other
Orsted Hornsea Project Four Limited (PDF, 575 KB)
Deadline 5 Submission - Post hearing submissions, including written submission of oral case and any post-hearing notes requested at the hearings held during w/c 16 May 2022
Other
Orsted Hornsea Project Four Limited (PDF, 355 KB)
Deadline 5 Submission - Comments on any other information submitted at Deadline 4
Other
Redcar and Cleveland Council (PDF, 84 KB)
Deadline 5 Submission: Update to ExQ1 responses
Other
Redcar Bulk Terminal Limited (PDF, 141 KB)
Deadline 5 Submission - Post hearing submissions, including written submission of oral case and any post-hearing notes requested at the hearings held during w/c 16 May 2022
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities UK Ltd (PDF, 70 KB)
Deadline 5 Submission - Other: Written Summary of Oral Submissions at ISH 3 and CAH 2 / Response to Action Point 8
Other
Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited (PDF, 51 KB)
Deadline 5 Submission - Other: Affected Persons - CPO Land
Other
South Tees Development Corporation (PDF, 99 KB)
Deadline 5 Submission - Post hearing submissions, including written submission of oral case and any post-hearing notes requested at the hearings held during w/c 16 May 2022
Other
CAH2 Action Points (PDF, 181 KB)
Action Points arising from Compulsory Acquisition Hearing 2 - 13 July 2022
Other
ISH3 Action Points (PDF, 95 KB)
Action Points arising from Issue Specific Hearing 3 on the draft Development Consent Order - 12 July 2022
Other
ISH4 Action Points (PDF, 98 KB)
Action Points arising from Issue Specific Hearing 4 on environmental matters - 14 July 2022
Other
Issue Specific Hearing 4 - Session 1 - Transcript - 14 July 2022 (PDF, 147 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Issue Specific Hearing 4 - Session 2 - Transcript - 14 July 2022 (PDF, 158 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Recording of Issue Specific Hearing 4 - Session 1 - 14 July 2022 (Document 4 KB)
Other
Recording of Issue Specific Hearing 4 - Session 2 - 14 July 2022 (Document 4 KB)
Other
Compulsory Acquisition Hearing 2 - Session 1 - Transcript - 13 July 2022 (PDF, 147 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Compulsory Acquisition Hearing 2 - Session 2 - Transcript - 13 July 2022 (PDF, 71 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Recording of Compulsory Acquisition Hearing 2 - Session 1 - 13 July 2022 (Document 4 KB)
Other
Recording of Compulsory Acquisition Hearing 2 - Session 2 - 13 July 2022 (Document 4 KB)
Other
Issue Specific Hearing 3 - Session 1 - Transcript - 12 July 2022 (PDF, 133 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Issue Specific Hearing 3 - Session 2 - Transcript - 12 July 2022 (PDF, 113 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Issue Specific Hearing 3 - Session 3 - Transcript - 12 July 2022 (PDF, 133 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Issue Specific Hearing 3 - Session 4 - Transcript - 12 July 2022 (PDF, 85 KB)
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Other
Marine Management Organisation (PDF, 284 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
NPL Waste Management Limited (PDF, 1 MB)
Additional Submission - Objection letter and marked up Statement of Common Ground – Accepted at the discretion of the Examining Authority
Other
Recording of Issue Specific Hearing 3 - Session 1 - 12 July 2022 (Document 4 KB)
Other
Recording of Issue Specific Hearing 3 - Session 2 - 12 July 2022 (Document 4 KB)
Other
Recording of Issue Specific Hearing 3 - Session 3 - 12 July 2022 (Document 4 KB)
Other
Recording of Issue Specific Hearing 3 - Session 4 - 12 July 2022 (Document 4 KB)
Other
Trinity House (PDF, 204 KB)
Deadline 4 Submission - Late submission accepted at the discretion of the Examining Authority
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 451 KB)
Deadline 4 Submission - DCO 8.1 - RCBC SoCG (Clean) July 2022 (D4)
Other
CATS North Sea Limited (PDF, 89 KB)
Deadline 4 Submission - Responses to comments on WRs
Other
ClientEarth (PDF, 291 KB)
Deadline 4 Submission - Responses to comments on WRs
Other
Climate Emergency Policy and Planning (CEPP) (PDF, 114 KB)
Deadline 4 Submission - Comments on any other information submitted at Deadline 3
Other
Veale Wasbrough Vizards LLP on behalf of Exolum Seal Sands Ltd (PDF, 97 KB)
Deadline 4 Submission - Comments on any other information submitted at Deadline 3
Other
Hartlepool Borough Council (PDF, 13 MB)
Deadline 4 Submission - Response to Rule 17 letter of 23 June 2022
Other
Marine Management Organisation (PDF, 190 KB)
Deadline 4 Submission - Comments on any other information submitted at Deadline 3
Other
Natural England (PDF, 161 KB)
Deadline 4 Submission
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage (PDF, 398 KB)
Deadline 4 Submission - DCO 8.11 - Northern Powergrid SoCG (Tracked) - July 22 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage (PDF, 6 MB)
