Thames Tideway Tunnel

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (0)

Developer's Application (406)

Acceptance (28)

Pre Examination (59)

Examination (1978)

Decision (41)

Decided (60)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Size: 744 KB
Westminster City Council
A submission on the proposed changes to the application
Other
Size: 309 KB
Transport For London
A submission on the proposed changes to the application
Other
Size: 141 KB
Environment Agency
A submission on the proposed changes to the application
Other
Size: 30 MB
Thames Water Utilities Ltd
Proposed changes at Blackfriars Bridge Foreshore
Other
Size: 138 KB
Thames Water Utilities Ltd
A letter from the applicant covering their proposed changes of 23 September 2013
Other
Size: 34 MB
Thames Water Utilites Ltd
Proposed changes at Victoria Embankment Foreshore
Other
Size: 2 MB
7.12 Health Impact Assessment Appendix F Site Assessments
Other
Size: 24 MB
7.10.03 Transport Assessment Barn Elms
Other
Other
Size: 230 KB
7.07 Sustainability Statement Appendix B1 Acton Storm Tanks
Other
Size: 5 MB
7.05 Final Report on Site Selection Process Volume 19 King Edward Memorial Park Foreshore
Other
Size: 2 MB
7.08 Energy and Carbon Footprint Report
Other
Size: 205 KB
5.1 Consultation Report Section 22 Heathwall Pumping Station
Other
Size: 2 MB
Other
Size: 22 MB
2.24 Greenwich Pumping Station Plans
Other
Size: 11 MB
7.04 Design and Access Statement Albert Embankment Foreshore
Other
Size: 555 KB
5.1 Consultation Report Sections 36 to 38
Other
Size: 6 MB
7.05 Final Report on Site Selection Process Volume 14 Heathwall Pumping Station
Other
Size: 5 MB
7.01 Appendix E Planning Assessment Dormay Street
Other
Size: 300 KB
7.19.2 Code of Construction Practice Part B Earl Pumping Station
Other
Size: 6 MB
7.01 Appendix L Planning Assessment Cremorne Wharf Depot
Other
Size: 10 MB
5.3 Heritage Statement Appendix A Hammersmith Pumping Station
Other
Size: 478 KB
5.1 Consultation Report Section 29 Deptford Church Street
Other
Size: 4 MB
6.2.27 Environmental Statement Volume 27 Minor Works Sites Assessment Sections 1 to 15
Other
Size: 22 MB
7.10.17 Transport Assessment Chambers Wharf
Other
Size: 244 KB
7.07 Sustainability Statement Appendix B15 Blackfriars Bridge Foreshore
Other
Size: 13 MB
7.04 Design and Access Statement Carnwath Road Riverside
Other
Size: 6 MB
7.01 Appendix U Planning Assessment Earl Pumping Station
Other
Size: 325 KB
8.1.1 Thames Tideway Strategic Study Executive Summary
Other
Size: 6 MB
7.01 Appendix Y Planning Assessment Beckton Sewage Treatment Works
Other
Size: 478 KB
7.19.2 Code of Construction Practice Part B Blackfriars Bridge Foreshore
Other
Size: 267 KB
7.07 Sustainability Statement Appendix B21 Greenwich Pumping Station
Other
Size: 148 KB
2.30 Red line boundary shapefiles
Other
Size: 546 KB
8.3 Needs Report Appendix F Tideway Fisheries Review
Other
Size: 11 MB
6.2.06 Environmental Statement Volume 6 Appendices A to N
Other
Size: 2 MB
Other
Size: 12 MB
7.10.13 Transport Assessment Albert Embankment Foreshore
Other
Size: 227 KB
7.07 Sustainability Statement Appendix B16 Shad Thames Pumping Station
Other
Size: 6 MB
7.04 Design and Access Statement Dormay Street
Other
Size: 3 MB
6.2.06 Environmental Statement Volume 6 Barn Elms Site Assessment Sections 1 to 15
Other
Size: 3 MB
6.2.08 Environmental Statement Volume 8 Dormay Street Site Assessment Sections 1 to 15
Other
Size: 4 MB
5.1 Consultation Report Appendix V Supplementary report on phase one consultation
Other
Size: 18 MB
2.23 Deptford Church Street Plans
Other
Size: 20 MB
6.2.12 Environmental Statement Volume 12 Appendices A to N
Other
Size: 18 MB
6.2.27 Environmental Statement Volume 27 Figures
Other
Size: 252 KB
