Thames Tideway Tunnel

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (0)

Developer's Application (406)

Acceptance (28)

Pre Examination (59)

Examination (1978)

Decision (41)

Decided (93)

Date

The selection shows documents received from the applicant in relation to the development consent order application.

SourceDescription
Other
Environment Agency (PDF, 141 KB)
A submission on the proposed changes to the application
Other
Transport For London (PDF, 309 KB)
A submission on the proposed changes to the application
Other
Westminster City Council (PDF, 744 KB)
A submission on the proposed changes to the application
Other
Thames Water Utilites Ltd (PDF, 34 MB)
Proposed changes at Victoria Embankment Foreshore
Other
Thames Water Utilities Ltd (PDF, 138 KB)
A letter from the applicant covering their proposed changes of 23 September 2013
Other
Thames Water Utilities Ltd (PDF, 30 MB)
Proposed changes at Blackfriars Bridge Foreshore
Other
6.2.03 Environmental Statement Volume 3 Project wide effects assessment (PDF, 8 MB)
Other
6.2.07 Environmental Statement Volume 7 Figures (PDF, 43 MB)
Other
5.3 Heritage Statement Appendix B Putney Embankment Foreshore (PDF, 23 MB)
Other
7.07 Sustainability Statement Appendix B8 Falconbrook Pumping Station (PDF, 240 KB)
Other
6.2.16 Environmental Statement Volume 16 Figures (PDF, 43 MB)
Other
5.1 Consultation Report Section 23 Albert Embankment Foreshore (PDF, 346 KB)
Other
5.3 Heritage Statement Appendix D Dormay Street (PDF, 10 MB)
Other
7.07 Sustainability Statement Appendix B4 Putney Embankment Foreshore (PDF, 233 KB)
Other
6.2.10 Environmental Statement Volume 10 Figures (PDF, 38 MB)
Other
7.10.08 Transport Assessment Falconbrook Pumping Station (PDF, 23 MB)
Other
7.07 Sustainability Statement Appendix B22 Abbey Mills Pumping Station (PDF, 253 KB)
Other
7.10.14 Transport Assessment Victoria Embankment Foreshore (PDF, 34 MB)
Other
6.2.25 Environmental Statement Volume 25 Abbey Mills Pumping Station Site Assessment Sections 1 to 15 (PDF, 6 MB)
Other
7.07 Sustainability Statement Appendix B9 Cremorne Wharf Depot (PDF, 231 KB)
Other
7.20.04 Navigational Issues and Preliminary Risk Assessment Kirtling Street Main Report and Appendices (PDF, 10 MB)
Other
6.2.01 Environmental Statement Volume 1 Appendix A Code of Construction Practice Part A (PDF, 485 KB)
Other
6.2.18 Environmental Statement Volume 18 Appendices A to N (PDF, 13 MB)
Other
6.2.10 Environmental Statement Volume 10 Appendices A to N (PDF, 14 MB)
Other
5.3 Heritage Statement Appendix P King Edward Memorial Park Foreshore (PDF, 20 MB)
Other
7.20.06 Navigational Issues and Preliminary Risk Assessment Cremorne Wharf Depot Annexes Hazard Logs (PDF, 372 KB)
Other
7.10.09 Transport Assessment Cremorne Wharf Depot (PDF, 24 MB)
Other
6.2.10 Environmental Statement Volume 10 Carnwath Road Riverside Site Assessment Sections 1 to 15 (PDF, 4 MB)
Other
8.3 Needs Report Main Report (PDF, 1 MB)
Other
2.12 Falconbrook Pumping Station Plans (PDF, 15 MB)
Other
7.05 Final Report on Site Selection Process Volume 6 Putney Embankment Foreshore (PDF, 3 MB)
Other
5.2 Statement in Respect of Statutory Nuisance (PDF, 273 KB)
Other
7.07 Sustainability Statement Appendix B5 Dormay Street (PDF, 227 KB)
Other
6.2.22 Environmental Statement Volume 22 Figures (PDF, 23 MB)
Other
6.2.04 Environmental Statement Volume 4 Figures (PDF, 32 MB)
Other
5.1 Consultation Report Section 26 Shad Thames Pumping Station (PDF, 223 KB)
Other
7.20.06 Navigational Issues and Preliminary Risk Assessment Cremorne Wharf Depot Main Report and Appendices (PDF, 6 MB)
Other
6.2.05 Environmental Statement Volume 5 Appendices A to N (PDF, 8 MB)
Other
7.06 Open Space Assessment (PDF, 2 MB)
Other
6.2.05 Environmental Statement Volume 5 Figures (PDF, 25 MB)
Other
7.17 Design Principles (PDF, 576 KB)
Other
7.20.10 Navigational Issues and Preliminary Risk Assessment Chambers Wharf Main Report and Appendices (PDF, 8 MB)
Other
2.03 Land Plans (PDF, 41 MB)
Other
5.1 Consultation Report Sections 1 to 10 (PDF, 6 MB)
Other
6.2.07 Environmental Statement Volume 7 Appendices A to N (PDF, 14 MB)
Other