Deadline 4 Submission - DCO 9.18 - Further information to Historic Environment Questions July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage (PDF, 1 MB)
Deadline 4 Submission - DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 4 Submission - 3.1 - Book of Reference (Tracked) July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 4 Submission - DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 499 KB)
Deadline 4 Submission - DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 362 KB)
Deadline 4 Submission - DCO 8.12 - Northumbrian Water Ltd SoCG (Tracked) July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 11 MB)
Deadline 4 Submission - 3.1 - Book of Reference (Clean) July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 427 KB)
Deadline 4 Submission - DCO 8.2 - STBC SoCG (Tracked) July 2022(D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 5 MB)
Deadline 4 Submission - DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 472 KB)
Deadline 4 Submission - DCO 8.1 - RCBC SoCG (Tracked) July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 623 KB)
Deadline 4 Submission - DCO 8.13 - PD Teesport Ltd SoCG (Clean) July 22 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 19 MB)
Deadline 4 Submission - DCO 9.21 - Notification of Further Proposed Changes and Update on Remaining Optionality July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 346 KB)
Deadline 4 Submission - DCO 2.1b - Schedule of Changes to the DCO July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 4 Submission - DCO 2.1 - Draft DCO July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 776 KB)
Deadline 4 Submission - DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 335 KB)
Deadline 4 Submission - DCO 8.33 - National Highways SoCG July 2022 (Final) (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 4 Submission - DCO 9.20 - Applicants response to Orsted HP4 D3 Submission July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 432 KB)
Deadline 4 Submission - DCO 8.36 - Statement of Commonality - July 2022(D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 302 KB)
Deadline 4 Submission - DCO 8.23 - NPL Waste Management SoCG (Clean) - July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 4 Submission - DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 626 KB)
Deadline 4 Submission - DCO 8.13 - PD Teesport Ltd SoCG (Tracked) July 22 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 675 KB)
Deadline 4 Submission - 1.2 - Application Guide - July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 397 KB)
Deadline 4 Submission - DCO 8.11 - Northern Powergrid SoCG (Clean) - July 22 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 362 KB)
Deadline 4 Submission - DCO 8.18 - CATS SoCG (Tracked) July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 4 Submission - DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 302 KB)
Deadline 4 Submission - DCO 8.23 - NPL Waste Management SoCG (Tracked) - July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 434 KB)
Deadline 4 Submission - DCO 8.2 - STBC SoCG (Clean) July 2022(D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 381 KB)
Deadline 4 Submission - DCO 8.18 - CATS SoCG (Clean) July 2022 (D4)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 264 KB)
Deadline 4 Submission - DCO 8.12 - Northumbrian Water Ltd SoCG (Clean) July 2022 (D4)
Other
Eversheds Sutherland (International) LLP on behalf of PD Teesport Limited (PDF, 100 KB)
Deadline 4 Submission
Other
Redcar and Cleveland Borough Council (PDF, 2 MB)
Deadline 4 Submission - Response to Rule 17 letter of 23 June 2022
Other
Redcar Bulk Terminal Limited (PDF, 5 MB)
Deadline 4 Submission - Responses to comments on WRs
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Ltd (PDF, 248 KB)
Deadline 4 Submission - Responses to comments on WRs
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Ltd (PDF, 78 KB)
Deadline 4 Submission - Responses to comments on WRs
Other
Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited (PDF, 209 KB)
Deadline 4 Submission - Other: Affected Persons - CPO Land
Other
Stockton on Tees Borough Council (PDF, 219 KB)
Deadline 4 Submission - Response to the Rule 17 letter of 23 June 2022
Other
The Crown Estate (PDF, 369 KB)
Deadline 4 Submission - Comments on any other information submitted at Deadline 3
Other
The Crown Estate (PDF, 176 KB)
Deadline 4 Submission - Comments on any other information submitted at Deadline 3
Other
Agenda for Compulsory Acquisition Hearing 2 (PDF, 180 KB)
Other
Agenda for Issue Specific Hearing 3 on the draft Development Consent Order (PDF, 176 KB)
Other
Agenda for Issue Specific Hearing 4 on environmental matters (PDF, 154 KB)
Other
Anglo American (PDF, 275 KB)
Deadline 3 Submission - Comments on the Applicants’ draft Development Consent Order
Other
CAT North Sea Limited (PDF, 42 KB)
Deadline 3 Submission
Other
CF Fertilisers UK Limited (PDF, 121 KB)