7.19.2 Code of Construction Practice Part B Kirtling Street
Other
Size: 290 KB
7.19.2 Code of Construction Practice Part B Victoria Embankment Foreshore
Other
Size: 714 KB
8.2.3 Objectives and Compliance Working Group Report Volume 2
Other
Size: 292 KB
7.19.2 Code of Construction Practice Part B Falconbrook Pumping Station
Other
Size: 6 MB
7.01 Planning Statement Main Report
Other
Size: 1 MB
7.23 Resilience to Change
Other
Size: 294 KB
7.19.2 Code of Construction Practice Part B Beckton Sewage Treatment Works
Other
Size: 29 MB
7.10.10 Transport Assessment Chelsea Embankment Foreshore
Other
Size: 11 MB
7.04 Design and Access Statement Heathwall Pumping Station
Other
Size: 142 KB
5.1 Consultation Report Section 35 Jews Row
Other
Size: 16 MB
2.28 Beckton Sewage Treatment Works Plans
Other
Size: 26 MB
2.08 Putney Embankment Foreshore Plans
Other
Size: 10 MB
8.3 Needs Report Appendix E Potential Source Control and SuDS Application
Other
Size: 333 KB
7.19.2 Code of Construction Practice Part B Deptford Church Street
Other
Size: 5 MB
7.05 Final Report on Site Selection Process Volume 21 Deptford Church Street
Other
Size: 4 MB
7.04 Design and Access Statement Bekesbourne Street
Other
Size: 9 MB
2.04 Crown and special category land plan
Other
Size: 12 MB
8.3 Needs Report Appendix D Sewer Separation Feasibility Study Final Report
Other
Size: 222 KB
7.07 Sustainability Statement Appendix B23 Beckton Sewage Treatment Works
Other
Size: 958 KB
7.05 Final Report on Site Selection Process Volume 23 Abbey Mills Pumping Station
Other
Size: 6 MB
7.01 Appendix F Planning Assessment King Georges Park
Other
Size: 2 MB
2.29 Project wide Ventilation Columns Plans
Other
Size: 36 MB
6.2.06 Environmental Statement Volume 6 Figures
Other
Size: 14 MB
7.16 Equalities Impact Assessment
Other
Size: 229 KB
7.07 Sustainability Statement Appendix B20 Deptford Church Street
Other
Size: 9 MB
7.04 Design and Access Statement Greenwich Pumping Station
Other
Size: 10 MB
5.3 Heritage Statement Appendix K Shad Thames Pumping Station
Other
Size: 2 MB
8.3 Needs Report Appendix A Regulatory Impact Report
Other
Size: 20 MB
7.10.19 Transport Assessment Earl Pumping Station
Other
Size: 215 KB
7.07 Sustainability Statement Appendix B2 Hammersmith Pumping Station
Other
Size: 5 MB
7.04 Design and Access Statement Beckton Sewage Treatment Works
Other
Size: 18 MB
7.04 Design and Access Statement Blackfriars Bridge Foreshore
Other
Size: 15 MB
6.2.23 Environmental Statement Volume 23 Appendices A to N
Other
Size: 524 KB
3.2 Explanatory Memorandum
Other
Size: 478 KB
8.2.5 Solutions Working Group Report Volume 2
Other
Size: 2 MB
7.15 Skills and Employment Strategy
Other
Size: 229 KB
7.07 Sustainability Statement Appendix B10 Chelsea Embankment Foreshore
Other
Size: 31 MB
6.2.25 Environmental Statement Volume 25 Figures
Other
Size: 3 MB
6.2.19 Environmental Statement Volume 19 Shad Thames Pumping Station Site Assessment Sections 1 to 15
Other
Size: 472 KB
5.1 Consultation Report Section 31 King Edward Memorial Park Foreshore
Other
Size: 47 MB
2.19 Blackfriars Bridge Foreshore Plans
Other
Size: 30 MB
2.02 Land acquisition plans
Other
Other
Size: 12 MB
2.20 Shad Thames Pumping Station Plans
Other
Size: 23 MB
6.2.19 Environmental Statement Volume 19 Figures
Other
Size: 1 MB
3.1 The Draft Thames Water Utilities Limited Development Consent Order
Other
Size: 813 KB
8.2.7 Planning and Environment Working Group Report
Other
Size: 284 KB
7.19.2 Code of Construction Practice Part B Chambers Wharf
Other
Size: 1,003 KB
7.05 Final Report on Site Selection Process Volume 13 Kirtling Street
Other
Size: 14 MB
7.04 Design and Access Statement Sections 1 to 5
Other
Size: 2 MB
8.1.5 Thames Tideway Strategic Study Solutions Working Group Volume 1
Other
Size: 238 KB