6.2.20 Environmental Statement Volume 20 Appendices A to N (PDF, 12 MB)
Other
7.10.12 Transport Assessment Heathwall Pumping Station (PDF, 17 MB)
Other
2.18 Victoria Embankment Foreshore Plans (PDF, 30 MB)
Other
5.3 Heritage Statement Appendix Q Abbey Mills Pumping Station (PDF, 10 MB)
Other
7.19.2 Code of Construction Practice Part B Putney Emankment Foreshore (PDF, 298 KB)
Other
7.19.2 Code of Construction Practice Part B Heathwall Pumping Station (PDF, 262 KB)
Other
6.2.03 Environmental Statement Volume 3 Figures Part B (PDF, 49 MB)
Other
7.05 Final Report on Site Selection Process Volume 20 Earl Pumping Station (PDF, 5 MB)
Other
6.2.15 Environmental Statement Volume 15 Figures (PDF, 29 MB)
Other
6.2.17 Environmental Statement Volume 17 Appendices A to N (PDF, 11 MB)
Other
6.2.23 Environmental Statement Volume 23 Figures (PDF, 32 MB)
Other
5.3 Heritage Statement Appendix E Cremorne Wharf Depot (PDF, 10 MB)
Other
7.01 Appendix V Planning Assessment Deptford Church Street (PDF, 8 MB)
Other
6.2.02 Environmental Statement Volume 2 Figures (PDF, 26 MB)
Other
7.10.21 Transport Assessment Greenwich Pumping Station (PDF, 18 MB)
Other
7.19.2 Code of Construction Practice Part B Greenwich Pumping Station (PDF, 349 KB)
Other
2.21 Chambers Wharf Plans (PDF, 13 MB)
Other
7.04 Design and Access Statement Glossary (PDF, 207 KB)
Other
7.19.2 Code of Construction Practice Part B Abbey Mills Pumping Station (PDF, 662 KB)
Other
6.2.04 Environmental Statement Volume 4 Acton Storm Tanks Site Assessment Sections 1 to 15 (PDF, 3 MB)
Other
6.2.21 Environmental Statement Volume 21 King Edward Memorial Park Foreshore Site Assessment Sections 1 to 15 (PDF, 6 MB)
Other
7.01 Appendix M Planning Assessment Chelsea Embankment Foreshore (PDF, 7 MB)
Other
7.04 Design and Access Statement Kirtling Street (PDF, 7 MB)
Other
7.07 Sustainability Statement Appendix B3 Barn Elms (PDF, 232 KB)
Other
7.09 Transport Strategy (PDF, 268 KB)
Other
6.3 Habitats Regulations Assessment No Significant Effects Report (PDF, 3 MB)
Other
7.05 Final Report on Site Selection Process Volume 7 Dormay Street (PDF, 4 MB)
Other
6.2.04 Environmental Statement Volume 4 Appendices A to N (PDF, 12 MB)
Other
6.2.12 Environmental Statement Volume 12 Figures (PDF, 29 MB)
Other
6.2.22 Environmental Statement Volume 22 Appendices A to N (PDF, 12 MB)
Other
7.04 Design and Access Statement Acton Storm Tanks (PDF, 8 MB)
Other
7.05 Final Report on Site Selection Process Volume 17 Blackfriars Bridge Foreshore (PDF, 3 MB)
Other
7.07 Sustainability Statement Main Report (PDF, 1 MB)
Other
7.12 Health Impact Assessment Appendix D2 Site profiles figures (PDF, 9 MB)
Other
7.20.11 Navigational Issues and Preliminary Risk Assessment King Edward Memorial Park Foreshore Annexes Hazard Logs (PDF, 2 MB)
Other
8.3 Needs Report Appendix B Compliance in Relation to CSOs in major cities across Europe (PDF, 2 MB)
Other
2.25 King Edward Memorial Park Foreshore Plans (PDF, 21 MB)
Other
5.1 Consultation Report Section 17 Carnwath Road Riverside (PDF, 281 KB)
Other
5.1 Consultation Report Appendix X Supplementary report on phase two consultation (PDF, 13 MB)
Other
7.01 Appendix G Planning Assessment Carnwath Road Riverside (PDF, 5 MB)
Other
7.04 Design and Access Statement King Georges Park (PDF, 8 MB)
Other
7.12 Health Impact Assessment Appendices A to D1 (PDF, 19 MB)
Other
2.16 Heathwall Pumping Station Plans (PDF, 12 MB)
Other
7.03 Section 106 Obligations Heads of Terms (PDF, 800 KB)
Other
7.07 Sustainability Statement Appendix B17 Chambers Wharf (PDF, 228 KB)
Other
7.10.11 Transport Assessment Kirtling Street (PDF, 27 MB)
Other
7.19.2 Code of Construction Practice Part B Shad Thames Pumping Station (PDF, 267 KB)
Other
7.19.2 Code of Construction Practice Part B King Georges Park (PDF, 368 KB)
Other
7.20.07 Navigational Issues and Preliminary Risk Assessment Chelsea Embankment Foreshore Main Report and Appendices (PDF, 6 MB)
Other
8.2.1 Summary Report (PDF, 625 KB)
Other
7.10.04 Transport Assessment Putney Embankment Foreshore (PDF, 27 MB)
Other
7.13 Overarching Archeological Written Scheme of Investigation (PDF, 3 MB)
Other