Deadline 3 Submission - Comments on the Applicants’ draft Development Consent Order
Other
Corporation of Trinity House of Deptford Strond (PDF, 201 KB)
Deadline 3 Submission - Comments on the Applicants’ draft Development Consent Order
Other
Environment Agency (PDF, 368 KB)
Deadline 3 Submission - Comments on any other information submitted at Deadline 2
Other
INEOS Nitriles (UK) Limited (PDF, 161 KB)
Deadline 3 Submission - Comments on the Applicants’ draft Development Consent Order
Other
Marine Management Organistation (PDF, 934 KB)
Deadline 3 Submission - Comments on Written Representations
Other
NatureScot (PDF, 668 KB)
Deadline 3 Submission
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 3 Submission - 9.13 Sensitivity Test Construction Traffic Modelling – HGVs and Worker Vehicles
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 3 Submission - 9.5 Compulsory Acquisition Schedule (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 927 KB)
Deadline 3 Submission - Draft Itinerary for a Further Accompanied Site Inspection
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 3 Submission - 5.13 Habitat Regulations Assessment Report (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 6 MB)
Deadline 3 Submission - 5.13 Habitat Regulations Assessment Report (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 3 Submission - 6.3.26a - ES Figure 9-6a
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 3 Submission - 9.14 Assessment of the Proposed Development against North East Marine Plan Policies
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 3 Submission - 9.5 Compulsory Acquisition Schedule (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 3 Submission - 6.3.123a - ES Figure 18-4
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 443 KB)
Deadline 3 Submission - 8.36 Statement of Commonality
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 3 Submission - 9.11 Applicants' Comments on Deadline 2 Submissions
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 3 Submission - 8.3 Statement of Common Ground with South Tees Development Corporation, Tees Valley Combined Authority and Teesworks Limited (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 3 Submission - 9.12 Applicants comments on Written Representations
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 3 Submission - 8.3 Statement of Common Ground with South Tees Development Corporation, Tees Valley Combined Authority and Teesworks Limited (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 3 Submission - 1.2 Application Guide
Other
Birketts LLP on behalf of Northumbrian Water Limited (PDF, 363 KB)
Deadline 3 Submission - Comments on responses to the ExA’s ExQ1 Submission Withdrawn by email dated 10 November 2022 [AS-210]
Other
Orsted Hornsea Project Four Limited (PDF, 5 MB)
Deadline 3 Submission - Comments on the Applicants’ draft Development Consent Order
Other
PD Teesport Limited (PDF, 119 KB)
Deadline 3 Submission - Comments on the Applicants’ draft Development Consent Order
Other
Redcar Bulk Terminal Limited (PDF, 5 MB)
Deadline 3 Submission - Comments on any other information submitted at Deadline 2
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Ltd (PDF, 103 KB)
Deadline 3 Submission - Comments on Applicants responses to ExA ExQ1, Statement of Commonality, other IP WRs and dDCO
Other
South Tees Development Corporation (PDF, 246 KB)
Deadline 3 Submission - Comments on responses to the ExA’s ExQ1
Other
Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited (PDF, 117 KB)
Deadline 3 Submission - Affected Persons - CPO Land
Other
Request for further information - Rule 17 (PDF, 167 KB)
Letter requesting further information from Redcar and Cleveland Borough Council, Stockton-on-Tees Borough Council and Hartlepool Borough Council
Other
Sembcorp Utilities (UK) Ltd (PDF, 1 MB)
Deadline 2 Submission – Sembcorp Land Plan - Late submission accepted at the discretion of the Examining Authority
Other
South Tees Development Corporation (PDF, 19 MB)
Deadline 2 Submission - Written Representation
Other
South Tees Development Corporation (PDF, 362 KB)
Deadline 2 Submission - Responses to comments on Relevant Representations
Other
South Tees Development Corporation (PDF, 192 KB)
Deadline 2 Submission - Responses to the Examining Authority’s First Written Questions
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 23 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 16
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 6 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 12
Other
Air Products Plc and Air Products Renewable Energy Limited (PDF, 97 KB)
Deadline 2 Submission - Summary of Development Consent Order Written Representations
Other
Air Products Plc and Air Products Renewable Energy Limited (PDF, 181 KB)
Deadline 2 Submission - Development Consent Order Written Representations
Other
Anglo American Crop Nutrients Limited (PDF, 2 MB)