7.07 Sustainability Statement Appendix B7 Carnwath Road Riverside
Other
Size: 13 MB
7.05 Final Report on Site Selection Process Volumes 1 and 2
Other
Size: 10 MB
7.04 Design and Access Statement Deptford Church Street
Other
Size: 5 MB
6.2.02 Environmental Statement Volume 2 Assessment Methodology Sections 1 to 15
Other
Size: 226 KB
7.07 Sustainability Statement Appendix B24 Bekesbourne Street
Other
Size: 205 KB
5.1 Consultation Report Section 28 Earl Pumping Station
Other
Size: 522 KB
8.2.2 Objectives and Compliance Working Group Report Volume 1
Other
Size: 16 MB
5.3 Heritage Statement Appendix M Deptford Church Street
Other
Size: 18 MB
6.2.16 Environmental Statement Volume 16 Appendices A to N
Other
Size: 9 MB
7.05 Final Report on Site Selection Process Volume 15 Albert Embankment Foreshore
Other
Size: 399 KB
5.1 Consultation Report Section 30 Greenwich Pumping Station
Other
Size: 34 MB
6.2.14 Environmental Statement Volume 14 Figures
Other
Size: 8 MB
7.01 Appendix P Planning Assessment Victoria Embankment Foreshore
Other
Size: 268 KB
5.1 Consultation Report Section 21 Kirtling Street
Other
Size: 41 MB
6.2.21 Environmental Statement Volume 21 Figures
Other
Size: 1 MB
8.1.6 Thames Tideway Strategic Study Solutions Working Group Volume 2
Other
Size: 263 KB
7.19.2 Code of Construction Practice Part B Chelsea Embankment Foreshore
Other
Other
Size: 289 KB
7.19.2 Code of Construction Practice Part B Carnwath Road Riverside
Other
Size: 383 KB
5.1 Consultation Report Section 14 Putney Embankment Foreshore
Other
Size: 19 MB
6.2.21 Environmental Statement Volume 21 Appendices A to N
Other
Size: 282 KB
7.19.2 Code of Construction Practice Part B King Edward Memorial Park Foreshore
Other
Size: 244 KB
7.07 Sustainability Statement Appendix B13 Albert Embankment Foreshore
Other
Size: 4 MB
6.2.19 Environmental Statement Volume 19 Appendices A to N
Other
Size: 48 MB
6.2.17 Environmental Statement Volume 17 Figures
Other
Size: 7 MB
6.2.03 Environmental Statement Volume 3 Appendix A4 Annexes D1 to D14
Other
Size: 21 MB
7.10.22 Transport Assessment Abbey Mills Pumping Station
Other
Size: 19 MB
5.3 Heritage Statement Appendix N Greenwich Pumping Station
Other
Size: 2 MB
7.24 Daylight Sunlight Assessment
Other
Size: 5 MB
6.2.25 Environmental Statement Volume 25 Appendices A to N
Other
Size: 7 MB
6.2.18 Environmental Statement Volume 18 Blackfriars Bridge Foreshore Site Assessment Sections 1 to 15
Other
Size: 1 MB
5.1 Consultation Report Appendices AA to CC
Other
Size: 33 MB
6.2.24 Environmental Statement Volume 24 Appendices A to N
Other
Size: 4 MB
6.2.13 Environmental Statement Volume 13 Chelsea Embankment Foreshore Sections 1 to 15
Other
Size: 6 MB
6.2.23 Environmental Statement Volume 23 Deptford Church Street Site Assessment Sections 1 to 15
Other
Size: 3 MB
6.2.09 Environmental Statement Volume 9 King Georges Park Site Assessment Sections 1 to 15
Other
Size: 3 MB
Other
Size: 192 KB
5.1 Consultation Report Section 18 Falconbrook Pumping Station
Other
Size: 10 MB
2.26 Bekesbourne Street Plans
Other
Size: 3 MB
6.2.01 Environmental Statement Volume 1 Appendix C Compensation Programme
Other
Size: 2 MB
7.14 Air Management Plan
Other
Size: 9 MB
7.01 Appendix Q Planning Assessment Blackfriars Bridge Foreshore
Other
Size: 4 MB
7.05 Final Report on Site Selection Process Volume 12 Chelsea Embankment Foreshore
Other
Size: 26 MB
6.2.26 Environmental Statement Volume 26 Figures
Other
Size: 193 KB
5.1 Consultation Report Section 12 Hammersmith Pumping Station
Other
Size: 12 MB
6.2.14 Environmental Statement Volume 14 Appendices A to N
Other
Size: 8 MB
7.01 Appendix T Planning Assessment King Edward Memorial Park Foreshore
Other
Size: 11 MB
5.3 Heritage Statement Appendix L Chambers Wharf
Other
Size: 10 MB