7.18 Engineering Design Statement (PDF, 5 MB)
Other
7.20.03 Navigational Issues and Preliminary Risk Assessment Albert Embankment Foreshore Annexes Hazard Logs (PDF, 4 MB)
Other
7.10.02 Transport Assessment Hammersmith Pumping Station (PDF, 21 MB)
Other
7.19.1 Code of Construction Practice Part A (PDF, 628 KB)
Other
7.20.05 Navigational Issues and Preliminary Risk Assessment Carnwath Road Riverside Annexes Hazard Logs (PDF, 549 KB)
Other
8.1.7 Cost Benefit Working Group Report (PDF, 1 MB)
Other
6.2.09 Environmental Statement Volume 9 Figures (PDF, 44 MB)
Other
6.2.22 Environmental Statement Volume 22 Earl Pumping Station Site Assessment Sections 1 to 15 (PDF, 3 MB)
Other
2.10 Dormay Street Plans (PDF, 11 MB)
Other
1.3 Newspaper Notices (PDF, 23 MB)
Other
6.2.16 Environmental Statement Volume 16 Albert Embankment Foreshore Site Assessment Sections 1 to 15 (PDF, 5 MB)
Other
6.2.09 Environmental Statement Volume 9 Appendices A to N (PDF, 12 MB)
Other
6.2.11 Environmental Statement Volume 11 Falconbrook Pumping Station Site Assessment Sections 1 to 15 (PDF, 4 MB)
Other
6.2.07 Environmental Statement Volume 7 Putney Embankment Foreshore Site Assessment Sections 1 to 15 (PDF, 5 MB)
Other
2.07 Barn Elms Plans (PDF, 17 MB)
Other
5.1 Consultation Report Appendix Z Report on Section 48 publicity (PDF, 3 MB)
Other
5.3 Heritage Statement Appendix C Carnwath Road Riverside (PDF, 12 MB)
Other
5.3 Heritage Statement Appendix H Victoria Embankment Foreshore (PDF, 27 MB)
Other
6.2.02 Environmental Statement Volume 2 Appendices A to O (PDF, 23 MB)
Other
6.2.20 Environmental Statement Volume 20 Figures (PDF, 31 MB)
Other
2.06 Hammersmith Pumping Station Plans (PDF, 11 MB)
Other
5.3 Heritage Statement Appendix G Albert Embankment Foreshore (PDF, 23 MB)
Other
7.01 Appendix S Planning Assessment Chambers Wharf (PDF, 6 MB)
Other
7.05 Final Report on Site Selection Process Volume 3 Acton Storm Tanks (PDF, 572 KB)
Other
6.2.11 Environmental Statement Volume 11 Figures (PDF, 30 MB)
Other
6.2.15 Environmental Statement Volume 15 Heathwall Pumping Station Site Assessment Sections 1 to 15 (PDF, 4 MB)
Other
6.2.24 Environmental Statement Volume 24 Greenwich Pumping Station Site Assessment Sections 1 to 15 (PDF, 4 MB)
Other
2.14 Chelsea Embankment Foreshore Plans (PDF, 19 MB)
Other
7.01 Appendix N Planning Assessment Albert Embankment Foreshore (PDF, 7 MB)
Other
7.04 Design and Access Statement Cremorne Wharf Depot (PDF, 5 MB)
Other
7.04 Design and Access Statement Chambers Wharf (PDF, 7 MB)
Other
8.1.2 Thames Tideway Strategic Study Steering Group Report (PDF, 3 MB)
Other
2.13 Cremorne Wharf Depot Plans (PDF, 10 MB)
Other
7.01 Appendix W Planning Assessment Greenwich Pumping Station (PDF, 7 MB)
Other
7.05 Final Report on Site Selection Process Volume 10 Falconbrook Pumping Station (PDF, 3 MB)
Other
7.20.08 Navigational Issues and Preliminary Risk Assessment Heathwall Pumping Station Annexes Hazard Logs (PDF, 2 MB)
Other
8.2.4 Solutions Working Group Report Volume 1 (PDF, 759 KB)
Other
6.2.01 Environmental Statement Volume 1 Introduction (PDF, 5 MB)
Other
6.2.15 Environmental Statement Volume 15 Appendices A to N (PDF, 7 MB)
Other
6.2.17 Environmental Statement Volume 17 Victoria Embankment Foreshore Site Assessment Sections 1 to 15 (PDF, 6 MB)
Other
2.11 King Georges Park Plans (PDF, 13 MB)
Other
7.01 Appendix K Planning Assessment Heathwall Pumping Station (PDF, 6 MB)
Other
7.04 Design and Access Statement Victoria Embankment Foreshore (PDF, 10 MB)
Other
7.04 Design and Access Statement Abbey Mills Pumping Station (PDF, 6 MB)
Other
7.07 Sustainability Statement Appendix B6 King Georges Park (PDF, 227 KB)
Other
1.4 Guide to the Application (PDF, 383 KB)
Other
6.2.12 Environmental Statement Volume 12 Cremorne Wharf Depot Site Assessment Sections 1 to 15 (PDF, 6 MB)
Other
7.01 Appendix X Planning Assessment Abbey Mills Pumping Station (PDF, 6 MB)
Other
7.05 Final Report on Site Selection Process Volume 8 King Georges Park (PDF, 3 MB)
Other
7.19.2 Code of Construction Practice Part B Bekesbourne Street (PDF, 286 KB)
Other
5.1 Consultation Report Section 13 Barn Elms (PDF, 329 KB)