Deadline 2 Submission - Written Representations and Response to First Written Questions
Other
CATS North Sea Limited (PDF, 2 MB)
Deadline 2 Submission - Response to the Examining Authority’s First Written Questions
Other
Burges Salmon LLP on behalf of CATS North Sea Limited (PDF, 2 MB)
Deadline 2 Submission - Written Representation
Other
Eversheds Sutherland (International) LLP on behalf of CF Fertilisers UK Limited (PDF, 911 KB)
Deadline 2 Submission - Responses to the ExA’s ExQ1
Other
ClientEarth (PDF, 13 MB)
Deadline 2 Submission - Written Representation and response to Applicant’s Deadline 1 comments on ClientEarth’s Relevant Representation (RR-004)
Other
Climate Emergency Policy and Planning (CEPP) (PDF, 10 MB)
Deadline 2 Submission - Cover Letter and Appendices A-J
Other
Corporation of Trinity House of Deptford Strond (PDF, 174 KB)
Deadline 2 Submission - Written Response to the Examining Authority’s (ExA) First Round of Written Questions for Deadline 2
Other
Environment Agency (PDF, 454 KB)
Deadline 2 Submission - Responses to the Examining Authority’s First Written Questions
Other
Historic England (PDF, 158 KB)
Deadline 2 Submission - Responses to the Examining Authority's First Written Questions
Other
Womble Bond Dickinson UK LLP on behalf of Huntsman Polyurethanes (UK) Limited (PDF, 107 KB)
Deadline 2 Submission - Response to the Examining Authority’s First Written Questions
Other
Womble Bond Dickinson UK LLP on behalf of Huntsman Polyurethanes (UK) Limited (PDF, 15 MB)
Deadline 2 Submission - Written Representation
Other
Eversheds Sutherland (International) LLP on behalf of INEOS Nitriles (UK) Limited (PDF, 112 KB)
Deadline 2 Submission - Cover Letter and Responses to EXQ1
Other
Marine Management Organisation (PDF, 741 KB)
Deadline 2 Submission - Responses to the Examining Authority's First Written Questions
Other
Marine Management Organisation (PDF, 259 KB)
Deadline 2 Submission - Responses to comments on Relevant Representations
Other
Maritime and Coastguard Agency (PDF, 246 KB)
Deadline 2 Submission - Cover Letter and Examining Authority’s First Written Questions (ExQs1)
Other
National Grid Carbon Limited (PDF, 84 KB)
Deadline 2 Submission - Responses to Written Questions GEN.1.4 and GEN.1.5
Other
Bryan Cave Leighton Paisner LLP on behalf of National Grid Electricity Transmission PLC (PDF, 5 MB)
Deadline 2 Submission - Written Representation
Other
Bryan Cave Leighton Paisner LLP on behalf of National Grid Gas PLC (PDF, 6 MB)
Deadline 2 Submission - Written Representation
Other
National Highways (PDF, 180 KB)
Deadline 2 Submission - Responses to the Examining Authority’s written questions and requests for information
Other
Natural England (PDF, 907 KB)
Deadline 2 Submission - Written Representation
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 2 Submission - 1.2 Application Guide
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 1 MB)
Deadline 2 Submission - 9.8 Appendix GEN.1.41c: South Tees Development Corporation Constitution
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 226 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 2
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 24 MB)
Deadline 2 Submission - 9.8 Appendix GEN.1.2: Position Statement between Hornsea Project Four and BP
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 2 Submission - 9.7 Applicants’ Response to the Examining Authority’s Written Questions
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 373 KB)
Deadline 2 Submission - 9.8 Appendix GEN.1.41a: The Tees Valley Combined Authority (Functions) Order 2017
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 2 Submission - 9.8 Appendix DLV.1.10: Updated Zone of Theoretical Visibility for new and extended substation
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 36 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1b: Preliminary Onshore Ground Investigation for Net Zero Teesside Ground Investigation Report
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 446 KB)
Deadline 2 Submission - 8.36 Statement of Commonality
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 342 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 3
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 433 KB)
Deadline 2 Submission - 5.10 Other Consents and Licences (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 17
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 2 Submission - 9.8 Appendix WE.1.15: Environment Agency Flood Zones and Defences
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 90 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 14
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 2 Submission - 2.1 Draft Development Consent Order: Comparison between Version 3 submitted 28 April 2022 and Version 4 submitted 9 June 2022
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 26 MB)