7.04 Design and Access Statement Earl Pumping Station
Other
Size: 261 KB
5.1 Consultation Report Section 19 Cremorne Wharf Depot
Other
Size: 224 KB
5.1 Consultation Report Section 11 Acton Storm Tanks
Other
Size: 1 MB
7.12 Health Impact Assessment Main Report
Other
Size: 388 KB
7.21 Stettlement Information Paper
Other
Size: 241 KB
7.07 Sustainability Statement Appendix B19 Earl Pumping Station
Other
Size: 1 MB
8.1.4 Thames Tideway Strategic Study Objectives Working Group Volume 2
Other
Size: 22 MB
7.10.16 Transport Assessment Shad Thames Pumping Station
Other
Other
Size: 227 KB
5.1 Consultation Report Section 20 Chelsea Embankment Foreshore
Other
Size: 3 MB
Other
Size: 37 MB
6.2.03 Environmental Statement Volume 3 Figures Part A
Other
Size: 7 MB
7.01 Appendix A Planning Assessment Acton Storm Tanks
Other
Size: 2 MB
8.1.3 Thames Tideway Strategic Study Objectives Working Group Volume 1
Other
Size: 439 KB
7.11 Draft Project Framework Travel Plan
Other
Size: 8 MB
7.05 Final Report on Site Selection Process Volume 22 Greenwich Pumping Station
Other
Size: 5 MB
7.01 Appendix H Planning Assessment Falconbrook Pumping Station
Other
Size: 19 MB
7.10.24 Transport Assessment Minor Works Sites
Other
Size: 3 MB
5.1 Consultation Report Appendix Y Report on post phase two consultation
Other
Size: 182 KB
5.1 Consultation Report Section 15 Dormay Street
Other
Size: 23 MB
7.10.20 Transport Assessment Deptford Church Street
Other
Size: 229 KB
7.07 Sustainability Statement Appendix B18 King Edward Memorial Park Foreshore
Other
Size: 152 KB
5.1 Consultation Report Section 34 Beckton Sewage Treatment Works
Other
Other
Size: 5 MB
7.01 Appendix R Planning Assessment Shad Thames Pumping Station
Other
Size: 25 MB
6.2.03 Environmental Statement Volume 3 Appendices B to D
Other
Size: 29 MB
6.2.18 Environmental Statement Volume 18 Figures Part A
Other
Size: 6 MB
7.04 Design and Access Statement Hammersmith Pumping Station
Other
Size: 6 MB
7.01 Appendix C Planning Assessment Barn Elms
Other
Size: 10 MB
7.04 Design and Access Statement King Edward Memorial Park Foreshore
Other
Size: 14 MB
7.04 Design and Access Statement Chelsea Embankment Foreshore
Other
Size: 26 MB
5.1 Consultation Report Appendices A to U
Other
Size: 12 MB
6.2.08 Environmental Statement Volume 8 Appendices A to N
Other
Size: 22 MB
7.10.18 Transport Assessment King Edward Memorial Park Foreshore
Other
Size: 5 MB
7.01 Appendix B Planning Assessment Hammersmith Pumping Station
Other
Size: 242 KB
5.1 Consultation Report Section 25 Blackfriars Bridge Foreshore
Other
Size: 976 KB
7.05 Final Report on Site Selection Process Volume 9 Carnwath Road Riverside
Other
Size: 6 MB
6.2.27 Environmental Statement Volume 27 Appendices A to N
Other
Size: 34 MB
5.3 Heritage Statement Appendix F Chelsea Embankment Foreshore
Other
Size: 229 KB
7.07 Sustainability Statement Appendix B12 Heathwall Pumping Station
Other
Size: 24 MB
7.10 Transport Assessment Main Report
Other
Size: 42 MB
5.3 Heritage Statement Appendix J Blackfriars Bridge Foreshore
Other
Size: 14 MB
6.2.26 Environmental Statement Volume 26 Appendices A to N
Other
Size: 31 MB
6.2.18 Environmental Statement Volume 18 Figures Part B
Other
Size: 591 KB
8.1.8 Supplementary Report to Government Summary
Other
Size: 2 MB
Other
Size: 19 MB
7.10.23 Transport Assessment Beckton Sewage Treatment Works
Other
Size: 3 MB
7.05 Final Report on Site Selection Process Volume 16 Victoria Embankment Foreshore
Other
Size: 2 MB
6.2.26 Environmental Statement Volume 26 Beckton Sewage Treatment Works Site Assessment Sections 1 to 15
Other
Size: 31 MB
6.2.03 Environmental Statement Volume 3 Appendices F to M
Other
Size: 309 KB
7.19.2 Code of Construction Practice Part B Cremorne Wharf Depot
Other
Size: 358 KB