Other
5.1 Consultation Report Section 24 Victoria Embankment Foreshore (PDF, 289 KB)
Other
7.07 Sustainability Statement Appendix B11 Kirtling Street (PDF, 234 KB)
Other
7.20.09 Navigational Issues and Preliminary Risk Assessment Victoria Embankment Foreshore Annexes Hazard Logs (PDF, 3 MB)
Other
8.2.6 Cost Benefit Working Group Report (PDF, 464 KB)
Other
6.2.01 Environmental Statement Volume 1 Appendix A Code of Construction Practice Part B (PDF, 6 MB)
Other
6.2.02 Environmental Statement Volume 2 Appendix P (PDF, 23 MB)
Other
6.2.13 Environmental Statement Volume 13 Figures (PDF, 41 MB)
Other
2.27 Abbey Mills Pumping Station Plans (PDF, 12 MB)
Other
5.1 Consultation Report Section 16 King Georges Park (PDF, 207 KB)
Other
5.1 Consultation Report Appendix W Interim engagement report (PDF, 907 KB)
Other
5.3 Heritage Statement Main Report (PDF, 6 MB)
Other
7.01 Appendix J Planning Assessment Kirtling Street (PDF, 8 MB)
Other
7.04 Design and Access Statement Falconbrook Pumping Station (PDF, 7 MB)
Other
7.04 Design and Access Statement Shad Thames Pumping Station (PDF, 6 MB)
Other
7.05 Final Report on Site Selection Process Volume 4 Hammersmith Pumping Station (PDF, 3 MB)
Other
7.10.05 Transport Assessment Dormay Street (PDF, 21 MB)
Other
7.19.2 Code of Construction Practice Part B Barn Elms (PDF, 286 KB)
Other
6.2.03 Environmental Statement Volume 3 Appendix E (PDF, 26 MB)
Other
6.2.20 Environmental Statement Volume 20 Chambers Wharf Site Assessment Sections 1 to 15 (PDF, 4 MB)
Other
2.01 Works Plans and Sections (PDF, 40 MB)
Other
5.1 Consultation Report Section 33 Abbey Mills Pumping Station (PDF, 189 KB)
Other
4.1 Statement of Reasons (PDF, 4 MB)
Other
7.05 Final Report on Site Selection Process Volume 18 Chambers Wharf (PDF, 742 KB)
Other
7.07 Sustainability Statement Appendix A Sustainability appraisal thematic (PDF, 661 KB)
Other
7.12 Health Impact Assessment Appendix E Community profiling maps (PDF, 36 MB)
Other
7.20.01 Navigational Issues and Preliminary Risk Assessment Putney Embankment Foreshore Main Report and Appendices (PDF, 8 MB)
Other
7.22 Utilities Statement (PDF, 44 MB)
Other
6.2.03 Environmental Statement Volume 3 Appendix A4 Annexes C1 to C3 (PDF, 2 MB)
Other
6.2.05 Environmental Statement Volume 5 Hammersmith Pumping Station Site Assessment Sections 1 to 15 (PDF, 4 MB)
Other
6.2.13 Environmental Statement Volume 13 Appendices A to N (PDF, 11 MB)
Other
5.1 Consultation Report Section 27 Chambers Wharf (PDF, 501 KB)
Other
7.04 Design and Access Statement Putney Embankment Foreshore (PDF, 22 MB)
Other
8.3 Needs Report Appendix C Population Statistics (PDF, 344 KB)
Other
6.2.08 Environmental Statement Volume 8 Figures (PDF, 31 MB)
Other
7.01 Appendix Z Planning Assessment Bekesbourne Street (PDF, 5 MB)
Other
7.07 Sustainability Statement Appendix B14 Victoria Embankment Foreshore (PDF, 228 KB)
Other
7.19.2 Code of Construction Practice Part B Dormay Street (PDF, 320 KB)
Other
7.19.2 Code of Construction Practice Part B Albert Embankment Foreshore (PDF, 298 KB)
Other
8.1.9 Supplementary Report to Government (PDF, 2 MB)
Other
6.2.28 Environmental Statement Volume 28 Glossary and Abbreviations (PDF, 353 KB)
Other
5.1 Consultation Report Section 32 Bekesbourne Street (PDF, 151 KB)
Other
7.02 Draft Statement of Common Ground (PDF, 3 MB)
Other
7.05 Final Report on Site Selection Process Volume 11 Cremorne Wharf Depot (PDF, 3 MB)
Other
2.05 Acton Storm Tanks Plans (PDF, 20 MB)
Other
2.22 Earl Pumping Station Plans (PDF, 10 MB)
Other
4.2 Funding Statement (PDF, 226 KB)
Other
7.01 Appendix D Planning Assessment Putney Embankment Foreshore (PDF, 7 MB)
Other
7.04 Design and Access Statement Barn Elms (PDF, 7 MB)
Other
7.10.15 Transport Assessment Blackfriars Bridge Foreshore (PDF, 41 MB)
Other
1.5 PINS Application Checklist (PDF, 327 KB)
Other
6.2.24 Environmental Statement Volume 24 Figures (PDF, 41 MB)
Other
7.10.07 Transport Assessment Carnwath Road Riverside (PDF, 26 MB)
Other
7.19.2 Code of Construction Practice Part B Hammersmith Pumping Station (PDF, 300 KB)
Other