Deadline 2 Submission - 9.8 Appendix PPL.1.3a: South Tees Regeneration Master Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 287 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 5
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 2 Submission - 2.1 Draft Development Consent Order
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 346 KB)
Deadline 2 Submission - 8.30 Statement of Common Ground with North Tees Limited, (“NTL”), North Tees Land Limited (“NTLL”) and North Tees Rail Limited (“NTRL”) (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1b: Appendix B Obstructions
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 338 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 4
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 746 KB)
Deadline 2 Submission - 8.33 Statement of Common Ground with National Highways
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 2 Submission - 9.8 Appendix GEN.1.11: PCC Layout Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 352 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 8
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 9 MB)
Deadline 2 Submission - 3.1 Book of Reference (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 2 Submission - 9.8 Appendix PPL.1.3b: South Tees Area Supplementary Planning Document
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 8 MB)
Deadline 2 Submission - 9.8 Appendix PPL.1.3c: Teesworks Design Guide
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 8 MB)
Deadline 2 Submission - 3.1 Book of Reference (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 971 KB)
Deadline 2 Submission - 9.5 Compulsory Acquisition Schedule (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 355 KB)
Deadline 2 Submission - 8.7 Statement of Common Ground with Historic England
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.8a: Safeguarding Plan - Deep Resources
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 4 MB)
Deadline 2 Submission - 9.8 Appendix PPL.1.2b: RBCB and STCB policy maps with Order Limit Overlay
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 357 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 7
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 427 KB)
Deadline 2 Submission - 5.10 Other Consents and Licences (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 2 Submission - 9.8 Appendix WE.1.27: Envirocheck Study Area
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 504 KB)
Deadline 2 Submission - 2.1a Schedule of Changes to the draft Development Consent Order
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 363 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 6
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 331 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 10
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 5 MB)
Deadline 2 Submission - 9.8 Appendix WE.1.12: PCC Site Topographic Survey
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 982 KB)
Deadline 2 Submission - 9.5 Compulsory Acquisition Schedule (Tracked)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 77 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Final Factual Report Part 1
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.8b: Safeguarding Plan - Shallow Resources
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1b: Appendix D Material Properties
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 4 MB)
Deadline 2 Submission - 9.8 Appendix BIO.1.39: Temporary Operations Oil Pollution Emergency Plan
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1b: Appendix I Screening Tables
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 2 Submission - 9.8 Appendix DLV.1.7: Landscape Character Assessment Extracts
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 327 KB)
Deadline 2 Submission - 8.30 Statement of Common Ground with North Tees Limited (“NTL”), North Tees Land Limited (“NTLL”) and North Tees Rail Limited (“NTRL”) (Clean)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 685 KB)
Deadline 2 Submission - 9.8 Applicants’ Response to the Examining Authority's Written Questions (Appendices)
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 14 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.2: Main Site Foundations Optioneering Appraisal
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 132 KB)
Deadline 2 Submission - 9.8 Appendix GEN.1.41b: The South Tees Development Corporation (Establishment) Order 2017
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 2 MB)
Deadline 2 Submission - 9.8 Appendix PPL.1.2a: Hartlepool Borough Council Policy Map with Order Limit Overlay
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 977 KB)
Deadline 2 Submission - 9.10 Applicants’ Comments on Deadline 1 Submissions
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1b: Appendix K Foundations
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 329 KB)
Deadline 2 Submission - 9.9 Applicants’ Comments on Local Impact Reports