7.19.2 Code of Construction Practice Part B Acton Storm Tanks
Other
Size: 20 MB
7.10.06 Transport Assessment King Georges Park
Other
Size: 4 MB
7.05 Final Report on Site Selection Process Volume 5 Barn Elms
Other
Size: 28 MB
2.17 Albert Embankment Foreshore Plans
Other
Size: 3 MB
6.2.03 Environmental Statement Volume 3 Appendices A to A4
Other
Size: 424 KB
6.2.01 Environmental Statement Volume 1 Appendix B Design Principles
Other
Size: 19 MB
2.15 Kirtling Street Plans
Other
Size: 17 MB
6.2.11 Environmental Statement Volume 11 Appendices A to N
Other
Size: 3 MB
1.2 Application Form
Other
Size: 26 MB
7.10.01 Transport Assessment Acton Storm Tanks
Other
Size: 14 MB
2.09 Carnwath Road Riverside Plans
Other
Size: 9 MB
6.2.14 Environmental Statement Volume 14 Kirtling Street Site Assessment Sections 1 to 15
Other
Size: 37 MB
6.1 Environmental Statement Non Technical Summary
Other
Size: 5 MB
1.1 Covering Letter
Other
Other
Size: 300 KB
7.19.2 Code of Construction Practice Part B Hammersmith Pumping Station
Other
Size: 26 MB
7.10.07 Transport Assessment Carnwath Road Riverside
Other
Size: 41 MB
6.2.24 Environmental Statement Volume 24 Figures
Other
Size: 327 KB
1.5 PINS Application Checklist
Other
Size: 41 MB
7.10.15 Transport Assessment Blackfriars Bridge Foreshore
Other
Size: 7 MB
7.04 Design and Access Statement Barn Elms
Other
Size: 7 MB
7.01 Appendix D Planning Assessment Putney Embankment Foreshore
Other
Size: 226 KB
4.2 Funding Statement
Other
Size: 10 MB
2.22 Earl Pumping Station Plans
Other
Size: 20 MB
2.05 Acton Storm Tanks Plans
Other
Size: 3 MB
7.05 Final Report on Site Selection Process Volume 11 Cremorne Wharf Depot
Other
Size: 3 MB
7.02 Draft Statement of Common Ground
Other
Size: 151 KB
5.1 Consultation Report Section 32 Bekesbourne Street
Other
Size: 353 KB
6.2.28 Environmental Statement Volume 28 Glossary and Abbreviations
Other
Size: 2 MB
8.1.9 Supplementary Report to Government
Other
Size: 298 KB
7.19.2 Code of Construction Practice Part B Albert Embankment Foreshore
Other
Size: 320 KB
7.19.2 Code of Construction Practice Part B Dormay Street
Other
Size: 228 KB
7.07 Sustainability Statement Appendix B14 Victoria Embankment Foreshore
Other
Size: 5 MB
7.01 Appendix Z Planning Assessment Bekesbourne Street
Other
Size: 31 MB
6.2.08 Environmental Statement Volume 8 Figures
Other
Size: 344 KB
8.3 Needs Report Appendix C Population Statistics
Other
Size: 22 MB
7.04 Design and Access Statement Putney Embankment Foreshore
Other
Size: 501 KB
5.1 Consultation Report Section 27 Chambers Wharf
Other
Size: 11 MB
6.2.13 Environmental Statement Volume 13 Appendices A to N
Other
Size: 4 MB
6.2.05 Environmental Statement Volume 5 Hammersmith Pumping Station Site Assessment Sections 1 to 15
Other
Size: 2 MB
6.2.03 Environmental Statement Volume 3 Appendix A4 Annexes C1 to C3
Other
Size: 44 MB
7.22 Utilities Statement
Other
Other
Size: 36 MB
7.12 Health Impact Assessment Appendix E Community profiling maps
Other
Size: 661 KB
7.07 Sustainability Statement Appendix A Sustainability appraisal thematic
Other
Size: 742 KB
7.05 Final Report on Site Selection Process Volume 18 Chambers Wharf
Other
Size: 4 MB
4.1 Statement of Reasons
Other
Size: 189 KB
5.1 Consultation Report Section 33 Abbey Mills Pumping Station
Other
Size: 40 MB
2.01 Works Plans and Sections
Other
Size: 4 MB
6.2.20 Environmental Statement Volume 20 Chambers Wharf Site Assessment Sections 1 to 15
Other
Size: 26 MB
6.2.03 Environmental Statement Volume 3 Appendix E
Other
Size: 286 KB
7.19.2 Code of Construction Practice Part B Barn Elms
Other
Size: 21 MB
7.10.05 Transport Assessment Dormay Street
Other
Size: 3 MB
7.05 Final Report on Site Selection Process Volume 4 Hammersmith Pumping Station
Other
Size: 6 MB