7.20.05 Navigational Issues and Preliminary Risk Assessment Carnwath Road Riverside Main Report and Appendices (PDF, 6 MB)
Other
1.1 Covering Letter (PDF, 5 MB)
Other
6.1 Environmental Statement Non Technical Summary (PDF, 37 MB)
Other
6.2.14 Environmental Statement Volume 14 Kirtling Street Site Assessment Sections 1 to 15 (PDF, 9 MB)
Other
2.09 Carnwath Road Riverside Plans (PDF, 14 MB)
Other
7.10.01 Transport Assessment Acton Storm Tanks (PDF, 26 MB)
Other
1.2 Application Form (PDF, 3 MB)
Other
6.2.11 Environmental Statement Volume 11 Appendices A to N (PDF, 17 MB)
Other
2.15 Kirtling Street Plans (PDF, 19 MB)
Other
6.2.01 Environmental Statement Volume 1 Appendix B Design Principles (PDF, 424 KB)
Other
6.2.03 Environmental Statement Volume 3 Appendices A to A4 (PDF, 3 MB)
Other
2.17 Albert Embankment Foreshore Plans (PDF, 28 MB)
Other
7.05 Final Report on Site Selection Process Volume 5 Barn Elms (PDF, 4 MB)
Other
7.10.06 Transport Assessment King Georges Park (PDF, 20 MB)
Other
7.19.2 Code of Construction Practice Part B Acton Storm Tanks (PDF, 358 KB)
Other
7.19.2 Code of Construction Practice Part B Cremorne Wharf Depot (PDF, 309 KB)
Other
6.2.03 Environmental Statement Volume 3 Appendices F to M (PDF, 31 MB)
Other
6.2.26 Environmental Statement Volume 26 Beckton Sewage Treatment Works Site Assessment Sections 1 to 15 (PDF, 2 MB)
Other
7.05 Final Report on Site Selection Process Volume 16 Victoria Embankment Foreshore (PDF, 3 MB)
Other
7.10.23 Transport Assessment Beckton Sewage Treatment Works (PDF, 19 MB)
Other
7.20.04 Navigational Issues and Preliminary Risk Assessment Kirtling Street Annexes Hazard Logs (PDF, 2 MB)
Other
8.1.8 Supplementary Report to Government Summary (PDF, 591 KB)
Other
6.2.18 Environmental Statement Volume 18 Figures Part B (PDF, 31 MB)
Other
6.2.26 Environmental Statement Volume 26 Appendices A to N (PDF, 14 MB)
Other
5.3 Heritage Statement Appendix J Blackfriars Bridge Foreshore (PDF, 42 MB)
Other
7.10 Transport Assessment Main Report (PDF, 24 MB)
Other
7.07 Sustainability Statement Appendix B12 Heathwall Pumping Station (PDF, 229 KB)
Other
5.3 Heritage Statement Appendix F Chelsea Embankment Foreshore (PDF, 34 MB)
Other
6.2.27 Environmental Statement Volume 27 Appendices A to N (PDF, 6 MB)
Other
7.05 Final Report on Site Selection Process Volume 9 Carnwath Road Riverside (PDF, 976 KB)
Other
5.1 Consultation Report Section 25 Blackfriars Bridge Foreshore (PDF, 242 KB)
Other
7.01 Appendix B Planning Assessment Hammersmith Pumping Station (PDF, 5 MB)
Other
7.10.18 Transport Assessment King Edward Memorial Park Foreshore (PDF, 22 MB)
Other
6.2.08 Environmental Statement Volume 8 Appendices A to N (PDF, 12 MB)
Other
5.1 Consultation Report Appendices A to U (PDF, 26 MB)
Other
7.04 Design and Access Statement Chelsea Embankment Foreshore (PDF, 14 MB)
Other
7.04 Design and Access Statement King Edward Memorial Park Foreshore (PDF, 10 MB)
Other
7.01 Appendix C Planning Assessment Barn Elms (PDF, 6 MB)
Other
7.04 Design and Access Statement Hammersmith Pumping Station (PDF, 6 MB)
Other
6.2.18 Environmental Statement Volume 18 Figures Part A (PDF, 29 MB)
Other
6.2.03 Environmental Statement Volume 3 Appendices B to D (PDF, 25 MB)
Other
7.01 Appendix R Planning Assessment Shad Thames Pumping Station (PDF, 5 MB)
Other
7.20.03 Navigational Issues and Preliminary Risk Assessment Albert Embankment Foreshore Main Report and Appendices (PDF, 11 MB)
Other
5.1 Consultation Report Section 34 Beckton Sewage Treatment Works (PDF, 152 KB)
Other
7.07 Sustainability Statement Appendix B18 King Edward Memorial Park Foreshore (PDF, 229 KB)
Other
7.10.20 Transport Assessment Deptford Church Street (PDF, 23 MB)
Other
5.1 Consultation Report Section 15 Dormay Street (PDF, 182 KB)
Other
5.1 Consultation Report Appendix Y Report on post phase two consultation (PDF, 3 MB)
Other
7.10.24 Transport Assessment Minor Works Sites (PDF, 19 MB)
Other
7.01 Appendix H Planning Assessment Falconbrook Pumping Station (PDF, 5 MB)
Other
7.05 Final Report on Site Selection Process Volume 22 Greenwich Pumping Station (PDF, 8 MB)
Other
7.11 Draft Project Framework Travel Plan (PDF, 439 KB)
Other