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 116 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 13
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 6 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 15
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 6 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 9
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 7 MB)
Deadline 2 Submission - 9.8 Appendix GH.1.1a: Factual Report Part 11
Other
North Tees Limited (PDF, 185 KB)
Deadline 2 Submission - Written Representation
Other
Northern Powergrid (PDF, 5 MB)
Deadline 2 Submission - Response to the Examining Authority's First Written Questions - Mains Record
Other
Birketts LLP on behalf of Northumbrian Water Limited (PDF, 101 KB)
Deadline 2 Submission - Cover Letter for Submission of Examining Authority’s First Written Questions
Other
Birketts LLP on behalf of Northumbrian Water Limited (PDF, 73 KB)
Deadline 2 Submission - Written Representation
Other
Birketts LLP on behalf of Northumbrian Water Limited (PDF, 97 KB)
Deadline 2 Submission - Deadline 2 Submission - Cover Letter for Submission of Written Representation Submission Withdrawn by email dated 10 November 2022 [AS-210]
Other
Birketts LLP on behalf of Northumbrian Water Limited (PDF, 75 KB)
Deadline 2 Submission - Responses to the Examining Authority’s Written Questions and Requests for Information
Other
Orsted Hornsea Project Four Limited (PDF, 344 KB)
Deadline 2 Submission - Summary of Written Representation
Other
Orsted Hornsea Project Four Limited (PDF, 593 KB)
Deadline 2 Submission - Legal Submission Note
Other
Orsted Hornsea Project Four Limited (PDF, 1 MB)
Deadline 2 Submission - Written Representation
Other
Orsted Hornsea Project Four Limited (PDF, 2 KB)
Deadline 2 Submission - Legal Submission Cover Letter
Other
PD Teesport Limited (PDF, 9 MB)
Deadline 2 Submission - Responses to the Examining Authority’s First Written Questions
Other
Redcar and Cleveland Borough Council (PDF, 360 KB)
Deadline 2 Submission - Response to Examining Authority's First Written Questions
Other
Russell Cooke on behalf of Redcar Bulk Terminal Limited (PDF, 241 KB)
Deadline 2 Submission - Responses to the Examining Authority’s written questions
Other
Redcar Bulk Terminal Limited (PDF, 150 KB)
Deadline 2 Submission - Written Representation
Other
Rule 13 Letter - Notification of Hearings (PDF, 64 KB)
Other
Womble Bond Dickinson UK LLP on behalf of SABIC UK Petrochemicals Limited (PDF, 13 MB)
Deadline 2 Submission - Written Representation
Other
Womble Bond Dickinson UK LLP on behalf of SABIC UK Petrochemicals Limited (PDF, 108 KB)
Deadline 2 Submission - Response to the Examining Authority’s First Written Questions
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Ltd (PDF, 316 KB)
Deadline 2 Submission - Written Representation
Other
DLA Piper UK LLP on behalf of Sembcorp Utilities (UK) Ltd (PDF, 1 MB)
Deadline 2 Submission - Responses to the Examining Authority's First Written Questions
Other
Letter to NatureScot inviting them to become an other person for the purpose of the Examination (PDF, 126 KB)
Other
ESP Utilities Group Ltd (PDF, 146 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
NPL Waste Management Limited (PDF, 520 KB)
Additional Submission - Accepted at the discretion of the Examining Authority
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 3 MB)
Additional Submission – Accepted at the discretion of the Examining Authority – Cover email
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 973 KB)
Additional Submission – Accepted at the discretion of the Examining Authority – 3.1a Supplementary Book of Reference
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 730 KB)
Additional Submission – Accepted at the discretion of the Examining Authority – 3.2a Supplementary Statement of Reasons
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 735 KB)
Additional Submission – Accepted at the discretion of the Examining Authority – 3.3a Supplementary Funding Statement
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 470 KB)
Additional Submission – Accepted at the discretion of the Examining Authority – 4.4a Additional Land Plan
Other
Procedural Decision made by the Examining Authority (PDF, 65 KB)
Acceptance of Change Request 10 and inviting Interested Parties for Comments
Other
Environment Agency (PDF, 289 KB)
Deadline 1 Submission - Comments on Relevant Representations (RRs)
Other
Womble Bond Dickinson UK LLP on behalf of Huntsman Polyurethanes (UK) Limited (PDF, 725 KB)
Deadline 1 Submission - ASI Suggested Locations
Other
Marine Management Organisation (PDF, 203 KB)
Deadline 1 Submission - Comments on Relevant Representations and Statement of Common Ground
Other
Net Zero Teesside Power Limited & Net Zero North Sea Storage Limited (PDF, 8 MB)
Deadline 1 Submission - 9.4 - Written Summary of Oral Submission for CAH1 - Appendix 4: Latest Audited Accounts - Shell U.K Limited