7.04 Design and Access Statement Shad Thames Pumping Station
Other
Size: 7 MB
7.04 Design and Access Statement Falconbrook Pumping Station
Other
Size: 8 MB
7.01 Appendix J Planning Assessment Kirtling Street
Other
Size: 6 MB
5.3 Heritage Statement Main Report
Other
Size: 907 KB
5.1 Consultation Report Appendix W Interim engagement report
Other
Size: 207 KB
5.1 Consultation Report Section 16 King Georges Park
Other
Size: 12 MB
2.27 Abbey Mills Pumping Station Plans
Other
Size: 41 MB
6.2.13 Environmental Statement Volume 13 Figures
Other
Size: 23 MB
6.2.02 Environmental Statement Volume 2 Appendix P
Other
Size: 6 MB
6.2.01 Environmental Statement Volume 1 Appendix A Code of Construction Practice Part B
Other
Size: 464 KB
8.2.6 Cost Benefit Working Group Report
Other
Other
Size: 234 KB
7.07 Sustainability Statement Appendix B11 Kirtling Street
Other
Size: 289 KB
5.1 Consultation Report Section 24 Victoria Embankment Foreshore
Other
Size: 329 KB
5.1 Consultation Report Section 13 Barn Elms
Other
Size: 286 KB
7.19.2 Code of Construction Practice Part B Bekesbourne Street
Other
Size: 3 MB
7.05 Final Report on Site Selection Process Volume 8 King Georges Park
Other
Size: 6 MB
7.01 Appendix X Planning Assessment Abbey Mills Pumping Station
Other
Size: 6 MB
6.2.12 Environmental Statement Volume 12 Cremorne Wharf Depot Site Assessment Sections 1 to 15
Other
Size: 383 KB
1.4 Guide to the Application
Other
Size: 227 KB
7.07 Sustainability Statement Appendix B6 King Georges Park
Other
Size: 6 MB
7.04 Design and Access Statement Abbey Mills Pumping Station
Other
Size: 10 MB
7.04 Design and Access Statement Victoria Embankment Foreshore
Other
Size: 6 MB
7.01 Appendix K Planning Assessment Heathwall Pumping Station
Other
Size: 13 MB
2.11 King Georges Park Plans
Other
Size: 6 MB
6.2.17 Environmental Statement Volume 17 Victoria Embankment Foreshore Site Assessment Sections 1 to 15
Other
Size: 7 MB
6.2.15 Environmental Statement Volume 15 Appendices A to N
Other
Size: 5 MB
6.2.01 Environmental Statement Volume 1 Introduction
Other
Size: 759 KB
8.2.4 Solutions Working Group Report Volume 1
Other
Size: 2 MB
Other
Size: 3 MB
7.05 Final Report on Site Selection Process Volume 10 Falconbrook Pumping Station
Other
Size: 7 MB
7.01 Appendix W Planning Assessment Greenwich Pumping Station
Other
Size: 10 MB
2.13 Cremorne Wharf Depot Plans
Other
Size: 3 MB
8.1.2 Thames Tideway Strategic Study Steering Group Report
Other
Size: 7 MB
7.04 Design and Access Statement Chambers Wharf
Other
Size: 5 MB
7.04 Design and Access Statement Cremorne Wharf Depot
Other
Size: 7 MB
7.01 Appendix N Planning Assessment Albert Embankment Foreshore
Other
Size: 19 MB
2.14 Chelsea Embankment Foreshore Plans
Other
Size: 4 MB
6.2.24 Environmental Statement Volume 24 Greenwich Pumping Station Site Assessment Sections 1 to 15
Other
Size: 4 MB
6.2.15 Environmental Statement Volume 15 Heathwall Pumping Station Site Assessment Sections 1 to 15
Other
Size: 30 MB
6.2.11 Environmental Statement Volume 11 Figures
Other
Size: 572 KB
7.05 Final Report on Site Selection Process Volume 3 Acton Storm Tanks
Other
Size: 6 MB
7.01 Appendix S Planning Assessment Chambers Wharf
Other
Size: 23 MB
5.3 Heritage Statement Appendix G Albert Embankment Foreshore
Other
Size: 11 MB
2.06 Hammersmith Pumping Station Plans
Other
Size: 31 MB
6.2.20 Environmental Statement Volume 20 Figures
Other
Size: 23 MB
6.2.02 Environmental Statement Volume 2 Appendices A to O
Other
Size: 27 MB
5.3 Heritage Statement Appendix H Victoria Embankment Foreshore
Other
Size: 12 MB
5.3 Heritage Statement Appendix C Carnwath Road Riverside
Other
Size: 3 MB
5.1 Consultation Report Appendix Z Report on Section 48 publicity
Other
Size: 17 MB
2.07 Barn Elms Plans
Other
Size: 5 MB