8.1.3 Thames Tideway Strategic Study Objectives Working Group Volume 1 (PDF, 2 MB)
Other
7.01 Appendix A Planning Assessment Acton Storm Tanks (PDF, 7 MB)
Other
6.2.03 Environmental Statement Volume 3 Figures Part A (PDF, 37 MB)
Other
7.20.07 Navigational Issues and Preliminary Risk Assessment Chelsea Embankment Foreshore Annexes Hazard Logs (PDF, 3 MB)
Other
5.1 Consultation Report Section 20 Chelsea Embankment Foreshore (PDF, 227 KB)
Other
Other
7.10.16 Transport Assessment Shad Thames Pumping Station (PDF, 22 MB)
Other
8.1.4 Thames Tideway Strategic Study Objectives Working Group Volume 2 (PDF, 1 MB)
Other
7.07 Sustainability Statement Appendix B19 Earl Pumping Station (PDF, 241 KB)
Other
7.21 Stettlement Information Paper (PDF, 388 KB)
Other
7.12 Health Impact Assessment Main Report (PDF, 1 MB)
Other
5.1 Consultation Report Section 11 Acton Storm Tanks (PDF, 224 KB)
Other
5.1 Consultation Report Section 19 Cremorne Wharf Depot (PDF, 261 KB)
Other
7.04 Design and Access Statement Earl Pumping Station (PDF, 10 MB)
Other
5.3 Heritage Statement Appendix L Chambers Wharf (PDF, 11 MB)
Other
7.01 Appendix T Planning Assessment King Edward Memorial Park Foreshore (PDF, 8 MB)
Other
6.2.14 Environmental Statement Volume 14 Appendices A to N (PDF, 12 MB)
Other
5.1 Consultation Report Section 12 Hammersmith Pumping Station (PDF, 193 KB)
Other
6.2.26 Environmental Statement Volume 26 Figures (PDF, 26 MB)
Other
7.05 Final Report on Site Selection Process Volume 12 Chelsea Embankment Foreshore (PDF, 4 MB)
Other
7.01 Appendix Q Planning Assessment Blackfriars Bridge Foreshore (PDF, 9 MB)
Other
7.14 Air Management Plan (PDF, 2 MB)
Other
6.2.01 Environmental Statement Volume 1 Appendix C Compensation Programme (PDF, 3 MB)
Other
2.26 Bekesbourne Street Plans (PDF, 10 MB)
Other
5.1 Consultation Report Section 18 Falconbrook Pumping Station (PDF, 192 KB)
Other
7.20.01 Navigational Issues and Preliminary Risk Assessment Putney Embankment Foreshore Annexes Hazard Logs (PDF, 3 MB)
Other
6.2.09 Environmental Statement Volume 9 King Georges Park Site Assessment Sections 1 to 15 (PDF, 3 MB)
Other
6.2.23 Environmental Statement Volume 23 Deptford Church Street Site Assessment Sections 1 to 15 (PDF, 6 MB)
Other
6.2.13 Environmental Statement Volume 13 Chelsea Embankment Foreshore Sections 1 to 15 (PDF, 4 MB)
Other
6.2.24 Environmental Statement Volume 24 Appendices A to N (PDF, 33 MB)
Other
5.1 Consultation Report Appendices AA to CC (PDF, 1 MB)
Other
6.2.18 Environmental Statement Volume 18 Blackfriars Bridge Foreshore Site Assessment Sections 1 to 15 (PDF, 7 MB)
Other
6.2.25 Environmental Statement Volume 25 Appendices A to N (PDF, 5 MB)
Other
7.24 Daylight Sunlight Assessment (PDF, 2 MB)
Other
5.3 Heritage Statement Appendix N Greenwich Pumping Station (PDF, 19 MB)
Other
7.10.22 Transport Assessment Abbey Mills Pumping Station (PDF, 21 MB)
Other
6.2.03 Environmental Statement Volume 3 Appendix A4 Annexes D1 to D14 (PDF, 7 MB)
Other
6.2.17 Environmental Statement Volume 17 Figures (PDF, 48 MB)
Other
6.2.19 Environmental Statement Volume 19 Appendices A to N (PDF, 4 MB)
Other
7.07 Sustainability Statement Appendix B13 Albert Embankment Foreshore (PDF, 244 KB)
Other
7.19.2 Code of Construction Practice Part B King Edward Memorial Park Foreshore (PDF, 282 KB)
Other
6.2.21 Environmental Statement Volume 21 Appendices A to N (PDF, 19 MB)
Other
5.1 Consultation Report Section 14 Putney Embankment Foreshore (PDF, 383 KB)
Other
7.19.2 Code of Construction Practice Part B Carnwath Road Riverside (PDF, 289 KB)
Other
7.20.09 Navigational Issues and Preliminary Risk Assessment Victoria Embankment Foreshore Main Report and Appendices (PDF, 8 MB)
Other
7.19.2 Code of Construction Practice Part B Chelsea Embankment Foreshore (PDF, 263 KB)
Other
8.1.6 Thames Tideway Strategic Study Solutions Working Group Volume 2 (PDF, 1 MB)
Other
6.2.21 Environmental Statement Volume 21 Figures (PDF, 41 MB)
Other
5.1 Consultation Report Section 21 Kirtling Street (PDF, 268 KB)
Other
7.01 Appendix P Planning Assessment Victoria Embankment Foreshore (PDF, 8 MB)
Other
6.2.14 Environmental Statement Volume 14 Figures (PDF, 34 MB)
Other
5.1 Consultation Report Section 30 Greenwich Pumping Station (PDF, 399 KB)
Other
7.05 Final Report on Site Selection Process Volume 15 Albert Embankment Foreshore (PDF, 9 MB)
Other
6.2.16 Environmental Statement Volume 16 Appendices A to N (PDF, 18 MB)
Other
5.3 Heritage Statement Appendix M Deptford Church Street (PDF, 16 MB)
Other
8.2.2 Objectives and Compliance Working Group Report Volume 1 (PDF, 522 KB)
Other
5.1 Consultation Report Section 28 Earl Pumping Station (PDF, 205 KB)
Other
7.07 Sustainability Statement Appendix B24 Bekesbourne Street (PDF, 226 KB)
Other
6.2.02 Environmental Statement Volume 2 Assessment Methodology Sections 1 to 15 (PDF, 5 MB)
Other
7.04 Design and Access Statement Deptford Church Street (PDF, 10 MB)
Other
7.05 Final Report on Site Selection Process Volumes 1 and 2 (PDF, 13 MB)
Other
7.07 Sustainability Statement Appendix B7 Carnwath Road Riverside (PDF, 238 KB)
Other
8.1.5 Thames Tideway Strategic Study Solutions Working Group Volume 1 (PDF, 2 MB)
Other
7.04 Design and Access Statement Sections 1 to 5 (PDF, 14 MB)
Other
7.05 Final Report on Site Selection Process Volume 13 Kirtling Street (PDF, 1,003 KB)
Other
7.19.2 Code of Construction Practice Part B Chambers Wharf (PDF, 284 KB)
Other
8.2.7 Planning and Environment Working Group Report (PDF, 813 KB)
Other
3.1 The Draft Thames Water Utilities Limited Development Consent Order (PDF, 1 MB)
Other
6.2.19 Environmental Statement Volume 19 Figures (PDF, 23 MB)
Other
2.20 Shad Thames Pumping Station Plans (PDF, 12 MB)
Other
7.20.02 Navigational Issues and Preliminary Risk Assessment Blackfriars Bridge Foreshore Main Report and Appendices (PDF, 16 MB)
Other
2.02 Land acquisition plans (PDF, 30 MB)
Other
2.19 Blackfriars Bridge Foreshore Plans (PDF, 47 MB)
Other
5.1 Consultation Report Section 31 King Edward Memorial Park Foreshore (PDF, 472 KB)
Other
6.2.19 Environmental Statement Volume 19 Shad Thames Pumping Station Site Assessment Sections 1 to 15 (PDF, 3 MB)
Other
6.2.25 Environmental Statement Volume 25 Figures (PDF, 31 MB)
Other
7.07 Sustainability Statement Appendix B10 Chelsea Embankment Foreshore (PDF, 229 KB)
Other
7.15 Skills and Employment Strategy (PDF, 2 MB)
Other
8.2.5 Solutions Working Group Report Volume 2 (PDF, 478 KB)
Other
3.2 Explanatory Memorandum (PDF, 524 KB)
Other
6.2.23 Environmental Statement Volume 23 Appendices A to N (PDF, 15 MB)
Other
7.04 Design and Access Statement Blackfriars Bridge Foreshore (PDF, 18 MB)
Other
7.04 Design and Access Statement Beckton Sewage Treatment Works (PDF, 5 MB)
Other
7.07 Sustainability Statement Appendix B2 Hammersmith Pumping Station (PDF, 215 KB)
Other
7.10.19 Transport Assessment Earl Pumping Station (PDF, 20 MB)
Other
8.3 Needs Report Appendix A Regulatory Impact Report (PDF, 2 MB)
Other
5.3 Heritage Statement Appendix K Shad Thames Pumping Station (PDF, 10 MB)
Other
7.04 Design and Access Statement Greenwich Pumping Station (PDF, 9 MB)
Other
7.07 Sustainability Statement Appendix B20 Deptford Church Street (PDF, 229 KB)
Other
7.16 Equalities Impact Assessment (PDF, 14 MB)
Other
6.2.06 Environmental Statement Volume 6 Figures (PDF, 36 MB)
Other
2.29 Project wide Ventilation Columns Plans (PDF, 2 MB)
Other
7.01 Appendix F Planning Assessment King Georges Park (PDF, 6 MB)
Other
7.05 Final Report on Site Selection Process Volume 23 Abbey Mills Pumping Station (PDF, 958 KB)
Other
7.07 Sustainability Statement Appendix B23 Beckton Sewage Treatment Works (PDF, 222 KB)
Other
8.3 Needs Report Appendix D Sewer Separation Feasibility Study Final Report (PDF, 12 MB)
Other
2.04 Crown and special category land plan (PDF, 9 MB)
Other
7.04 Design and Access Statement Bekesbourne Street (PDF, 4 MB)
Other
7.05 Final Report on Site Selection Process Volume 21 Deptford Church Street (PDF, 5 MB)
Other
7.19.2 Code of Construction Practice Part B Deptford Church Street (PDF, 333 KB)
Other
8.3 Needs Report Appendix E Potential Source Control and SuDS Application (PDF, 10 MB)
Other
2.08 Putney Embankment Foreshore Plans (PDF, 26 MB)
Other
2.28 Beckton Sewage Treatment Works Plans (PDF, 16 MB)