6.2.07 Environmental Statement Volume 7 Putney Embankment Foreshore Site Assessment Sections 1 to 15
Other
Size: 4 MB
6.2.11 Environmental Statement Volume 11 Falconbrook Pumping Station Site Assessment Sections 1 to 15
Other
Size: 12 MB
6.2.09 Environmental Statement Volume 9 Appendices A to N
Other
Size: 5 MB
6.2.16 Environmental Statement Volume 16 Albert Embankment Foreshore Site Assessment Sections 1 to 15
Other
Size: 23 MB
1.3 Newspaper Notices
Other
Size: 11 MB
2.10 Dormay Street Plans
Other
Size: 3 MB
6.2.22 Environmental Statement Volume 22 Earl Pumping Station Site Assessment Sections 1 to 15
Other
Size: 44 MB
6.2.09 Environmental Statement Volume 9 Figures
Other
Size: 1 MB
8.1.7 Cost Benefit Working Group Report
Other
Size: 549 KB
Other
Size: 628 KB
7.19.1 Code of Construction Practice Part A
Other
Size: 21 MB
7.10.02 Transport Assessment Hammersmith Pumping Station
Other
Size: 4 MB
Other
Size: 5 MB
7.18 Engineering Design Statement
Other
Size: 3 MB
7.13 Overarching Archeological Written Scheme of Investigation
Other
Size: 27 MB
7.10.04 Transport Assessment Putney Embankment Foreshore
Other
Size: 625 KB
8.2.1 Summary Report
Other
Other
Size: 368 KB
7.19.2 Code of Construction Practice Part B King Georges Park
Other
Size: 267 KB
7.19.2 Code of Construction Practice Part B Shad Thames Pumping Station
Other
Size: 27 MB
7.10.11 Transport Assessment Kirtling Street
Other
Size: 228 KB
7.07 Sustainability Statement Appendix B17 Chambers Wharf
Other
Size: 800 KB
7.03 Section 106 Obligations Heads of Terms
Other
Size: 12 MB
2.16 Heathwall Pumping Station Plans
Other
Size: 19 MB
7.12 Health Impact Assessment Appendices A to D1
Other
Size: 8 MB
7.04 Design and Access Statement King Georges Park
Other
Size: 5 MB
7.01 Appendix G Planning Assessment Carnwath Road Riverside
Other
Size: 13 MB
5.1 Consultation Report Appendix X Supplementary report on phase two consultation
Other
Size: 281 KB
5.1 Consultation Report Section 17 Carnwath Road Riverside
Other
Size: 21 MB
2.25 King Edward Memorial Park Foreshore Plans
Other
Size: 2 MB
8.3 Needs Report Appendix B Compliance in Relation to CSOs in major cities across Europe
Other
Other
Size: 9 MB
7.12 Health Impact Assessment Appendix D2 Site profiles figures
Other
Size: 1 MB
7.07 Sustainability Statement Main Report
Other
Size: 3 MB
7.05 Final Report on Site Selection Process Volume 17 Blackfriars Bridge Foreshore
Other
Size: 8 MB
7.04 Design and Access Statement Acton Storm Tanks
Other
Size: 12 MB
6.2.22 Environmental Statement Volume 22 Appendices A to N
Other
Size: 29 MB
6.2.12 Environmental Statement Volume 12 Figures
Other
Size: 12 MB
6.2.04 Environmental Statement Volume 4 Appendices A to N
Other
Size: 4 MB
7.05 Final Report on Site Selection Process Volume 7 Dormay Street
Other
Size: 3 MB
6.3 Habitats Regulations Assessment No Significant Effects Report
Other
Size: 268 KB
7.09 Transport Strategy
Other
Size: 232 KB
7.07 Sustainability Statement Appendix B3 Barn Elms
Other
Size: 7 MB
7.04 Design and Access Statement Kirtling Street
Other
Size: 7 MB
7.01 Appendix M Planning Assessment Chelsea Embankment Foreshore
Other
Size: 6 MB
Other
Size: 3 MB
6.2.04 Environmental Statement Volume 4 Acton Storm Tanks Site Assessment Sections 1 to 15
Other
Size: 662 KB
7.19.2 Code of Construction Practice Part B Abbey Mills Pumping Station
Other
Size: 207 KB
7.04 Design and Access Statement Glossary
Other
Size: 13 MB
2.21 Chambers Wharf Plans
Other
Size: 349 KB
7.19.2 Code of Construction Practice Part B Greenwich Pumping Station
Other
Size: 18 MB
7.10.21 Transport Assessment Greenwich Pumping Station
Other
Size: 26 MB
6.2.02 Environmental Statement Volume 2 Figures
Other
Size: 8 MB
7.01 Appendix V Planning Assessment Deptford Church Street
Other