Other
5.1 Consultation Report Section 35 Jews Row (PDF, 142 KB)
Other
7.04 Design and Access Statement Heathwall Pumping Station (PDF, 11 MB)
Other
7.10.10 Transport Assessment Chelsea Embankment Foreshore (PDF, 29 MB)
Other
7.19.2 Code of Construction Practice Part B Beckton Sewage Treatment Works (PDF, 294 KB)
Other
7.23 Resilience to Change (PDF, 1 MB)
Other
7.01 Planning Statement Main Report (PDF, 6 MB)
Other
7.19.2 Code of Construction Practice Part B Falconbrook Pumping Station (PDF, 292 KB)
Other
8.2.3 Objectives and Compliance Working Group Report Volume 2 (PDF, 714 KB)
Other
7.19.2 Code of Construction Practice Part B Victoria Embankment Foreshore (PDF, 290 KB)
Other
7.19.2 Code of Construction Practice Part B Kirtling Street (PDF, 252 KB)
Other
6.2.27 Environmental Statement Volume 27 Figures (PDF, 18 MB)
Other
6.2.12 Environmental Statement Volume 12 Appendices A to N (PDF, 20 MB)
Other
2.23 Deptford Church Street Plans (PDF, 18 MB)
Other
5.1 Consultation Report Appendix V Supplementary report on phase one consultation (PDF, 4 MB)
Other
6.2.08 Environmental Statement Volume 8 Dormay Street Site Assessment Sections 1 to 15 (PDF, 3 MB)
Other
6.2.06 Environmental Statement Volume 6 Barn Elms Site Assessment Sections 1 to 15 (PDF, 3 MB)
Other
7.04 Design and Access Statement Dormay Street (PDF, 6 MB)
Other
7.07 Sustainability Statement Appendix B16 Shad Thames Pumping Station (PDF, 227 KB)
Other
7.10.13 Transport Assessment Albert Embankment Foreshore (PDF, 12 MB)
Other
7.20.10 Navigational Issues and Preliminary Risk Assessment Chambers Wharf Annexes Hazard Logs (PDF, 2 MB)
Other
6.2.06 Environmental Statement Volume 6 Appendices A to N (PDF, 11 MB)
Other
8.3 Needs Report Appendix F Tideway Fisheries Review (PDF, 546 KB)
Other
2.30 Red line boundary shapefiles (ZIP, 148 KB)
Other
7.07 Sustainability Statement Appendix B21 Greenwich Pumping Station (PDF, 267 KB)
Other
7.19.2 Code of Construction Practice Part B Blackfriars Bridge Foreshore (PDF, 478 KB)
Other
7.01 Appendix Y Planning Assessment Beckton Sewage Treatment Works (PDF, 6 MB)
Other
8.1.1 Thames Tideway Strategic Study Executive Summary (PDF, 325 KB)
Other
7.01 Appendix U Planning Assessment Earl Pumping Station (PDF, 6 MB)
Other
7.04 Design and Access Statement Carnwath Road Riverside (PDF, 13 MB)
Other
7.07 Sustainability Statement Appendix B15 Blackfriars Bridge Foreshore (PDF, 244 KB)
Other
7.10.17 Transport Assessment Chambers Wharf (PDF, 22 MB)
Other
6.2.27 Environmental Statement Volume 27 Minor Works Sites Assessment Sections 1 to 15 (PDF, 4 MB)
Other
5.1 Consultation Report Section 29 Deptford Church Street (PDF, 478 KB)
Other
5.3 Heritage Statement Appendix A Hammersmith Pumping Station (PDF, 10 MB)
Other
7.01 Appendix L Planning Assessment Cremorne Wharf Depot (PDF, 6 MB)
Other
7.19.2 Code of Construction Practice Part B Earl Pumping Station (PDF, 300 KB)
Other
7.01 Appendix E Planning Assessment Dormay Street (PDF, 5 MB)
Other
7.05 Final Report on Site Selection Process Volume 14 Heathwall Pumping Station (PDF, 6 MB)
Other
5.1 Consultation Report Sections 36 to 38 (PDF, 555 KB)
Other
7.04 Design and Access Statement Albert Embankment Foreshore (PDF, 11 MB)
Other
2.24 Greenwich Pumping Station Plans (PDF, 22 MB)
Other
7.20.02 Navigational Issues and Preliminary Risk Assessment Blackfriars Bridge Foreshore Annexes Hazard Logs (PDF, 2 MB)
Other
5.1 Consultation Report Section 22 Heathwall Pumping Station (PDF, 205 KB)
Other
7.08 Energy and Carbon Footprint Report (PDF, 2 MB)
Other
7.05 Final Report on Site Selection Process Volume 19 King Edward Memorial Park Foreshore (PDF, 5 MB)
Other
7.07 Sustainability Statement Appendix B1 Acton Storm Tanks (PDF, 230 KB)
Other
7.20.08 Navigational Issues and Preliminary Risk Assessment Heathwall Pumping Station Main Report and Appendices (PDF, 9 MB)
Other
7.10.03 Transport Assessment Barn Elms (PDF, 24 MB)
Other
7.12 Health Impact Assessment Appendix F Site Assessments (PDF, 2 MB)
Other
7.10 Transport Assessment Annex A Baseline data GIS database (ZIP, 538 MB)
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.