Size: 10 MB
5.3 Heritage Statement Appendix E Cremorne Wharf Depot
Other
Size: 32 MB
6.2.23 Environmental Statement Volume 23 Figures
Other
Size: 11 MB
6.2.17 Environmental Statement Volume 17 Appendices A to N
Other
Size: 29 MB
6.2.15 Environmental Statement Volume 15 Figures
Other
Size: 5 MB
7.05 Final Report on Site Selection Process Volume 20 Earl Pumping Station
Other
Size: 49 MB
6.2.03 Environmental Statement Volume 3 Figures Part B
Other
Size: 262 KB
7.19.2 Code of Construction Practice Part B Heathwall Pumping Station
Other
Size: 298 KB
7.19.2 Code of Construction Practice Part B Putney Emankment Foreshore
Other
Size: 10 MB
5.3 Heritage Statement Appendix Q Abbey Mills Pumping Station
Other
Size: 30 MB
2.18 Victoria Embankment Foreshore Plans
Other
Size: 17 MB
7.10.12 Transport Assessment Heathwall Pumping Station
Other
Size: 12 MB
6.2.20 Environmental Statement Volume 20 Appendices A to N
Other
Size: 14 MB
6.2.07 Environmental Statement Volume 7 Appendices A to N
Other
Size: 6 MB
5.1 Consultation Report Sections 1 to 10
Other
Size: 41 MB
2.03 Land Plans
Other
Size: 8 MB
Other
Size: 576 KB
7.17 Design Principles
Other
Size: 25 MB
6.2.05 Environmental Statement Volume 5 Figures
Other
Size: 2 MB
7.06 Open Space Assessment
Other
Size: 8 MB
6.2.05 Environmental Statement Volume 5 Appendices A to N
Other
Size: 6 MB
Other
Size: 223 KB
5.1 Consultation Report Section 26 Shad Thames Pumping Station
Other
Size: 32 MB
6.2.04 Environmental Statement Volume 4 Figures
Other
Size: 23 MB
6.2.22 Environmental Statement Volume 22 Figures
Other
Size: 227 KB
7.07 Sustainability Statement Appendix B5 Dormay Street
Other
Size: 273 KB
5.2 Statement in Respect of Statutory Nuisance
Other
Size: 3 MB
7.05 Final Report on Site Selection Process Volume 6 Putney Embankment Foreshore
Other
Size: 15 MB
2.12 Falconbrook Pumping Station Plans
Other
Size: 1 MB
8.3 Needs Report Main Report
Other
Size: 4 MB
6.2.10 Environmental Statement Volume 10 Carnwath Road Riverside Site Assessment Sections 1 to 15
Other
Size: 24 MB
7.10.09 Transport Assessment Cremorne Wharf Depot
Other
Size: 372 KB
Other
Size: 20 MB
5.3 Heritage Statement Appendix P King Edward Memorial Park Foreshore
Other
Size: 14 MB
6.2.10 Environmental Statement Volume 10 Appendices A to N
Other
Size: 13 MB
6.2.18 Environmental Statement Volume 18 Appendices A to N
Other
Size: 485 KB
6.2.01 Environmental Statement Volume 1 Appendix A Code of Construction Practice Part A
Other
Size: 10 MB
Other
Size: 231 KB
7.07 Sustainability Statement Appendix B9 Cremorne Wharf Depot
Other
Size: 6 MB
6.2.25 Environmental Statement Volume 25 Abbey Mills Pumping Station Site Assessment Sections 1 to 15
Other
Size: 34 MB
7.10.14 Transport Assessment Victoria Embankment Foreshore
Other
Size: 253 KB
7.07 Sustainability Statement Appendix B22 Abbey Mills Pumping Station
Other
Size: 23 MB
7.10.08 Transport Assessment Falconbrook Pumping Station
Other
Size: 38 MB
6.2.10 Environmental Statement Volume 10 Figures
Other
Size: 233 KB
7.07 Sustainability Statement Appendix B4 Putney Embankment Foreshore
Other
Size: 10 MB
5.3 Heritage Statement Appendix D Dormay Street
Other
Size: 346 KB
5.1 Consultation Report Section 23 Albert Embankment Foreshore
Other
Size: 43 MB
6.2.16 Environmental Statement Volume 16 Figures
Other
Size: 240 KB
7.07 Sustainability Statement Appendix B8 Falconbrook Pumping Station
Other
Size: 23 MB
5.3 Heritage Statement Appendix B Putney Embankment Foreshore
Other
Size: 43 MB
6.2.07 Environmental Statement Volume 7 Figures
Other
Size: 8 MB
6.2.03 Environmental Statement Volume 3 Project wide effects assessment
Other
Size: 538 MB
7.10 Transport Assessment Annex A Baseline data GIS database
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.